HYDRAULICS OF CULVERTS

Size: px
Start display at page:

Download "HYDRAULICS OF CULVERTS"

Transcription

1 HYDRAULICS OF CULVERTS Walter F. Silva, Ph.D., P.E. December 8 & 11, 2015

2 Now you know.. UNIFORM, CRITICAL FLOW and PIPE FLOW

3 Classification of Culvert Flow USGS classifies culvert flow into six types, depending on the headwater and tailwater levels and whether the slope is mild or steep (Bodhaine, 1986)

4 EQUATIONS FOR WEIR AND ORIFICE

5 Submergence Criteria INLET SUBMERSION OCCURS WHEN THE RATIO OF THE INLET HEAD TO THE CULVERT HEIGHT (HW/d) IS IN THE RANGE OF 1.2 TO 1.5.

6 Inlet Control In steep slopes and low headwater and tailwater levels the flow passes through the critical depth at the inlet and downstream is supercritical S2 curve approaching normal depth If the outlet is submerged there will be a hydraulic jump inside the culvert Type 1

7 Inlet unsubmerged on steep slope with Weir Flow Energy Equation: Q 2 HW = y c K e 2 2gA c HW = Head above the invert of the culvert Yc = critical depth Ac = flow area corresponding to yc Ke = entrance loss coefficient Needs to compute critical depth in the conduit HW y c d

8 Inlet control: Unsubmerged entrance Inlet unsubmerged on steep slope with Weir Flow Rearranging the previous equation Q = C d A c 2g HW y c HW = Head above the invert of the culvert y c = critical depth Ac = flow area corresponding to yc Cd = Discharge coefficient Circular culvert with squared edge Cd = 0.93 if HW/d < 0.4 Circular culvert with squared edge Cd = 0.80 if HW/d = 1.5 Cd can be corrected for bevels and rounding of the entrance Box culverts flush in vertical headwall Cd = 0.95 (USGS type 1 flow)

9 Inlet control: Submerged entrance Inlet Submerged on steep slope with Orifice flow The orifice equation governs: Q = C d A 0 2g HW HW = Head above the invert of the culvert Ao = Cross sectional area of the inlet d= Discharge coefficient The orifice coefficient varies according to the degree of rounding, the bevel height and the degree of submergence (HW/d) The purpose of the bevel is to reduce the flow contraction at the inlet (increase the Cd)

10 HW/d Orifice Cd for culverts Squared entrance Cd Cd

11 OTHER IMPROVEMENTS FOR INLET CONTROL The FHWA did extensive experimental work on culverts Improvements for inlet control includes: Bevels Mitered entrances Wingwalls Side tapered inlets Depressions Their purpose is to increase the flow passing through the culvert by improving the entrance conditions

12 INLET TYPES When tapered inlets are feasible, the improvement in hydraulic performance can be significant in some cases.

13

14

15 COMPARISON WITH DIFFERENT IMPROVEMENTS

16 NOMOGRAMS The FHWA developed inlet control nomographs considering improvements by wingwalls and side tapered inlets and depressions Their purpose is facilitate hand-made design calculations Good for first trial and quick estimates

17 Outlet Control Type 4 (Figure D) is full pipe flow conditions under pressure In Type 6 (Figure B) outlet is unsubmerged but culvert flows full Critical depth could occur at the outlet in Figure B Type 2 and 3 are open channel flow, subcritical flow on mild slope (Figs. A and C) Cases B and D are treated as full flow

18 Outlet Control with full flow conditions The pipe flow energy equation is: HW = TW S 0 L K e + f L 4R Q 2 2gA 2 Solving for the discharge: EGL Q = A 2g HW TW + S 0L 1 + K e + f L 4R TW TW Effective Head: H eff = HW TW + S 0 L S 0 Head loss could be estimated using Manning s equation instead of Darcy- Weisbach f L 4R = 2gn2 L K n 2 R 4/3 K n = 1 for SI and 1.49 for ES FHWA developed Outlet control nomographs based on Effective Head

19 ROADWAY OVERTOPPING The flow will be similar to flow over a broad crested weir. An iterative procedure must be used to divide flow between the culvert and the embankment flow

20 CULVERT DESIGN IS A TRIAL AND ERROR PROCEDURE BOTH INLET AND OUTLET CONTROL MUST BE CALCULATED COMPARE WITH ALLOWABLE HEADWATER ELEVATION CHOOSE THE HIGHER HEAD FOR A GIVEN DISCHARGE DO A PERFORMANCE ANALYSIS TO DETERMINE OPERATION OF THE CULVERT UNDER DIFFERENT CONDITIONS UNSUBMERGED INLET IN CULVERTS OPERATES AS WEIR OR ORIFICE FLOW PRESSURIZED FLOW MUST BE ANALYZED BY EFFECTIVE HEAD: DIFFERENCE BETWEEN TOTAL HEAD AT THE HEADWATER AND THE TAILWATER

21 One more thing you need to know.. PERFORMANCE CURVES

22 PERFORMANCE CURVES 1. Plot of headwater depth or elevation versus flow rate. 2. Useful in evaluating the hydraulic capacity of a culvert for various headwaters. 3. Displays the consequences of higher flow rates at the site. 4. Both inlet and outlet control curves must be plotted. 5. Dominant control at a given headwater is hard to predict 6. Control may shift from the inlet to the outlet or viceversa over a range of flow rates. 7. Using the concept of minimum performance the figure shows that, at the allowable headwater the culvert operates under inlet control.

23 CULVERT HYDRAULICS IN HDS-5: MINIMUM PERFORMANCE and ACCURACY Minimum performance means that while the culvert may operate more efficiently at times (more flow for a given headwater level), it will never operate at a lower level of performance than calculated HDS-5 culvert design methods are based on design charts and nomographs. These charts and nomographs are based on data from hydraulic tests and on theoretical calculations. There is scatter in the test data and the selection of a best fit design equation. The correlation between the design equations and the design nomographs is not exact. Reproduction of the design charts introduces additional error. The results of the procedure are accurate to within plus or minus ten percent, in terms of headwater elevation.

24 PERFORMANCE CURVE FOR ALL CONDITIONS

25 WORKSHOP 2 DESIGN USING NOMOGRAPHS

MSMA 2 nd Edition DID Malaysia CHAPTER 18 CULVERT

MSMA 2 nd Edition DID Malaysia CHAPTER 18 CULVERT MSMA nd Edition. 01 DID Malaysia CHAPTER 18 CULVERT 18.1 INTRODUCTION... 18-1 18.1.1 Components... 18-1 18.1. Application... 18-18. HYDRAULICS FUNDAMENTALS... 18-18..1 Flow Conditions... 18-18.. Type of

More information

Outlet Flow Velocity in Circular Culvert

Outlet Flow Velocity in Circular Culvert Archives of Hydro-Engineering and Environmental Mechanics Vol. 61 (2014), No. 3 4, pp. 193 203 DOI: 10.1515/heem-2015-0013 IBW PAN, ISSN 1231 3726 Outlet Flow Velocity in Circular Culvert Wojciech Szpakowski

More information

Section 1000 Culverts and Bridges Table of Contents

Section 1000 Culverts and Bridges Table of Contents Section 1000 Culverts and Bridges Table of Contents 1001 INTRODUCTION... 1000 1 1002 CULVERT DESIGN STANDARDS... 1000 1 1002.1 CONSTRUCTION MATERIALS... 1000 1 1002.2 MINIMUM CULVERT SIZE... 1000 2 1002.3

More information

When dealing with the hydraulics of open channel flow, there are three basic relationships: Inflow Outflow = Change in Storage

When dealing with the hydraulics of open channel flow, there are three basic relationships: Inflow Outflow = Change in Storage Chapter 6. HYDRAULICS 6.1. Open Channel Flow When dealing with the hydraulics of open channel flow, there are three basic relationships: 1. Continuity Equation. Energy Equation 3. Momentum Equation 6.1.1

More information

Facilities Development Manual

Facilities Development Manual State of Wisconsin Department of Transportation Facilities Development Manual ORIGINATOR Director, Bureau of Highway Development PROCEDURE 13-25-35 CHAPTER 13 Drainage SECTION 25 Storm Sewer Design SUBJECT

More information

HYDRAULIC DESIGN OF HIGHWAY CULVERTS

HYDRAULIC DESIGN OF HIGHWAY CULVERTS Publication No. FHWA-NHI-01-020 September 2001 U.S. Department of Transportation Federal Highway Administration Hydraulic Design Series Number 5 HYDRAULIC DESIGN OF HIGHWAY CULVERTS Technical Report Documentation

More information

LIST OF FIGURES Figure Title

LIST OF FIGURES Figure Title TABLE OF CONTENTS CHAPTER THIRTY-ONE... 5 31-1.0 INTRODUCTION... 5 31-1.01 Definition of a Culvert... 5 31-1.02 Purpose... 6 31-1.03 Definitions... 6 31-1.04 Symbols... 7 31-2.0 POLICY... 7 31-2.01 Definition...

More information

HYDRAULICS INTRODUCTION HYDRAULICS OF OPEN DRAINAGE CHANNELS

HYDRAULICS INTRODUCTION HYDRAULICS OF OPEN DRAINAGE CHANNELS CHAPTER 4 129 HYDRAULICS INTRODUCTION Many millions of dollars are spent annually on culverts, storm drains and subdrains, all vital to the protection of streets, highways and railroads. If inadequately

More information

Hydraulic Modeling with HY-8

Hydraulic Modeling with HY-8 Hydraulic Modeling with HY-8 Linda Hansen PE, PWS MI Dept. of Environmental Quality Water Resources Division UP District Floodplain Engineer Today s Outline What is HY-8? Best Applications & Limitations

More information

Outlet Structure Modeling

Outlet Structure Modeling Watershed Modeling using HEC-RAS Outlet Structure Modeling Jeff Wickenkamp, P.E., CFM, D.WRE Patrick Lach, P.E. Hey and Associates, Inc. Water Resources, Wetlands and Ecology Outline of Presentation Why

More information

Hydraulic Design of Highway Culverts HDS 5 September 1985

Hydraulic Design of Highway Culverts HDS 5 September 1985 Hydraulic Design of Highway Culverts HDS 5 September 1985 Welcome to HDS 5 - Hydraulic Design of Highway Culverts Table of Contents Preface Tech Doc U.S. - SI Conversions DISCLAIMER: During the editing

More information

APPLICATION FORM AF-50: CONSENT UNDER SECTION 50, ARTERIAL DRAINAGE ACT, 1945

APPLICATION FORM AF-50: CONSENT UNDER SECTION 50, ARTERIAL DRAINAGE ACT, 1945 APPLICATION FORM AF-50: CONSENT UNDER SECTION 50, ARTERIAL DRAINAGE ACT, 1945 APPLICATION DETAILS Name of Applicant: Company / authority: Address: Date of Application: Client (if appropriate): BRIDGE DETAILS

More information

7.0 ENERGY DISSIPATION DESIGN

7.0 ENERGY DISSIPATION DESIGN SPALDING COUNTY, GEORGIA CHAPTER 7 7.0 ENERGY DISSIPATION DESIGN... 7-1 7.1 SYMBOLS AND DEFINITIONS... 7-1 7.2 DESIGN CRITERIA... 7-1 7.2.1 INTRODUCTION... 7-1 7.2.2 GENERAL CRITERIA... 7-2 7.2.3 EROSION

More information

This chapter describes the network element data used to define a stormwater or sanitary (wastewater) sewer model.

This chapter describes the network element data used to define a stormwater or sanitary (wastewater) sewer model. Network Element Data 7 This chapter describes the network element data used to define a stormwater or sanitary (wastewater) sewer model. Channel, Pipe & Culvert Links Channels, pipes, and culverts are

More information

Summary of Detention Pond Calculation Canyon Estates American Canyon, California

Summary of Detention Pond Calculation Canyon Estates American Canyon, California July 15, 2015 Bellecci & Associates, Inc Summary of Detention Pond Calculation Canyon Estates American Canyon, California 1. Methodology: Method: Unit Hydrograph Software: Bentley Pond Pack Version 8i

More information

Chapter 9 STORMWATER DESIGN. Table 9-1 Hydrology Design Methods

Chapter 9 STORMWATER DESIGN. Table 9-1 Hydrology Design Methods www.knoxvilletn.gov/engineering/ 9.1 Hydrology Methods Chapter 9 STORMWATER DESIGN Table 9-1 shows the various hydrologic computation methods that can be used to compute peak flows in the City of Knoxville.

More information

RETENTION BASIN EXAMPLE

RETENTION BASIN EXAMPLE -7 Given: Total Tributary Area = 7.5 ac o Tributary Area within Existing R/W = 5.8 ac o Tributary Area, Impervious, Outside of R/W = 0.0 ac o Tributary Area, Pervious, Outside of R/W = 1.7 ac o Tributary

More information

Considerations In Estimating Tailwater Elevations

Considerations In Estimating Tailwater Elevations Considerations In Estimating Tailwater Elevations by Alphonse (Al) J. Stewart, P.E., President www.suncam.com Page 1 of 39 ************************************************************************ This

More information

Chapter 10. Conduit Outlet Structures Introduction General Layout Information

Chapter 10. Conduit Outlet Structures Introduction General Layout Information 10.0 Introduction This section addresses the design of culvert outlets, which are typically oriented in-line with the flow in a drainageway, and storm sewer outlets, which are typically oriented perpendicular

More information

Culvert Sizing procedures for the 100-Year Peak Flow

Culvert Sizing procedures for the 100-Year Peak Flow CULVERT SIZING PROCEDURES FOR THE 100-YEAR PEAK FLOW 343 APPENDIX A: Culvert Sizing procedures for the 100-Year Peak Flow A. INTRODUCTION Several methods have been developed for estimating the peak flood

More information

20. Security Classif. (of this page) Unclassified Form DOT F (8-72) Reproduction of completed page authorized

20. Security Classif. (of this page) Unclassified Form DOT F (8-72) Reproduction of completed page authorized 1. Report No. FHWA/TX-06/0-2109-2 Technical Report Documentation Page 2. Government 3. Recipient s Catalog No. Accession No. 4. Title and Subtitle EVALUATION OF HYDRAULIC EFFECTS OF CULVERT SAFETY END

More information

Chapter 11 Culverts and Bridges

Chapter 11 Culverts and Bridges Chapter 11 Table of Contents 11-1 Introduction... 1 11-2 General Design... 1 11-2-1 Design Criteria... 1 11-2-2 Design Flows... 1 11-2-3 Permitting and Regulations... 2 11-2-4 Aesthetics and Safety...

More information

Chapter 11 Culverts and Bridges

Chapter 11 Culverts and Bridges Chapter 11 Table of Contents 11-1 Introduction... 1 11-2 General Design... 1 11-2-1 Design Criteria... 1 11-2-2 Design Flows... 1 11-2-3 Permitting and Regulations... 2 11-2-4 Aesthetics and Safety...

More information

Chapter 11 Culverts and Bridges

Chapter 11 Culverts and Bridges Chapter 11 Culverts and Bridges Contents 1.0 Introduction... 1 2.0 General Design... 1 2.1 Design Criteria... 1 2.2 Design Flows... 1 2.3 Permitting and Regulations... 1 2.4 Aesthetics and Safety... 2

More information

H Y D R A U L I C E F F I C I E N C Y

H Y D R A U L I C E F F I C I E N C Y 2 Hydrology and Economics Hydrologic analysis involves the estimation of a design flow rate based on climatological and watershed characteristics. This analysis is one of the most important aspects of

More information

Hydrologic Study Report for Single Lot Detention Basin Analysis

Hydrologic Study Report for Single Lot Detention Basin Analysis Hydrologic Study Report for Single Lot Detention Basin Analysis Prepared for: City of Vista, California August 18, 2006 Tory R. Walker, R.C.E. 45005 President W.O. 116-01 01/23/2007 Table of Contents Page

More information

Basic Design of Replogle Flumes

Basic Design of Replogle Flumes ITRC Report No. R 02-010 IRRIGATION TRAINING AND RESEARCH CENTER California Polytechnic State University San Luis Obispo, California 93407 www.itrc.org Basic Design of Replogle Flumes Replogle flumes are

More information

INCREASING THE EFFICIENCY OF UNDER ROAD CULVERTS IN PROTECTING THE DESERT ROADS AGAINST TORRENTS & FLASH WATER

INCREASING THE EFFICIENCY OF UNDER ROAD CULVERTS IN PROTECTING THE DESERT ROADS AGAINST TORRENTS & FLASH WATER INCREASING THE EFFICIENCY OF UNDER ROAD CULVERTS IN PROTECTING THE DESERT ROADS AGAINST TORRENTS & FLASH WATER Ashour M.A. 1, Abdallah A.A., Aly T.E. 3, El-Attar S.E. 4 1,3,4 Department of Civil Engineering,

More information

GIS Enabled Automated Culvert Design

GIS Enabled Automated Culvert Design GIS Enabled Automated Culvert Design Andrew Graettinger, PhD Ashton Greer, Leah Clifton, Zachary Wilbanks, and Bradford Wilson The University of Alabama Civil, Construction, and Environmental Engineering

More information

COMPUTER APPLICATIONS HYDRAULIC ENGINEERING

COMPUTER APPLICATIONS HYDRAULIC ENGINEERING - 7535 COMPUTER APPLICATIONS IN HYDRAULIC ENGINEERING Connecting Theory to Practice Fifth Edition HAESTAD PRESS Table of Contents Revision History Foreword CHAPTER 1 BASIC HYDRAULIC PRINCIPLES 1 1.1 General

More information

STATE UNIVERSITY OF NEW YORK COLLEGE OF TECHNOLOGY CANTON, NEW YORK COURSE OUTLINE CONS 322 HYDRAULICS

STATE UNIVERSITY OF NEW YORK COLLEGE OF TECHNOLOGY CANTON, NEW YORK COURSE OUTLINE CONS 322 HYDRAULICS STATE UNIVERSITY OF NEW YORK COLLEGE OF TECHNOLOGY CANTON, NEW YORK COURSE OUTLINE CONS 322 HYDRAULICS Prepared By: Joseph Reilly CANINO SCHOOL OF ENGINEERING TECHNOLOGY CIVIL AND CONSTRUCTION TECHNOLOGY

More information

Australian Rainfall and Runoff guidance on blockage of hydraulic structures: numerical implementation and three case studies

Australian Rainfall and Runoff guidance on blockage of hydraulic structures: numerical implementation and three case studies Journal of Hydrology (NZ) 56 (2): 109-122 2017 New Zealand Hydrological Society (2017) Australian Rainfall and Runoff guidance on blockage of hydraulic structures: numerical implementation and three case

More information

Lecture 2. Flow through culverts

Lecture 2. Flow through culverts Lectre Flow throgh clverts Clverts Clverts are the condits, which convey storm water throgh highway and railways embankments. A clvert consists of three parts: the intake (also called inlet or fan), the

More information

2017 VTAS&S. APPENDIX C Virginia Tech Stormwater Design Manual

2017 VTAS&S. APPENDIX C Virginia Tech Stormwater Design Manual APPENDIX C Virginia Tech Stormwater Design Manual Table of Contents 1.0 Stormwater Hydrology...1 1.1 References...1 1.2 Design Frequencies...1 1.2.1 General...1 1.2.2 Storm Drainage Systems...1 1.3 Stormwater

More information

STORMWATER DESIGN CRITERIA. PUBLIC WORKS DEPARTMENT City of Hudson Oaks, Texas

STORMWATER DESIGN CRITERIA. PUBLIC WORKS DEPARTMENT City of Hudson Oaks, Texas STORMWATER DESIGN CRITERIA PUBLIC WORKS DEPARTMENT City of Hudson Oaks, Texas REVISED JANUARY 23, 2014 TABLE OF CONTENTS Foreword.... 3 Storm Water Management Policy.... 4 Definitions.... 5 1. Preliminary

More information

2C-12 Detention Basin Outlet Structures

2C-12 Detention Basin Outlet Structures Iowa Stormwater Management Manual 2C-12 2C-12 Detention Basin Outlet Structures A. Introduction The methods described in Section 2C-9 are used to estimate the volume of the detention storage. The second

More information

Hancor, Inc. Drainage Handbook Hydraulics 3-1

Hancor, Inc. Drainage Handbook Hydraulics 3-1 Hancor, Inc. Drainage Handbook Hydraulics 3-1 3-0 HYDRAULICS TABLE OF CONTENTS 3-1 Overview of Hydraulic Considerations...3-2 3-2 Design Manning s Value...3-2 3-3 Discharge Curves...3-4 3-3 The Conveyance

More information

ARR BLOCKAGE: NUMERICAL IMPLEMENTATION AND THREE CASE STUDIES

ARR BLOCKAGE: NUMERICAL IMPLEMENTATION AND THREE CASE STUDIES ARR BLOCKAGE: NUMERICAL IMPLEMENTATION AND THREE CASE STUDIES Paul Ollett 1 Bill Syme 2 1 HYDRALINC Pty Ltd, Gold Coast, Queensland 2 BMT WBM Pty Ltd, Brisbane, Queensland ABSTRACT Comprehensive guidance

More information

Chapter 10 CULVERTS SOUTH DAKOTA DRAINAGE MANUAL

Chapter 10 CULVERTS SOUTH DAKOTA DRAINAGE MANUAL Chapter 10 CULVERTS SOUTH DAKOTA DRAINAGE MANUAL October 2011 Table of Contents Section Page 10.1 INTRODUCTION...10-1 10.1.1 Definition...10-1 10.1.2 Purpose...10-1 10.1.3 Concepts...10-1 10.1.4 Symbols...10-2

More information

Geneva Dam. Design of a Steep, Temporary, Riprap Ramp

Geneva Dam. Design of a Steep, Temporary, Riprap Ramp Geneva Dam Design of a Steep, Temporary, Riprap Ramp A Run-of of-river Dam Analysis for Geneva Dam Credit to: Yu-Chun Su, Ph.D., P.E., CFM David T. Williams. Ph.D., P.E, CFM Presentation Purpose History

More information

CONCRETE PIPE AND PORTAL CULVERT HANDBOOK

CONCRETE PIPE AND PORTAL CULVERT HANDBOOK CONCRETE PIPE AND PORTAL CULVERT HANDBOOK PIPES, INFRASTRUCTURAL PRODUCTS AND ENGINEERING SOLUTIONS DIVISION PREFACE TO 2006 REVISION Concrete pipes and portal culverts are the most frequently used and

More information

Extended Detention Basin Design

Extended Detention Basin Design Extended Detention Basin Design 1 Extended Detention 2 Ohio Department of Transportation 1 Extended Detention Basin L&D Vol. 2 Section 1117.3 Provides quality and quantity treatment 3 Extended Detention

More information

MEMO. Date: July 4, 2018 Pages: 3 CCTA File: To: Ted Kruska CCTA Via: . Laura Goetz & Amanda Kellett

MEMO. Date: July 4, 2018 Pages: 3 CCTA File: To: Ted Kruska CCTA Via:  . Laura Goetz & Amanda Kellett MEMO Date: July 4, 208 Pages: 3 CCTA File: 3583 To: Ted Kruska CCTA Via: email From: Subject: Laura Goetz & Amanda Kellett Concession 7 Culvert Replacement Hydraulic Analysis C.C. Tatham & Associates Ltd.

More information

APPENDIX G HYDRAULIC GRADE LINE

APPENDIX G HYDRAULIC GRADE LINE Storm Drainage 13-G-1 APPENDIX G HYDRAULIC GRADE LINE 1.0 Introduction The hydraulic grade line is used to aid the designer in determining the acceptability of a proposed or evaluation of an existing storm

More information

Water Control Structures Selected Design Guidelines Alberta Environment Page 17-1

Water Control Structures Selected Design Guidelines Alberta Environment Page 17-1 Alberta Transportation Water Control Structures Selected Design Guidelines Alberta Environment Page 17-1 17.0 MAIN CANAL CONVEYANCE STRUCTURES 17.1 General Conveyance structures typically employed on main

More information

DESIGN OF CHANNEL FLOW DIVERSION FACILITIES

DESIGN OF CHANNEL FLOW DIVERSION FACILITIES DESIGN OF CHANNEL FLOW DIVERSION FACILITIES FOR RIPARIAN HABITAT IRRIGATION BRUCE M. PHILLIPS, M.S., P.E. ABSTRACT Increased awareness and concern regarding environmental degradation has resulted in protection

More information

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination Highway Drainage Proper drainage is a very important consideration in design of a highway. Inadequate drainage facilities can lead to premature deterioration of the highway and the development of adverse

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

Index. Page numbers followed by f indicate figures.

Index. Page numbers followed by f indicate figures. Index Aerodynamic method, 103, 110 111 Algae, 131, 173, 175 Alternate depth, 88 Alternating block method, 132, 140 141 Attenuation, 106, 107f, 118, 120 Page numbers followed by f indicate figures. Baseflow

More information

Tests on Circular-Pipe-Culvert Inlets

Tests on Circular-Pipe-Culvert Inlets Tests on Circular-Pipe-Culvert Inlets R. E. SCHILLER, Jr Assistant Professor Texas A & M College e THE effect of various types of inlets on flow through short model circular pipe culverts has been investigated

More information

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS CUYAHOGA COUNTY ENGINEER DRAINAGE MANUAL

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS CUYAHOGA COUNTY ENGINEER DRAINAGE MANUAL CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS CUYAHOGA COUNTY ENGINEER DRAINAGE MANUAL Supplement to O.D.O.T. LOCATION and DESIGN MANUAL, Volume 2, Drainage Design, Section 1000 and 1100 July 29, 2011 Revisions

More information

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS CUYAHOGA COUNTY ENGINEER DRAINAGE MANUAL

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS CUYAHOGA COUNTY ENGINEER DRAINAGE MANUAL CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS CUYAHOGA COUNTY ENGINEER DRAINAGE MANUAL Supplement to O.D.O.T. LOCATION and DESIGN MANUAL, Volume 2, Drainage Design, Section 1000 and 1100 November 18, 2013

More information

RE: Final Drainage Letter: Northwest Aurora Alley Improvements 2016

RE: Final Drainage Letter: Northwest Aurora Alley Improvements 2016 April 12, 2016 Mr. Craig Perl, P.E. Senior Engineer City of Aurora Public Works Department 15151 E. Alameda Parkway Aurora, CO 80012 RE: Final Drainage Letter: Northwest Aurora Alley Improvements 2016

More information

and Hydraulic Analysis 412

and Hydraulic Analysis 412 Conveyance System Design and Hydraulic Analysis This chapter presents acceptable methods for the analysis and design of storm and surface water conveyance systems. Conveyance systems can be separated into

More information

North Domingo Baca Extension at Barstow

North Domingo Baca Extension at Barstow Modeling Report April 5, 2001 North Domingo Baca Extension at Barstow Prepared for the Albuquerque Metropolitan Arroyo Flood Control Authority Julie Coonrod, Ph.D., P.E. Department of Civil Engineering

More information

CHAPTER 15 PIPE DRAINS

CHAPTER 15 PIPE DRAINS CHAPTER 15 PIPE DRAINS 15.1 INTRODUCTION... 15-1 15.2 LOCATION AND ALIGNMENT... 15-1 15.2.1 Roadway Reserves.... 15-1 15.2.2 Privately Owned Properties... 15-2 15.2.3 Public Open Space... 15-2 15.2.4 Drainage

More information

Contents. Drainage Analysis: Hunters Trace, Westpointe, and Hunters Creek

Contents. Drainage Analysis: Hunters Trace, Westpointe, and Hunters Creek Drainage Analysis: Hunters Trace, Westpointe, and Hunters Creek Contents SITE LOCATION / DESCRIPTION... 3 WESTPOINTE STORMWATER MANAGEMENT PLAN... 3 THE ENCLAVE AT WESTPOINTE DETENTION POND... 3 Table

More information

Irrigation Crossing Structures

Irrigation Crossing Structures Irrigation Crossing Structures Road Open channel H.R. Open Irrigation Canal Tail escape Water way + Road way Culvert Bridge Water way + Water way Syphon Aqueduct Retaining walls Lining ١ 1- FUNCTION AND

More information

CITY OF WAXAHACHIE, TEXAS MANUAL FOR THE DESIGN OF STORM DRAINAGE SYSTEMS

CITY OF WAXAHACHIE, TEXAS MANUAL FOR THE DESIGN OF STORM DRAINAGE SYSTEMS CITY OF WAXAHACHIE, TEXAS MANUAL FOR THE DESIGN OF STORM DRAINAGE SYSTEMS MAY, 2001 TABLE OF CONTENTS Page No. SECTION I: INTRODUCTION 1.1 General... I-1 1.2 Scope... I-1 1.3 Organization of Manual...

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment

More information

Drop Height For Channel Erosion Control

Drop Height For Channel Erosion Control Drop Height For Channel Erosion Control James C.Y. Guo, Professor and Director Department of Civil Engineering, U. of Colorado at Denver, Denver, Colorado 8017 E-mail: James.Guo@cudenver.edu Introduction

More information

Hydraulics of Precast Concrete Conduits

Hydraulics of Precast Concrete Conduits CPAA DESIGN MANUAL Hydraulics of Precast Concrete Conduits PIPES AND BOX CULVERTS Concrete Pipe Association of Australasia Hydraulics of Precast Concrete Conduits PIPES AND BOX CULVERTS Concrete Pipe Association

More information

Calibration of Hydrologic Design Inputs for a Small Urban Watershed

Calibration of Hydrologic Design Inputs for a Small Urban Watershed Research Project Proposal for Johnson County Stormwater Management Program and City of Overland Park, Kansas Calibration of Hydrologic Design Inputs for a Small Urban Watershed Bruce M. McEnroe & C. Bryan

More information

Lab #3 Conservation Equations and the Hydraulic Jump CEE 331 Fall 2004

Lab #3 Conservation Equations and the Hydraulic Jump CEE 331 Fall 2004 CEE 33 Lab 3 Page of 8 Lab #3 Conservation Equations and the Hydraulic Jump CEE 33 Fall 004 Safety The major safety hazard in this laboratory is a shock hazard. Given that you will be working with water

More information

CHAPTER 3 HYDROLOGY AND HYDRAULICS 3.1 SCOPE 3.2 COMPUTATION METHODS FOR RUNOFF

CHAPTER 3 HYDROLOGY AND HYDRAULICS 3.1 SCOPE 3.2 COMPUTATION METHODS FOR RUNOFF CHAPTER 3 HYDROLOGY AND HYDRAULICS 3.1 SCOPE This section sets forth the hydrologic parameters to be used in computations to determine volumes and peak rates of stormwater runoff as well as the hydraulic

More information

CVE 372 HYDROMECHANICS OPEN CHANNEL FLOW I

CVE 372 HYDROMECHANICS OPEN CHANNEL FLOW I CVE 372 HYDROMECHANICS OPEN CHANNEL FLOW I Dr. Bertuğ Akıntuğ Department of Civil Engineering Middle East Technical University Northern Cyprus Campus CVE 372 Hydromechanics 1/50 Overview 3.1 General Characteristics

More information

NC2 Ash Disposal Area Run-on and Run-off Control System Plan

NC2 Ash Disposal Area Run-on and Run-off Control System Plan NC2 Ash Disposal Area Run-on and Run-off Control System Plan Omaha Public Power District Nebraska City Station Nebraska City, Nebraska October 17, 2016 OPPD NC2 Ash Disposal Area Run-On and Run-Off Control

More information

of the Crump weir Modelling of composite type variation

of the Crump weir Modelling of composite type variation Modelling of composite type variation of the Crump weir Ashley Maritz BEng Honours Student Department of Civil Engineering University of Pretoria aamaritz9@gmail.com Dr Pieter Wessels Specialist Engineer

More information

Preliminary Drainage Study: Town of Hillsboro Pedestrian & Traffic Safety Project Traffic Calming Project UPC# 70587

Preliminary Drainage Study: Town of Hillsboro Pedestrian & Traffic Safety Project Traffic Calming Project UPC# 70587 Preliminary Drainage Study: Town of Hillsboro Pedestrian & Traffic Safety Project Traffic Calming Project UPC# 70587 Introduction: The intent of this study was to perform a preliminary drainage study of

More information

BMP Design Aids. w w w. t r a n s p o r t a t i o n. o h i o. g o v. Equations / Programs

BMP Design Aids. w w w. t r a n s p o r t a t i o n. o h i o. g o v. Equations / Programs BMP Design Aids 1 Equations / Programs Outlet Discharge Equations Hydrograph and Pond Routing Programs USGS StreamStats 2 Ohio Department of Transportation 1 Training Intent Introduction and overview of

More information

Hydrologic and Hydraulic Analysis Report Mountaineer Plant Bottom Ash Pond Complex New Haven, West Virginia

Hydrologic and Hydraulic Analysis Report Mountaineer Plant Bottom Ash Pond Complex New Haven, West Virginia Hydrologic and Hydraulic Analysis Report Mountaineer Plant Bottom Ash Pond Complex New Haven, West Virginia September 2015 Terracon Project Number: N4155129 Prepared for: American Electric Power 1 Riverside

More information

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent Slope Drains DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent [1] Slope drains can act as outlet

More information

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent Slope Drains DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control [1] Soil Treatment Permanent [1] Slope drains can act as outlet

More information

STORMWATER RUN-ON AND RUN-OFF CONTROL PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL

STORMWATER RUN-ON AND RUN-OFF CONTROL PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL STORMWATER RUN-ON AND RUN-OFF CONTROL PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO. 0200-S3N-R2 AFIN: 32-00042 OCTOBER 12, 2016 STORMWATER RUN-ON AND RUN-OFF CONTROL PLAN

More information

Engineering Report Preliminary Floodplain Study. Executive Summary

Engineering Report Preliminary Floodplain Study. Executive Summary Executive Summary Engineering Report Preliminary Floodplain Study The Federal Emergency Management Agency (FEMA) has updated the Flood Insurance Rate Maps (FIRM) for Finney County, including the City of

More information

Application of Particle Image Velocimetry in Hydraulic Engineering Research. Michael Horst, Ph.D., P.E., ASCE 1

Application of Particle Image Velocimetry in Hydraulic Engineering Research. Michael Horst, Ph.D., P.E., ASCE 1 Application of Particle Image Velocimetry in Hydraulic Engineering Research Michael Horst, Ph.D., P.E., ASCE 1 Particle Image Velocimetry (PIV) is a non-intrusive method used for ascertaining hydraulic

More information

Analyzing Flood Risk from the I&M Canal s Non-Levee Embankments A Modified Application of FEMA s Natural Valley Procedure

Analyzing Flood Risk from the I&M Canal s Non-Levee Embankments A Modified Application of FEMA s Natural Valley Procedure Analyzing Flood Risk from the I&M Canal s Non-Levee Embankments A Modified Application of FEMA s Natural Valley Procedure Tiffany Coleman, PE Senior Project Engineer Stantec/STARR September 10, 2015 How

More information

SECTION 4 STORM DRAINAGE

SECTION 4 STORM DRAINAGE 4.01 GENERAL SECTION 4 STORM DRAINAGE These standards shall provide minimum requirements for the design of Storm Drainage and related appurtenances within the City of West Sacramento rights of way and

More information

(b) Discuss in brief shaft spillway with neat sketches. Marks 04. OR Q (2) Explain in brief USBR stilling basin. Marks 08

(b) Discuss in brief shaft spillway with neat sketches. Marks 04. OR Q (2) Explain in brief USBR stilling basin. Marks 08 (b) Discuss in brief shaft spillway with neat sketches. Marks 04 OR Q (2) Explain in brief USBR stilling basin. Marks 08 Stilling Basins The basins are usually provided with special appurtenances including

More information

Bridge Planning Updates. Bridge Planning Practitioners Workshop April 2012

Bridge Planning Updates. Bridge Planning Practitioners Workshop April 2012 Bridge Planning Updates Bridge Planning Practitioners Workshop April 2012 Bridge Website Bridge Website Bridge Website Bridge Website BPG 11 Stormwater Management at Rural Bridges Released July 2010 Documents

More information

DRAINAGE CRITERIA MANUAL (V.1, Chapter 1) DRAINAGE POLICY CONTENTS

DRAINAGE CRITERIA MANUAL (V.1, Chapter 1) DRAINAGE POLICY CONTENTS DRAINAGE CRITERIA MANUAL (V.1, Chapter 1) DRAINAGE POLICY DRAINAGE POLICY CONTENTS Section Page DP- 1.0 STATEMENT OF POLICY 1.1 Drainage Policy 1.2 Purpose and Scope 1.3 Regional Master Planning 1.4 Local

More information

Stream Restoration at Road Crossings in Northern Wisconsin. Dale Higgins, USDA Forest Service

Stream Restoration at Road Crossings in Northern Wisconsin. Dale Higgins, USDA Forest Service Stream Restoration at Road Crossings in Northern Wisconsin Dale Higgins, USDA Forest Service Key Points Large # of road and trail stream crossings on the landscape Many crossings adversely impact streams

More information

Development of transition mat scour protection design methodology and comparison to the state-of-the-practice

Development of transition mat scour protection design methodology and comparison to the state-of-the-practice Hydrology Days 2011 Development of transition mat scour protection design methodology and comparison to the state-of-the-practice Michael D. Turner, Amanda L. Cox 1, and Christopher I. Thornton Department

More information

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS PART 3 - STANDARDS FOR SEWERAGE FACILITIES 3.3 - DESIGN OF STORM SEWERS 3.301 Design of Storm Sewers A. General Information B. Investigations and Surveys C. Special Projects 3.302 Design Criteria for Storm

More information

Division V Section 5600 Storm Drainage Systems & Facilities

Division V Section 5600 Storm Drainage Systems & Facilities Division V Section 5600 Storm Drainage Systems & Facilities DIVISION V CONSTRUCTION AND MATERIAL SPECIFICATIONS SECTION 5600 STORM DRAINAGE SYSTEMS AND FACILITIES Approved and Adopted this 19 th day of

More information

HYDRAULIC DEMONSTRATION CHANNEL

HYDRAULIC DEMONSTRATION CHANNEL HYDRAULIC DEMONSTRATION CHANNEL PACKING LIST Pitot-Static Tube and Manometer Tube Flow Meters 1. 48 Long Differential Manometer 2. Clear Tubing 3. Pitot-static Tube Clamp 4. Pitot-static Tube 1. Venturi

More information

CUYAHOGA COUNTY ENGINEER

CUYAHOGA COUNTY ENGINEER CUYAHOGA COUNTY ENGINEER DRAINAGE MANUAL Supplement to O.D.O.T. LOCATION and DESIGN MANUAL, Volume 2, Drainage Design, Section 1000 and 1100 May 28, 2010 Revisions to the July 29, 2009 edition are noted

More information

STORMWATER RUN-ON AND RUN-OFF CONTROL PLAN ENTERGY ARKANSAS, INC. WHITE BLUFF PLANT CLASS 3N CCR LANDFILL

STORMWATER RUN-ON AND RUN-OFF CONTROL PLAN ENTERGY ARKANSAS, INC. WHITE BLUFF PLANT CLASS 3N CCR LANDFILL STORMWATER RUN-ON AND RUN-OFF CONTROL PLAN ENTERGY ARKANSAS, INC. WHITE BLUFF PLANT CLASS 3N CCR LANDFILL PERMIT NO. 199-S3N-R3 AFIN: 3-11 OCTOBER 13, 216 STORMWATER RUN-ON AND RUN-OFF CONTROL PLAN ENTERGY

More information

Development of a Stage-Discharge Rating for Site Van Bibber Creek at Route 93

Development of a Stage-Discharge Rating for Site Van Bibber Creek at Route 93 Development of a Stage-Discharge Rating for Site 330 - Van Bibber Creek at Route 93 Prepared for: Urban Drainage and Flood Control District 2480 W. 26 th Avenue Suite 156-B Denver, CO 80211 May 19, 2006

More information

CHAPTER 300 HYDRAULICS SECTION 301 INTRODUCTION

CHAPTER 300 HYDRAULICS SECTION 301 INTRODUCTION CHAPTER 300 HYDRAULICS SECTION 301 INTRODUCTION 301.01 Section Description This chapter provides policies and technical procedures for analyzing the majority of stormwater facilities required for land

More information

PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION

PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION US Army Corps of Engineers Philadelphia District PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION CECIL COUNTY MARYLAND STORMWATER MANAGEMENT PLAN NARRATIVE INITIAL SUBMISSION JUNE 2014 1 PEARCE CREEK

More information

Pipe Flow Hydraulics

Pipe Flow Hydraulics CHE- 3115 Chemical Engineering Processes I - Laboratory Experiment 1 Pipe Flow Hydraulics BACKGROUND The conveyance of fluids through fixed conduits is the most common unit operation in engineering practice.

More information

Travers Reservoir Rehabilitation Project Irrigation Technical Conference Lethbridge, AB June 2, 2010

Travers Reservoir Rehabilitation Project Irrigation Technical Conference Lethbridge, AB June 2, 2010 Travers Reservoir Rehabilitation Project 2010 Irrigation Technical Conference Lethbridge, AB June 2, 2010 Location Plan Western Irrigation District Headworks CALGARY Eastern Irrigation District Headworks

More information

A study of the inlet characteristics and entrance losses of pipe culvert with a flush mounted, sharp edged inlet

A study of the inlet characteristics and entrance losses of pipe culvert with a flush mounted, sharp edged inlet Scholars' Mine Masters Theses Student Research & Creative Works 1960 A study of the inlet characteristics and entrance losses of pipe culvert with a flush mounted, sharp edged inlet Luke Lea Callaway Jr.

More information

APPENDIX F DESIGN CRITERIA FOR STORM WATER DRAINAGE FACILITIES (1.10 of Appendix A)

APPENDIX F DESIGN CRITERIA FOR STORM WATER DRAINAGE FACILITIES (1.10 of Appendix A) APPENDIX F 1.10 DESIGN CRITERIA FOR STORM WATER DRAINAGE FACILITIES (1.10 of Appendix A) SECTION 1 INTRODUCTION 1.01 Purpose The purpose of this manual is to establish standard methods and principals for

More information

APPENDIX A CHECKLIST FOR PREPARATION OF H&H REPORTS

APPENDIX A CHECKLIST FOR PREPARATION OF H&H REPORTS OFFICE OF STRUCTURES MANUAL ON HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 3 APPENDIX A CHECKLIST FOR PREPARATION OF H&H REPORTS (SEE ALSO APPENDIX B FOR DESIGN-BUILD PROJECTS) MARCH 2011 MARCH 2011 1 CHAPTER

More information

Determining Peak Flow Under Different Scenarios and Identifying Undersized Culverts

Determining Peak Flow Under Different Scenarios and Identifying Undersized Culverts Determining Peak Flow Under Different Scenarios and Identifying Undersized s Dr. Todd Walter, Biological and Environmental Engineering, Cornell University Dr. Art DeGaetano, Earth and Atmospheric Sciences,

More information

WinTR-55 Small Watershed Hydrology

WinTR-55 Small Watershed Hydrology WinTR-55 Small Watershed Hydrology Intermediate WinTR-55 Training Modeling Watersheds with Structures SEE NOTES AT CLASS EXERCISE #4. 1 Course Outline Overview Review of Hydrology Terms Modeling Single

More information

Lab #3 Conservation Equations and the Hydraulic Jump CEE 331 Fall 2003

Lab #3 Conservation Equations and the Hydraulic Jump CEE 331 Fall 2003 CEE 33 Lab 3 Page of 8 Lab #3 Conservation Equations and the Hydraulic Jump CEE 33 Fall 003 Safety The major safety hazard in this laboratory is a shock hazard. Given that you will be working with water

More information

Chapter 9 Hydraulic Structures

Chapter 9 Hydraulic Structures Chapter 9 Hydraulic Structures Contents Structures in Streams... 1 Grade Control Structures... 2 Overview... 2 Simplified Design Procedures for Drop Structures... 4 2.2.1 Introduction... 4 2.2.2 Geometry...

More information