I-395 Reconstruction. Project Advisory Group Meeting A1. PRESENTATION November 15, 2011

Size: px
Start display at page:

Download "I-395 Reconstruction. Project Advisory Group Meeting A1. PRESENTATION November 15, 2011"

Transcription

1 I-395 Reconstruction Project Advisory Group Meeting A1 PRESENTATION November 15,

2 Meeting A1 Agenda Project Overview Project Evolution Sample of VQ Process Small group exercise Next Step Meeting A2

3 Project Overview Need for Improvements Improve safety by alleviating existing operational and geometric deficiencies; eliminate left hand entrance/exit ramps Lane configuration Improve local access to and from I-395 Reduce evacuation time from Miami Beach

4 Project Overview SR 826 / SR 836 Section EB Auxiliary Lanes Auxiliary Lanes & Interchange Improvements I-395 Port Tunnel NW 57 th AVE NW 42 nd AVE NW 27 th AVE NW 17 th AVE BISCAYNE BLVD N LEJEUNE RD

5 Project Overview Record of Decision issued by FHWA on July 16, 2010 Alt. No. 3 approved as selected alternative Improved geometric design Eastbound and westbound elevated connector facilities Right hand entrance and exit ramps Begin Project End Project

6 On-Going Activities Public Involvement Right of Way Acquisition Preliminary Design 6

7 Public Involvement Technical Advisory Committee mtg. No. 1 held on October 19, 2011 Project Advisory Mtg. No. 1, November 15, 2011 Presentation to the MPO on December 8, 2011 Website and Project Branding 7

8 Right of Way Acquisition Total Parcels: 69 Acquired Parcels: 18 Parcels is Progress: 11 Right of Way funded thru 2015 LEGEND Parcels Acquired Parcels Required 8

9 Preliminary Design Complete Survey, Traffic Analysis and Soil Testing Establish final horizontal & vertical alignment Develop Visual Quality Process and Manual- Bridge Alternatives & Architecture 9

10 Funding Construction Cost $ $500 Million Priority Long Range Transportation Plan

11 Survey: Nov Schedule Traffic Analysis: Dec Soil Testing: Dec Project Advisory Group (PAG) Meetings : Spring 2012 and Summer 2012 Public Involvement: On-Going 30% Plans: Fall 2012 Draft Request For Proposal (RFP): Summer 2013 Right of Way Clear: Summer

12 Visual Quality Process Balance engineering, architecture and construction with project constraints such as community expectation and cost Emphasize Bridge architecture Establish Selection Criteria Develop Bridge Type Alternatives Finalize Aesthetics of bridge based on: Input from TAC, PAG and Community Constructability Construction costs 12

13 Selection Process Selection Process Using Type Selection Matrix: : Quantitative evaluation of bridge alternatives based on selection criteria ranking and weighting Selection criteria includes: Functionality Requirements Relative construction Cost Relative Maintenance Cost Constructability Maintenance of Traffic Relative Environmental impact Aesthetics / landmark structure Community integration Right-of-way

14 Functionality Requirements Driving Selection Criteria the degree to which each alternative contributes to provide a safe and efficient means of moving traffic determination is made as to whether the alternative can be designed in such a way it satisfies the project design criteria.

15 Driving Selection Criteria Relative Construction Cost Estimation of the cost of constructing a particular alternative. Factors include: efficiency of the design material cost ease of construction the degree to which conventional construction methods can be used.

16 Driving Selection Criteria Relative Maintenance Cost a measure of the expected cost required to maintain the structure and keep it operational through its design life. Factors include: detailing of the components Allowance for easier maintenance

17 Driving Selection Criteria Constructability a measure of how easily a given alternative can be constructed within the framework of constraints imposed on the project. Factors include: Minimizing construction risk Construction level of complexity Duration of construction

18 Driving Selection Criteria Maintenance of Traffic a measure of how easily traffic staging can be managed within the constraints imposed on the project for a given alternative. Factors include: Minimizing Traffic Interruption Minimizing complex geometries and transitions Reducing costs of temporary structures

19 Driving Selection Criteria Relative Environmental impact measures to what extent a bridge alternative changes the current environment, either positively or negatively. Factors Include: mitigation measures required relative cost to the project

20 Driving Selection Criteria Aesthetics / Landmark Structure evaluating the form of the overall bridge structure within the site environment. Factors include: Structural form aesthetic and landmark impact Scale, shapes and details Color and texture of elements. Design enhancements of appurtenances

21 Driving Selection Criteria Community Integration This criterion evaluates the level of satisfaction a community feels about each particular alternative in the integration of the community and to what extent the visual appearance of the bridge structure represents the community

22 Bridge types: Bridge Alternatives Steel Box Girder Concrete Girder Concrete Box Girder Extradosed Arch Cable-Stayed Suspension

23 Project Evolution Visual Quality Process 23

24 Tower Configurations 24

25 Concept Development 25

26 Design Development 26

27 Design Development 27

28 Design Development 28

29 Preferred Alternate 29

30 Bridge Architecture SCULPTING THE STRUCTURE STRUCTURE IN CONTEXT DETAILS OF DESIGN SCALE USER EXPERIENCE REVIEW MAJOR STRUCTURAL ELEMENTS 30

31 Sculpting the Structure Integration of architectural and structural concepts. 31

32 Sculpting the Structure 32

33 Sculpting the Structure 33

34 Structure in Context Place Time Community 34

35 Scale Integrate the structure into the landscape at both the macro (traveler) scale and micro (pedestrian) scale. 35

36 User Experience Drivers Cyclists/Pedestrians Boaters Residents 36

37 User Experience 37

38 User Experience 38

39 User Experience 39

40 User Experience 40

41 Details 41

42 Towers 42

43 Arches 43

44 Piers 44

45 Aesthetic Lighting 45

46 Aesthetic Lighting 46

47 Initiate Selection Criteria Discussion PAG has a round table discussion on the essential qualities of a successful project FDOT and design team available to answer questions and take comments Start defining selection criteria (to be continued at next TAC/PAG meetings) 47

48 Selection Matrix

49 Selection Matrix Type Selection Matrix: Selection process: 1. each member of selection committee evaluates each alternative on a scale from 1 to 10, with 10 being the best. 2. The weight of each alternative shall be assigned by FDOT according to its importance. 3. The evaluation of each alternative is a sum of each criterion evaluation multiplied by the weight of each one. 4. Some of the criteria may have a pre-set fatal flaw limit, such as the construction budget available or the maintenance yearly budget, etc. 5. Selection matrix result provides a recommendation to FDOT to make a final decision. Final selection of the bridge type shall be made by FDOT.

50 Place and Time The completed bridge will make a statement about this community and its values. What should it say in 5, 15 and 75 years from now?

51 Developing Themes Some thoughts are: Boat like Modern Futuristic Historic Neighborhood Scale Citywide Scale Iconic Others

52 I-395 Reconstruction THANK YOU!!! 52

I-395 Reconstruction MDX SR Improvements I-95 Concrete Pavement Reconstruction

I-395 Reconstruction MDX SR Improvements I-95 Concrete Pavement Reconstruction I-395 Reconstruction MDX SR 83611 Improvements I-95 Concrete Pavement Reconstruction FTBA Conference February 10, 2016 Presentation Outline Project Overview I-395 Reconstruction MDX SR 83611 I-95 Pavement

More information

Whittier Bridge I-95 Improvement Project Newburyport/Amesbury/Salisbury

Whittier Bridge I-95 Improvement Project Newburyport/Amesbury/Salisbury Whittier Bridge I-95 Improvement Project Newburyport/Amesbury/Salisbury EAE No. 14427 http://whittierbridge.mhd.state.ma.us/ Public Meeting 12.07.11 Whittier Bridge I-95 Improvement Project Newburyport/Amesbury/Salisbury

More information

I-10 CONNECT. Public Meeting #1

I-10 CONNECT. Public Meeting #1 I-10 CONNECT Public Meeting #1 The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT

More information

WELCOME. Public Meeting for I-35 / I-44 Interchange. October 6, 2015

WELCOME. Public Meeting for I-35 / I-44 Interchange. October 6, 2015 WELCOME Public Meeting for I-35 / I-44 Interchange October 6, 2015 TEAM INTRODUCTIONS PURPOSE OF THIS MEETING is to present the alternative alignments for the I-35/I-44 and I-35/NE 63rd Street Interchanges

More information

CMAA - BREAKFAST OF CHAMPIONS May 2, 2012

CMAA - BREAKFAST OF CHAMPIONS May 2, 2012 CMAA - BREAKFAST OF CHAMPIONS May 2, 2012 SIXTH STREET VIADUCT REPLACEMENT Gary Lee Moore, P.E. City Engineer Deborah Weintraub, AIA, LEED AP Chief Deputy City Engineer Alfred L. Mata, P.E. Project Manager

More information

I-345 Feasibility Study Public Meeting

I-345 Feasibility Study Public Meeting I-345 Feasibility Public Meeting December 11, 2012 December 11, 2012 1 Feasibility Team TxDOT Dallas District & Bridge Division Parsons Brinckerhoff Huitt-Zollars APM Halff Associates Civil Associates

More information

Conceptual Design Report

Conceptual Design Report Conceptual Design Report I-244/Arkansas River Multimodal Bridge Tulsa, Oklahoma Prepared for the Oklahoma Department of Transportation Prepared by: August 2009 I-244 / ARKANSAS RIVER MULTIMODAL BRIDGE

More information

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce

Project Team. D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce Project Team D6 South Miami-Dade Resident Engineer Erik Padron, P.E. D6 Construction Project Manager Dari Vorce D6 Design Project Manager Ali Toghiani, P.E. CEI: AIM Engineering and Surveying Francis Chin,

More information

SPAGHETTI BOWL. RTC Workshop April 20, 2018

SPAGHETTI BOWL. RTC Workshop April 20, 2018 SPAGHETTI BOWL RTC Workshop April 20, 2018 EIS TIMELINE PLANNING NEPA FINAL DESIGN & ROW CONSTRUCTION ALTERNATIVES UPDATES We will review changes to the Alternatives Alternative 1 Alternative 2 Alternative

More information

Oversight Team Meeting

Oversight Team Meeting Oversight Team Meeting September 18, 2014 INTRODUCTIONS (15 MINUTES) Name and affiliation Review agenda Edits to June s Oversight Team meeting summary Review the policy statements 2 Agenda Introduction

More information

Innerbelt Bridge Subcommittee Meeting 1 Meeting Minutes

Innerbelt Bridge Subcommittee Meeting 1 Meeting Minutes CLEVELAND INNERBELT CONSTRUCTION CONTRACT GROUP 1 CUY-90-14.92, PID No. 77332 1 Meeting Minutes Project: Central Viaduct Date: Subject: Innerbelt Bridge Subcommittee Time: 1:00pm - 3:00pm By: AMC/JWB Place:

More information

CHITTENDEN COUNTY REGIONAL PLANNING COMMISSION Winooski/Burlington, US RTs 2 & 7 Bridge Scoping Study ADVISORY COMMITTEE MEETING NO.

CHITTENDEN COUNTY REGIONAL PLANNING COMMISSION Winooski/Burlington, US RTs 2 & 7 Bridge Scoping Study ADVISORY COMMITTEE MEETING NO. CHITTENDEN COUNTY REGIONAL PLANNING COMMISSION Winooski/Burlington, US RTs 2 & 7 Bridge Scoping Study ADVISORY COMMITTEE MEETING NO. 5 Agenda: 1. Welcome/Introductions 2. Progress & Updates Since Previous

More information

Pattullo Bridge Replacement Project. Cost Report

Pattullo Bridge Replacement Project. Cost Report Pattullo Bridge Replacement Project Cost Report January 2018 Cost Report Page i TABLE OF CONTENTS 1 PURPOSE... 1 2 BASIS FOR THE ESTIMATE... 2 2.1 Scope of the Works... 2 2.2 Scope of Capital Costs...

More information

On behalf of the Carolina Crossroads project team we thank you for taking the time to attend this meeting.

On behalf of the Carolina Crossroads project team we thank you for taking the time to attend this meeting. On behalf of the Carolina Crossroads project team we thank you for taking the time to attend this meeting. Located in the heart of South Carolina, the I-20/26/126 Corridor is the crossroads of the state

More information

Alternatives Evaluation Methodology

Alternatives Evaluation Methodology Alternatives Evaluation Methodology www.vision54 56.com B 1 Phase 2 Alternatives Evaluation Methodology PASCO COUNTY METROPOLITAN PLANNING ORGANIZATION 8731 Citizens Drive New Port Richey, FL 34654 Ph

More information

INTERACTIVE HIGHWAY SAFETY DESIGN MODEL (IHSDM)

INTERACTIVE HIGHWAY SAFETY DESIGN MODEL (IHSDM) INTERACTIVE HIGHWAY SAFETY DESIGN MODEL (IHSDM) TSITE 2016 Winter Meeting Nashville, TN February 25, 2016 AGENDA Project History IHSDM: Background & Overview IHSDM: Interstate 24 Model IHSDM: Interstate

More information

SEGMENTAL CONTRUCTION IN THE INNER CITY: THE BQE CONNECTOR RAMP TO WILLIAMSBURG BRIDGE

SEGMENTAL CONTRUCTION IN THE INNER CITY: THE BQE CONNECTOR RAMP TO WILLIAMSBURG BRIDGE SEGMENTAL CONTRUCTION IN THE INNER CITY: THE BQE CONNECTOR RAMP TO WILLIAMSBURG BRIDGE Paul Gauvreau University of Toronto, Canada (formerly J. Muller International) Thomas E. Kelly, Jr. Earth Tech/J.

More information

40TH AVENUE NE BRIDGE REPLACEMENT

40TH AVENUE NE BRIDGE REPLACEMENT Is this Project funded? The City plans to use approximately $22 million of Penny for Pinellas funds to rebuild this and other bridges in the near future. The Federal Department of Transportation (FDOT)

More information

IH 30/IH 35E Reconstruction Project Pegasus Final Technical Memorandum - Evaluation of Conceptual Alternatives Task 7.5

IH 30/IH 35E Reconstruction Project Pegasus Final Technical Memorandum - Evaluation of Conceptual Alternatives Task 7.5 MEMO TO: Timothy Nesbitt, P.E. DATE: August 26, 2002 FROM: SUBJECT: Sandy Wesch-Schulze, P.E., AICP IH 30/IH 35E Reconstruction Project Pegasus Final Technical Memorandum - Evaluation of Conceptual Alternatives

More information

Welcome. Public Meeting. August 2, :00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m.

Welcome. Public Meeting. August 2, :00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m. Welcome Public Meeting August 2, 2017 5:00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m. www.glenwoodsouthbridge.net Welcome to the South Bridge Environmental Assessment Public Meeting Why Are We Here Tonight?

More information

Existing vs. Proposed Ramp Noise Sensitivity Analysis Austin Boulevard Interchange

Existing vs. Proposed Ramp Noise Sensitivity Analysis Austin Boulevard Interchange I-290 Phase I Study West of US 45 (Mannheim Road) to Racine Avenue Existing vs. Proposed Ramp Noise Sensitivity Analysis Austin Boulevard Interchange Technical Memorandum Prepared By: Huff & Huff, Inc.

More information

Overview of Prior Studies

Overview of Prior Studies FLORIDA DEPARTMENT OF TRANSPORTATION PORT OF MIAMI TUNNEL STUDY Overview of Prior Studies This summary was provided on July 29, 2003 by Jeff V. Easley, PE, Vice President of Reynolds, Smith and Hills as

More information

Red Wing Bridge Alternates

Red Wing Bridge Alternates Alternate 1 Tied Arch Alternate 2 Simple Span Truss Alternate 1 Design Drawing Alternate 2 Design Drawing Similar Bridge Design to Alternate 1 Similar Bridge Design to Alternate 2 Evaluation Matrix for

More information

A three-stage process was implemented in order to develop and evaluate the project concepts and provide recommendations for the project.

A three-stage process was implemented in order to develop and evaluate the project concepts and provide recommendations for the project. MEMORANDUM TO: FROM: Highway 36/Rice Street PMT Mark Benson DATE: March 23, 2009 RE: Selection of a Preferred Alternative SEH No. 105803 The purpose of this memorandum is to document the process for selecting

More information

Route 7/15 Norwalk Project - Update Winter Route 7/15 Norwalk. Presentation to Silvermine January 30, 2017 CTDOT State Project #

Route 7/15 Norwalk Project - Update Winter Route 7/15 Norwalk. Presentation to Silvermine January 30, 2017 CTDOT State Project # Project - Update Winter 2017 Agenda Introductions Project Goals Update on Work Status Alternative Development Project Schedule Review Next Steps Project Goals Provide for increased mobility and connectivity

More information

Diverging Diamond Interchanges in Michigan

Diverging Diamond Interchanges in Michigan 2015 MDOT / ACEC Partnering Workshop Diverging Diamond Interchanges in Michigan Lori Swanson MDOT Oakland TSC John Katers OHM Advisors Chris Van Norwick MDOT Grand Region Rob Leppala TranSystems Topics

More information

Florida Department of Transportation District Four KICK-OFF MEETING. I-95 at Southern Boulevard (SR 80) Project Development and Environment Study

Florida Department of Transportation District Four KICK-OFF MEETING. I-95 at Southern Boulevard (SR 80) Project Development and Environment Study Florida Department of Transportation District Four KICK-OFF MEETING I-95 at Southern Boulevard (SR 80) Project Development and Environment Study Palm Beach County, Florida Financial Project ID No.: 435516-1-22-02

More information

INTERCHANGE MODIFICATION REPORT

INTERCHANGE MODIFICATION REPORT INTERSTATE 75 AND STATE ROAD 884 (COLONIAL BOULEVARD) INTERCHANGE LEE COUNTY, FLORIDA INTERCHANGE MODIFICATION REPORT Prepared for: Florida Department of Transportation District One May 2017 Interchange

More information

Transportation Update

Transportation Update Transportation Update Projects Underway Norview Avenue About the Project: The Norview Avenue Interchange Improvement Project will eliminate the existing weave movement associated with the on- and off-ramps

More information

SCOPE OF SERVICES INTERSTATE 195 CORRIDOR PLANNING STUDY FROM INTERSTATE 95/NW 12 TH AVENUE TO ALTON ROAD

SCOPE OF SERVICES INTERSTATE 195 CORRIDOR PLANNING STUDY FROM INTERSTATE 95/NW 12 TH AVENUE TO ALTON ROAD SCOPE OF SERVICES INTERSTATE 195 CORRIDOR PLANNING STUDY FROM INTERSTATE 95/NW 12 TH AVENUE TO ALTON ROAD (ROADWAY ID 87004000 - MP 0.000 TO MP 4.910) (ROADWAY ID 87003000 MP 3.962 TO MP 4.132) BACKGROUND

More information

INTERCHANGE SAFETY. Steve Allen. Houston Daugherty. Director, Strategic Transportation Investments Division (TDOT)

INTERCHANGE SAFETY. Steve Allen. Houston Daugherty. Director, Strategic Transportation Investments Division (TDOT) INTERCHANGE SAFETY Steve Allen Director, Strategic Transportation Investments Division (TDOT) Houston Daugherty Director of Transportation & Traffic (Cannon & Cannon Inc.) 2014 TSITE Summer Meeting August

More information

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES 4.0 INTRODUCTION The ability to accommodate high volumes of intersecting traffic safely and efficiently through the arrangement of one or more interconnecting

More information

VENETIAN CAUSEWAY. (Venetian Way) Project Development & Environment (PD&E) Study FROM NORTH BAYSHORE DRIVE TO PURDY AVENUE. FM No.

VENETIAN CAUSEWAY. (Venetian Way) Project Development & Environment (PD&E) Study FROM NORTH BAYSHORE DRIVE TO PURDY AVENUE. FM No. VENETIAN CAUSEWAY (Venetian Way) Project Development & Environment (PD&E) Study FROM NORTH BAYSHORE DRIVE TO PURDY AVENUE FM No. 422713-2-22-01 Efficient Transportation Decision Making (ETDM): 12756 Project

More information

APPROVAL TO SUBMIT COMMENTS ON I-45 AND MORE DRAFT ENVIRONMENTAL IMPACT STATEMENT

APPROVAL TO SUBMIT COMMENTS ON I-45 AND MORE DRAFT ENVIRONMENTAL IMPACT STATEMENT TAC Agenda Item 09 Mailout 7/12/17 APPROVAL TO SUBMIT COMMENTS ON I-45 AND MORE DRAFT ENVIRONMENTAL IMPACT STATEMENT Background The Texas Department of Transportation, in cooperation with the Federal Highway

More information

TAMPA BAY NEXT MAJOR PROJECTS UPDATE

TAMPA BAY NEXT MAJOR PROJECTS UPDATE TAMPA BAY NEXT MAJOR PROJECTS UPDATE Marshall Hampton, FDOT District Seven Tampa Bay Next Program Manager January 18, 2019 1 2 Program Overview Funding Priorities Fiscal Year 2018 2019 2020 2021 2022 2023

More information

2. Alternatives ENVIRONMENTAL ASSESSMENT US 52 OPERATIONAL IMPROVEMENTS. 2.1 Introduction

2. Alternatives ENVIRONMENTAL ASSESSMENT US 52 OPERATIONAL IMPROVEMENTS. 2.1 Introduction 2. Alternatives 2.1 Introduction This chapter discusses the development and evaluation of scenarios and alternatives considered for the proposed action. The goal of this process, which is described in

More information

SR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.

SR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No. Palm Beach County, Florida Palm Beach Metropolitan Planning Organization April 217 Project Study Area LIMITS: SR 9/I-95: from S of 45th Street to N of 45th Street 45th Street: From Village Boulevard to

More information

I-65/I-70 North Split Project

I-65/I-70 North Split Project I-65/I-70 North Split Project Public Open House October 10, 2018 Alternatives Development Process Define Problems Identify Context Gather Input Define Alternatives Balance Trade-Offs Select Alternative

More information

Interstate 10 (SR 8)/ SR 200 (US 301) Interchange Interchange Modification Report. APPENDIX E Interchange Concepts Considered

Interstate 10 (SR 8)/ SR 200 (US 301) Interchange Interchange Modification Report. APPENDIX E Interchange Concepts Considered Interstate 10 (SR 8)/ SR 200 (US 301) Interchange Interchange Modification Report APPENDIX E Interchange Concepts Considered 112 Screening of Interchange Concepts Nine (9) interchange concepts were considered

More information

I-65/I-70 North Split Project. Alternatives Screening Report CAC Meeting October 9, 2018

I-65/I-70 North Split Project. Alternatives Screening Report CAC Meeting October 9, 2018 I-65/I-70 North Split Project Alternatives Screening Report CAC Meeting October 9, 2018 Alternatives Development Process Define Problems Identify Context Gather Input Define Alternatives Balance Trade-Offs

More information

Appendix B Highway 407 Interchange Review - Cochrane Street Area

Appendix B Highway 407 Interchange Review - Cochrane Street Area Appendix B Highway 407 Interchange Review - Cochrane Street Area AECOM 300 ater Street hitby, ON, Canada L1N 9J2 www.aecom.com Memorandum To Michael May, P.Eng., Town of hitby Page 1 CC Subject Greg Hardy,

More information

Reconstruction Project Update

Reconstruction Project Update I-65/I-70 North Split Interchange Reconstruction Project Update September 18, 2017 Agenda Welcome/introductions Project overview Scope and limits Need Environmental Assessment Maintenance of traffic Financial

More information

Community Advisory Committee Meeting No. 2. June 22, 2006

Community Advisory Committee Meeting No. 2. June 22, 2006 Community Advisory Committee Meeting No. 2 June 22, 2006 Introductions The Study Team KDOT Wichita Partners Consultants CAC members Overview Today s Agenda Opinion Survey Study Status Starting Concept

More information

Figure 28 Ocean Drive Improvements and Middle Thorofare Bridge Replacement Alternatives Comparison Matrix

Figure 28 Ocean Drive Improvements and Middle Thorofare Bridge Replacement Alternatives Comparison Matrix Figure 28 Ocean Drive Improvements and Middle Thorofare Bridge Alternatives Comparison Matrix Ocean Drive Improvements & Middle Thorofare Bridge Alternatives 1A. Engineering - Roadway - Proposed Travel

More information

SR 836 / I-395 and SR 5 / US 1 / Biscayne Boulevard Tunnel Concept Evaluation FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 6

SR 836 / I-395 and SR 5 / US 1 / Biscayne Boulevard Tunnel Concept Evaluation FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 6 SR 836 / I-395 and SR 5 / US 1 / Biscayne Boulevard Tunnel Concept Evaluation FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 6 October 2014 TABLE OF CONTENTS 1. Figure 1.A: Compendium of General Concerns

More information

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017

I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017 I-64 Capacity Improvements Segment I Financial Plan Annual Update December 1, 2017 State Project # 0064-965-264, P101, R201, C501, B616, B617, B618, B619, B620, B621, D601, D602 Federal # NHS-064-3(479),

More information

DRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0

DRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0 SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605/SR-60 EA# 3101U0 October 9, 2017 Contents 1 Purpose of ICE Memo... 1 2 Background... 1 3 Existing Interchange Deficiencies... 1 4 Context Sensitive

More information

3 INTERSTATES. The Carolina Crossroads Project Team Welcomes You

3 INTERSTATES. The Carolina Crossroads Project Team Welcomes You The Carolina Crossroads Project Team Welcomes You 3 INTERSTATES + 12 = KEY INTERCHANGES We re here to: Discuss the Carolina Crossroads I-20/26/126 Corridor Project Gather your input on study issues We

More information

Hampton Roads Crossing Study (HRCS) Supplemental Environmental Impact Statement (SEIS)

Hampton Roads Crossing Study (HRCS) Supplemental Environmental Impact Statement (SEIS) Hampton Roads Crossing Study (HRCS) (SEIS) Hampton City Council December 9, 2015 Purpose of Today s Briefing Provide update on the status of the study Review key topics and alternatives under consideration

More information

WELCOME IL 47. Community Advisory Group Meeting #4 Waubonsee Community College Tuesday, November 15, 2016

WELCOME IL 47. Community Advisory Group Meeting #4 Waubonsee Community College Tuesday, November 15, 2016 WELCOME IL 47 Community Advisory Group Meeting #4 Waubonsee Community College Tuesday, November 15, 2016 MEETING AGENDA 1. Welcome/Introduction 2. Review Previous Public Involvement 3. Range of Alternatives

More information

I-94/I-69 Interchange Bridge Construction

I-94/I-69 Interchange Bridge Construction I-94/I-69 Interchange Bridge Construction General Project Information Let in August 2013 Cost of $76 million Prime Contractor Walter Toebe Construction Company Reconstruction of I-94 from Griswold to Lapeer

More information

I-74 Final Design Request For Proposal

I-74 Final Design Request For Proposal Dear Consultants: Introduction I-74 Final Design Request For Proposal Iowa Department of Transportation (In cooperation with Illinois Department of Transportation) October 5, 2007 The Iowa Department of

More information

WELCOME. QEW Credit River Bridge Detail Design Assignment from Mississauga Road to Hurontario Street. Public Information Centre Round #1 October 2017

WELCOME. QEW Credit River Bridge Detail Design Assignment from Mississauga Road to Hurontario Street. Public Information Centre Round #1 October 2017 WELCOME QEW Credit River Bridge Detail Design Assignment from Mississauga Road to Hurontario Street Public Information Centre Round #1 October 2017 Please Sign In PURPOSE OF THIS MEETING The Ontario Ministry

More information

2-2 ALTERNATIVES CONSIDERED AND ELIMINATED

2-2 ALTERNATIVES CONSIDERED AND ELIMINATED Section 2: Alternatives Development and Evaluation 2-1 INTRODUCTION This section of the Scoping Information Packet describes the alternatives to be evaluated in the Environmental Impact Statement (EIS)

More information

I-4 Ultimate Social Media

I-4 Ultimate Social Media January 7, 2015 I-4 Ultimate Social Media Learning about #I4Ultimate construction and how the project will keep traffic on the go on @idriveorlando @MyFDOT_CFL #I4Ultimate Interstate Today Designed and

More information

DRAFT AIR QUALITY TECHNICAL MEMORANDUM

DRAFT AIR QUALITY TECHNICAL MEMORANDUM AIR QUALITY TECHNICAL MEMORANDUM PROJECT DEVELOPMENT AND ENVIRONMENT STUDY STATE ROAD 60 GRADE SEPARATION OVER CSX RAILROAD Polk County, Florida Financial Project ID: 436559-1-22-01 Prepared for: Florida

More information

Overall project. The $288 million Phase 2 DesignBuild project starts construction. this spring, with completion by December 31, 2016

Overall project. The $288 million Phase 2 DesignBuild project starts construction. this spring, with completion by December 31, 2016 Overall project Johnson County Gateway Interchange Project Improvements 87th Street The $288 million Phase 2 DesignBuild project starts construction this spring, with completion by December 31, 2016 Phase

More information

CHAPTER 8: I-71 ACCESS IMPROVEMNETS

CHAPTER 8: I-71 ACCESS IMPROVEMNETS CHAPTER 8: I-71 ACCESS IMPROVEMNETS I-71 Access Improvements were a separate and distinct part of the overall Uptown Transportation Study. This Part B work is fully documented in the Planning Study Report

More information

Palm Coast-Daytona Beach-Port Orange Transportation Management Area (TMA) River to Sea TPO. TMA Federal Certification Review Closeout Presentation

Palm Coast-Daytona Beach-Port Orange Transportation Management Area (TMA) River to Sea TPO. TMA Federal Certification Review Closeout Presentation Palm Coast-Daytona Beach-Port Orange Transportation Management Area (TMA) River to Sea TPO TMA Federal Certification Review Closeout Presentation MPO Board Meeting January 27, 2016 Federal Highway Administration

More information

Willamette River Transit Bridge. Portland - Milwaukie Light Rail Willamette River Bridge WRBAC

Willamette River Transit Bridge. Portland - Milwaukie Light Rail Willamette River Bridge WRBAC Portland - Milwaukie Light Rail Willamette River Bridge WRBAC 12.11.08 Vision Deliver a bridge that embodies the Portland aesthetic, is functional and affordable Aesthetic the right bridge for the context

More information

Attachment A FTA DCE Worksheet Section II, NEPA Class of Action

Attachment A FTA DCE Worksheet Section II, NEPA Class of Action Attachment A FTA DCE Worksheet Section II, NEPA Class of Action ATTACHMENT A Federal Transit Administration DCE Worksheet Section II, NEPA Class of Action II. NEPA Class of Action Answer the following

More information

I-65/I-70 North Split Interchange Reconstruction Project Frequently Asked Questions

I-65/I-70 North Split Interchange Reconstruction Project Frequently Asked Questions I-65/I-70 North Split Interchange Reconstruction Project Frequently Asked Questions General Overview What is the I-65/I-70 North Split Reconstruction Project? The I-65/I-70 North Split Reconstruction Project

More information

I-64 Capacity Improvements Segment I Financial Plan Annual Update

I-64 Capacity Improvements Segment I Financial Plan Annual Update I-64 Capacity Improvements Segment I December 1, 2016 State Project # 0064-965-264, P101, R201, C501, B616, B617, B618, B619, B620, B621, D601, D602 Federal # NHS-064-3(479), NHA-064-3(479) UPC 104905

More information

Pensacola Bay Bridge Replacement Design Build. Industry Forum. Kerrie Harrell, P.E. District 3 Consultant Project Management Engineer

Pensacola Bay Bridge Replacement Design Build. Industry Forum. Kerrie Harrell, P.E. District 3 Consultant Project Management Engineer Pensacola Bay Bridge Replacement Design Build Industry Forum Kerrie Harrell, P.E. District 3 Consultant Project Management Engineer Project Location 2 GENERAL PROJECT INFORMATION Replacement of the structurally

More information

Walt Whitman Bridge Redecking Fact Sheet

Walt Whitman Bridge Redecking Fact Sheet Walt Whitman Bridge Redecking Fact Sheet Walt Whitman Bridge opened to traffic on May, 9. The DR Board of Commissioners approved two contracts totaling $9,,8. to both redeck the bridge and monitor construction

More information

Bow Concord I-93 Improvements City of Concord Transportation Policy Advisory Committee

Bow Concord I-93 Improvements City of Concord Transportation Policy Advisory Committee Bow Concord I-93 Improvements City of Concord Transportation Policy Advisory Committee December 15, 2016 Agenda Project History / Project Development Process Traffic Modeling Alternatives Development o

More information

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project.

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project. 1 Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project. 2 During this public meeting, we will explain the 75 th Street Corridor Improvement

More information

State Route 8 Bridge Replacement Project

State Route 8 Bridge Replacement Project OPEN HOUSE PUBLIC INVOLVEMENT MEETING Celebration Church 688 Dan Street, Akron, Ohio Tuesday, July 14, 2015 5:00 PM to 7:00 PM State Route 8 Bridge Replacement Project Existing Bridge Future Bridges: Steel

More information

Operational Analysis of Dulles Toll Road Ramps to Tysons. Board Transportation Committee Meeting September 17, 2013

Operational Analysis of Dulles Toll Road Ramps to Tysons. Board Transportation Committee Meeting September 17, 2013 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County Department of Transportation 1 Agenda Overview & Assumptions

More information

Exposition Light Rail Transit Project

Exposition Light Rail Transit Project Exposition Light Rail Transit Project Downtown & Mid-Corridor Project Status Update Meeting Holman United Methodist Church Thursday, July 23, 2009 Phase 1 Project Description 8.6 mile corridor from Downtown

More information

PORT OF MIAMI TUNNEL PROJECT Highlights & Where we are today!

PORT OF MIAMI TUNNEL PROJECT Highlights & Where we are today! PORT OF MIAMI TUNNEL PROJECT Highlights & Where we are today! FEBRUARY 12, 2014 FTBA CONSTRUCTION CONFERENCE PROJECT PARTNERS Public Sponsors 90% Equity Partner Contractor 10% Equity Partner Operator Federal

More information

Conclusions & Lessons Learned

Conclusions & Lessons Learned What is a DDI Recommended Practices Traffic Operations Analysis Geometric Design FHWA Review Conclusions & Lessons Learned It s not about you, it s about the public Developed by Access Utah County

More information

BQE Atlantic to Sands Project Overview. 1. Project Background 2. Current Conditions & Findings 3. Upcoming Activities

BQE Atlantic to Sands Project Overview. 1. Project Background 2. Current Conditions & Findings 3. Upcoming Activities BQE Atlantic to Sands Project Overview 1. Project Background 2. Current Conditions & Findings 3. Upcoming Activities Commissioner Polly Trottenberg, New York City Department of Transportation June 29,

More information

DESIGN AND LAUNCHING OF A REDUNDANT TRUSS OVER RAILROAD YARD

DESIGN AND LAUNCHING OF A REDUNDANT TRUSS OVER RAILROAD YARD 2018 Purdue Road School Transportation Conference Rendering by Touchstone Architecture Martin Furrer, PE, SE March 6, 2018 DESIGN AND LAUNCHING OF A REDUNDANT TRUSS OVER RAILROAD YARD Project Location

More information

The Gateway Expressway FTBA Conference. February 2-3, 2017

The Gateway Expressway FTBA Conference. February 2-3, 2017 The Gateway Expressway FTBA Conference February 2-3, 2017 256996-1 SR 686 (Roosevelt Blvd.) at CR 611 (49th St. N) PD&E 256866-1 Segment 2A 256997-1 SR 686 (Roosevelt Blvd.) from 49th St. Bridge to north

More information

MDX Contract #: RFP MDX Work Program #: ETDM #: 11501

MDX Contract #: RFP MDX Work Program #: ETDM #: 11501 SR 874/Don Shula Expressway Ramp Connector Project Development & Environment (PD&E) Study PUBLIC HEARING December 8, 2011 MDX Contract #: RFP-09-04 MDX Work Program #: 87410.011 ETDM #: 11501 1 This Public

More information

US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison

US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison T E C H N I C A L M E M O R A N D U M US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison PREPARED FOR: Mn/DOT District 7 PREPARED BY: CH2M HILL DATE: March 27, 2007 This technical

More information

AIR QUALITY TECHNICAL MEMORANDUM

AIR QUALITY TECHNICAL MEMORANDUM AIR QUALITY TECHNICAL MEMORANDUM AIR QUALITY TECHNICAL MEMORANDUM GOLDEN GLADES INTERCHANGE PD&E STUDY Miami-Dade County, Florida Financial Management Number: 428358-1-22-01 Efficient Transportation Decision

More information

Construction of Bridges

Construction of Bridges Construction of Bridges Materials suitable for the Construction of Long-span Bridges 1. Stone in arch masonry 2. Steel in girder or box-section constructed in steel plates and standard sections 3. Steel

More information

(DC2) SITE SPECIFIC DEVELOPMENT CONTROL PROVISION

(DC2) SITE SPECIFIC DEVELOPMENT CONTROL PROVISION (DC2) SITE SPECIFIC DEVELOPMENT CONTROL PROVISION 1. General Purpose To accommodate the development of a mid rise residential building that supports a broad mix of dwelling types and provides a commitment

More information

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 WELCOME IL 47 Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 MEETING PURPOSE MEETING AGENDA 1. Welcome/Introduction 2. Review Previous Public Involvement 3. Process/Schedule

More information

LONG BRIDGE - PRESENT & FUTURE: A MULTIMODAL ANALYSIS

LONG BRIDGE - PRESENT & FUTURE: A MULTIMODAL ANALYSIS LONG BRIDGE - PRESENT & FUTURE: A MULTIMODAL ANALYSIS Review of the Potomac River Crossing a Rail Resource for the Washington, DC Region and Beyond Presenter: Edward La Guardia P.E. Michael Baker International

More information

I-17 and Happy Valley Road Diverging Diamond Interchange (DDI)

I-17 and Happy Valley Road Diverging Diamond Interchange (DDI) I-17 and Happy Valley Road Diverging Diamond Interchange (DDI) Bharat Kandel (ADOT) and Jeremy Neuman (HDR) February 28, 2018 Project Purpose and Overview New interchange will accommodate current and future

More information

Final Recommendations Identification of Improvements, Strategies, and Solutions

Final Recommendations Identification of Improvements, Strategies, and Solutions Identification of Improvements, Strategies, and Solutions Prepared by: December 2015 TABLE OF CONTENTS 1. Introduction... 1 1 2. Freight Policy Recommendations... 2 1 3. Freight Infrastructure Recommendations...

More information

Construction Look Ahead February 2018

Construction Look Ahead February 2018 To our 9 th and Colorado redevelopment neighbors: Construction Look Ahead February 2018 Block 7South Exterior Bridge walkway between Block 7 South building and the existing Parking Garage the installation

More information

TRANSPORTATION PROJECT REPORT DRAFT CONCEPTUAL ACCESS MODIFICATION PROPOSAL OCTOBER 2002

TRANSPORTATION PROJECT REPORT DRAFT CONCEPTUAL ACCESS MODIFICATION PROPOSAL OCTOBER 2002 TRANSPORTATION INTERSTATE 87 INTERCHANGE 11A TOWN OF MALTA SARATOGA COUNTY, NY DRAFT CONCEPTUAL ACCESS MODIFICATION PROPOSAL OCTOBER 2002 PROJECT REPORT NEW YORK STATE DEPARTMENT OF TRANSPORTATION JOSEPH

More information

Public Information Meeting - 14 September 2015 New Champlain Bridge Corridor Project

Public Information Meeting - 14 September 2015 New Champlain Bridge Corridor Project Public Information Meeting - 14 September 2015 Meeting Objective To provide information on the Highway 15 works of the in the Verdun and Sud-Ouest boroughs up to March 2016 ------------ including anticipated

More information

Interchange Workshop Report (August 2004)

Interchange Workshop Report (August 2004) U.S. Highway 14 Corridor Study New Ulm to North Mankato Table of Contents Section Interchange Workshop Report (August 2004) Page 1. Introduction and Next Steps 1 2. Interchange Workshop Participants &

More information

Road Safety Audits are. Definition. Why do we need RSAs? Tori Brinkly, Highway Safety Engineer, WFL-FHWA. NWTTS -- April 21, 2010

Road Safety Audits are. Definition. Why do we need RSAs? Tori Brinkly, Highway Safety Engineer, WFL-FHWA. NWTTS -- April 21, 2010 Road Safety Audits Operational and Safety Reviews Tori Brinkly, Highway Safety Engineer, WFL-FHWA NWTTS -- April 21, 2010 Definition A road safety audit is a formal and independent safety performance review

More information

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects SEPTEMBER 1989 Arkansas State Highway and Transportation Department GEOMETRIC DESIGN CRITERIA for Non-freeway

More information

Restoration of Historic Streetcar Service in Downtown Los Angeles. Executive Summary -- Alternatives Analysis (AA) FINAL

Restoration of Historic Streetcar Service in Downtown Los Angeles. Executive Summary -- Alternatives Analysis (AA) FINAL Restoration of Historic Streetcar Service in Downtown Los Angeles Executive Summary -- Alternatives Analysis (AA) FINAL January 13, 2012 This page intentionally left blank Table of Contents S1.0 PURPOSE

More information

Long Bridge - Present & Future: A Multimodal Analysis

Long Bridge - Present & Future: A Multimodal Analysis Long Bridge - Present & Future: A Multimodal Analysis Edward La Guardia P.E. American Public Transportation Association (APTA); American Railway Engineering and Maintenance-of- Way Association (AREMA);

More information

Multiple Account Evaluation for Alberta Transportation: A Decision Making Tool

Multiple Account Evaluation for Alberta Transportation: A Decision Making Tool Alberta Transportation Multiple Account Evaluation for Alberta Transportation: A Decision Making Tool A Guideline for Using MAE for Transportation Planning Projects of Varying Strategic Scope and Complexity

More information

SR 29 Project Development & Environment Study. Presentation to SR 29 Stakeholders Advisory Committee. January 23, 2014

SR 29 Project Development & Environment Study. Presentation to SR 29 Stakeholders Advisory Committee. January 23, 2014 SR 29 Project Development & Environment Study Presentation to SR 29 Stakeholders Advisory Committee January 23, 2014 Purpose and Need Enhancing Economic Competitiveness Improving Emergency Evacuation Capabilities

More information

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016 Rehabilitation of West Main Street Culvert and Shirley Street Bridge Town of Ayer November 22, 2016 Agenda Outline Introductions Project Goals and Objectives Existing Conditions Review Design Considerations

More information

15 VISUAL QUALITY MANAGEMENT

15 VISUAL QUALITY MANAGEMENT 15 VISUAL QUALITY MANAGEMENT 15.1 General The Design-Builder shall conduct all work necessary to meet the requirements for visual quality management, including: providing a Visual Quality Manager and Visual

More information

Request for Proposals. Hillsdale Pedestrian/Bicyclist Bridge Design

Request for Proposals. Hillsdale Pedestrian/Bicyclist Bridge Design Request for Proposals Hillsdale Pedestrian/Bicyclist Bridge Design Public Works Department City of San Mateo 330 West 20th Avenue San Mateo, CA 94403 JUNE 13, 2013 The City of San Mateo (CITY) is accepting

More information

TRAFFIC SAFETY EVALUATION. Using the Highway Safety Manual and the Interactive Highway Safety Design Model. I 15 Dry Lakes Design Exception

TRAFFIC SAFETY EVALUATION. Using the Highway Safety Manual and the Interactive Highway Safety Design Model. I 15 Dry Lakes Design Exception TRAFFIC SAFETY EVALUATION Using the Highway Safety Manual and the Interactive Highway Safety Design Model I 15 Dry Lakes Design Exception Prepared for: Nevada Department of Transportation Safety Engineering

More information

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310

FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310 INTERCHANGE MODIFICATION REPORT FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310 PREPARED BY: VIRGINIA DEPARTMENT OF TRANSPORTATION STAUNTON DISTRICT DECEMBER 13, 2006

More information

EXECUTIVE SUMMARY. The IP developed the following purpose and need statement for the Part B I-71 Access Improvement Study.

EXECUTIVE SUMMARY. The IP developed the following purpose and need statement for the Part B I-71 Access Improvement Study. EXECUTIVE SUMMARY The Ohio-Kentucky-Indiana Regional Council of Governments (OKI) has conducted the with the following purpose: Develop a comprehensive transportation plan for the Uptown area that serves

More information