1 REQUEST FOR QUOTES: # LE Navajo Division of Transportation Department of Airports Management ADOT GRANT #E5S2R - Independent Fee Estimate - Reconstruct Runway 15/33 (Approximately 2,000 x 75 ) The Navajo Division of Transportation (Navajo DOT) is requesting request for proposal from qualified firms to provide Independent Fee Estimate (IFE) services for Reconstruct Runway 15/33 (Approximately 2,000 x 75 ) project at the, Tuba City, Arizona. The IFE must be conducted in accordance with the Federal Aviation Administration s Airport Improvement Program (AIP) Handbook Order D, Sponsor Requirements for Cost Reasonableness. Detailed information and instructions on the proposal preparation, required documents, eligibility requirements and evaluation criteria can be found on the following websites: 1. Navajo DOT: 2. Arizona Airport Association: Questions, Concerns or Request for Additional Information pertaining specifically for RFQ # LE will be directed to: Arlando S. Teller, Program Manager, Navajo DOT Department of Airports Management; Telephone: ; ateller@navajodot.org. RFQ Submittal Deadline July 10, 2014 Late or facsimiled proposals will not be accepted. Firms responding as such shall be considered non-responsive. End of RFQ Announcement Navajo Division of Transportation P a g e 1

2 TASK ORDER A ATTACHMENT TO PROFESSIONAL SERVICES AGREEMENT BETWEEN OWNER AND ENGINEER, DATED, 2015 FURTHER DESCRIPTION OF SERVICES OF ENGINEER 1. This Attachment is made a part of and incorporated by reference into the Professional Services Agreement made on between the NAVAJO NATION (Owner) and ARMSTRONG CONSULTANTS, INC., (Engineer) providing for professional engineering services. The Services of Engineer as described in Section 1 of the Agreement are amended or supplemented as indicated below and the time periods for the performance of certain services are stipulated as indicated below. 2. LOCATION 3. WORK PROGRAM Attached Element 1 Reconstruct Runway 15/33 (Approximately 2,000 x 75 ) 4. FEES - The fees will be as noted below. (All lump sums) Design Phase 1Preliminary Design Phase 2 Final Design Design Survey Design Geotechnical Geotechnical Special Investigation Bidding Services Construction Services Sub Total Navajo Nation 5% Tax (work on site) Total OWNER: NAVAJO NATION Division of Transportation, Division Director ENGINEER: ARMSTRONG CONSULTANTS, INC. Dennis Corsi, President 1

3 SCOPE OF WORK TUBA CITY AIRPORT ADOT #E5S2R ELEMENT #1 RECONSTRUCT RUNWAY 15/33 (Approximately 4,600 x 75 ) Runway 15/33 is 6,230 feet long and is showing signs of failure in roughly the middle two thirds of the runway length. The runway ends appear to have been rehabilitated at some time in the past and are planned to be rehabilitated again by ADOT s APMS program with what is anticipated to be a one inch overlay. This scope of work provides for the design of the reconstruction of the remaining portion of the runway (approximately 4,600 feet) a bid package that reduces the length of reconstruction to fit within the ADOT E5S2R grant, and construction services for the reduced runway length project. The design will not include adjustment of the edge lights as it is not noted in the grant description, as a result, the finished slopes between the runway edge and the edge lighting may not be to FAA standard. This may need to be addressed in a future project. Element 1 includes the follow design considerations. 1.1 A geotechnical investigation will be conducted for the full length of the runway. 1.2 The design survey will topo the full length of the runway out to the outer edges of the safety area. 1.3 The drainage pattern and impervious areas will not change as part of this project and therefore no drainage design will be provided. 1.4 The pavement design will be calculated with FAARFIELD at 12,500 lbs in a single wheal gear configuration. Materials used will meet the FAA design standards. Based upon observations the existing pavement will likely not be able to be recycled for use in the pavement section but if the geotechnical investigation shows otherwise, it will be reused. 1.5 The proposed runway profile and transverse slopes will meet the FAA design criteria where possible within the limits of this project. 1.6 Erosion control measures may be installed in some areas adjacent to the new pavement if site conditions require and budget allows. 1.7 A centerline will be marked in accordance with Advisory Circular 150/5340-1L with Type I, grade A glass beads. 1.8 Shoulder grading will be included in the design from the edge of pavement to no further than the edge lights. This project is not intended to correct any safety area deficiencies, and therefore grading will not continue beyond the edge lights. Estimated Construction Cost for the 4,600 foot reconstruction is $2,800,000. The construction cost is dependent upon the availability of a suitable aggregate source. 2

4 PHASE 1 - PRELIMINARY DESIGN FOR ELEMENT 1 The design phase will assemble the design documents into the appropriate bid schedules and work elements to meet available funding and project phasing and sequencing requirements. Construction schedules will be coordinated to attempt synchronizing the least interference with airport operations, and appropriate timing relative to ADOT MPD Aeronautics Group funding schedules. The designer will complete its evaluation of alternatives and provide well-defined constriction requirements. Activities include: 1. Coordinate with the Owner, ADOT MPD Aeronautics Group and local users to minimize impacts to day-to-day operations. This will include various meetings during the design phase to review the progress of the design and discuss construction details, proposed time frame of the construction, special requirements of the project, and field information gathering. It is anticipated that there will be two meetings with the Owner and ADOT-MPD Aeronautics Group for this item. 2. Prepare project scope of work and contract. This includes establishing the scope of work through meeting with the Owner and ADOT MPD Aeronautics Group. This also includes drafting the contract for work to be done by the Engineer for the Owner. Prepare preliminary cost estimates and schematic design for each element of the project. 3. Preparing requirements for the design survey, establishing the limits of the work area and scheduling time for surveying to be completed are each part of this item. a. This task includes preparing the limits of work and time schedule for the topographical surveying for this project. b. The Scope will be prepared and submitted to subconsultants for determining proposed fees. 4. Analyze topographic and site survey data, including establishment of project control points. Prepare the data for use with computer modeling. Included are the following separate tasks: a. Input raw survey data into the computer program in order to sort data into company standard layers for efficient analysis. b. Sort all data points by layers and description for computer modeling. c. Prepare LDD network (surface model) of existing ground contours, pavement edges, electrical equipment, drainage features and other miscellaneous entities. d. Generate three-dimensional contour model from TIN. e. Prepare surface for pavement profiles, grading and/or paving cross sections and drainage features. 3

5 5. Prepare an overall construction phasing plan in order to maximize project constructability. 6. Determine fleet mix through coordination with Owner, State and FAA. 7. Inventory local material suppliers, sources and capabilities. 8. Complete a soils investigation, soils report, and provide recommendations including: a. Field Exploration i. Obtain thirty two (32) soil borings on the runway area. Laboratory testing shall be conducted on the borings. b. Laboratory Testing Test Number of Tests -200 sieve analysis 96 each In place moisture density 96 each Atterburgs 11 each Swell/Consolidation 32 each CBR & Proctors 11 each Sulfates 11 each.02mm gradations 11 each c. Special Investigation: During a field investigation of the runway, the runway surface appeared to lift up approximately three inches in an angular pattern across the runway. This was noted in two areas. An additional investigation will be conducted by the geotechnical sub consultant to investigate the issue. If necessary, a design to prevent future lifting in the problem area will be completed. 9. Analyze pavement and soils testing data. The Engineer will analyze the data, consisting of the following tasks: a. Generate geotechnical conclusions b. Prepare pavement data and soil information for incorporation within the contract documents. c. Prepare pavement data and soil information for incorporation within the contract documents. 10. Prepare 30% construction plans. Construction plans will be prepared depicting all work involved for Element 1. The following list of drawings will be used as a guideline. Drawings may be added or deleted during the design phase if required. a DESCRIPTION ELEMENT 1 Cover sheet- project title, project/grant number, funding agencies, index to drawings, project key and vicinity maps 1 Sheet 4

6 b c Survey Control Map, Summary of Approximate Quantities, General Notes and Legends, where applicable Construction Safety and Phasing Plan- This plan will identify all phasing and construction and safety notes for the project. It will identify to the Contractor the sequencing of work. Phasing will be required between Element 1 1 Sheet 2 Sheets d Grading and Drainage Plans 6 Sheet e Typical Sections and Details 2 Sheet f Pavement Marking Plans 1 Sheet g Pavement Marking Details 1 Sheet h Plan and Profile Sheets for Runway 6/24 depict the runway centerline profiles; ft. (8 STA) per sheet 6 Sheets i Connector Taxiway Tie-Ins 1 Sheet j Cross Section Sheets- (Runway) 6 Sheets TOTAL SHEET COUNT 27 Sheets 11. Prepare 30% contractor contract document packages. The Engineer will prepare contract documents including invitation for bids, instructions to bidders, proposal, equal employment opportunity clauses and applicable wage rates, construction contract agreement, performance bond, payment bond, general and special provisions. Preparation will include establishing the location for the bid opening and description of the work schedule. Contract documents will be prepared as early as possible during the design phase and submitted to the Owner and ADOT MPD Aeronautics Group. 12. The Engineer will assemble the 30% technical specifications necessary for the intended work. Standard FAA specifications will be utilized where possible. Additional specifications will be prepared to address work items or material that is not covered by the FAA specifications. The standard specifications to be utilized may include the following items: Item P-151 Item P-152 Item P-208 Item P-401 Item P-602 Item P-603 Item P-610 Item P-620 Item T-901/908 Clearing and Grubbing Excavation and Embankment Aggregate Base Course Plan Mix Bituminous Pavements Bituminous Prime Coat Bituminous Tack Coat Structural Portland Cement Concrete Runway and Taxiway Painting Seeding/Mulching The added technical specifications may include but not be limited to the following items: Item Special-1 Item Special-2 Mobilization Removals (Pavement, lights and signage) 5

7 Item Special-6 Watering 13. Prepare 30% engineer s design report packages. During the preparation of the construction plans and specifications, an engineer design report will be prepared. The report will include the summary of the project, pavement, drainage design, schedule and cost estimate for the completion of the project. The design report will follow the current FAA Airports guidance. 14. Solicit comments on preliminary design from ADOT-MPD Aeronautics Group including attending 30% review meeting. PHASE 2 FINAL DESIGN FOR ELEMENT 1 In the final design phase, the designer will provide well-defined construction requirements, with selected bid alternatives as appropriate to allow competitive construction bids. Construction schedules will be closely coordinated with weather conditions to minimize interference with airport operations. Activities include: 1. Incorporate engineering phase design comments and respond as necessary to requests for additional information. 2. Calculate Estimated Quantities. The Engineer will calculate all necessary quantities for the various work items in each Element. 3. Prepare Estimate of Probable Construction Cost for Element 1. Using the final quantities calculated following the completion of the plans and specifications, the Engineer will prepare the construction cost estimate. The estimate will be based on information obtained from previous projects, contractors, material suppliers and other databases available. 4. Prepare and submit final plans and specifications. Copies will be submitted to the ADOT MPD Aeronautics Group and Owner. A final set of plans, specifications and contract documents will be prepared which incorporates revisions, modifications and corrections determined during the ADOT MPD Aeronautics Group and Owner s review. 5. Prepare final engineer s design report. The final engineer s design report will include comments from the 30% review and incorporate the final design data. 6. Prepare and submit final plans and specifications. A final set of plans, specifications and contract documents will be prepared which incorporates revisions, modifications and corrections determined during the ADOT MPD Aeronautics Group and Owner s review. 7. An ADOT environmental form will be required to be completed and submitted to the ADOT MPD Aeronautics Group. 6

8 BIDDING SERVICES 1. Assist the Owner with the advertisement for bids, attend prebid conference at the airport, issue any addendums required and interpretation of the project requirements. 2. Provide technical assistance during bidding. 3. Attend and assist the Owner with the bid opening. 4. Prepare an abstract of bids and make recommendation for award. 5. Assist in award notification to successful bidder and notify and return bid bonds to the unsuccessful bidders. CONSTRUCTION SERVICES During the construction phase of the project, the designer will assist the Owner to monitor and document progress for quality and cost control. Review contractor payment requests, quality control and acceptance testing, establish necessary survey control, inform the Owner of project progress and problems, complete the quality assurance (QA) test summary, conduct the final project inspection and complete the final project report. Activities include: 1. Coordinate construction contract agreement, review bonds, insurance certificates, construction schedules, etc. 2. Review and accept the Contractor s Safety Plan Compliance Document prior to issuing the Notice to Proceed. 3. Coordinate a Construction Management Plan with the contractor prior to paving operations taking place. 4. No AGIS survey requirements are to be conducted as a part of this contract or project. 5. Conduct pre-construction conference. 6. Provide review of all submittals for materials to be used on the project. Review all shop drawings items as required during construction. 7. Provide technical assistance and recommendations to the airport during construction. 7

9 8. Provide a full-time resident inspector to monitor and document construction progress for Element 1, confirm conformance with schedules, plans and specifications, measure and document construction pay quantities, document significant conversations or situations, document input or visits by local authorities, etc. 9. Prepare change orders and supplemental agreements, if required. All coordination of change orders will be provided by the Engineer. 10. Prepare and submit weekly inspection reports. Reports will be submitted to the ADOT-MPD Aeronautics Group and Sponsor. 11. Prepare and confirm monthly payment requests. Payment requests will be reviewed for accuracy with contractor and project inspector. Engineer will prepare ADOT reimbursement requests for the Owner. 12. Prepare and submit the project QA test summary. 13. Conduct final project inspection with the Owner and ADOT-MPD Aeronautics Group and the contractor. Any punch list items will be noted and coordinated with the contractor for necessary action. 14. Prepare record drawings and a final project report. The final report will follow the current FAA AIP Final Report guidance. ADOT-MPD Aeronautics Group and the Sponsor will each receive a copy of the record drawings in the format they choose. 8

CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. ACTION REQUESTED: Motion to Approve Amendment No. 1 to the Professional

CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. ACTION REQUESTED: Motion to Approve Amendment No. 1 to the Professional City of RE NG CITY COUNCIL AGENDA REPORT TO: FROM: Honorable Mayor and City Council Members Rick Moskwa Public Works Director Agenda Item No.: 8-1 Meeting Date: April 10, 2017 ACTION REQUESTED: Motion

More information

REQUEST FOR QUALIFICATIONS PROFESSIONAL AIRPORT ENGINEERING SERVICES RUNWAY 16R-34L IMPROVEMENTS PROGRAM RENO-TAHOE INTERNATIONAL AIRPORT

REQUEST FOR QUALIFICATIONS PROFESSIONAL AIRPORT ENGINEERING SERVICES RUNWAY 16R-34L IMPROVEMENTS PROGRAM RENO-TAHOE INTERNATIONAL AIRPORT REQUEST FOR QUALIFICATIONS PROFESSIONAL AIRPORT ENGINEERING SERVICES RUNWAY 16R-34L IMPROVEMENTS PROGRAM RENO-TAHOE INTERNATIONAL AIRPORT The Reno-Tahoe Airport Authority (RTAA) Reno, Nevada, is seeking

More information

SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY

SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY REQUEST FOR QUALIFICATIONS Professional Construction Management Services Harrisburg International Airport Rehabilitate Runway 13-31 Susquehanna Area Regional

More information

EXHIBIT A-2 SCOPE OF SERVICES HAS PROJECT NUMBER 646A PROFESSIONAL ENGINEERING DESIGN SERVICES FOR TAXIWAYS RA, RB, SA, AND SB AT IAH

EXHIBIT A-2 SCOPE OF SERVICES HAS PROJECT NUMBER 646A PROFESSIONAL ENGINEERING DESIGN SERVICES FOR TAXIWAYS RA, RB, SA, AND SB AT IAH 1. INTRODUCTION EXHIBIT A-2 SCOPE OF SERVICES HAS PROJECT NUMBER 646A PROFESSIONAL ENGINEERING DESIGN SERVICES FOR TAXIWAYS RA, RB, SA, AND SB AT IAH 1.1. The objective of this Project includes: 1.1.1.

More information

Materials and Surfacing - Organization and Functions

Materials and Surfacing - Organization and Functions Materials and Surfacing - Organization and Functions Organization & Functions Page 1 Materials and Surfacing. Organization: Chief Materials and Surfacing Engineer 1. Materials 2. Pavement Design 3. Surfacing

More information

Addendum No. 1 Page 1 of 2

Addendum No. 1 Page 1 of 2 Addendum No. 1 Page 1 of 2 DATE: March 14, 2016 Joliet Junior College 1215 Houbolt Road Joliet, IL 60431 TO: Prospective Bidders SUBJECT: Addendum No. 1 PROJECT NAME: Parking Lot S7 Improvements JJC PROJECT

More information

Document Bid Form (General Contract) State of Ohio Standard Requirements for Public Facility Construction

Document Bid Form (General Contract) State of Ohio Standard Requirements for Public Facility Construction Document 00 41 13 - Bid Form (General Contract) State of Ohio Standard Requirements for Public Facility Construction Sealed bids will be received by Miami University at 181 Cole Service Building, Oxford,

More information

[ADD / DELETE / MODIFY FOLLOWING ITEMS AS APPROPRIATE TO THE PROJECT:]

[ADD / DELETE / MODIFY FOLLOWING ITEMS AS APPROPRIATE TO THE PROJECT:] SECTION 14 - REMOVALS 14-1 GENERAL This item shall consist of removing, [salvaging], [abandoning,] [stockpiling] and/or disposing of existing [pavements,] [asphalt-treated bases (ATB),] [cement-treated

More information

REQUEST FOR PROPOSAL ARCHITECTURAL & ENGINEERING SERVICES OTTAWA COUNTY ROAD COMMISSION COOPERSVILLE AREA MAINTENANCE COMPLEX

REQUEST FOR PROPOSAL ARCHITECTURAL & ENGINEERING SERVICES OTTAWA COUNTY ROAD COMMISSION COOPERSVILLE AREA MAINTENANCE COMPLEX REQUEST FOR PROPOSAL ARCHITECTURAL & ENGINEERING SERVICES OTTAWA COUNTY ROAD COMMISSION COOPERSVILLE AREA MAINTENANCE COMPLEX The Ottawa County Road Commission is seeking the submittal of written proposals

More information

MADRAS MUNICIPAL AIRPORT TAXIWAY RECONSTRUCTION AIP NO PRE-BID CONFERENCE (VOLUNTARY) June 25, 2018 AGENDA

MADRAS MUNICIPAL AIRPORT TAXIWAY RECONSTRUCTION AIP NO PRE-BID CONFERENCE (VOLUNTARY) June 25, 2018 AGENDA MADRAS MUNICIPAL AIRPORT TAXIWAY RECONSTRUCTION AIP NO. 3-41-0035-010 PRE-BID CONFERENCE (VOLUNTARY) June 25, 2018 AGENDA (Pass around sign in sheet, fill in Name, Company, Phone #, Fax #) 1. INTRODUCTIONS

More information

ORDINANCE NO INTRODUCED BY COUNCIL

ORDINANCE NO INTRODUCED BY COUNCIL Public Service Committee Andrew Roberts, Chair ORDINANCE NO. 18-1 29 INTRODUCED BY COUNCIL AN ORDINANCE AUTHORIZING THE PROPER CITY OFFICIAL TO ENTER INTO A CONTRACT WITH CRAWFORD, MURPHY, AND TILLY INC.,

More information

REQUEST FOR PROPOSAL Department of Public Works Highway Division

REQUEST FOR PROPOSAL Department of Public Works Highway Division REQUEST FOR PROPOSAL Department of Public Works Highway Division Town Office Location: 2417 Franklin Street Telephone: (802) 247-3635 Ext. 211 Pre-Bid Meeting: Monday, April 6 th Bid Opening: Monday, April

More information

OVERALL & CONTRACT DBE GOAL METHODOLOGY. Goal Period FY /01/15 to 9/30/18 AIP Projects Overall DBE Goal: 2.

OVERALL & CONTRACT DBE GOAL METHODOLOGY. Goal Period FY /01/15 to 9/30/18 AIP Projects Overall DBE Goal: 2. OVERALL & CONTRACT GOAL METHODOLOGY Airport Sponsor City of Airport Name Boise Airport Goal Period FY 2016-2018 10/01/15 to 9/30/18 Projects AIP Projects-2016-2018 Name of Preparer John Anderson, T-O Engineers

More information

CHARLEVOIX COUNTY CHARLEVOIX COUNTY ROAD COMMISSION BOARD 2018 ANNUAL PAVEMENT MARKINGS BID

CHARLEVOIX COUNTY CHARLEVOIX COUNTY ROAD COMMISSION BOARD 2018 ANNUAL PAVEMENT MARKINGS BID CHARLEVOIX COUNTY CHARLEVOIX COUNTY ROAD COMMISSION BOARD 2018 ANNUAL PAVEMENT MARKINGS BID NOTICE TO BIDDERS The Charlevoix County Road Commission invites qualified contractors to bid on the annual requirement

More information

DENVER INTERNATIONAL AIRPORT GATE APRON REHABILITATION AND DRAINAGE IMPROVEMENT PROGRAM DESIGN AND CA SERVICES RFP/RFQ

DENVER INTERNATIONAL AIRPORT GATE APRON REHABILITATION AND DRAINAGE IMPROVEMENT PROGRAM DESIGN AND CA SERVICES RFP/RFQ The following is an excerpt from the Concourse C Field Investigation Services for 2016 Design Work performed by Jacobs. This is a sample of what may be expected for future field investigation services.

More information

RUNWAY 34R EXTENSION AND RELATED WORK PACKAGE 2 BRIDGE STRUCTURE EXTENSIONS. Manassas Regional Airport ADDENDUM NO. 2

RUNWAY 34R EXTENSION AND RELATED WORK PACKAGE 2 BRIDGE STRUCTURE EXTENSIONS. Manassas Regional Airport ADDENDUM NO. 2 RUNWAY 34R EXTENSION AND RELATED WORK PACKAGE 2 BRIDGE STRUCTURE EXTENSIONS Manassas Regional Airport ADDENDUM NO. 2 April 19, 2013 This Addendum is hereby made a part of the Contract Documents and Specifications

More information

VILLAGE OF VERNON HILLS REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER AT RISK SERVICES. Part I: Proposal Information

VILLAGE OF VERNON HILLS REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER AT RISK SERVICES. Part I: Proposal Information VILLAGE OF VERNON HILLS REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER AT RISK SERVICES Part I: Proposal Information A General Information The Village of Vernon Hills is soliciting proposals for construction

More information

PROJECT ITEMS CHECK LIST Project No.

PROJECT ITEMS CHECK LIST Project No. PROJECT ITEMS CHECK LIST Project No. Action Required Action Completed Form No Action or Form Name Responsible for work 1 Obtain plans, proposals and cross sections from the Construction. and/or 2 Check

More information

NO. OF PAGES 6 BIDDERS ARE REQUESTED TO RETAIN THIS SPECIFICATION FOR FUTURE REFERENCE TABLE OF CONTENTS

NO. OF PAGES 6 BIDDERS ARE REQUESTED TO RETAIN THIS SPECIFICATION FOR FUTURE REFERENCE TABLE OF CONTENTS State of New York Executive Department Office of General Services Procurement Services Group Corning Tower - 38 th Floor Empire State Plaza Albany, NY 12242 COMMODITY GROUP 31502 - BITUMINOUS CONCRETE

More information

MSCAA /04 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION MATERIALS

MSCAA /04 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION MATERIALS 219-1.1 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION This item consists of a base course composed of crushed recycled concrete aggregate, crushed to meet a particular gradation,

More information

ITEM P-609 SEAL COATS AND BITUMINOUS SURFACE TREATMENTS DESCRIPTION

ITEM P-609 SEAL COATS AND BITUMINOUS SURFACE TREATMENTS DESCRIPTION ITEM P-609 SEAL COATS AND BITUMINOUS SURFACE TREATMENTS DESCRIPTION 609-1.1 This item shall consist of an aggregate filled polymerized seal coat composed of a single or two coat application placed on the

More information

SECTION BID PROPOSAL FORM. Telephone NO: ( ) Facsimile NO: ( ) Oklahoma License NO:

SECTION BID PROPOSAL FORM. Telephone NO: ( ) Facsimile NO: ( ) Oklahoma License NO: ISSUE DATE: MARCH 21, 2012 (REVISION 2-08/31/12) PROJECT: CNB BUILDINGS 2 AND 3 CATOOSA, OKLAHOMA OWNER: BID TO: (Mail & Fax) CHEROKEE NATION BUSINESSES 777 WEST CHEROKEE STREET CATOOSA, OKLAHOMA 74015

More information

Kerrville-Kerr County Airport Board Request for Design/Build Qualifications for Aircraft Hangar

Kerrville-Kerr County Airport Board Request for Design/Build Qualifications for Aircraft Hangar Kerrville-Kerr County Airport Board Request for Design/Build Qualifications for Aircraft Hangar The Kerrville-Kerr County Airport Board intends to engage qualified firms to provide designbuild services

More information

2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition. Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer

More information

ADDENDUM #1 Construction Support Services for the Water Treatment Plant Project PW

ADDENDUM #1 Construction Support Services for the Water Treatment Plant Project PW January 31, 2018 To Whom It May Concern: I. INSTRUCTIONS ADDENDUM #1 Construction Support Services for the Water Treatment Plant Project 18-0018PW A. The following additions, deletions, revisions, and/or

More information

Request for Proposal W

Request for Proposal W Request for Proposal 90003519W Clark Hall Professional Engineering Services to Assess the Existing Retaining Wall and to Develop Repair Recommendations 1 2 West Virginia University Request for Proposals

More information

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS

SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01 Aggregate Base... 14.1 14-3.02 Asphalt

More information

REQUEST FOR QUOTE (RFQ) DELIVER, PLACE, AND COMPACT DRIVING SURFACE AGGREGATE (DSA)

REQUEST FOR QUOTE (RFQ) DELIVER, PLACE, AND COMPACT DRIVING SURFACE AGGREGATE (DSA) 3/2018 REQUEST FOR QUOTE (RFQ) DELIVER, PLACE, AND COMPACT DRIVING SURFACE AGGREGATE (DSA) (ROAD NAME(S) & ID #) (NAME OF MUNICIPALITY & COUNTY) 1. SCOPE OF WORK: (hereinafter referred to as Owner ), requires

More information

ADDENDUM NO. ONE REHABILITATION OF TAXIWAY G AND RECONSTRUCTION OF TAXIWAY D FOR THE TRENTON-MERCER AIRPORT AB

ADDENDUM NO. ONE REHABILITATION OF TAXIWAY G AND RECONSTRUCTION OF TAXIWAY D FOR THE TRENTON-MERCER AIRPORT AB ADDENDUM NO. ONE Notice is hereby given that on June 22, 2017 at 11:00 AM (Prevailing time), sealed proposals will be opened and read in public by the Purchasing Agent in the Mercer County McDade Administration

More information

ANNE ARUNDEL COUNTY Department of Public Works DATE: 01/25/2017 FROM: Rich Osborn, P.E., Prof.L.S., Project Manager, Bureau of Engineering SUBJECT: Minutes for Pre-Bid Meeting January 19, 2017 South Shore

More information

SUMMARY TO MINUTES OF PRE-BID CONFERENCE FOR T-HANGAR REPLACEMENT

SUMMARY TO MINUTES OF PRE-BID CONFERENCE FOR T-HANGAR REPLACEMENT SUMMARY TO MINUTES OF PRE-BID CONFERENCE FOR T-HANGAR REPLACEMENT SARASOTA BRADENTON INTERNATIONAL AIRPORT August 14, 2017 10:00 AM 1. INTRODUCTION Sign-in Sheet. 2. SUBMITTAL The Bid opening date is Wednesday

More information

TERMS OF REFERENCE PROJECT EDINBURGH ROAD FROM SPEEDVALE AVENUE TO LONDON ROAD

TERMS OF REFERENCE PROJECT EDINBURGH ROAD FROM SPEEDVALE AVENUE TO LONDON ROAD TERMS OF REFERENCE PROJECT EDINBURGH ROAD FROM SPEEDVALE AVENUE TO LONDON ROAD OBJECTIVES/PURPOSE The City of Guelph intends to upgrade the underground services to current standards and carry out complete

More information

INVITATION TO BID ON TOWN PAVING PROJECTS

INVITATION TO BID ON TOWN PAVING PROJECTS INVITATION TO BID ON TOWN PAVING PROJECTS Offers shall be clearly labeled Paving Bid and submitted to: Town of Madison Paving Bid Attn: Tim Curtis, Town Manager 26 Weston Ave Madison, ME 04950 Bid opening:

More information

ADDENDUM #1. The following sheets have been revised and are being reissued as part of this addendum:

ADDENDUM #1. The following sheets have been revised and are being reissued as part of this addendum: ADDENDUM #1 AIRFIELD IMPROVEMENTS EXTEND, MARK, AND LIGHT RUNWAY 6-24 AND TAXIWAY ALPHA REHABILITATE RUNWAY 6-24 at the LAKE WALES MUNICIPAL AIRPORT FAA AIP NO: TBD FDOT FM NO: TBD BID NO: 16-412 5/11/16

More information

A. Modifications to DIVISION 40 STANDARD CONSTRUCTION SPECIFICATIONS FOR ASPHALT SURFACING. Routed depth shall be 1-1/2 inch.

A. Modifications to DIVISION 40 STANDARD CONSTRUCTION SPECIFICATIONS FOR ASPHALT SURFACING. Routed depth shall be 1-1/2 inch. Date: April 2, 2014 To: All Planholders of Record Re: Addendum No. 3 Pavement Crack Sealing Palmer Municipal Airport This addendum consists of two (2) pages plus one (1) attachment. Attachment is as follows:

More information

Manistee County Road Commission 2018 Processed Road Gravel Specifications and Bid Form Page 1 of 8

Manistee County Road Commission 2018 Processed Road Gravel Specifications and Bid Form Page 1 of 8 Page 1 of 8 SEALED PROPOSALS (BIDS) WILL BE RECEIVED UNTIL 3:00 PM, EDT, FRIDAY, FEBRUARY 23, 2018 Board of County Road Commissioners of the County of Manistee, 8946 Chippewa Highway, Bear Lake, Michigan

More information

KU Design Guidelines APPENDIX II PERMEABLE BITUMINOUS PAVEMENT

KU Design Guidelines APPENDIX II PERMEABLE BITUMINOUS PAVEMENT PERMEABLE BITUMINOUS PAVEMENT PART 1: GENERAL 1.01. RELATED DOCUMENTS: A. Drawings and general provisions of Contract, including Special Requirements General Conditions and Division 1 Specifications Sections,

More information

REQUEST FOR PROPOSAL DEMOLITION & REMOVAL OF THE OLD TOWN HALL 2278 US ROUTE 4 EAST

REQUEST FOR PROPOSAL DEMOLITION & REMOVAL OF THE OLD TOWN HALL 2278 US ROUTE 4 EAST REQUEST FOR PROPOSAL DEMOLITION & REMOVAL OF THE OLD TOWN HALL 2278 US ROUTE 4 EAST MENDON, VT 05701 TOWN OF MENDON, VERMONT August, 2018 1 1. SUMMARY AND BACKGROUND The Town of Mendon s original Town

More information

ADDENDUM NO. ONE (1)

ADDENDUM NO. ONE (1) ADDENDUM NO. ONE (1) Revise the 3 rd paragraph under Competitive Sealed Bid Procedure (page 3) to read: Bids received on or prior to the Submission Deadline will be opened publicly and read aloud, beginning

More information

Tucson International Airport (TUS) Rehabilitate Taxiway D, Shoulders and Connectors

Tucson International Airport (TUS) Rehabilitate Taxiway D, Shoulders and Connectors Tucson International Airport (TUS) Rehabilitate Taxiway D, Shoulders and Connectors NOTICE OF INVITATION OF BID DESIGN BID BUILD PROJECT REHABILITATE TAXIWAY D, SHOULDERS AND CONNECTORS Tucson Airport

More information

TABLE OF CONTENTS COVER PAGE 1 NO TABLE OF CONTENTS ADDENDUM ACKNOWLEDGEMENT

TABLE OF CONTENTS COVER PAGE 1 NO TABLE OF CONTENTS ADDENDUM ACKNOWLEDGEMENT TABLE OF CONTENTS Sections Description No. of Return with Pages Submittal COVER PAGE 1 NO TABLE OF CONTENTS ADDENDUM ACKNOWLEDGEMENT 1 YES SECTION A CHANGES TO THE CONTRACT DOCUMENTS 1 NO SECTION B PRE-BID

More information

ADDENDUM NO. 1. March 3, 2017

ADDENDUM NO. 1. March 3, 2017 ADDENDUM NO. 1 March 3, 2017 INDIANAPOLIS INTERNATIONAL AIRPORT Cargo Apron Utility Corridor Relocations Temporary AOA Fence Realignment IAA Project No. I-17-004 CONTENTS ADDENDUM NO. 1 TEXT PAGES 2-4

More information

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 6/2/2014 Project 140353 Addendum No. 1 PID No. 86675 MOT IR 75 11.75/11.80

More information

UNIVERSITY OF KENTUCKY Memorial Hall/College of Law Expansion and Renovation UK Project No

UNIVERSITY OF KENTUCKY Memorial Hall/College of Law Expansion and Renovation UK Project No PART 1 GENERAL 1.1 RELATED DOCUMENTS REQUIREMENTS COMMON TO ALL WORK CATEGORIES 1. Drawings and general provisions of the Contract, including General Special Conditions and other Division 1 Specification

More information

Construction Activity Descriptions April, 2018

Construction Activity Descriptions April, 2018 Construction Activity Descriptions April, 2018 Check the Capital Project Delivery website to ensure this is the current version. Table of Contents Construction... 1 Construction Initiated (5000)... 1 Prepare

More information

ADDENDUM NO. 3. Item 3 NOTICE OF OPPORTUNITY - REPLACE in its entirety with the attached ***REVISED 08/03/2018

ADDENDUM NO. 3. Item 3 NOTICE OF OPPORTUNITY - REPLACE in its entirety with the attached ***REVISED 08/03/2018 Construction Contracts Administration, Procurement Contracts & Materials Management (PCMM) Oregon State University 644 SW 13 th Ave. Corvallis, Oregon 97333 P 541-737-4261 F 541-737-5546 oregonstate.edu

More information

2.1 Backfill - General

2.1 Backfill - General 2.1 Backfill - General Excavations are made for the purpose of constructing bridge substructure elements, and consequently requiring competent backfill material. The backfill material must be adequately

More information

FACILITIES MANAGEMENT

FACILITIES MANAGEMENT FACILITIES MANAGEMENT Design & Construction REQUEST FOR PROPOSAL Third Party Testing and Special Inspections Parking Lots and Ramps Arts Campus Parking Reconfiguration Phase 2 Project #0674501 Addendum

More information

ADDENDUM # 01. Date: 5/4/2018. Pickens Area Bus Office Repaving Project. IFB Number:

ADDENDUM # 01. Date: 5/4/2018. Pickens Area Bus Office Repaving Project. IFB Number: ADDENDUM # 01 Date: 5/4/2018 Reference: IFB Number: 118-22-5-11 The following questions were submitted for clarification and/or to request additional information. All questions that were submitted are

More information

St. Tammany Parish Government Department of Procurement P. O. Box 628 Covington, LA Phone: (985) Fax: (985)

St. Tammany Parish Government Department of Procurement P. O. Box 628 Covington, LA Phone: (985) Fax: (985) St. Tammany Parish Government Department of Procurement P. O. Box 628 Covington, LA 70434 Phone: (985) 898-2520 Fax: (985) 898-5227 Pat Brister Parish President February 5, 2016 Please find the following

More information

MANDATORY SUPPLEMENTAL SPECIFICATIONS FOR CONTRACTOR QUALITY CONTROL Contractor Quality Control - is replaced with the following:

MANDATORY SUPPLEMENTAL SPECIFICATIONS FOR CONTRACTOR QUALITY CONTROL Contractor Quality Control - is replaced with the following: MANDATORY SUPPLEMENTAL SPECIFICATIONS FOR CONTRACTOR QUALITY CONTROL EFFECTIVE DATE: OCTOBER 14, 2011 200.07 Contractor Quality Control - is replaced with the following: (a) (b) (c) Scope: These requirements

More information

APPENDIX A DEFINITION OF PROFESSIONAL ENGINEERING CONSULTING SERVICES

APPENDIX A DEFINITION OF PROFESSIONAL ENGINEERING CONSULTING SERVICES Appendix A RFP No. 894-2014 Page 1 of 1 Template Version: SrC120131129 - Consulting Services RFP APPENDIX A DEFINITION OF PROFESSIONAL ENGINEERING CONSULTING SERVICES Revision: 2014-09-22 DEFINITION OF

More information

Highway / Utility Guide

Highway / Utility Guide Oregon Department of Transportation Highway Division Right of Way Section Highway / Utility Guide Railroad & Utilities Unit Right of Way Section STATEMENT OF PURPOSE It is important to understand that

More information

150/ G Versus 150/ H Contractor Quality Control Program

150/ G Versus 150/ H Contractor Quality Control Program AC 150/5370-10G AC 150/5370-10H 1 Part 1 of General Provisions Part 2 of General Construction Items 2 Section 100 Item C-100 3 Quality Control Program (CQCP) 4 100-01 General. When the specification requires

More information

FAA AIP No.: WKD Job No.: CA

FAA AIP No.: WKD Job No.: CA ADDENDUM NO. 1 July 16, 2014 at 12:00 pm to the Plans, Specifications and ontract Documents for the Fairfield ounty Airport Perimeter Security Fence Project Fairfax, South arolina FAA AIP No.: 3-45-0058-013-2014

More information

ADDENDUM NO. 1. FY 2012 Full Depth Reclamation Project CITY OF GAINESVILLE, GEORGIA

ADDENDUM NO. 1. FY 2012 Full Depth Reclamation Project CITY OF GAINESVILLE, GEORGIA ADDENDUM NO. 1 FY 2012 Full Depth Reclamation Project CITY OF GAINESVILLE, GEORGIA Bids to be received until 2:00 p.m., local time, July 9, 2012 SPECIFICATIONS Delete Section 00 41 53 Bid Unit Price in

More information

ATLANTIC PROVINCES ASSOCIATION OF LANDSCAPE ARCHITECTS

ATLANTIC PROVINCES ASSOCIATION OF LANDSCAPE ARCHITECTS ATLANTIC PROVINCES ASSOCIATION OF LANDSCAPE ARCHITECTS CONSULTANT FEE SCHEDULE FOR LANDSCAPE ARCHITECTURAL CONSULTING SERVICES A GUIDELINE NOV 2008 TABLE OF CONTENTS Table Of Contents... 2 INTRODUCTION...

More information

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX BID PACKAGE #1 SITE WORK

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX BID PACKAGE #1 SITE WORK HOSKINS ARCHITECTURE, LLC 1827 1 ST AVENUE NORTH, SUITE 104 BIRMINGHAM, ALABAMA 35203 205.321.4122 ADDENDUM NO. 1 PROJECT: BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX BID PACKAGE #1 SITE WORK

More information

00900 ADDENDUM #1. All Document Holders of Record. Date: February 16, Bayfield Waterline Replacement Project

00900 ADDENDUM #1. All Document Holders of Record. Date: February 16, Bayfield Waterline Replacement Project 00900 ADDENDUM #1 Issued to: All Document Holders of Record Date: February 16, 2016 Project: Bayfield Waterline Replacement Project This Addendum forms a part of the Contract described above. The original

More information

Item P-219 Recycled Concrete Aggregate Base Course

Item P-219 Recycled Concrete Aggregate Base Course Item P-219 Recycled Concrete Aggregate DESCRIPTION 219-1.1 This item consists of a base course composed of recycled concrete aggregate, crushed to meet a particular gradation, constructed on a prepared

More information

EXHIBIT A SCOPE OF SERVICES FOR DISTRICTWIDE CONSULTING ENGINEERNG SERVICES STRUCTURES DESIGN

EXHIBIT A SCOPE OF SERVICES FOR DISTRICTWIDE CONSULTING ENGINEERNG SERVICES STRUCTURES DESIGN EXHIBIT A SCOPE OF SERVICES FOR DISTRICTWIDE CONSULTING ENGINEERNG SERVICES STRUCTURES DESIGN Financial Project ID: 417069-1-32-04 Work Program Item No.: N/A Federal Aid Project ID: County/Section No.:

More information

SAN ANTONIO WATER SYSTEM PRE-CONSTRUCTION MINUTES

SAN ANTONIO WATER SYSTEM PRE-CONSTRUCTION MINUTES JOB #: SAN ANTONIO WATER SYSTEM PRE-CONSTRUCTION MINUTES TITLE: DATE: TIME: PROJECT ENGINEER: DESIGNER / CONSULTANT: INSPECTOR: _ 704-7110 704-7199 AWARD DATE: BASIC BID AWARD AMOUNT: $ ADDENDUMS: Addendum

More information

Addendum No. 2. Pre-Bid Meeting Notes and Scope of Work Clarifications

Addendum No. 2. Pre-Bid Meeting Notes and Scope of Work Clarifications Addendum No. 2 Project No. 2016-01EL West Barbour Street 12kV Underground Reconductoring Revisions to Drawings and Specifications Pre-Bid Meeting Notes and Scope of Work Clarifications Replace Section

More information

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT). SECTION 32 01 16 ASPHALT OVERLAY PART 1 - GENERAL 1.1 SCOPE OF WORK A. This Section specifies the requirements for scarifying, grinding, sweeping and repair of existing asphalt concrete pavement to establish

More information

Public Works Department 305 West Third Street, East Wing, Third Floor Oxnard, California Tel

Public Works Department 305 West Third Street, East Wing, Third Floor Oxnard, California Tel Public Works Department 305 West Third Street, East Wing, Third Floor Oxnard, California 93030 Tel 805.385.8280 October 24, 2018 ADDENDUM NO. 2 Vineyard Avenue Street Resurfacing Project PW 16-12 SCHEDULED

More information

FACILITIES MANAGEMENT

FACILITIES MANAGEMENT FACILITIES MANAGEMENT Design & Construction August 18, 2017 Re: Request for Proposals- Third Party Testing and Special Inspections University of Iowa The University of Iowa, located in Iowa City, Iowa,

More information

JANUARY 25, 2016 ADDENDUM NO. 3 FOR. ORD Baggage Service Road Retaining Wall Repair

JANUARY 25, 2016 ADDENDUM NO. 3 FOR. ORD Baggage Service Road Retaining Wall Repair JANUARY 25, 2016 ADDENDUM NO. 3 FOR ORD Baggage Service Road Retaining Wall Repair Specifications and Contract Documents Number: 132110 CDA Project Number: H6163.15-02 For which bids are scheduled to be

More information

Mainelli Wagner & Associates, Inc.

Mainelli Wagner & Associates, Inc. www.mwaeng.com Mainelli Wagner & Associates, Inc. 6920 Van Dorn Street, Suite A, Lincoln, NE 68506 Phone: (402) 421-1717 Fax: (402) 421-6061 January 30, 2019 To Whom It May Concern: The Burt County Board

More information

PennDOT Pub. 170 Highway Occupancy Permit (HOP) Manual Page 56

PennDOT Pub. 170 Highway Occupancy Permit (HOP) Manual Page 56 PennDOT Pub. 170 Highway Occupancy Permit (HOP) Manual Page 56 Additional Fees Additional fees may be charged by PennDOT consistent with Sections 411 and 420 of the State Highway Law and Regulations 441.4(d)

More information

SUBJECT: ADDENDUM #1 IFB # Taxiway A Rehabilitation - Bid Package 1 at Myrtle Beach International Airport (MYR) NOTICE of REVISIONS:

SUBJECT: ADDENDUM #1 IFB # Taxiway A Rehabilitation - Bid Package 1 at Myrtle Beach International Airport (MYR) NOTICE of REVISIONS: Office of Procurement Conway, SC 29526 3230 Hwy 319 E Conway, SC 29526 843.915.5380 (Ph) 843.365.9861 (Fx) TO: FROM: ALL INTERESTED PARTIES Kimberly Massie, CPPB, Director of Procurement DATE: May 31,

More information

TDOT PROPOSED SCOPE OF WORK CEI

TDOT PROPOSED SCOPE OF WORK CEI REVISED 12/14/09 TDOT PROPOSED SCOPE OF WORK CEI SCOPE OF SERVICES SUMMARY This document is to define as clearly as possible the duties of the consultant with regard to administration of the TDOT construction

More information

SECTION STORM DRAIN REHABILITATION. 1. Protection of environment; Section O Trench excavation, backfill, and compaction; Section

SECTION STORM DRAIN REHABILITATION. 1. Protection of environment; Section O Trench excavation, backfill, and compaction; Section 02540-1 of 10 SECTION 02540 STORM DRAIN REHABILITATION 02540.01 GENERAL A. Description Storm drain rehabilitation shall include, but not necessarily be limited to, pipe joint sealing, inlet and manhole

More information

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards... SECTION 02210 - SITE GRADING CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement and Payment...

More information

AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor April 9, :30 a.m.

AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor April 9, :30 a.m. AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor 9:30 a.m. Minutes Approval of Minutes: Regular Commission Meeting March 12, 2014 Executive Director Approval

More information

Kalkaska County Road Commission 1049 Island Lake Road Kalkaska, MI Telephone: Facsimile:

Kalkaska County Road Commission 1049 Island Lake Road Kalkaska, MI Telephone: Facsimile: Kalkaska County Road Commission 1049 Island Lake Road Kalkaska, MI 49646 Telephone: 231.258.2242 Facsimile: 231.258.8205 The Kalkaska County Road Commission is an Equal Opportunity Provider and Employer

More information

ADDENDUM #2 JUNE 30, It is required that all bidders acknowledge receipt of Addenda on Page BF-2 of the Bid Form.

ADDENDUM #2 JUNE 30, It is required that all bidders acknowledge receipt of Addenda on Page BF-2 of the Bid Form. ADDENDUM #2 JUNE 30, 2017 APRON REHABILITATION PHASE 3 HENRY E. ROHLSEN AIRPORT ST. CROIX, U.S. VIRGIN ISLANDS FAA AIP No.: 3-78-0002-037-2017 This addendum modifies or interprets the proposal documents

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES OCTOBER 09, 2014 EAST BAY REGIONAL PARK DISTRICT Atlas Road Extension Improvements POINT PINOLE REGIONAL SHORELINE PROPOSALS DUE: 2:00PM, NOVEMBER

More information

Planned Procurement Opportunities Report. April 2018

Planned Procurement Opportunities Report. April 2018 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the

More information

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS

SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS The City of Blue Springs hereby adopts Section 2200 of the Kansas City Metropolitan Chapter of APWA Construction and Material

More information

Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio.

Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio. Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio. General Conditions Scope: It is the intent of these specifications

More information

CITY OF TACOMA Department of Neighborhood and Community Services

CITY OF TACOMA Department of Neighborhood and Community Services CITY OF TACOMA Department of Neighborhood and Community Services ADDENDUM NO. 3 DATE: January 31, 2017 REVISIONS TO: Request for Bids Specification No. NC16-0353F On-Call Building Demolition NOTICE TO

More information

SECTION ASPHALT CONCRETE

SECTION ASPHALT CONCRETE SECTION 02740 ASPHALT CONCRETE PART 1. GENERAL 1.01 SECTION INCLUDES A. Work includes but is not limited to the following: 1.02 RELATED SECTIONS 1. Provide all material, labor, and equipment to prepare

More information

UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04

UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04 UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04 1. Description This work shall consist of the design, manufacture and construction of a T-WALL structure

More information

State Historic Preservation Office. Bidding, Contracting, and Construction Guidelines for the Historic Restoration Fund

State Historic Preservation Office. Bidding, Contracting, and Construction Guidelines for the Historic Restoration Fund State Historic Preservation Office Bidding, Contracting, and Construction Guidelines for the Historic Restoration Fund April 2014 Table of Contents Conflict of Interest... 3 Floodplains... 3 Hazardous

More information

Mainelli Wagner & Associates, Inc.

Mainelli Wagner & Associates, Inc. www.mwaeng.com Mainelli Wagner & Associates, Inc. 6920 Van Dorn Street, Suite A, Lincoln, NE 68506 Phone: (402) 421-1717 Fax: (402) 421-6061 December 28, 2018 The Platte County Board of Supervisors will

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 02222 - EXCAVATION, BACKFILL, AND COMPACTION FOR UTILITIES PART 1 - GENERAL 1.01 SECTION INCLUDES A. Excavating trenches for the installation of utilities and stormwater detention facilities. B.

More information

SECTION PAVING AND SURFACING

SECTION PAVING AND SURFACING SECTION 02500 - PAVING AND SURFACING CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And

More information

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS 12.1 The subdivider shall construct and install the improvements in accordance with the County's Standards for Construction Plans and Specifications

More information

PROJECT # University of South Carolina, Aiken USCA Convocation Center Shed Aiken, South Carolina ADDENDUM NUMBER

PROJECT # University of South Carolina, Aiken USCA Convocation Center Shed Aiken, South Carolina ADDENDUM NUMBER University of South Carolina, Aiken PROJECT #10010.01 SECTION 00911 - ADDENDUM NUMBER 2 PARTICULARS 1.01 DATE: April 10, 2012 1.02 PROJECT: USC AIKEN CONVOCATION CENTER SHED 1.03 STATE PROJECT NUMBER:

More information

SECTION PORTLAND CEMENT CONCRETE

SECTION PORTLAND CEMENT CONCRETE PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including the supplemental documents as indicated in the Site Work General Provisions, apply to work of this

More information

REQUEST FOR QUALIFICATIONS

REQUEST FOR QUALIFICATIONS REQUEST FOR QUALIFICATIONS DESIGN / ENGINEERING TEAM RIVERFRONT TOWN CENTER Town of Shallotte 106 Cheers Street, PO Box 2287 Shallotte, North Carolina 28459 Deadline for Submittal: February 9, 2018 at

More information

The construction phase, of course, is the execution of the work as required by the contract documents when the building is finally built.

The construction phase, of course, is the execution of the work as required by the contract documents when the building is finally built. L1C4: Commercial Building Fundamentals Lesson 7 Study Guide Construction The construction phase, of course, is the execution of the work as required by the contract documents when the building is finally

More information

SECTION 28 AGGREGATE BASE COURSE (FAA P-208) [For base course under runway and taxiway surfaces, use Section 29, FAA Item P-209.]

SECTION 28 AGGREGATE BASE COURSE (FAA P-208) [For base course under runway and taxiway surfaces, use Section 29, FAA Item P-209.] 28-1 GENERAL SECTION 28 AGGREGATE BASE COURSE (FAA P-208) The Contractor shall perform all work required by the plans and specifications for construction of aggregate base course for, use under runway

More information

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices. SECTION 01220 UNIT PRICES PART 1 GENERAL 1.01 SUMMARY A. This Section specifies administrative and procedural requirements for the unit prices. B. The omission of any unit price description from this Section

More information

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS

603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS 603.1 DESCRIPTION Determine the smoothness of the pavement surface and correct the deficiencies as specified in the Contract Documents. For the purposes of this

More information

Ohio Department of Transportation - Prebid Questions

Ohio Department of Transportation - Prebid Questions Project No. 120625 Sale Date - 12/14/2012 ATB-76747 - IR-90-7.56, PART 1;ATB-90-13.60, PART 2 12/11/2012 8:03:55 AM Per Addendum 5 Item 184 was reduced drastically. With over 35,000 LF of new guardrail

More information

Town of Brandon, Vermont US Route 7 (Center Street) Segment 6 Improvements NH 019-3(496) Request for Qualifications

Town of Brandon, Vermont US Route 7 (Center Street) Segment 6 Improvements NH 019-3(496) Request for Qualifications , Vermont US Route 7 (Center Street) Segment 6 Improvements NH 019-3(496) Request for Qualifications Construction Inspection Services Issued: January 18, 2017 Due: February 8, 2017 I. INTRODUCTION The,

More information

CHAPTER 7 PAVEMENT DESIGN. 1. Gradation (sieve and hydrometer analysis) 3. Moisture density relationships and curves

CHAPTER 7 PAVEMENT DESIGN. 1. Gradation (sieve and hydrometer analysis) 3. Moisture density relationships and curves CHAPTER 7 PAVEMENT DESIGN 7.0 GENERAL The purpose of this chapter is to define the requirements for design of pavement within proposed and existing roadways for new subdivision streets and secondary roads.

More information

Metropolitan Washington Airports Authority. Request for Qualifications Information. Architectural / Engineering Task Contract Design Services

Metropolitan Washington Airports Authority. Request for Qualifications Information. Architectural / Engineering Task Contract Design Services Request for Qualifications Information Architectural / Engineering Task Contract Design Services At Ronald Reagan Washington National Airport Washington Dulles International Airport Dulles Toll Road System

More information