contractors ENGINEERED SOLUTIONS

Size: px
Start display at page:

Download "contractors ENGINEERED SOLUTIONS"

Transcription

1 contractors ENGINEERED SOLUTIONS

2 Custom Engineered Floor System for Mid- and High-Rise Structures Engineered Solutions From 2» Long-Span Metal Dek and structural steel floor assembly» Prefabricated panels One panel can cover up to 1,200 sq. ft. Panels can clear span up to 35 ft.» Performance tested Fire Sound and Impact Vibration Structural» Built-in lineal chase way» Unique assembly using traditional constuction techniques and materials Design assistance provided for Versa-Floor [HR]* projects *patents pending

3 Custom Engineered Composite Floor System SPEED + SAFETY = MONEY» Reduce project schedule by up to 50%*» Double or triple floor installation speed* (15,000 sq. ft. per crane per day)*» Enhance jobsite safety*» Reduce workforce *Compared to CIP construction Floor system Benefits Mid- & High-Rise Structures» Decreases weight of structure Reduces foundation requirements Lessens seismic impact» Reduces column footprint Facilitates space planning Produces 2% more useable floor space» Provides flexibility Allows for core drilling where needed Offers options for suspending components Finishes with painted Dek or gypsum ceilings Panelization» Creates vertically aligned lineal chase way for M/E/P» Creates flush spandrel beam condition (Allows floor-to-ceiling glass curtain wall) Jobsite Benefits Safety with Panelization» Assembles at grade level» Carries welded wire fabric and rebar bundles when lifted» Includes fall protection before lifting Vertical Transportation of Panels» Needs fewer crane picks» Carries additional materials when lifted» Reduces burden on man lifts Production» Provides for controlled output» Facilitates quality control» Allows for panel inspection before lifting» Installs with limited to no shoring» Allows timely access to trades Engineering Performance» Gravity and shear load tested» UL 2-hour unprotected fire rating» Sound Transmission Class up to 57 db» Impact Insulation Class up to 57 db» Vibration conforms to AISC Design Guide 11 3

4 Custom Engineered Composite Floor System M/E/P Riser Block-Out Negative Reinforcement as Required M/E/P Chaseway Created by Versa-Floor [HR] Panels (See detail page 6) Normal or Light Weight Concrete Reinforced Spandrel Beam (See detail page 6) Welded Wire Fabric Versa-Floor [HR] Prefabricated Panel Multi-Story Structural Steel Column Deep-Dek Composite Floor Dek with Factory Closed Ends Spandrel Beam Assembly Seat Angle for Versa-Floor [HR] Panel Installation PrOCESS 1. Set multi-story structural steel columns 2. Install Versa-Floor [HR] panelized sections 3. Install temporary shoring beams, if required 4. Install Versa-Dek at corridors and balconies 5. Block out chaseways where openings are required 6. Install welded wire fabric 7. Install negative reinforcement, if required 8. Install spandrel beam system at perimeter 9. Pour normal or light weight concrete Versa-Floor [HR] Panel to Column Connection (See detail page 6) M/E/P Riser Block-Out in Floors Below Versa-Dek Composite at Corridors 4 5

5 Versa-Floor [HR] panel cut section at reinforced spandrel beam Versa-Floor [HR] panels forming M/E/P chase way Versa-Floor [HR] panel-to-column connection (Deep-Dek Composite section partially removed & opposite channel shown for clarity) 6

6 Custom Engineered Composite Floor System Design Flexibility Flush spandrel beam condition allows floor-to-ceiling glass curtain wall. Versa-Floor [HR] creates unobstructed ceilings without filler beams. Versa-Floor [HR] panels create aligned lineal chase ways, which simplify M/E/P installation. Versa-Floor [HR] has no post-tension strands to hinder M/E/P installation. 7

7 versafloor.com Contact the Versa-Floor [HR] Design Team for design and technical assistance. Main Office: 650 Rosewood Drive» Columbia, SC phone (888) » Main Office: 1730 West Reno» Oklahoma City, OK phone (405) » Metal Dek Group v07.09

ENGINEERS ENGINEERED SOLUTIONS DEEP-DEK COMPOSITE COMPOSITE LONG SPAN FLOOR DECK.

ENGINEERS ENGINEERED SOLUTIONS DEEP-DEK COMPOSITE COMPOSITE LONG SPAN FLOOR DECK. ENGINEERS ENGINEERED SOLUTIONS DEEP-DEK COMPOSITE COMPOSITE LONG SPAN FLOOR DECK www.metaldek.com DEEP-DEK 4.5 COMPOSITE DEEP-DEK 6 COMPOSITE DEEP-DEK COMPOSITE Deep-Dek Composite* is a long-span composite

More information

DEEP-DEK COMPOSITE A VERSA-FLOOR SYSTEM

DEEP-DEK COMPOSITE A VERSA-FLOOR SYSTEM ENGINEERS ENGINEERED SOLUTIONS DEEP-DEK COMPOSITE A VERSA-FLOOR SYSTEM LONG SPAN COMPOSITE FLOOR SYSTEM DEEP-DEK COMPOSITE A VERSA-FLOOR SYSTEM Deep-Dek Composite A Versa-Floor System Deep-Dek Composite*

More information

ENGINEERED SOLUTIONS VERSA-DEK COMPOSITE 3.5LS COMPOSITE LONG SPAN FLOOR DECK.

ENGINEERED SOLUTIONS VERSA-DEK COMPOSITE 3.5LS COMPOSITE LONG SPAN FLOOR DECK. E N G I N E E R S ENGINEERED SOUTIONS VERSA-DEK COMPOSITE 3.5S COMPOSITE ONG SPAN FOOR DECK www.metaldek.com VERSA-DEK COMPOSITE 3.5S VERSA-DEK COMPOSITE 3.5S Dovetail-shaped structural composite Dek engineered

More information

Caitlin Ferrell Structural Option Dr. Boothby, AE Faculty Consultant. Erie Convention Center and Sheraton Hotel

Caitlin Ferrell Structural Option Dr. Boothby, AE Faculty Consultant. Erie Convention Center and Sheraton Hotel Caitlin Ferrell Structural Option Dr. Boothby, AE Faculty Consultant Erie Convention Center and Sheraton Hotel Erie, Pennsylvania Technical Report #2: Pro-Con Structural Study of Alternate Floor Systems

More information

Structural Steel Building Systems NATIONWIDE DESIGN, MANUFACTURE AND DELIVERY

Structural Steel Building Systems NATIONWIDE DESIGN, MANUFACTURE AND DELIVERY Structural Steel Building Systems NATIONWIDE DESIGN, MANUFACTURE AND DELIVERY Table of Contents Applications Overview... 4-5 Roofing and Flooring Systems... 6-7 Ceiling and Cladding Systems... 8-9 Long-Span

More information

PRESENTATION PLAN A MODEL COMPARISON FLOOR CONSTRUCTION

PRESENTATION PLAN A MODEL COMPARISON FLOOR CONSTRUCTION PRESENTATION PLAN A MODEL COMPARISON FLOOR CONSTRUCTION An overview of costing strategies for wood framed construction elements CREATING A PROJECT ENDLESS POSSIBILITIES COMPATORS LIST A FLOOR Cast in Place

More information

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site Installing DELTABEAM Installation of DELTABEAM These DELTABEAM installation instructions are intended to complement the project s erection plan. Peikko s technical support can help with the erection plan

More information

HAMBRO COMPOSITE FLOOR SYSTEM

HAMBRO COMPOSITE FLOOR SYSTEM HAMBRO COMPOSITE FLOOR SYSTEM OUR EXPERTISE AT YOUR SERVICE Canam has been offering owners, real estate developers, architects, engineers and contractors an array of construction solutions since 1970.

More information

TECHNICAL REPORT II STRUCTURAL STUDY OF ALTERNATE FLOOR SYSTEMS

TECHNICAL REPORT II STRUCTURAL STUDY OF ALTERNATE FLOOR SYSTEMS TECHNICAL REPORT II STRUCTURAL STUDY OF ALTERNATE FLOOR SYSTEMS Chris Vanaskie Structural Peninsula Regional Medical Center Salisbury, MD December 22, 2008 TABLE OF CONTENTS Executive Summary... 3 Introduction...

More information

Modular Wood Framing Goes Vertical

Modular Wood Framing Goes Vertical Modular Wood Framing Goes Vertical By: Troy Bean, P.E., S.E. DCI Engineers January 2013 The Wood Products Council is a Registered Provider with. Credit(s) earned on completion of this program will be reported

More information

AISC Steel & Timber Research for High-Rise Residential Buildings

AISC Steel & Timber Research for High-Rise Residential Buildings AISC Steel & Timber Research for High-Rise Residential Buildings Final Report December 4 th, 2017 SOM Designed Benchmark Concrete Building Skidmore, Owings, and Merrill, LLP 2017 224s Michigan Avenue Suite

More information

STEEL STRUCTURAL SYSTEMS

STEEL STRUCTURAL SYSTEMS STEEL STRUCTURAL SYSTEMS Steel elements are of two basic types: Structural steel shapes are formed into their final shapes by hot-rolling. This method produces such common elements as wide flange sections,

More information

TECHNICAL REPORT 1. Structural Concepts / Structural Existing Conditions. Penn State Hershey Medical Center Children s Hospital. Hershey, Pennsylvania

TECHNICAL REPORT 1. Structural Concepts / Structural Existing Conditions. Penn State Hershey Medical Center Children s Hospital. Hershey, Pennsylvania TECHNICAL REPORT 1 Structural Concepts / Structural Existing Conditions Penn State Hershey Medical Center Children s Hospital Matthew V Vandersall The Pennsylvania State University Architectural Engineering

More information

HAMBRO COMPOSITE FLOOR SYSTEM

HAMBRO COMPOSITE FLOOR SYSTEM HAMBRO COMPOSITE FLOOR SYSTEM OUR EXPERTISE AT YOUR SERVICE Canam has been offering owners, real estate developers, architects, engineers and contractors an array of construction solutions since 1970.

More information

Installing metal decking, curtain walls, window walls, siding systems, miscellaneous metals, ornamental iron, and similar materials; and

Installing metal decking, curtain walls, window walls, siding systems, miscellaneous metals, ornamental iron, and similar materials; and Steel Erection Plan for Construction Purpose Company Name must meet the requirements of OSHA's Steel Erection standard (29 CFR 1926, Subpart R). This Steel Erection Plan for Construction is our company's

More information

Statement of Special Inspections Michigan Building Code 2012 (MBC 2012)

Statement of Special Inspections Michigan Building Code 2012 (MBC 2012) Gaines Charter Township 8555 Kalamazoo Ave SE Caledonia MI 49316 PH: 616 698-6640 Fax: 616 698-2490 www.gainestownship.org Building Department Statement of Special Inspections Michigan Building Code 2012

More information

Structural Technical Report #2 By Robert Whitaker

Structural Technical Report #2 By Robert Whitaker Structural Technical Report #2 By Robert Whitaker Robert Whitaker Structural ~ Parfitt Parkview at Bloomfield Station Bloomfield, NJ 10-31-05 Executive Summary This report covers the comparative redesign

More information

LIGHT-GAUGE PANELIZED WALL SYSTEMS. Michael Waggoner Mark Schroeder

LIGHT-GAUGE PANELIZED WALL SYSTEMS. Michael Waggoner Mark Schroeder LIGHT-GAUGE PANELIZED WALL SYSTEMS Michael Waggoner Mark Schroeder INTRODUCTION Development of Light-Gauge Panelized Wall Systems Selecting the Right Framing Systems Building Code Design Considerations

More information

Library In Metropolitan Washington, D.C.

Library In Metropolitan Washington, D.C. 1 Library In Metropolitan Washington, D.C. Penn State Architectural Engineering Senior Capstone Project Rob Leicht Picture Provided by Multivista 2 Picture Provided by Multivista 3 Building Name: Library

More information

Prefabricated Light Weight Steel Structures. Systems Guide WALLS, FLOORS, TRUSSES

Prefabricated Light Weight Steel Structures. Systems Guide WALLS, FLOORS, TRUSSES Prefabricated Light Weight Steel Structures WALLS, FLOORS, TRUSSES www.psiincusa.com 14869 Persistence Drive Woodbridge, Virginia 22191 Phone: 703.550.1466 Fax: 703-550-0486 Systems Guide Introduction

More information

Temecula Medical Center Temecula, CA

Temecula Medical Center Temecula, CA Temecula Medical Center Temecula, CA Technical Assignment #2 Sean F. Beville The Pennsylvania State University Architectural Engineering Structural Option Senior Thesis Project Student Advisor: Thomas

More information

William W. Wilkins Professional Building Columbus, Ohio

William W. Wilkins Professional Building Columbus, Ohio William W. Wilkins Professional Building Columbus, Ohio Technical Assignment 1 October 5, 2006 Michelle Structural Option AE 481W Senior Thesis Faculty Advisor: Dr. Boothby Table of Contents Executive

More information

The Perfect Choice for Mezzanines in Custom Metal Buildings

The Perfect Choice for Mezzanines in Custom Metal Buildings The Perfect Choice for Mezzanines in Custom Metal Buildings Ecospan composite floor system. The Ecospan Composite Floor System is an innovative, simple, effective and economical method of providing all

More information

Structural Inspection

Structural Inspection General: Background: An inspection and structural analysis have been performed for the purpose of evaluating the buildings structural systems and components. A full set of structural drawings was utilized

More information

Structural Technical Report I October 5, 2006 Structural Concepts / Structural Existing Conditions Report

Structural Technical Report I October 5, 2006 Structural Concepts / Structural Existing Conditions Report 1 THE ODYSSEY ARLINGTON, VA Aaron Snyder Structural Option Advisor: M. Kevin Parfitt, PE Structural Technical Report I October 5, 2006 Structural Concepts / Structural Existing Conditions Report Executive

More information

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014 STATE STRUCTION FUND DIRECTIVE 5-1 Issue date: October 2014 STRUCTURAL STEEL 1. General: It is the Fund's policy that the design of the structural steel is the prime responsibility of the project's Structural

More information

MOUNTAIN STATE BLUE CROSS BLUE SHIELD HEADQUARTERS

MOUNTAIN STATE BLUE CROSS BLUE SHIELD HEADQUARTERS MOUNTAIN STATE BLUE CROSS BLUE SHIELD HEADQUARTERS PARKERSBURG, WEST VIRGINIA DOMINIC MANNO STRUCTURAL OPTION FACULTY CONSULTANT: DR. ANDRES LEPAGE Technical Report 3 11-21-08 TABLE OF CONTENTS TABLE OF

More information

SPECIAL INSPECTION AGREEMENT

SPECIAL INSPECTION AGREEMENT PART 1 STATEMENT OF SPECIAL INSPECTIONS When special inspection is required to be performed in accordance with International Building Code Chapter 17, a building permit cannot be issued until a statement

More information

Project Address: Name of Person Completing Form:

Project Address: Name of Person Completing Form: Statement of Inspections This form is provided as a way to list aspects of the project that require special inspection and testing in accordance with IBC Sections 107.1, 1704, and 1705 and define duties

More information

181 Fremont San Francisco, CA. Tech Report 3 10/17/2014. PSUAE Structural Option Advisor: Dr. Thomas Boothby

181 Fremont San Francisco, CA. Tech Report 3 10/17/2014. PSUAE Structural Option Advisor: Dr. Thomas Boothby 181 Fremont San Francisco, CA Tech Report 3 10/17/2014 PSUAE Structural Option Advisor: Dr. Thomas Boothby Caroline Klatman cjk5258@psu.edu October 17, 2014 Dr. Thomas Boothby The Pennsylvania State University

More information

Structural Redesign Gravity System

Structural Redesign Gravity System Redesign Gravity System Design Considerations A composite floor system was used for this design to maximize the efficiency of the material being used. This type of system requires less material and provides

More information

A Composite Structural Steel and Prestressed Concrete Beam for Building Floor Systems

A Composite Structural Steel and Prestressed Concrete Beam for Building Floor Systems University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln Architectural Engineering -- Dissertations and Student Research Architectural Engineering Spring 4-20-2012 A Composite Structural

More information

Matthew Kutzler. Structural Option Spring Buildings C and D Campus Square, Lehigh University Bethlehem, PA

Matthew Kutzler. Structural Option Spring Buildings C and D Campus Square, Lehigh University Bethlehem, PA Matthew Kutzler Structural Option Spring 2004 Buildings C and D Campus Square, Lehigh University Bethlehem, PA Located at Lehigh University in Bethlehem, PA Complex consists of four dormitories and a parking

More information

151 First Side. Technical Assignment 2 November 16 th, William J. Buchko. AE 481w Senior Thesis The Pennsylvania State University

151 First Side. Technical Assignment 2 November 16 th, William J. Buchko. AE 481w Senior Thesis The Pennsylvania State University November 16 th, 2007 William J. Buchko AE 481w Senior Thesis The Pennsylvania State University Thesis Advisor: Kevin Parfitt Table of Contents Executive Summary... 3 Structural System Overview Foundation...

More information

Executive Summary. Non-Composite Steel system 2- Way Flat Concrete Slab Wood Beam with Form Deck Pre-Cast Hollow Core Plank

Executive Summary. Non-Composite Steel system 2- Way Flat Concrete Slab Wood Beam with Form Deck Pre-Cast Hollow Core Plank Executive Summary This report is a description, analysis and comparison of the existing floor system and four alternatives. The proposed floor system for the Kenneth Langone Athletic and Recreation Center

More information

House of Sweden. Structural Study of Alternative Floor Systems K St. NW Washington, DC 20007

House of Sweden. Structural Study of Alternative Floor Systems K St. NW Washington, DC 20007 Structural Study of Alternative Floor Systems 2900 K St. NW 20007 The Pennsylvania State University Department of Architectural Engineering Senior Thesis 2008-2009 October 24, 20008 Prepared by: Prepared

More information

Table of Contents.2. Introduction...3 Gravity Loading and Deflections..4. Existing Structural System..8

Table of Contents.2. Introduction...3 Gravity Loading and Deflections..4. Existing Structural System..8 WISCONSIN PLACE RESIDENTIAL TECHNICAL ASSIGNMENT 2 OCTOBER 29, 2007 KURT KRASAVAGE THE PENNSYLVANIA STATE UNIVERSITY STRUCTURAL OPTION FACULTY ADVISOR: DR. ALI MEMARI 1 Table of Contents Table of Contents.2

More information

Southwest Housing, Arizona State University

Southwest Housing, Arizona State University Prepared by KSENIA TRETIAKOVA Structural Option 01.09.2012 Architectural Engineering Pennsylvania State University 2012 Southwest Housing, Arizona State University Technical Report #3 Lateral System 01.09.2012

More information

JAMES DEAN BAKER ALCOA CORPORATE CENTER STRUCTURAL OPTION 201 ISABELLA STEET

JAMES DEAN BAKER ALCOA CORPORATE CENTER STRUCTURAL OPTION 201 ISABELLA STEET JAMES DEAN BAKER STRUCTURAL OPTION ALCOA CORPORATE CENTER 201 ISABELLA STEET PRESENTATION OUTLINE Introduction Existing Conditions Structural Existing Conditions Design Goals and Criteria Suspension Design

More information

Structural Design Engineers 120 Montgomery Street, Suite 1410 San Francisco, California / Fax 415/

Structural Design Engineers 120 Montgomery Street, Suite 1410 San Francisco, California / Fax 415/ 120 Montgomery Street, Suite 1410 San Francisco, California 94104 415/781-1505 Fax 415/781-2718 sde@sdesf.com Rajendra Sahai, SE Principal John W. Laws, SE Principal Steven Lepisto, SE Principal STRUCTURAL

More information

SECTION COMPOSITE METAL DECKING

SECTION COMPOSITE METAL DECKING PART 1 GENERAL 1.1 DESCRIPTION SECTION 05 36 00 1. Use this section only for NCA projects. 2. Delete between // ---- // if not applicable to project. Also delete any other item or paragraph not applicable

More information

SECTION NON-LOAD BEARING WALL FRAMING. B. Section Furring and Lathing: Lath and furring for interior plaster applications.

SECTION NON-LOAD BEARING WALL FRAMING. B. Section Furring and Lathing: Lath and furring for interior plaster applications. SECTION 09.22.16 NON-LOAD BEARING WALL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Non-load bearing metal studs for wall assemblies. B. Area Separation and shaft wall framing products. 1.2 RELATED SECTIONS

More information

Hershey Research Park Building One. Technical Report 2. Jonathan Krepps Structural Option Advisor: Dr. Hanagan 10/12/12

Hershey Research Park Building One. Technical Report 2. Jonathan Krepps Structural Option Advisor: Dr. Hanagan 10/12/12 Hershey Research Park Building One Technical Report 2 Advisor: Dr. Hanagan 10/12/12 Table of Contents Executive Summary..3 Building Introduction 4 Structural Overview..5 Materials 9 Design Codes 10 Design

More information

Best Buy Corporate Building D (4) Richfield, MN

Best Buy Corporate Building D (4) Richfield, MN Best Buy Corporate Building D (4) Thesis Proposal Professor Boothby December 12 th, 2008 Executive Summary: The Best Buy Corporate Building D is a 6 story building with a total area of 304,610 square feet.

More information

FOUR. at the Fore BY RICHARD B. GARLOCK, P.E.

FOUR. at the Fore BY RICHARD B. GARLOCK, P.E. The first tower to open at the original World Trade Center site, 4WTC maximizes its space and views with creative column construction. FOUR at the Fore BY RICHARD B. GARLOCK, P.E. Joe Woolhead APRIL 2015

More information

Structural Technical Report 1 Structural Concepts / Structural Existing Conditions Report

Structural Technical Report 1 Structural Concepts / Structural Existing Conditions Report Michael A. Troxell Structural Option Advisor: Professor Parfitt College of Business Administration Oct. 5, 2005 Structural Technical Report 1 Structural Concepts / Structural Existing Conditions Report

More information

1000 CONNECTICUT AVENUE

1000 CONNECTICUT AVENUE 1000 CONNECTICUT AVENUE Gea Johnson Structural Option Faculty Advisor: Dr. Hanagan September 23, 2011 Revised: December 16, 2011 Washington DC Technical : Existing Conditions Table of Contents Executive

More information

Technical Report 3. Alyssa Stangl Structural Option Advisor Dr. Linda Hanagan L A J O L L A C O M M O N S P H A S E I I O F F I C E T O W E R

Technical Report 3. Alyssa Stangl Structural Option Advisor Dr. Linda Hanagan L A J O L L A C O M M O N S P H A S E I I O F F I C E T O W E R Technical Report 3 Alyssa Stangl Structural Option Advisor Dr. Linda Hanagan L A J O L L A C O M M O N S P H A S E I I O F F I C E T O W E R Site and Location La Jolla Commons, San Diego, California General

More information

La Jolla Commons Office Tower. Appendix Slides. Architecture Breadth. Dual Systems Check. Lateral System. Shear Wall Modeling. Verification.

La Jolla Commons Office Tower. Appendix Slides. Architecture Breadth. Dual Systems Check. Lateral System. Shear Wall Modeling. Verification. Appendix Slides Architecture Breadth Dual Systems Check Shear Wall Modeling Lateral System Verification Model Verification Vibrations Analysis Architecture Breadth 198 8 La Jolla Commons Office Tower Floor-to-Ceiling

More information

The ACR : Advanced Design Features for a Short Construction Schedule

The ACR : Advanced Design Features for a Short Construction Schedule Transactions of the 17 th International Conference on Structural Mechanics in Reactor Technology (SMiRT 17) Prague, Czech Republic, August 17 22, 2003 Paper # S01-3 The ACR : Advanced Design Features for

More information

Industry Standard Terms & Definitions Of The Steel Deck Institute

Industry Standard Terms & Definitions Of The Steel Deck Institute Industry Standard Terms & Definitions Of The Steel Deck Institute A specialized set of jargon to describe common terms used by manufacturers and other professionals associated with the usage of Steel Deck

More information

North Mountain IMS Medical Office Building

North Mountain IMS Medical Office Building North Mountain IMS Medical Office Building Phoenix, Arizona Michael Hopple Technical Assignment 2 October 29 th, 2007 AE 481W-Senior Thesis The Pennsylvania State University Faculty Adviser: Dr. Ali Memari,

More information

Structural Breadth Study

Structural Breadth Study Structural Breadth Study Connection Redesign Structural Breadth Study Connection Redesign Existing EIFS Connection The expansion project is a steel frame structure with concrete slab on deck. There is

More information

Bi-Directional Static Load Testing of Drilled Shafts

Bi-Directional Static Load Testing of Drilled Shafts Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 2, 2015 1.0 GENERAL This work shall consist of furnishing all

More information

Bi-Directional Static Load Testing of Drilled Shafts

Bi-Directional Static Load Testing of Drilled Shafts Supplemental Technical Specification for Bi-Directional Static Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (01/18) 1.0 GENERAL This work shall consist of furnishing all materials, equipment,

More information

Earth and Engineering Sciences Building University Park, Pennsylvania

Earth and Engineering Sciences Building University Park, Pennsylvania Executive Summary The Earth and Engineering Sciences building is a 4 story educational and laboratory facility. An additional basement level is located below grade and provides the foundation for the East

More information

SJI Updates Expanded Load Tables for Noncomposite Joists / Joist Girders and Development of New Composite Joist Series

SJI Updates Expanded Load Tables for Noncomposite Joists / Joist Girders and Development of New Composite Joist Series SJI Updates Expanded Load Tables for Noncomposite Joists / Joist Girders and Development of New Composite Joist Series SUMMARY David Samuelson Steel joists are growing in recognition as being a very economical

More information

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK DIVISION 5 - STRUCTURAL STEEL AND IRON WORK SECTION 05100 STRUCTURAL METAL FRAMING PART 1.00 GENERAL 1.01 SCOPE OF WORK A. Work Included: 1. 2. Structural steel complete in place. Steel joists complete

More information

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017 SECTION 053100 STEEL DECKING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

POINT. Making the. The highlights of High Point University s newest academic building are comprised of open volumes, and steel makes them happen.

POINT. Making the. The highlights of High Point University s newest academic building are comprised of open volumes, and steel makes them happen. The highlights of High Point University s newest academic building are comprised of open volumes, and steel makes them happen. Making the POINT BY CHARLES BOWMAN, PE THE NEW COTTRELL HALL, home of the

More information

Mechanical Engineer of Record: (Smoke Control Systems Only) Name & License Company. Others: Responsible Party Name & License Company

Mechanical Engineer of Record: (Smoke Control Systems Only) Name & License Company. Others: Responsible Party Name & License Company PRINCE WILLIAM COUNTY Department Development Services Building Development Division STATEMENT OF SPECIAL INSPECTIONS (Building/Other Structures other than Retaining Walls) Version 2015-12-31 Building Permit

More information

Table of Contents 2. Structural Systems.4 Foundations.4 Floor System...4 Columns..5 Lateral System...5

Table of Contents 2. Structural Systems.4 Foundations.4 Floor System...4 Columns..5 Lateral System...5 WISCONSIN PLACE RESIDENTIAL TECHNICAL ASSIGNMENT 1 OCTOBER 5, 2007 KURT KRASAVAGE THE PENNSYLVANIA STATE UNIVERSITY STRUCTURAL OPTION FACULTY ADVISOR: DR. ALI MEMARI Table of Contents Table of Contents

More information

Simplified Building Schematic for Typical Floor (Levels 9 through 22):

Simplified Building Schematic for Typical Floor (Levels 9 through 22): Introduction to Structural System Simplified Building Schematic for Typical Floor (Levels 9 through 22): Key: - Tower Columns - Tower Shear Walls - Parking Garage Columns - Parking Garage Shear Walls Solid

More information

Danielle Shetler - Structural option Courtyard by Marriott Lancaster, PA

Danielle Shetler - Structural option Courtyard by Marriott Lancaster, PA Structural Analysis Overview: During the structural analysis of the in Lancaster, Pa, a redesign of the lateral and gravity system from masonry bearing and shear walls to a staggered truss system was performed.

More information

S p a c e e l e v a t o r. Structure selection and design Prof Schierle 1

S p a c e e l e v a t o r. Structure selection and design Prof Schierle 1 S p a c e e l e v a t o r Structure selection and design Prof Schierle 1 Selection criteria: 1 Morphology 2 Capacity Limits 3 Code Requirements 4 Cost 5 Load Conditions 6 Resources and Technology 7 Sustainability

More information

SECTION STEEL DECKING

SECTION STEEL DECKING SECTION 05 31 00 STEEL DECKING SPEC WRITER NOTE: 1. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Refer to Section 05 36 00, COMPOSITE METAL DECKING for floor

More information

Design Guidev1.2 A REVOLUTIONARY STRUCTURAL SYSTEM FOR MID AND HIGH-RISE RESIDENTIAL CONSTRUCTION.

Design Guidev1.2 A REVOLUTIONARY STRUCTURAL SYSTEM FOR MID AND HIGH-RISE RESIDENTIAL CONSTRUCTION. Design Guidev1.2 A REVOLUTIONARY STRUCTURAL SYSTEM FOR MID AND HIGH-RISE RESIDENTIAL CONSTRUCTION. www.girder-slab.com COMPOSITE STEEL AND PRECAST SYSTEM A revolutionary steel-based framing system that

More information

2016 CDM Smith All Rights Reserved July 2016 SECTION COMPOSITE STEEL FLOOR DECK

2016 CDM Smith All Rights Reserved July 2016 SECTION COMPOSITE STEEL FLOOR DECK PART 1 GENERAL 1.01 SCOPE OF WORK SECTION 05 36 00 COMPOSITE STEEL FLOOR DECK A. Furnish all labor, materials, equipment and incidentals required and install composite steel floor deck complete as shown

More information

DIVISION 5 METALS SECTION METAL DECKING

DIVISION 5 METALS SECTION METAL DECKING DIVISION 5 METALS SECTION 05 30 00 PART 1 GENERAL 1.01 SUMMARY A. Section Includes: All labor and materials required to furnish and install metal decking and accessories including shear connectors, closures,

More information

Structural Option October 24, Technical Report 2. Evaluation of Floor System Alternatives. Residence Inn By Marriott.

Structural Option October 24, Technical Report 2. Evaluation of Floor System Alternatives. Residence Inn By Marriott. Katie Ritter Advisor: Dr. Ali Memari Structural Option October 24, 2008 Technical Report 2 Evaluation of Floor System Alternatives Residence Inn By Marriott Norfolk, Virginia TABLE OF CONTENTS Executive

More information

Lintel Tables Design Notes and Limitations

Lintel Tables Design Notes and Limitations LINTEL TABLES Lintel Tables Design Notes and Limitations 1. These tables apply to one and two family residential structures only that conform to the requirements of the 2006, 2009 or 2012 International

More information

SEISMIC RESTRAINT SYSTEM

SEISMIC RESTRAINT SYSTEM 1. GENERAL 1.1. Description: SECTION 16012 SEISMIC RESTRAINT SYSTEM 1.1.1. This specification covers design and installation of seismic bracing and anchorage required for conduit, cable tray, bus duct,

More information

Thesis Proposal Executive Summary Depth and Breadth Analysis

Thesis Proposal Executive Summary Depth and Breadth Analysis Mathew Nirenberg Structural Option Metropolis at Dadeland Adviser: Schneider Proposal Executive Summary 12/12/05 Thesis Proposal Executive Summary Depth and Breadth Analysis The Metropolis at Dadeland

More information

Statement of Special Inspections 2013 CBC

Statement of Special Inspections 2013 CBC BUILDIG & SAFET DIVISIO 2729 Prospect Park Drive Rancho Cordova, CA 95670 Phone: (916) 851-8760 Fax: (916) 851-8762 Statement of Special Inspections 2013 CBC PERMIT #: PROJECT ADDRESS: This Statement of

More information

DAVID GEIGER BAE STRUCTURAL OPTION

DAVID GEIGER BAE STRUCTURAL OPTION DAVID GEIGER BAE STRUCTURAL OPTION SENIOR THESIS PRESENTATION 14 APRIL 2009 INTRODUCTION Building Overview Proposal Summary Goals Depth Study Structural System Redesign Breadth Study Cost Comparison Schedule

More information

Table 3. Detailed Comparison of Structural Provisions of IRC 2000 and 1997 NEHRP (Continued)

Table 3. Detailed Comparison of Structural Provisions of IRC 2000 and 1997 NEHRP (Continued) 2000 IRC 1997 NEHRP Section Provision Section Provision Comments CHAPTER 3 BUILDING PLANNING R301 DESIGN CRITERIA R301.2.2 Seismic Provisions R301.2.2.1 Determination of Seismic Design Category R301.2.2.1.1

More information

Alexis Pacella Structural Option Dr. Schneider Lexington II, Washington D.C. Technical Report #2 October 31,

Alexis Pacella Structural Option Dr. Schneider Lexington II, Washington D.C. Technical Report #2 October 31, 1 Executive Summary: Pro-Con Structural Study of Alternate Floor Systems is an investigation into possible alternative structural systems for Lexington II in Washington, D.C. For this report, several structural

More information

Point Pleasant Apartments Point Pleasant, NJ Ryan P. Flynn Structural Option Faculty Consultant: Dr. Hanagan

Point Pleasant Apartments Point Pleasant, NJ Ryan P. Flynn Structural Option Faculty Consultant: Dr. Hanagan Point Pleasant Apartments Point Pleasant, NJ Ryan P. Flynn Structural Option Faculty Technical Report #3: Lateral System Analysis and Confirmation Design Table of Contents Introduction... 3 Executive Summary...

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING

SECTION HANGERS AND SUPPORTS FOR PLUMBING SECTION 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

Technical Report #2. Matthew R Peyton

Technical Report #2. Matthew R Peyton Technical Report #2 This Document is Technical Report #2 for 5th year senior thesis in the Architectural Engineering Departments at The Pennsylvania State University. This Report is to prepare a study

More information

STEEL DECK INSTITUTE Industry Standard Terms & Definitions

STEEL DECK INSTITUTE Industry Standard Terms & Definitions s Industry Standard Terms & Definitions November 2016 Industry Standard Terms & Definitions A specialized set of jargon to describe common terms used by manufacturers and other professionals associated

More information

Rutgers University Law School Building Addition and Renovation Camden, NJ

Rutgers University Law School Building Addition and Renovation Camden, NJ Building Addition and Renovation Camden, NJ Technical Assignment 1 October 5, 2007 Nathan E. Reynolds Structural Option Senior Thesis The Pennsylvania State University Faculty Consultant: Professor M.

More information

FAIRFIELD INN & SUITES, MARRIOT PITTSBURGH, PA

FAIRFIELD INN & SUITES, MARRIOT PITTSBURGH, PA 10/28/2009 TECHNICAL REPORT II FAIRFIELD INN & SUITES, MARRIOT PITTSBURGH, PA Advisor: Dr. Ali Memari Structural Option TABLE OF CONTENTS Table of Contents 2 Executive Summary...3 Introduction: Fairfield

More information

OVERALL STRUCTURAL SYSTEM

OVERALL STRUCTURAL SYSTEM EXECUTIVE SUMMARY The at the Pittsburgh International Airport, PA, is a 275,000 square foot multi-use building located directly adjacent to the airport s landside terminal. The building consists of an

More information

Nortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1

Nortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1 16 May 2014 Page 1 PART 1 GENERAL 1.1 DESCRIPTION This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories

More information

Technical Report #1. Matthew R Peyton

Technical Report #1. Matthew R Peyton Technical Report #1 This Document is Technical Report #1 for 5th year senior thesis in the Architectural Engineering Departments at The Pennsylvania State University. This Report will include structural

More information

Earth and Engineering Sciences Building

Earth and Engineering Sciences Building Executive Summary The purpose of this report is to provide an analysis of the existing floor system of the Earth and Engineering Sciences Building at University Park, Pennsylvania, as well as investigating

More information

CORPORATE HEADQUARTERS

CORPORATE HEADQUARTERS TECHNICAL REPORT 1 `` CORPORATE HEADQUARTERS Great Lakes Region, U.S.A. M. JULIA HAVERTY STRUCTURAL OPTION ADVISOR: H. SUSTERSIC 12 SEPTEMBER 2014 Contents Executive Summary... 2 Purpose and Scope... 3

More information

ENTRY FORM. DVASE 2014 Excellence in Structural Engineering Awards Program

ENTRY FORM. DVASE 2014 Excellence in Structural Engineering Awards Program ENTRY FORM DVASE 2014 Excellence in Structural Engineering Awards Program PROJECT CATEGORY (check one): Buildings under $2M Buildings Over $100M Buildings $2M-$10M Other Structures Under $5M Buildings

More information

5/6/2008. Presentation Outline. Project Overview. Project Overview. Structural System Analysis. Project Overview. Granby Tower

5/6/2008. Presentation Outline. Project Overview. Project Overview. Structural System Analysis. Project Overview. Granby Tower Presentation Outline Justin Pennycoff AE Senior Thesis 2008 Construction Management Structural Breadth CM Depth Mechanical Breadth Mechanical System Analysis s Q& A Location Total Cost $180 million Building

More information

Maximize Your Space. Mezzanines are ideal for:

Maximize Your Space. Mezzanines are ideal for: www.vertispace.ws Maximize Your Space Worker productivity and manufacturing efficiencies are under constant scrutiny in today s business world. Whether you re an operations manager charged with expanding

More information

SECTION COLD-FORMED METAL FRAMING

SECTION COLD-FORMED METAL FRAMING SECTION 05.40.00 COLD-FORMED METAL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Cold-formed metal framing for: B. Exterior load-bearing steel stud walls. 1. Interior load-bearing steel stud walls. 2.

More information

Thesis Proposal 12/13/06

Thesis Proposal 12/13/06 Photo courtesy of OTO Development, http://www.otodevelopment.com/ Dr. Memari Thesis Advisor Thesis Proposal 12/13/06 Executive Summary Structural System The in, is an eleven story hotel complex which reaches

More information

HYBRID DESIGN REDUCES COSTS WHEN DESIGN FIRST BEGAN. Switching from a concrete frame to steel beams and concrete columns proved advantageous

HYBRID DESIGN REDUCES COSTS WHEN DESIGN FIRST BEGAN. Switching from a concrete frame to steel beams and concrete columns proved advantageous Switching from a concrete frame to steel beams and concrete columns proved advantageous HYBRID DESIGN REDUCES COSTS WHEN DESIGN FIRST BEGAN ON THE 30-STORY IJL FINANCIAL CENTER IN DOWNTOWN CHARLOTTE, the

More information

Jonathan R. Torch Technical Report 2 Columbia University. Technical Report 2. Pro-Con Structural Study of Alternate Floor Systems

Jonathan R. Torch Technical Report 2 Columbia University. Technical Report 2. Pro-Con Structural Study of Alternate Floor Systems Technical Report 2 Pro-Con Structural Study of Alternate Floor Systems Columbia University Broadway & 120 th Street, New York, NY Jonathan R. Torch Pennsylvania State University Architectural Engineering

More information

15/06/ Clippers Quay. Salford Manchester.

15/06/ Clippers Quay. Salford Manchester. Salford Manchester 1 CCL Introduction to CCL Founded in 1935 Specialised engineered solutions for structures Independently owned private company 700+ employees 30 group companies Global presence Advanced

More information

Brent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan

Brent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan Structural Design: Goals: The original design of 200 Minuteman Drive was dictated largely by Brickstone Properties, the building s owner. The new design of 200 Minuteman Drive, with additional floors,

More information

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011.

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011. DIVISION 05 METALS 05 12 00 STRUCTURAL STEEL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Structural steel framing members, support members. 1.2 RELATED REQUIREMENTS A. Section 05 50 00 - Metal Fabrications:

More information

Construction Management Study

Construction Management Study Construction Management Study CONSTRUCTION MANAGEMENT STUDY A construction management study of the alternate concrete system was done to examine the impact that changing the building s superstructure material

More information

DIVISION 13 - SPECIAL CONSTRUCTION SECTION ACOUSTICAL PANEL ENCLOSURE

DIVISION 13 - SPECIAL CONSTRUCTION SECTION ACOUSTICAL PANEL ENCLOSURE DIVISION 13 - SPECIAL CONSTRUCTION SECTION 13080 - ACOUSTICAL PANEL ENCLOSURE 1 GENERAL 1.01 SUMMARY A. ACOUSTIC ENCLOSURE CONSISTING OF WALLS, CEILING, STRUCTURAL FRAMING, CONNECTING MEMBERS, DOORS, WINDOWS,

More information