Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director
|
|
- Gordon Hawkins
- 5 years ago
- Views:
Transcription
1 Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director 6/2/2014 Project Addendum No. 1 PID No MOT IR /11.80 Bridge Repair Letting: June 5, 2014 Notice to all Bidders and Suppliers to please be advised of the attached Proposal Addendum. For internet access to information referenced in this addendum, please see the ODOT web site at -> ftp://ftp.dot.state.oh.us/pub/contracts/attach/mot-86675/ The Department utilizes Bid Express ( as the official medium for electronic bid submittal. All bidders must prepare bids and submit them online via Bid Express. Addenda amendments must be acknowledged in the miscellaneous section of the Expedite (EBS) file and all amendments loaded in order for your bid to be considered for award of this project. Bid express will not accept bids that do not have amendments incorporated. Failure to incorporate changed quantities or items in your Expedite (EBS) submissions will result in the rejection of your bid. ODOT is an Equal Opportunity Employer and Provider of Services
2 Completion Date Change: Yes Completion Date revised to 10/15/15. Proposal Addendum For MOT /11.80; PID Project Bid Item Changes, Additions or Deletions: Yes Funding Splits Required: Yes Revised Bid Items: Ref. Item No. No. Total Quantity Unit Description Section E Sq. Yd. Subgrade Compaction E Cu. Yd. Aggregate Base E Each Structure Junction Box E Each Removal of Structure Mounted Sign and Disposal, As Per Plan E Sq. Ft. Surface Preparation of Existing Structural Steel E Sq. Ft. Field Painting of Existing Structural Steel, Prime Coat E Sq. Ft. Field Painting of Structural Steel, Intermediate Coat E Sq. Yd. Field Painting of Structural Steel, Finish Coat, As Per Plan E Month Field Office, Type B 0010 Deleted Bid Items: Ref. Item No. No. Total Quantity Unit Description Section E Ft. Special Pressure Relief Joint, Type A 0004 Please be advised of the following: The following changes are being made by this addendum: alteration to PN555, removal of pressure relief joint, additional structural steel painting, completion and interim completion date revision, and additional miscellaneous changes.
3 Add the following Note: Yes PN 555 All provisions of PN555 apply to both structures in this contract (including the data collection of profile data and providing corrective work plans for the entire bridge encounter) with the following exception. The Contractor will not be responsible for actually performing any corrective grinding on surfaces that were not constructed as part of this contract. PN 555-4/19/2013 SURFACE SMOOTHNESS FOR BRIDGES AND APPROACHES 1.0 DESCRIPTION: The Surface smoothness requirements of C&MS are modified as follows for bridge encounters defined as 25 feet (7.6 m) of entry pavement, entry approach slab, bridge deck, exit approach slab and 25 feet (7.6 m) of exit pavement including all joints and pavement transitions within this length of roadway. 2.0 MATERIALS AND EQUIPMENT: Provide smoothness measuring equipment conforming to Supplement Provide a certified profiler who is on the approved list on the Office of Technical Services website. Furnish the Department s approval letter of the profiler and the operator to the Engineer prior to commencing work. Furnish equipment meeting the requirements of C&MS for performing corrective diamond grinding. 3.0 SMOOTHNESS MEASUREMENT: Collect surface smoothness measurements for both wheelpaths in each proposed travel lane during one continuous pass. The wheelpaths are located parallel to the centerline or baseline of the roadway or ramp and approximately 3.0 feet (1.0 m) inside all lane edges, measured transversely. Start the profile measurement approximately 250 feet (76 m) before the approach slab/pavement interface at the entry end and continue to approximately 250 feet (76 m) after the approach slab/pavement interface at the exit end. Ensure the profiler will meet the surface smoothness requirements per for the bridge encounter. Notify the engineer a minimum of 24 hours prior to surface smoothness measurements. Do not perform any measurements until all final wearing courses are in place within the bridge encounter lanes being measured and all concrete surfaces have reached specified curing and loading requirements. Remove all dirt and debris from the surface of the travel lanes prior to performing the surface smoothness measurements. Provide temporary pavement markings for all travel lanes that are of sufficient size to be visible during surface smoothness measurements. Ensure the path of the profiler is parallel to the lane edges at all times during data collection. Develop an International Roughness Index (IRI) according to ASTM E 1926 for the bridge encounter using a continuous 25 foot (7.6 m) base length analysis for each wheelpath and calculate the Mean IRI (MRI) for each travel lane. The MRI is the average of the IRI values for the right and left wheelpaths in each travel lane. Submit two copies of the summary report from ProVAL conforming to Supplement 1112 and two electronic copies of all bridge encounter profiles in ProVAL compatible format to the Engineer of which one copy of the summary report and one electronic copy of the profiles will be submitted to the Office of Technical Services. Provide necessary traffic control and survey stationing for all surface smoothness measurements.
4 4.0 MANDATORY CORRECTIVE WORK: For bridge encounters exceeding 265 feet (80 m) in length, corrective work is required for each travel lane with an MRI above 130 inches per mile (2.08 m/km). Perform corrective action to reduce the MRI for each corrected lane to 100 inches per mile (1.58 m/km) or less. The MRI threshold does not apply to bridge encounters less than 265 feet (80 m) in length. Corrective work is required where the IRI in any 25 foot (7.6 m) segment of the bridge encounter exceeds 250 inches per mile (3.94 m/km), except in segments that include a steel armored expansion joint system, where the limit would be 350 inches per mile (5.52 m/km). Perform corrective action to reduce the IRI for each corrected lane to 250 inches per mile (3.16 m/km) or less, except in segments that include a steel armored expansion joint system, reduce the IRI for each corrected lane to 350 inches per mile (4.74 m/km), or less. Do not perform corrective diamond grinding within 1.5 feet (0.45 m) of a steel armored expansion joint system installed prior to the corrective work. Do not exceed 0.5 inches (13 mm) of material removed by corrective diamond grinding without approval of the Engineer. If corrective work is required, develop a corrective work plan. At least 7 days before beginning corrective work, submit one copy of the following information to the Engineer: (1) corrective work plan; (2) all IRI and MRI analyses; and (3) all collected road profiles in ProVAL compatible format and one copy of the information will be sent to the Office of Technical Services; Attn.: Infrastructure Management Section, 1980 W. Broad St., Columbus, OH Do not begin corrective work until receiving the Engineer s acceptance of the corrective work plan. Upon completion of the corrective work, re-measure surface smoothness according to these specifications. Re-groove diamond ground surfaces according to , if the existing grooves are less than 0.08 inches (2 mm) deep, at no additional cost to the Department. Plan sheets added, deleted or replaced: Yes 4, 26, 28, 29, 50, 51, 62, 66, 68 Plan sheet revisions: Yes 1. Sheet 1/164 a. Delete Standard Construction Drawing BP Sheet 4/164 a. Remove the left side 6-inch shallow pipe underdrain from the normal typical for Ramp B6. 3. Sheet 5/164 a. Add the following note: Removal of Structure Mounted Sign and Disposal, As Per Plan This items shall include the removal and disposal of the sign support assembly, bridge mounted in addition to the removal and disposal of the sign. 4. 9/164 Revise the following notes: a. Interim Completion Date Note
5 The concrete deck of the MOT bridge carrying Ramp B2 shall be in place no later than 10/31/2014. This date shall be considered an interim completion date for the project. Liquidated damages shall be assessed in accordance with CMS for each calendar day this requirement is not met. b. Sequence of Construction Note Add the following: i. Stage 2 work shall begin no earlier than 01/01/2015. ii. Limited nighttime lane closures of the ramp from US 35 Westbound to I-75 Southbound will be allowed as deemed necessary by the Engineer. The duration and timing of these closures will be at the approval of the Engineer. The Contractor will be required to submit a detour plan for approval. All work associated with these detours will be at no additional cost to the Department. 5. Sheet 26/164 a. Revise Item Subgrade Compaction quantity b. Revise Item Aggregate Base quantity c. Remove Item Special Pressure Relief Joint, Type A d. Revise Item , 8, Each, Median Junction Box to Item , 20, Each, Structure Junction Box 6. Sheet 27/164 a. Revise Item , 24, Month, Field Office, Type C to Item , 16, Month, Field Office Type B 7. Sheet 28/164 a. Station To (new line) i. Add 204 Subgrade Compaction 80 Sq. Yd. ii. Add 304 Aggregate Base 13 Cu. Yd. b. Revise the totals of 204 Subgrade Compaction and 304 Aggregate Base 8. Sheet 29/164 a. Remove P-1, Pressure Relief Joint 9. Sheet 32/164 a. Remove Item 451 Special Pressure Relief Joint, Type A 10. Sheet 50/164 and 51/164 a. Revise Item 625 Median Junction Box to Item 625 Structure Junction Box. b. Add Item 625 Structure Junction Box to reference numbers; K2-12, K2-13, K2-14, K2-15, K2-16, K1-16, K1-16A, K1-17, K1-18, K1-19, K1-20, and K Sheet 62/164 a. Remove Pressure Relief Joint, Type A. 12. Sheet 66/164 a. Revise first paragraph to Item 514, Field Painting of Existing Structural Steel note
6 13. Sheet 68/164 a. Revise the quantities for the following items: i. 514 Surface Preparation of Existing Structural Steel ii. 514 Field Painting of Existing Structural Steel, Prime Coat iii. 514 Field Painting Structural Steel, Intermediate Coat iv. 514 Field Painting Structural Steel, Finish Coat, As Per Plan. Answers to Prebid Questions: No
Ohio Department of Transportation
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 Ted Strickland, Governor Jolene M. Molitoris, Director THE DEPARTMENT UTILIZES BID EXPRESS (http://www.bidx.com)
More informationOhio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 12/5/2012 Project 130002 Addendum 1 PID 76691 ALL IR 75 5.53 Part1;
More informationOhio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 10/29/2013 Project 133023 Addendum No. 1 PID No. 93445 SUM SR 8
More informationOhio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 11/21/2014 Project 140560 Addendum No. 2 PID No. 82972 HAM IR 275
More informationOhio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 11/3/2014 Project 140485 Addendum No. 8 PID No. 77254 LUC IR 75
More informationOhio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 4/1/2014 Project 140227 Addendum No. 1 PID No. 86154 SUM Akron Cleveland
More informationOhio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 5/1/2013 Project 130251 Addendum No. 2 PID No. 80695 LUC IR 475
More informationOhio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 1/13/2014 Project 141016 Addendum No. 1 PID No. 87277 HOL SR 515
More informationOhio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 4/14/2015 Project 150249 Addendum No. 2 PID No. 81747 FRA IR 270
More informationSTATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA.
STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA April 18, 2008 888.01 General 888.02 Materials 888.03 Concrete Proportioning 888.04
More informationIGGA Guide Specification: Conventional Diamond Grinding for Pavement Preservation Introduction
IGGA Guide Specification: Conventional Diamond Grinding for Pavement Preservation Introduction This standard developed, by the International Grooving and Grinding Association (IGGA), specifies the procedures
More informationOhio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 10/30/2014 Project 140485 Addendum No. 7 PID No. 77254 LUC IR 75
More informationOhio Department of Transportation - Prebid Questions
Project No. 120625 Sale Date - 12/14/2012 ATB-76747 - IR-90-7.56, PART 1;ATB-90-13.60, PART 2 12/11/2012 8:03:55 AM Per Addendum 5 Item 184 was reduced drastically. With over 35,000 LF of new guardrail
More informationOhio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 10/16/2014 Project 140522 Addendum No. 1 PID No. 76282 FRA USR 40
More informationJOB BB0903 HWY. 71B INTCHNG. IMPVTS. (S) JULY 25, 2018
JOB BB0903 HWY. 71B INTCHNG. IMPVTS. (S) JULY 25, 2018 On Maintenance of Traffic Details Sheet No. 46 there is a note that states I-49 Stage Construction is to be Completed Prior to Beginning Work on Hwy.
More informationOhio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 3/21/2011 Project 110136 Addendum No. 6 PID No. 16144 WOO SR 25
More information2399 Pavement Surface Smoothness
2399 Pavement Surface Smoothness 2399.1 DESCRIPTION The final mainline and all other pavement surfaces where the posted vehicle speed is 30 mph [48 km/hr] or greater shall be measured using an Inertial
More informationJANUARY 25, 2016 ADDENDUM NO. 3 FOR. ORD Baggage Service Road Retaining Wall Repair
JANUARY 25, 2016 ADDENDUM NO. 3 FOR ORD Baggage Service Road Retaining Wall Repair Specifications and Contract Documents Number: 132110 CDA Project Number: H6163.15-02 For which bids are scheduled to be
More informationJANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25
General Info Number: PROJECT NO. 43-17-03 Description: BRIDGE DECK REPAIR AND REHABILITATION, ARLINGTON ROAD OVER OHIO TURNPIKE M.P. 122.3, JOPPA ROAD OVER OHIO TURNPIKE M.P. 128.5, DEAN ROAD OVER OHIO
More informationSpecial Provision No. 103F31 January 2014
AMENDMENT TO OPSS 313, APRIL 2007 Special Provision No. 103F31 January 2014 Asphaltic Concrete Payment Adjustment for Surface Smoothness Based on Quality Assurance Measurements Taken by an Inertial Profiler
More informationIGGA Guide Specification: Conventional Diamond Grinding of City Streets Introduction
IGGA Guide Specification: Conventional Diamond Grinding of City Streets Introduction This standard developed, by the International Grooving and Grinding Association (IGGA), specifies the procedures for
More informationSpecial Provision No. 103F31 June This Special Provision covers all surface smoothness requirements for hot mix asphalt construction.
ASPHALTIC CONCRETE SURFACE SMOOTHNESS - Asphaltic Concrete Payment Adjustment for Surface Smoothness Based on Quality Assurance Measurements Taken by an Inertial Profiler Special Provision No. 103F31 June
More informationOhio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 5/11/2015 Project 153037 Addendum No. 2 PID No. 98695 CUY SR 10
More informationSpecial Provision No. 103F31 December 2014
ASPHALTIC CONCRETE SURFACE SMOOTHNESS Special Provision No. 103F31 December 2014 Asphaltic Concrete Payment Adjustment for Surface Smoothness Based on Quality Assurance Measurements Taken by an Inertial
More informationANSWERS TO QUESTIONS RECEIVED THROUGH 11:00 A.M. ON JANUARY 4, 2019:
ADDENDUM NO. PROJECT NO. 3-9-07 PAGE 2 ANSWERS TO QUESTIONS RECEIVED THROUGH :00 A.M. ON JANUARY, 209: Q# Plan sheet 2 has a note MAINTENANCE OF TRAFFIC (LOCAL ROADS) which relates to bid item 22 and calls
More informationSECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS
SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page SECTION 14 RESTORATION OF SURFACES... 14.1 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01
More informationSECTION CURB, COMBINATION CURB AND GUTTER, AND MONOLITHIC MEDIAN. 1. Bituminous concrete pavement; Section
02670-1 of 6 SECTION 02670 CURB, COMBINATION CURB AND GUTTER, AND 02670.01 GENERAL A. Description This work shall include, but not necessarily be limited to, the construction of concrete curb, concrete
More informationJosh Bowman, P. E. District 7 Area Engineer
Josh Bowman, P. E. District 7 Area Engineer Plan acceptance is ultimately granted through the Office of Construction Administration in the District This presentation serves as a guide to what a reasonable
More informationANSWERS TO QUESTIONS RECEIVED THROUGH 1:00 PM ON MAY 24, 2018:
ADDENDUM NO. 3 PROJECT NO. 43805 (PART A & B) PAGE 2 ANSWERS TO QUESTIONS RECEIVED THROUGH :00 PM ON MAY 24, 208: Q#32 Addendum # answered Question #7 indicating that an average depth of 3 feet for the
More informationPCC Pavement Rideability
Supplemental Technical Specification for PCC Pavement Rideability SCDOT Designation: SC-M-502 (04/16) 1. SCOPE 1.1. The Resident Construction Engineer (RCE) will evaluate Portland cement concrete (PCC)
More informationRUNWAY 34R EXTENSION AND RELATED WORK PACKAGE 2 BRIDGE STRUCTURE EXTENSIONS. Manassas Regional Airport ADDENDUM NO. 2
RUNWAY 34R EXTENSION AND RELATED WORK PACKAGE 2 BRIDGE STRUCTURE EXTENSIONS Manassas Regional Airport ADDENDUM NO. 2 April 19, 2013 This Addendum is hereby made a part of the Contract Documents and Specifications
More informationOHIO TURNPIKE AND INFRASTRUCTURE COMMISSION ADDENDUM NO. 1 PROJECT NO ANSWERS TO QUESTIONS RECEIVED THROUGH 12:00 PM ON DECEMBER 29, 2015
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION ADDENDUM NO. 1 PROJECT NO. 43-16-05 ANSWERS TO QUESTIONS RECEIVED THROUGH 12:00 PM ON DECEMBER 29, 2015 Q#1 Can Asbury Road (MP 197.8) & State Route 700 (MP
More informationSHOULDER DETAIL CONCRETE CURB SHOULDER DETAIL ASPHALT CURB SHOULDER DETAIL PAVEMENT JOINT DETAIL PAVEMENT JOINT DETAIL NORMAL SECTION COMMON AND ASPHALT ALTERNATE NOTES ITEM LEGEND EX. ITEM LEGEND CONCRETE
More informationSECTION BID FORM. Garfield Street Drainage Improvements
SECTION 00410 BID FORM Garfield Street Drainage Improvements ARTICLE 1 - BID RECIPIENT 1.01 This Bid is submitted to: City of Lindsborg, Kansas City Clerk s Office 101 S. Main Street Lindsborg, KS 67456
More informationAPPROACHES AND BRIDGE OVER TYE RIVER (RTE. 29 NBL) RFP QUESTIONS AND ANSWERS-REVISION 2
Project: APPROACHES AND BRIDGE OVER TYE RIVER (RTE. 29 NBL) PROJECT: 0029-005-130, C501, B645 RFP QUESTIONS AND ANSWERS-REVISION 2 Date: 12/04/09 Approaches and Bridge over Tye River (Rte. 29 NBL) Subject:
More informationMICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MATERIALS AND WORKMANSHIP PAVEMENT WARRANTY
MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MATERIALS AND WORKMANSHIP PAVEMENT WARRANTY CFS:EMC 1 of 8 APPR:KPK:CJB:06-13-17 FHWA:APPR:06-14-17 a. Description. The materials and workmanship
More informationFEBRUARY 13, 2019 AT 2:00 P.M. (EASTERN) (Estimated Cost: $9,000,000.00) Bids. Kokosing Construction Company, Inc. $8,623,609.96
General Info Number: PROJECT NO. 43-19-02 Description: BRIDGE DECK REPAIR AND REHABILITATION OHIO TURNPIKE OVER ABANDONED RAILROAD M.P. 34.2, OHIO TURNPIKE OVER STATE ROUTE 108 M.P. 34.5, COUNTY ROUTE
More informationODOT District Pavement General Notes P401: ITEM PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN
P401: ITEM 254 - PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN P402: ITEM 254 - PAVEMENT PLANING, PORTLAND CEMENT CONCRETE, AS PER PLAN P403: ITEM 304 - AGGREGATE BASE, AS PER PLAN P404: DELETED P405:
More information729 - MULTI-LAYER POLYMER CONCRETE OVERLAY SECTION 729 MULTI-LAYER POLYMER CONCRETE OVERLAY
SECTION 729 MULTI-LAYER POLYMER CONCRETE OVERLAY 729.1 DESCRIPTION Prepare the surface of the reinforced concrete bridge deck and construct a multi-layer polymer concrete overlay (overlay) as shown on
More informationState of New Jersey Department of Transportation
State of New Jersey Department of Transportation Special Provisions For State Aid Projects Chris Christie Governor Richard T. Hammer Acting Commissioner Kim Guadagno Lt. Governor Edition 011 SPECIAL PROVISIONS
More informationFox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS
Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # 2016-04 PROJECT SPECIFICATIONS TABLE OF CONTENTS SECTION 100 GENERAL... 1 SECTION 200 MATERIALS... 1 CONSTRUCTION METHODS... 1 SECTION
More informationSECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS
SECTION 32 16 13 CONCRETE CURBS, GUTTERS AND SIDEWALKS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and required
More informationSTATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 850 CEMENT TREATED FREE DRAINING BASE APRIL 18, 2008
STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 850 CEMENT TREATED FREE DRAINING BASE APRIL 18, 2008 850.01 Description 850.02 Materials 850.03 Proportioning, Mixing, and Transporting
More informationAttachment A Concrete Curb and Sidewalk Replacement Cambria County, Johnstown Driver s Exam Center Project# Building# 093DL01
I. Bidding Requirements The Contractor to provide bid for entire project. II. Work Included The following items are site specific requirements of the project. Contractor to repair, replace and install
More information< ~ -n~rtz, Concrete Engineer Office of Materials
Minnesota Department of Transportation MEMO Office of Materials Mailstop 645 1400 Gervais Avenue Maplewood, MN 55109 'stribution 57, 612, 618, 650 ~ < ~ -n~rtz, Concrete Engineer Office of Materials Implementation
More informationSECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS
SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS Section Page 26-1 GENERAL... 26.1 26-2 PAVEMENT KEYCUTTING... 26.1 26-3 PAVEMENT PLANING... 26.2 26-4 PLANED PAVEMENT CONFORMS... 26.3
More informationOKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT AND BRIDGE DECK SMOOTHNESS
430-2QA(a-i) 09 OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PAVEMENT AND BRIDGE DECK SMOOTHNESS These Special Provisions amend and where in conflict, supersede applicable sections of the
More informationSECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS
SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01 Aggregate Base... 14.1 14-3.02 Asphalt
More informationINCLUDE IN ALL PAVING PROJECTS UNLESS OTHERWISE DIRECTED BY TSB
1.1 TESTING AND EVALUATION OF FINISHED PAVEMENT SURFACE SMOOTHNESS USING INTERNATIONAL ROUGHNESS INDEX (IRI) CRITERIA 1.1.1 General Contrary to the requirements of Specification 3.50, Asphalt Concrete
More informationSpecifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio.
Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio. General Conditions Scope: It is the intent of these specifications
More information603 - ASPHALT PAVEMENT SMOOTHNESS SECTION 603 ASPHALT PAVEMENT SMOOTHNESS
SECTION 603 ASPHALT PAVEMENT SMOOTHNESS 603.1 DESCRIPTION Determine the smoothness of the pavement surface and correct the deficiencies as specified in the Contract Documents. For the purposes of this
More informationOhio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 3/5/2013 Project 130164 Addendum No. 1 PID No. 81599 SUM SR 619
More informationOhio Department of Transportation
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 Ted Strickland, Governor Jolene M. Molitoris, Director THE DEPARTMENT UTILIZES BID EXPRESS (http://www.bidx.com)
More informationSECTION 503 TEMPORARY PAVEMENT RESTORATION
SECTION 503 TEMPORARY PAVEMENT RESTORATION 503-1 DESCRIPTION: This work consists of furnishing, placing, compacting, and maintaining a temporary pavement surface suitable for driving in accordance with
More informationBids JANUARY 10, 2019 AT 2:00 P.M. (EASTERN) (Estimated Cost: $29,000,000.00) Miller Bros. Const., Inc. $27,699,031.59
General Info Number: PROJECT NO. 43-19-07 Description: BRIDGE REHABILITATION AND 3RD LANE WIDENING OHIO TURNPIKE OVER AI CREEK M.P. 47.4, OHIO TURNPIKE OVER S.R. 64 (N. MAIN ST.) M.P. 47.5 MILEPOST 46.50
More informationSection CONCRETE SIDEWALKS. 1. Payment for concrete sidewalks is on square foot basis.
PART 1 GENERAL 1.01 SUMMARY A. This Section includes the following: Section 02775 1. Reinforced concrete sidewalks. 2. Wheelchair Ramps. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1. Payment for concrete
More informationMAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0
MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2018.05 EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0 The bid opening date is Thursday March 15, 2018 at 11:00 a.m. The following changes
More informationSECTION ASPHALT PAVING AND SURFACING
SECTION 02500 ASPHALT PAVING AND SURFACING PART 1 - GENERAL 1.01 WORK INCLUDED A. Traffic control as required to divert vehicular and pedestrian traffic around construction. B. Spreading and compacting
More informationPAY QUANTITY NOTES INCLUDES CU. YDS. FOR DRIVEWAYS, RETURNS, DIKES, AND MISCELLANEOUS EARTHWORK WHERE NO QUANTITY IS SHOWN ON P & P SHEETS.
PAY QUANTITY NOTES (F-1) (F-2) (F-3) (F-4) (F-5) (F-6) (F-7) (F-8) (F-9) (F-10) (F-11) (F-12) (F-13) (F-14) (F-15) (F-16) (F-17) (F-18) (F-19) INCLUDES CU. YDS. FOR DRIVEWAYS, RETURNS, DIKES, AND MISCELLANEOUS
More informationCITY OF TACOMA Tacoma Rail
CITY OF TACOMA Tacoma Rail ADDENDUM NO. 2 DATE: May 11, 2015 REVISIONS TO: Request for Bids Specification No.: TR15-0215F SR-509 TRACK UPGRADES NOTICE TO ALL BIDDERS: This addendum is issued to clarify,
More information4.0 Method of Measurement. Measurement for Optional Temporary Pavement Marking will be made to the nearest linear foot.
4.0 Method of Measurement. Measurement for Optional Temporary Pavement Marking will be made to the nearest linear foot. 5.0 Basis of Payment. Payment for OPTIONAL TEMPORARY PAVEMENT MARKING as described
More informationESTIMATE OF QUANTITIES
ESTIMATE QUANTITIES STATE S.D. SHEET NO. TOTAL SHEETS 2 12 SPECIFICATIONS TEMPORARY PAVEMENT MARKING, Continued STATE S.D. SHEET NO. TOTAL SHEETS 3 12 South Dakota Standard Specifications for Roads and
More informationODOT District Bridge General Notes B405: OBJECT MARKERS AND STRUCTURE/CULVERT IDENTIFICATION SIGNS
B401: DELETED B402: DELETED B403: DELETED B404: STRUCTURE/CULVERT IDENTIFICATION SIGNS B405: OBJECT MARKERS AND STRUCTURE/CULVERT IDENTIFICATION SIGNS B406: ITEM 514 - FIELD PAINTING, MISC.; REPAIR PAINTING
More informationGeneral Info. Number: PROJECT NO
General Info Number: PROJECT NO. 43-16-04 Description: BRIDGE DECK REPLACEMENT AND REHABILITATION, RAKER-BARDEN ROAD (CR. 7-2) OVER OHIO TURNPIKE M.P. 41.9, DELTA-SANTEE ROAD (CR. 7) OVER OHIO TURNPIKE
More informationMAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT
MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2018.04 CLEANING AND PAINTING STEEL STRUCTURES - CIDER HILL ROAD UNDERPASS BRIDGE - MILE 6.2, CAPTAIN THOMAS ROAD UNDERPASS BRIDGE - MILE 14.8, ROUTE 126
More information21 PAVEMENTS General Administrative Requirements Standards Personnel Certification
21 PAVEMENTS 21.1 General The Design-Builder shall conduct all Work necessary to meet the requirements associated with all Project pavements. The permanent pavement structure for all Project roadways is
More informationPay Schedule for Ride Quality
Pay Schedule for Ride Quality 2007 Design & Bridge Conference Dale A. Rand, P.E. TxDOT Const. Div. Ride Specification International Roughness Index (IRI) is the International Roughness Index and measures
More informationKANSAS TURNPIKE AUTHORITY KTA CONTRACT NO Mill and Superpave overlay I-35 (KTA) from MM 13 to MM 26.8 ADDENDUM NO. 1
KANSAS TURNPIKE AUTHORITY KTA CONTRACT NO. 6028 Mill and Superpave overlay I-35 (KTA) from MM 13 to MM 26.8 ADDENDUM NO. 1 The Contract Documents for KTA Contract No. 6028 are hereby amended in the following
More informationPIC PID Const Project Pre Bid Meeting. April 25, 2013
PIC-674-4.21 PID 83958 Const Project 466314 Pre Bid Meeting April 25, 2013 1 Project Goals Complete Replacement of PIC-674-0430 structure Improve deficient sight distance by reconstructing vertical curves
More informationPublic Works Department 305 West Third Street, East Wing, Third Floor Oxnard, California Tel
Public Works Department 305 West Third Street, East Wing, Third Floor Oxnard, California 93030 Tel 805.385.8280 October 24, 2018 ADDENDUM NO. 2 Vineyard Avenue Street Resurfacing Project PW 16-12 SCHEDULED
More informationConstruction Administration Updates
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director Construction Administration Updates Clint Bishop Construction Administration Updates Construction Administration Updates
More informationOhio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 4/26/2012 Project 123004 Addendum No. 1 PID No. 86921 DEL/MRW IR
More informationThe Town will coordinate with the adjacent property Owner for access allowing work to the East side of the building.
ADDENDUM #1 EXTERIOR REPAIRS YOUTH SERVICES BUREAU 63 LINDEN STREET MANCHESTER, CT 06040 BID #15/16-68 S/P+A PROJECT NO. 15.207 DATE: March 15, 2016 The following changes to the Drawings and Project Specifications
More informationSTATE OF OHIO DEPARTMENT OF TRANSPORTATION. SUPPLEMENT 1011 ODOT REVISION TO AASHTO/AWS BRIDGE WELDING CODE D and Interims.
STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1011 ODOT REVISION TO AASHTO/AWS BRIDGE WELDING CODE D1.5-2002 and Interims July 30, 2004 Conformance with AASHTO/AWS D1.5 Bridge Welding Code is required
More informationSECTION QUALITY CONTROL - CONSTRUCTION MANAGER EDITION
Montgomery County Public Schools Facilities DIVISION 1 - GENERAL REQUIREMENTS SECTION 01450 - QUALITY CONTROL - CONSTRUCTION MANAGER EDITION PART 1 - GENERAL 1.1 Summary: A Independent testing, inspection
More informationTG Structural Steel Superstructure
TG07.1 - Structural Steel Superstructure Questions are numbered in the order received. Numbers missing in the sequence either have been answered in a previous response set or will be included in a future
More informationOhio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 2/5/2015 Project 150030 Addendum No. 6 PID No. 88310 FRA IR 270
More informationTo: Plan Holder Project: O Neill Ranch Well and Treatment Plant Project
5180 SOQUEL DR. SOQUEL, CA 95073 PO Box 1550 CAPITOLA, CA 95010 TEL 831-475-8500 FAX 831-475-4291 BOARD OF DIRECTORS To: Plan Holder Project: O Neill Ranch Well and Treatment Plant Project Dr. THOMAS LAHUE
More informationNOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 12/20/2017
NOTIFICATION OF ADDENDUM ADDENDUM NO. 1 DATED 12/20/2017 Control 6316-00-001 Project RMC - 631600001 Highway US0059 County HARRISON Ladies/Gentlemen: Attached please find an addendum on the above captioned
More informationWEST BOUNTIFUL CITY, UTAH REQUEST FOR PROPOSAL. City Park Playground Equipment.
1.0 INTRODUCTION WEST BOUNTIFUL CITY, UTAH REQUEST FOR PROPOSAL City Park Playground Equipment The West Bountiful City, Utah is seeking proposals from interested Applicants to furnish and install playground
More informationOhio Department of Transportation - Prebid Questions
Project No. 110467 Sale Date - 8/25/2011 HAM-83469 - CR-CR 239-9.49 (WINTON/ S. GILMORE ROAD) 8/22/2011 9:56:54 AM Pole E on plan page 323 shows that 2" anchor bolts should be used for this pole. However,
More informationACKNOWLEDGEMENT OF RECEIPT OF ADDENDUM
WELLS COUNTY HIGHWAY DEPARTMENT 1600 W. WASHINGTON STREET BLUFFTON, INDIANA 46714 PHONE 260/824-6430 FAX 260/824-6431 WELLS COUNTY HIGHWAY DEPARTMENT & BOARD OF COMMISSIONERS Date: January 8, 2019 To:
More informationDesigner Supplement: AS-2-15 Approach Slab Installation January 16, 2015
1 Overview: The purpose of Standard Bridge Drawing, AS-2-15, is to address details of approach slabs not previously addressed in the AS-1-81 Standard Bridge Drawing. Specifically, the drawing was initiated
More informationALBERTA TRANSPORTATION CONSTRUCTION BULLETIN #25 PAVEMENT SMOOTHNESS TESTING AND EVALUATION USING INTERNATIONAL ROUGHNESS INDEX CRITERIA
ALBERTA TRANSPORTATION CONSTRUCTION BULLETIN #25 PAVEMENT SMOOTHNESS TESTING AND EVALUATION USING INTERNATIONAL ROUGHNESS INDEX CRITERIA Background Beginning in early 2014 all paving projects include smoothness
More informationASPHALT CONCRETE COLD PLANING THROUGH DECEMBER 2017
FOR ASPHALT CONCRETE COLD PLANING THROUGH DECEMBER 2017 Date Prepared: March 2017 TABLE OF CONTENTS SECTION 1 GENERAL... SP-1 1-1.01 Terms and Definitions... SP-1 SECTION 2 BIDDING... SP-1 2-1.01 General...
More informationODOT District Roadway General Notes R401: LINEAR GRADING R402: ITEM RESHAPING UNDER GUARDRAIL R403: CURB RAMPS / DETECTABLE WARNINGS
R401: LINEAR GRADING R402: ITEM 209 - RESHAPING UNDER GUARDRAIL R403: CURB RAMPS / DETECTABLE WARNINGS R404: DELETED R405: BARRIER REFLECTORS R406: PAVEMENT MARKING LANE WIDTHS R407: TYPE A ANCHOR ASSEMBLY
More informationCarter Bridge to Brooks Street Design Build RFI Questions and Answers
1. Project Limits -- Nick Wyatt of Kokosing Construction Co., Inc The project criteria defines the project limits by listing 19 bridges. However, portions of these structures were very recently overlayed
More information806 - DURABLE PAVEMENT MARKING SECTION 806 DURABLE PAVEMENT MARKING
SECTION 806 DURABLE PAVEMENT MARKING 806.1 DESCRIPTION Prepare the pavement and apply the pavement markings as shown in the Contract Documents. When rumble strips are to be constructed on the project,
More informationMPA Project No. LP1703-C1 Project Title: Tanks Coating Upgrade Location: Logan International Airport
MPA Project No. LP1703-C1 Project Title: Tanks Coating Upgrade Location: Logan International Airport RESPONSES TO QUESTIONS and/or RFI s Date: June 16, 2016 The attention of Contractors submitting General
More informationADDENDUM NO. 1. Date: July 6, Lot 3 Improvements Project Irvine Valley College. BID No South Orange County Community College District
ADDENDUM NO. 1 Date: Lot 3 Improvements Project BID No. 352 South Orange County Community College District General-All project documents including contract documents, drawings, and specifications, shall
More informationSECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS
SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS The City of Blue Springs hereby adopts Section 2200 of the Kansas City Metropolitan Chapter of APWA Construction and Material
More informationHydraulic Updates. History of 603/604
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director Hydraulic Updates SS 802 Constructing and Inspecting Pipe Culverts, Sewers, Drains and Drainage Structures AND SS 902 Conduit
More information1/16 Single Broadcast Polymer Flooring System
specification 1/16 Single Broadcast Polymer Flooring System Part 1 - GENERAL General Provisions A. Work to be covered by this section, under written specification or by drawing, shall comply with all provisions
More informationCOMMUNICATIONS NETWORK UPGRADES AT VARIOUS LOCATIONS CITY OF SIOUX FALLS, SOUTH DAKOTA Bid Request No ADDENDUM NO.
COMMUNICATIONS NETWORK UPGRADES AT VARIOUS LOCATIONS CITY OF SIOUX FALLS, SOUTH DAKOTA Bid Request No. 15-1079 2015 CONTRACTOR S BID DATE: PLACE FOR CONTRACTOR S TO SUBMIT BIDS: Thursday, June 25th, 2015,
More informationAsphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007
Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION March 22, 2007 Description: This work consists of furnishing and applying asphalt rubber binder followed by an application of treated cover aggregate
More informationNOTICE TO BIDDERS ADDENDUM NO. 3. Dated: March 25, 2019 SAP
Public Works Department Donald J. Theisen, P.E. Director NOTICE TO BIDDERS Wayne H. Sandberg, P.E. Deputy Director/County Engineer Type of Work: ADDENDUM NO. 3 Dated: March 25, 209 SAP 082-68-022 Removing
More informationGeneral Info Number: PROJECT NO Description: REPAIRS AND RESURFACING INTERCHANGE 209 MILEPOST TRUMBULL COUNTY, OHIO
General Info Number: PROJECT NO. 59-18-03 Description: REPAIRS AND RESURFACING INTERCHANGE 209 MILEPOST 209.20 TRUMBULL COUNTY, OHIO Deadline: April 25, 2018 at 2:00 P.M. (Eastern) (Estimated Cost: $3,100,000.00)
More informationAdd: D3.1(k) Engineer for the purposes of this Project shall have the same meaning as Contract Administrator.
Corporate Finance epartment Materials Management ivision 342-2013 AENUM 1 Page 1 of 5 PLESSIS ROA TWINNING AN GRAE SEPARATION AT CN REITT SUBIVISION: RAIL SHOOFLY GRAE PREPARATION AN MISCELLANEOUS WASTEWATER
More informationMaryland Transportation Authority (MDTA)
Maryland Transportation Authority (MDTA) I-95 Major Deck and Superstructure Rehabilitation South of the Fort McHenry Tunnel Northeast Bridge Preservation Partnership Conference September 20, 2016 David