1 DECISION MATRIX FOR LIQUID LOADING IN GAS WELLS FOR COST/BENEFIT ANALYSES OF LIFTING OPTIONS A Thesis by HAN-YOUNG PARK Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE May 2008 Major Subject: Petroleum Engineering

2 DECISION MATRIX FOR LIQUID LOADING IN GAS WELLS FOR COST/BENEFIT ANALYSES OF LIFTING OPTIONS A Thesis by HAN-YOUNG PARK Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE Approved by: Chair of Committee, Committee Members, Head of Department, Gioia Falcone Catalin Teodoriu Marietta J. Tretter Stephen A. Holditch May 2008 Major Subject: Petroleum Engineering

3 iii ABSTRACT Decision Matrix for Liquid Loading in Gas Wells for Cost/Benefit Analyses of Lifting Options. (May 2008) Han-Young Park, B.S., Hanyang University, Seoul Chair of Advisory Committee: Dr. Gioia Falcone Field-proven solutions already exist to reduce the loss of gas production when liquid loading begins to occur. However, the choice of remedial technique, its feasibility, and its cost, vary considerably depending on a field s location, size export route, and the individual operator s experience. The selection of the best remedial technique and the timeframe within which the remedial action is undertaken are critical to a project s profitability. Although there are literature reviews available regarding solutions to liquid loading problems in gas wells, a tool capable of helping an operator select the best remedial option for a specific field case still does not exist. This thesis proposes a newly developed decision matrix to screen the possible remedial options available to the operator. The matrix can not only provide a critical evaluation of potential solutions to the problem of liquid loading in gas wells vis-à-vis the existing technical and economic constraints, but can also serve as a reference to operators for investment decisions and as a quick screening tool for the selection of production optimisation strategies.

4 iv Under its current status of development, this new tool consists of a decision algorithm built around a decision tree. Unlike other data mining techniques, decision trees quickly allow for subdividing large initial datasets into successively smaller sets by a series of decision rules. The rules are based on information available in the public domain. The effectiveness of the matrix is now ready to be tested against real field datasets.

5 v DEDICATION TO MY WIFE AND DAUGHTER

6 vi ACKNOWLEDGEMENTS First of all, I would like to express my sincere gratitude and appreciation to my advisor, Dr. Gioia Falcone for her invaluable guidance, encouragement, and continuous technical advice in completing this work. I am extremely grateful to Dr. Catalin Teodoriu and Dr. Marietta J. Tretter who served as members of my committee for helping me throughout the completion of my study. I would also like to thank all my officemates and classmates for their friendship and my thanks go to Texas A&M University for the quality education that I have received and for being the home that I will never forget. Finally, I thank God for empowering and guiding me during the course of my Master of Science degree.

7 vii TABLE OF CONTENTS Page ABSTRACT... DEDICATION... ACKNOWLEDGEMENTS... TABLE OF CONTENTS... LIST OF FIGURES... LIST OF TABLES... iii v vi vii ix xi CHAPTER I IMPORTANCE OF THIS RESEARCH Introduction Objectives... 2 II LITERATURE REVIEW Liquid Loading in Gas Wells Remedial Options to Reduce Liquid Loading Problems Current Development Status on Prediction of Liquid Loading and Selection of Remedial Options Limiation of Previous Attemps to Select Remedial Options III METHODOLOGY AND APPROACH TO DECISION MATRIX Possible Approaches: Data Mining Techniques Approach Chosen for This Work Consideration Factors in Selection of Techniques IV DEVELOPMENT OF DECISION MATRIX... 41

8 viii CHAPTER Page 4.1 Introduction Decision Tree & Preliminary Screening [Round 1] Technical Evaluation of Lifting Options [Round 2] Economic Evaluation of Lifting Options [Round 3] Decision Matrix Programming Field Data to Validate Decision Matrix V CONCLUSION AND RECOMMENDATION FOR FUTURE WORK Conclusion Recommendation for Future Work NOMENCLATURE REFERENCES VITA... 79

9 ix LIST OF FIGURES FIGURE Page 2.1 Flow regimes in vertical multiphase flow Progression of a typical gas well Decline curve showing onset of liquid loading Map of deliquification options Plunger lift installation Plunger lift cycle Gas lift ESP system PCP system Sucker rod pump system Hydraulic pumping Well performance model for gas wells with liquid loading problem Multi-criteria model Neural network model Neural network activation Example of decision tree SVD projection(1) SVD projection(2) Example of K-NN Work flow and possible approaches to data mining General structure of decision matrix Developed decision tree to screen remedial options Applicability of technical remedial options by well deviation Applicability of technical remedial options by well depth Applicability of technical remedial options by operating volume....50

10 x FIGURE Page 4.7 Approximate depth-rate application chart of technical remedial options Feasibility of plunger lift for 2 3/8inch tubing and 2 7/8inch tubing GLR requirement for plunger lift with/without packer Applicability of technical remedial options by gravity Programmed decision matrix - Round 1 (1) Programmed decision matrix - Round 1 (2) Programmed decision matrix - Round 1 (3) Programmed decision matrix - Round 1 (4) Programmed decision matrix - Round 1 (5) Programmed decision matrix - Round 2 (1) Programmed decision matrix - Round 2 (2) Programmed decision matrix - Round Programmed decision matrix - Comprehensive review (1) Programmed decision matrix - Comprehensive review (2) Programmed decision matrix - Comprehensive review (3)...70

11 xi LIST OF TABLES TABLE Page 2.1 Remedial Measures to Reduce Liquid Loading Ranking Remedial Measures Power Source of Artificial Lift Methods Technical Evaluation Matrix... 57

12 1 CHAPTER I IMPORTANCE OF THIS RESEARCH 1.1 Introduction Liquid loading is an all too common problem in mature gas fields. It is estimated that at least 90% of the producing gas wells in the U.S. are operating in liquid loading regime. Liquid loading is more detrimental in tight wells than in prolific wells, where it has less impact. The phenomenon is a serious problem in subsea tie-backs, where the mechanics of fluid flow are dominated by back pressure effects through the risers and the flowlines. Although the mechanism of liquid loading is fairly well understood, the oil and gas industry still lacks reliable predictive models. Efforts are being made across the industry and within academia to link the observed well dynamics with the intermittent response of a reservoir that is typical of liquid loading in gas wells. However, the models currently used to predict and diagnose liquid loading problems are mainly based on steady-state analysis and so cannot handle the transient phenomena associated with liquid loading effects. Even when transient multiphase wellbore models are employed, the problem remains ill-posed as a steadystate type of inflow performance relationship is being used to characterize the reservoir. This implies the wrong boundary conditions between the well and the reservoir itself. This thesis follows the publication style of SPE Journal.

13 2 Field-proven solutions already exist to reduce the loss of gas production when liquid loading begins to occur. However, the choice of remedial technique, its feasibility, and its cost vary dependent on the affected field s location, its size, and its export route. Given the limited applicability of current multiphase models and the paucity of published field cases, we propose to approach the problem by gathering and synthesizing field data from key regions worldwide that show different liquid loading characteristics and present different technical and economical challenges. 1.2 Objectives The objective of this research is to build a generic decision matrix, based on data, to screen the possible remedial options available to the operator; in addition, the impact of over-designing and under-designing the production facilities will be evaluated and quantified from a cost/benefit analysis point of view. The matrix will be designed to forecast what profitability may result, either in increased gas sales, increased reserves, or both. The remedial options will include accepted practices and up and coming techniques. Among the various approaches that will be taken to build the decision matrix is the use of what is referred to as a decision tree in data mining techniques. This is a wellknown technique, particularly effective for classification problems, and it is easy to understand and interpret.

14 3 CHAPTER II LITERATURE REVIEW 2.1 Liquid Loading in Gas Wells Flow Patterns in a Gas Well The flow pattern in a vertical production conduit of a gas well is usually illustrated by four basic flow patterns or flow regimes as shown in Fig The flow regimes are largely classified with bubble flow, slug flow, slug-annular transition flow and annularmist flow, which are determined by the velocity of the gas and liquid phases and the relative amounts of gas and liquid at any given point in the flow stream. Fig Flow regimes in vertical multiphase flow (Lea, 2003).

15 4 If the flow pattern is an annular-mist type, the well still may have a relatively low gravity pressure drop. However, as the gas velocity begins to drop, the well flow can become a slug type and then bubble flow. In these cases, a much larger fraction of the tubing volume is filled with liquid. A gas well may go through any or all of these flow regimes during its lifetime. The general progression of a typical gas well from initial production to its end of life is shown in Fig Fig Progression of a typical gas well (Lea, 2003). Initially, the well may show the mist flow regime that brings a high gas rate and then transit into slug-annular transition, slug, and bubble flow with time. Liquid production may also increase as the gas production declines. Flow at the surface will remain in mist

16 5 flow until the conditions change sufficiently at the surface so that the flow exhibits transition flow. Flow downhole may show bubble or slug flow even though the flow regime at the surface looks like a mist flow Occurrence of Liquid Loading Gas and liquid are both produced to surface if the gas velocity is high enough to lift or carry liquid. The problem happens because the velocity of the gas in the tubing drops with time, and the velocity of the liquids decline even faster as the production goes on. As a result, the liquid begins to accumulate in the bottom of the well and liquid slugs are formed in the conduit, which increase the percentage of liquids in the conduits while the well is flowing. The bottomhole pressure increases and gas production decreases until gas flow stops. In other words, the liquid loading process occurs when the gas velocity within the well drops below a certain critical gas velocity. The gas is then unable to lift the water coproduced with the gas (either condensed or formation water) to surface. The water will fall back and accumulate downhole. A hydrostatic column is formed that imposes a back pressure on the reservoir and hence reduces gas production. The process eventually results in intermittent gas production and well die-out. Several sources may be suspected as the source of liquid causing the problem. It is reasonably said that the liquid sources may be from water coning, aquifer water, water produced from another zone, free formation water, and hydrocarbon condensate.

17 Recognizing of Symptoms of Liquid Loading The occurrence of liquid loading in a gas well can be recognized by several symptoms. If it is found out early and then the appropriate action is taken at a proper time, the losses in gas production can be minimized. The symptoms indicating liquid loading summarized by James F. Lea (2004) are like following: o Sharp reduction of flow rate Fig Decline curve showing onset of liquid loading (Lea, 2004). o Onset of liquid slugs at the surface of the well o Increasing difference between the tubing and casing flowing pressure (i.e. p cf -p tf ) with time, measurable without packers present o Sharp changes in gradient on a flowing pressure survey

18 7 2.2 Remedial Lifting Options to Reduce Liquid Loading Problem Many types of technique of remedial lifting have been developed so far. Most of the techniques focus on increasing gas velocity and artificially waterlifting to reduce liquidloading problems. The following table (Veeken, 2003) shows the remedial measures depending on the purpose of use. These methods may be used singly or in combination of two or more. Table Remedial Measures to Reduce Liquid Loading (Veeken, 2003) Classification Increase gas velocity Reduce critical velocity Artificially lift water Remove water Techniques - Intermittent production - Gas lift - Stimulation - Venting - Compression - Velocity string - Compression - Velocity string - Mechanical liner solutions (stinger) - Batch soap sticks / surfactant - Continuous surfactant injection (capillary strings) - Bubble breakers (restriction) - Plunger - Chamber (plunger plus lift gas) - Downhole pump (rod, PCP, ESP) - Swabbing - Downhole separation & Injection (intermittent production) - Heated tubing

19 8 Different classification is shown below, which is presented by C-FER Technologies in According to the map of deliquification options, we can first divide into 4 categories: Reduce water influx, Lift gas and water together, Wellbore separation, and Shut-in well. Wellbore separation further categorizes in two ways: lift water to surface separately and downhole water disposal. Fig Map of deliquification options (Piers, 2007) The remedial options have their own technical characteristics, meaning that the use of them can vary depending on the situation of the well. Thus, at the designing stage, their characteristics should be well-reviewed for the best resolution. In next chapter,

20 9 frequently used techniques are reviewed to discern their applications, advantages, and disadvantages Plunger Lift System Operation A plunger lift system uses gas pressure buildup in a well to lift a column of accumulated liquid out of the well. Basically, the plunger lift system utilizes a plunger traveling up and down inside the tubing to lift the liquid. Fig Plunger lift installation Fig Plunger lift cycle (Lea et al., 2004) Thus, the operation of the plunger system relies on the natural buildup of pressure in a gas well while the well is shut-in. The shut-in pressure of the well must be higher than

21 10 the sales-line pressure to move plunger. The figures above show typical plunger lift installation (Fig. 2.5) and plunger lift operation cycle (Fig. 2.6). Applications A plunger system is good at removing liquid in gas wells if the well has sufficient GLR and the pressure is enough to lift the plunger and liquid slugs. Common applications for plunger lift are as followings: o Gas wells with liquid loading problems; o Intermittent gas lift wells with fallback problems; o Wells with scale and paraffin problems; o Oil production with associated gas. In order to apply the plunger system, there are additional specific requirements or limitations. Wells must produce at least 400scf/bbl per 1,000ft of depth, meaning that high gas-liquid ratio is required to apply plunger system (EPA, 2003). The other limitation is that the wells should have shut-in pressure that is 1.5 times of sales line pressure (EPA, 2003). Advantages / Disadvantages The greatest advantage of the plunger system is the cost. It is very cost effective method: lower installation and lower operation cost. This system requires no outside energy source to operate because it uses the well s natural energy. The plunger enables

22 11 the well to clean off paraffin deposits so it is useful for the wells experiencing paraffin and scale problems Gas Lift Operation A gas lift system is operated by injecting external gas into the production flow stream at some depth in the wellbore. Thereby, it reduces the hydrostatic pressure and enables reservoir production to be improved. The components of a gas lift system are gas source to inject, surface injection system (compressor, control valves, etc), downhole gas lift equipment (valves, mandrels), and surface processing systems (separators, control valves). For the design of gas lift, we need to analyze how much gas needs to be injected and where it should be injected. Fig. 2.7 Gas lift (Veeken, 2003).

23 12 Applications A gas lift system applies to continuous or intermittent flow. When the well is not as economic with continuous gas lift, as occurs when bottomhole pressure declines, the well is converted to intermittent gas lift. The converting time is when production rate is about 200bbl/day (Lea, 2003). The applications for gas lift are summarized below: o Tubing and casing flows; o Wells available to get supply pressurized gas for injection; o Well with insufficient bottomhole pressure; o Relatively high GLR wells. Advantages / Disadvantages Compared to the other methods, it is simple to operate and also its installation cost is not expensive. Sand and other solids can be handled efficiently. A gas lift is also effective in crooked holes. Corrosion and gas can be handled well by a gas lift system. However, for a deep well with low bottomhole pressure, it is not good for application Electric Submersible Pump (ESP) Operation Many different types of pump are available today. Size, capacities, and operating voltages of a pump vary. The ESP system is composed of an electric motor, a protector, a gas separator, a pump, and cable. Typically, ESP systems are adjusted for the high liquid production wells. In a gas well that needs to lift the liquid accumulated in

24 13 wellbore, ESP installation can be designed. The design should focus on the treatment of gas come in pump assembly. Three different methods to remove liquid in gas wells are discussed: o Gas separation before coming to pump assembly by using completions or special separation techniques; o Pumping gas at special stage and then move to conventional operation; o Placing pump below perforation let gas flow up the annulus while water falls by gravity to the pump intake (liquid re-injected into a formation below packer). Fig. 2.8 ESP system (Schlumberger, 2007).

25 14 Applications The ESP system is typically reserved for application of the well producing primarily liquid. In gas wells, ESP can be applied when it is necessary to handle large liquid volume. The other considerations for application are summarized below: o Water rates exceed at least 100bpd (Lea, 2003); o High volume lift requirement (100~30,000bpd) (Weatherford, 2007); o Deep wells / deviated wells; o Waterflood or high water-cut wells Advantages / Disadvantages ESP system can be applied at low bottomhole pressure and in crooked wells. Usually it is advantageous over other methods in high volume of production wells. In terms of disadvantages, special considerations are required in cases of high volume of gas production because the high-volume gas inside pump can cause gas interference or severe damage if the system is not installed properly. Installation cost is high and the system needs a little more power consumption. Also, the availability of electric power, particularly high voltage of electric (1,000V or higher), is critical to consideration Progressive Cavity Pump (PCP) Operation PCP is a type of a sucker rod pumping unit that uses a rotor and a stator. This system consists of a surface drive, a downhole pump, and a stator that is attached to the

26 15 bottom of a production tubing string. The fluid contained in a cavity can be flowed up by rod rotation using an electric motor at the surface. Fig. 2.9 PCP system (Schlumberger, 2007). Applications PCP can be applied to the wells producing sand-laden heavy oil and bitumen, high water-cut wells, and in the gas wells that require dewatering. Operating depth is somewhat limited, as it is believed that the maximum depth of operation is 6,000ft (Weatherford, 2007). Well s deviation is not a factor, so PCP is applicable regardless of hole deviation.

27 16 Advantages / Disadvantages Solid and gas handling is good or excellent while corrosion handling is just fair. This system can be installed and operated economically due to low capital investment and power consumption. Compared to other pumping methods, it is able to operate more quietly Sucker Rod Pump Operation Rod pump system consists of a surface pumping unit, a rod string, and a pump. The liquid is lifted by the reciprocating pumping action of the surface unit attached to the rod string. The liquid comes into the assembly at the downstroke, and then be lifted at the upstroke of rod. Fig Sucker rod pump system (Weatherford, 2007).

28 17 Applications Sucker rod pump has very broad applications: o Applicable to sandy fluid, gaseous, high viscosity; o All types of wells: horizontal, slant, directional and vertical well. Advantages / Disadvantages Sucker rod pumping systems have been used widely, and are very familiar to most operating workers. This system is highly reliable and easy to analyze. High temperature or viscous liquid can be produced. It is economical to repair and service. However, this system has some disadvantages. In crooked holes, for example, this system is not appropriate. The depth and volume necessary to operate by this system are limited because of rod weight and strength considerations. The overall size and weight of this system may prohibit its offshore application Jet Lift / Piston Lift Operation The hydraulic lift systems, jet lift and piston lift, consist of a surface power fluid system, a prime mover, a surface pump, and a downhole jet or reciprocating/piston pump.

29 18 Fig Hydraulic pumping (Schlumberger, 2007). The power fluid (oil or water) is supplied from power-fluid storage in surface to downhole pump through the wellhead valve. In a piston pump installation, power fluid actuates the pressurized piston engine on top of the pump, and then the fluid returns to the surface with accumulated liquid. In case of jet pump, the nozzle works for converting high-pressure, low velocity energy of the power fluid to high-velocity, low-pressure energy. In the throat the power fluid is mixed with the low-pressure pump intake fluid. Then, the velocity energy of this mixed stream is then moved to the diffuser which converts it to static pressure to provide the pressure necessary to bring the fluid to the surface.

30 19 Applications These hydraulic pumps are commonly adaptable to all types of wells (deviated, horizontal, and vertical wells). These systems are efficient in multiple well installations. The other applications are summarized below: o Applicable to API 10 gravity or higher fluid (Weatherford, 2007); o Applicable to sandy or fluid containing solids; o Applicable to high volume and high depth wells. Advantages / Disadvantages Both jet and piston pump are easy to maintain. Downhole pumps can be circulated out for maintenance or can be retrieved by wireline. Paraffin can be handled well by heating or chemically treating the power fluid. Produced fluids with high sand content or other abrasives may cause problems. Initial costs for pumping installation are high, and operation and maintenance works are not easier than the sucker rod pump system.

31 Current Development Status on Prediction of Liquid Loading and Selection of Remedial Options As examined in the previous section, many remedial options have been developed so far. They have been proven in the field to reduce the loss of gas production when liquid loading begins to occur. As they have different characteristics in terms of technical, environmental and economical views, a choice is always required whenever they meet liquid loading problem. However, the choice may be not easy because each option s feasibility and cost vary dependent on the field s location, size, its export route, etc. No generic tool or model has been developed to help the designer select the most appropriate option. Internal efforts within individual operators have been made to build such a tool but no success due to wide geographical variations of issues and costs. Table Ranking Remedial Measures (Veeken, 2003) Measure Ultimate Recovery Capacity Cost Risks 1. Water shut-off Stimulation Compression Foam lift Gas lift Velocity string Downhole pump

32 21 Some examples that have been made to develop such a tool or model from the industry are introduced in the following. Veeken ranked (June 2003) remedial measures, as shown in Table 2.2. This table shows that the remedial options can be ranked on the basis of four aspects (ultimate recovery, capacity, cost, risks). The characteristics of the options are well-described in this format, which can be used in preliminary selection of options. However, in the detailed design stage, it is not enough because a more complicated and detailed comparison is required for the best optimization. Another attempt was done by Schlumberger. From their recent report, it is known that they tried to solve and manage liquid loading problems by integrated method: analyzing the available well data, defining actual status and well performance, diagnosing the well, selecting the most suitable production system, managing the data, and optimizing the operation. To define the well model and adjust the actual production data with simulated well behavior, the composite system (NODAL) analysis has been implemented by software (Pipesim). Once the well model has been verified, system analysis evaluates the future well behavior and selects the appropriate production systems by comparing the results from different input parameters and conditions. Also, system analysis completes the diagnosis work to find the causes that decreased gas production.

33 22 Fig Well performance model for gas wells with liquid loading problem (Schlumberger, 2006). In Fig. 2.12, the flow chart of the procedure for defining well performance is shown. However, this system analysis is useful only if enough data acquired so that the most appropriate method for solving liquid loading problem can be selected. If the data is too limited to do system analysis, then multi-criteria ranking analysis has been suggested to identify the best choice of remedial option.

34 23 For details on the multi-criteria ranking method, Schlumberger (2006) defined factors determining liquid loading and influencing the selection of the method, and then grouped into the following general classes (GFC): o Well completion o Well production and pressure history o Well performance class o Laboratory tests o Field tests o Other problems and tests o Costs From the general classes (macro level) defined above, the subclasses (micro level) of parameters with defined importance are extracted. Here, the general classes are criteria to evaluate remedial options and have sub-criteria (called subclass). Integrated Evaluation Factor (IEF) is defined by the following calculation; n IEF = n GFC i ) i= 1 ( Eq. 2-1 Then, the method having the highest IEF value is recommended for application. The particularly important thing is how to give an evaluation number. Here, a five-level (0 to 4) evaluation system has been used in model development. The evaluation of this method arises from the description table already made, and the level of importance of certain parameter alters as a function of final effectiveness of applied method. A sample

35 24 evaluation matrix table can be found at Fig to help demonstrate how the multicriteria model is applied. Fig Multi-criteria model (Schlumberger, 2006).

36 Limitations of Previous Attempts to Select Remedial Options The previous section reviewed the relative literature and current development status of the selection of remedial options for solving liquid loading problem. Fieldproven solutions already exist for reducing the loss of gas production in gas wells. However, a user-friendly and generic decision matrix doesn t exist even after previous efforts and achievements on the development of such tool. As we examined, the matrix by Veeken (2003) is too simple to be used as a generic tool for the selection of lifting options even though the characteristics of the options are well-described in the matrix. The matrix, in other words, doesn t cover specific consideration factors affecting the selection of lifting options. Schlumberger s model relies on running software and system analysis, and therefore requires much data from the field and much time to do analysis with software; thus, it is not useful in speeding up the decision making process between when the first symptoms of liquid loading and the severe impact on a gas well s production. Under such circumstances, this thesis proposes a newly developed decision matrix to quickly screen the possible remedial options available to the operator. The matrix can not only provide a critical evaluation of potential solutions to the problem of liquid loading in gas wells in relation to the existing technical and economic constraints, but can also help operators make investment decisions and as a quick screening tool for the selection of remedial techniques.

37 26 CHAPTER III METHODOLOGY AND APPROACH TO DECISION MATRIX 3.1 Possible Approaches: Data Mining Techniques What is data mining? Data mining refers to extracting or mining knowledge from large amounts of data, and is called knowledge discovery in database (KDD). It is the exploration and analysis of large quantities of data in order to discover meaningful patterns and rules (Berry et al., 2004) or a process to help discover patterns and relationships in data that we use to make valid predictions. Why are we considering using data mining techniques for this project? As we discussed before, we may gather as much field experience data as we can, data related to production under operation of remedial lifting options; then, we need to develop a tool that enables us to select appropriate remedial option by analyzing the data and extracting valuable information from them. Once we are ready to analyze the data, the first thing to do is to describe the data, summarize its statistical attributes, visualize it using charts and graphs and catch its patterns, and find out meaningful relationship among variables. The next thing is to build a predictive model based on patterns and relationship. Then, we need to test the model by using new data different with original dataset. Once the test is done, final verification of the model is required. There are different prediction types and various model types of data mining techniques. Prediction types are divided into two categories, classification and regression. Classification predicts the category or class the data may fall into, while regression

38 27 means to predict what number value a variable will have. There numerous model types: neural network, decision trees, multivariate adaptive regression splines (MARS), rule induction, K-nearest neighbor and memory-based reasoning (MBR), logistic regression, matrix decomposition, and so on. To apply data mining techniques, we have to decide which type of prediction and type of model is going to be adjusted to our project. The most important model types of data mining are described below Neural Network A neural network is used in classification problems (output variable is categorical) or for regressions (output variable is continuous). The basic structure of a neural network is shown in Fig It consists of an input layer, hidden layers, and output layers that are interconnected. The output of a neural network relies on the cooperation of the individual neurons within the network to operate. Hidden Layers Input Layer Output Layer Hidden Unit Fig Neural network structure.

39 28 In detail, each node takes in a set of inputs and multiplies them by a given weight Wxy. Then, the node adds them together, applies a function to them, and passes the output to the node in the next layer. Fig. 3.2 shows how it works. Fig Neural network activation (Twocrows, 2007) The connection weights are unknown values which are decided by a training method. For training, backpropagation method is commonly used. Simply speaking, backpropagation is an algorithm designed to reduce a target value error by finding the difference between the calculated output and the desired output. In this industry, we can find applications of neural network method easily. For example, neural network method was used to identify the well performance and define the well model by training neural network with real production data. Specifically, a prediction of bottomhole pressure and reservoir temperature was conducted by neural network, and it was also used to identify flow patterns in gas wells.

40 Decision Tree Decision tree is a structure that can be used to divide a large set of data into successively smaller sets by applying a series of decision rules. This division then leads to a class or value. For example, Fig. 3.3 shows a simple decision tree to illustrate all the basic components of a decision tree: decision node, branches and leaves. Fig. 3.3 Example of decision tree (Twocrows, 2007) As shown in Fig. 3.3 above, the root node in the top of tree, Income>$40,000, specifies a rule to be conducted. In this case, we have two possible answers (either Yes or No ); therefore two branches are taken. In continuity, the tree is going to be grown depending on expected rules and the resulting branches will be split into discrete groups. In some cases, two or more branches can be made, but each branch is going to lead to different decision node finally. In this particular characteristic of decision tree, the model is commonly used in data mining to examine the data and categorize it by tree shape,

41 30 then make its rules that will be used in predictions. The advantages of decision tree are summarized below: o Very fast at classifying unknown records o Easy to interpret for small-sized trees o Accuracy is comparable to other classification techniques for many simple data sets o Excellent to handle non-numeric data Matrix Decomposition Many data mining techniques implicitly assume that there is a single explanation for each data value that appears in a dataset, and they try to build a model that explains such data. However, in many real datasets, this view is too simple: the data values are the result of the interaction of several overlapping processes, each of which has made some contribution to each value (Skillicorn et al., 2003). Because of this, the matrix decompositions are useful methods because they are able to separate these contributions of different processes to datasets. The following techniques are known as kinds of matrix decompositions: o Singular value decomposition (SVD) and principal component analysis (PCA) o o o Semidiscrete decomposition (SDD) Independent component analysis (ICA) Non-negative matrix factorization (NNMF)

42 31 All of these techniques show how to decompose a dataset matrix, A, into a form like Equation below. Eq. 3-1 A = UΣV From now on, the singular value decomposition (SVD) method and interpretation method are explained. Where U and V are orthogonal, Σ is a diagonal matrix. The matrix A is matrix with m rows and n columns. U is m by n, V is n by n, and Σ is n by n. A matrix U is orthogonal if the matrix multiplied by its transpose is an identity matrix, that is, U T U=I. The matrix Σ contains the singular values on the diagonal. The matrix U contains the left singular vectors, and the matrix V contains the right singular vectors. The transpose of matrix A multiplied by A is a square matrix, and any square matrix admits a spectral decomposition into eigenvectors and eigenvalues. The singular values of A are the square roots of the eigenvalues of A T A. For interpretation of SVD, the geometric method is usually used. The geometric interpretation regards the rows of U as coordinates of the objects in the space spanned by new axes, the rows of V (columns of V') as defining new axes, and as a scaling factor indicating the relative importance of each new axis. Since SVD is a decomposition that rotates the original space in such a way that the variance is maximized along the first axis, the remaining variance is maximized along the second axis, and so on. Fig. 3.4 and 3.5 illustrate how SVD works.

43 32 Fig Projection (1). Fig Projection (2). Fig. 3.4 shows that the shadow of a sphere will always be a circle (two dimensions) regardless of the location of light. In contrast, Fig. 3.5 shows that the ellipsoid shadow is either an ellipse or a circle. From these figures, following statements can be made: o Any two-dimensional projection of a sphere will convey all of the information necessary to reproduce the sphere. There is no best projection. o An ellipsoid has a best projection: the projection that produces the ellipse with the longest major axis. Rotating this ellipse about the major axis perfectly reproduces the ellipsoid. o In a least squares sense, the SVD produces a best projection. o If the SVD reduces M attributes to m SVD linear combinations of the M attributes, then these m linear combinations provide the best m-dimensional representation of the original M-dimensional space. As explained above, the SVD preserves the information in the original matrix, A, even though the dimensionality is reduced.

44 K-nearest Neighbor and Memory-Based Reasoning (MBR) K-nearest neighbor technique is based on the concept of similarity, which is a classification technique. This technique decides in which class to place a new case by examining some number, the K in k-nearest neighbor, of the most similar cases or neighbors as seen in Fig. 3.6 (from Two Crows Corporation). From the figure we can decide that N, new case, is assigned to the class X because the seven X s within the ellipse outnumber the two Y s. The number of cases for each class is important in order to assign new case to the same class most of its neighbors belong to. The measures of distance and similarity are important to K-NN technique. To apply K-NN method we need to measure the distance between attributes in the data. Then, we will select the set of already classified cases to use as a basis for classifying new cases and need to decide both the range of neighborhood and method to count the neighbors. Fig. 3.6 Example of K-NN (Twocrows, 2007)

45 34 K-NN method is good at classifying numeric data, but it requires some special consideration to handle categorical variables. K-NN needs much computational work, so it takes more time compared to other methods such as neural network. To reduce working time or to speed up the process, memory-based reasoning (MBR) can be used which keeps all the data in the memory. The advantages of this method are that K-NN is very easy to understand in case few predictor variables exist and it is a useful method for building a model composed of non-standard data type. 3.2 Approach Chosen for This Work Besides the four data mining techniques we discussed above, there are different types of data mining techniques still used in the industry. For this work, among various datamining techniques, we chose to use a decision tree to build the decision matrix for solving liquid loading problems, because a decision tree is useful for the classification and is easy to understand and interpret. The decision tree helped to streamline the initial information for this project in a more rapid and efficient manner than other techniques. The output from a decision tree is easier to interpret, and a decision tree can be readily coded in a simple program, as was done for this project. On the basis of a decision tree, the same selection procedure can be implemented by means of other data mining techniques.

46 Consideration Factors in Selection of Techniques The selection of an appropriate lift option is critical to the project profitability. The proper artificial lift can improve productivity by removing liquid effectively and eventually raising project economics. On the contrary, a bad choice cannot be expected to improve production and adversely affects the economics of project. There are many factors that need to be considered when selecting an artificial lift option. These factors include site information like location, well characteristics, producing characteristics, fluid properties, power availability, surface facilities, reservoir characteristics, operation concerns, completion type, service availability, and economic points. Due to the great amount of factors affecting the selection of remedial techniques, it was clear since the beginning of this work that not all factors could be included in the decision matrix. In particular, it was immediately noted that different operators may give a different level of importance to different decision parameters. However, this work aims to be as exhaustive as possible, on the basis of the information that was available Site Information (Location) The production facilities are installed differently depending on the well s location, especially the surrounding environment. The offshore well needs to install all surface facilities on the platform with limited aerial extent. Thus, special considerations are required to utilize concentrated area. For this reason, some artificial lifts requiring spacious area may not be used. Also, the logistics on equipment and power is difficult to

47 36 establish compared to onshore. We can summarize that the main issues of offshore wells are like follows: o Footprint of equipments; o Costs; o Access for operation and maintenance of equipments; o More specific problem is for plunger lift system when downhole safety valve (DHSV) is installed in offshore wells. Regardless of well location, either onshore or offshore, we are given the regulations or approval conditions to observe, which are imposed by authorized organizations (e.g. government). Such conditions generally include safety rule, environmental protection rules, and pollution treatment plans, etc. For instance, some artificial options making high noise should be excluded if it is not able to meet the condition Well Characteristics Well characteristics like depth, deviation, and size of tubular are the most significant criteria in the selection process for an appropriate artificial lift. As discussed in the previous chapter on artificial option attributes, each option has its own limitations on depth, deviation, and tubular size. It is said that the depth may have little effect in determining the method of artificial lift. However, if we need to design an artificial lift for a very deep well below 15,000ft, depth may indeed be a factor. In this case, there are limited options available to be applied due to their maximum depth of operation.

48 37 Depending on the amount of deviation of hole, the efficiency of each lifting option is different, with efficiency usually reduced. For a highly deviated well or horizontal well, some options are not recommended to be used Producing Characteristics According to how much liquid is being produced or how much gas is being produced, the production scheme should be differently made. The production rate in total volume basis is one of the criteria that screen artificial lift options, and the GLR is one of the most important factors in the selection process. For instance, in extremely high rates of production like above 15,000 bpd, ESP and gas lift systems can only be considered. On the other hand, with a low rate of production, we can consider all possible artificial lift techniques. GLR places importance on which high gas-liquid ratio wells will be a problem for any method of lift unless proper venting is considered. Specifically, the pumping systems are inefficient if GLR exceeds 500scf/bbl (Lea, 2003) Fluid Properties The consideration points in fluid properties are viscosity, density, and composition. In general, viscosities less than 10cp (above 30 API) are not a factor in determining the lift method (Brown, 1980). For instance, sucker rods do not fall down easily for highly viscous fluid, and such a phenomenon results in inefficient production. The fluid composition is important to see if the fluid results in a corrosion problem.

49 Power Availability The power sources for artificial lift prime movers are usually electricity or pressurized gas. Most of these wells are located in isolated places far from residency areas. In some situations, it is not useful for a well to be supplied stable electricity from power generation stations. To use pumping systems like ESP and hydraulic pumps, stable electricity should be obtained, but for gas lift system, high pressurized gas is required to supply securely Surface Facilities Surface facilities like flow lines, choke valve, and separators are to be considered when choosing a proper lifting method. In general, they need to be designed in such a way that one can accommodate new equipment (method for liquid unloading) Reservoir Characteristics Reservoir characteristics is a factor that should be considered in order to make a production plan that figures out how much it will be produced monthly and how further time it will be produced. Based on production remaining time and production rate, the selection of lifting method can be made Operation Concerns Here, the operation concerns include, but are not limited to: o Scale

50 39 o Corrosion o Erosion o Emulsion o Formation/Deposition of hydrates In addition, bottom-hole temperature and surface climate are also consideration points in operation. Sand causes erosion problems for all types of artificial lift methods. Downhole corrosion may be caused by electrolysis between different metal types, H2S or CO2 content in the produced fluid, highly saline or saturated brine water, or oxygenation of metals (Brown, 1980). For paraffin, once it is accumulated in the upper tubing string or flow-line, it will cause pressure drop. Scale deposition will decrease flow efficiency by reducing ID of tubing. Bottomhole temperature is one of factors that should be considered before final selection, because very high temperatures in bottomhole will damage equipment like pump motor and cable. Lifting equipment capable of operating over certain high temperatures should be selected Service Availability Some types of lifting methods require work-over or pulling units in time of service or replacement, while other types of methods can be serviced by using wire-line. Sometimes the methods may be sensitive in terms of operation cost. Basically, checking points about service availability are to investigate which service personnel, replacement parts, and service rigs or equipment are available.

51 Economic Point Generally, we consider economic point of view in the last stage of selection process after technical evaluation is done. If several options are verified for application from a technical point of view, we will evaluate their influence on economics of project. The capital expenditure, operation expenditure, expected income, and other economic factors (e.g. equipment life of time, etc.) will be considered and the result of economic evaluation will be used eventually when the final decision is made.

52 41 CHAPTER IV DEVELOPMENT OF DECISION MATRIX 4.1 Introduction The primary purpose of this research is to build decision matrix to screen remedial options for liquid loading by gathering and synthesizing field data. Fig. 4.1 below shows the work flow and possible approaches to data mining. We used decision tree method to apply data mining technique to processed data. Eventually, the matrix is targeted to evaluate technical feasibility, chance of success, and cost profitability for each option. The matrix that we built will assist engineers in determining an appropriate option and can therefore be used as a decision tool. Field Data (Industry) Data processing Database Decision Tree Decision Tools Decision Matrix Data Mining Neural Network K-NN Input Layer Hidden Layers Output Layer Hidden Unit Matrix Decomposition Fig Work flow and possible approaches to data mining

53 42 For this research, we have done the following; 1) Performed literature review on different remedial techniques of liquid loading problems in gas wells; 2) Gathered available experience data from released papers and analytical/theoretical data from manufacture documents; 3) Developed decision tree, so called Round 1, to screen remedial techniques preliminary and to aid decision in selecting remedial technique; 4) Developed technical evaluation chart (Round 2) for further screening and evaluating options technically; 5) Developed economic evaluation tool (Round 3) to see cost & profitability of each option; 6) Built a decision matrix by combining 3 Rounds above. We used Visual Basic Language (VBL) programming to build the matrix. Following Fig. 4.2 shows the general structure of decision matrix. As stated above, the matrix contains 3 Rounds: Preliminary Screening [Round 1], Technical Evaluation [Round 2], and Economic Evaluation [Round 3].

54 43 SCHEME FOR THE SELECTION OF DELIQUIFICATION OPTIONS Information on constraints & requirements ROUND 1 : PRELIMINARY SCREENING S T E P 1 S T E P 2 S T E P 3 S T E P 4 S T E P 5 Information on wells, remedial options ROUND 2 : TECHNICAL EVALUATION ROUND 3 : ECONOMIC EVALUATION FINAL SELECTION & RANKING Fig General structure of decision matrix 4.2 Decision Tree & Preliminary Screening [Round 1] The decision tree should be composed logically from the starting point to the end point. Also, the tree should eventually suggest a reasonable solution at the end. Using both the gathered information and the comparison chart or deviation table analyzed with each option s characteristics, we discovered which items could be appropriate regarding a corresponding situation that the wells have. The decision tree has many questions to be answered and action boxes to be conducted as shown in Fig The questions have been divided into several steps for

55 44 differentiation, which are about production situation, fluid characteristics, and production facilities. For example, each question generally asks what condition the well has or what properties the fluid shows. Such questions are designed to find distinctions among remedial options so that, at the end of tree, we can find the best option at the given conditions by removing some options from each step if we follow the tree. In other words, some remedial options should be dropped in case they are not available in the given conditions. Thus, the key point of the decision tree is finding distinctions between options by analyzing the operating availability of each option from experience field data and analytical review data. The developed decision tree is shown in Fig It is built with 9 steps, from node 0 to node 8. Each node has at least two branches. We will now move on to a detailed explanation of each node, so how remedial options are screened and what consideration factors have been taken into are discussed below.

56 45 SELECTED OPTIONS (1) Plunger Lift (2)Gas Lift (3) ESP (4) PCP (5) Rod Pump (6) Jet ift (7) Piston Pump 0 0A1: Offshore? Yes No 0B1: Onshore? Yes (2)~(4), (6)~(7) (1)~(7) [Drop (1), (5)] Repeat element (1A1) 1 1A1 : Vertical well? Yes 1A2: Deviated 1A3: Deviated 1A4 : Deviated No angle, <20? No 20<angle<50? No 50<angle<80? No Yes Yes Yes 1A5 : Deviated angle, >80? Yes (2)~(4), (6)~(7) (2)~(4), (6)~(7) (3)~(4), (6)~(7) (3)~(4), (6)~(7) [Drop (2)] [Drop (1), (2)] Repeat element (2A1) 2 2A1 : Well Depth,<6000 ft? Yes No 2A2 : Depth 6000< D <15,000 ft? Yes No 2A3 : Depth 15000< D <20,000 ft? Yes (2)~(4), (6)~(7) (2)~(3), (6)~(7) {7} [Drop (4)] [Drop (2),(3),(4),(5),(6)] Repeat element (3A1) 3 3A1: Operating Fluid Volume, >200 bpd? Yes No 3A2: Operating Fluid Volume, <200 bpd? Yes (2)~(4), (6)~(7) (2), (4), (7) [Drop (1)] [Drop (3),(6)] Repeat element (5A1) 4 4A1: Operating Volume 200<Vol.<4000 bpd? Yes 4A2: Operating volume 4A3: Operating Fluid No No No 4000<Vol. <4500 bpd? 4500<Vol.<6000 bpd? Yes Yes 4A4: Operating Fluid 6000<Vol.<15000 bpd? Yes No 4A5: Operating Fluid 15000<Vol.<30000 bpd? Yes (2)~(4), (6), (7) (2)~(4),(6) (2),(3),(6) (2),(3),(6) (2),(3) [Drop (1)] [Drop (1),(7)] [Drop (1),(4),(7)] [Drop (1),(4),(5),(7)] [Drop (1),(4),(5),(6),(7)] Repeat element (5A1) Fig Developed decision tree to screen remedial options 45

57 46 5 5A1: GLR <500 scf/bbl? Yes 5A1: GLR (For Plunger) >300scf/bbl/1000ft? Yes Simulate to see if the systems could be 5A2: the system can No No {2} efficient be efficient? [Drop (1)] [Drop (3),(4),(5),(6),(7)] Yes Repeat element (6A1) (2), (3), (6) 6 6A1: Fluid Gravity >15 API? Yes No 6A2 : Fluid Gravity 8<API<15? Yes No 6A3 : Fluid Gravity API<=8? Yes (2), (3), (6) (3), (6) [Drop (2)] [Drop (1),(2),(3),(5),(6),(7)] Repeat element (7A1) 7 7A1: Fluid contains solids (sand, etc)? Yes No 7A2: Fluid contains no-solids? Yes (2), (6) (2),(3),(6) [Drop (3)] Repeat element (8A1) 8A1: Natural Energy is enough to lift liquid? No Consider External energy Yes Candidates 8 8A21: Pressurized gas available? No 8A22: Possible to supply Investigate if electricity is 8A31: Electricity 8A32: supply Electricity No No gas economically? available available for motor? economically? No Investigate if pressurized gas is available Yes Yes Yes Yes (2), (6)* (2), (6)* (2)*, (6) (2)*, (6) Go To Round 2 & 3 for Technical Evaluation and Economic Evaluation Fig (Continued) 46

58 Model Node [0]: Location This element asks where the wells are situated, either offshore or onshore. In case of onshore, there is no limitation on applicability of each option. On the other hand, some options are not applicable offshore, specifically the rod pump system is not recommended to be used at the offshore well since its overall weight and size can prohibit use on offshore applications (Richard W. Donnelly, 1985). Also, the plunger system, insert capillary string foam and chemical injection, and progressive cavity pump are difficult to apply on offshore fields in cases where the downhole safety valve (DHSV) has been installed. However, new technology like Torus Insert Safety Valve (by Caledyne Ltd), which is configured to fit capillary tube, fibre optic or electrical penetrators or rotary seals, may enable them to be used. (Journal Offshore, September 2007) Model Node [1]: Well Deviation This element asks how much the well is deviated. Depending on well deviation, each remedial-technique s availability can be decided and its efficiency is different.. As shown in Fig. 4.4, ESP and PCP are not affected by deviation but the other methods are inefficient or not applicable at horizontal wells. Therefore, we are going to screen gas lift for a well deviated over 70 and plunger lift method is screened at the horizontal well from Round 1. Then, we need to differentiate them at Round 2 [Technical Evaluation of Artificial lift methods] and evaluate methods that can operate at some high deviation hole. For instance, some methods such as Sucker rod pump, Jet lift, and Piston pump do

59 48 not show high efficiency at high deviated hole, while ESP and PCP do. We will discuss Round 2 in further detail in the next chapter. Applicability by Well Deviation Angle, degree Plunger Gas lift ESP PCP Rod Pump Jet lift Piston Pump Typical Range Maximum Fig Applicability of technical remedial options by well deviation (After Weatherford (2007) and Clegg et al (1993)) Model Node [2]: Well Depth Depth will have a strong influence on selection of artificial lift method because each method has capacity limitation of motor or equipment. Using each option s operation depth limit, we are able to choose an appropriate option for the given depth. Fig. 4.5 shows maximum depth to apply and typical operation depth for each option. As you see from the following figure, a well depth of over 6,000ft is not able to utilize PCP method

60 49 when unloading liquid from the well. For a high-depth well over 15,000ft, three methods (Gas lift, ESP, Jet lift) are limited. Similarly, Rod pump and Piston pump methods are limited to 16,000ft and 17,000ft respectively. The experience and performance data shows Plunger system is able to be used at the highest depth if other conditions are met. Applicability by Depth Depth, ft ` Plunger Gas lift ESP PCP Rod Pump Jet lift Piston Pump Typical Range Maximum Fig Applicability of technical remedial options by well depth (After Weatherford (2007) and Clegg et al (1993)) Model Node [3] & [4]: Operating Volume Rate The total production volume rate is an important factor in the selection of artificial lift method because each lift method has its own operation limits due to its mechanical power capacity. Basically for very low production volume there is no application

61 50 exceptions; however, some of the artificial lift methods are limited to high volume production. The following figure shows typical range of operating volume rate and maximum to operate. Basically, when higher volume rate is operating, less artificial methods are available to use. As shown below, we are able to select appropriate method based on the given operating volume rate. For instance, plunger is removed from possible method if the well is producing fluid over 200bpd. As the volume is larger, Piston Pump is screened at over 4,000bpd, PCP at over 4,500bpd, and then Rod Pump is removed at over 6,000bpd. Jet lift is still available up to 15,000bpd. Remaining two options, Gas lift and ESP, are able to be used up to 30,000bpd. Applicability by Operating Volume Volume, bpd Plunger Gas lift ESP PCP Rod Pump Jet lift Piston Pump Typical Range Maximum Fig Applicability of technical remedial options by operating volume (After Weatherford (2007))

62 51 The figures help us to recognize which method is not applicable to certain depth and volume rates, and provide each option s typical range of operation in terms of depth and volume rate. Now, we are going to look at a figure that shows approximate depth-rate application chart of artificial lift methods. From this chart, we can know what the relationship between depth and rate shows and which method can have bigger range of rate application at certain depth. For example, at 1,000ft, Gas lift that has the largest range is applicable up to 33,000bpd, while Plunger lift has the smallest range of application. Volume, bpd GasLift ESP JetLift Plunger GasLift ESP PCP RodPump JetLift PistonPump PistonPump 5000 PCP RodPump Plunger Depth, ft Fig Approximate depth-rate application chart of technical remedial options (After Lea, 2003)

63 Model Node [5]: Gas-Liquid Ratio (GLR) In the selection process of artificial lift method, the producing gas-liquid ration (GLR) needs to be considered. In particular, GLR value should be dealt with first when designing lifting mechanisms. From previous studies on the influence of GLR, we have GLR rule of thumb. In general, this rule states that the well must have a GLR of 400scf/bbl for every 1000ft for application of plunger system (Lea, 2003). However, it varies depending on well geometry, reservoir pressure, and resultant casing buildup operating pressure. Fig. 4.8 and Fig. 4.9 show GLR requirement for plunger system application at different plunger configurations, and a much higher GLR is required at the site of packer installed. Weatherford s brochure regarding plunger system and a paper by Morrow et al (2006) suggest 300scf/bbl/1000ft to consider plunger system. Therefore, we are going to take recent opinion, 300scf/bbl/1000ft, in this model of the decision matrix. Fig Feasibility of plunger lift for 2 3/8inch Tubing (Left), 2 7/8inch Tubing (Right) (Beeson et al, 1957)

64 53 Fig GLR requirement for plunger lift with/without packer (Otis plunger lift manual, 1991) Pumping systems such as ESP and PCP need certain gas ratios in fluid to be operated effectively. Most pumping systems become inefficient when the GLR exceeds some high value, typically 500scf/bbl, because of gas interference (Lea, 2003). High volume of gas inside an electrical pump can cause gas interference or severe damage if the ESP installation is not designed properly (Weatherford ESP brochure, 2007). For foam lift, there is a GLR rule of thumb which says that foam lift can be applied if producing GLR is in a range 428~770scf/bbl/1000ft (250~450 m3/m3/1000m) (Solesa et al, 2006).

65 Model Node [6]: Fluid Gravity ( API) Fluid gravity is one of the most important factors considered when we choose appropriate artificial method. In general, viscosities less than 10cp (above 30 API) are not a factor in determining the lift method. Applicability by Viscosity Piston Pump Jet lift Rod Pump PCP ESP Gas lift Plunger API Fig Technical remedial options applicability by fluid gravity ( API) (After Weatherford (2007) and Clegg et al (1993)) We need to be cautious for high viscous fluid below 10 API because high viscosity fluid is difficult to lift by any method. For Gas lift, high viscous fluids may cause additional problems due to the cooling effect of the gas expanding - a more limited range of fluid gravity that can be operated by other methods.

66 Model Node [7]: Fluid Property (Sand Containment) Production with sand causes erosion problems for all types of artificial lift methods. In particular, ESP system is quite open to trouble, while PCP is able to control sand and is regarded as the best sand handling method of all the methods. Several papers explain what solution is given to resolve the problems occurred due to sand while ESP operation. In terms of solutions, use of a downhole desander, use of sand separating device, or installation of ESPCP configured with PCP advantage are suggested Model Node [8]: Power Availability The power availability is critical to the selection of artificial lift method, as it determines if power can be supplied economically. Table Power Source of Artificial Lift Methods Prime mover type Plunger Gas lift ESP PCP Rod Pump Jet lift Piston pump Natural energy of well Pressurized gas (Compressor w/ electric motor or gas engine) Electric motor Gas engine or Electric motor Gas engine or Electric motor Multi-cylinder hydraulic pump w/ electric motor or gas engine Multi-cylinder hydraulic pump w/ electric motor or gas engine

67 56 Low cost power availability is important to project profitability. The table above shows each method s power sources required for operation Result of Round 1 If we follow all steps of tree with selected options at starting node, the remaining options will be one or two, and in some cases, more than two. From this decision tree, as we remove the remedial options that are impossible to apply at given conditions, we are supposed to obtain the lifting options technically applicable to the given conditions. However, we still wonder what option is the best technically and what profit the option can bring to the project. Therefore, we need to proceed to Round 2 and 3 in order to rank the methods technically and economically, enabling us to find the most appropriate lifting option at given wells.

68 Technical Evaluation of Lifting Options [Round 2] During the Round 1, we screened preliminary unavailable options. From Round 2, we are going to examine further the screened options in terms of technical aspects and evaluate them so as to rank them. The options have different efficiencies depending on a well s characteristics, such as location and depth. In this sense, the efficiency of each option depending on a well s characteristics and its technical constraints were investigated. With the obtained information, we were able to make technical evaluation matrix like Table 4.2 below. To present each option s efficiency and workability, we used a grading system of 5 different levels of workability (e.g. excellent, good, fair, poor, and limited). Table 4.2 Technical Evaluation Matrix Considerations Plunger Gas Rod Jet Piston ESP PCP lift Pump lift Pump 1 Well Offshore Location Onshore Vertical Well Type 20~50 deviated ~80 deviated Horizontal <6000ft <D<15000ft Well Depth Operating Volume 15000<D<20000ft <200bpd <V<4000bpd <V<4500bpd <V<6000bpd >6000bpd Solid Handling Paraffin Handling Corrosion Handling Crooked Hole Scale * Legend : 0.9 : Excellent 0.5 : Fair 0.75 : Good 0.25 : Poor 0 : limited (not appropriate)

69 58 How has each system been evaluated and graded? Basically, we used the technical information obtained from published papers, technical brochures, and reports. In other words, the matrix has been built to fit our specific needs using discovered technical data. In this matrix, we used 9 consideration factors. Among them, 4 factors (well location, well type, well depth, and operating volume) were used in Round 1 as for screening not for evaluating. Thus, references regarding those factors - well location through operating volume - can be found in the previous section through The other factors are newly introduced for the purpose of technical evaluation, which are common problems affecting lifting options selection. For the evaluation of those new factors such as solid handling and scale, numbers of papers were referred to in order to make the matrix. The grade on workability and efficiency can be properly changed or modified by the user because this matrix was made generally acceptable instead of representing if the problem is serious or minor.

70 Economical Evaluation of Lifting Options [Round 3] The purpose of Round 3 is to evaluate every option from an economic point of view. The selection of an economical lifting option is important to the project s profitability. The first step in the economic evaluation is to estimate each option s investment cost and then to compare the costs of each option. The cost comparison chart should be one of the most important sources for decision. The investment cost we considered consists of capital cost, maintenance cost, and fuel and power cost. For detail, the capital cost includes equipment and its installation costs. The maintenance cost includes labor cost, supplies, and cost for MTBF (Mean Time Between Failure). Every cost varies depending on market situation. Thus, it is important that the most updated price information be entered as input value to obtain more precise results of economic evaluation. After cost comparison, we did a cost/benefit analysis to see how much profit will be made based on the incurred cost and expected revenue. The revenue is calculated by the assumption that the selected lifting option will bring much production compared to the production without installing option. Simply, following equation is used for revenue calculation: Eq. 4.2 Expected revenue = [Qgas w/ lifting option- Qgas w/o lifting option] x gas price x life of well

71 60 The results of cost/benefit analysis include internal rate of return (IRR) and net present value (NPV) which are yardsticks for decision. Mathematically the IRR is defined as any discount rate that results in a net present value of zero in a series of cash flows. The relationship between NPV and IRR is defined in the following equation: Eq. 4.2 Where, C t is cash at time t IRR stands for internal rate of return The cost comparison and cost/benefit analysis are useful for making a final decision regarding the selection of lifting options, because the ranking of each option in terms of economic view can be made based on the results.

72 Decision Matrix Programming Using the software VBL, we programmed a decision matrix based on the developed decision algorithm and evaluation matrixes, meaning that all three rounds are combined in one program. Basically, the programming has been made user-friendly so that the selection process can easily be done. For example, check box and drop-down menu options have been used, which enable users to select an answer quickly and then click to move to the next step and so forth Step by Step Guide to Running Decision Matrix In the following section, we are going to examine the whole program step by step. First, we need to discuss Round 1 in regards to screening lifting options and it is therefore called Preliminary Screening. After Round 1, we will move to Round 2 and then Round 3 for evaluating the options technically and economically. Finally, we will go to the final review sheet that summarizes each Round s results and shows the result of the cost/benefit analysis. Round 1 [Preliminary Screening] The programming on Round 1 has been made based on the developed decision tree. The Fig shows the first step of Round 1 where we will meet with three questions about a well s location, type, and depth. We can easily find an answer by clicking the drop-down menu button. Once all questions have been answered, a user can click the command button STEP 1 >> Find Appropriate Options to obtain appropriate options.

73 62 For example, if the well is in offshore, drilled vertically, and depth is less than 6000ft, we will get 5 lifting options from among 7 lifting options possible, meaning that 2 options have been screened because they are not appropriate for the given conditions. Fig Programmed decision matrix Round 1 (1) Fig represents the second step of Round 1. In this step, we will be asked to answer what operating volume is produced and what GLR value is. Operating volume can be answered by using drop-down menu, but users have to type specific numbers in the cells to answer the GLR value. Then, click the command button STEP 2 >> Find Appropriate Options like we did in the step 1, and we can find the options still available.

74 63 Fig Programmed decision matrix Round 1 (2) The following figure (Fig. 4.13) shows step 3 of Round 1 that checks fluid properties including fluid gravity and sand containment. Choose the answers and click the command button to find appropriate options. Fig Programmed decision matrix Round 1 (3)

75 64 In the last step of Round 1, power availability is checked as seen in Fig After choosing answers from drop-down menu, we finish by clicking the command button. Fig Programmed decision matrix Round 1 (4) Finally, we will see a summary table, like Fig. 4.15, that shows the lifting options that remain from the screening process. For this specific screen process, we find 3 options (Gas lift, ESP, Jet lift) that are appropriate for the given conditions. Fig Programmed decision matrix Round 1 (5)

76 65 Round 2 [Technical Evaluation] Based on the technical evaluation matrix (refer to Table. 4.2), we programmed Round 2: Technical Evaluation as shown in Fig As explained before, we are going to evaluate the screened options further in terms of technical aspects. The instruction and screen shot of this Round 2 are given as follows: o First, click the command button Import Screened From R1 to bring the results from Round 1; and o Second, answer all items by using drop-down menu. Fig Programmed decision matrix Round 2 (1)

77 66 The results can also be found in the graph as exhibited in Fig The gas lift system is the most appropriate in this evaluation stage, but a jet lift system can be considered a close second. Fig Programmed decision matrix Round 2 (2) Round 3 [Economical Evaluation] The purpose of Round 3 is to estimate how much capital cost and maintenance cost will be incurred in order to evaluate each option s economic. The programming has been made based on the economic data set equipped in the program. The economic data is subject to variation; for example, the equipment cost may go up and labor cost also

78 67 icrease. Due to this possibility, it is recommended that the data should be updated regularly. The main screen of Round 3 is shown below in Fig The first step is to enter the data (e.g. life of well, power cost) into the yellow-colored cells. Then, click the button Cost Comparison to see the cumulative cost and cost per well and so on. The chart in the right side of the screen is helpful for comparing the results of each option. As seen in the chart, the gas lift has been presented as the most expensive system for the given conditions. Fig Programmed decision matrix Round 3 Comprehensive Review This comprehensive review is for reviewing every Round s results and is also for summarizing the results in a screen. In addition, the cost/benefit analysis is given in this

79 68 comprehensive review round. Both Fig and Fig show the results of Round 1 through Round 3. To import the results from each Round, click the command buttons Import ROUND 1 RESULT, Import ROUND 2 RESULT, and Import ROUND 3 RESULT. Then, we can find the summary of each Round results. Fig Programmed decision matrix Comprehensive review (1)

80 69 Fig Programmed decision matrix Comprehensive review (2) Finally, the cost/benefit analysis is presented as shown in Fig This analysis aims to provide how much benefit can be incurred when we choose an option. For this analysis, we need to enter the increased production value that can be assumed or estimated by using specific simulation software. Clicking the button Analysis allows the users to find each option net cash flow, IRR, and so on. Moreover, a chart showing each option s NPV (at discount rate 10%) and IRR is given at the bottom, where we can easily find the most profitable option.

81 Fig Programmed decision matrix Comprehensive review (3) 70

Artificial Lift Technique (VI Semester)

Artificial Lift Technique (VI Semester) Artificial Lift Technique (VI Semester) Q.1. What do you mean by artificial lift technique in Petroleum industry? Answer. Artificial lift is a means of overcoming bottomhole pressure so that a well can

More information

DECISION MATRIX SCREENING TOOL TO IDENTIFY THE BEST ARTIFICIAL LIFT METHOD FOR LIQUID-LOADED GAS WELLS. A Thesis NITSUPON SOPONSAKULKAEW

DECISION MATRIX SCREENING TOOL TO IDENTIFY THE BEST ARTIFICIAL LIFT METHOD FOR LIQUID-LOADED GAS WELLS. A Thesis NITSUPON SOPONSAKULKAEW DECISION MATRIX SCREENING TOOL TO IDENTIFY THE BEST ARTIFICIAL LIFT METHOD FOR LIQUID-LOADED GAS WELLS A Thesis by NITSUPON SOPONSAKULKAEW Submitted to the Office of Graduate Studies of Texas A&M University

More information

Introduction to Artificial Lift

Introduction to Artificial Lift Introduction to Artificial Lift March 2013 What are your Artificial Lift challenges? Gassy oil Heavy/viscous oil Sandy oil High water cut Dewatering gas wells Deep Hot Low fluid levels Offshore Uncertainty

More information

Well Unloading Technologies and Selection Criteria

Well Unloading Technologies and Selection Criteria eni s.p.a. upstream & technical 2013-2014 Master in Petroleum Engineering and Operations Well Unloading Technologies and Selection Criteria Author: Agozie Amadi Prince San Donato Milanese 13-14-15 October

More information

Petroleum Production Optimization

Petroleum Production Optimization Petroleum Production Optimization Petroleum Production Optimization Fundamentals Production Optimization refers to the various activities of measuring, analyzing, modelling, prioritizing and implementing

More information

Non-linear ESP Artificial Lift by Multiple Pumps for Oil and Gas Well Development

Non-linear ESP Artificial Lift by Multiple Pumps for Oil and Gas Well Development Universal Journal of Petroleum Sciences (04), 3-39 www.papersciences.com Non-linear ESP Artificial Lift by Multiple Pumps for Oil and Gas Well Development E.G. Ladopoulos Interpaper Research Organization

More information

TECHNICAL GUIDANCE DOCUMENT NUMBER 7: WELL VENTING FOR LIQUIDS UNLOADING

TECHNICAL GUIDANCE DOCUMENT NUMBER 7: WELL VENTING FOR LIQUIDS UNLOADING TECHNICAL GUIDANCE DOCUMENT NUMBER 7: SG.17.1.7 WELL VENTING FOR LIQUIDS UNLOADING Introduction This document provides technical guidance to Partners of the CCAC Oil and Gas Methane Partnership (OGMP).

More information

2015 Global Petroleum Technologies Limited.

2015 Global Petroleum Technologies Limited. CONCEPTUAL DOCUMENT The GPT US - ARTIFICIAL LIFT SYSTEM PERMANENT DEPLOYED ON UMBILICAL OR CONCENTRIC PIPE INSTALLATION AND REMOVAL METHOD (PAT-Pending). The information provided in this document ( Information

More information

Down Hole Flow Assurance

Down Hole Flow Assurance Down Hole Flow Assurance Ferhat Erdal Senior Advisor - Flow Assurance Steve Cochran Senior Advisor - Flow Assurance SPE GCS Annual Drilling Symposium Spring, TX April 13, 2017 Flow Assurance Key Words

More information

Petroleum Production Systems

Petroleum Production Systems Petroleum Production Systems SECOND EDITION Michael J. Economides A. Daniel Hill Christine Ehlig-Economides Ding Zhu PRENTICE HALL Upper Saddle River, NJ Boston Indianapolis San Francisco New York Toronto

More information

Solid-Expandable Systems. The Key to Economical Recovery in Mature Fields

Solid-Expandable Systems. The Key to Economical Recovery in Mature Fields Solid-Expandable Systems The Key to Economical Recovery in Mature Fields A White Paper November 2013 Solid-expandable technology provides a low-cost, permanent alternative to cement squeezes. 2013 Weatherford.

More information

Petroleum and Coal COMPARATIVE APPROACH TO OPTIMUM SELECTION OF ARTIFICIAL LIFT SYSTEM

Petroleum and Coal COMPARATIVE APPROACH TO OPTIMUM SELECTION OF ARTIFICIAL LIFT SYSTEM Article Open Access COMPARATIVE APPROACH TO OPTIMUM SELECTION OF ARTIFICIAL LIFT SYSTEM Kevin Chinwuba Igwilo 1, Emeka Emmanuel Okoro 1 and Samuel Ubanatu 2 1 Petroleum Engineering Department, Covenant

More information

The Lowest OPEX Producer Wins the Production Game

The Lowest OPEX Producer Wins the Production Game The Lowest OPEX Producer Wins the Production Game Enercom Dallas, February 23, 2018 Jeff Saponja, CEO A Schlumberger Joint Venture Multiple Patents Pending HEAL Systems, 2018 Agenda 1. Horizontal Well

More information

Southern North Sea De-Liquification Experience. Second European Conference for Gas Well Deliquification. Assen.

Southern North Sea De-Liquification Experience. Second European Conference for Gas Well Deliquification. Assen. Southern North Sea De-Liquification Experience Daniel Diaz Adam Beck Jennifer Herrera Nadim Kassan Renee Omsberg Alan Bruce Second European Conference for Gas Well Deliquification. Assen. Agenda * SNS

More information

Production Engineering ALI NOORULDEEN

Production Engineering ALI NOORULDEEN Production Engineering ALI NOORULDEEN 2014 Production System A complete oil or gas production system consists of: 1- Reservoir 2- Well 3- Separators 4- Pumps 5- Transportation pipelines The reservoir supplies

More information

Raise Production Inc. The. Next. Revolution. in Oil and Gas

Raise Production Inc. The. Next. Revolution. in Oil and Gas Raise Production Inc. Next The Revolution in Oil and Gas Optimizing Productivity Multi-stage fracking helps stimulate the well optimizing productivity In the past decade horizontal drilling and multi-stage

More information

Joint Industry Project on Deliquification

Joint Industry Project on Deliquification on Deliquification Predicting the gains for European wells Jordy de Boer Erik Nennie 2 Project structure and goals Overall goal: Transfer US knowledge on deliquification to Europe Three phases: 1. Literature

More information

Coiled Tubing for Downhole Applications

Coiled Tubing for Downhole Applications Coiled Tubing for Downhole Applications Tenaris Tubular technologies. Innovative services. Tenaris is the leading global manufacturer and supplier of tubular products and services used in the drilling,

More information

Horizontal Well Artificial Lift Projects (TUHWALP) TUHWALP Overview

Horizontal Well Artificial Lift Projects (TUHWALP) TUHWALP Overview Horizontal Well Artificial Lift Projects (TUHWALP) TUHWALP Overview Cem Sarica Outline Mission Significance Challenges Interest Research & Development Plan Scope Schedule Budget Mission Work with the Petroleum

More information

Innovation and Integrity by Design

Innovation and Integrity by Design 3 rd EUROPEAN CONFERENCE ON GAS WELL DELIQUIFICATION NEW DEVELOPMENTS IN OFFSHORE DELIQUIFICATION SOLUTIONS Mark Murray Daniel Stewart 17 th September 2008 Market Size (excluding Russia and China) 775,000

More information

Capillary Tube for Deliquification Growing Rapidly in USA. Over 600 MMSCF/Day increased production in USA

Capillary Tube for Deliquification Growing Rapidly in USA. Over 600 MMSCF/Day increased production in USA Capillary Tube for Deliquification Growing Rapidly in USA Over 6,000 Wells Completed to date Over 600 MMSCF/Day increased production in USA Successful applications in high PI wells in Europe Big break

More information

Lab Testing of Shallow Gas Well Deliquification Pumping Systems

Lab Testing of Shallow Gas Well Deliquification Pumping Systems Gas Well Deliquification Workshop Sheraton Hotel, February 23 25, 2015 Lab Testing of Shallow Gas Well Deliquification Pumping Systems Daniel Booy, Research Engineer Kelly Piers, Division Director, Exploration

More information

Kuwait EPF. Early Production Facilities MARCOM-AGC

Kuwait EPF. Early Production Facilities MARCOM-AGC Kuwait EPF Early Production Facilities MARCOM-AGC 1 Enhanced Oil Recovery Techniques Water Flooding Cold Heavy Oil Production with Sand (CHOPS) processing plant Steam Flooding Surface Treatment Pumping

More information

SUBSURFACE PRODUCTION OPERATIONS

SUBSURFACE PRODUCTION OPERATIONS SUBSURFACE PRODUCTION OPERATIONS Training Venue and Dates Subsurface Production Operations 5 25-29 March $3,750 Dubai In any of the 5 star hotel. Exact venue will be informed soon. Training Fees 3750$

More information

Artificial Lift Optimization & Well Cleanout Technology

Artificial Lift Optimization & Well Cleanout Technology Artificial Lift Optimization & Well Cleanout Technology CJS The Company & its Business Model CJS Private Western Canadian company; head office in Calgary; Lloydminster service center Offers alternative

More information

INCREASED PRODUCTION THROUGH EMULSION VISCOSITY REDUCERS. EVR More: Emulsion Viscosity Reducers More Oil Recovery

INCREASED PRODUCTION THROUGH EMULSION VISCOSITY REDUCERS. EVR More: Emulsion Viscosity Reducers More Oil Recovery INCREASED PRODUCTION THROUGH EMULSION VISCOSITY REDUCERS EVR More: Emulsion Viscosity Reducers More Oil Recovery GOAL: MORE OIL RECOVERY The goal of all oil producers is to be able to produce more oil

More information

Predicting the gains of deliquification

Predicting the gains of deliquification Gas Well Deliquification Workshop Sheraton Hotel, February 17 20, 2013 Predicting the gains of deliquification Wouter Schiferli, Jordy de Boer, Erik Nennie (TNO) Project structure and goals Joint Industry

More information

Nodal Analysis Approach in Minimizing Pressure Losses to Improve Well Productivity

Nodal Analysis Approach in Minimizing Pressure Losses to Improve Well Productivity Journal of Emerging Trends in Engineering and Applied Sciences (JETEAS) 6(5): 353-359 Scholarlink Research Institute Journals, 2015 (ISSN: 2141-7016) jeteas.scholarlinkresearch.com Journal of Emerging

More information

Subsurface Production Operations and Artificial Lift Technologies

Subsurface Production Operations and Artificial Lift Technologies An Intensive 5 Day Training Course Subsurface Production Operations and Artificial Lift Technologies 23-MAR-17 12-16 Nov 2017, Dubai www.petroknowledge.com Subsurface Production Operations and Artificial

More information

PCM Vulcain. High Temperature Package. Artificial lift for enhanced oil recovery

PCM Vulcain. High Temperature Package. Artificial lift for enhanced oil recovery PCM Vulcain High Temperature Package Artificial lift for enhanced oil recovery Unlocking unconventional reserves It is estimated that half of the world s known oil reserves are difficult-to-extract unconventional

More information

CLEARMAX Wellbore Cleaning Services

CLEARMAX Wellbore Cleaning Services CLEARMAX Wellbore Cleaning Services Drilling Evaluation Completion Production Intervention Wellbore cleaning services Chemicals Hydraulic systems Mechanical tools Engineering a clearer path to optimize

More information

Preface to the First Edition Preface to the Second Edition. Acknowledgment

Preface to the First Edition Preface to the Second Edition. Acknowledgment Dedication Preface to the First Edition Preface to the Second Edition Forewords Acknowledgment iii xiii xv xvii xix Chapter 1 Introduction to Pipeline Systems 1 1.1 Introduction 1 1.2 Liquid Pipelines

More information

LOWIS Life-of-Well Information Software

LOWIS Life-of-Well Information Software LOWIS Enabling better decision making for artificial-lift optimization Get More from Your Wells Optimizing production is no longer an option it s a necessity. But unleashing the potential of your artificially

More information

The SPE Foundation through member donations and a contribution from Offshore Europe

The SPE Foundation through member donations and a contribution from Offshore Europe Primary funding is provided by The SPE Foundation through member donations and a contribution from Offshore Europe The Society is grateful to those companies that allow their professionals to serve as

More information

Open Access A Novel Approach to Detect Tubing Leakage in Carbon Dioxide (CO 2 ) Injection Wells via an Efficient Annular Pressure Monitoring

Open Access A Novel Approach to Detect Tubing Leakage in Carbon Dioxide (CO 2 ) Injection Wells via an Efficient Annular Pressure Monitoring Send Orders for Reprints to reprints@benthamscience.ae 8 The Open Petroleum Engineering Journal, 2015, 8, 8-15 Open Access A Novel Approach to Detect Tubing Leakage in Carbon Dioxide (CO 2 ) Injection

More information

Selection of the Best Artificial Lift Method for One of the Iranian Oil Field Using Multiple Attribute Decision Making Methods

Selection of the Best Artificial Lift Method for One of the Iranian Oil Field Using Multiple Attribute Decision Making Methods International Journal of Engineering and Technology Volume 2 No. 2, February, 2012 Selection of the Best Artificial Lift Method for One of the Iranian Oil Field Using Multiple Attribute Decision Making

More information

FUNDAMENTALS OF THE PETROLEUM INDUSTRY CERTIFICATION

FUNDAMENTALS OF THE PETROLEUM INDUSTRY CERTIFICATION FUNDAMENTALS OF THE PETROLEUM INDUSTRY CERTIFICATION CORPORATE COLLEGE SEMINAR SERIES Date: November 1 December 15 In partnership with: For more information, contact: Michael Burns Director Michael.Burns@LoneStar.edu

More information

Capillary Injection Tubing Anchor Technologies

Capillary Injection Tubing Anchor Technologies Capillary Injection Tubing Anchor Technologies Patent Pending Randy Matthews- Weatherford Shad Frazier- SandRidge Energy ABSTRACT There are many oil and gas fields across the United States which have been

More information

Use of Isolated Tailpipe: Proving to be a Natural Progression for Rod Pumped Horizontal Wells

Use of Isolated Tailpipe: Proving to be a Natural Progression for Rod Pumped Horizontal Wells Gas Well Deliquification Workshop Sheraton Hotel, February 20 22, 2017 Use of Isolated Tailpipe: Proving to be a Natural Progression for Rod Pumped Horizontal Wells Brian Ellithorp Echometer Company -

More information

Gas Lift Workshop Doha Qatar 4-88 February Optimisation of Gas Lift Well Clean-up Operations. by Juan Carlos Mantecon

Gas Lift Workshop Doha Qatar 4-88 February Optimisation of Gas Lift Well Clean-up Operations. by Juan Carlos Mantecon Gas Lift Workshop Doha Qatar 4-88 February 2007 Optimisation of Gas Lift Well Clean-up Operations by Juan Carlos Mantecon 1 WELL CLEAN-UP Well Clean-up is the period when drilling debris and fluids are

More information

HYDRAULIC LIFT SYSTEMS. Effective Solutions for Long-term Recovery

HYDRAULIC LIFT SYSTEMS. Effective Solutions for Long-term Recovery HYDRAULIC LIFT SYSTEMS Effective Solutions for Long-term Recovery DOVER ARTIFICIAL LIFT Elevating the potential of artificial lift production. Dover Artificial Lift, part of Dover Energy, offers a comprehensive

More information

Optimization Design of ESP Well Extract for Offshore Oilfield

Optimization Design of ESP Well Extract for Offshore Oilfield Optimization Design of ESP Well Extract for Offshore Oilfield Zhigang Yu Zhanjiang Branch of CNOOC Ltd., Zhanjiang 524057, China Abstract As an important measure of getting stable production for ESP wells,

More information

MetalSkin Cased-Hole Liner System

MetalSkin Cased-Hole Liner System MetalSkin Cased-Hole Liner System Using advanced solid expandable technology to reduce costs, optimize completion size and ultimately maximize production and ROI Reducing Operating Costs over the life

More information

Comments of the Railroad Commission of Texas

Comments of the Railroad Commission of Texas and Natural Sector: New Source Performance Standards and National Emission Standards for Hazardous Air Pollutants Reviews, 76 Fed. Reg. 52738 (August 23, 2011), Workover and completion or re-completion

More information

ARTIFICIAL LIFT IN DEPLETED RESERVOIRS

ARTIFICIAL LIFT IN DEPLETED RESERVOIRS ARTIFICIAL LIFT IN DEPLETED RESERVOIRS Why Ar'ficial Li. Comparison of Ar'ficial Li. Methods - Typical Ranges Ar'ficial Li.ing the Mississippian Wells Ar'ficial Li.ing Horizontal Wells Plunger Li. vs Rod

More information

The Vee-Pump: The Petroleum Engineer s Pump

The Vee-Pump: The Petroleum Engineer s Pump ALRDC Seminar New and Novel Artificial Lift Technologies ConocoPhillips, Houston, Texas The Vee-Pump: The Petroleum Engineer s Pump Alastair Simpson, Petroleum Engineer, Inventor Vesper Pumps, Inc (Subsidiary

More information

MAXIMIZING VALUE OF OIL AND GAS DEVELOPMENTS THROUGH RESERVOIR TO SURFACE INTEGRATED MODELING

MAXIMIZING VALUE OF OIL AND GAS DEVELOPMENTS THROUGH RESERVOIR TO SURFACE INTEGRATED MODELING MAXIMIZING VALUE OF OIL AND GAS DEVELOPMENTS THROUGH RESERVOIR TO SURFACE INTEGRATED MODELING AND OPTIMIZATION EWO meeting, 19 th of October 2017 Dr R. Marmier, Total SA, Head of Integrated Asset Modeling

More information

Virtuoso Industry leading engineering simulators, operator training systems and online monitoring systems

Virtuoso Industry leading engineering simulators, operator training systems and online monitoring systems Virtuoso Industry leading engineering simulators, operator training systems and online monitoring systems Production, pipeline & asset management systems Wood Group provides robust, real-time online and

More information

DECONSTRUCTING THE ARTIFICIAL LIFT GAP The Consequences of Lift System Transition on per Barrel Cost

DECONSTRUCTING THE ARTIFICIAL LIFT GAP The Consequences of Lift System Transition on per Barrel Cost DECONSTRUCTING THE ARTIFICIAL LIFT GAP The Consequences of Lift System Transition on per Dave Kimery, Camille Jensen and Jeff Saponja HEAL Systems This paper was presented at the 2016 Southwestern Petroleum

More information

UniFlo AFD INFLOW CONTROL SCREEN

UniFlo AFD INFLOW CONTROL SCREEN UniFlo AFD INFLOW CONTROL SCREEN W W W. S U P E R I O R E N E R G Y. C O M UniFlo AFD INFLOW CONTROL SCREEN Situation Long horizontal wells are common for oil production, because they increase efficiency.

More information

Energize your mind. January 2008

Energize your mind.   January 2008 Energize your mind. www.halliburton.com January 2008 A State-of-the-art Cased-Hole Tubing Conveyed Reservoir Fluid Sampling System for HPHT Applications. The capture and analysis of a representative reservoir

More information

A Comparison Study between the Newly Developed Vertical Wells Steam Assisted Gravity Drainage and the Conventional SAGD Process

A Comparison Study between the Newly Developed Vertical Wells Steam Assisted Gravity Drainage and the Conventional SAGD Process Engineering, 217, 9, 575-59 http://www.scirp.org/journal/eng ISSN Online: 1947-394X ISSN Print: 1947-3931 A Comparison Study between the Newly Developed Vertical Wells Steam Assisted Gravity Drainage and

More information

Dan Paul Ştefănescu*, Alexandru Nitulete** NONINVASIVE STIMULATION OPPORTUNITIES IN A MARGINAL GAS FIELD

Dan Paul Ştefănescu*, Alexandru Nitulete** NONINVASIVE STIMULATION OPPORTUNITIES IN A MARGINAL GAS FIELD AGH DRILLING, OIL, GAS Vol. 33 No. 2 2016 http://dx.doi.org/10.7494/drill.2016.33.2.507 Dan Paul Ştefănescu*, Alexandru Nitulete** NONINVASIVE STIMULATION OPPORTUNITIES IN A MARGINAL GAS FIELD 1. INTRODUCTION

More information

Tubing-Conveyed Perforating Systems

Tubing-Conveyed Perforating Systems WIRELINE SERVICES Tubing-Conveyed Perforating Systems Full-Service Support, Complete Optimization Delivering downhole perforating solutions through our expertise, innovation, and collaboration Onshore

More information

ESP experiences on the Mature Dunlin Field An integrated approach to optimise Field Performance

ESP experiences on the Mature Dunlin Field An integrated approach to optimise Field Performance ESP experiences on the Mature Dunlin Field An integrated approach to optimise Field Performance R Heath Fairfield Energy Limited J Cardozo - Schlumberger Content Reservoir History Block 10 Redevelopment

More information

How to establish an integrated production management system across the reservoir lifecycle

How to establish an integrated production management system across the reservoir lifecycle SPECAL TOPC: RESERVOR MONTORNG How to establish an integrated production management system across the reservoir lifecycle Stian Engebretsen 1* introduces an integrated production management workflow. ntroduction

More information

Injection Wells for Liquid-Waste Disposal. Long-term reliability and environmental protection

Injection Wells for Liquid-Waste Disposal. Long-term reliability and environmental protection Injection Wells for Liquid-Waste Disposal Long-term reliability and environmental protection ACHIEVE MULTIPLE GOALS FOR LIQUID-WASTE DISPOSAL INJECTION WELLS Expertly located, designed, constructed, and

More information

Ikatan Ahli Teknik Perminyakan Indonesia Simposium Nasional dan Kongres X Jakarta, November Makalah Profesional IATMI

Ikatan Ahli Teknik Perminyakan Indonesia Simposium Nasional dan Kongres X Jakarta, November Makalah Profesional IATMI Ikatan Ahli Teknik Perminyakan Indonesia Simposium Nasional dan Kongres X Jakarta, 12 14 November 28 Makalah Profesional IATMI 8-39 utilization as an alternative artificial lift in Sembakung field, East

More information

allenges with the Production of Heavier Crudes

allenges with the Production of Heavier Crudes allenges with the Production of Heavier Crudes TRANSFORMING THE INDUSTRY Antonio Rojas Figueroa Design Department Coordinator Introduction According to Oil in Place, the distribution by type of oil in

More information

Paraffin Deposition Progress Report April June 2003

Paraffin Deposition Progress Report April June 2003 Paraffin Deposition Progress Report April June 2003 Single-Phase Studies The single phase paraffin project is now in the final phase using the Cote Blanche Island (CBI), CBI is the third fluid used in

More information

SPE Introduction. Objectives. There are three primary objectives of this new pumping method:

SPE Introduction. Objectives. There are three primary objectives of this new pumping method: SPE 109141 Using a New Artificial-Lift System in Mexican Mature Oil Fields Vann Roy R./Vann Pumping, Gachuz-Muro Heron/Pemex E&P, Alcazar-Cancino Luis O./Pemex E&P, Guerra-López Mauricio/LLEGAR EOR International

More information

Design Considerations For Artificial Lifting Of Enhanced Geothermal System Fluids

Design Considerations For Artificial Lifting Of Enhanced Geothermal System Fluids INL/EXT-5-533 Design Considerations For Artificial Lifting Of Enhanced Geothermal System Fluids X. Xie K. K. Bloomfield G. L. Mines G. M. Shook July 25 The INL is a U.S. Department of Energy National Laboratory

More information

CAIRN ENERGY INDIA PTY LIMITED (Incorporated in New South Wales, Australia ACN )

CAIRN ENERGY INDIA PTY LIMITED (Incorporated in New South Wales, Australia ACN ) CAIRN ENERGY INDIA PTY LIMITED (Incorporated in New South Wales, Australia ACN 002 066 784) GLOBAL EXPRESSION OF INTEREST / PRE-QUALIFICATION FOR PROVISION OF LAND DRILLING UNITS, WORKOVER RIGS AND VARIOUS

More information

Your Pump Solution for the Oil and Gas Industry.

Your Pump Solution for the Oil and Gas Industry. Your Pump Solution for the Oil and Gas Industry. State-of-the-art technology for fossil fuels. The oil and gas industry places some of the toughest demands on its equipment and on suppliers. As an established

More information

CT Reverse Circulating - Basics

CT Reverse Circulating - Basics CT Reverse Circulating - Basics Reverse circulating with aqueous fluid to unload frac sand from large wellbores If sufficient annular velocities are possible with normal circulation, usually don t use

More information

New Advancements in the Abrasion Resistance of Internal Plastic Coatings

New Advancements in the Abrasion Resistance of Internal Plastic Coatings 1 New Advancements in the Abrasion Resistance of Internal Plastic Coatings Robert S. Lauer NOV Tuboscope 2835 Holmes Road Houston, Texas, USA +17137995212 Robert.Lauer@NOV.com ABSTRACT For more than 60

More information

Advanced Production Technologies

Advanced Production Technologies Advanced Production Technologies For improved oil and gas recovery www.pragma-well.com Disruptive Industry Vision Pragma delivers advanced production technologies for the upstream oil and gas industry.

More information

OINTRODUCTION. Technology Overview for Oil Services Companies: Using Flow Modeling to Lower Costs, Increase Reliability, and Reduce Risks

OINTRODUCTION. Technology Overview for Oil Services Companies: Using Flow Modeling to Lower Costs, Increase Reliability, and Reduce Risks W H I T E P A P E R - 1 1 9 Technology Overview for Oil Services Companies: Using Flow Modeling to Lower Costs, Increase Reliability, and Reduce Risks David Schowalter, PhD, ANSYS, Inc. OINTRODUCTION Oil

More information

Capillary Injection Tubing Anchor Technologies

Capillary Injection Tubing Anchor Technologies Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 23 26, 2014 Capillary Injection Tubing Anchor Technologies Randy Matthews US Business Development Manager Externally Banded Capillary

More information

Rig Integral MPD Equipment and Services

Rig Integral MPD Equipment and Services Rig Integral MPD Equipment and Services Drill faster and reach farther with MPD equipment integrated into the rig Achieve drilling objectives with closed-loop systems MPD provides a closed-loop circulation

More information

Amjad Abdelrahman Amber Helm

Amjad Abdelrahman Amber Helm Amjad Abdelrahman Amber Helm Production Chemicals Optimization Congress June 29-30, 2016 PETROLEUM CORPORATION 1 Outline Area and System Overview Flow Assurance Challenges Chemical Treatments Optimization

More information

Installation of Pump-off Control Technology in Goldsmith-Cummins Deep Unit. Proposed by: 16 March 2005 Marietta College

Installation of Pump-off Control Technology in Goldsmith-Cummins Deep Unit. Proposed by: 16 March 2005 Marietta College Installation of Pump-off Control Technology in Goldsmith-Cummins Deep Unit Proposed by: 16 March 2005 Marietta College Table of Contents I. Executive Summary 3 II. Introduction 6 Chart 1 Costs Incurred

More information

Online Data to Decisions and Value

Online Data to Decisions and Value Online Data to Decisions and Value Introduction Asset Optimization Introduction (David Rossi, Scientific Advisor Asset Optimization, SIS) Agenda and objective for the workshop Schlumberger Asset Optimization

More information

Appraising the Performance of Cyclic Production Scheme through Reservoir Simulation, a Case Study Tariq Al-Zahrani, Saudi Aramco

Appraising the Performance of Cyclic Production Scheme through Reservoir Simulation, a Case Study Tariq Al-Zahrani, Saudi Aramco SPE 152151 Appraising the Performance of Cyclic Production Scheme through Reservoir Simulation, a Case Study Tariq Al-Zahrani, Saudi Aramco Copyright 2012, Society of Petroleum Engineers This paper was

More information

The Integral Optimization Method of Oilfield Production System

The Integral Optimization Method of Oilfield Production System Advances in Petroleum Exploration and Development Vol. 13, No. 1, 17, pp. 57-6 DOI:1.3968/9418 ISSN 195-54X [Print] ISSN 195-5438 [Online] www.cscanada.net www.cscanada.org The Integral Optimization Method

More information

Numerical Simulation of Foam Flow in Annulus With Wellbore Heat Transfer

Numerical Simulation of Foam Flow in Annulus With Wellbore Heat Transfer Advances in Petroleum Exploration and Development Vol. 8, No. 1, 2014, pp. 43-48 DOI:10.3968/5383 ISSN 1925-542X [Print] ISSN 1925-5438 [Online] www.cscanada.net www.cscanada.org Numerical Simulation of

More information

PRODUCTION WELL WATER SHUT-OFF TREATMENT IN A HIGHLY FRACTURED SANDSTONE RESERVOIR

PRODUCTION WELL WATER SHUT-OFF TREATMENT IN A HIGHLY FRACTURED SANDSTONE RESERVOIR WRI-01-R010 PRODUCTION WELL WATER SHUT-OFF TREATMENT IN A HIGHLY FRACTURED SANDSTONE RESERVOIR Final Report By Lyle A. Johnson Jr. July 2001 Work Performed Under Cooperative Agreement DE-FC26-98FT40323

More information

The Importance of Compression and Surface Pressure in Production Optimisation

The Importance of Compression and Surface Pressure in Production Optimisation Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 23 26, 2014 The Importance of Compression and Surface Pressure in Production Optimisation Larry Harms APLNG Why emphasize the

More information

Effects of flow behavior on the design of transient operation scenarios

Effects of flow behavior on the design of transient operation scenarios Effects of flow behavior on the design of transient operation scenarios *Jakyung Kim 1) and Yutaek Seo 2) 1), 2) Division of Ocean Systems Engineering, KAIST, Daejeon 305-600, Korea 1) kjkwkrud@kaist.ac.kr

More information

Hydraulic Dewatering Retrievable Pump System

Hydraulic Dewatering Retrievable Pump System Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 23 26, 2014 Hydraulic Dewatering Retrievable Pump System Presented By: David Bolt Cormorant Hydraulic Dewatering Continuing the

More information

Hydraulic Diaphragm Insert Pump

Hydraulic Diaphragm Insert Pump Gas Well Deliquification Workshop Adams Mark Hotel, February 25-27, 2008 Hydraulic Diaphragm Insert Pump Jared Mangum, Smith Lift Dave Brewster, ConocoPhillips Outline Project Needs Background Solutions

More information

Aquifer Airlift Testing

Aquifer Airlift Testing Presentation for the CWWCA Annual Meeting 2008 by Hank Baski Colorado Springs January 12, 2008 Overview Ground Water: Fallacies & Forecasts Commonly believed fallacies hinder optimal development of water

More information

Evaluation of Intelligent Dual-Lateral Well in Multi-Layered Reservoirs

Evaluation of Intelligent Dual-Lateral Well in Multi-Layered Reservoirs Paper ID 56 Evaluation of Intelligent Dual-Lateral Well in Multi-Layered Reservoirs R.Charoengosan 1 *, F. Srisuriyachai 1, S. Athichanagorn 1 1 Department of Mining and Petroleum Engineering, Chulalongkorn

More information

2 nd European Conference on Gas Well Deliquification Hampshire Hotel, Groningen, The Netherlands September

2 nd European Conference on Gas Well Deliquification Hampshire Hotel, Groningen, The Netherlands September 2 nd European Conference on Gas Well Deliquification Hampshire Hotel, Groningen, The Netherlands September 24 26 2007 HYDRAULIC JET PUMPING A SUCCESSFUL ALTERNATIVE TO DEWATERING GAS WELLS Jim Speer *

More information

Gas Well Deliquification by Chemical Foam Workshop Steven Oude Heuvel Craig Adelizzi

Gas Well Deliquification by Chemical Foam Workshop Steven Oude Heuvel Craig Adelizzi 1 Gas Well Deliquification by Chemical Foam Workshop 2013 Steven Oude Heuvel Craig Adelizzi Contents 1) Introduction to the theory around gas well liquid loading. 2) Deliquification through the use of

More information

ConcentraFlo. Pipeline chemistry solutions and services

ConcentraFlo. Pipeline chemistry solutions and services ConcentraFlo Pipeline chemistry solutions and services CHEMICALLY DRIVEN, COMPREHENSIVE SOLUTIONS FOR MAXIMUM THROUGHPUT Schlumberger specialists deliver integrated chemical, equipment, and analytical

More information

Petroleum and Natural Gas Engineering is accredited by European Accreditation Agency (ASIIN).

Petroleum and Natural Gas Engineering is accredited by European Accreditation Agency (ASIIN). General information Today, in scope with the world s gradually increasing demand for oil and gas sectors, we are at the forefront in petroleum education and technology. The high demand for petroleum engineers

More information

Flow Assurance Principles Applied to Unconventional Gas Well Deliquification

Flow Assurance Principles Applied to Unconventional Gas Well Deliquification Gas Well Deliquification Workshop Sheraton Hotel, February 23 25, 2015 Flow Assurance Principles Applied to Unconventional Gas Well Deliquification Rob Sutton, Consultant Steve Pohler, Marathon Oil Company

More information

Selection of the Best Artificial Lift Method in One of the Iranian Oil Field by the Employment of ELECTRE Model

Selection of the Best Artificial Lift Method in One of the Iranian Oil Field by the Employment of ELECTRE Model British Journal of Applied Science & Technology (4): 72-8, 2 SCIENCEDOMAIN international www.sciencedomain.org Selection of the Best Artificial Lift Method in One of the Iranian Oil Field by the Employment

More information

HYDRAULIC ARTIFICIAL LIFT SYSTEMS

HYDRAULIC ARTIFICIAL LIFT SYSTEMS CORMORANT ENGINEERING Leaders in Hydraulic Artificial Lift CORMORANT HYDRAULIC ARTIFICIAL LIFT SYSTEMS Lifespan Lift Systems Hydraulic Reciprocating CORMORANT Dedicated to development, deployment, and

More information

A Comparison between. commercial Pipeline Fluid-dynamic Codes. OLGA vs. LEDAFLOW

A Comparison between. commercial Pipeline Fluid-dynamic Codes. OLGA vs. LEDAFLOW A Comparison between commercial Pipeline Fluid-dynamic Codes OLGA vs. LEDAFLOW Presentation Content Scope Analyzed Pipeline System and Basic Data Steady State Simulation Results and Summary Transient Simulation

More information

Multi-Zone Production in Three Tatarstan Oilfields. Atlas Badretdinov JSC Tatoilgas Mauro Petry Weatherford Maxim Popov Weatherford

Multi-Zone Production in Three Tatarstan Oilfields. Atlas Badretdinov JSC Tatoilgas Mauro Petry Weatherford Maxim Popov Weatherford Multi-Zone Production in Three Tatarstan Oilfields Atlas Badretdinov JSC Tatoilgas Mauro Petry Weatherford Maxim Popov Weatherford April 2008 Outline Definition of the challenge Technical Solution Results

More information

Effects of Enhanced Oil Recovery on Production Engineers, Elm Coulee Field, Bakken Reservoir, Richland County, Montana

Effects of Enhanced Oil Recovery on Production Engineers, Elm Coulee Field, Bakken Reservoir, Richland County, Montana Montana Tech Library Digital Commons @ Montana Tech Petroleum Engineering Faculty Scholarship 9-2013 Effects of Enhanced Oil Recovery on Production Engineers, Elm Coulee Field, Bakken Reservoir, Richland

More information

Production Optimization Using Different Scenarios of Gas Lift and ESP Installation

Production Optimization Using Different Scenarios of Gas Lift and ESP Installation International Journal of Petroleum and Geoscience Engineering (IJPGE) 1 (1): 50- ISSN 2289-4713 Academic Research Online Publisher Production Optimization Using Different Scenarios of Gas Lift and ESP

More information

Multiple screw pumps on FPSO vessels

Multiple screw pumps on FPSO vessels Multiple screw pumps on FPSO vessels During the past five decades, the booming offshore activities of the oil and gas industries required new approaches to processing and transportation of the well streams

More information

ISOTHERM NT. Advanced insulating packer fluid for arctic and low-temperature reservoir applications

ISOTHERM NT. Advanced insulating packer fluid for arctic and low-temperature reservoir applications ISOTHERM NT Advanced insulating packer fluid for arctic and low-temperature reservoir applications ISOTHERM NT: Advanced insulating packer fluid for arctic and lowtemperature reservoir applications Complications

More information

The effect of Specialty Chemicals on the Minimum Lift Velocity to Unload a Gas Well

The effect of Specialty Chemicals on the Minimum Lift Velocity to Unload a Gas Well Gas Well De-Liquification Workshop March 1-3, 2004 The effect of Specialty Chemicals on the Minimum Lift Velocity to Unload a Gas Well Sunder Ramachandran Sr. Development Scientist Baker Petrolite Baker

More information

Overview of Completions

Overview of Completions Overview of Completions PESA Oil & Gas 101 21 May 2015 Nick Clem, Applications Engineering Director Ganesh Subbaraman, Engineering Manager Outline Background Drivers affecting selection of completion types

More information

Profit Optimization ABSTRACT PROBLEM INTRODUCTION

Profit Optimization ABSTRACT PROBLEM INTRODUCTION Profit Optimization Quinn Burzynski, Lydia Frank, Zac Nordstrom, and Jake Wolfe Dr. Song Chen and Dr. Chad Vidden, UW-LaCrosse Mathematics Department ABSTRACT Each branch store of Fastenal is responsible

More information

Practical Cementing Technique to Repair Severe Casing Damage David Cirer, Erick Arze, Juan Manuel Moggia, Ruben Hector Soto, Pan American Energy.

Practical Cementing Technique to Repair Severe Casing Damage David Cirer, Erick Arze, Juan Manuel Moggia, Ruben Hector Soto, Pan American Energy. SPE 154241 Practical Cementing Technique to Repair Severe Casing Damage David Cirer, Erick Arze, Juan Manuel Moggia, Ruben Hector Soto, Pan American Energy. Copyright 2012, Society of Petroleum Engineers

More information