2 Marine Fueling Facility Program Update Advisory Bruce Marshall Harbor Director Bill Helbig Interim Engineering Director Jeff Smith Finance Director August 13, 2012

3 Program Update History Marine Fuel Market Public Marine Fueling Facilities What We Are Hearing Site Selection Criteria Potential Locations Financial Analysis Next Steps

4 History 1940 s: Marine fuel available in Thurston County 1950 s: Fuel Became available in downtown Olympia on Port property 1958: Zittel s Marina fuel facility constructed 1960: West Bay fuel facility constructed 1998: Port approached by private sector interest in fueling facility at NorthPoint

5 History Cont : Planning meetings held to discuss fueling facility into NorthPoint development 2005: BST Associates conducted Port Economic Impact Study, indicating high demand 2008: Port approached by private sector interest to locate fueling facility at A-Dock 2008: Commission received petition with approximately 800 individuals requesting fueling facility 2009, 2011: Commission directed staff to perform Marine Fueling Facility Studies

6 AREA FUEL DOCKS Past and Present Fuel Dock Fuel Dock Fuel dock (Closed) Fuel Dock (Closed) Olympia

7 Marine Fuel Market 267,000 registered vessels in Washington 17 th largest boating population in United States 7 th largest boating economy in United States 10,500 registered vessels in Thurston County 2000 moorage slips in Thurston County

8 Marine Fuel Market Cont slips (80%) are in downtown Olympia area Swantown is 7 th largest marina in Washington 68% increase in visiting boaters at Swantown since 2007 Downtown Olympia is most underserved marine fueling market in Washington with no fueling facilities

9 Public Fueling Facilities 32 public ports and cities operate marinas 20 have marine fueling facilities 13 (65%) operate fueling facilities as public owned business enterprise Ability to use economy of scale in operations Better environmental oversight Marginal rate of return hinders private sector operation

10 What We Are Hearing from Public We don t want to travel long distances for fuel. Area fuel docks have limited water depth, short fueling docks, limited maneuverability and slow pumps. We don t like stopping to fuel. People don t come to Olympia because there is no fuel available. We want a fuel dock in Olympia.

11 Site Selection Criteria Convenience for Boaters Protected from Adverse Conditions Water Depth Existing Infrastructure Fuel Storage Location Staffing / Operating Compatibility with Existing Uses Environmental Considerations

12 Potential Locations Port Plaza NorthPoint Boatworks A-Dock

13 Potential Locations Cont. Port Plaza Dock Not Compatible With Existing Use Fuel Storage Facility Location Swantown Boatworks Dock Not Compatible with Existing Use NorthPoint Area (West of Hearthfire) Water Depth Dock Facilities Environmental Considerations Swantown A-Dock Dock Facilities

14 NorthPoint Area

15 NorthPoint Area Site Considerations New Dock System Overwater Coverage Water Depth Dredging Underground / Aboveground Fuel Storage Permitting Considerations Endangered Species Act Navigable Waterway & Water Quality State Environmental Policy Act (SEPA) Review Hydraulic Project Approval Shoreline & Critical Area Review Program Costs $5.0M to $6.2M

16 Swantown A-Dock

17 Swantown A-Dock Site Considerations Existing Public Dock Modification of Existing Dock System Construction of Fuel Float Underground / Aboveground Fuel Storage Permitting Considerations Navigable Waterway & Water Quality State Environmental Policy Act (SEPA) Review Hydraulic Project Approval Shoreline Review Program Costs $1.9M to $2.4M

18 Financial Analysis Methodology: 1. Assumptions 2. Estimate the relevant cash flows 3. Estimate Financial Results

19 Next Steps Feasibility Study Publication Complete Financial Analysis Public Participation Plan Commission Direction

20 Conclusion Advisory Only

21

Port of Olympia Marine Fueling Station Feasibility Study

Port of Olympia Marine Fueling Station Feasibility Study Port of Olympia Marine Fueling Station Feasibility Study Prepared for The Port of Olympia: 2407 N 31st Street, Suite 100 Tacoma, WA 98407 253.396.0150 A/E Services Agreement No. 2012-1020 Port Project

More information

Nutrient Bioextraction with Shellfish, A Viable Component of Water Quality Trading for the Puget Sound Region, Washington State

Nutrient Bioextraction with Shellfish, A Viable Component of Water Quality Trading for the Puget Sound Region, Washington State Nutrient Bioextraction with Shellfish, A Viable Component of Water Quality Trading for the Puget Sound Region, Washington State Bobbi Hudson, Aimee Christy and Andrew Suhrbier A Community on Ecosystem

More information

TMDLs: An Agency s Perspective California Marine Affairs & Navigation Conference Panel Discussion

TMDLs: An Agency s Perspective California Marine Affairs & Navigation Conference Panel Discussion TMDLs: An Agency s Perspective California Marine Affairs & Navigation Conference Panel Discussion Karen Holman Manager, Environmental Programs Port of San Diego January 16, 2014 1 Panel Questions 1. What

More information

Nutrient bioextraction using wild set of blue mussels (Mytilus trossulus) in Budd Inlet, southern Puget Sound, Washington State

Nutrient bioextraction using wild set of blue mussels (Mytilus trossulus) in Budd Inlet, southern Puget Sound, Washington State Nutrient bioextraction using wild set of blue mussels (Mytilus trossulus) in Budd Inlet, southern Puget Sound, Washington State Bobbi Hudson, Aimee Christy and Andrew Suhrbier National Shellfisheries Association

More information

Position Title: Marina Office Supervisor

Position Title: Marina Office Supervisor PORT OF SKAGIT Job Description Position Title: Marina Office Supervisor Title Immediate Supervisor: Director of Business Development and Real Estate Title of Positions Directly Supervised: Marina Services

More information

Public Notice: Application for Permit

Public Notice: Application for Permit US Army Corps Of Engineers Walla Walla District 201 North Third Avenue Walla Walla, WA 99362-1876 Public Notice: Application for Permit APPLICATION NO.: NWW-2004-1200073 WATERWAY: Pend Oreille River APPLICANT:

More information

Waterway Capacity Study (WCS) of the Gulf Intracoastal Waterway between Mobile Bay and Wolf Bay

Waterway Capacity Study (WCS) of the Gulf Intracoastal Waterway between Mobile Bay and Wolf Bay Waterway Capacity Study (WCS) of the Gulf Intracoastal Waterway between Mobile Bay and Wolf Bay Taylor Engineering, Inc. Christopher Bender, Ph.D., P.E. John Adams, P.E. Terry Hull, P.E. Introduction:

More information

Frequently Asked Questions

Frequently Asked Questions Frequently Asked Questions Chelan County Shoreline Master Program Update July 2009 What is an SMP? Shoreline Master Programs (SMP) are a combination of rules and comprehensive planning that are prepared

More information

Althea S. Hotaling 1, Robert A. Swett 2, Thomas T. Ankersen 3, Robert B. Lingle 3, and Charles W. Listowski 4

Althea S. Hotaling 1, Robert A. Swett 2, Thomas T. Ankersen 3, Robert B. Lingle 3, and Charles W. Listowski 4 Althea S. Hotaling 1, Robert A. Swett 2, Thomas T. Ankersen 3, Robert B. Lingle 3, and Charles W. Listowski 4 1 University of Florida, School of Natural Resources and Environment, Gainesville, FL, USA

More information

LOCATION: At 12 Port of Everett locations in Port Gardner at Everett, Washington.

LOCATION: At 12 Port of Everett locations in Port Gardner at Everett, Washington. US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management

More information

GREAT KILLS HARBOR, STATEN ISLAND, NEW YORK FEDERAL NAVIGATION PROJECT MAINTENANCE DREDGING

GREAT KILLS HARBOR, STATEN ISLAND, NEW YORK FEDERAL NAVIGATION PROJECT MAINTENANCE DREDGING Public Notice In replying refer to: Public Notice No. GREAT KILLS HARBOR FY13 Published: April 30, 2013, Expires: May 30, 2013 New York District 26 Federal Plaza New York, N.Y. 10278 ATTN: CENAN-OP-ST

More information

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R Wanamaker Building 100 Penn Square East Philadelphia, PA 19107-3390 ATTN: CENAP-OP-R THIS IS NOT A PAID ADVERTISEMENT Public Notice Public Notice No. CENAP-OP-R-2007-1271 Application No. In Reply Refer

More information

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R February 2, 2018

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R February 2, 2018 THIS IS NOT A PAID ADVERTISEMENT Public Notice Wanamaker Building 100 Penn Square East Philadelphia, PA 19107-3390 ATTN: CENAP-OP-R Public Notice No. Date CENAP-OP-R-2015-1060-24 February 2, 2018 Application

More information

Preventing Vessel-Generated Pollution through Voluntary Environmental Certification: Best Management Practices for Boating in the Salish Sea

Preventing Vessel-Generated Pollution through Voluntary Environmental Certification: Best Management Practices for Boating in the Salish Sea Western Washington University Western CEDAR Salish Sea Ecosystem Conference 2014 Salish Sea Ecosystem Conference (Seattle, Wash.) Apr 30th, 10:30 AM - 12:00 PM Preventing Vessel-Generated Pollution through

More information

County of Orange. Dana Point Marinas Workshop No. 5. Marina Planning. Meeting No. 6. January 30, 2007 CASH &

County of Orange. Dana Point Marinas Workshop No. 5. Marina Planning. Meeting No. 6. January 30, 2007 CASH & County of Orange Dana Point Marinas Workshop No. 5 Marina Planning Meeting No. 6 January 30, 2007 CASH & Dana Point Marinas Project Considerations Age & Dock Condition Existing Boater Feedback Design Criteria

More information

Chapter 5 Regulatory Coordination and Compliance

Chapter 5 Regulatory Coordination and Compliance Chapter 5 Regulatory Coordination and Compliance This chapter provides an update on the federal, state, and local laws and regulations that required the City to coordinate with regulatory agencies to obtain

More information

Exhibit B Shoreline Checklist & Statement of Exemption Form for Ensuring Consistency with SMP Policies and Regulations and No Net Loss Policy

Exhibit B Shoreline Checklist & Statement of Exemption Form for Ensuring Consistency with SMP Policies and Regulations and No Net Loss Policy CLALLAM COUNTY Department of Community Development 223 East 4th Street, Suite 5 Port Angeles Washington 98362 360-417-2420 Exhibit B Shoreline Checklist & Statement of Exemption Form for Ensuring Consistency

More information

Memorandum. California public trust law governs the administration of tidelands and submerged lands in several ways:

Memorandum. California public trust law governs the administration of tidelands and submerged lands in several ways: Memorandum To: Piers 30-32 Citizen s Advisory Committee ( CAC ) Land Use Subcommittee From: Brad Benson and Diane Oshima Date: January 10, 2013 Re: Public Trust Doctrine and BCDC The purpose of this memo

More information

Appendix D. San Francisco Bay Plan Consistency Analysis

Appendix D. San Francisco Bay Plan Consistency Analysis Appendix D San Francisco Bay Plan Consistency Analysis San Francisco Bay Plan Consistency Analysis Page 1 of 9 Protection of the Shoreline Policy 2: Riprap revetments, the most common shoreline protective

More information

Notice No Closing Date: May 2, 2015

Notice No Closing Date: May 2, 2015 Public Notice U.S. Army Corps of Engineers Pittsburgh District In Reply Refer to Notice No. below US Army Corps of Engineers, Pittsburgh District 1000 Liberty Avenue Pittsburgh, PA 15222-4186 Application

More information

Current Trends in Marina Planning and Design

Current Trends in Marina Planning and Design ASSOCIATION OF PACIFIC PORTS 101 st Annual Conference, July 2014 Current Trends in Marina Planning and Design, PE, LEED AP, Reid Middleton Outline Introduction Market & Demand Planning Environmental Design

More information

ESA Considerations for Columbia River Vessel Traffic

ESA Considerations for Columbia River Vessel Traffic ESA Considerations for Columbia River Vessel Traffic Pacific Northwest Waterways Association 2017 Annual Convention Brent Carson Matthew Love October 18, 2017 Roadmap Lower Columbia River Projects Update

More information

Initial Project Review

Initial Project Review Pierce County Department of Planning and Land Services, 2401 South 35th Street, Tacoma, WA (253) 798-7037 Initial Project Review Shoreline Substantial Development Permit / Shoreline Conditional Use Permit:

More information

Project Overview. Northwest Innovation Works LLC and the Port of Kalama propose to develop and operate

Project Overview. Northwest Innovation Works LLC and the Port of Kalama propose to develop and operate Project Overview Northwest Innovation Works LLC and the Port of Kalama propose to develop and operate a natural gas-tomethanol production plant and storage facilities, and a new marine terminal, in the

More information

CITY OF VALDEZ ALASKA REQUEST FOR PROPOSALS

CITY OF VALDEZ ALASKA REQUEST FOR PROPOSALS CITY OF VALDEZ ALASKA REQUEST FOR PROPOSALS Project: Build, Own, and Operate a Fuel Dock and Related Infrastructure for the New Boat Harbor in Valdez, Alaska Issued: June 23, 2017 City of Valdez Port and

More information

MARINA PHASING AND COSTS

MARINA PHASING AND COSTS WATERFRONT PLACE IMPLEMENTATION STRATEGY Prepared for Port of Everett TEAM Reid Middleton BST Associates RMC Architects MARINA PHASING AND COSTS This section Prepared by: Reid Middleton September 2014

More information

J O I N T P U B L I C N O T I C E

J O I N T P U B L I C N O T I C E J O I N T P U B L I C N O T I C E CHARLESTON DISTRICT, CORPS OF ENGINEERS 69A Hagood Avenue Charleston, South Carolina 29403-5107 and THE S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL Water Quality

More information

Revitalization Plan and EIR Board of Supervisors Hearing January 31, 2006

Revitalization Plan and EIR Board of Supervisors Hearing January 31, 2006 Dana Point Harbor Revitalization Plan and EIR Board of Supervisors Hearing January 31, 2006 Existing Conditions 2 3 4 Dana Point Harbor Drive Golden Lantern Proposed Commercial Core Plan (PA 1 & 2) 5 Environmental

More information

PORT MASTER PLAN AMENDMENT NO. 26 LA WATERFRONT LAND USE ADDITIONS, MINOR FILLS, AND NEW HARBORS

PORT MASTER PLAN AMENDMENT NO. 26 LA WATERFRONT LAND USE ADDITIONS, MINOR FILLS, AND NEW HARBORS PORT MASTER PLAN AMENDMENT NO. 26 LA WATERFRONT LAND USE ADDITIONS, MINOR FILLS, AND NEW HARBORS BACKGROUND The Port Master Plan for the Port of Los Angeles (Port) was certified by the California Coastal

More information

The Port of Bellingham

The Port of Bellingham The Port of Bellingham Revitalizing Bellingham s Waterfront Mike Stoner, Environmental Director June 8, 2015 1 The Bellingham Bay Demonstration Pilot 2 100 Years of Industrial Use 3 4 Community Uncertainty

More information

PUBLIC NOTICE. A detailed description and plans of the applicant's activity are enclosed to assist in your review.

PUBLIC NOTICE. A detailed description and plans of the applicant's activity are enclosed to assist in your review. PUBLIC NOTICE US Army Corps of Engineers New York District Jacob K. Javits Federal Building New York, N.Y. 10278-0090 ATTN: Regulatory Branch In replying refer to: Public Notice Number: NAN-2016-00535-WOM

More information

Weldcraft Boatyard Clean-up and Redevelopment Project

Weldcraft Boatyard Clean-up and Redevelopment Project Weldcraft Boatyard Clean-up and Redevelopment Project Habitat Mitigation Mike Stoner Environmental Director Port of Bellingham 1801 Roeder Avenue Bellingham, WA 98227 mikes@portofbellingham.com June 10,

More information

Waterfront Lands Analysis By: BST Associates For: City of Tacoma

Waterfront Lands Analysis By: BST Associates For: City of Tacoma Waterfront Lands Analysis 2008 By: BST Associates For: City of Tacoma 1 Purpose Is sufficient land available to meet the most critical needs of water-dependent uses? Recreational boating Power, sail, and

More information

Joint Public Notice. PURPOSE: To restore navigation depths for vessels using the facility. DREDGED MATERIAL MANAGEMENT PROGRAM (DMMP):

Joint Public Notice. PURPOSE: To restore navigation depths for vessels using the facility. DREDGED MATERIAL MANAGEMENT PROGRAM (DMMP): US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management

More information

DRAFT - CLALLAM COUNTY SHORELINE MASTER PROGRAM (SMP)

DRAFT - CLALLAM COUNTY SHORELINE MASTER PROGRAM (SMP) Planning Commission Review Draft August 2014 DRAFT - CLALLAM COUNTY SHORELINE MASTER PROGRAM (SMP) Note to Reviewers: The Clallam County Shoreline Master Program (SMP) was adopted in 1976, and last amended

More information

County of Orange County Executive Office

County of Orange County Executive Office County of Orange County Executive Office Attachment C AGENCY/DEPARTMENT: Registrar of Voters LEGISLATIVE PROPOSAL 2017-18 Legislative Session SUBJECT: Ballot Argument Priority PROPOSAL SUMMARY: This proposal

More information

City of Ocean City Lagoon/Back Bay Dredging Town Hall Meeting

City of Ocean City Lagoon/Back Bay Dredging Town Hall Meeting City of Ocean City Lagoon/Back Bay Dredging Town Hall Meeting Total Estimated Dredge Material required for North to South of the City 500,000 Cubic Yards of Dredge Material Includes: North to South of

More information

Clean Marina Award Checklist

Clean Marina Award Checklist Clean Marina Award Checklist Marina Name: Owner/Manager: Address: Website: Phone/Fax: E-mail: Date: This form is designed for use by marina operators to conduct self-assessments of their facilities. This

More information

I213. Westhaven Tamaki Herenga Waka Precinct

I213. Westhaven Tamaki Herenga Waka Precinct I213. Westhaven Tamaki Herenga Waka Precinct I213.1. Precinct description The Westhaven Tamaki Herenga Waka Precinct is located at the western edge of the city centre and comprises the land and coastal

More information

Joint Public Notice. LOCATION: In Salmon Bay, Lake Washington Ship Canal, at Seattle, Washington.

Joint Public Notice. LOCATION: In Salmon Bay, Lake Washington Ship Canal, at Seattle, Washington. US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management

More information

Adjacent to Pearl Avenue, in the City of Burlington, Burlington County, New

Adjacent to Pearl Avenue, in the City of Burlington, Burlington County, New THIS IS NOT A PAID ADVERTISEMENT 0BPublic Notice Wanamaker Building 100 Penn Square East Philadelphia, PA 19107-3390 ATTN: CENAP-OP-R Public Notice No. 1BCENAP-OP-R-2014-0120 Application No. In Reply Refer

More information

Chapter 4 Policies and Regulations for Shoreline Modifications

Chapter 4 Policies and Regulations for Shoreline Modifications Chapter 4 Policies and Regulations for Shoreline Modifications 4.1 Beach Access Structures 4.1.0 Applicability Beach Access Structures, as defined in Chapter 11, shall be consistent with the following

More information

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT APPLICATION FOR REGIONAL GENERAL PERMIT NO. 85 (RGP) Coronado Cays Home Owners Association Boat Dock Removal and Replacement

More information

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R THIS IS NOT A PAID ADVERTISEMENT Public Notice Wanamaker Building 100 Penn Square East Philadelphia, PA 19107-3390 ATTN: CENAP-OP-R Public Notice No. CENAP-OP-R-2015-167-24 Application No. In Reply Refer

More information

SUMMARY OF MITIGATION OF CONCERNS RAISED IN FINAL ENVIRONMENTAL IMPACT STATEMENT

SUMMARY OF MITIGATION OF CONCERNS RAISED IN FINAL ENVIRONMENTAL IMPACT STATEMENT SUMMARY OF MITIGATION OF CONCERNS RAISED IN FINAL ENVIRONMENTAL IMPACT STATEMENT Summary: Building a new bridge is necessary to replace the aging and obsolete Tappan Zee which serves as a critical Hudson

More information

I. GENERAL INFORMATION

I. GENERAL INFORMATION STAFF REPORT DAROGA STATE PARK DOCKS & MOORAGE FLOATS REPLACEMENT TO: Douglas County Hearing Examiner FROM: Douglas County Land Services Staff RE:, SP-12-03 DATE: January 7,2013 I. GENERAL INFORMATION

More information

Final Supplemental Environmental Impact Statement

Final Supplemental Environmental Impact Statement Final Supplemental Environmental Impact Statement April 2014 City of Seattle Department of Transportation 700 Fifth Avenue, Suite 3900 Seattle, WA 98124 TABLE OF CONTENTS Elliott Bay Seawall Project TABLE

More information

Bitterman, Deborah Bitterman, Deborah; FW: Beebe ranch dock permit. Tuesday, September 21, :30:51 PM Draft BB Ranch Letter to Forums.

Bitterman, Deborah Bitterman, Deborah; FW: Beebe ranch dock permit. Tuesday, September 21, :30:51 PM Draft BB Ranch Letter to Forums. From: To: Subject: Date: Attachments: Bitterman, Deborah Bitterman, Deborah; FW: Beebe ranch dock permit. Tuesday, September 21, 2010 2:30:51 PM Draft BB Ranch Letter to Forums.pdf -----Original Message----From:

More information

Notice No Closing Date: September 12, 2016

Notice No Closing Date: September 12, 2016 Public Notice U.S. Army Corps of Engineers Pittsburgh District In Reply Refer to Notice No. below US Army Corps of Engineers, Pittsburgh District 1000 Liberty Avenue Pittsburgh, PA 15222-4186 Application

More information

Puget Sound No Discharge Zone for Vessel Sewage. Northwest Straits Commission, January 29, 2016

Puget Sound No Discharge Zone for Vessel Sewage. Northwest Straits Commission, January 29, 2016 Puget Sound No Discharge Zone for Vessel Sewage Northwest Straits Commission, January 29, 2016 What is a No Discharge Zone (NDZ)? Designated area where both treated and untreated sewage from vessels cannot

More information

Chapter 6 Avoidance, Minimization, and Mitigation

Chapter 6 Avoidance, Minimization, and Mitigation Chapter 6 Avoidance, Minimization, and Mitigation This chapter provides a summary of the mitigation measures that the City could implement to avoid, minimize, rectify, or compensate for impacts from the

More information

Public Notice. In Reply Refer To: Corps File No. LRE S18 Date: October 1, 2018 Expires: October 19, 2018

Public Notice. In Reply Refer To: Corps File No. LRE S18 Date: October 1, 2018 Expires: October 19, 2018 US Army Corps of Engineers Detroit District Public Notice Applicant: Barrett Boat Works In Reply Refer To: Corps File No. LRE-1983-570234-S18 Date: October 1, 2018 Expires: October 19, 2018 Proposed marina

More information

HARBOR INFRASTRUCTURE INVENTORIES Manitowoc Harbor, Wisconsin

HARBOR INFRASTRUCTURE INVENTORIES Manitowoc Harbor, Wisconsin HARBOR INFRASTRUCTURE INVENTORIES Manitowoc Harbor, Wisconsin Harbor Location: Manitowoc Harbor is on the west shore of Lake Michigan about 79 miles north of Milwaukee, Wisconsin. Authority: River & Harbor

More information

J O I N T P U B L I C N O T I C E

J O I N T P U B L I C N O T I C E J O I N T P U B L I C N O T I C E CHARLESTON DISTRICT, CORPS OF ENGINEERS 69A Hagood Avenue Charleston, SC 29403-5107 and THE S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL Office of Ocean and Coastal

More information

Shoreline Restoration Planning. Technical Review Committee December 17, 2008 City of Tacoma Shoreline Master Program Update

Shoreline Restoration Planning. Technical Review Committee December 17, 2008 City of Tacoma Shoreline Master Program Update Shoreline Restoration Planning Technical Review Committee December 17, 2008 City of Tacoma Shoreline Master Program Update What is the Shoreline Restoration Plan? Strategies and actions to meet the goals

More information

Joint Public Notice Application for a Department of the Army Permit and an Environmental Protection Agency Water Quality Certification

Joint Public Notice Application for a Department of the Army Permit and an Environmental Protection Agency Water Quality Certification US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and an Environmental Protection Agency Water Quality Certification US Army Corps of Engineers

More information

WA Department of Ecology SEA Program Post Office Box Olympia, WA Telephone: (360) ATTN: Federal Permit Coordinator

WA Department of Ecology SEA Program Post Office Box Olympia, WA Telephone: (360) ATTN: Federal Permit Coordinator US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management

More information

SECTION V - STATE AND FEDERAL IMPLEMENTATION

SECTION V - STATE AND FEDERAL IMPLEMENTATION SECTION V - STATE AND FEDERAL IMPLEMENTATION A. State Actions Needed The State of New York is an active partner in the revitalization of the Buffalo LWRA. In addition to the ongoing implementation of the

More information

JOINT PUBLIC NOTICE. for a modification to the existing permit for approval for an existing floating dock in SHEM CREEK

JOINT PUBLIC NOTICE. for a modification to the existing permit for approval for an existing floating dock in SHEM CREEK JOINT PUBLIC NOTICE CHARLESTON DISTRICT, CORPS OF ENGINEERS 69A Hagood Avenue Charleston, South Carolina 29403-5107 and the S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL OFFICE OF OCEAN AND COASTAL

More information

Beneficial Reuse of Dredged Sediments in the Middle Harbor Slip 1 Fill

Beneficial Reuse of Dredged Sediments in the Middle Harbor Slip 1 Fill Beneficial Reuse of Dredged Sediments in the Middle Harbor Slip 1 Fill Port of Long Beach Category: Environmental Enhancement Heather Tomley Director of Environmental Planning Port of Long Beach 4801 Airport

More information

The Shoreline Management Act and Use of State-Owned Aquatic Lands

The Shoreline Management Act and Use of State-Owned Aquatic Lands This packet of materials helps to define the nexus between the Shoreline Management Act and the Washington State Department of Natural Resources (WDNRs) management of state-owned aquatic lands. This was

More information

Liberty Bay Marina Study 2010

Liberty Bay Marina Study 2010 Liberty Bay Marina Study 2010 Abstract The purpose for the Liberty Bay Marina study was to assess the impact to water quality from untreated sewage discharges that may occur from transient and permanently

More information

These guidelines are to ensure systematic and consistent pier construction throughout the Jonathan s Landing development.

These guidelines are to ensure systematic and consistent pier construction throughout the Jonathan s Landing development. PIER GUIDELINES 1 PIER CONSTRUCTION GUIDELINES These guidelines are to ensure systematic and consistent pier construction throughout the Jonathan s Landing development. 1. DEFINITIONS The following definitions

More information

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R February 13, 2019

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R February 13, 2019 THIS IS NOT A PAID ADVERTISEMENT Public Notice Wanamaker Building 100 Penn Square East Philadelphia, PA 19107-3390 ATTN: CENAP-OP-R Public Notice No. Date CENAP-OP-R-2012-0699 February 13, 2019 Application

More information

JOINT PUBLIC NOTICE. August 29, United States Army Corps of Engineers State of Louisiana

JOINT PUBLIC NOTICE. August 29, United States Army Corps of Engineers State of Louisiana JOINT PUBLIC NOTICE August 29, 2016 United States Army Corps of Engineers State of Louisiana New Orleans District Department of Environmental Quality Regulatory Branch Office of Environmental Services

More information

Marina Committee Report. March 30, 2011 Virginia Institute of Marine Science Gloucester Point, Virginia

Marina Committee Report. March 30, 2011 Virginia Institute of Marine Science Gloucester Point, Virginia Marina Committee Report March 30, 2011 Virginia Institute of Marine Science Gloucester Point, Virginia VMTA Committees VMTA seeks to serve its diverse membership through a number of committees: Membership;

More information

ATTACHMENT 2 PROJECT NEED AND JUSTIFICATION

ATTACHMENT 2 PROJECT NEED AND JUSTIFICATION ATTACHMENT 2 PROJECT NEED AND JUSTIFICATION INTRODUCTION The Project includes providing erosion control and shoreline stabilization measures including beach nourishment, maintenance dredging and bypassing,

More information

CITY OF CHELAN SHORELINE MASTER PROGRAM

CITY OF CHELAN SHORELINE MASTER PROGRAM CHELAN COUNTY GRANT NO. G0800231 Revisions to Planning Commission Hearing Draft: Reformat and Text Reductions and Responses to Comments CITY OF CHELAN SHORELINE MASTER PROGRAM Prepared for: City of Chelan

More information

Overview of Prior Studies

Overview of Prior Studies FLORIDA DEPARTMENT OF TRANSPORTATION PORT OF MIAMI TUNNEL STUDY Overview of Prior Studies This summary was provided on July 29, 2003 by Jeff V. Easley, PE, Vice President of Reynolds, Smith and Hills as

More information

Port of New Bedford. Director of Engineering and Operations Position Description

Port of New Bedford. Director of Engineering and Operations Position Description Port of New Bedford Director of Engineering and Operations Position Description A. Function Under the direction of the Executive Director of the (NBPA), the Director of Engineering and Operations directs,

More information

KING COUNTY FERRY DISTRICT 2014 STRATEGIC PLAN

KING COUNTY FERRY DISTRICT 2014 STRATEGIC PLAN KING COUNTY FERRY DISTRICT 2014 STRATEGIC PLAN 2014 2018 Prepared by: ECONorthwest In association with: TABLE OF CONTENTS TABLE OF CONTENTS Executive Summary Introduction Strategic Planning Process Situation

More information

EAST WATERWAY HARBOR ISLAND SUPERFUND SITE CLEANUP CLEANING UP THE ENVIRONMENT, WHILE IMPROVING COMMERCE FOR THE PORT OF SEATTLE

EAST WATERWAY HARBOR ISLAND SUPERFUND SITE CLEANUP CLEANING UP THE ENVIRONMENT, WHILE IMPROVING COMMERCE FOR THE PORT OF SEATTLE EAST WATERWAY HARBOR ISLAND SUPERFUND SITE CLEANUP CLEANING UP THE ENVIRONMENT, WHILE IMPROVING COMMERCE FOR THE PORT OF SEATTLE Ravi Sanga 1 ABSTRACT In 2003, the EPA entered into an agreed order with

More information

Fidalgo Bay Eelgrass Mitigation Project

Fidalgo Bay Eelgrass Mitigation Project Fidalgo Bay Eelgrass Mitigation Project Port of Anacortes Bob Elsner, Director of Engineering P.O. Box 297 Anacortes, WA 98221 (360) 299-1822 June 13, 2008 TABLE OF CONTENTS Introduction Paper Highlights............................

More information

CLALLAM COUNTY. Preliminary Draft Committee Review. Shoreline Master Program (SMP) Proposed Update to the 1992 Clallam County SMP

CLALLAM COUNTY. Preliminary Draft Committee Review. Shoreline Master Program (SMP) Proposed Update to the 1992 Clallam County SMP Preliminary Draft Committee Review CLALLAM COUNTY Shoreline Master Program (SMP) Proposed Update to the 1992 Clallam County SMP Note to Reviewers: This is a preliminary draft of the proposed revisions

More information

Public Notice of Application for Permit

Public Notice of Application for Permit US Army Corps of Engineers Alaska District ANCHORAGE Regulatory Division (1145) CEPOA-RD Post Office Box 6898 JBER, Alaska 99506-0898 Public Notice of Application for Permit PUBLIC NOTICE DATE: February

More information

LAKE MINNEWAWA ASSOCIATION

LAKE MINNEWAWA ASSOCIATION LAKE MINNEWAWA ASSOCIATION HARVESTING OPERATIONS REPORT FOR 2016 Table Contents DNR Permit To Destroy Aquatic Vegetation........................... page 3 DNR Permit To Relocate Or Remove Bog............................

More information

A. INTRODUCTION. This is a publically funded project which includes extension of the Tampa Riverwalk from Waterworks Park to the N. Boulevard bridge.

A. INTRODUCTION. This is a publically funded project which includes extension of the Tampa Riverwalk from Waterworks Park to the N. Boulevard bridge. PROJECT NARRATIVE SWFWMD Dock and Maintenance Dredging Permit Application/Petition No.: 742595 for Dock & Maintenance Dredging Project Name: The Heights of Tampa- Dock Permit County: Hillsborough; Sec/Twp/Rge:

More information

Puget Sound No Discharge Zone

Puget Sound No Discharge Zone Puget Sound No Discharge Zone For Vessel Sewage Fall 2013 What is a No Discharge Zone (NDZ)? Designated area where sewage from vessels cannot be discharged States with NDZs Provides states with the ability

More information

Port Preservation using Zoning and Land Use Regulation

Port Preservation using Zoning and Land Use Regulation National Working s & Waterways Symposium Small, Medium and Large Working s Establishing Value and Protecting from Encroachment Port Preservation using Zoning and Land Use Regulation March 27, 2013 Bill

More information

Florida Department of Environmental Protection

Florida Department of Environmental Protection Florida Department of Environmental Protection Noticed General Permit for Dredging of Public Navigation Channel and Canal Infrastructure by the West Coast Inland Navigation District within Lee County Background

More information

Permit Hurdles for Mooring Fields

Permit Hurdles for Mooring Fields Session Title: Managed Mooring Fields and Harbor Management Plans Thursday, November 2, 2006 10:10am Permit Hurdles for Mooring Fields Michael Poff Coastal Engineering Consultants, Inc. 165 166 PERMIT

More information

THIS IS NOT A PAID ADVERTISEMENT. Public Notice No.

THIS IS NOT A PAID ADVERTISEMENT. Public Notice No. THIS IS NOT A PAID ADVERTISEMENT 0BPublic Notice Wanamaker Building 100 Penn Square East Philadelphia, PA 19107-3390 ATTN: CENAP-OP-R Public Notice No. 1BCENAP-OP-R-2010-898-24 Application No. In Reply

More information

Where the Ocean Meets Land. Coastal Engineering

Where the Ocean Meets Land. Coastal Engineering Where the Ocean Meets Land Coastal Engineering Photo credit : Rio Tinto Alcan Our Expertise MARINAS AND HARBOURS Design and repair of breakwaters Sedimentation and dredging studies Navigation guidelines

More information

Pipeline Development Considerations A Risk-Based Perspective

Pipeline Development Considerations A Risk-Based Perspective Pipeline Development Considerations A Risk-Based Perspective Dallas Bar Association Energy Law Section Review of oil & Gas Law XXV Vince Murchison, Member August 16, 2012 Subject Areas to Cover Review

More information

CC-530EHP Flood Protection

CC-530EHP Flood Protection CC-530EHP Flood Protection Compliance with Environmental and Historic Preservation Requirements (see Section 531.b(4) in the CRS Coordinator s Manual) NOTE: The self-certification of compliance with environmental

More information

ERDC and e-nav Data Use

ERDC and e-nav Data Use ERDC and e-nav Data Use Ned Mitchell, PhD Research Civil Engineer ERDC Coastal and Hydraulics Lab Vicksburg, Miss. AAPA Harbors and Navigation 30 MAR 2016 Traditional ERDC Harbors and Navigation Support

More information

Shoreline Master Program Update Public Participation Plan. City of Tacoma, Washington

Shoreline Master Program Update Public Participation Plan. City of Tacoma, Washington Shoreline Master Program Update Public Participation Plan City of Tacoma, Washington Prepared for the City of Tacoma August 28, 2009 Introduction The City of Tacoma is conducting a comprehensive update

More information

Public Notice. Navigation Section Notice Date: May 23, 2018 PO Box 3755 Expiration Date: June 21, 2018

Public Notice. Navigation Section Notice Date: May 23, 2018 PO Box 3755 Expiration Date: June 21, 2018 Public Notice Navigation Section Notice Date: May 23, 2018 PO Box 3755 Expiration Date: June 21, 2018 Seattle, WA 98124-3755 Reference: PMP-18-15 ATTN: John Pell (OD-TS-NS) or Joanne Gardiner (PMP-E) US

More information

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R September 20, 2018

THIS IS NOT A PAID ADVERTISEMENT. Public Notice. Public Notice No. CENAP-OP-R September 20, 2018 THIS IS NOT A PAID ADVERTISEMENT Public Notice Wanamaker Building 100 Penn Square East Philadelphia, PA 19107-3390 ATTN: CENAP-OP-R Public Notice No. Date CENAP-OP-R-2007-1091-39 September 20, 2018 Application

More information

J O I N T P U B L I C N O T I C E

J O I N T P U B L I C N O T I C E J O I N T P U B L I C N O T I C E CHARLESTON DISTRICT, CORPS OF ENGINEERS 1949 Industrial Park Road, Room 140 Conway, South Carolina 29526 and THE S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL Office

More information

Air and Water Quality

Air and Water Quality Air and Water Quality Our Natural Resources Introduction Water and air are essential for humans as well as the animals and plants that inhabit San Rafael. The Air and Water Quality Element is intended

More information

615 W Alder St. Community Services Department Shelton, WA Planning Division (360)

615 W Alder St. Community Services Department Shelton, WA Planning Division (360) www.co.mason.wa.us MASON COUNTY 615 W Alder St. Community Services Department Shelton, WA 98584 Planning Division (360) 427-9670 TO: Mason County Planning Advisory Commission & Public FROM: Rebecca Hersha,

More information

Clallam County Shoreline Master Program (SMP) Update

Clallam County Shoreline Master Program (SMP) Update Title Level 1 Title Level 2 Clallam County Shoreline Master Program (SMP) Update Sekiu-Clallam Bay Regional Forum November 2, 2017 Clallam County Shoreline Master Program: In effect for Over 40 years,

More information

Comprehensive Scheme

Comprehensive Scheme Port of South Whidbey Comprehensive Scheme December 2013 Business Growth Transportation Public Access Financial Stability Partnerships Forword Purpose of the Comprehensive Scheme The residents of South

More information

Optimal Capacity of Malletts Bay to Accommodate Boating Activity

Optimal Capacity of Malletts Bay to Accommodate Boating Activity Optimal Capacity of Malletts Bay to Accommodate Boating Activity Report Submitted To: Dawn Francis, Town Manager, Town of Colchester - DFrancis@colchestervt.gov Breck Bowden, ENSC 202 Professor - wbowden@uvm.edu

More information

APPLICANT: Decatur Head Beach Association 1327 Decatur Head Drive Decatur Island Anacortes, WA Telephone: (425)

APPLICANT: Decatur Head Beach Association 1327 Decatur Head Drive Decatur Island Anacortes, WA Telephone: (425) US Army Corps of Engineers Seattle District Joint Public Notice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management

More information

J O I N T P U B L I C N O T I C E

J O I N T P U B L I C N O T I C E J O I N T P U B L I C N O T I C E CHARLESTON DISTRICT, CORPS OF ENGINEERS 69A Hagood Avenue Charleston, South Carolina 29403 and THE S.C. DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL Office of Ocean

More information

RE-ISSUED NOTICE OF PREPARATION SUBSEQUENT ENVIRONMENTAL IMPACT REPORT

RE-ISSUED NOTICE OF PREPARATION SUBSEQUENT ENVIRONMENTAL IMPACT REPORT RE-ISSUED NOTICE OF PREPARATION SUBSEQUENT ENVIRONMENTAL IMPACT REPORT Date: January 5, 2010 Subject: Re-Issue Notice of Intent to Prepare a Draft Subsequent Environmental Impact Report Project Title:

More information

CLALLAM COUNTY. Final Draft. Shoreline Master Program (SMP) Proposed Update to the 1992 Clallam County SMP

CLALLAM COUNTY. Final Draft. Shoreline Master Program (SMP) Proposed Update to the 1992 Clallam County SMP Final Draft CLALLAM COUNTY Shoreline Master Program (SMP) Proposed Update to the 1992 Clallam County SMP Note to Reviewers: This is a revised draft of the proposed revisions to the County s Shoreline Master

More information

NOTES: Steering Committee Meeting #3

NOTES: Steering Committee Meeting #3 Lake Tahoe Shoreline Plan NOTES: Steering Committee Meeting #3 Held April 26, 2016 Meeting in Brief The Lake Tahoe Shoreline Steering Committee, made up of directors of agencies and nonprofit organizations

More information