Tom Key, EPRI
|
|
- Barry Strickland
- 6 years ago
- Views:
Transcription
1 Panel: Valuing Existing and Developing New Pumped Storage Assets in the West Northwest Hydroelectric Association 010 Winter Meeting February 17, 010 Tom Key, EPRI
2 DOE-Industry Project: Quantifying the Full Value of Hydropower in the Transmission Grid Funded through DOE FOA DE , Advanced Water Power Topic Area 4: Hydropower Grid Services $.M, over yrs with $640k needed Industry cost share
3 Quantifying the Full Value of Hydropower in the Transmission Grid Objective: Methods to value grid services from hydropower Participants: EPRI, HDR-DTA, HPPi, LCG Consulting, ORNL, Sandia, Brendan Kirby and Cascade Consulting Scope of Work (starting February 010, see timeline slide): Conduct industry case studies and evaluate hydropower participation in ancillary services markets Prepare detailed simulation for WECC area and determine effects of alternative policies on value of hydropower Analyze systemic operating constraints on hydropower resources Develop data base of current and future hydro plant costs Deliver effective methodology for planning and applying hydropower assets to support integration of variable generation
4 Project Team DOE Technical Program Manager Alejandro.Moreno DOE Contracts Manager EPRI Project Manager Thomas Key EPRI Contracts Manager Mr. David Morrison Principal Investigator Daniel Brooks, EPRI Grid Modeling and Studies LCG Consulting Dr Rajat Deb Sidart Deb Dr Carol Cheng Dr Hossein Daneshi Cascade Consulting Dr Alberto Del Rosso Principal Investigator Patrick March, HPPI Hydropower Operations, Cost and Markets HDR DTA David Grady Robert Rittase Steve Brown Brendan Kirby, Consulting DOE FFRDC Support ORNL Hydrologic Constraints Dr. Brennan Smith Dr. Michael R. Starke SNLA Grids and Markets Dr. Abraham Ellis Dr. Verne Loose Dr. Mark Ehlen 4
5 Industry Coordination National Hydro Association (NHA) Hydraulic Power Committee (Oct 009) NWHA (February 17th) Pumped Storage Council (Feb 18) NHA Annual Meeting (April 6 th ) HydroVision (Charlotte week of July 6 th ) Wind, energy storage and hydropower groups FERC and Independent System Operators (ISOs) Other key organizations Power Management Agencies, Bureau of Reclamation, Army Corps of Engineers 5
6 Proposed Study Timeline PROJECT GANTT CHART CONTRACT START Month 1-1 Month 1-4 TASK 1: Prepare Industry Case Studies 1a 1b 1c TASK : Establish Wide-Area Modeling Approach and Foundational Scenario a b Typical Task Deliverable TASK : Evaluate National Hydropower Participation in Ancillary Services Markets TASK 4: Analyze Systemic Operating Constraints on Hydropower Resources a b c d 4a 4b 4c TASK 5: Develop Data Base of Current and Projected Cost Elements for Development Options 5a 5b 5c 5d TASK 6: Develop and Compute Scenario Simulations for WECC Projects 6a 6b TASK 7: Determine Effects of Alternative Policy Scenarios on Value of Hydropower TASK 8: Define New Methodology for Planning and Applying Hydropower Assets 7a 8a 7b 8b TASK 9: Documentation and Dissemination of Results (See Project Milestones/Deliverables) PROJECT MILESTONES/DELIVERABLES Project Review Meetings Industry Review Meetings Final Report Final Briefing Draft Final 6
7 Task 1: Looking for Industry Participants for Grid Services Case Studies such as: Market/Region Project Project Type Owner NEISO Northfield FirstLight NYISO Blenheim-Gilboa New York Power Authority PJM PJM Conowingo Muddy Run Conventional Exelon Generation Exelon Generation SERC SERC Raccoon Mountain Bad Creek Tennessee Valley Authority Duke MISO MISO Osage Taum Sauk Conventional AmerenUE AmerenUE CAISO CAISO Helms Castaic PG&E LADWP/CDWR Pacific NW Pacific NW Rocky Reach Grand Coulee Conventional Conv. + P-S Chelan County PUD USBR (BPA) CONFIRMED UNCONFIRMED Please Contact: Tom Key, , tkey@epri.com or Pat March, , pamarch@hydroppi.com 7
8 Unit Efficiency (%) Plant Efficiency (%) Optimized Plant Efficiency (%) Energy (MWh) Unit Power (MW) Optimized Plant Efficiency (%) Detailed Performance Analyses Optimized Unit Efficiency Plant vs Efficiency Unit Power vs Power Efficiencies and Load vs Time Energy Production vs Power, GH = 1180 Actual Plant Efficiency Optimized Plant Efficiency ActUnitPower1 ActUnitPower ActUnitPower ActUnitPower4 ActUnitPower5 ActUnitPower6 ActUnitPower7 ActUnitPower8 95 OptUnitPower1 OptUnitPower OptUnitPower OptUnitPower4 OptUnitPower5 OptUnitPower6 OptUnitPower7 OptUnitPower GH = 1140 GH = 100 GH = Energy (MWh) 40 Optimized Plant Efficiency GH = GH = GH = GH = 140 GH = /1/ :45 01/1/09 10:5 01/1/09 10:59 01/1/09 11:07 01/1/09 11:14 01/1/09 11: Time Scroll 0 Data ' Power (MW) X-Axis Scale ' 80 Plant Power (MW) Power (MW) 8
9 Supplemental Project Notice Draft project notice 9
Quantifying the Full Value of Hydropower in the Transmission Grid. Tom Key Project Manager Industry Review at NHA Annual Meeting April 6, 2011
Quantifying the Full Value of Hydropower in the Transmission Grid Tom Key Project Manager Industry Review at NHA Annual Meeting April 6, 2011 Quantifying the Full Value of Hydropower in the Transmission
More informationQuantifying the Value of Hydropower in the Electric Grid: Final Report
Quantifying the Value of Hydropower in the Electric Grid: Final Report 2013 TECHNICAL REPORT DE-EE0002666 Quantifying the Value of Hydropower in the Electric Grid: Final Report 1023144 Final Report, February
More informationPumped Storage - The Proven Grid Scale Storage Solution. Presented to: NWPCC GRAC Committee
Pumped Storage - The Proven Grid Scale Storage Solution Presented to: NWPCC GRAC Committee January 27, 2015 Presentation Agenda Part 1 Variable Energy Resources Integration Challenges The Need for Grid
More informationHydroelectric Pumped Storage Potential and Renewable Energy Integration in the Northwest
Hydroelectric Pumped Storage Potential and Renewable Energy Integration in the Northwest Wind generation on Bonneville Power Administration s (BPA) system in the Northwest grew from almost nothing in 1998
More informationU.S. Hydropower. Fleet and Resource Assessments. National Hydropower Association Annual Conference. Brennan T. Smith, Ph.D., P.E.
U.S. Hydropower Fleet and Resource Assessments National Hydropower Association Annual Conference April 5, 2011 Capital Hilton Washington, D.C. presented by Brennan T. Smith, Ph.D., P.E. National Hydropower
More informationNW Hydro and California
NW Hydro and California SUMMER 2017 PublicGeneratingPool.com thampton@publicgeneratingpool.com, 360-852-7366 Northwest Hydro There is approximately 46,000 Mw of hydro capability in the Pacific Northwest
More informationNARUC. Winter Committee Meetings. Committee On Water
NARUC Winter Committee Meetings Committee On Water Hydropower Types of Hydropower Projects - Impoundment - Diversion (run of river) - Pumped Storage Turbine Types Impulse high head, lower flow -- Pelton
More informationHydropower Value Study Past, Present, and Future
Hydropower Value Study Past, Present, and Future ABHISHEK SOMANI Energy and Environment Directorate, Electricity Infrastructure Northwest Hydroelectric Association Annual Conference, 2019 Portland, OR
More informationNovember 16, SUBJECT: Council s Regional Hydropower Potential Scoping Study
Bill Bradbury Chair Oregon Henry Lorenzen Oregon W. Bill Booth Idaho James A. Yost Idaho Jennifer Anders Vice Chair Montana Pat Smith Montana Tom Karier Washington Phil Rockefeller Washington November
More informationThe Role of Public-Private Partnerships in Advanced Turbine Development
The Role of Public-Private Partnerships in Advanced Turbine Development Michael J. Sale Conference on Environmentally Enhanced Hydropower Turbines Washington, DC, May 19, 2011 Slide 1 Hydropower is a well-established
More informationScience & Technology Needs for Hydropower
Science & Technology Needs for Hydropower Brennan T. Smith Program Manager Wind and Water Power Technologies Oak Ridge National Laboratory RNRF Congress on Assessing America's Renewable Energy Future Dallas
More informationU.S. Hydropower. Resource Assessments. Northwest Hydroelectric Association Small Hydro Workshop
U.S. Hydropower Resource Assessments Northwest Hydroelectric Association Small Hydro Workshop September 22-23, 2011 Bend, Oregon presented by Brennan T. Smith, Ph.D., P.E. Water Power Program Manager Oak
More informationQuantifying the Value of Hydropower in the Electric Grid:
SANDIA REPORT SAND2011-1009 Unlimited Release Printed January 2011 Quantifying the Value of Hydropower in the Electric Grid: Role of Hydropower in Existing Markets Verne W. Loose Prepared by Sandia National
More informationRenewable Integration Power Delivery & Utilization
Renewable Integration Power Delivery & Utilization Karen Forsten Area Manager, Renewable Integration, Operations & Planning Renewable Energy Council Denver, Colorado March 26, 2010 Variability & Uncertainty
More informationWind Integration and Grid Reliability Impacts
Wind Integration and Grid Reliability Impacts Charlton I. Clark Technology Manager, Renewable Systems Interconnection Wind and Water Power Program Office of Energy Efficiency and Renewable Energy U. S.
More information2015 ISO/RTO Metrics Report. Summary. November 2015
2015 ISO/RTO Metrics Report Summary November 2015 ISO/RTO Metrics Report Background Independent system operators (ISOs) and regional transmission organizations (RTOs) that are regulated by the Federal
More informationUS Energy Resources for Electricity Generation
US Energy Resources for Electricity Generation 2014 U.S. ELECTRICITY GENERATION Hydro 6% Other renewables 7% Others 2% Nuclear 19% Coal 39% Natural gas 27% From www.wikipedia.org and www.eia.gov 28 Demand
More informationGreat Basin Transmission ITP Submission to California ISO. May 2018
Great Basin Transmission ITP Submission to California ISO May 2018 LS Power Power generation and transmission company formed in 1990 39,000+ MW Power generation development, construction or operations
More informationNCSL Transmission Policy Institute Denver, CO
Wind Energy: Where Are We At NCSL Transmission Policy Institute Denver, CO June 17-18, 2010 J. Charles Smith Executive Director UWIG What is UWIG? Non-profit corporation established by 6 utilities in 1989
More informationNorthwest Power and Conservation Council
Northwest Power and Conservation Council Pumped Storage GRAC Meeting Banks Lake Pumped Storage Project (North Dam) FERC Project No. 14329 Portland, Oregon January 27, 2015 Presented by: Lloyd Reed and
More informationHydropower Program Overview
Water Power Technologies Office Hydropower Program Overview Tim Welch Hydropower Program Manager Timothy.Welch@EE.Doe.Gov (202)-586-7055 February 22, 2018 1 Program Name or Ancillary Text eere.energy.gov
More informationBPA s Non-Wires Solutions Overview
BPA s Non-Wires Solutions Overview How are we changing the Pacific Northwest? Mike Weedall Vice President, Energy Efficiency Bonneville Power Administration March 20, 2006 Overview BPA Profile Energy Efficiency
More informationHydropower Impact Analyses for Water Supply Reallocation Studies
Hydropower Impact Analyses for Water Supply Reallocation Studies Russell L. Davidson, MSCE, PE Water Supply Workshop 2 June 2009 Tulsa, OK 2 June 2009 Hydropower Analysis Center 1 Other 6% Fossil Steam
More informationTime Topic Presenter. Rao Konidena, MISO Daniel Brooks, EPRI
Tuesday October 4, 2011 8 AM-2:45 PM (CT) Time Topic Presenter 8:00 a.m. Welcome, introduction, key points from Monday discussion on energy storage applications by utilities and treatment in energy markets.
More informationRevenues from Ancillary Services and the Value of Operational Flexibility
Revenues from Ancillary Services and the Value of Operational Flexibility October 31, 2002 LCG Consulting The Issue Research Highlights In a restructured electricity industry, markets govern the operation
More informationClimate Change Vulnerabilities of and Adaptation Strategies for New York State s Future Electric System
Climate Change Vulnerabilities of and Adaptation Strategies for New York State s Future Electric System Project Overview Summary The Electric Power Research Institute (EPRI) is leading a two-year project
More informationNovember 6, SUBJECT: Briefing on the effect of compound climate events on adequacy in the Pacific Northwest
James Yost Chair Idaho W. Bill Booth Idaho Guy Norman Washington Tom Karier Washington Jennifer Anders Vice Chair Montana Tim Baker Montana Ted Ferrioli Oregon Richard Devlin Oregon MEMORANDUM November
More informationValuing Pumped Storage: Debunking Myths; Creating Tools
NORTHWEST HYDROELECTRIC ASSOCIATION 2016 Pumped Storage Workshop Valuing Pumped Storage: Debunking Myths; Creating Tools FEBRUARY 18, 2016 Portland Marriott Downtown Waterfront Portland, Oregon Three Interrelated
More informationStakeholder Comments Template
Stakeholder Comments Template Submitted by Company Date Submitted John Hu Los Angeles Department of Water and Power System Planning Office: 213-367-0506 E-mail: gang-kung.hu@ladwp.com Los Angeles Department
More informationATC Stakeholder Update 2019 PROMOD Study Assumptions. Tom Dagenais Todd Tadych ATC Economic Planning
ATC Stakeholder Update 2019 PROMOD Study Assumptions Tom Dagenais Todd Tadych ATC Economic Planning 7-10-09 1 Agenda / Introduction MISO RGOS Model Description MISO RGOS Model History and Background MISO
More informationQuantifying the Maintenance Costs Associated with Variable Operating Conditions
Quantifying the Maintenance Costs Associated with Variable Operating Conditions By Patrick A. March, Hydro Resource Solutions LLC Introduction In Greek mythology, the three Fates determine each person
More informationERSTF Loads and Resources Balance
ERSTF Loads and Resources Balance Clyde Loutan, Senior Advisor Renewable Energy Integration, CAISO EPRI Dallas Regional Office Las Colinas Tower II February 3 & 4 Loads and Resources Team Subgroup Lead
More information20 MW Flywheel Energy Storage Plant
1 20 MW Flywheel Energy Storage Plant Case Study for the: Advanced Energy 2010 Conference Chet Lyons, Director, Marketing and Sales November 8-9, 2010 3 Safe Harbor Statement This presentation contains
More informationBasin-Scale Hydropower and Environmental Opportunity Assessments
Basin-Scale Hydropower and Environmental Opportunity Assessments A framework for identifying and evaluating hydropower and environmental opportunities and linkages Simon Geerlofs, Jerry Tagestad, Kyle
More informationPacific Northwest National Laboratory-
Pacific Northwest National Laboratory- A National Energy Research Asset With Significant Regional Impact Advanced Energy Conference 2011 October 12, 2011 Dennis Stiles, Program Manager Energy & Environment
More informationUnderstanding the Value of Hydropower and Pumped Storage
NWHA 2018, Portland - OR Understanding the Value of Hydropower and Pumped Storage ABHISHEK SOMANI, PNNL Feb 21, 2018 DOE Initiatives on Valuation of Pumped Storage and Hydropower In July 2016, the Hydropower
More informationDraft Application for New License for Major Water Power Project Existing Dam
Draft Application for New License for Major Water Power Project Existing Dam Northfield Project Northfield Mountain Pumped Storage Project (FERC Project Number 2485) Turners Falls Hydroelectric Project
More informationUNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION
UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION California Independent System ) Docket Nos. ER12-1630 Operator Corporation ) ER14-971 Informational Report of the California Independent System
More informationFERC Docket EL Fast-Start Resources
FERC Docket EL18-34-000 Fast-Start Resources Anthony Giacomoni December 18, 2018 PJM 2017 Session Objectives Review motivation for the FERC Order regarding faststart resources Review PJM s current special-pricing
More informationWestern Energy Imbalance Market and Regional Initiatives
Western Energy Imbalance Market and Regional Initiatives Presentation to mid-c Seminar Don Fuller Director Strategic Alliances July 27, 2016 Today s topics Renewable portfolio continues to grow Energy
More informationNovember 10, Tom Eckman, Ben Kujala, John Ollis, Gillian Charles and Massoud Jourabchi
Phil Rockefeller Chair Washington Tom Karier Washington Henry Lorenzen Oregon Bill Bradbury Oregon W. Bill Booth Vice Chair Idaho James Yost Idaho Pat Smith Montana Jennifer Anders Montana November 10,
More informationEIPC Interconnection-wide Webinar and Stakeholder Discussion. November 17, 2015
EIPC Interconnection-wide Webinar and Stakeholder Discussion November 17, 2015 Webinar Outline Presentation on 2025 Summer Peak (2025S) and 2025 Winter Peak (2025W) Roll-up Case Development Report to be
More informationCAISO Generator Deliverability Assessment Methodology. On-Peak Deliverability Assessment Methodology (for Resource Adequacy Purposes)
Background On-Peak Deliverability Assessment Methodology (for Resource Adequacy Purposes) The CAISO s deliverability study methodology for resource adequacy purposes was discussed extensively in the CPUC
More informationBPA Comments on Appendix H. Pacific Northwest California Transfer Increase Informational Special Study
BPA Comments on Appendix H Pacific Northwest California Transfer Increase Informational Special Study February 28, 2019 On February 4, 2019, the California ISO (CAISO) released the 2018 2019 Transmission
More informationCAISO s Flexible Resource Adequacy and Must Offer Obligation Phase 2 Revised Straw Proposal Public Generating Pool and Public Power Council Comments
CAISO s Flexible Resource Adequacy and Must Offer Obligation Phase 2 Revised Straw Proposal Public Generating Pool and Public Power Council Comments May 22, 2017 Public Generating Pool (PGP) and Public
More informationBest Practice Guidelines for Hydro Performance Processes
Best Practice Guidelines for Hydro Performance Processes by Patrick A. March, Charles W. Almquist, and Paul J. Wolff Abstract This paper discusses hydro performance processes and presents draft Best Practice
More informationThe Other End of Storage: Rebirth of Pumped Hydro
The Other End of Storage: Rebirth of Pumped Hydro Presentation to the Midwestern Governors Association March 21, 2017 Nick Griffin (Market Development Manager) Ryan Randazzo (Plant Manager) Ludington Pumped
More informationJoint NWHA and NHA Northwest Regional Meeting. Is Pumped Storage in Your Future? Mark W. Killgore, P.E., D. WRE. October 29, 2009
Joint NWHA and NHA Northwest Regional Meeting Is Pumped Storage in Your Future? Mark W. Killgore, P.E., D. WRE October 29, 2009 Wind Interconnection Challenges Wind Variability Hourly Daily or Weekly Annual
More informationCARIS Procedure Development and Simulation Model Evaluation
CARIS Procedure Development and Simulation Model Evaluation Bill Lamanna Manager Long Term Planning New York Independent System Operator ESPWG Meeting NYISO September 16, 2009 Draft 1 for discussion only
More informationHydropower Modeling at EIA
Hydropower Modeling at EIA For Northwest Hydroelectric Association s 2015 Annual Conference Portland, OR By Operations Research Analyst, Renewables Analysis Team Michelle.Bowman@eia.gov U.S. Energy Information
More informationIntroduction to Bonneville Power Administration
Introduction to Bonneville Power Administration Greg Delwiche, Senior Vice President, BPA Power Services January 31, 2013 Federal Columbia River Power System Columbia River Basin & BPA Service Area WHAT
More informationFlywheel Based Energy Storage for Grid Services
Flywheel Based Energy Storage for Grid Services Matthew Lazarewicz VP and Chief Technical Officer Beacon Power Corporation Buffalo, NY 2011 Advanced Energy Conference October 12-13, 2011 1 Safe Harbor
More informationJuly 5, 2018 MEMORANDUM. Power Committee. John Ollis, Power System Analyst. SUBJECT: Wholesale Electricity Price Forecast BACKGROUND:
James Yost Chair Idaho W. Bill Booth Idaho Guy Norman Washington Tom Karier Washington Jennifer Anders Vice Chair Montana Tim Baker Montana Ted Ferrioli Oregon Richard Devlin Oregon July 5, 2018 MEMORANDUM
More informationIncreased Capabilities for Transfers of Low Carbon Electricity between the Pacific Northwest and California Informational Study
2018-2019 Transmission Planning Process Increased Capabilities for Transfers of Low Carbon Electricity between the Pacific Northwest and California Informational Study Ebrahim Rahimi Lead Regional Transmission
More informationEnergy Storage Integration in Alberta s Energy Only Market. Kevin Dawson Director, Market Design Alberta Electric System Operator
Energy Storage Integration in Alberta s Energy Only Market Kevin Dawson Director, Market Design Alberta Electric System Operator Outline The AESO and Alberta s Wholesale Electricity Market About the AESO
More informationSusitna Hydro Evaluation Project
Susitna Hydro Evaluation Project Seminar on the Development of Large Hydroelectric Projects with a Focus on the Susitna Project presented to Alaska Energy Authority November 2008 Project History Presentation
More informationMarch 3, Submitted to: CAISO
March 3, 2016 Submitted to: CAISO (regionaltransmission@caiso.com) COMMENTS OF NEXTERA ENERGY TRANSMISSION WEST, LLC ON THE CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION S 2015-2016 TRANSMISSION PLANNING
More informationStatus of the western energy imbalance market and regional initiatives
Status of the western energy imbalance market and regional initiatives Presentation to 2016 NWPPA Power Supply Conference Don Fuller Director Strategic Alliances August 1, 2016 Today s topics Renewable
More information2015 INTEGRATED RESOURCE PLAN. IRPWG Meeting Session 7 Day 2 May 30, 2014 REDACTED VERSION
2015 INTEGRATED RESOURCE PLAN IRPWG Meeting Session 7 Day 2 May 30, 2014 REDACTED VERSION IRPWG Meeting May 30 th Agenda Day 2 8:30 Recap from Previous Day/Overview of Day 2 Randy McAdams 8:45 Overview
More informationMaximizing the Market Value of Flexible Hydro Generation
Maximizing the Market Value of Flexible Hydro Generation PREPARED BY Pablo Ruiz Jamie Read Johannes Pfeifenberger Judy Chang Roger Lueken March 29, 2018 Copyright 2018 The Brattle Group, Inc. Content Growing
More informationSenate Interim Committee on Veterans and Emergency Preparedness
Senate Interim Committee on Veterans and Emergency Preparedness Small-Scale Hydroelectric Power Andy Ginsburg, Assistant Director Energy Planning and Innovation Oregon Department of Energy September 22,
More informationNovember 6, SUBJECT: Streamflow and Temperature Projections of the Latest Climate- Change Datasets for the Columbia River Basin
Henry Lorenzen Chair Oregon Bill Bradbury Oregon Phil Rockefeller Washington Tom Karier Washington W. Bill Booth Vice Chair Idaho James Yost Idaho Pat Smith Montana Jennifer Anders Montana November 6,
More informationDECISIONS on operating transfer limits and transmission
1144 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 19, NO. 2, MAY 2004 Hydro Turbine-Governor Model Validation in Pacific Northwest Dmitry Kosterev Abstract This paper presents an approach for generator model
More informationIntegrating High Levels of Variable Renewable Energy Sources
Integrating High Levels of Variable Renewable Energy Sources Erik Ela EPRI Grid Ops and Planning eela@epri.com NYISO Environmental Advisory Council Troy, NY May 6, 2016 EPRI Grid Operations & Planning
More information2011 IRP Public Input Meeting. December 15, Pacific Power Rocky Mountain Power PacifiCorp Energy
2011 IRP Public Input Meeting December 15, 2010 Pacific Power Rocky Mountain Power PacifiCorp Energy Agenda 2011 IRP schedule update and next steps Resource portfolio development status Supply Side Resources
More informationMassive Energy Storage Design for Renewable Electricity Generation Systems
Massive Energy Storage Design for Renewable Electricity Generation Systems Benjamin Omell and Donald J. Chmielewski,, Chicago, IL Outline Introduction and Objectives Case Study Method: Supervisory Control
More informationImproving Reliability Through Better Models
Improving Reliability Through Better Models By Philip Overholt, Dmitry Kosterev, Joseph Eto, Steve Yang, and Bernard Lesieutre The Office of Electricity Delivery and Energy Reliability of the U.S. Department
More informationCONTENTS LIST OF TABLES LIST OF FIGURES
CONTENTS 1.0 PURPOSE OF ACTION AND NEED FOR POWER... 1-1 1.1 PURPOSE OF THE ACTION... 1-1 1.2 NEED FOR PROJECTS... 1-3 1.2.1 PacifiCorp Operations... 1-3 1.2.2 Cowlitz PUD Operations... 1-5 1.2.3 Regional
More informationOverview of Columbia River System Operations for Hydropower and Fish Passage
Consultation on MRC s Hydropower Programme Vientiane, Lao PDR, 25-26 September 2008 Overview of Columbia River System Operations for Hydropower and Fish Passage By Bolyvong Tanovan, PhD, PE Chief, Water
More informationImproved Transmission Constraint Pricing Market Issues Working Group February 5, 2007
Improved Transmission Constraint Pricing Market Issues Working Group February 5, 2007 1 Outline of Today s Presentation Concept Review Review Next Steps from Previous Discussions Updated Historical Shadow
More informationPumped Storage Report
2018 Pumped Storage Report EXECUTIVE SUMMARY Duke Energy s Jocassee Pumped Storage Hydropower Facility in South Carolina Executive Summary This White Paper was prepared by the National Hydropower Association
More informationAnalyzing the Value of Storage and Demand Response in a Wholesale Market
Analyzing the Value of Storage and Demand Response in a Wholesale Market Marissa Hummon National Summit on Smart Grid & Climate Change - 2014 Washington, D.C. NREL is a national laboratory of the U.S.
More informationBulk Energy Storage Resource Case Study Update with the 2016 LTPP Assumptions
Bulk Energy Storage Resource Case Study Update with the 2016 LTPP Assumptions Shucheng Liu Principal, Market Development 2016-2017 Transmission Planning Process Stakeholder Meeting February 28, 2017 Page
More informationGenerator Interconnection Developer Perspective. February 28, 2019
Generator Interconnection Developer Perspective February 28, 2019 DENNIS DESMARAIS, PE Energy industry entire career PGE 17 years PacifiCorp 7 years Generator Interconnection Queue Management Transmission
More informationWritten Testimony Submitted to the Water and Power Subcommittee Committee on Natural Resources U.S. House of Representatives
Written Testimony Submitted to the Water and Power Subcommittee Committee on Natural Resources U.S. House of Representatives Oversight Hearing on Hydropower: Providing 75% of America's Current Renewable
More informationSINCE 1997 FERC CERTIFIED WIDE RANGE OF CUSTOMERS MANAGES 58,000 MW WHOLLY OWNED SERVES 4,000 MW 130 EMPLOYEES. Power Marketing Company
POWER AT WORK TPS 1 FERC CERTIFIED Power Marketing Company MANAGES 58,000 MW Customer Generation Assets SINCE 1997 Providing Energy Management Services SERVES 4,000 MW Third Party Wholesale & Retail Load
More informationPowerSimm for Applications of Resource Valuation
PowerSimm for Applications of Resource Valuation Presented by: Sean Burrows, PhD Alankar Sharma/Kristina Wagner sburrows@ascendanalytics.com 303.415.1400 June 15, 2017 Agenda Defining Model Objectives
More informationColumbia River Drainage
Columbia River Spring/Summer Run-Off Conditions and Operations for Legislative Council on River Governance August 21, 2012 Boise, Idaho Rick Pendergrass Manager, Power & Operations Planning Bonneville
More informationNorthwest Power and Conservation Council NW Power Markets Symposium Products & Transactions
Northwest Power and Conservation Council NW Power Markets Symposium Products & Transactions Presented by: John Wilkinson John.Wilkinson@MorganStanley.com 604-658-8132 July 2013 Disclaimer: The information
More information2016 Summer Reliability Assessment
Table of Contents Preface... 3 Overview... 5 FRCC... 6 MISO... 7 MRO-Manitoba Hydro... 8 MRO-SaskPower... 9 NPCC-Martimes... 10 NPCC-New England... 11 NPCC-Ontario... 13 NPCC- Québec... 14 PJM... 15 SERC...
More informationNORTHWESTERN ENERGY 2018 ELECTRICITY RESOURCE PROCUREMENT PLAN STRAWMAN 1
NORTHWESTERN ENERGY 2018 ELECTRICITY RESOURCE PROCUREMENT PLAN CHAPTER 1. EXECUTIVE SUMMARY STRAWMAN 1 1. Load Service Requirements a. Peaking Capacity (Planning Reserve Margin) b. Dispatchable Capacity
More informationMid-C Seminar July 16 th, 2014
NWPP Members Market Assessment and Coordination Initiative Mid-C Seminar July 16 th, 2014 Dan Williams, LC Chair, Portland General Electric Slides not reviewed or approved by MC Members 1 Agenda History
More informationNew England Power Sector Overview
USAID/NARUC East Africa Regional Regulatory Partnership Exchange: New England Power Sector Overview Andrew Greene Massachusetts Dept. of Public Utilities Energy Facilities Siting Board Dar es Salaam, Tanzania
More informationJanuary 3, 2018 MEMORANDUM. Council Members. John Ollis, Power System Analyst. SUBJECT: Marginal Carbon Emissions Rate Study Draft BACKGROUND:
Henry Lorenzen Chair Oregon Bill Bradbury Oregon Guy Norman Washington Tom Karier Washington W. Bill Booth Vice Chair Idaho James Yost Idaho Jennifer Anders Montana Tim Baker Montana January 3, 2018 MEMORANDUM
More informationRecommendations on the TPP policy and economic assessment by TPP topic
Public Advocates Office California Public Utilities Commission 505 Van Ness Avenue San Francisco, California 94102 Tel: 415-703-1584 www.publicadvocates.cpuc.ca.gov COMMENTS OF THE PUBLIC ADVOCATES OFFICE
More informationMid-Continent Independent System Operator (MISO) Overview. INCMA February 15, 2017
Mid-Continent Independent System Operator (MISO) Overview INCMA February 15, 2017 1 2 ISO s/rto s manage flows on the transmission system by directing generator usage 3 North American Electric Grid Operators
More informationHydropower Potential Studies Reviewed for Scoping Study. Twenty four studies reviewed Grouped by categories Organized by chapters in report
Hydropower Potential Studies Reviewed for Scoping Study Twenty four studies reviewed Grouped by categories Organized by chapters in report PROJECTS AT EXISTING UNPOWERED DAMS A 1 Hydropower Resource Assessment
More informationREGIONAL TRANSMISSION RESOURCES
REGIONAL TRANSMISSION RESOURCES Contents I-2. OVERVIEW I-3. THE PACIFIC NORTHWEST TRANSMISSION SYSTEM Regional Constraints PSE Westside Transmission Constraints I-7. PSE TRANSMISSION EFFORTS Puget Sound
More informationSustainable Use of Hydropower in a Drinking Water System - Pittsfield, MA
Sustainable Use of Hydropower in a Drinking Water System - Pittsfield, MA Christian A. Murphy Wakefield MA, Electrical Engineering Dept. AECOM Water christian.murphy@aecom.com Contributors: Doug Gove,
More informationolumbia River Treaty The Columbia by Steve Oliver, Vice President, Generation Asset Management, Bonneville Power Administration 16 Oct
The Columbia by Steve Oliver, Vice President, Generation Asset Management, Bonneville Power Administration 16 Oct 2006 1 Presentation Outline Geography of the Pacific Northwest Bonneville Power Administration
More informationCAN EXISTING MULTI-PURPOSE HYDROELECTRIC ASSETS SMOOTH UTILITY-SCALE WIND VARIABILITY?
CAN EXISTING MULTI-PURPOSE HYDROELECTRIC ASSETS SMOOTH UTILITY-SCALE WIND VARIABILITY? Alisha R. Fernandez 1*, Seth Blumsack 1, Patrick Reed 2 1 John and Willie Leone Family Department of Energy and Mineral
More informationPacific Northwest Low Carbon Scenario Analysis
Pacific Northwest Low Carbon Scenario Analysis Achieving Least-Cost Carbon Emissions Reductions in the Electricity Sector Mid-Columbia Seminar Wenatchee, Washington July 25, 2018 Arne Olson, Senior Partner
More informationMISO Energy Storage Study DRAFT Scope
MISO Energy Storage Study DRAFT Scope MISO Energy Storage Study DRAFT Scope July 19, 2011 MISO Page 1 Table of Contents 1. Introduction... 3 2. Study Objectives... 3 3. Study Drivers... 4 4. Study Description...
More informationUNITED STATES OF AMERICA 132 FERC 62,179 FEDERAL ENERGY REGULATORY COMMISSION
UNITED STATES OF AMERICA 132 FERC 62,179 FEDERAL ENERGY REGULATORY COMMISSION Public Utility District No. 1 of Chelan County, Project No. 2145-107 Washington ORDER APPROVING WILDLIFE HABITAT MANAGEMENT
More informationUCAP Calculation Comparison
UCAP Calculation Comparison Dispatchable resources within PJM, NYISO, & MISO September 2017 Draft for Discussion Overview map British Columbia Alberta Manitoba Newfoundland Labrador Ontario Quebec PEI
More informationThe Electric Generation Expansion Analysis System (EGEAS) Software 2017 EPRI Update
The Electric Generation Expansion Analysis System (EGEAS) Software 2017 EPRI Update Adam Diamant Technical Executive Energy and Environmental Analysis EGEAS Users Group MISO, Eagan, MN October 4, 2017
More informationOfficer Certification Form Discussion
Officer Certification Form Discussion Sheri Prevratil Manager, Corporate Credit New York Independent System Operator Credit Policy Working Group January 22, 2016 2000-2016 New York Independent System Operator,
More informationEnergy. Roseville, CA U.S.A. Argonne, IL USA. Technical Report. October 30, DOE Contract No. ANL Contract No. 2F-3110.
Technical Report Energy Exemplar EE-2013-10-30-01 October 30, 2013 DOE Contract No. DE-FOA-0000486 ANL Contract No. 2F-3110 Adjustable Speed Pumped-Storage Hydro- Generator ( PSH) Evaluation by PLEXOS
More informationMarch 5, SUBJECT: Additional Background Materials for Scenario Input Assumptions
Phil Rockefeller Chair Washington Tom Karier Washington Henry Lorenzen Oregon Bill Bradbury Oregon W. Bill Booth Vice Chair Idaho James Yost Idaho Pat Smith Montana Jennifer Anders Montana March 5, 2015
More informationOverview of PJM: Looking Back to Look Forward Tokyo Power Market Summit
Overview of PJM: Looking Back to Look Forward Tokyo Power Market Summit Craig Glazer Vice President, Federal Government Policy PJM Interconnection June, 2018 Topics 1. PJM Overview 2. Evolution of PJM
More information