1 Indian Oil and Pétrole et gaz des Gas Canada Indiens du Canada Suite 100, 9911 Chula Boulevard, Tsuu T ina, AB T2W 6H6 Tel.: (403) Fax: (403) March 2000 Your file - Votre référence Our file - Notre référence E-5010 Information Letter How to Prepare the Environmental Assessment Required Pursuant to the Canadian Environmental Assessment Act Note: This Information Letter was issued as IOGC IL It supercedes IOGC IL95-1. PURPOSE The purpose of this Information Letter is to provide guidelines for those completing environmental assessments for oil and gas projects being conducted on Indian Lands. More specifically, the Information Letter provides details of the information requirements of IOGC in order to adequately screen an environmental assessment. The following information requirements apply to all applications for oil and gas exploratory licences, surface leases and rights of way agreements on Indian Lands in Canada. In the past, there has been a range in the quality of the information contained in environmental assessments. This has resulted in delayed approvals and has created an unnecessary work load. In order to expedite assessments, quantitative data must be collected as per this Information Letter. If environmental assessments, environmental protection plans or other documents forwarded to support an application are not complete, they will be returned to the proponent. Appendix A outlines the criteria required and will ensure that unnecessary project approval delays are not encountered. The criteria in this Information Letter do not apply to transmission pipeline applications as these are the responsibility of the Lands and Trust Services Directorate, Indian and Northern Affairs Canada (INAC). For information regarding transmission pipelines, please contact the regional office of INAC in the province of the proposed pipeline. BACKGROUND The Indian Oil and Gas Act and Indian Oil and Gas Regulations, 1995, provide the framework under which Indian Oil and Gas Canada (IOGC) operates. Copies of these documents may be obtained from the following website:
2 IOGC IL March 2000 How to Prepare the Environmental Assessment Page 2 of 16 The Canadian Environmental Assessment Act (CEAA) and associated Regulations have been in force for over five years and its intent is generally well understood. For further information, contact the CEAA office at the National website: info@ceaa.gc.ca or the above Canada Justice website. Regulatory Authority Indian Oil and Gas Canada is a regulatory agency within the Department of Indian Affairs and Northern Development (DIAND) responsible for the management and administration of oil and gas resources located on Indian reserve lands in Canada. The mandate of IOGC is: to further First Nation initiatives to manage and control their own oil and gas resources; and, to fulfil the Crown s fiduciary and statutory obligations related to the management of oil and gas resources on Indian reserve lands. Pursuant to sections 5(1)(c) and (d) of the CEAA, IOGC is the responsible authority (RA) for the environmental screening and approval of applications to conduct oil and gas projects on Indian reserve land. To do this, IOGC requires the proponent (grantee) to provide an environmental assessment covering the proposed project. Linkage to other Regulations Section 4(c) of the Indian Oil and Gas Regulations, 1995, states: It is a condition of every contract that the operator will comply with, unless otherwise agreed to by the Minister and specified in the contract, all provincial laws applicable to non- Indian lands that relate to the environment or to the exploration for, or development, treatment, conservation or equitable production of oil and gas and that are not in conflict with the (Indian Oil and Gas) Act or these Regulations. Note that section 4(c) includes the rules and regulations of the Alberta Energy and Utilities Board (EUB) which are adopted by IOGC on all Indian reserves except where more stringent provincial standards exist.
3 IOGC IL March 2000 How to Prepare the Environmental Assessment Page 3 of 16 APPLICATION PROCEDURE Once the environmental assessment is complete using the criteria outlined in Appendix A, submit one copy to IOGC and provide one copy to the Chief and Council of the First Nation where the project will take place. A third copy should be made available to the First Nation environmental monitor, where applicable. Scheduling: application approval or rejection A minimum of 12 working days is required by IOGC to screen a project application. This period commences when the complete assessment is received at IOGC and the screening period will increase for complex applications or those in potentially sensitive areas. When IOGC has screened and approved your application, you will receive a letter containing the environmental terms attached to the approval. This letter will subsequently be attached to the surface lease, exploratory licence or right of way agreement and become part of the leasing conditions. In the event that there are environmental concerns preventing the approval of your application, you will be contacted by telephone to discuss alternatives. Submit your application to: Indian Oil and Gas Canada Suite 100, 9911 Chula Boulevard Tsuu T ina, AB T2W 6H6 phone: fax: Questions and information: Manager, Environment and Surface phone: Contact IOGC for DIAND contacts in each province.
4 IOGC IL March 2000 How to Prepare the Environmental Assessment Page 4 of 16 APPENDIX A CRITERIA FOR PREPARING AN ENVIRONMENTAL ASSESSMENT PURSUANT TO THE CANADIAN ENVIRONMENTAL ASSESSMENT ACT 1.0 INTRODUCTION Proponents (applicants) are responsible for ensuring that the level of effort directed to the assessment is appropriate for the nature of the project under assessment, its potential effects and the environmental setting. The First Nation Chief and Council and residents issues must also be addressed and documented. Concise reporting of the pertinent facts, keeping environmental conservation and protection, sustainable development and residents concerns foremost, will speed up the process. Where an EUB guide, information letter or interim directive applies, this must be noted. 2.0 THE CEAA PROCESS The proponent is responsible for: Scope of project (see Appendix A-1) Potential impacts Mitigation measures Cumulative effects (see Appendix A-2) Residual impacts and level of significance Reclamation plans Indian Oil and Gas Canada is responsible for: CEAA screening Project approval: IOGC is the Responsible Authority (RA) in consultation with the First Nation CEAA terms letter 3.0 ENVIRONMENTAL ASSESSMENT REQUIREMENTS The following requirements are common to all applications: Project scope: the environmental assessment must include all the components and activities of the proposed project from site selection to decommissioning and reclamation (cradle-to-grave). Appendix A-1: Scope of Project Standard Considerations provides examples. Spatial boundaries: typically the area being leased or permitted plus an area of typically 1 km diameter around the leased or licenced land.
5 IOGC IL March 2000 How to Prepare the Environmental Assessment Page 5 of 16 Borrow pits and remote sumps must be included in the assessment if they are on Reserve lands. Using such boundaries will allow the assessment of off-lease impacts and the evaluation of cumulative effects (see Appendix A-2). When a project transects both provincial and Indian Reserve land (an off- Reserve facility is being tied-in to an on-reserve facility) briefly describe the complete project but provide baseline information, impacts and mitigation for the on-reserve portion of the project, and off-reserve impacts which could potentially have an effect on the Reserve. Temporal boundaries: covers those impacts anticipated over the lifetime of the project. Effects on the environment, humans and wildlife, health and safety, accidents and malfunctions, land clearing, drilling, operations and the reclamation phases must be considered. Project schedule: state the date the initial project phase is expected to commence and when it will be completed, e.g., land clearing, construction and drilling. Emergency Response Plan: for projects involving hydrogen sulphide gas, attach the appropriate page from the Emergency Response Plan (ERP) call-up roster. Indian Oil and Gas Canada does not require a copy of the complete ERP. Sustainable development is a fundamental objective of the environmental assessment process. During the exploration and development of the hydrocarbon resource, attention must be paid to the conservation of other resources. 4.0 BASELINE INFORMATION The following baseline information must be covered and forms the basis of the assessment regardless of whether the application is for a exploratory licence, lease or right-of-way agreement. As some of this information will affect the surveyors preparing the land survey, ensure that they are aware of any policy items that may affect their work. This could avoid a re-survey. The assessment must include captioned colour photographs and a brief description of the existing landscape within the project area. Include photographs of sensitive areas and areas of concern. These photographs will also be used at the decommissioning and reclamation stage to assess the quality of landscape recontouring.
6 IOGC IL March 2000 How to Prepare the Environmental Assessment Page 6 of Map Scale Provide maps and/or photo mosaics, for example: Regional map at 1:50,000 scale or 1:250,000 scale for large projects Known cultural, archaeological, or environmentally sensitive sites at 1:50,000 scale Air photos at 1:20,000 or 1:30,000 scale 4.2 Biophysical conditions List the existing biophysical conditions using the following guidelines: Topography: Does the proposed project area include any steep land forms? IOGC Environmental Policy (March 1997) states: Surface leases with more than 9.0 m cut-and-fill (measured as the change in elevation between any two corners of a surveyed lease) require written explanatory justification to be placed on file. Such exception will be granted in only extreme circumstances. Cut-and-fill must never exceed a 10 m change in elevation. Disturbance shall not be allowed within 50 m from the lease boundary to coulee breaks or steep slopes. In most cases, there will be a requirement to re-contour the lease to its original topography upon decommissioning. There shall be a distance of not less than 100 m between the lease boundary and any water body. Land use: state the existing and surrounding land use. Groundwater: provide information on the depth to groundwater, natural springs, and the distance to potable water wells; are they upslope or downslope? If no information is available, note this in the environmental assessment. Further information may be required. Groundwater information is not always readily available on Reserve land so check with the First Nation as a survey may have been conducted. If the project becomes extensive (as the pool develops) a groundwater survey may be required. Surface water and wetlands: ensure the distance to any water body or wetland (including riparian areas, seasonal draws, ephemeral draws and muskeg) is stated on the survey plan and in the assessment.
7 IOGC IL March 2000 How to Prepare the Environmental Assessment Page 7 of 16 Compliance is required with The Navigable Waters Protection Act and The Fisheries Act. Contact the Department of Fisheries and Oceans for information: Soils: provide information on the soil characteristics. Wherever possible avoid stripping topsoil, such as on native prairie or in frozen conditions in a forested area. Identify subsoil characteristics. Identify any soil with special handling requirements, or potential for wind or water erosion. Vegetation: state the ecoregion, the regional vegetation type and describe the existing vegetation within the spatial boundaries. List any potentially endangered or traditionally important species. Forested areas: describe the dominant forest cover type, and species and provide data on salvageable timber, as follows: Salvageable timber volume assessment Coniferous: average dbh, for spruce, fir and pine Deciduous: average dbh Volume of timber requiring salvage: deciduous and coniferous (m 3 ) Number of loads (based on 45 m 3 /loads) Wildlife and wildlife habitat: describe the wildlife habitat, list key species known to frequent the area and if a Wildlife Management Plan is in effect for the region. Contact the Band s representative to request information from the elders wherever possible. Using the list developed by the Committee on the Status of Endangered Wildlife Species in Canada (COSEWIC) state if any threatened or endangered species use the area. Identify species of concern or at risk using the provincial ranking definitions. Identify riparian habitat, overwintering grounds, calving grounds, mineral licks and wildlife species of subsistence or economic value. If sensitive habitat may be affected provide an approximation of the area of similar habitat available within four surrounding sections. Be aware of compliance requirements with the Migratory Birds Convention Act. Fish and fish habitat: describe any fish and fish habitat on which the project may have an impact. Compliance with The Fisheries Act, subsections 35(1) and (2), is required. Contact the Department of Fisheries and Oceans for details:
8 IOGC IL March 2000 How to Prepare the Environmental Assessment Page 8 of Social and traditional concerns The following areas of concern must be addressed: Social: list proximity to homes and other structures, traplines (First Nation members are not required to register with the province) or other social concerns. Traditional uses and traditional environmental knowledge (TEK): contact the Band representative and request that an elder is consulted regarding traditional uses. Document them and any concerns. Cultural and archaeological sites: contact the Band representative and request that an elder is consulted regarding cultural or archaeological sites. Document them and any concerns. If the information is sensitive, it may be forwarded to IOGC as a separate memorandum. An archaeological survey may be required. Noise: discuss the noise to be generated and the effect on surrounding residents. Document any concerns and your mitigation. Recreation and aesthetic concerns: provide details. 4.4 Malfunctions and accidents List the environmental effects that could be caused by malfunctions and accidents that might occur over the life of the project. 4.5 Public consultation Public participation and consultation is a key objective of the CEAA. Although approval of the First Nation Chief and Council is required for a project to proceed, it is also crucial that the proponent contacts all Reserve residents who may be affected by the project and address any concerns related to health, environment, social effects or safety that may be expressed. The proponent must maintain a log stating who has been contacted, their concerns if any, and how they have been addressed. Include a copy of the log with plans to mitigate the concerns. Likewise, if a public consultation program was undertaken (e.g., open houses, meetings) provide a record of those residents with concerns and how they have been addressed.
9 IOGC IL March 2000 How to Prepare the Environmental Assessment Page 9 of ENVIRONMENTAL IMPACTS AND PROPOSED MITIGATION State clearly the potential environmental impacts from the proposed project on each of above components and your planned mitigation of those impacts. Conclude by stating the residual impacts and level of significance when mitigation is in place. Approval or rejection of the project may largely depend on your treatment of this requirement. Cumulative effects: see CEAA, section 16(1), (2), (3) and (4). This covers the consideration of the effects of all past, present and possible future projects (see Appendix A-2). Note: The Environmental Operating Practices for the Upstream Petroleum Industry - Alberta Operations, Canadian Association of Petroleum Producers (CAPP), May 1999, provides an excellent source of environmental management practices. 6.0 SPECIFIC PROJECT INFORMATION The following three sections provide additional pertinent information to be addressed while developing the project assessment. 6.1 Exploratory Programs IOGC Environmental Policy (March 1997) states: (a) Seismic programs using dynamite detonations must maintain a 180 m setback from potable water wells and residences unless a lesser setback is approved by the First Nation. (b) The proponent shall be advised to test potable water wells for flow and potability if the wells could potentially be affected by a proposed seismic program. If testing does not take place the proponent s CEAA terms letter must state that the proponent is responsible for subsequent water well complaints. Agreement shall be reached with the Nation involved if testing is not to take place and documented by IOGC. The environmental assessment must include: An air-photo mosaic of the program clearly showing the proposed seismic lines, locations of water body crossings, water bodies and riparian areas, erodible soils, areas of steep slope, homes and buildings within 500 m of the proposed lines, and sensitive areas. Include colour photographs of sensitive areas. Evidence of reserve resident consultation for the seismic program. Residents within 500 m of the proposed lines shall be contacted.
10 IOGC IL March 2000 How to Prepare the Environmental Assessment Page 10 of 16 Ensure the proposed routing has considered environmental and social factors and convey this information to the geophysical staff and surveyors. This may reduce the need for line location changes. The following information must be addressed, where applicable: New access roads which lie within 500 m of existing cut lines will not be approved unless adequate justification is provided. Seismic lines must follow existing cut lines or access where these lines lie within 400 m of the proposed lines. No new water crossings by seismic equipment will be permitted within 1 km of an existing crossing. Low impact avoidance cut techniques must be used. Low impact vehicles must be used where possible. Doglegs must be implemented at all road/seismic intersections and at the intersection of seismic lines with Reserve boundaries. Surface disturbance will not be permitted within 50 m of any water body except as hand-cut for the laying of cables. Wet terrain crossing is permitted only during frozen ground conditions. In forested areas a reforestation plan must be provided as part of the mitigation. Discuss this with the First Nation. Shot holes must be filled-in and reseeded during the following growing season. State if the First Nation requires rollback prior to reseeding. Native seed species compatible with the surrounding area will be required unless otherwise approved by the First Nation. Canada No.1 grade seed must be used. For 3D seismic programs in forested areas: detail how the program will be conducted to negate the potentially severe impact. Low impact ground vehicles shall be used. State if the program will be helicopter assisted. Wandering source lines are mandatory. Source line maximum width is 5 m. Receiver lines must be hand cut to a maximum of 1.5 m wide. Timber salvage is required. Seismic program reclamation plans must be provided.
11 IOGC IL March 2000 How to Prepare the Environmental Assessment Page 11 of Wellsite and Facility Leases, Access Roads, Borrow Pits, Remote Sumps IOGC Environmental Policy (March 1997) states: Surface leases with more than 9.0 m cut-and-fill (measured as the change in elevation between any two corners of a surveyed lease) require written explanatory justification to be placed on file. Such exception will be granted in only extreme circumstances. Cut-and-fill must never exceed a 10 m change in elevation. The environmental assessment must take the following into consideration: Disturbance shall not be permitted within 50 m of coulee breaks or steep slopes or any water body not being crossed. Lease boundaries shall be not less than 100 m from any water body, wetland or riparian area. New access roads must be at least 500 m from existing cut lines or access. Access road slope must not exceed 15 per cent. No roads shall be located within 100 m of streams or waterbodies. Remote sump and borrow pits: IOGC and the First Nation must approve a proposed remote sump or borrow pit location. These areas are subject to IOGC leasing requirements and the land characteristics must be included in the assessment. Potable water wells must be tested for flow and potability if within 400 m of the lease boundary. Land survey which must show residences and buildings within 500 m; access road length, and distance to waterbodies including seasonal wetlands and muskeg. Product: oil, sweet gas, sour gas Colour photographs of the proposed site, access road and surrounding area. Groundwater: provide depth to groundwater. No pump-off is allowed during any season where it may infiltrate muskeg or water bodies. Following satisfactory testing, pump-off onto agricultural land is acceptable, with land-user approval, or on to native grassland.
12 IOGC IL March 2000 How to Prepare the Environmental Assessment Page 12 of 16 Drilling mud program: include details of the drilling mud program and whether the sump will be on the lease (see also Groundwater, sub-section 4.2). State if a permeability test will be undertaken for the drilling mud sump. There shall be at least 1 m of impermeable material between the sump contents and the groundwater table. Surface water: state the distance to any water body (including seasonal sites and muskeg). Discuss surface water control on and off the lease. There shall be a distance of at least 100 m between the lease boundary and any water body. Vegetation: discuss how the lease has been located, short-sided, or aligned to avoid removing merchantable timber or impinging on sensitive areas. Practice low disturbance drilling on native grasslands. State your program for weed control. Reclamation both during operations and at project decommissioning will require using compatible native species if the site disturbed has native vegetation. Access road: discuss access road routing and the slopes encountered. The routing must follow the most environmentally benign path. State whether culverts will be used. Drainage ditches must be sized adequately to control run-off and be installed with erosion control materials. Where possible, consider not stripping the access road until a producing well has been confirmed. Subsequent flowline installation should be planned to follow access roads and existing clearings as much as possible. Operating phase Describe what equipment will remain on site when the well goes into production. Discuss the waste management plan. Knock-out tank placement must be approved by IOGC and the First Nation, and the method of leak detection must be stated. In general, underground storage tanks (USTs) will not be approved. Will the product be trucked or pipelined and to where? Is it likely that produced water disposal wells will be required during operations? State if the lease will be fenced. All equipment should be surrounded by an exclusion fence. Describe the proposed operating schedule. How often and during what seasons will the site be visited for product removal, inspection, service and/or maintenance. State if the well will be subject to seasonal shut-in.
13 IOGC IL March 2000 How to Prepare the Environmental Assessment Page 13 of 16 Application must be made to IOGC for approval to change the use of a lease, e.g., convert it to a battery or produced water disposal well. Additional environmental information will be required at this time General Health and safety Indian Oil and Gas Canada, the First Nation and the provincial authority must be notified immediately in the event of any health or environmentthreatening emergency or off-lease spills. On-lease spills greater than 1 m 3 must be reported to IOGC immediately. Lease environmental audit The lessee should be aware that a leasing condition requirement for the lessee on record at IOGC is to provide an independently conducted environmental lease audit to IOGC and the First Nation the year following lease approval and every five years thereafter (every three years for a battery) throughout the life of the lease Decommissioning and Reclamation Land reclamation on all Indian reserves will be subject to the Alberta C&R IL/95-3 (and revisions), Reclamation criteria for wellsites and associated facilities, as well as to First Nation and IOGC approval. Forested area reclamation may require trees to be replanted. Discuss this with the First Nation. Reclamation plans should be provided.
14 IOGC IL March 2000 How to Prepare the Environmental Assessment Page 14 of Flowlines, Pipelines and Linear Disturbances All flowlines or pipelines installations require application to IOGC for a right of way agreement. IOGC Environmental Policy (March 1997) states: A Conservation and Reclamation Plan (C&R Plan) will be required if the project criteria are equal to those required for an Alberta C&R Plan. The environmental assessment must address the following: Objective: state what is being transported. Pipeline rights-of-way must follow the access road and existing clearings as far as possible. Deviations from this will require justification. Water crossings: contact IOGC and the First Nation if a major water crossing is proposed. Hydrogen sulphide: if the pipeline will carry H 2 S, forward a copy of the relevant call-up page from the Emergency Response Plan to IOGC and the First Nation. Hydrostatic testing: state the source of test water. State the procedure and location for pipeline test water disposal. Transmission pipeline applications are the responsibility of Lands and Trust Services, Indian and Northern Affairs Canada at the regional office in the province of the proposed pipeline.
15 IOGC IL March 2000 How to Prepare the Environmental Assessment Page 15 of 16 SCOPE OF PROJECT - STANDARD CONSIDERATIONS Appendix A-1 The proponent is responsible for assessing the following, where applicable: Well Site objective: state the resource anticipated construction of the access road (including water crossings) and lease construction of temporary crew camp construction of a borrow pit construction of a remote sump installation and operation of a drilling rig collection of water for drilling operations disposal of drilling mud construction and operation of production facilities trenching and installation of pipelines truck transportation of product decommissioning and abandonment of facility remediation and reclamation of lease, access road, and pipeline right-of-way cumulative effects Seismic type of seismic equipment construction of temporary crew camp construction of access roads and linear clearings (including water crossings) shot hole drilling and dynamite installation operation of seismic equipment including source detonation shot hole abandonment reclamation of access roads and linear clearings cumulative effects Pipelines objective: product being transported construction of access roads and linear rights-of-way (including water crossings) stripping of soils, trenching and installation of pipe surface reclamation pipeline operation (including pressure testing and maintenance) decommissioning and abandonment of pipelines reclamation of access roads and pipeline rights-of-way cumulative effects Compressor construction of access roads (including water crossings) and lease construction of compressor facility (including leak collection system) trenching and installation of pipelines operation of compressor facility decommissioning and abandonment of facility and pipelines remediation and reclamation of access roads, lease and pipeline rights-of-way cumulative effects Oil Battery construction of access roads (including water crossings) and lease construction of oil battery facility construction of tank farm trenching and installation of pipelines operation of oil battery decommissioning and abandonment of facility and pipelines remediation and reclamation of access roads, lease and pipeline rights-of-way cumulative effects
16 IOGC IL March 2000 How to Prepare the Environmental Assessment Page 16 of 16 CUMULATIVE EFFECTS ASSESSMENT (CEA) Appendix A-2 In accordance with section 16 of the Canadian Environmental Assessment Act, cumulative effects must be addressed in every environmental assessment. The scope of the cumulative assessment should be relative to the degree of effects anticipated. Areas with high concentrations of development will require a more in-depth assessment. Sustainable Development is closely linked with cumulative environmental effect determination and is established as a fundamental objective of the federal environmental review process. Handling Uncertainty in predicting effects and determining significance can arise due to variations in natural systems, a lack of information, knowledge or scientific agreement regarding cause-effect relationships, or the inability of predictive models to accurately represent complex systems. The following guidelines should be followed when dealing with uncertainty: Make conservative conclusions (i.e., assume that an effect is more rather than less adverse) - Precautionary Principle; and Provide a record or audit trail of all assumptions, data gaps, and confidence in data quality and analysis to justify conclusions. KEY CRITERIA FOR AN ACCEPTABLE CEA The study area is large enough to allow the assessment of biophysical components that may be affected by the project. This may result in an area that is considerably larger than the project s footprint. Each biophysical component may have a different study area. As a standard consideration, assessment should be undertaken at an ecosection or ecosite (i.e., 1:50,000 to 1:20,000 scale) level. Airphoto interpretation and existing vegetation data bases should be used. As a guideline for spatial assessment, consider assessing effects in all immediately surrounding sections. Whether natural or human-induced, identify actions and/or developments that have occurred, or currently exist which may also affect those same biophysical components. Future actions that are approved within the study area must be considered. The incremental additive effects of the proposed project on the biophysical components are assessed. If the nature of the effect s interaction is more complex (e.g., synergistic) then assess the effect on that basis, or explain why that is not reasonable or possible. The total effect of the proposed project and other actions on the biophysical components are assessed. For analysis of effects use quantitative techniques (e.g., comparison of area of habitat within an area being lost versus total available within the spatial boundaries) based on the best available data. This should be enhanced by qualitative discussion based on the best professional judgement. Prediction of effects based on examination of precedent may be useful. Outline commitments to mitigation, monitoring and effects management (e.g., as part of the Environmental Protection Plan). These measures may be required at a regional scale to address broader concerns of effects on biophysical components. Implement mechanisms to evaluate the results of the monitoring and provide for subsequent mitigation or project modification, as necessary. The significance of residual effects are clearly stated and defended. Identification of the cumulative socio-economic impacts or benefits of the proposed project in association with existing developments.
17 August 2001 Addendum to IOGC IL How to Prepare the Environmental Assessment Page 1 ADDENDUM August 2001 IOGC staff process hundreds of surface applications each year. The time required to review and approve each application is as much of a concern to IOGC as it is to the applicants. Therefore, any information the environmental assessment authors can provide that will reduce ambiguities in the description of the project or the predicted impacts has the potential to reduce the IOGC review and approval time line. If a topic in the suggested Table of Contents is not relevant or there are not any data available, IOGC would prefer to see such a comment under that heading, rather than have the heading omitted, leaving the reviewer wondering whether the topic was overlooked. The Applicant shall ensure that, for each application, a copy of the environmental assessment and all relevant correspondence is provided to the First Nation Oil and Gas Representative. 1) Suggested Table of Contents and Report Outline for Environmental Assessments to be Reviewed by Indian Oil and Gas Canada for the Environmental Screenings Required Under the CEAA: Executive Summary Project Description Background -company name -project type (well site, pipeline, exploratory) -schedule -location -product expected Route / Site Selection and Consideration of Alternative Locations Proposed Construction Methods Operational Activities Environmental Overview (General and Site Specific) Surficial Geology, Landforms and Soils Hydrology (Surface Water and Groundwater - includes wetlands) Vegetation (including Species at Risk) Wildlife (including Species at Risk) and Wildlife Habitat Fish (including Species at Risk) and Fish Habitat Land Use Social and Traditional Concerns
18 August 2001 Addendum to IOGC IL How to Prepare the Environmental Assessment Page 2 -Social -Traditional Uses and Traditional Environmental Knowledge -Cultural and Archaeological -Noise -Recreation and Aesthetics -Public Consultation (summary of issues identified) Impacts and Mitigation Methodology Impact Assessment -Surficial Geology, Landforms and Soils -Hydrology (Surface Water and Groundwater) -Vegetation -Wildlife and Wildlife Habitat -Fish and Fish Habitat -Land Use -Social and Traditional Concerns (itemized as per overview) Mitigation (including implementation) Residual Impacts Interim and Final Reclamation Cumulative Environmental Effects Limitations (information unavailable at the time of the assessment) Conclusions References Appendices Map (1: scale) and/or Photomosaic (complete with reference date) Survey Plan Soils Data Site Photographs Record of Public Consultation forms List of Company / First Nation / IOGC / etc. contacts 2) Provided below is clarification of the requirements and expectations for specific sections. a) Application Procedures, Questions and Related Information: In mid year, 2000, the responsibilities of the separate Environmental Analyst and Surface Landman positions were combined into individual Environmental and
19 August 2001 Addendum to IOGC IL How to Prepare the Environmental Assessment Page 3 Surface Analyst positions. Each has responsibility for specific Reserves. Contact the IOGC Land Administrative Officer ( ) to determine which Environmental and Surface Analyst will be responsible for reviewing and processing your application. b) Appendix A, Section 3.0: Project Scope - Route/Site Selection Information provided on route/site selection should clearly describe the rationale for the chosen route/site. It is important to identify the alternatives that were considered and to demonstrate that biophysical and socio-economic components have been addressed, in addition to engineering constraints. It will be important to demonstrate that a more environmentally sound route/site was not practicable. It is particularly important that the route/site selection decision be based on current, on-the-ground conditions. Therefore the process should involve the assessment of recent, stereographic aerial photographs of the project area, combined with field reconnaissance (note: a photomosaic of the project area/reserve should be submitted with the environmental assessment). It is strongly recommended that siting decisions made in the field involve the environmental consultant and a representative of the First Nation, in addition to the proponent and the land surveyor. This approach will increase the probability that the project location is optimal from an environmental perspective and will reduce the likelihood of approval delays by IOGC. c) Appendix A, Section 4.2: Biophysical Conditions - Topography Paragraph 2 refers to a setback of the lease boundary relative to coulee breaks or steep slopes. This should read, Surface leases (including wellsites and access roads), pipeline rights-of-way and seismic lines shall be set back from coulee breaks, valley breaks or the top of any other steep slope a minimum of 50 m. This detail was inadvertently omitted from, and should be included in, Section 6.3 Flowlines, Pipelines and Linear Disturbances. d) Appendix A, Section 4.2: Biophysical Conditions - Soils Information provided on soil characteristics should include a general description of soils in the project area based on regional soil survey information, as well as more site-specific descriptions for well sites and pipeline corridors. The site-specific soil evaluation should be conducted prior to construction, by an individual capable of characterizing soils, to ensure proper soil handling and reclamation, as well as for effective spill and vegetation management. The evaluation effort should reflect the nature of any existing soils information for the project area, as well as the variability of the site. Sampling intensity should increase at locations with greater topographic variability. The evaluation should identify topsoil and upper subsoil depths, soil texture, structure, consistency, percent admixing (on arable lands - broken, cultivated or pasture), slope class and aspect, erosion potential, site drainage, site stability and any rooting restrictions
20 August 2001 Addendum to IOGC IL How to Prepare the Environmental Assessment Page 4 evident. Soil sampling locations and site characteristics should be clearly marked on a site map in the environmental assessment. Greater attention to soil conservation measures will be expected on arable lands, especially where problem soils are expected to be encountered (soils requiring special handling procedures during construction because they are salt-affected, contain sand or gravel layers, or contain bedrock). In the case of salt-affected soils, soil chemistry (e.g., electrical conductivity) will be required to determine appropriate soil conservation measures. e) Appendix A, Section 4.2: Biophysical Conditions - Surface Water and Wetlands Proponents should be aware of the potential implications of the Federal Policy on Wetland Conservation for their project. For guidance on addressing wetland issues in accordance with the policy, proponents are directed to the Wetlands Environmental Assessment Guideline. Both documents are available online at the Canadian Wildlife Service (CWS) website: f) Appendix A, Section 4.2: Biophysical Conditions - Vegetation Species at risk information can be obtained from the list developed by the Committee on the Status of Endangered Wildlife Species in Canada (COSEWIC) and from the biodiversity data centre of the relevant provincial government. A list of any potential species at risk and traditionally important species must be provided. The nature and extent of weed infestations on the project site should be documented. g) Appendix A, Section 4.2: Biophysical Conditions - Wildlife and Wildlife Habitat Traditional knowledge regarding wildlife and wildlife habitat must be documented. Contact the Band s representative and request they obtain the information from the Elders. Using the list developed by the Committee on the Status of Endangered Wildlife in Canada (COSEWIC), state if any species at risk utilize the area. This information is required to identify and assess the likely effects of a proposed project on species at risk in the project area. Updates to Environment Canada s Species at Risk website ( ) provide an improved means of predicting the presence of species at risk in the project area. The website offers a geo-referencing tool that will show any species at risk whose geographic distributions (ranges) fall within a specified spatial boundary. Information on the biology, population and distribution, habitat preferences, threats, protection, and recovery efforts of each species is also provided. Since documented ranges of wildlife species are rarely exact, proponents are advised to select spatial boundaries of varying sizes to ensure that
21 August 2001 Addendum to IOGC IL How to Prepare the Environmental Assessment Page 5 any species at the edge of its range in the project area will be recorded. The habitat preferences of each species listed should be cross-referenced to the habitats present in the project area to determine whether the species are likely to be affected by the project, and whether project relocation or other mitigation should be considered. This exercise should be included as part of the environmental assessment. Rationale is required if it is concluded that listed species are not affected by the project. In addition to the above, proponents are expected to be aware of, and incorporate into their project planning and implementation, provincial and federal government initiatives related to biodiversity conservation, whether they involve a wildlife refuge on adjacent, off-reserve lands, established environmental protection guidelines, etc. As an example, the CWS has produced a document entitled Development of Standardized Guidelines for Petroleum Activities that Affect COSEWIC Prairie and Northern Region Vertebrate Species at Risk. Phone the Environment Canada library, Prairie and Northern Region, in Edmonton at for information. The last sentence should read as follows: Compliance with the Migratory Birds Convention Act is required. For guidance on addressing migratory bird issues in an environmental assessment, proponents are directed to the Migratory Birds Environmental Assessment Guideline and Environmental Assessment Guideline for Forest Habitat of Migratory Birds. Both documents are available online at the CWS website: h) Appendix A, Section 4.2: Biophysical Conditions - Fish and Fish Habitat Proponents must ensure compliance with sections of The Fisheries Act relating to the protection of fish and fish habitat. As well, proponents should be familiar with specific policies and guidelines of the Department of Fisheries and Oceans (DFO) that apply to the activities being proposed. Such documents include Policy for the Management of Fish Habitat (1986) and Habitat Conservation and Protection Guidelines (1999). Both of these documents, and other relevant documents, are available on-line at the DFO website: i) Appendix A, Section 4.5: Public Consultation The Record of Public Consultation forms, filled out and signed by the interviewer who did the consultation, are required with the environmental assessment to substantiate that the intent of CEAA, in relation to adequate public consultation, has been met by the project proponent. A copy of the form is provided with this addendum for your convenience. j) Appendix A, Section 5.0: Environmental Impacts and Proposed Mitigation Environmental effects that extend to locations beyond the Reserve, resulting from on-reserve projects, must also be described.
Shell Quest Carbon Capture and Storage Project. Shell Canada Limited
SCREENING SCOPING DOCUMENT For the proposed Shell Quest Carbon Capture and Storage Project Shell Canada Limited Prepared by: Canadian Environmental Assessment Agency Natural Resources Canada Fisheries
More informationIndian Oil and Gas Canada
Indian Oil and Gas Canada Indian Oil and Gas Canada s Environmental Regulatory and Policy Changes Watertech 2013 ESSA Conference Banff Springs, April 10-13, 2013 Elaine Blais, BSc. P.Ag. Environment Team
More informationConservation and Reclamation INFORMATION LETTER. Environmental Protection Guidelines for Oil Production Sites - Revised January 2002
March 2002 Conservation and Reclamation INFORMATION LETTER C&R/IL/02-1 Environmental Protection Guidelines for Oil Production Sites - Revised January 2002 CHANGES TO THE INFORMATION LETTER This Information
More informationPreliminary Disclosure; Application for Approval; Operating Permits, Volume 2: Licences and Approvals; and Abandonment Approval and
Information required by EUB Guide G-23 1.0 GENERAL INFORMATION 1.1 INTRODUCTION The application should include: a brief project summary, objectives, approvals requested, technical and economic details,
More informationENVIRONMENTAL SCREENING REPORT
ENVIRONMENTAL SCREENING REPORT Pursuant to the Canadian Environmental Assessment Act (CEA Act) SCREENING SUMMARY TransCanada PipeLines Limited (TransCanada) is proposing to conduct a contaminant sampling
More informationEnvironmental Assessment Matrix
For FCC Use Only Date: Customer Name: Environmental Assessment Matrix Loan Number: Please complete each question. Some answers may require additional information. Attach additional documentation where
More informationCode of Practice for Exploration Operations
Code of Practice for Exploration Operations September 2005 Made under the Environmental Protection and Enhancement Act Published by Alberta Queen s Printer Alberta Queen s Printer Suite 700, Park Plaza
More informationComprehensive Study Scoping Document. for Lower Mattagami Hydroelectric Complex Redevelopment CEAR Reference Number:
Comprehensive Study Scoping Document for Lower Mattagami Hydroelectric Complex Redevelopment CEAR Reference Number: 07-03-26302 Prepared pursuant to Subsection 21(1) of the Canadian Environmental Assessment
More informationFebruary Reference Section in Supplemental. Reference Section in Consultants Reports. Reference Section in Application. TOR No.
Request i Final Terms of Environmental Impact Assessment Report for Coal Valley Resources Inc. (CVRI) Proposed Robb Trend Project Cross (Concordance) Table to Location in ii PURPOSE OF THE TERMS OF REFERENCE
More informationPROPOSED TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR CANADIAN NATURAL RESOURCES LIMITED HORIZON NORTH PIT EXTENSION PROJECT
PROPOSED TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR CANADIAN NATURAL RESOURCES LIMITED HORIZON NORTH PIT EXTENSION PROJECT Approximately 70 km North of Fort McMurray, Alberta ISSUED
More informationENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass
ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County, NS NOVA SCOTIA DEPARTMENT OF THE ENVIRONMENT
More informationTABLE OF CONTENTS. Page
TABLE OF CONTENTS Page 1 PROJECT INTRODUCTION... 1-1 1.1 PROJECT BACKGROUND... 1-2 1.2 PROJECT PROPONENT... 1-2 1.3 PROJECT OVERVIEW... 1-3 1.4 PROJECT REGULATORY APPROVAL PROCESS... 1-4 1.4.1 Existing
More informationGUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK
PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK Guide to the
More informationSemCAMS Area Project Description
REGULATORY The Redwillow Pipeline Project involves crossing a provincial boundary, and therefore, approval for it will require the preparation of an application to the NEB. plans to proceed with the regulatory
More informationSiting an Upstream Oil and Gas Site in an Environmentally Sensitive Area on Private Land
Siting an Upstream Oil and Gas Site in an Environmentally Sensitive Area on Private Land Guidance for Private Land September 2003 R&R/03-2 As a result of revisions to Alberta Energy and Utilities Board
More informationEAP Supplement Instructions
SRD/ Instructions for Completing Supplements under the Enhanced Approvals Process Purpose: These instructions are intended to provide assistance and clarification in the completion of EAP Supplement forms;
More informationSpecies at Risk Act Policies and Guideline Series
Species at Risk Act Policies and Guideline Series Addressing Species at Risk Act Considerations Under the Canadian Environmental Assessment Act for Species Under the Responsibility of the Minister responsible
More informationBERGER PEAT MOSS LIMITED
BERGER PEAT MOSS LIMITED Terms of Reference for the Big River Peat Harvest Project Submitted to: Ministry of Environment Environmental Assessment and Stewardship Branch 3211 Albert Street, 4th Floor Regina,
More informationEnvironmental Review Process. Presented by Environment and Natural Resource Unit, Lands and Economic Development, BC Region
Environmental Review Process Presented by Environment and Natural Resource Unit, Lands and Economic Development, BC Region Outline 1. Overview of the Canadian Environmental Assessment Act (CEAA) 2. Indigenous
More informationGeophysical Guidelines for the Muskwa-Kechika Management Area
Geophysical Guidelines for the Muskwa-Kechika Management Area May 18, 2004 TABLE OF CONTENTS TABLE OF CONTENTS...i OIL AND GAS COMMISSION...1 1.0 PURPOSE OF THE GUIDELINE...3 2.0 ADAPTIVE MANAGEMENT /
More informationRECLAMATION PLAN FOR. (name of Mine) MINING OPERATION
RECLAMATION PLAN FOR (name of Mine) MINING OPERATION Note: This prototype, developed by the State Mining and Geology Board (Board), is intended to assist smaller-scale mine operators in environmentally
More informationBattle Lake Watershed Development Planning Pilot Project. Report of the Multistakeholder Pilot Project Team
Battle Lake Watershed Development Planning Pilot Project Report of the Multistakeholder Pilot Project Team BATTLE LAKE WATERSHED DEVELOPMENT PLANNING PILOT PROJECT Background Battle Lake is located in
More informationScoping Document for the Environmental Assessment Statoil Waverley 3D Seismic Survey Exploration Licenses 2435 and 2436
Scoping Document for the Environmental Assessment Statoil Waverley 3D Seismic Survey Exploration Licenses 2435 and 2436 September 1, 2017 Page 1 This page is intentionally left blank Table of Contents
More informationCOMPREHENSIVE STUDY REPORT BRUCE HEAVY WATER PLANT DECOMMISSIONING PROJECT
COMPREHENSIVE STUDY REPORT BRUCE HEAVY WATER PLANT DECOMMISSIONING PROJECT Prepared by: Canadian Nuclear Safety Commission March 2003 TABLE OF CONTENTS page 1.0 INTRODUCTION.. 1 2.0 BACKGROUND 1 2.1 Project.
More informationAppendix E : Guidelines for Riparian Buffer Areas
Appendix E : Guidelines for Riparian Buffer Areas This document should be read in conjunction with the CRCA Planning Policy. 1.0 PURPOSE The purpose of this document is to summarize the recommendations
More informationBACKGROUND INFORMATION. for the INITIAL FEDERAL PUBLIC COMMENT PERIOD. on the
BACKGROUND INFORMATION for the INITIAL FEDERAL PUBLIC COMMENT PERIOD on the Comprehensive Study pursuant to the Canadian Environmental Assessment Act of the Ajax Mine Project Kamloops, British Columbia
More informationSantoy 8 Satellite Mine at the Seabee Gold Mine. Technical Review Comments. on the. Environmental Impact Statement.
Environmental Impact Assessment Technical Review Comments on the Environmental Impact Statement as submitted by Claude Resources Inc. Saskatchewan Ministry of Environment December, 2009 1. INTRODUCTION
More informationGeneric Guidelines for the Preparation of an Environmental Impact Statement. pursuant to the Canadian Environmental Assessment Act, 2012
Generic Guidelines for the Preparation of an Environmental Impact Statement pursuant to the Canadian Environmental Assessment Act, 2012 May 2016 Canadian Nuclear Safety Commission (CNSC) 2016 PWGSC catalogue
More informationTechnical Guidance for Assessing Cumulative Environmental Effects under the Canadian Environmental Assessment Act, 2012
Technical Guidance for Assessing Cumulative Environmental Effects under the Canadian Environmental Assessment Act, 2012 Canadian Environmental Assessment Agency December 2014 DRAFT This page has been left
More informationChapter 4. Airport Authority Governance, Statutes and Policies
Chapter 4 Airport Authority Governance, Statutes and Policies Table of Contents 4. Airport Authority Governance, Statutes and Policies... 4-1 4.1 The Federal Government and Airport Authorities... 4-1 4.2
More informationGENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN AND AROUND WATERBODIES AND ON WATERBODY BANKS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 182 APRIL 2017 GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN AND AROUND WATERBODIES AND ON WATERBODY BANKS TABLE OF CONTENTS
More informationEnvironmental Protection and Enhancement Act Guide to Content for Industrial Approval Applications
Environmental Protection and Enhancement Act Guide to Content for Industrial Approval Applications June 2, 2014 Environmental Protection and Enhancement Act Guide to Content for Industrial Approval Applications
More informationEnvironmental Impact Statement for the Slave Falls Tramway Conversion Project
Environmental Impact Statement for the Slave Falls Tramway Conversion Project Prepared for Submitted by 41844.101 March 2008 ENVIRONMENTAL IMPACT STATEMENT FOR THE SLAVE FALLS TRAMWAY CONVERSION PROJECT
More informationUNDERGROUND UTILITY CROSSING (TRENCHLESS) General Submission Requirements
COMPLETE APPLICATION CHECKLIST Jan 2016 UNDERGROUND UTILITY CROSSING (TRENCHLESS) The following checklist has been compiled to assist the applicant in preparing their application for approval pursuant
More informationReview of the Fisheries Act 23 DECEMBER 2016 PREPARED BY: THE CANADIAN ENERGY PIPELINE ASSOCIATION
Review of the Fisheries Act 23 DECEMBER 2016 PREPARED BY: THE CANADIAN ENERGY PIPELINE ASSOCIATION 1 Contents Introduction 3 Delegation to the NEB 3 Assessments and regulatory guidance 4 Provincial requirements
More informationGuidelines for the Closure and Reclamation of Advanced Mineral Exploration and Mine Sites in the Northwest Territories
DRAFT Guidelines for the Closure and Reclamation of Advanced Mineral Exploration and Mine Sites in the Northwest Territories Preface... 5 Introduction... 7 Purpose... 7 Authority... 7 How These Guidelines
More informationTERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR CANADIAN NATURAL RESOURCES LIMITED S PROPOSED HORIZON NORTH PIT EXTENSION PROJECT
TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR CANADIAN NATURAL RESOURCES LIMITED S PROPOSED HORIZON NORTH PIT EXTENSION PROJECT Approximately 70 km North of Fort McMurray, Alberta ISSUED
More informationLNG Canada Development Inc.
LNG Canada Development Inc. Shell Centre 32 nd Floor 400 4 th Avenue SW PO Box 100, Station M Calgary AB T2P 2H5 Canada Submitted electronically to: compliance.conformite@ceaa-acee.gc.ca April 20, 2016
More informationDraft. Environmental Assessment Guidelines (including the Scope of the Environmental Assessment)
Draft the Scope of the Environmental Assessment) March 2012 Page left intentionally blank I II Page left intentionally blank III TABLE OF CONTENTS 1 INTRODUCTION... 1 1.1 PROJECT BACKGROUND... 1 1.2 APPLICATION
More informationGUIDE TO THE CODE OF PRACTICE FOR WATERCOURSE CROSSINGS, INCLUDING GUIDELINES FOR COMPLYING WITH THE CODE OF PRACTICE
GUIDE TO THE CODE OF PRACTICE FOR WATERCOURSE CROSSINGS, INCLUDING GUIDELINES FOR COMPLYING WITH THE CODE OF PRACTICE May 2000 Revised April 2001 TABLE OF CONTENTS Page 1. Introduction 3 2. Topics in the
More informationScoping Document for the Environmental Assessment. BP Exploration (Canada) Ltd. Tangier 3D Seismic Survey
Scoping Document for the Environmental Assessment BP Exploration (Canada) Ltd. Tangier 3D Seismic Survey Exploration Licenses 2431, 2432, 2433, and 2434 August 2013 Contents 1.0 Purpose... 2 2.0 Regulatory
More informationAddressing Purpose of and Alternative Means under the Canadian Environmental Assessment Act, 2012
Addressing Purpose of and Alternative Means under the Canadian Environmental Assessment Act, 2012 March 2015 i Disclaimer The Operational Policy Statement: Addressing Purpose of and Alternative Means under
More informationTerms of Reference. As Required by the Environment Act For Preparation of an Environmental Assessment Report
The public is invited to submit comments on this draft Terms of Reference until : Comments should be submitted to : January 21, 2008 Environmental Assessment Branch Nova Scotia Environment and Labour PO
More informationJuly 23, 2014 EAB File #: Transaction #: Brad Hannan Ministry of Highways and Infrastructure 1630 Park Street REGINA SK S4N 2G1
Ministry of Environment Environmental Assessment Branch 4 th floor, 3211 Albert Street Regina, Saskatchewan S4S 5W6 Phone: (306) 787-6132 Fax: (306) 787-0930 July 23, 2014 EAB File #: 2014-013 Transaction
More informationTABLE OF CONTENTS 5.0 FOREST MANAGEMENT PLANNING...
TABLE OF CONTENTS 5.0 FOREST MANAGEMENT PLANNING... 1 5.1 Planning Framework... 1 5.1.1 Sustainable Forest Management Planning... 1 5.1.2 Five-Year Operating Plan... 1 5.1.3 Annual Operating Plans... 3
More informationNORTHWEST TERRITORIES WATER BOARD
NORTHWEST TERRITORIES WATER BOARD WATER LICENCE APPLICATION QUESTIONNAIRE FOR OIL AND GAS EXPLORATION: DRILLING Prepared by Department of Indian Affairs and Northern Development Water Resources Division
More informationmethods consist of: activities of The physical the Project surveying; stockpiling; grading; piling and turbine delivery; distribution line; operation
3.0 SCOPE OF THE ASSESSMENT The following section provides the scope of the Project and its assessment as well as the used for the environmental assessment. methods 3.1 Scope of the Project and Assessment
More informationHydrology and Watershed Management
Hydrology and Watershed Management The summaries and their associated interpretations contained in this document are for general information only, not legal advice. To interpret or apply the law, you must
More informationPROJECTS ON FEDERAL LANDS. Making a determination under section 67 of the Canadian Environmental Assessment Act, 2012
PROJECTS ON FEDERAL LANDS Making a determination under section 67 of the Canadian Environmental Assessment Act, 2012 December 2014 Disclaimer: The approach in this guide is presented as an option and is
More informationNetwork utilities, subject to compliance with Part 6 (Infrastructure) A.3 Existing vegetation cover.
5.3.2. Rural Zone 5.3.2.1. Permitted Activities 5.3.2.1.1. Residential, recreational, agricultural, exotic forestry or tourist related activities which comply with the standards for permitted activities
More informationREASONS FOR DECISION MINISTERIAL APPROVAL PURSUANT TO SECTION 15(1)(a) THE ENVIRONMENTAL ASSESSMENT ACT
REASONS FOR DECISION MINISTERIAL APPROVAL PURSUANT TO SECTION 15(1)(a) THE ENVIRONMENTAL ASSESSMENT ACT SASKATCHEWAN WATER CORPORATION BUFFALO POUND NON-POTABLE WATER SUPPLY SYSTEM EXPANSION PROJECT Introduction
More informationGuide to Content for Energy Project Applications
Environmental Protection and Enhancement Act Guide to Content for Energy Project Applications March 29, 2014 Table of Contents Introduction... 3 General Instructions... 7 Part 1: New Plants and Facilities...
More informationENVIRONMENTAL AND SOCIO-ECONOMIC EFFECTS ASSESSMENT
ENVIRONMENTAL AND SOCIO-ECONOMIC EFFECTS ASSESSMENT TABLE OF CONTENTS Page 6.0 ENVIRONMENTAL AND SOCIO-ECONOMIC EFFECTS ASSESSMENT... 6-1 6.1 Methodology... 6-1 6.1.1 Spatial and Temporal Boundaries...
More informationAlberta Wetland Assessment and Impact Report Directive
Alberta Wetland Assessment and Impact Report Directive June 2017 Title: Number: Program Name: Water Policy Branch Effective Date: June 1, 2015 This document was updated on: Disclaimer: June 1, 2017 This
More informationPROPOSED TERMS OF REFERENCE ENVIRONMENTAL ASSESSMENT REPORT FOR THE PROPOSED QUEST CARBON CAPTURE AND STORAGE PROJECT
PROPOSED TERMS OF REFERENCE ENVIRONMENTAL ASSESSMENT REPORT FOR THE PROPOSED QUEST CARBON CAPTURE AND STORAGE PROJECT ISSUED BY: Shell Canada Limited DATE: August 6, 2010 Executive Summary Executive Summary
More informationThe Halifax Harbour Solutions Project Provision of Sewage Treatment
The Halifax Harbour Solutions Project Provision of Sewage Treatment ENVIRONMENTAL SCREENING PURSUANT TO THE CANADIAN ENVIRONMENTAL ASSESSMENT ACT Prepared by Halifax Regional Municipality June, 2000 Revised
More informationEnvironment and Sustainable Resource Development. Supplement Instructions Enhanced Approval Process (EAP)
Environment and Sustainable Resource Development Supplement Instructions Enhanced Approval Process (EAP) December 1, 2013 Instructions for Completing Supplements under the Enhanced Approvals Process Purpose:
More informationCity of Mississauga Environmental Impact Studies Terms of Reference 2002
City of Mississauga Environmental Impact Studies Terms of Reference 2002 1.0 INTRODUCTION To ensure in so far as possible, both private and public developments are consistent with Natural Heritage and
More informationFinal Environmental Assessment Guidelines (including the Scope of the Environmental Assessment)
Final Environmental Assessment Guidelines (including the Scope of the Environmental Assessment) July 2012 RDIMS: 7401089 Page left intentionally blank I RDIMS: 7401089 II RDIMS: 7401089 Page left intentionally
More information6.0 ENVIRONMENTAL AND SOCIO-ECONOMIC EFFECTS ASSESSMENT
6.0 ENVIRONMENTAL AND SOCIO-ECONOMIC EFFECTS ASSESSMENT The description of the environmental and socio-economic setting, and current state of the environment within the Project area (Section 5.0), are
More informationKEEYASK TRANSMISSION PROJECT EA REPORT APPENDIX C VALUED ENVIRONMENTAL COMPONENTS
APPENDIX C VALUED ENVIRONMENTAL COMPONENTS C.1. VALUED ENVIRONMENTAL COMPONENTS Valued environmental components (VECs) are defined as fundamental elements of the physical, biological or socio-economic
More informationavailable in multiple formats Environmental Self-Assessment Handbook for Rail Infrastructure Projects
available in multiple formats Environmental Self-Assessment Handbook for Rail Infrastructure Projects This document and other Canadian Transportation Agency publications are available on our Web site at
More informationAudit of Forest Planning and Practices
Audit of Forest Planning and Practices TimberWest Forest Corporation Tree Farm Licence 47 FPB/ARC/174 February 2015 Table of Contents Audit Results...1 Background...1 Audit Approach and Scope...2 Planning
More informationPROPOSED TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR VALUE CREATION INC. S PROPOSED ADVANCED TRISTAR PROJECT
PROPOSED TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR VALUE CREATION INC. S PROPOSED ADVANCED TRISTAR PROJECT Approximately 10 km to the Proposed Plant Site from Fort McMurray, Alberta
More informationSubstation Developments Environmental Guidelines Checklist for Applicants
Substation Developments Environmental Guidelines Checklist for Applicants Effective date: February 1, 2016 These guidelines are intended to be used in conjunction with the flowchart in Figure 1 which conceptually
More informationAppendix 4. Soil Management Plan
Appendix 4 Soil Management Plan Soil Management Plan This Soil Management Plan (SMP) has been developed for the Giscome Quarry and Lime Plant Project. The SMP is a living document and will be updated as
More informationHIGHWAY 905 ALL WEATHER ROADWAY STONY RAPIDS TO LAKE ATHABASCA NEAR FOND DU LAC
PROJECT-SPECIFIC GUIDELINES FOR THE PREPARATION OF AN ENVIRONMENTAL IMPACT STATEMENT AND CANADIAN ENVIRONMENTAL ASSESSMENT ACT COMPREHENSIVE STUDY SCOPING DOCUMENT HIGHWAY 905 ALL WEATHER ROADWAY STONY
More informationPapua New Guinea LNG Project. Environmental and Social Management Plan Appendix 11: Reinstatement Management Plan PGGP-EH-SPENV
Esso Highlands Limited Papua New Guinea LNG Project Environmental and Social Management Plan Appendix 11: PGGP-EH-SPENV-000018-013 LNG Project Page 2 of 13 CONTENTS 1.0 Objectives... 3 2.0 Legal and Other
More informationLNG Canada submitted a formal update as per Condition 11.2 of the CEAA Decision Statement on June 30, 2017:
LNG Canada Development Inc. Shell Centre 32 nd Floor 400 4 th Avenue SW PO Box 100, Station M Calgary AB T2P 2H5 Canada Submitted electronically to: compliance.conformite@ceaa-acee.gc.ca July 4, 2018 Canadian
More informationPteragen Canada Inc.
Decision 2013-171 May 7, 2013 The Alberta Utilities Commission Decision 2013-171: Application No. 1608907 Proceeding ID No. 2181 May 7, 2013 Published by The Alberta Utilities Commission Fifth Avenue Place,
More informationAlberta Transportation. Environmental Protection Plan for the Planning and Construction of Water and Transportation Projects
Alberta Transportation Environmental Protection Plan for the Planning and Construction of Water and Transportation Projects January 9, 2009 INFTRA Table of Contents Page Table of Contents... i 1.0 INTRODUCTION...1
More informationAlberta Transportation The City of Edmonton The City of Calgary
Alberta Transportation The City of Edmonton The City of Calgary PUBLISHING INFORMATION TITLE: PREPARED BY: DOCUMENT HOLDER: Environmental Construction Operations (ECO) Plan Framework Instructions for
More informationApproval and Permitting Requirements Document for Renewable Energy Projects
Approval and Permitting Requirements Document for Renewable Energy Projects Ministry of Natural Resources September 2009 Approval and Permitting Requirements Document for Renewable Energy Projects Ontario
More informationReclamation Manual Design Data Collection Guidelines Chapter 5 Typical Design Data Package Template
Reclamation Manual The Introduction (Chapter 1) for these design data collection guidelines contains additional information concerning: preparing a design data collection request, design data collection
More informationNorthern Frontier Northern Homeland
Northern Frontier Northern Homeland THE REPORT OF THE MACKENZIE VALLEY PIPELINE INQUIRY Volume Two Terms and Conditions Mr. Justice THOMAS R. BERGER ii NORTHERN FRONTIER, NORTHERN HOMELAND - Mackenzie
More informationAlberta Electric System Operator Yeo 2015S Substation Needs Identification Document
Decision 3476-D01-2015 Alberta Electric System Operator Yeo 2015S Substation Needs Identification Document ATCO Electric Ltd. Yeo Substation Project Facility Application February 18, 2015 Alberta Utilities
More informationPeatland Restoration. Environment and Sustainable Resource Development
Peatland Restoration Environment and Sustainable Resource Development Why Peatland Criteria? Equivalent Capability Carbon Sequestration Water Storage Reservoir Filter Precipitation as it recharges the
More informationROVER PIPELINE LLC. Rover Pipeline Project HORIZONTAL DIRECTIONAL DRILL CONTINGENCY PLAN
ROVER PIPELINE LLC Rover Pipeline Project HORIZONTAL DIRECTIONAL DRILL CONTINGENCY PLAN February 2015 Section TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 PLANNED HDD CROSSINGS... 1 3.0 MONITORING PROCEDURES...
More informationEnvironmental Assessment Approval. Alton Natural Gas Storage Project
Approval Approval Date: Original Dated December 18, 2007 Alton Natural Gas Storage Project Alton Natural Gas Storage LP, Proponent Colchester County, Nova Scotia Alton Natural Gas Storage (the Undertaking
More informationEnvironmental Setting
Trans Mountain is seeking approval for a Certificate of Public Convenience and Necessity (CPCN) from the National Energy Board (NEB) for a $5.4 billion expansion of its oil pipeline system from Strathcona
More informationForest Recreation Management
Forest Recreation Management 1 Forest Recreation Management Introduction...3 CONTENTS The Benefits of Guidelines...3 Considerations...4 Planning...5 Construction of Recreation Areas...6 Protecting Cultural
More informationOctober 2, 2015 EAB File #: Transaction #:
Ministry of Environment Environmental Assessment Branch 4 th floor, 3211 Albert Street Regina, Saskatchewan S4S 5W6 Phone: 306.787 5971 Fax: 306 787 0930 October 2, 2015 EAB File #: 2015-013 Transaction
More informationALBERTA TRANSPORTATION TERMS OF REFERENCE
ALBERTA TRANSPORTATION TERMS OF REFERENCE FOR ENVIRONMENTAL EVALUATION June 2011 Page 1 SCOPE OF ASSESSMENT The TERMS OF REFERENCE FOR ENVIRONMENTAL EVALUATION are to be utilized for those projects that
More informationEnvironmental Information Worksheet
Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project
More informationDoig River First Nation ~56 Rose Prairie, B.C. VOC 2HO Ph: (250) 82'7-3'7'76 Fax: (250) 82'7-3'7'78
Doig River First Nation ~56 Rose Prairie, B.C. VOC 2HO Ph: (250) 82'7-3'7'76 Fax: (250) 82'7-3'7'78 November 16, 2015 Shauna Sigurdson, Regional Director, Prairie and Northern Region Canadian Environmental
More information14. Sustainable Forestry Principals
14. Sustainable Forestry Principals Fish River Lakes Concept Plan Addendum Materials April 2018 14. SUSTAINABLE FORESTRY PRINCIPLES In response to our discussion with LUPC Staff and others on the topic
More informationJeremy s Construction Ltd.
Jeremy s Construction Ltd. Environmental Assessment Registration Document Proposed Doyles Quarry Extension Submitted by: Jeremy s Construction Limited P.O. Box 137 Doyles, NL A0N 1J0 March 2017 Table of
More informationScoping Document. for the. Strategic Environmental Assessment. for Exploration Activities. on the Southwestern Scotian Slope
Scoping Document for the Strategic Environmental Assessment for Exploration Activities on the Southwestern Scotian Slope Canada-Nova Scotia Offshore Petroleum Board July 2011 Table of Contents 1.0 Introduction...
More informationBIPOLE III TRANSMISSION PROJECT: A MAJOR RELIABILITY IMPROVEMENT INITIATIVE ENVIRONMENTAL ASSESSMENT SCOPING DOCUMENT
BIPOLE III TRANSMISSION PROJECT: A MAJOR RELIABILITY IMPROVEMENT INITIATIVE ENVIRONMENTAL ASSESSMENT SCOPING DOCUMENT Submitted by: Manitoba Hydro Transmission Licensing and Environmental Assessment Department
More informationDEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF MINING AND RECLAMATION. Coal Refuse Disposal - Site Selection
DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF MINING AND RECLAMATION DOCUMENT NUMBER: 563-2113-660 TITLE: Coal Refuse Disposal - Site Selection EFFECTIVE DATE: February 8, 1999 AUTHORITY: The Coal Refuse
More informationTABLE OF CONTENTS TABLE OF FIGURES TABLE OF TABLES 2. REGULATORY PROCESS Impact Assessment Process Permits and Licences...2.
TABLE OF CONTENTS PAGE 2. REGULATORY PROCESS...2.1 2.1 Impact Assessment Process...2.1 2.1.1 Mackenzie Valley Resource Management Act... 2.1 2.1.2 Taltson Expansion Project and Impact Assessment Process...
More informationMay 8, 2017 EASB File #: Transaction #:
Ministry of Environment Environmental Assessment and Stewardship Branch 4 th floor, 3211 Albert Street Regina, Saskatchewan S4S 5W6 Phone: (306) 787-6132 Fax: (306) 787-0930 May 8, 2017 EASB File #: 2016-022
More informationOperational Policy Statement
Operational Policy Statement Determining Whether a Designated Project is Likely to Cause Significant Adverse Environmental Effects under the Canadian Environmental Assessment Act, 2012 November 2015 i
More informationSite C Clean Energy Project. Monthly Environmental Monitoring Summary Report - February 2017
Site C Clean Energy Project Monthly Environmental Monitoring Summary Report - February 2017 Prepared by BC Hydro Submitted May 8, 2017 Page 1 of 17 Table of Contents Introduction... 4 Project Progress...
More informationSunEEarth Alberta Solar Development Inc.
Decision 22422-D01-2017 Yellow Lake Solar Project September 26, 2017 Alberta Utilities Commission Decision 22422-D01-2017 Yellow Lake Solar Project Proceeding 22422 Application 22422-A001 September 26,
More informationROVER PIPELINE LLC. Rover Pipeline Project HORIZONTAL DIRECTIONAL DRILL CONTINGENCY PLAN
ROVER PIPELINE LLC Rover Pipeline Project HORIZONTAL DIRECTIONAL DRILL CONTINGENCY PLAN April 2015 Section TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 PLANNED HDD CROSSINGS... 1 3.0 MONITORING PROCEDURES...
More informationCFB SUFFIELD NATIONAL WILDLIFE AREA SHALLOW GAS INFILL DEVELOPMENT PROJECT PROJECT DESCRIPTION
CFB SUFFIELD NATIONAL WILDLIFE AREA SHALLOW GAS INFILL DEVELOPMENT PROJECT PROJECT DESCRIPTION NOVEMBER 1, 2005 TABLE OF CONTENTS 1.0 INTRODUCTION... 1 1.1 PROJECT OVERVIEW... 1 1.1.1 Purpose of the Project...
More informationELECTRICAL TRANSMISSION LINES & SUBSTATIONS
TERMS OF REFERENCE ELECTRICAL TRANSMISSION LINES & SUBSTATIONS Notes for NEPA for Generic Terms of Reference This generic Terms of Reference (TOR) is applicable to development projects involving the construction
More informationTERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR KOCH OIL SANDS OPERATING ULC PROPOSED DUNKIRK IN SITU PROJECT
TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR KOCH OIL SANDS OPERATING ULC PROPOSED DUNKIRK IN SITU PROJECT Approximately 76 km from Fort McMurray, Alberta and Approximately 111 km Northeast
More informationCarpinteria Valley Water District Carpinteria Advanced Purification Project
NOTICE OF PREPARATION AND SCOPING MEETING Carpinteria Valley Water District Carpinteria Advanced Purification Project TO: Agencies, Organizations, and Interested Parties DATE: January 7, 2019 SUBJECT:
More information