A GIS Tool Prioritizing Dams for Removal within the State of North Carolina Kat Hoenke Southeast Aquatic Resources Partnership (SARP)

Size: px
Start display at page:

Download "A GIS Tool Prioritizing Dams for Removal within the State of North Carolina Kat Hoenke Southeast Aquatic Resources Partnership (SARP)"

Transcription

1 A GIS Tool Prioritizing Dams for Removal within the State of North Carolina Kat Hoenke Southeast Aquatic Resources Partnership (SARP) Cape Fear River Partnership Meeting May 15-16, 2014

2 Project Background Originally funded by American Rivers and Duke University, and completed in updates funded by SARP Prioritizes dams for removal in North Carolina using Ecological and Social Metrics

3 National Fish Habitat Partnership Covers 14 States Southeast Aquatic Habitat Plan Connection to Cape Fear Lock and Dam #2

4

5 SEACAP SEACAP Project Goals Compile a regional database of barriers Develop a relative prioritization assessment based on each barrier s potential to benefit migratory & resident fish species Interactive web map and tool that will allow users to run custom assessments at various scales and based on user specified parameters SEACAP Program seeks to encourage connectivity efforts in the region through state connectivity teams, promoting this tool and others. 1

6 Fish Passage / Dam Removal Motivation Why remove a dam? o Dams alter the river habitat and communities o Diadromous fish unable to migrate o Water quality impacts o Dam removal can quickly restore riverine habitat in many cases o Many dams are old and not used o Many dams are hazardous

7 Why Prioritize Dams? Over 5000 dams in North Carolina >700 dams in the Cape Fear River Basin

8 Project Objectives Organize barrier data Spatially associate ecological data to dams Create a user friendly tool prioritizing dams for removal using ecological and social metrics Run simulations of the tool to create a list of potential removal projects

9 Objectives Hierarchy Final rank of dams is determined by: o Weighting of Criteria (eg. Habitat Quality) o Each Criteria has measurable indicators (eg. Presence of SNHA at dam) o Each indicator is ranked from 0 to 1 o Indicators are weighted within criteria Objective: Identify the Best Dams to Remove Criteria Criteria Criteria Criteria Indicator Indicator Indicator Indicator Indicator Indicator Indicator Indicator

10 Criteria Criteria are qualities that make a dam good to remove: The dam is on an area of high habitat quality Removal of dam will maximize connectivity of river network Dam is on area of high water quality, or on an area of low water quality directly attributed to dam Dam is on a stream with a high flow rate Dam has social attributes that make it easier to remove Dam has safety concerns Criteria are weighted

11 Indicators Indicators are data attributed to the dam within a criterion: ie: Habitat Criterion Dam is on a stream with a natural heritage area Dam is on a stream with an excellent benthic community Dam is close to an anadromous fish spawning area. Dam is on an area designated as having outstanding resource waters Indicators are ranked and weighted within a criterion

12

13 I: Data Sources Barrier dataset a combination of: o NC Dam Safety (NC Dam Safety Program) o Aquatic Obstruction Inventory (NC DENR, USFWS) o National Inventory of Dams (USACE) o FERC Hydropower dataset Habitat Metric Data NC Natural Heritage NC DMF NC Museum of Natural Sciences Collection NC WRC USFWS NOAA

14 Organize Barrier Dataset Tool Input: Barrier Dataset Associate indicator data with Barrier dataset Habitat Quality SNHA Connectivity Upstream mileage Water Quality Impaired streams Model: Barrier Prioritization Indicators and criteria weighted according to user Flow Stream Order Output: Shapefile of ranked dams Social Use Ownership Safety Hazards Hazard

15 The Prioritization Tool Package User selects Geographic Area User selects barrier dataset User selects and adds weights to indicators for each criterion Users adds weights to criteria Tool adds criteria fields and a rank field to the dataset Tool outputs ranked shapefile o Dataset can be sorted and viewed in order of highest to lowest rank

16 II: NC BPT and the Cape Fear Prioritizing dams in the Cape Fear River Basin is part of the Cape Fear River Partnership Action Plan, Action # 2.2. To address this item, we will: Run the NC BPT in its current state on the Cape Fear River Basin using default anadromous fish scenario weights. Run the BPT after its update with new data Run the SEACAP tool on the Cape Fear Basin once it is completed in December of 2014 COMPARE the three outputs. NOAA.gov

17 Anadromous Fish Round One: Criteria and Indicator Weights

18 Anadromous Fish Round One: Results Lock And Dam #1 Lock And Dam #2 Huske Lock And Dam B. Everett Jordan Lake High Falls Woodlake Dam Un-named Un-named, Adjacent to 95 Upchurch Lake Dam UN-NAMED Randleman Dam Hope Mills Dam #1 Oakdale Cotten Mills Da Charles L. Turner Reser City Lake Dam Cox Lake Dam Phillips Creek Dam UN-NAMED Orton Lake Dam Cedar Falls Upper

19

20 Cape Fear Users Cape Fear Users Following update, will run the tool for CPF Basin Updates will include new data from the Museum of Natural Sciences. Updated anadromous fish spawning Flow as a means of species location information Updated connectivity Updated social attributes How can this tool help you? Leverage for project funds Project selection efficiency How can it be improved?

21 Questions?

A GIS Tool Prioritizing Dams for Removal within the State of North Carolina. By: Kathleen McCole Hoenke. May 2012

A GIS Tool Prioritizing Dams for Removal within the State of North Carolina. By: Kathleen McCole Hoenke. May 2012 A GIS Tool Prioritizing Dams for Removal within the State of North Carolina By: Kathleen McCole Hoenke Dr. Mukesh Kumar, Co-Advisor Dr. Martin Doyle, Co-Advisor American Rivers, Client May 2012 Masters

More information

Penobscot II: Penobscot Habitat Blueprint Barrier Prioritization Tool: Assessing the Ecological Impacts of Barriers in the Penobscot River Basin

Penobscot II: Penobscot Habitat Blueprint Barrier Prioritization Tool: Assessing the Ecological Impacts of Barriers in the Penobscot River Basin University of Massachusetts Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish

More information

Hydropower Project License Summary YADKIN AND PEE DEE RIVERS, NORTH CAROLINA YADKIN-PEE DEE HYDROELECTRIC PROJECT (P-2206)

Hydropower Project License Summary YADKIN AND PEE DEE RIVERS, NORTH CAROLINA YADKIN-PEE DEE HYDROELECTRIC PROJECT (P-2206) Hydropower Project License Summary YADKIN AND PEE DEE RIVERS, NORTH CAROLINA YADKIN-PEE DEE HYDROELECTRIC PROJECT (P-2206) Photo Credit: Duke Energy Tillery Dam This summary was produced by the Hydropower

More information

Follow this and additional works at:

Follow this and additional works at: University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish

More information

CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND RESTORATION PLAN. Habitat GIT Meeting 9 May 2017

CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND RESTORATION PLAN. Habitat GIT Meeting 9 May 2017 CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 131 132 122 239 65 53 80 119 27 RESTORATION PLAN 110 135 120 252 174.59 112 92 56 62 102

More information

Pacific Northwest Region, Forest Service Basin-scale Restoration Prioritization Process

Pacific Northwest Region, Forest Service Basin-scale Restoration Prioritization Process Pacific Northwest Region, Forest Service Basin-scale Restoration Prioritization Process Pacific Northwest Region U.S.D.A. Forest Service Dave Heller, Regional Fish Program Leader Bruce McCammon, Regional

More information

Cape Fear River Water Supply Evaluation

Cape Fear River Water Supply Evaluation Cape Fear River Water Supply Evaluation March 30, 2016 Division of Water Resources Cape Fear River WaterSupply Evaluation Todays goal: Review the Draft Cape Fear River Water Supply Evaluation Review the

More information

Little River Watershed Restoration Project. Mark Powell, Consultant Natural Resources Management

Little River Watershed Restoration Project. Mark Powell, Consultant Natural Resources Management Little River Watershed Restoration Project Mark Powell, Consultant Natural Resources Management Lessons Learned Strong partnerships RC&D, Soil and Water, 2 counties, Albemarle Commission, Universities,

More information

Aquatic Resource Mitigation Fund

Aquatic Resource Mitigation Fund Aquatic Resource Mitigation Fund Lori Sommer- Mitigation Program Coordinator Land Resource Management Program NH Department of Environmental Services PRESENTATION OVERVIEW Brief overview on mitigation

More information

Barrier Removal Prioritization for Stream Resident Species on the Westfield River in Western Massachusetts

Barrier Removal Prioritization for Stream Resident Species on the Westfield River in Western Massachusetts University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish

More information

RECOMMENDED FRAMEWORK FOR EVALUATING ECOLOGICAL FLOWS IN THE STREAMS AND RIVERS OF NORTH CAROLINA

RECOMMENDED FRAMEWORK FOR EVALUATING ECOLOGICAL FLOWS IN THE STREAMS AND RIVERS OF NORTH CAROLINA RECOMMENDED FRAMEWORK FOR EVALUATING ECOLOGICAL FLOWS IN THE STREAMS AND RIVERS OF NORTH CAROLINA Conducted by: RTI and USGS Funded by: Environmental Defense Fund, NC DENR, and NC WRC COMPONENTS Flow Alteration

More information

COORDINATING A MULTI-YEAR, MULTI-MILLION DOLLAR WATERSHED-WIDE FISH PASSAGE PROGRAM

COORDINATING A MULTI-YEAR, MULTI-MILLION DOLLAR WATERSHED-WIDE FISH PASSAGE PROGRAM COORDINATING A MULTI-YEAR, MULTI-MILLION DOLLAR WATERSHED-WIDE FISH PASSAGE PROGRAM A Case Study of Major Dam Natural Fishways & Removal Coordinating Resources for Measurable Outcomes Andrew T. Struck,

More information

River Basin Management of the Meuse

River Basin Management of the Meuse River Basin Management of the Meuse The IMC Masterplan for Migratory Fish Willem L.M. Schreurs Secretary General EC IEA Hydropower Workshop, Brussels 29 30 May 2017 River Basin Management of the Meuse

More information

Mohawk River Basin Research Initiative

Mohawk River Basin Research Initiative Mohawk River Basin Research Initiative 2014-2016 In 2009 the New York Ocean and Great Lakes Ecosystem Council issued a report entitled Our Waters, Our Communities, Our Futures which recommended an ecosystem-based

More information

ILF Instrument Development and Execution. The North Carolina Experience September 15, 2010

ILF Instrument Development and Execution. The North Carolina Experience September 15, 2010 ILF Instrument Development and Execution The North Carolina Experience September 15, 2010 Presentation Overview EEP Background Instrument Development Process Content of Agreement Q&A (but feel free to

More information

Integrating Biodiversity & Infrastructure Priorities

Integrating Biodiversity & Infrastructure Priorities Integrating Biodiversity & Infrastructure Priorities Bill Napolitano Director of Environmental Planning, Southeastern Regional Planning and Economic Development District Jennifer Carlino Conservation Agent

More information

Chapter 11: Recommendations. Chapter 11 DIADROMOUS FISH HABITAT CONSERVATION AND RESTORATION RECOMMENDATIONS AND/OR REQUIREMENTS

Chapter 11: Recommendations. Chapter 11 DIADROMOUS FISH HABITAT CONSERVATION AND RESTORATION RECOMMENDATIONS AND/OR REQUIREMENTS Chapter 11: Recommendations Chapter 11 DIADROMOUS FISH HABITAT CONSERVATION AND RESTORATION RECOMMENDATIONS AND/OR REQUIREMENTS 445 Atlantic Coast Diadromous Fish Habitat Group I. Recommendations for All

More information

EXECUTIVE SUMMARY. Consultative Committee Report Jordan River Water Use Plan

EXECUTIVE SUMMARY. Consultative Committee Report Jordan River Water Use Plan EXECUTIVE SUMMARY The consultative process was initiated in April 2000 and completed in November 2001. The consultative process follows the steps outlined in the 1996 provincial government Water Use Plan

More information

Workshop Summary Great Plains Native Fish Conservation Network February 7, 2017 Cornhusker Hotel, Lincoln, Nebraska

Workshop Summary Great Plains Native Fish Conservation Network February 7, 2017 Cornhusker Hotel, Lincoln, Nebraska Workshop Summary Great Plains Native Fish Conservation Network February 7, 2017 Cornhusker Hotel, Lincoln, Nebraska Participants: Great Plains Native Fish Conservation Network Vision Statement: Rivers

More information

Session A1- Basinwide approaches to prioritizing stream connectivity projects

Session A1- Basinwide approaches to prioritizing stream connectivity projects University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish

More information

Session A7 - A Systematic Approach to Improve Passage at Dams Necessary for Recovery of Endangered Atlantic Salmon in Maine

Session A7 - A Systematic Approach to Improve Passage at Dams Necessary for Recovery of Endangered Atlantic Salmon in Maine University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish

More information

Introduction. What is a River Basin Restoration Priority? Criteria for Selecting a Targeted Local Watershed (TLW) Savannah River Basin Overview

Introduction. What is a River Basin Restoration Priority? Criteria for Selecting a Targeted Local Watershed (TLW) Savannah River Basin Overview Savannah River Basin Restoration Priorities 2008 2 TABLE OF CONTENTS Introduction 1 What is a River Basin Restoration Priority? 1 Criteria for Selecting a Targeted Local Watershed (TLW) 2 Savannah River

More information

Council CNL (15)43. Maintaining and improving river connectivity: the current position and experience in England

Council CNL (15)43. Maintaining and improving river connectivity: the current position and experience in England Agenda item 5.2 For information Council CNL (15)43 Maintaining and improving river connectivity: the current position and experience in England CNL(15)43 Maintaining and improving river connectivity: the

More information

PUBLIC NOTICE REQUEST FOR PERMISSION TO MODIFY A U.S. ARMY CORPS OF ENGINEERS PROJECT UNDER SECTION 408

PUBLIC NOTICE REQUEST FOR PERMISSION TO MODIFY A U.S. ARMY CORPS OF ENGINEERS PROJECT UNDER SECTION 408 ECP-2018-S408-0002 PUBLIC NOTICE REQUEST FOR PERMISSION TO MODIFY A U.S. ARMY CORPS OF ENGINEERS PROJECT UNDER SECTION 408 TITLE: Cape Fear River Lock and Dam No. 1, Proposed Construction of Fish Passage

More information

Charter: Great Lakes Region Aquatic Habitat Connectivity Collaborative

Charter: Great Lakes Region Aquatic Habitat Connectivity Collaborative Charter: Great Lakes Region Aquatic Habitat Connectivity Collaborative Preamble Aquatic Habitat Connectivity The nature and extent of habitat connectivity is a key contributor to biodiversity conservation

More information

Upper Mississippi River Conference 2016 Action Agenda: Raise the Grade

Upper Mississippi River Conference 2016 Action Agenda: Raise the Grade Upper Mississippi River Conference 2016 Action Agenda: Raise the Grade December 16, 2016 On Oct. 13 14, 2016, a partnership of river stakeholders hosted the ninth annual Upper Mississippi River Conference,

More information

CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND RESTORATION PLAN. Update to Chesapeake Bay Program Management Board June 14, 2018

CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND RESTORATION PLAN. Update to Chesapeake Bay Program Management Board June 14, 2018 CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 131 132 122 239 65 53 80 119 27 RESTORATION PLAN 110 135 120 252 174.59 112 92 56 62 102

More information

RE: Fishery evaluation for South, Old Cow Creek Hydroelectric Facilities

RE: Fishery evaluation for South, Old Cow Creek Hydroelectric Facilities April 29th, 2008 Richard Ely, Davis Hydro 27264 Meadowbrook Drive Davis CA 95618 RE: Fishery evaluation for South, Old Cow Creek Hydroelectric Facilities On January 29 th, 2008 Cramer biologists Joseph

More information

North Carolina Nutrient Criteria Development Plan

North Carolina Nutrient Criteria Development Plan North Carolina Nutrient Criteria Development Plan June 20, 2014 Submitted to the United States Environmental Protection Agency - Region 4 by the North Carolina Department of Environment and Natural Resources

More information

Estuary Habitat Restoration STRATEGY 2012

Estuary Habitat Restoration STRATEGY 2012 Estuary Habitat Restoration STRATEGY 2012 INTRODUCTION The Estuary Restoration Act of 2000 (ERA), as amended, (title I of Pub. L. 106 457) fosters a collaborative and comprehensive process among federal

More information

Milburnie Dam Removal

Milburnie Dam Removal INFO KIT RALEIGH-BASED RESTORATION SYSTEMS, an ecological restoration and environmental mitigation company, is excited to announce the initiation of the removal of the Milburnie Dam on the Neuse River.

More information

DEVELOPING A WATERSHED IMPROVEMENT PLAN TO MEET MULTIPLE COMMUNITY OBJECTIVES IN GAINESVILLE AND HALL COUNTY, GEORGIA

DEVELOPING A WATERSHED IMPROVEMENT PLAN TO MEET MULTIPLE COMMUNITY OBJECTIVES IN GAINESVILLE AND HALL COUNTY, GEORGIA DEVELOPING A WATERSHED IMPROVEMENT PLAN TO MEET MULTIPLE COMMUNITY OBJECTIVES IN GAINESVILLE AND HALL COUNTY, GEORGIA Chrissy, Thom 1, David Dockery 2, Kevin McInturff 3, Betsy Massie 1, and Lauren Murphy

More information

Habitat GIT Fish Passage, Brook Trout, Cosatal Habitats STAC Workshop (Mike Slattery)

Habitat GIT Fish Passage, Brook Trout, Cosatal Habitats STAC Workshop (Mike Slattery) Update: Fish Passage Workgroup, Habitat GIT Background The fish passage workgroup is part of the Habitat Goal Implementation Team. Fish Passage Outcome: During the period of 2011-2025, restore historical

More information

2017 Lake Hartwell Association

2017 Lake Hartwell Association 2017 Lake Hartwell Association By Stan Simpson Water Manager/Civil Engineer Savannah District 14 October 2017 Trusted Partners Delivering Value, Today and Tomorrow CHARLESTON JACKSONVILLE MOBILE SAVANNAH

More information

Prioritizing Land Conservation to Protect Water Quality in North Carolina s Triangle Region

Prioritizing Land Conservation to Protect Water Quality in North Carolina s Triangle Region Prioritizing Land Conservation to Protect Water Quality in North Carolina s Triangle Region By Emily Chapin Dr. Dean Urban, Advisor May 2015 Final Draft Masters project submitted in partial fulfillment

More information

Formal ILP Proposed Study Plan Review

Formal ILP Proposed Study Plan Review Formal ILP Proposed Study Plan Review August 15, 2012 Prepared by R2 Resource Consultants Fish and Aquatic Resources Proposed Studies Characterization of Aquatic Habitats in the Susitna River with Potential

More information

Upper Narragansett Bay Fish Passage: Case Studies in Connectivity Restoration

Upper Narragansett Bay Fish Passage: Case Studies in Connectivity Restoration Upper Narragansett Bay Fish Passage: Case Studies in Connectivity Restoration by Larry R. Oliver 1 and Wendy C. Gendron 2 OVERVIEW: Connectivity is an essential consideration and attribute of most aquatic

More information

Linking Water Quality and Migratory Fish Passage to Economic Contributions of Fisheries and Water Use

Linking Water Quality and Migratory Fish Passage to Economic Contributions of Fisheries and Water Use Insert Your Image Here Linking Water Quality and Migratory Fish Passage to Economic Contributions of Fisheries and Water Use Project/Grant Objective 1. Delineate impacts to drinking water quality from

More information

Aquatic habitat offset to address cumulative impacts in the context of hydropower development

Aquatic habitat offset to address cumulative impacts in the context of hydropower development Aquatic habitat offset to address cumulative impacts in the context of hydropower development Special IAIA Symposium on Biodiversity & Ecosystem Services in Impact Assessment Aquatic Biodiversity and Ecological

More information

What Is Salmonid Habitat Intrinsic Potential (IP) Modeling

What Is Salmonid Habitat Intrinsic Potential (IP) Modeling What Is Salmonid Habitat Intrinsic Potential (IP) Modeling An Overview of Fundamental Aspects Keven Bennett UW / Olympic Natural Resources Center Outer Washington Coast IP Modeling Peer Review Workshop

More information

Prioritizing Target Watersheds for Action Project Implementation Committee Meeting May 3, 2018

Prioritizing Target Watersheds for Action Project Implementation Committee Meeting May 3, 2018 Prioritizing Target Watersheds for Action Project Implementation Committee Meeting May 3, 2018 Evaluation Criteria 1. Priority Restoration Watershed 2. Priority Conservation Watershed 3. Priority Freshwater

More information

Chapter Three: Discussion and Conclusion. 3.1 Introduction/Overview. 3.2 Countywide Stream Assessment

Chapter Three: Discussion and Conclusion. 3.1 Introduction/Overview. 3.2 Countywide Stream Assessment 3.1 Introduction/Overview The objective of this study was to develop a stream prioritization tool that evaluates stream reaches in terms of the potential water quality improvements that could be achieved

More information

Fish Passage Culvert Inspection (FPCI)

Fish Passage Culvert Inspection (FPCI) Fish Passage Culvert Inspection (FPCI) Creighton Creek (CR) Watershed FIA Project Number SOTSA 9153004 Prepared for: Tolko Industries Ltd., Okanagan Regional Woodlands Prepared by: Michele Trumbley, RPBio

More information

Status Ecological Flows in NC and Complications of Being on the Coast. Bob Christian East Carolina University Greenville, North Carolina USA

Status Ecological Flows in NC and Complications of Being on the Coast. Bob Christian East Carolina University Greenville, North Carolina USA Status Ecological Flows in NC and Complications of Being on the Coast Bob Christian East Carolina University Greenville, North Carolina USA Outline NC Ecological Flows and Science Advisory Board (EFSAB)

More information

1:24K Fish Habitat Distribution Development Project. Data Format Outlines and Data Compilation Protocols

1:24K Fish Habitat Distribution Development Project. Data Format Outlines and Data Compilation Protocols 1:24K Fish Habitat Distribution Development Project Data Format Outlines and Data Compilation Protocols Information Workshop, Salem, Oregon May 8, 2001 Fish Habitat Distribution Data Outline A. Data description:

More information

Farmington Dam Repurpose Project

Farmington Dam Repurpose Project Farmington Dam Repurpose Project 2017 $158,100,000 to re-purpose the Farmington Dam from flood protection only to a long-term water storage facility that increases water supply reliability to the region.

More information

What is a River Basin Restoration Priority? 1. Criteria for Selecting a Targeted Local Watershed (TLW) 2. Broad River Basin Overview 3

What is a River Basin Restoration Priority? 1. Criteria for Selecting a Targeted Local Watershed (TLW) 2. Broad River Basin Overview 3 Broad River Basin Restoration Priorities 2009 TABLE OF CONTENTS Introduction 1 What is a River Basin Restoration Priority? 1 Criteria for Selecting a Targeted Local Watershed (TLW) 2 Broad River Basin

More information

Staff summary of Issues & Recommendations Protected Areas

Staff summary of Issues & Recommendations Protected Areas Staff summary of Issues & Recommendations Protected Areas *Preliminary draft, please refer to full recommendations for complete review 10/29/2013 10:06 AM 2009 Fish and Wildlfe Program Section Section

More information

Status of the Ohio River Basin Fish Habitat Partnership

Status of the Ohio River Basin Fish Habitat Partnership Southern Illinois University Carbondale OpenSIUC Cache River Symposium Symposia 10-2010 Status of the Ohio River Basin Fish Habitat Partnership Nate Caswell US Fish and Wildlife Service Follow this and

More information

ENVIRONMENTAL CONSIDERATIONS FOR EVALUATING INTERBASIN WATER TRANSFERS IN GEORGIA

ENVIRONMENTAL CONSIDERATIONS FOR EVALUATING INTERBASIN WATER TRANSFERS IN GEORGIA ENVIRONMENTAL CONSIDERATIONS FOR EVALUATING INTERBASIN WATER TRANSFERS IN GEORGIA Nolton G. Johnson, Steven R. Layman, and Cristin C. Krachon AUTHORS: Geosyntec Consultants, 1255 Roberts Blvd NW, Suite

More information

Fish Habitat Outcome Management Strategy , v.1

Fish Habitat Outcome Management Strategy , v.1 Management Strategy 2015 2025, v.1 I. Introduction Fish and shellfish in the Chesapeake Bay and its watershed rely on a variety of important habitats throughout the watershed. These habitats, which are

More information

Meacham Creek Fish Habitat Enhancement: Application of the CTUIR River Vision

Meacham Creek Fish Habitat Enhancement: Application of the CTUIR River Vision Meacham Creek Fish Habitat Enhancement: Application of the CTUIR River Vision Future of Our Salmon A Vision of Restoration in the Columbia River Basin June 1, 2011 James Webster Confederated Tribes of

More information

Low Impact Hydropower Institute 34 Providence Street Portland, ME Tel. (207) Fax (206)

Low Impact Hydropower Institute 34 Providence Street Portland, ME Tel. (207) Fax (206) Low Impact Hydropower Institute 34 Providence Street Portland, ME 04103 Tel. (207) 773-8190 Fax (206) 984-3086 www.lowimpacthydro.org LOW IMPACT HYDROPOWER QUESTIONNAIRE E. LOW IMPACT HYDROPOWER QUESTIONNAIRE

More information

Susitna-Watana Hydroelectric Project (FERC No )

Susitna-Watana Hydroelectric Project (FERC No ) (FERC No. 14241) Analysis of Fish Harvest in and Downstream of the Area Study Plan Section 9.15 Initial Study Report Prepared for Prepared by R2 Resource Consultants, Inc. February 2014 Draft TABLE OF

More information

DRAINAGE MASTER PLAN FOR THE TOWN OF BLOOMING GROVE AND VILLAGES OF WASHINGTONVILLE AND SOUTH BLOOMING GROVE

DRAINAGE MASTER PLAN FOR THE TOWN OF BLOOMING GROVE AND VILLAGES OF WASHINGTONVILLE AND SOUTH BLOOMING GROVE DRAINAGE MASTER PLAN FOR THE TOWN OF BLOOMING GROVE AND VILLAGES OF WASHINGTONVILLE AND SOUTH BLOOMING GROVE PUBLIC MEETING March 8, 2017 LOGISTICS Meeting Agenda: Presentation (7:15 7:45 pm) [Auditorium]

More information

Beaver Creek Hydrology, LLC. Franklin, Tennessee

Beaver Creek Hydrology, LLC. Franklin, Tennessee Beaver Creek Hydrology, LLC. Franklin, Tennessee The Harpeth River Blueway Problems with Harpeth River EPA s 303(d) Listed for siltation, habitat alteration, nutrient enrichment and low dissolved oxygen

More information

Using GIS for Prioritization in Subwatershed Restoration

Using GIS for Prioritization in Subwatershed Restoration Using GIS for Prioritization in Subwatershed Restoration Elena Horvath Advisor: Joseph Bishop, PhD November 10, 2011 The Pennsylvania State University Master in Geographic Information Systems www.gis.psu.edu

More information

The Piedmont Nutrient Reduction Sourcebook

The Piedmont Nutrient Reduction Sourcebook Working with Local Governments: The Piedmont Nutrient Reduction Sourcebook Strategies for Reducing and Managing Nutrients to Waters of the North Carolina Piedmont Southeast Stormwater Association Annual

More information

Case Studies III: Skokomish River Ecosystem Restoration Washington State

Case Studies III: Skokomish River Ecosystem Restoration Washington State University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish

More information

NEW Water: Green Bay Metropolitan Sewerage District

NEW Water: Green Bay Metropolitan Sewerage District NEW Water: Green Bay Metropolitan Sewerage District Third largest wastewater treatment facility in Wisconsin Currently treat 38 million gallons a day Two facilities Green Bay Facility (30mgd) De Pere Facility

More information

Wetland and Stream Functional Assessment in North Carolina- A New Regulatory World?

Wetland and Stream Functional Assessment in North Carolina- A New Regulatory World? Wetland and Stream Functional Assessment in North Carolina- A New Regulatory World? John R. Dorney Moffatt & Nichol, Raleigh, NC September 14, 2015 North Carolina APWA Stormwater Conference, Wilmington,

More information

North Carolina Nutrient Criteria Development Plan

North Carolina Nutrient Criteria Development Plan North Carolina Nutrient Criteria Development Plan Version 2.0 March 3, 2014 Submitted to the United States Environmental Protection Agency - Region 4 by the North Carolina Department of Environment and

More information

The South Atlantic Third Thursday Web Forum

The South Atlantic Third Thursday Web Forum The South Atlantic Third Thursday Web Forum Call in for audio: 866-720-8724 2917595555# Using the South Atlantic and Southeast Conservation Blueprints to inform your organization s priorities 7-19-2018

More information

Modeling the Middle and Lower Cape Fear River using the Soil and Water Assessment Tool Sam Sarkar Civil Engineer

Modeling the Middle and Lower Cape Fear River using the Soil and Water Assessment Tool Sam Sarkar Civil Engineer Modeling the Middle and Lower Cape Fear River using the Soil and Water Assessment Tool Sam Sarkar Civil Engineer Outline Problem statement and project objectives Watershed model development Model calibration

More information

Monitoring Water Resources

Monitoring Water Resources Department of Environment and Natural Resources Division of Water Resources STATUS REPORT TO THE GENERAL ASSEMBLY ON WATER SUPPLY PLANNING SEPTEMBER 1, 2008 THROUGH AUGUST 31, 2009 Assuring a sustainable

More information

Solutions through Science. Hydropower. Services and Solutions for Environmental Compliance

Solutions through Science. Hydropower. Services and Solutions for Environmental Compliance Solutions through Science Hydropower Services and Solutions for Environmental Compliance Hydropower facilities are never the same. Site-specific environmental conditions, operating requirements, or budget

More information

Chapter 3: Fish Passage on Mainstream Dams

Chapter 3: Fish Passage on Mainstream Dams MRC Preliminary Design Guidance (PDG) for Proposed Mainstream Dams in the LMB Chapter 3: Fish Passage on Mainstream Dams So Nam MRC Fisheries Programme Coordinator Fish and Hydropower Workshop Research

More information

Conceptual Design and Feasibility of a Natural Fishway at the Fremont BART Weir, Alameda Creek, California

Conceptual Design and Feasibility of a Natural Fishway at the Fremont BART Weir, Alameda Creek, California Conceptual Design and Feasibility of a Natural Fishway at the Fremont BART Weir, Alameda Creek, California Final Report September 2005 Prepared by Center for Ecosystem Management and Restoration, Oakland,

More information

Restoring Rivers Through Dam Removal

Restoring Rivers Through Dam Removal Restoring Rivers Through Dam Removal Thomas Ardito Narragansett Bay Estuary Program Chris Fox Wood-Pawcatuck Watershed Association Who We Are: Narragansett Bay Estuary Program Mission: To protect and restore

More information

NC Water Resources Planning April 4, Tom Fransen. North Carolina Division of Water Resources 1

NC Water Resources Planning April 4, Tom Fransen. North Carolina Division of Water Resources 1 NC Water Resources Planning April 4, 2011 Tom Fransen North Carolina Division of Water Resources 1 Water links us to our neighbor in a way more profound and complex than any other. -John Thorson 1/18/2011

More information

Prioritizing Habitat Projects in Areas of Concern Throughout the Great Lakes

Prioritizing Habitat Projects in Areas of Concern Throughout the Great Lakes Prioritizing Habitat Projects in Areas of Concern Throughout the Great Lakes Karen Rodriguez U.S. Environmental Protection Agency Great Lakes National Program Office August 1, 2013 Great Lakes Water Quality

More information

NFWF Coastal Watershed Resilience Assessments for Seven U.S. Watersheds Request for Proposals: Responses to Offeror s Questions 11/9/16

NFWF Coastal Watershed Resilience Assessments for Seven U.S. Watersheds Request for Proposals: Responses to Offeror s Questions 11/9/16 NFWF Coastal Watershed Resilience Assessments for Seven U.S. Watersheds Request for Proposals: Responses to Offeror s Questions 11/9/16 Background Documents/Related Products 1) Can NFWF provide the name

More information

KILARC RESERVOIR PLANNING UNIT Cow-Battle Creek Watershed

KILARC RESERVOIR PLANNING UNIT Cow-Battle Creek Watershed Existing Conditions & Uses Overview Canal, small forebay, and powerhouse surrounded by private land in a rural setting 111 acres in Shasta County; 16 acres outside the FERC boundary and 95 acres inside

More information

Basin-Scale Hydropower and Environmental Opportunity Assessments

Basin-Scale Hydropower and Environmental Opportunity Assessments Basin-Scale Hydropower and Environmental Opportunity Assessments A framework for identifying and evaluating hydropower and environmental opportunities and linkages Simon Geerlofs, Jerry Tagestad, Kyle

More information

Presentation at the Woodrow Wilson International Center for Scholars Charles Lawson and Willem Brakel July 23, 2009

Presentation at the Woodrow Wilson International Center for Scholars Charles Lawson and Willem Brakel July 23, 2009 Presentation at the Woodrow Wilson International Center for Scholars Charles Lawson and Willem Brakel July 23, 2009 40 percent of the border between the U.S. and Canada is water Over 300 lakes and rivers

More information

Outcomes. Kelly Karll-SEMCOG Margaret Barondess - MDOT

Outcomes. Kelly Karll-SEMCOG Margaret Barondess - MDOT Eco-Logical: I-75 Corridor I-75 Conservation Transportation Action Planning in to Monroe Achieve County: Multiple Stormwater Environmental Considerations Outcomes Kelly Karll-SEMCOG Karll@semcog.org Margaret

More information

Modeling Eutrophication Processes in the Delaware Estuary to Link Watershed Efforts to Control Nutrient Impacts

Modeling Eutrophication Processes in the Delaware Estuary to Link Watershed Efforts to Control Nutrient Impacts Modeling Eutrophication Processes in the Delaware Estuary to Link Watershed Efforts to Control Nutrient Impacts Delaware Watershed Research Conference Philadelphia, PA November 8, 2017 Principal Investigators:

More information

REPLACING CULVERTS FOR FLOOD RESILIENCY AND AQUATIC CONNECTIVITY. Cheryl Bondi and Lori Sommer NHDES Aquatic Resource Mitigation Program

REPLACING CULVERTS FOR FLOOD RESILIENCY AND AQUATIC CONNECTIVITY. Cheryl Bondi and Lori Sommer NHDES Aquatic Resource Mitigation Program REPLACING CULVERTS FOR FLOOD RESILIENCY AND AQUATIC CONNECTIVITY Cheryl Bondi and Lori Sommer NHDES Aquatic Resource Mitigation Program How do stream crossings impact aquatic ecosystems and public safety?

More information

Prioritizing Mitigation of Road-Stream Crossings for Resident Aquatic Organisms by Accounting for Habitat Quantity, Quality, and Accessibility

Prioritizing Mitigation of Road-Stream Crossings for Resident Aquatic Organisms by Accounting for Habitat Quantity, Quality, and Accessibility University of Massachusetts Amherst ScholarWorks@UMass Amherst Environmental & Water Resources Engineering Masters Projects Civil and Environmental Engineering 5-2015 Prioritizing Mitigation of Road-Stream

More information

Session C8- Migratory fish, Fish passage and the National Partnership between The Nature Conservancy and NOAA s Community-based Restoration Program

Session C8- Migratory fish, Fish passage and the National Partnership between The Nature Conservancy and NOAA s Community-based Restoration Program University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish

More information

Glades Reservoir Environmental Impact Statement (EIS)

Glades Reservoir Environmental Impact Statement (EIS) Glades Reservoir Environmental Impact Statement (EIS) Permit Application #SAS-2007-00388 Public Scoping Meeting Proposed Operational Plan/Scenarios March 2012 Glades Reservoir Environmental Impact Statement

More information

Reducing Spring Water Temperatures Below Sack Dam

Reducing Spring Water Temperatures Below Sack Dam Study 33 Reducing Spring Water Temperatures Below Sack Dam Final 2015 Monitoring and Analysis Plan January 2015 1.0 Reducing Spring Water Temperatures Below Sack Dam Theme(s): Adult Migration Rearing

More information

Fish Passage EXEMPTION Application

Fish Passage EXEMPTION Application OREGON DEPARTMENT OF FISH AND WILDLIFE Fish Passage EXEMPTION Application Use this form if a waiver has already been granted for the artificial obstruction for which an Exemption is being requested, fish

More information

Available Yield from Reallocation in Federal Reservoirs Excluding Lake Aquilla. The USACE study evaluated four alternatives for each reservoir:

Available Yield from Reallocation in Federal Reservoirs Excluding Lake Aquilla. The USACE study evaluated four alternatives for each reservoir: 4B.18 4B.18.1 BRA Reservoirs Excluding Lake Aquilla 1 4B.18.1.1 Description of Option 2 Reservoirs owned by the United States Army Corps of Engineers (USACE) typically serve multiple functions, including

More information

INTRODUCTION AND BACKGROUND

INTRODUCTION AND BACKGROUND INTRODUCTION AND BACKGROUND Duke Energy Carolinas, LLC (Duke) operated the Dillsboro Hydroelectric Project under a license from the Federal Energy Regulatory Commission (FERC No. 2602). The Project is

More information

Maumee Area of Concern Water Quality Database Development

Maumee Area of Concern Water Quality Database Development Maumee Area of Concern Water Quality Database Development Project Overview Background In 1987 the Maumee Area of Concern (AOC) in northwest Ohio was designated as an Area of Concern based on the identification

More information

Biological Fidelity Analysis of EFS Stream Classes

Biological Fidelity Analysis of EFS Stream Classes Biological Fidelity Analysis of EFS Stream Classes Funded by: Environmental Defense Fund Conducted by: RTI International RTI International is a trade name of Research Triangle Institute. www.rti.org Project

More information

Ceresco Dam Removal Project. Michigan Watershed Summit March 25, 2015 Luke Trumble, P.E., MDEQ-WRD Jay Wesley, MDNR-Fisheries

Ceresco Dam Removal Project. Michigan Watershed Summit March 25, 2015 Luke Trumble, P.E., MDEQ-WRD Jay Wesley, MDNR-Fisheries Ceresco Dam Removal Project Michigan Watershed Summit March 25, 2015 Luke Trumble, P.E., MDEQ-WRD Jay Wesley, MDNR-Fisheries Outline Overview of Ceresco Dam History Public Process Funding Dam Removal Ecosystem

More information

APPENDIX A-3 SALUDA HYDROELECTRIC PROJECT LOWER SALUDA RIVER BENTHIC MACROINVERTEBRATE MONITORING AND ENHANCEMENT PROGRAM

APPENDIX A-3 SALUDA HYDROELECTRIC PROJECT LOWER SALUDA RIVER BENTHIC MACROINVERTEBRATE MONITORING AND ENHANCEMENT PROGRAM APPENDIX A-3 SALUDA HYDROELECTRIC PROJECT LOWER SALUDA RIVER BENTHIC MACROINVERTEBRATE MONITORING AND ENHANCEMENT PROGRAM SOUTH CAROLINA ELECTRIC & GAS COMPANY COLUMBIA, SOUTH CAROLINA SALUDA HYDROELECTRIC

More information

1. Use Conceptual Ecosystem Models. Leigh Skaggs, Office of Water Project Review

1. Use Conceptual Ecosystem Models. Leigh Skaggs, Office of Water Project Review Recent Experiences with Cost Effectiveness and Incremental Cost Analyses (CE/ICA) for Ecosystem Restoration Projects Leigh Skaggs, Office of Water Project Review Recent reviews of Civil Works ecosystem

More information

CNL(10)51. NASCO Guidelines for the Protection, Restoration and Enhancement of Atlantic salmon Habitat

CNL(10)51. NASCO Guidelines for the Protection, Restoration and Enhancement of Atlantic salmon Habitat CNL(10)51 NASCO Guidelines for the Protection, Restoration and Enhancement of Atlantic salmon Habitat 1. Introduction Salmon habitat in freshwater has been greatly affected by various activities, both

More information

Using Climate Science in Hydropower Planning

Using Climate Science in Hydropower Planning Using Climate Science in Hydropower Planning Susan Walker, NOAA- Fisheries Alaska Hydropower Coordinator Andrea J. Ray, Ph.D., NOAA Earth System Research Lab, Physical Sciences Division, Boulder, CO Joseph

More information

PUBLIC NOTICE. Attn: Mr. Bill Mumford 1312 Briar Chapel Parkway Chapel Hill, NC 27516

PUBLIC NOTICE. Attn: Mr. Bill Mumford 1312 Briar Chapel Parkway Chapel Hill, NC 27516 US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: December 5, 2016 Comment Deadline: December 20, 2016 Corps Action ID Number: SAW-2001-21252 The Wilmington District, Corps of Engineers

More information

DRAFT Cape Fear River Water Supply Evaluation

DRAFT Cape Fear River Water Supply Evaluation DRAFT Cape Fear River Water Supply Evaluation Prepared by: North Carolina Division of Water Resources December 2015 Executive Summary The Cape Fear River Water Supply Evaluation reviews the long term water

More information

RESPONSE TO FEBRUARY 16, 2018 REQUEST FOR ADDITIONAL INFORMATION, RESOURCE AGENCY LATE FILING, AND OTHER RELATED INFORMATION ATTACHMENT T

RESPONSE TO FEBRUARY 16, 2018 REQUEST FOR ADDITIONAL INFORMATION, RESOURCE AGENCY LATE FILING, AND OTHER RELATED INFORMATION ATTACHMENT T RESPONSE TO FEBRUARY 16, 2018 REQUEST FOR ADDITIONAL INFORMATION, RESOURCE AGENCY LATE FILING, AND OTHER RELATED INFORMATION ATTACHMENT T DISTRICTS ANALYSIS AND COMMENT ON USFWS ATTACHMENT 5: USE OF COMULATIVE

More information

Cedar River Watershed Habitat Conservation Plan

Cedar River Watershed Habitat Conservation Plan Cedar River Watershed Habitat Conservation Plan Briefing for the WRIA 8 Salmon Recovery Council November 21, 2013 Cyndy Holtz Seattle Public Utilities cyndy.holtz@seattle.gov What is an HCP? Habitat Conservation

More information

South Carolina Department of Natural Resources Georgia Department of Natural Resources American Shad Habitat Plan for the Savannah River

South Carolina Department of Natural Resources Georgia Department of Natural Resources American Shad Habitat Plan for the Savannah River South Carolina Department of Natural Resources Georgia Department of Natural Resources American Shad Habitat Plan for the Savannah River Submitted to the Atlantic States Marine Fisheries Commission as

More information

2016 New England Forests and Rivers Fund Grant Slate

2016 New England Forests and Rivers Fund Grant Slate 2016 New England Forests and Rivers Fund Grant Slate NFWF CONTACTS Amanda Bassow Director, Northeast Regional Office amanda.bassow@nfwf.org 202-595-2476 John Wright Coordinator, Northeast Regional Office

More information

CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND RESTORATION PLAN - UPDATE. Update to Chesapeake Bay Program STAR January 25, 2018

CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND RESTORATION PLAN - UPDATE. Update to Chesapeake Bay Program STAR January 25, 2018 CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND RESTORATION 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 PLAN - UPDATE 131 132 122 239 65 53 80 119 27 110 135 120 252 174.59 112 92

More information

Interview Summary October 14, 2009

Interview Summary October 14, 2009 NORTH SANTIAM RIVER BASIN WATER MANAGEMENT Interview Summary October 14, 2009 I. Introduction Oregon Consensus (OC) is a program of the National Policy Consensus Center in PSU s Hatfield School of Government.

More information