1 Purpose of? To provide Guidance, Knowledge and Understanding of the Water Supply Procedures and work instruction, to be used when Swabbing and Flushing Mains after Installing, Commissioning New Mains, or as part of Mains re-habilitation programme. Note: This toolbox Talk is not exhaustive and you must refer to Scottish Water s Water Supply Hygiene Code of Practice or other DOMS documentation i.e. DOM-WN-PRC Work Instruction Commissioning / Decommissioning Water Mains & DOM-WN-PRC MAINS SWABBING Why? To safeguard the quality of water to customers and to demonstrate that Scottish Water and their partners apply due diligence to the distribution network. Swabbing and Flushing Mains is an important process for Installing and Commissioning any new main or Re-habilitation work on existing mains as part water distribution network for maintaining the quality of water supplied. The main must be swabbed and flushed to remove any material which may have entered into the main during installation or Re-habilitation of the main. Who will be affected? All Staff who undertake the installation of new mains or Re-Habilitation of existing mains on the water distribution network. When do I need to Swab the main? Swabbing and Flushing Mains is required as per Scottish Water s HCOP appendix 1 and DOMS for (a) All New Water Mains Installations. (Prior to Pressure testing stage) (b) Any Rehabilitated Water Mains (incl. replacement by pipe bursting/slip lining, swagging or relining). (c) Swabbing as part of the Full Disinfection process using tablet 20mg/l or 50mg/l instead of dosing units on new or existing mains. All the activities above must have swabbing and flushing undertaken to prevent any actual contamination of the new main or existing water network. Swabbing Method Statement All new mains installed must be pressure tested to ensure that there are no leaks on the section of main to be disinfected which may allow ingress of contaminated material into the main or escape of highly chlorinated water. The main must be swabbed and flushed to remove any material which may have entered into the main during installation etc. Water for swabbing, testing and disinfection of any new and or existing water mains and structures shall be taken from existing supplies wherever possible. NOTE temporary pumps may be needed to be made available if the pressure and or the flow is inadequate. The arrangements used to take water from the existing network to fill, swab, and test or flush the new main must be sufficiently protected to ensure that no backflow or back siphoning to the network can take place. This will require the fitting of a double check valve assembly if a direct connection is being used. Prior to any swabbing approval should be sought from Scottish Water for feed water to be made available for the planned swabbing operation. Page 1 of 5

2 All debris and dirt shall be removed using a single new clean hard grade foam swab for the mains less than 200mm in diameter. For larger mains two foam swabs in tandem shall be used. In both cases the swabs shall be soaked in a 20mg/litre Hypo-chlorite solution before insertion and propelled through the main at a low speed using mains pressure ideally the swab velocity should be between.8 and 1.5 m/sec. Swabbing shall be continued until the flushing water runs clear and that no erosion, silting or contamination occurs in the receiving water course into which it is discharged. The swabbing must be repeated as many times as necessary until the water in front of the swab is clear with no particulate material present (a turbidity tube/meter will aid inspection). The final swab should not have any ingrained material present or be discoloured. This process shall be carried out in one sequence of operations on any length of the main. The smell of the swab should also be noted if any unusual odour is present the swabbing should be repeated until no unusual odour is apparent. This is particularly important for ductile iron mains. Any unusual odour should be reported to the public health team. Any debris that is expelled should be reported for feedback to the contractor / company pipe layers and operation staff. Pushing a swab through the main by water pressure is not appropriate for water mains above 200mm (8 ) diameter. This results in too much water passing the swab and having to be pumped out of the next exit excavation with the potential for re-contamination. The maximum length that should be swabbed and disinfected using this method, in one pass, is, 200m unless agreed by Scottish Water. Also, more importantly from a disinfection point of view, water passing the swab is continuously diluting the 20mg/l chlorine leaving insufficient time for adequate disinfection and or possible contaminations of a water course. Swabbing shall generally be carried out in separate lengths not greater than 1km for pipe diameters under 200mm unless otherwise approved by Scottish Water Staff. All swabs must be recovered and accounted for from the retrieval point on the main being swabbed and immediately resealed, ensuring that no deleterious material enters the main. It is important to ensure that the complete swab or all its components part are recovered after swabbing operation to avoid problems on particularly existing mains with choking of metres, ball valve, ferrules connection etc. at a later date. In the event of a swab failing to emerge from the main, the swab shall be located and removed together with any obstruction. The swab is removed and the main resealed as soon as the possible after removal ensuring that no deleterious material enters the main. it is important to ensure that the complete swab or all its components part are recovered after swabbing operation to avoid problems on particularly existing mains with choking of meter s, ball valve, ferrules connection etc at a later date. Page 2 of 5

3 Foam Swabs In general, swabs shall be soft absorbent hard backed foam, medium grade with a minimum diameter of 25mm greater than the nominal internal diameter of the pipe, up to and including 200mm pipe work and a minimum of 50mm greater for pipe work of nominal internal diameter greater than 200mm In general swab size used should be the next size up from the main to be flushed. E.g. 100mm main minimum 125mm swab up to a maximum of 150mm swab 150mm main minimum 175mm swab 250mm main minimum 300mm swab Swabs shall only be used once and then disposed of appropriately. Swabs should be kept stored in sealed plastic bags prior to use, prior to insertion the swab should be soaked in 20mg/l hypochlorite solution and sealed in a plastic bag for transport or until ready to use. Key points of 1 Water for swabbing, shall be taken from existing supplies wherever possible. 2 The filling of mains for testing swabbing etc should only be done through 25mm hydrant standpipes fitted with double check valve. 3 Close all connections to the main being swabbed. 4 Swabs should be kept stored in sealed plastic bags prior to use, prior to insertion the swab should be soaked in 20mg/l hypochlorite solution and sealed in a plastic bag for transport or until ready to use. 5 Swab insertion points should be thoroughly disinfected using 250mg/l solution and the insertion point resealed immediately. 6 The correct type/ size of swabs are used for the main being swabbed. 7 Swab speed, Ideally the swab velocity should be between 0.8 and 1.5 meters/second 8 The swabbing must be repeated as many times as necessary until the water in front of the swab is clear with no particulate, material is present. 9 All swabs are accounted for and removed from the main. 10 When the swabbing process is complete: Disinfect & Sample Main as per HCOP. This TOOLBOX TALK and has been designed to provide information and guidance. It is NOT a substitute for information held in DOMS documents that can be viewed on the Intranet. IT IS ESSENTIAL THAT REFERENCE IS MADE TO THESE DOCUMENTS TO OBTAIN FULL GUIDANCE. Page 3 of 5

4 Page 4 of 5

5 Page 5 of 5

APPENDIX A WATERMAIN TESTING PROCEDURE: NEW DEVELOPMENT

APPENDIX A WATERMAIN TESTING PROCEDURE: NEW DEVELOPMENT SCOPE This procedure covers the cleaning, disinfection, hydrostatic testing and sampling of watermains. Unless specified otherwise, this procedure applies to all new watermains including above ground by-pass

More information

Procedure for Disinfecting Watermains

Procedure for Disinfecting Watermains Engineering & Construction Services Division Standard Specifications for Sewers and Watermains TS 7.30 September 2018 Procedure for Disinfecting Watermains Table of Contents TS 7.30.01 SCOPE... 3 TS 7.30.02

More information

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO: CONTRACT TITLE GRANT NO: UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA The following standard specification is intended to be edited according to the specifics of the project. Brackets [ ] and areas shaded in gray [e.g. format] indicate requirements that are optional depending

More information

B. All new water mains and temporary pipelines shall be disinfected prior to connection to the District s existing system.

B. All new water mains and temporary pipelines shall be disinfected prior to connection to the District s existing system. NORTH MARIN WATER DISTRICT STANDARD SPECIFICATIONS SECTION 15041 DISINFECTION OF PIPING PART 1 GENERAL 1.01 DESCRIPTION This section describes requirements for disinfection by chlorination of potable and

More information

Self-Lay Policy Appendix One Commissioning and handover. February 2018 Version 1

Self-Lay Policy Appendix One Commissioning and handover. February 2018 Version 1 Self-Lay Policy Appendix One Commissioning and handover February 2018 Version 1 Contents 1. Introduction and background... 3 2. Works Inspection audits... 3 1. Pre-connection inspection... 3 2. Post vesting

More information

Construction Design & Management (CDM) Regulations 2007

Construction Design & Management (CDM) Regulations 2007 Section 1 Mains Pre-commencement Meeting Before the construction of the new water main commences, a pre-commencement site meeting will be arranged by appointment. This meeting is usually attended by a

More information

Palmerston North City Council. Water Supply Mains Disinfection Code of Practice

Palmerston North City Council. Water Supply Mains Disinfection Code of Practice Palmerston North City Council Water Supply Mains Disinfection Code of Practice Palmerston North City Council Water Supply Mains Disinfection Code of Practice Environmental Training Centre 33 The Esplanade,

More information

CONSTRUCTION SPECIFICATION FOR TEMPORARY POTABLE WATER SUPPLY SERVICES

CONSTRUCTION SPECIFICATION FOR TEMPORARY POTABLE WATER SUPPLY SERVICES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 493 NOVEMBER 2015 CONSTRUCTION SPECIFICATION FOR TEMPORARY POTABLE WATER SUPPLY SERVICES TABLE OF CONTENTS 493.01 SCOPE 493.02 REFERENCES 493.03 DEFINITIONS

More information

CONSTRUCTION SPECIFICATION FOR TEMPORARY POTABLE WATER SUPPLY SERVICES

CONSTRUCTION SPECIFICATION FOR TEMPORARY POTABLE WATER SUPPLY SERVICES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 493 NOVEMBER 2009 (Reissued November 2010) CONSTRUCTION SPECIFICATION FOR TEMPORARY POTABLE WATER SUPPLY SERVICES TABLE OF CONTENTS 493.01 SCOPE 493.02

More information

Watermain Replacement and Connection Procedure

Watermain Replacement and Connection Procedure Engineering & Construction Services Division Standard Specifications for Sewers and Watermains TS 7.70 September 2017 Connection Procedure Table of Contents TS 7.70.01 SCOPE... 2 TS 7.70.02 REFERENCES...

More information

Amendment to OPSS 493 (Nov 2015) Construction Specification for Temporary Potable Water Supply Services

Amendment to OPSS 493 (Nov 2015) Construction Specification for Temporary Potable Water Supply Services Engineering & Construction Services Division Standard Specifications for Sewers and Watermains TS 493 September 2017 Amendment to OPSS 493 (Nov 2015) Construction Specification for Temporary Potable Water

More information

Introduction. Training Requirements. Hydrants & Standpipes. DOM-WN-PRC SAMPLING FROM A HYDRANT Version D April 2016

Introduction. Training Requirements. Hydrants & Standpipes. DOM-WN-PRC SAMPLING FROM A HYDRANT Version D April 2016 Introduction It is sometimes necessary to take samples e.g. for investigational or operational purposes, from locations such as new, renovated or repaired mains. In these circumstances, the sample may

More information

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL

SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL This section covers the furnishing and installation of ductile iron water pipe, fittings, thrust restraint and pipe disinfection. Ductile Iron Pipe MATERIALS

More information

Installation of sanitary sewers, storm sewers and water piping requires the issuance of a Building Permit prior to commencement of installation.

Installation of sanitary sewers, storm sewers and water piping requires the issuance of a Building Permit prior to commencement of installation. Development and Infrastructure Department 50 Dickson St., 3rd Floor, P.O. Box 669 Cambridge, Ontario. N1 R 5W8 519.621.0740; TTY 519.623.6691 Site Service Installation - Rational Sampling Program RE: Building

More information

Ground Level WATER MAIN. 1000mm. Excavation depth minimum 100mm below bottom of pipe. Minimum length X width to be 1000mm X 1000mm.

Ground Level WATER MAIN. 1000mm. Excavation depth minimum 100mm below bottom of pipe. Minimum length X width to be 1000mm X 1000mm. Tappings: 20-50mm Plumber requirements (These are the requirements where the Property Service is installed by plumber there is the option to have Gippsland Water fully install the Property Service) Tappings

More information

Code of Practice for Disinfection of Water Systems

Code of Practice for Disinfection of Water Systems Code of Practice for Disinfection of Water Systems No. COP-04 Date: 20 June 2017 uncontrolled when copied or printed Page 1 of 34 Revision Description Released By Date 2 Water Networks Manager September

More information

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY WORK PROCEDURE

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY WORK PROCEDURE NEW MAINS (CUSTOMER CONNECTIONS) AND MAINS REHABILITATION NEW MAINS - APPROVAL TO CONNECT Document Title: Document Reference: Work Procedure - New Mains (Customer Connections) and Mains Rehabilitation

More information

San Diego State University Environmental Health and Safety Department. Water Main and Building Water Disinfection and Testing

San Diego State University Environmental Health and Safety Department. Water Main and Building Water Disinfection and Testing San Diego State University Environmental Health and Safety Department Water Main and Building Water Disinfection and Testing I. Water Main Disinfection A. Introduction These procedures describes methods

More information

CONSTRUCTION SPECIFICATION FOR CEMENT MORTAR LINING OF WATERMAINS

CONSTRUCTION SPECIFICATION FOR CEMENT MORTAR LINING OF WATERMAINS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 462 NOVEMBER 2009 (Reissued November 2010) CONSTRUCTION SPECIFICATION FOR CEMENT MORTAR LINING OF WATERMAINS TABLE OF CONTENTS 462.01 SCOPE 462.02

More information

SPECIFICATIONS FOR THE CLEANING AND CEMENT MORTAR LINING OF CAST AND DUCTILE IRON WATER MAINS INDEX TS GENERAL...3

SPECIFICATIONS FOR THE CLEANING AND CEMENT MORTAR LINING OF CAST AND DUCTILE IRON WATER MAINS INDEX TS GENERAL...3 Works and Emergency Services CITY OF TORONTO WATER AND WASTEWATER SERVICES STANDARD CONSTRUCTION SPECIFICATIONS TS 7.10 June 2001 SPECIFICATIONS FOR THE CLEANING AND CEMENT MORTAR LINING OF CAST AND DUCTILE

More information

CHAPTER 8 WATER SUPPLY SYSTEM

CHAPTER 8 WATER SUPPLY SYSTEM CHAPTER 8 WATER SUPPLY SYSTEM 8-1 INTRODUCTION These improvement standards shall govern the engineering design of all domestic water systems intended for operation and maintenance by the County of Sutter

More information

SUPPLY SYSTEM ASSESSMENT QUESTIONNAIRE BWA ASSESSMENT TOOL GENERAL OVERVIEW:

SUPPLY SYSTEM ASSESSMENT QUESTIONNAIRE BWA ASSESSMENT TOOL GENERAL OVERVIEW: GENERAL OVERVIEW: Community Name: Date visited: Have there been any recent weather events (high precipitation, overland flooding, snow melt): Is water quality (clarity, colour, odour) affected by weather?

More information

Section 12: Distribution network and related matters

Section 12: Distribution network and related matters SEC TION 12 : DISTRIBUTION NETWORK AND RELATED MATTERS 12 Section 12 Section 12: Distribution network and related matters Summary of Section 12 Describes the importance of quality assurance systems including

More information

LAYING NEW WATER SUPPLY PIPES

LAYING NEW WATER SUPPLY PIPES LAYING NEW WATER SUPPLY PIPES www.nwl.co.uk waterregs@nwl.co.uk @nwater_care 0191 419 6583 0191 419 6664 Water Regulations Department Northumbrian Water Leat House Pattinson Road Washington NE38 8LB LAYING

More information

Pipe-Bursting Success with AC Pipe

Pipe-Bursting Success with AC Pipe Texas Municipal Utilities Association Annual Conference Inn on Barons Creek January 26, 2012 Pipe-Bursting Success with AC Pipe Pre-chlorinated Pipe Bursting to Replace Potable Waterlines in Round Rock,

More information

SECTION POLYVINYL CHLORIDE (PVC) WATERLINE

SECTION POLYVINYL CHLORIDE (PVC) WATERLINE SECTION 02632 POLYVINYL CHLORIDE (PVC) WATERLINE PART 1 - GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment, and incidentals required, and install polyvinyl chloride (PVC) waterline,

More information

Ontario s Watermain Disinfection Procedure. Aziz S. Ahmed, P. Eng. May 18 h, 2016

Ontario s Watermain Disinfection Procedure. Aziz S. Ahmed, P. Eng. May 18 h, 2016 Ontario s Watermain Disinfection Procedure Aziz S. Ahmed, P. Eng. May 18 h, 2016 PART I BACKGROUND 2 Concerns of Regulated Community Regarding AWWA C651 Difficulties in taking bacteriological samples during

More information

ICE PIGGING: A NEW APPROACH TO CLEANING PRESSURISED PIPELINES

ICE PIGGING: A NEW APPROACH TO CLEANING PRESSURISED PIPELINES ICE PIGGING: A NEW APPROACH TO CLEANING PRESSURISED PIPELINES Graeme Berriman, Operations Manager Ice Pigging (Suez Water) ABSTRACT Ice Pigging is an innovative technique used for cleaning pressurised

More information

Water Safety Plan Guide Groundwater Abstraction Bores and Wells Version 1, Ref P1.3

Water Safety Plan Guide Groundwater Abstraction Bores and Wells Version 1, Ref P1.3 Water Safety Plan Guide Groundwater Abstraction Bores and Wells Version 1, Ref P1.3 January 2014 Citation: Ministry of Health. 2014. Water Safety Plan Guide: Groundwater Abstraction Bores and Wells, Version

More information

SECTION C10 CLEANING AND CEMENT LINING GENERAL

SECTION C10 CLEANING AND CEMENT LINING GENERAL SECTION C10 CLEANING AND CEMENT LINING GENERAL The work under this section consists of the cleaning and cement mortar lining of existing cast iron water mains in place within the limits specified on the

More information

Environmental Control Plan

Environmental Control Plan Environmental Control Plan Environmental Control Plan In accordance with Watts & Hughes Construction Waikato Bay of Plenty Limited. corporate strategies the Company has an Environment Control Plan which

More information

Standard terms and conditions

Standard terms and conditions Standard terms and conditions Development Services For the provision of a water service (Water Supply, Wastewater and Drainage) Introduction Under Section 73(2)(a) of the Water Services Act 2012, landowners

More information

Preparing for Technical Training: Essential Skills for Water/Wastewater Operators. Practice Tests

Preparing for Technical Training: Essential Skills for Water/Wastewater Operators. Practice Tests Practice Tests COURSE OUTLINE: Module # Name Practice Test included Module 1: Basic Math Refresher Module 2: Fractions, Decimals and Percents Module 3: Measurement Conversions Module 4: Linear, Area and

More information

AIR SCOURING OF WATER MAINS - AN ASSET MANAGEMENT APPROACH. Rick Woulfe & Steve Codd. Western Water

AIR SCOURING OF WATER MAINS - AN ASSET MANAGEMENT APPROACH. Rick Woulfe & Steve Codd. Western Water AIR SCOURING OF WATER MAINS - AN ASSET MANAGEMENT APPROACH Paper Presented by : Rick Woulfe & Steve Codd Authors: Peter Kitney, Water Quality & Environmental Specialist Rick Woulfe, GIS Co-ordinator Steve

More information

ICE PIGGING - THE WAY AHEAD FOR WATER MAIN CLEANING. Graeme Berriman. Gosford City Council

ICE PIGGING - THE WAY AHEAD FOR WATER MAIN CLEANING. Graeme Berriman. Gosford City Council Best Operator Paper NSW 2011 ICE PIGGING - THE WAY AHEAD FOR WATER MAIN CLEANING Paper Presented by: Graeme Berriman Author: Graeme Berriman, Special Projects Officer Gosford City Council 36th Annual Qld

More information

WATER SERVICE APPLICATION Not to be used for Fire Service

WATER SERVICE APPLICATION Not to be used for Fire Service New Service Service Renewal CITY OF NEWPORT DEPARTMENT OF UTILITIES WATER DIVISION 70 HALSEY STREET NEWPORT, RI 02840 Phone: 401-845-5600 Fax: 401-846-0947 WATER SERVICE APPLICATION Not to be used for

More information

F. Provide at least 2 feet of vertical separation between a water line and any utility or stormdrain crossing it.

F. Provide at least 2 feet of vertical separation between a water line and any utility or stormdrain crossing it. Section 3 F. Provide at least 2 feet of vertical separation between a water line and any utility or stormdrain crossing it. 3.8 Highway Crossings The design engineer shall, prior to the design of any highway

More information

Water Safety Plan Guide Surface Water Abstraction Rivers, Streams and Infiltration Galleries Version 1, Ref P1.1

Water Safety Plan Guide Surface Water Abstraction Rivers, Streams and Infiltration Galleries Version 1, Ref P1.1 Water Safety Plan Guide Surface Water Abstraction Rivers, Streams and Infiltration Galleries Version 1, Ref P1.1 January 2014 Citation: Ministry of Health. 2014. Water Safety Plan Guide: Surface Water

More information

TYPE DESIGN DENSITY FUNCTION

TYPE DESIGN DENSITY FUNCTION TYPE DESIGN DENSITY FUNCTION (Aqua Swab) S (Aqua Criss Cross Swab S-SC (Aqua Criss Cross Swab Silicon Carbide) Light 0,025 kg/dm³ up to 1 km up to 4 km up to 4 km AB (Aqua Bare) (Aqua Criss Cross) -WB

More information

TECHNICAL SPECIAL PROVISION FOR FINANCIAL PROJECT ID:

TECHNICAL SPECIAL PROVISION FOR FINANCIAL PROJECT ID: TECHNICAL SPECIAL PROVISION FOR 1001 WATER DISTRIBUTION SYSTEM FINANCIAL PROJECT ID: 200105-7-52-01 The official record of this Technical Special Provision is the electronic file signed and sealed under

More information

Oregon Health Services - Drinking Water Program

Oregon Health Services - Drinking Water Program Oregon Health Services - Drinking Water Program Drinking Water Hauling Guidelines June, 2008 INTRODUCTION Hauling water for drinking purposes is not regulated in the State of Oregon. The mission of the

More information

Water Pollution Control for Work in Sensitive Areas

Water Pollution Control for Work in Sensitive Areas Water Pollution Control for Work in Sensitive Areas 10-1. WATER POLLUTION CONTROL The Contractor is advised that failure to fully comply with the provisions of this Section, and all requirements listed

More information

GENERAL INFORMATION AND REQUIREMENTS

GENERAL INFORMATION AND REQUIREMENTS GENERAL INFORMATION AND REQUIREMENTS 1.0 BOARD S STANDARD SPECIFICATIONS: Copies of these Standard Specifications for Water Mains, Sanitary Sewers and Sewage Pumping Stations may be purchased from the

More information

3 TM Scotchkote TM Spray in Place Pipe 269 Coating. Case Study: Syracuse, New York

3 TM Scotchkote TM Spray in Place Pipe 269 Coating. Case Study: Syracuse, New York 3 TM Scotchkote TM Spray in Place Pipe 269 Coating Case Study: Syracuse, New York Client: City of Syracuse Department of Water 101 North Beech Street Syracuse, NY 13210 Contact: Eric Murdock, P.E. Chief

More information

APPENDIX C: PROCEDURES FOR WATER MAIN CLEANING, DISINFECTION, AND BACTERIOLOGICAL TESTING

APPENDIX C: PROCEDURES FOR WATER MAIN CLEANING, DISINFECTION, AND BACTERIOLOGICAL TESTING APPENDIX C: PROCEDURES FOR WATER MAIN CLEANING, DISINFECTION, AND BACTERIOLOGICAL TESTING October 2017 APPENDIX C APPENDIX C: PROCEDURES FOR WATER MAIN CLEANING, DISINFECTION, AND BACTERIOLOGICAL TESTING

More information

CHAPTER 7 - UTILITY SERVICES WATER SUPPLY AND RETICULATION

CHAPTER 7 - UTILITY SERVICES WATER SUPPLY AND RETICULATION CHAPTER 7 - UTILITY SERVICES WATER SUPPLY AND RETICULATION Page 175 of 309 7.1 EXTRACTS FROM THE DISTRICT PLAN Refer Appendix 17 Subdivision and Development Standards Utility Services: Water Supply and

More information

Agitate the treatment solution thoroughly in the target zone. This really helps get the best results!

Agitate the treatment solution thoroughly in the target zone. This really helps get the best results! Product Description BoreSaver Ultra C is a powerful rehabilitation product that dissolves iron oxide deposits in potable groundwater bores, wells, pumps and pipes. Overview BoreSaver Ultra C is added to

More information

Chapter 5 Water, Plumbing, and Waste

Chapter 5 Water, Plumbing, and Waste Chapter 5 Water, Plumbing, and Waste Parts 5-1 WATER 5-2 PLUMBING SYSTEM 5-3 MOBILE WATER TANK AND MOBILE FOOD ESTABLISHMENT WATER TANK 5-4 SEWAGE, OTHER LIQUID WASTE, AND RAINWATER 5-5 REFUSE, RECYCLABLES,

More information

Method Measurement of Enterovirus and Norovirus Occurrence in Water by Culture and RT-qPCR. EPA/600/R-10/181 December 2010

Method Measurement of Enterovirus and Norovirus Occurrence in Water by Culture and RT-qPCR. EPA/600/R-10/181 December 2010 EPA/600/R-10/181 December 2010 www.epa.gov/ord Method 1615 Measurement of Enterovirus and Norovirus Occurrence in Water by Culture and RT-qPCR Office of Research and Development National Exposure Research

More information

NATIONAL GRID SEMI-BURIED GAS METER BOX Model KG60046

NATIONAL GRID SEMI-BURIED GAS METER BOX Model KG60046 National Grid Semi-Buried Gas Meter Box NATIONAL GRID SEMI-BURIED The from W T Knowles is an unobtrusive brown meter box designed to be partially buried in the ground. This model was commissioned by National

More information

Town of Cornwall Water & Sewer Utility Corporation

Town of Cornwall Water & Sewer Utility Corporation Town of Cornwall Water & Sewer Utility Corporation Minimum Standard of Acceptability for Water, Sewer & Sprinkler Connections At the time of application for water, sewer and/or sprinkler service the applicant

More information

Charlottetown - Water & Sewer Utility Minimum Standard of Acceptability for Water, Sewer & Sprinkler Connections

Charlottetown - Water & Sewer Utility Minimum Standard of Acceptability for Water, Sewer & Sprinkler Connections Charlottetown - Water & Sewer Utility Minimum Standard of Acceptability for Water, Sewer & Sprinkler Connections At the time of application for water, sewer and/or sprinkler service the applicant shall

More information

SECTION 401 WATER PIPE AND FITTINGS 2.2 POLYVINYL CHLORIDE (PVC) PIPE AND FITTINGS

SECTION 401 WATER PIPE AND FITTINGS 2.2 POLYVINYL CHLORIDE (PVC) PIPE AND FITTINGS SECTION 401 PIPE AND FITTINGS PART 2 MATERIALS 2.2 POLYVINYL CHLORIDE (PVC) PIPE AND FITTINGS A. PVC Pressure Pipe sizes 4 inch through 12 inch: ANSI/AWWA C 900 1. DR18 B. PVC Pressure Pipe sizes 14 inch

More information

Affinity Water Limited New Supplies

Affinity Water Limited New Supplies 1 of 13 Affinity Water Limited New Supplies Policy and Company Specific Requirements for Water Mains and Service Pipes Constructed by Self-Lay Organisations 2 of 13 CONTENTS 1 Introduction 3 1.1 General

More information

Comprehensive approach to the decommissioning of oil pipelines

Comprehensive approach to the decommissioning of oil pipelines Comprehensive approach to the decommissioning of oil pipelines by Aleš Brynych and Aleš Crha CEPS a. s., Jesenice, Czech Republic Pipeline Pigging Conference Tehran, Iran 24-25 October, 2016 Organized

More information

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT WET SERVICES 78 FOX STREET BUILDING

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT WET SERVICES 78 FOX STREET BUILDING Report for Department of Infrastructure Development Wet Services Preliminary Report: 78 Fox Street Building October 2014 GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT WET

More information

The Study on Water Supply System for Siem Reap Region in Cambodia Main Report Chapter 5

The Study on Water Supply System for Siem Reap Region in Cambodia Main Report Chapter 5 2) Meter District It is recommended to introduce a Meter District System (MDS) for the proposed distribution network. By introducing the MDS, the Waterworks can evaluate the effectiveness of water supply

More information

Riviera Beach DIVISION 2. CROSS CONNECTION CONTROL

Riviera Beach DIVISION 2. CROSS CONNECTION CONTROL Riviera Beach DIVISION 2. CROSS CONNECTION CONTROL Sec. 20-231. Definitions. The following words, terms and phrases, when used in this division, shall have the meanings ascribed to them in this section,

More information

STANDARD DETAILS. Revised January Bonita Springs Utilities, Inc East Terry Street (239)

STANDARD DETAILS. Revised January Bonita Springs Utilities, Inc East Terry Street (239) STANDARD DETAILS Revised January 2018 Bonita Springs Utilities, Inc. 11900 East Terry Street Bonita Springs, FL 34135 (239) 992-0711 DETAIL SHEET INDEX WATER DETAILS W-1 CONSTRUCTION JUMPER ASSEMBLY W-2

More information

Installation Training For Space Heating Systems

Installation Training For Space Heating Systems Installation Training For Space Heating Systems HYDROMX Technical Team February 2014 Contents Energy Efficiency with Hydromx Equipment Preparation Estimating and Measuring the Water Volume Emptying and

More information

Self lay policy. Company specific addendum to Code of Practice for the self laying of Water Mains and Services England and Wales 2 nd Edition May 2009

Self lay policy. Company specific addendum to Code of Practice for the self laying of Water Mains and Services England and Wales 2 nd Edition May 2009 Self lay policy and Company specific addendum to Code of Practice for the self laying of Water Mains and Services England and Wales 2 nd Edition May 2009 Issue 2 - May 2013 Contents Introduction Page 3

More information

Ecosol Rain Tank Maintenance Guide. environmentally engineered for a better future. Ecosol WASTEWATER FILTRATION SYSTEMS

Ecosol Rain Tank Maintenance Guide. environmentally engineered for a better future. Ecosol WASTEWATER FILTRATION SYSTEMS Rain Tank Maintenance Guide environmentally engineered for a better future The Rain Tank has been designed specifically for easy onsite cleaning and maintenance using a licensed waste contractor equipped

More information

Revised Total Coliform Rule (RTCR) Level 1 Assessment Form

Revised Total Coliform Rule (RTCR) Level 1 Assessment Form Revised Total Coliform Rule (RTCR) Level 1 Assessment Form Public Water System (PWS) Information PWS Name: Assessment Trigger Date: Completion Date: PWS ID: Level 1 Assessment Information Both the Level

More information

Check if Issues Found. Check if Reviewed. Assessment Elements

Check if Issues Found. Check if Reviewed. Assessment Elements Oklahoma Department of Environmental Quality Water Quality Division, Public Water Supply Group Revised Total Coliform Rule Level 2 Assessment Form RTCR-2 PWS ID#: PWS Name: County: City/Town: Seasonal

More information

***************************************************************************************************************

*************************************************************************************************************** 02732 SANITARY FORCE MAIN *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 33 34 00. ***************************************************************************************************************

More information

Exhibit A FOX CHAPEL AUTHORITY STANDARD SPECIFICATIONS FOR MATERIALS AND INSTALLATION OF WATER MAINS

Exhibit A FOX CHAPEL AUTHORITY STANDARD SPECIFICATIONS FOR MATERIALS AND INSTALLATION OF WATER MAINS Exhibit A FOX CHAPEL AUTHORITY STANDARD SPECIFICATIONS FOR MATERIALS AND INSTALLATION OF WATER MAINS Requests for extensions to Authority water mains shall be made in writing by the owner or owners of

More information

A Bug s Life: Simulating, Planning and Implementing a Temporary Conversion from Chloramines to Free Chlorine for Biofilm Control

A Bug s Life: Simulating, Planning and Implementing a Temporary Conversion from Chloramines to Free Chlorine for Biofilm Control A Bug s Life: Simulating, Planning and Implementing a Temporary Conversion from Chloramines to Free Chlorine for Biofilm Control Simon Horsley, Stantec Consulting, 300-675 Cochrane Drive West Tower, Markham,

More information

APPENDIX 2. Water Commissioning. Township of King Design Criteria and Standard Detail Drawings

APPENDIX 2. Water Commissioning. Township of King Design Criteria and Standard Detail Drawings APPENDIX 2 Water Commissioning Township of King Design Criteria and Standard Detail Drawings Township of King Design Criteria and Standard Detail Drawings APPENDIX 2 WATER COMMISSIONING Form No. Title

More information

WATER MAIN CLEANING A NEW ERA. Alan Butler. Wingecarribee Shire Council

WATER MAIN CLEANING A NEW ERA. Alan Butler. Wingecarribee Shire Council WATER MAIN CLEANING A NEW ERA Paper Presented by: Alan Butler Author: Alan Butler, Water & Sewer Technical Coordinator, Wingecarribee Shire Council 8 th Annual WIOA NSW Water Industry Operations Conference

More information

AQUAVENDOR AUTO. Ultrafiltration Unit SETUP OPERATING INSTRUCTIONS

AQUAVENDOR AUTO. Ultrafiltration Unit SETUP OPERATING INSTRUCTIONS AQUAVENDOR AUTO OPERATING INSTRUCTIONS Ultrafiltration Unit SETUP Locate the Ultrafiltration Unit undercover with sufficient space around the unit for maintenance and for installing plumbing connections.

More information

ATOC Guidance Note Provision of Drinking Water for On-Train Use

ATOC Guidance Note Provision of Drinking Water for On-Train Use ATOC Guidance Note Provision of Drinking Water Synopsis This Guidance Note provides advice on the management of drinking water supply, storage, use and chlorination at depots, stations and on-train, to

More information

REGISTRATION EXAMINATION, NOVEMBER 2015 LICENSED DRAINLAYER ANSWER SCHEDULE

REGISTRATION EXAMINATION, NOVEMBER 2015 LICENSED DRAINLAYER ANSWER SCHEDULE No. 9197 REGISTRATION EXAMINATION, NOVEMBER 2015 LICENSED DRAINLAYER ANSWER SCHEDULE Plumbers, Gasfitters and Drainlayers Board, 2015. All rights reserved. No part of this publication may be reproduced

More information

ADVANCED WATER DISTRIBUTION MODELING AND MANAGEMENT

ADVANCED WATER DISTRIBUTION MODELING AND MANAGEMENT H A E S T A D M E T H O D S ADVANCED WATER DISTRIBUTION MODELING AND MANAGEMENT F i r s t E d i t i o n Table of Contents Preface Continuing Education Units About the Software xv xix xxi Chapter 1 Introduction

More information

Checklist for Developing a Corrective Action Plan under the NJDEP Ground Water Rule. (DRAFT September 15, 2015 DRAFT)

Checklist for Developing a Corrective Action Plan under the NJDEP Ground Water Rule. (DRAFT September 15, 2015 DRAFT) Checklist for Developing a Corrective Action Plan under the NJDEP Ground Water Rule (DRAFT September 15, 2015 DRAFT) Water System and Well Information Company Name Contact Name Company Mailing Address

More information

Keeping your water flowing How we maintain our mains network

Keeping your water flowing How we maintain our mains network Keeping your water flowing How we maintain our mains network Keeping your water flowing Planning for mains Maintenance and replacement of our water supply network can cause disruption to our customers

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION TECHNICAL SPECIFICATION ITEM 04821 TEMPORARY VEHICLE AND EQUIPMENT FUELING AREA PART 1 - GENERAL 1.01 Description Installation of erosion and sediment control for a temporary vehicle and equipment fueling

More information

Supplementary Manual to Water Services

Supplementary Manual to Water Services Supplementary Manual to Water Services VERSION CONTROL Issue Date Version Issue Issued To Prepared By Reviewed By 27/02/15 0 1 General B Griffiths D Wharton 20/08/15 1 2 General B Griffiths D Wharton 08/06/16

More information

The Town of Fort Frances

The Town of Fort Frances The Town of Fort Frances STANDARD OPERATING PROCEDURE NO.3 FOR WATER MAIN BREAKS AND REPAIRS SECTION OPERATIONS & FACILITIES NEW: December 2004 REVISED: June 2009, December 2009 POLICY Resolution No. 371

More information

Ministry of the Environment and Climate Change. DRAYTON DRINKING WATER SYSTEM Inspection Report

Ministry of the Environment and Climate Change. DRAYTON DRINKING WATER SYSTEM Inspection Report Site Number: Inspection Number: Date of Inspection: Inspected By: 220004064 1-BZLHQ Jul 10, 2015 Martha Weber Drinking Water System Drayton Drinking Water System DWS# 220004064 2015/16 Focused TABLE OF

More information

System & Equipment Checkout Procedure Client Name Plant Location

System & Equipment Checkout Procedure Client Name Plant Location System & Equipment Checkout Procedure Client Name Plant Location Procedure Title: Boiler Feed Water System Prepared By: Applied Performance Strategies 1 of 7 Approved By: Date: 01/11/08 Date: Purpose:

More information

BRITISH STANDARD BS : 1991 ISO : 1991

BRITISH STANDARD BS : 1991 ISO : 1991 BRITISH STANDARD BS 6068-6.5: 1991 ISO 5667-5: 1991 Water quality Part 6: Sampling Section 6.5 Guidance on sampling of drinking water and water used for food and beverage processing BS6068-6.5:1991 This

More information

SECTION PLUMBING PIPING SYSTEMS

SECTION PLUMBING PIPING SYSTEMS SECTION 15300 PLUMBING PIPING SYSTEMS PART 1 - GENERAL 1.01 SPECIAL NOTICE A. Each contractor shall read all relevant documents, become familiar with the job, the scope of work, type of general construction,

More information

Company specific addendum

Company specific addendum Self lay policy and Company specific addendum to Code of Practice for the self laying of Water Mains and Services England and Wales 2 nd Edition May 2009 Issue 1.0 - April 2015 life fl ow smoothly helping

More information

OPERATION OF CHLORINATION / DECHLORINATION SYSTEM AT SHORTLANDS WWTP. Ken Newton. Ken Newton Wastewater Treatment Plant Operator

OPERATION OF CHLORINATION / DECHLORINATION SYSTEM AT SHORTLANDS WWTP. Ken Newton. Ken Newton Wastewater Treatment Plant Operator OPERATION OF CHLORINATION / DECHLORINATION SYSTEM AT SHORTLANDS WWTP Paper Presented by : Ken Newton Author: Ken Newton Wastewater Treatment Plant Operator Hunter Water Corporation, NSW 62 nd Annual Water

More information

Module 6 Shock Chlorination. For more information refer to the Water Wells That Last video (Part III Shock Chlorination).

Module 6 Shock Chlorination. For more information refer to the Water Wells That Last video (Part III Shock Chlorination). For more information refer to the Water Wells That Last video (Part III Shock Chlorination). Well maintenance is essential to ensure that a well will last. Water wells provide ideal conditions for IRBs.

More information

The Town of Fort Frances

The Town of Fort Frances The Town of Fort Frances STANDARD OPERATING PROCEDURE NO.3 FOR WATER MAIN BREAKS AND REPAIRS SECTION OPERATIONS & FACILITIES NEW: December 2004 REVISED: June 2009, December 2009, June 2012 POLICY Resolution

More information

SECTION WATER DISTRIBUTION SYSTEM

SECTION WATER DISTRIBUTION SYSTEM Conditions of Use/ Responsibility of Data Montgomery County Public Schools Facilities Guide DIVISION 2 - SITE WORK These guideline specifications are to be used by the A/E as a base document in the development

More information

Order of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below.

Order of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below. SEDIMENT CONTROL NOTES 1.0 GENERAL 1.1 The Developer and Contractor shall comply with the requirements of all regulatory authorities, federal, provincial and municipal government departments including

More information

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY STRATEGY and PLANNING WATER WORK PROCEDURE WORKING WITH ASBESTOS CEMENT (AC) PIPES

DISTRIBUTION, OPERATION and MAINTENANCE STRATEGY STRATEGY and PLANNING WATER WORK PROCEDURE WORKING WITH ASBESTOS CEMENT (AC) PIPES WORKING WITH ASBESTOS CEMENT (AC) PIPES Document Title: Work Procedure Document Reference: DOM-WN-PRC-00000315 Approved By: Customer Service Delivery Title: General Manager Record of Changes and Amendments

More information

GENERAL SPECIFICATION FOR THE REHABILITATION OF SEWERS USING THE THERMOFORM (PVC) PIPE LINING SYSTEM

GENERAL SPECIFICATION FOR THE REHABILITATION OF SEWERS USING THE THERMOFORM (PVC) PIPE LINING SYSTEM 1. GENERAL 1.01 DESCRIPTION GENERAL SPECIFICATION FOR THE REHABILITATION OF SEWERS USING THE THERMOFORM (PVC) PIPE LINING SYSTEM A. The Contractor shall furnish all labor, equipment and materials necessary

More information

Water and Wastewater Technician POA (2011) Subtask to Unit Comparison

Water and Wastewater Technician POA (2011) Subtask to Unit Comparison Water and Wastewater Technician POA (2011) Subtask to Unit Comparison Task 1 Monitors control 1.01 Monitors electrical A1 Trade Safety Awareness. (A & C Board Standard) A4 Trade Science And Trade Electricity

More information

CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS SECTION 00005B TABLE OF CONTENTS ***CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS***

CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS SECTION 00005B TABLE OF CONTENTS ***CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS*** 00005B *** *** BOLD ITALICIZED Item is bound within this specification manual. Regular non-italicized Item is not bound within this specification manual, however item is part of the contract. Contents

More information

SECTION PUBLIC WATER SERVICE CONNECTIONS

SECTION PUBLIC WATER SERVICE CONNECTIONS SECTION 33 14 14 PUBLIC WATER SERVICE CONNECTIONS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe and fittings for water service connections to small commercial, light industrial, and residential

More information

City of Middletown WATER & SEWER DEPARTMENT 82 Berlin Street Middletown, CT TEL: (860) FAX: (860)

City of Middletown WATER & SEWER DEPARTMENT 82 Berlin Street Middletown, CT TEL: (860) FAX: (860) City of Middletown WATER & SEWER DEPARTMENT 82 Berlin Street Middletown, CT 06457 TEL: (860) 638-3500 FAX: (860) 343-8091 GENERAL REQUIREMENTS WATER MAIN AND SERVICE INSTALLATION JANUARY 2017 WATER MAINS:

More information

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT WET SERVICES ABSA BUILDING

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT WET SERVICES ABSA BUILDING Report for Department of Infrastructure Development Wet Services Preliminary Report: ABSA Building October 2014 GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT WET SERVICES

More information

FINDING THE SOURCE OF HYDROCARBONS IN DRINKING WATER A CUSTOMER COMPLAINT. Steven Newham, Goulburn Valley Water

FINDING THE SOURCE OF HYDROCARBONS IN DRINKING WATER A CUSTOMER COMPLAINT. Steven Newham, Goulburn Valley Water FINDING THE SOURCE OF HYDROCARBONS IN DRINKING WATER A CUSTOMER COMPLAINT Paper Presented by: Steven Newham, Author: Steven Newham, Process & Water Quality Specialist, Goulburn Valley Water 77 th Annual

More information

WATER SPECIFICATIONS. The Corporation of the City

WATER SPECIFICATIONS. The Corporation of the City WATER SPECIFICATIONS The Corporation of the City REVISED: February 2016 TABLE OF CONTENTS 1 GENERAL... 5 1.1 Introduction... 5 1.2 Definitions... 5 2 WATER PLANS... 6 2.1 Consulting Engineer... 6 2.2 Subdivider

More information

Acceptance guideline 16: Stormwater contamination/first flush collection and stormwater bypass

Acceptance guideline 16: Stormwater contamination/first flush collection and stormwater bypass Acceptance guideline 16: Stormwater contamination/first flush collection and stormwater bypass Overview The purpose of this acceptance guideline is to outline under what circumstances Icon Water will permit

More information

SODIUM HYPOCHLORITE PORTABLE DOSING UNIT. Max Hadzidimitriou. Yarra Valley Water

SODIUM HYPOCHLORITE PORTABLE DOSING UNIT. Max Hadzidimitriou. Yarra Valley Water SODIUM HYPOCHLORITE PORTABLE DOSING UNIT Paper Presented by: Max Hadzidimitriou Authors: Max Hadzidimitriou, Project Manager, David Younger, Water Quality Engineer, Yarra Valley Water 73 rd Annual Water

More information

SECTION WASTEWATER FORCE MAINS

SECTION WASTEWATER FORCE MAINS SECTION 02732 WASTEWATER FORCE MAINS PART - GENERAL 1.01 GENERAL: A. This section includes the general requirements for design and installation of force main systems serving wastewater lift stations. B.

More information