SUTTON ESTATE, CHELSEA ENVIRONMENTAL STATEMENT JULY 2015 Volume I - Non-Technical Summary

Size: px
Start display at page:

Download "SUTTON ESTATE, CHELSEA ENVIRONMENTAL STATEMENT JULY 2015 Volume I - Non-Technical Summary"

Transcription

1 SUTTON ESTATE, CHELSEA ENVIRONMENTAL STATEMENT JULY 2015 Volume I -

2 Environmental Statement Volume 1 Sutton Estate, Chelsea Project no: KU Document title: Environmental Statement Volume 1 - Revision: Final Date: July 2015 Client name: Affinity Sutton Homes Project manager: Hannah Greene Author: Hannah Greene Jacobs U.K. Limited 160 Dundee Street Edinburgh EH11 1DQ United Kingdom T +44 (0) F +44 (0) Copyright 2015 Jacobs U.K. Limited. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This report has been prepared on behalf of, and for the exclusive use of Jacobs Client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this report by any third party. Document history and status Revision Date Description By Review Approved Final July 2015 Final version for issue H. Greene E. Bergin P. Marsden

3 Environmental Statement Sutton Estate Environmental Statement - Volume 1: Non Technical Summary Table of Contents 1. Introduction... 1 The Application... 1 The Environmental Impact Assessment Process Consultation Existing Site Context Key Features of the Proposed Development... 5 Key features... 5 Phasing of the Proposed Development Alternatives and Design Evolution Environmental Impacts and Mitigation Air Quality Noise and Vibration Water Resources Ecology Socio-economics Geology and Soils Built Heritage Archaeology Townscape and Visual Traffic, Transport and Access Waste Cumulative effects Next steps Page i

4 1. Introduction The Application Affinity Sutton Homes (ASH, the Applicant ) proposes to redevelop part of the Sutton Estate in order to provide for its long-term regeneration The Estate is located between Fulham Road (shown as green below) and King s Road (shown as red in the figure below), in the Royal Borough of Kensington and Chelsea (RBKC) The location of the site is shown in the Plate 1.1 below. Plate 1.1 : Site location The current layout of the Estate is shown in Plate 1.2 below. The planning application relates to land within the red line boundary, whilst the blue line boundary indicates property owned by Affinity Sutton Homes which does not form part of the application. Page 1

5 Plate 1.2 : Existing block arrangement The Environmental Impact Assessment Process Environmental Statement The Proposed Development has been assessed under the Town and Country Planning (Environmental Impact Assessment) Regulations 2011, as amended by the Town and Country Planning (Environmental Impact Assessment) (Amendment) Regulations These are referred to as the EIA Regulations in the rest of this document The Environmental Statement is a report of the findings of the Environmental Impact Assessment (EIA) process. The Environmental Statement assesses and reports upon the likely significant effects of the Proposed Development and how they can be mitigated This document provides a non-technical summary of the Environmental Statement (ES) prepared for the Proposed Development. The Environmental Statement has been produced in line with policy and legislation relating to planning and the environment The EIA process has been undertaken for the Applicant, Affinity Sutton Homes by Jacobs. Page 2

6 1.2.5 The ES is part of the planning application for the Proposed Development. It is prepared in four volumes as follows: Volume I Non-technical summary (this document); Volume II - Environmental Statement: Main text; Volume III - Environmental Statement: Figures; and Volume IV - Environmental Statement: Annexes and Supporting Documents Full details of all likely significant effects identified can therefore be found within Volumes II to IV of the Environmental Statement, along with information on all mitigation proposals. Volumes II to IV of the ES also provide details of the policy and legislative context relevant to the application, baseline conditions of the site and surrounding area, stakeholder consultation, and the assessment methodology used. Scoping Scoping is the process by which applicants set out what the Environmental Statement will cover in terms of topics and issues, and how it will be undertaken in terms of approach. A scoping report is submitted by the applicant to the local authority and stakeholders for their scoping opinion A scoping report for the Proposed Development was submitted to Kensington and Chelsea Borough Council ( the Council ) for consideration in September A scoping opinion was provided by the Council in October As details of the Proposed Development evolved, an addendum to the scoping report was submitted to the Council in July 2014 after which the Council requested additional supporting studies. This ES has been produced in line with Council recommendations Topics scoped out of the assessment in agreement with the Council were: light spillage, solar glare, microclimate and electronic interference. These topics were scoped out as they were considered unlikely to give rise to significant environmental effects and it is not anticipated that these will cause different environmental impacts than those from the existing development. 2. Consultation Consultation is an important aspect of the EIA process. Views of consultees help to focus technical studies and to identify specific issues which require further assessment Consultees involved in the EIA process have included the following: Kensington and Chelsea Borough Council; English Heritage; Natural England; Environment Agency; and Greater London Archaeological Advisory Service These consultees and others have been involved beyond the EIA process in terms of the wider evolution of development proposals. These include Affinity Sutton Homes tenants, local resident groups, the Greater London Authority and Transport for London Affinity Sutton Homes held two rounds of consultation events, in June 2014 and January 2015, to present the proposals and gather feedback from tenants and the wider public. Page 3

7 2.1.5 In addition to having a dedicated Resident Liaison Manager who holds regular drop in sessions and who is contactable every week day, other engagement activities and communication channels with tenants have included: A dedicated webpage set up to provide details on the Proposed Development; A regular newsletter ( Chelsea Chat ) providing information to the existing tenants about the proposals, including updates on progress and activities; Tenant-only consultation sessions to provide information about the project and gather feedback on areas of concern; Regular, ongoing coffee sessions hosted by Affinity Sutton Homes to encourage open discussion about the Proposed Development. The aim of these is to encourage those who do not usually engage to come and discuss the proposals with the Affinity Sutton Homes Resident Liaison Manager; The Sutton Estate Redevelopment Steering Group, elected by the tenants, which meets monthly and helps to oversee the Proposed Development on behalf of the existing tenants; Posters located around the Estate providing project updates and reminders of consultation events; Site visits to other estates redeveloped by Affinity Sutton Homes; A dedicated project address, telephone number and Freepost address set up to enable tenants to communicate with Affinity Sutton Homes Details of consultation activities are provided in the Statement of Community Engagement, which is submitted as part of the planning application Consultation with statutory consultees and local residents will be ongoing throughout the demolition and construction of the Proposed Development. 3. Existing Site Context The site of the Proposed Development is bounded by Marlborough Street to the north, Ixworth Place to the west, Cale Street to the south and Elystan Street to the east. The site is located in the Stanley Ward within the administrative boundaries of the Royal Borough of Kensington and Chelsea. The area within the redline boundary is 1.5ha The Sutton Estate currently comprises 462 affordable rented dwellings, contained within 15 five-storey buildings. Two of these blocks are occupied by the Estate s older tenants. The application boundary incorporates all the existing residential units on the Estate with the exception of two residential blocks which have commercial use at ground floor, in the south east corner of the Estate, known as Leverstock House (Block L) and Maylands House (Block M). The blocks included as part of the application are therefore Blocks A, B, C, D, E, F, G, H, I, J, K, N and O The exterior of a typical accommodation block is shown in Plate 1.3 below. Page 4

8 Plate 1.3 : Typical accommodation block on the existing Sutton Estate The site was developed in 1913 by the William Sutton Housing Trust to supply low cost housing to residents in Chelsea The majority of the Sutton Estate provides social housing for Affinity Sutton Homes tenants. The decanting of Affinity Sutton Homes tenants in Blocks A-D commenced twelve years ago and was concluded in As flats became void in Blocks A-D, Affinity Sutton Homes offered units to RBKC for the provision of licenced temporary accommodation for homeless households on the Housing Register. These units are managed by SMART on behalf of RBKC. No private accommodation is currently allocated on the site. 4. Key Features of the Proposed Development Key features The Proposed Development comprises: Demolition of the existing 383 residential dwellings in Blocks A-K and N-O; Construction of 343 new residential dwellings, comprising 237 affordable (social rented) dwellings and 106 private sale residential dwellings; Construction of a basement which will include car and motorcycle parking, storage areas, an energy centre, and plant areas including water tank room and pump room; Provision of a community centre; Provision of new retail floor space and workspace units; Landscaping, including screen planting, ornamental planting and rolled turf; and Construction of a new link road between Cale Street and Marlborough Street Block L (Leverstock House) and Block M (Maylands House), are owned by Affinity Sutton Homes and comprise 79 affordable residential dwellings, but lie outside the red line boundary. It is intended to undertake some improvement works for these two retained buildings, but this will be subject to a separate planning application. Page 5

9 4.1.3 A summary of the accommodation on the proposed site is provided in Table 1.1. The total red line boundary covers approximately 1.5 hectares. Table 1.1 : Summary of accommodation provision in the Proposed Development (NIA) Tenure Affordable Private Overall Number of units Phase 1 Phase 2 Phase 3 TOTAL Phase 2 Phase 4 TOTAL Totals 1-bedroom bedroom bedroom bedroom Totals % of overall (by tenure) 57% 30% 13% 100% 71% 29% 100% In terms of design, the masterplan looks to reshape the existing Estate. It aims to improve routes and create better open space, whilst still retaining a sense of community, and incorporating heritage features from the current blocks. The layout proposed is less linear than the existing one, and creates street frontages, connectivity, and improves access to daylight. The layout of the new development will also provide a significant improvement from a personal safety perspective. The redeveloped Estate will include communal areas that are not accessible to the public. There will also be defined routeways through the Estate which are overlooked to provide passive surveillance and add to the sense of security on the Estate In terms of scale and height, the existing buildings comprise five storeys plus mansard roof, chimneys and lift overruns (circa 18.7m). These would be replaced with six storey blocks (ground floor plus five upper storeys) up to 20.3m, with some duplexes below extending to lower ground floor level An artist s impression of the completed development is shown in Plate 1.4 below. Plate 1.4 : Artist s impression of the courtyard from the south Page 6

10 Phasing of the Proposed Development Demolition and construction work is anticipated to commence in spring 2016 and will last for approximately seven years The indicative construction programme in Plate 1.5 shows the sequence of phases, and the likely relative duration of each phase. Plate 1.5 : Indicative construction programme Demolition and construction of the Proposed Development will be carried out in four phases to minimise disruption to existing tenants. The phasing of the Proposed Development is described in Table 1.2 and shown in Figure 1.3 in the Environmental Statement. The phasing has been carefully considered such that all existing tenants will be required to move once during the construction period; from their current home into a new home on the redevelopment. The decanting of Affinity Sutton tenants in Blocks A-D was concluded in Tenants that lived in Blocks A-D have been moved into void properties on the existing Estate or have elected to move off site. Some tenants have elected to move off the Estate. Table 4.2 : Phasing of the Proposed Development Phase Activities Location of activities Tenant decant Timing Phase 1 Demolition of Blocks A to D North and west of Blocks A-D will be vacant Start Demolition of the Estate Office Construction of new residential buildings, referred to as Cores 1 to 7 in Block One which includes 136 affordable social rent units the site, on Marlborough Street and Ixworth Place. prior to construction. The SMART tenants are in the process of being found alternative accommodation and this process is being managed by RBKC. Residents in Blocks E, F, G, H, I, N and O (partially) move into in Phase 1 Spring 2016 Finish Autumn 2017 Page 7

11 Phase Activities Location of activities Tenant decant Timing Phase 2 Phase 2 will be divided into Phase 2 and 2a Tenants in existing Blocks Start three overlapping sub-phases is located in the J and K will move into the Winter (2, 2a and 2b). southwest of the units constructed as part of 2018 Phase 2 Construction of Cores 8-12 in Block One which includes 75 private sale site on Cale Street Phase 2b is Phase 2B while tenants in the existing Block O will move to units constructed in Phase 2A. Finish Autumn 2020 units located in the Phase 2a Construction of Core 13 in Block One which includes north of the site on Marlborough Street 15 affordable social rent units Phase 2b Construction of Cores 14 and 15 in Block Three which includes 55 affordable social rent units Phase 3 Demolition of Blocks O and Centre of the site Tenants in the remaining Start J and partial demolition of section of Block K will be Autumn Block K. decanted into the new 2020 Construction of Core 16 in units. Block Three, which includes 31 affordable social rented units and the new community centre. Tenants that have previously moved off-site but have registered an interest in returning to the Finish early 2022 new development, and those tenants who were originally decanted from Blocks A-D will be eligible for one of the new units. At the end of Phase 3 all tenants will have moved into their new home. Phase 4 Demolition of the remainder Southeast of the The Phase 4 units will be Start in of Block K site on Cale for private market sale. early Construction of new residential buildings comprising of Core 20 of Block Two which includes 31 units for private sale with retail use at ground Street, near the sunken garden, and adjacent to Block L, which will be retained 2022 Finish early 2023 floor and two workspace units; and the 9 mews houses which are referred to as Cores Blocks 18 and 19 on plan. (Note that there is no Core 17). Page 8

12 5. Alternatives and Design Evolution Currently, the residential dwellings located within Blocks A-D do not and cannot meet the minimum living standards under the Department of Communities and Local Government s (DCLG) Decent Homes Standards and the Greater London Authority s (GLA) space standards. The Proposed Development is aimed at meeting these standards to allow the dwellings to be lived in on a permanent basis A number of alternative options for the site have been considered. These are set out in the Development Appraisal that forms part of the planning application. Several options were considered to redevelop the site to meet the DCLG Decent Home Standards and GLA space standards. The options included: Option 1 do nothing; Option 2a refurbishment of Blocks A-D; Option 2b remodelling Blocks A-D; Option 2c lateral extension; Option 2d vertical extension; Option 2e new development on the site of Blocks A-D; and Option 3 redevelopment of the Estate (excluding Blocks L & M) (Partial Redevelopment) As described above, the do nothing scenario, Option 1, was not acceptable since ASH is under legal obligation to provide appropriate accommodation for all their tenants and is required to ensure that all tenants are housed in accommodation which meets the appropriate standards. RBKC confirmed in 2009 that the do nothing scenario was not acceptable as it would mean that tenants remained in unfit premises that do not meet Decent Homes Standards The options were considered against the main objective of reproviding all existing affordable housing tenants with a new home which met Decent Homes Standards and the GLA s space standards. Where possible Affinity Sutton Homes has, within all options, sought to maximise the amount of affordable floorspace. Technical and financial viability was also considered A quantitative appraisal of each option comprised assessment against: a number of objective measures which form part of the Mayor s Design Standards; accessibility criteria; and sustainability and environmental performance criteria. Option 3 yielded the highest score under the sustainability and environmental performance criteria (which are of particular relevance to the EIA), and also yielded the greatest overall score Option 3 was the only option considered to meet technical and financial objectives and is therefore the most viable solution for the Sutton Estate. It is therefore the option that the Applicant and RBKC agreed should be progressed and which forms the basis of this planning application. The key reasons for the selection of this option is that it is the only option that is viable from both a technical and financial perspective; it maximises cross-subsidy from the private sale dwellings; it provides the best solution for the existing tenants, creating a balanced community; and the new development meets all current design and sustainability standards and criteria The design of this option has evolved and has been informed by consultation with the Council, stakeholders and the public. Consultation has covered matters such as floorspace, unit numbers, design, massing, layout, highway matters, landscaping, lighting and public realm The mix of units provided was determined in line with a Housing Needs Assessment undertaken by the Applicant. Page 9

13 6. Environmental Impacts and Mitigation Air Quality Chapter 5: Air Quality of the ES presents an assessment of potential impacts on air quality. The likely significant effects resulting from the demolition of existing buildings and construction and operation of the Proposed Development are assessed in accordance with the relevant and accepted guidance The assessment comprises a number of sections: namely construction and demolition dust; suitability of the site; impact of the development on local air quality; and emissions. These are summarised separately, and overall conclusions are presented. Principal air pollutants of concern from a human health perspective are nitrogen dioxide and particulate matter An appraisal of the of the potential dust levels associated with demolition and construction (including emissions from construction transport) shows that, although dust is likely to occur from site activities through demolition and construction, this can be reduced to Low risk through the application of appropriate mitigation measures. Providing the mitigation measures are in place and appropriately managed, it is unlikely that unacceptable dust impacts would occur to adjacent receptors during the construction stage, and therefore there a negligible effect is predicted An assessment of the suitability of the site for the type of development proposed shows that the predicted concentrations of nitrogen dioxide at some locations within the Proposed Development are above the Air Quality Objective (AQO), due to the high background concentration. However the largest change in annual mean nitrogen dioxide at any sensitive receptor from the combined emissions of road traffic and energy centre emissions leads to a small insignificant change in ambient concentration. Particulate matter concentrations as a result of the development are expected to be within the relevant AQOs for all modelled receptors The impact of the development on local air quality during its operation was assessed by considering the contributions from traffic and from the energy centre. This demonstrates that the forecast concentrations of nitrogen dioxide exceed the AQO at all of the assessed locations, due to the background concentration already being above the AQO. For particulate matter, the forecast concentrations are expected to be insignificant. The increases in nitrogen dioxide concentration due to emissions from the proposed energy centre are considered negligible During its operation the Proposed Development will result in negligible increases of annual emissions of nitrogen dioxide due to traffic. However, to lessen any such impact, the Proposed Development will include facilities for electric cars and bicycles to promote sustainable transport options. The development is located close to major public transport routes and is a 700m walk distance from South Kensington Underground Station The proposed energy centre is likely to lead to approximately 1,321kg of nitrogen dioxide being emitted per year. The proposed energy centre will contain highly efficient units burning natural gas and has been selected to minimise emissions from the Proposed Development. The use of natural gas as a fuel leads to lower emissions of this pollutant compared to alternative fuels, such as biofuels and biomass. The energy centre will house a catalytic converter to further reduce and minimise emissions. The selected boilers are very low emitters, and the flues have been combined to aid in the dispersion of the pollutants. Flues will terminate 3m above the roof level. Page 10

14 6.1.8 An overall assessment of the significance of the air quality impacts of the Proposed Development in relation to emissions of nitrogen dioxide and particulate matter has been made in line with the London Council Air Quality and Planning Guidance (Revised 2007). The guidance states that the conclusion as to the overall significance of the air quality impacts should be based on professional judgement, based on specified factors, and the basis for making this judgement should be set out clearly. On this basis it is concluded that the overall impact due to the Proposed Development is not significant. The increase in nitrogen dioxide as a result of the Proposed Development is negligible and the development will introduce a relatively low number of people to an area where air quality is above the air quality objective for nitrogen dioxide. It is therefore considered that the Proposed Development is acceptable from an air quality perspective The residual likely effects relating to the air quality are therefore considered not significant. Noise and Vibration Chapter 6: Noise and Vibration of the ES presents the assessment undertaken to determine the potential noise and vibration effects of the Proposed Development, including consideration of the suitability of the development in terms of both existing and future noise and vibration exposure In respect of construction the assessment considers noise and vibration impacts of proposed demolition and construction activities (including construction traffic) on existing noise sensitive receptors in the area, for example existing dwellings and public open spaces In respect of operation the assessment comprises the following components: Constraints of the existing noise environment for residential development; The potential noise impact of the equipment to be installed as part of the development known as fixed plant (such as chillers, the energy centre and extraction fans) on nearby existing sensitive receptors; The potential noise impact of fixed plant on sensitive receptors associated with the development, for example residents of the newly-constructed development; and The potential noise and vibration impacts due to additional road traffic resulting from introduction of the development The assessment is informed by noise modelling based on a representative sample of receptors, manufacturers data on noise-emitting plant, qualitative methods and, where appropriate, professional judgement The assessment concludes that there is the potential for significant adverse noise and vibration effects during construction. These effects will be minimised by the use of appropriate mitigation measures such as use of low noise emission plant where possible and programming works so that the requirement for working outside normal working hours is minimised Noise and vibration limits are expected to be agreed with the Council, and via Section 61 agreements which enable a developer to apply for Prior Consent for construction works within agreed limits. Applications for such consent are made to the Local Authority and contain a method statement of the works and the steps to be taken to minimise noise which provide the prior consent During operation, with appropriate selection of glazing, mechanical ventilation and plant (including the proposed mitigation measures), acceptable internal and external noise levels are achievable within the Proposed Development. The site is therefore considered suitable for residential development. Page 11

15 6.2.8 For the operation of the Proposed Development, no significant adverse effects are predicted. Whilst exact details of the mechanical services strategy and the associated type of plant for certain parts of the development have yet to be specified, from the information presently available it is considered that the noise output from such plant would be relatively minor and relatively easy to mitigate. Water Resources Chapter 7: Water Resources of the ES presents an assessment of the potential effects of the Proposed Development on surface water, groundwater and hydrogeology, with a focus on quality and quantity of water affected. Impacts on flood risk patterns are also considered A search area of 500m from the site boundary was used to inform the assessment of water resources, although where a hydrological connection renders it necessary, locations outside of the 500m area are considered Currently, the site is covered in around 90 percent impermeable surfaces (buildings and other hard surfaces such as concrete paving) There are no waterbodies on or next to the site. The nearest waterbody is the River Thames, located 800m south of the site boundary. The River Thames is heavily modified and has moderate ecological potential. The culverted River Westbourne (also known as the Ranelagh sewer) is located about 430m to the east of the site boundary and functions as a sewer. Groundwater is located under the site between 3.5m and 5.5m below ground level The site is located entirely within Flood Zone 1, which has a low flood risk A Flood Risk Assessment has been prepared and forms part of the ES. This indicates that with the implementation of the drainage design, which incorporates water storage/control measures (attenuation), and other mitigation measures, there will be no significant flood risk to the site. There will also be no increase in flood risk to the surrounding land The design of the Proposed Development has reduced the potential effects on water resources. This includes the incorporation of sustainable drainage techniques to reduce runoff, raising the ground floor level and basement entrance to prevent flooding, and staged construction of the basement While the site has low sensitivity in terms of water resources, in the absence of mitigation, there is potential for significant impacts during construction from concrete, oils, petrol and other pollutants to both the groundwater and the sewer network near the site All but two potential impacts during construction of the Proposed Development are minor or negligible. Those with moderate and therefore of likely significant impact are: 1) spillages and leakages of oil, fuel and other potentially polluting substances which could migrate into soil and groundwater, and 2) spillages and leakages of concrete at high ph water contaminated by contact with cementitous material which could impact groundwater or surface water systems Good practice construction measures (for example locating topsoil storage and waste disposal facilities away from drainage features and open pits) and the use of simple pollution control methods (for example the use of a wheel wash for vehicles at the site exit) will reduce the impacts of the Proposed Development on the water environment to non-significant levels All potential impacts during operation, and the associated likely impact significance, are minor or negligible. These would be mitigated by measures included in the drainage design such as oil interceptors for the parking area. Page 12

16 The residual likely effects relating to the water environment are therefore considered not significant. Ecology Chapter 8: Ecology of the ES presents an assessment of the potential effect of the Proposed Development on the ecology of the site and surrounding area The assessment is based on a desktop review of available information, and field surveys comprising a Phase 1 Habitat Survey and bat activity surveys A search area of 2km from the site boundary was used to inform the existing baseline with species records and designated nature conservation sites The site mainly consists of buildings and paved areas. Vegetation on the site is limited to ornamental trees and shrubs which are located throughout the site with a cluster around the Estate Office. Fauna of note on the site is considered to be limited to bats and nesting birds, both of which present less than local value. The site has low ecological value for wildlife and is limited in its ability to support biodiversity No part of the site is designated for ecological interest. The nearest designation to the site is the River Thames and Tidal Tributaries Site of Importance to Nature Conservation (non-statutory designation) located 0.85km to the south of the Proposed Development. The Battersea Park Nature Area Local Nature Reserve (statutory designation) is located about 1.7km southeast of the site Significant effects on surrounding ecological designations during construction and operation are unlikely. This is because of the distance of the site from any designations, the absence of any ecological links (e.g. hydrological or habitat links) to designated sites and the low ecological value of the intervening habitats Mitigation in the form of nest checks will be required to avoid impacts and/or to avoid contravening legislation protecting breeding birds during site clearance Bat surveys found the site to have low or negligible suitability to support roosting bats, and to provide low value bat foraging habitat. It is possible however that bats could establish roosts prior to demolition. Further bat surveys will be carried out in 2015 to confirm the absence of bats and avoid contravening legislation The plant species Cotoneaster was recorded amongst introduced shrub within the garden of the Estate Office, which is classified as invasive species. Under legislation it is an offence to allow invasive plants to spread onto adjacent land, or to plant or encourage the spread of invasive plants outside of your property (in this case, the site). Mitigation in the form of good working practices is recommended to prevent spread of this species Landscaping is proposed as part of the construction phase of the Proposed Development that will enhance the ecology of the site. This will include the planting of native species, the use of green/brown roofs and creation of wildlife areas, including bird and bat boxes. These benefits are considered non-significant The residual likely effects relating to ecology are therefore considered not significant. Socio-economics Chapter 9: Socio-economics of the ES presents an assessment of the likely significant socio-economic effects associated with the Proposed Development A Health Impact Assessment and Equality Impact Assessment were also carried out in relation to the Proposed Development. These two assessments are not summarised in this but are submitted as part of the ES. Page 13

17 6.5.3 The socio-economics assessment focused on four themes: 1) employment opportunities and business activity, 2) social infrastructure, 3) the supply and quality of affordable and market housing, and 4) community cohesion. The study area for the assessment varies for each theme, ranging from the application site itself to Greater London Local reports, internet sites such as National Statistics and 2011 census data were used to establish the baseline on current conditions. Data were obtained from Affinity Sutton Homes for 403 Affinity Sutton Homes tenants living on the site, and from RBKC for 60 SMART households living in temporary accommodation in Blocks A-D The proportion of older people living on the Sutton Estate (over 65) is higher than that in Kensington and Chelsea Borough as a whole, and than in London. Conversely, there is a high proportion of young people (5-15 years) within the population of the SMART accommodation The site is located within an urban area and as such there is an established social infrastructure surrounding the site, including educational, open space, community and health facilities. The only amenity space on the site is known as the sunken garden ; this has been fenced off at the request of the tenants due to anti-social behaviour Affinity Sutton Homes own 28 retail units on the Estate which are all currently let to retail tenants. These retail units are at street level in Blocks L and M. The ward in which the Estate lies has a higher proportion of people in full time employment than the London and national averages and unemployment is lower than the average in Kensington & Chelsea, London and England Housing quality is an issue for the Sutton Estate. Block A-D (159 existing flats) of the Sutton Estate do not and cannot meet Decent Homes Standards and have been declared "not fit for purpose". They cannot be legally used as social rented housing on a permanent basis as they no longer meet today s standards in terms of liveability, management, sustainability, permeability and visual quality. As at January 2015, when the Housing Needs Assessment was frozen for the purpose of the planning application, there were 69 SMART households in Blocks A-D The redevelopment of the Estate has the primary aim of improving the quality of housing for all existing Affinity Sutton Homes tenants. Design and operational features of the proposals relevant to the socio-economic assessment include: 1) the proposed quantity and split of affordable (social rented) and private market sale housing, 2) the provision of replacement communal open space (significantly exceeding that currently provided), 3) a new tenant-led community centre, 4) flexible retail space and 5) flexible employment space Demolition and construction of the Proposed Development will generate increased economic activity through capital and revenue expenditure as well as job creation, both directly and indirectly There will be negligible impacts on local businesses as there are no temporary bus diversions or temporary road closures required. Good practice measures during demolition and construction will help avoid any impacts for example on shoppers There will be a negligible effect on social infrastructure during construction as demand for facilities such as schools and health services will remain at a similar level During the construction period the demand for social infrastructure is unlikely to change, as the population of the Estate will remain at a similar level to that immediately prior to construction works commencing, as existing ASH residents will all remain on the Estate. Impacts on social infrastructure will therefore be negligible. Page 14

18 The quantity, mix, and design of the affordable housing proposed is based on meeting the specific needs of the existing ASH tenants, all of whom will remain on the Estate. The primary purpose is to meet the housing need of the existing tenants, however there may be a small surplus (of 9 social rented units) which will contribute towards the wider annual need for 4,800 affordable housing units in the borough. The scheme will therefore have a minor beneficial effect on the number of currently available affordable housing units in the borough While the loss of approximately 69 SMART dwellings in Blocks A-D will reduce the stock of this type of temporary accommodation available to the Borough, it is acknowledged that these flats are made available for this use on a voluntary basis and so could be withdrawn at any time. Nevertheless, in terms of scale the 69 units which have been used for this purpose represent about 3% of the total number of households in temporary accommodation within RBKC. As such this is considered to be a minor adverse impact on the supply of temporary accommodation in RBKC, and therefore not significant The Estate has a sunken garden which provides the only amenity space for tenants. This facility has been fenced off, at the request of the tenants for a number of years due to anti-social behaviour. As the sunken garden is only removed in Phase 4, and all tenants will be in their new homes at the end of Phase 3, there will be no loss of amenity space within the Estate during the construction period There is an existing lounge area on site. This area will continue to be accessible to the tenants of these blocks until it is demolished as part of Phase 4. By this time the new Community Centre in Phase 3 will have been completed and will be available for use by all tenants of the Estate. Therefore there is no net loss of internal or external communal space within the Estate during the period of construction, resulting in a negligible effect on community cohesion During operation, the Proposed Development will generate a number of beneficial effects The proposed scheme will include flexible retail space and flexible employment space which is envisaged could be used as design space/artist studios. The increased permanent resident population is likely to increase spending at local shops around Chelsea Green. These economic impacts would have a minor and therefore non-significant beneficial effect on the local economy Operation of the Proposed Development is unlikely to significantly impact existing social infrastructure, including surrounding schools and health facilities. All social rented units to be developed on the Estate will accommodate existing tenants, and therefore there will be no additional demand for school places arising from these 237 units. The only potentially additional demand for school places will be from the proposed 106 new units for private sale. Calculations have been undertaken and it is estimated that there will 3.3 new pupils of primary school age and 0.59 pupils of secondary age. In the context of the anticipated increase in demand in pupils seeking places in the borough by 2023, the redevelopment is considered to have a negligible impact on demand for educational facilities which is not significant. Similarly, there will be no additional demand placed on healthcare provision from the redevelopment of the site and is considered to be negligible and not significant The private housing will generate additional demand on child play space of 100sqm. This minor adverse effect would be reduced to negligible through the payment of the Community Infrastructure Level charge which also goes towards health, education and other social infrastructure The Proposed Development would improve the standard of accommodation for existing tenants. The 237 replacement social rented units will significantly improve the standard of accommodation for those existing tenants who will occupy all the new affordable dwellings. This is considered to be a major beneficial and therefore significant beneficial effect on the wellbeing of the current tenants. Page 15

19 Furthermore the 106 proposed dwellings for private sale will make a considerable contribution towards RBKC s housing target of 750 dwellings per annum, making best use of brownfield urban land in one of the most highly accessible parts of London. This will provide a moderate beneficial and therefore significant beneficial effect on housing supply in the borough A number of design features of the development will lead to improved community cohesion once the development is complete. This includes a new Community Centre, new community square and shared secure courtyards and a more open environment which is less oppressive and intimidating. In combination these design features are likely to generate a moderate beneficial and therefore significant beneficial effect on community cohesion The cumulative impact assessment found a moderate and therefore significant cumulative beneficial impact on the provision of affordable housing, and a major cumulative and therefore significant cumulative beneficial impact on the provision of market housing within RBKC A major significant cumulative beneficial impact will result from employment growth (both direct and indirect) which will arise from the construction activity associated with these developments Mitigation to be applied in respect of the adverse socio-economic impacts identified will comprise payment of Community Infrastructure Levy (CIL) charge towards health, education and other social infrastructure, addressing the impacts on demand for social infrastructure In addition, to enhance potentially positive socio-economic impacts of the scheme, the Applicant will contribute towards training for construction skills to facilitate employment opportunities for local people. This commitment will be made through a Section 106 agreement Whilst the mitigation measures above will help improve the scheme, the residual impacts are considered to be unchanged. In summary, there will be no residual adverse significant effects from the scheme. Geology and Soils Chapter 10: Geology and Soils of the ES presents an assessment of the potential effects of the Proposed Development on the geology and soils of the site and surrounding area The assessment is based on a desktop review of available information on the current condition of soils and groundwater of the site, as well as information obtained from the Council and results of intrusive investigations commissioned by Affinity Sutton Homes The geology of the site includes Kempton Park Gravels over London Clay. Groundwater flows to the south of the site, toward the River Thames. The groundwater supports local water supply and is important as a source of water to flow to the River Thames Sensitive receptors include existing and future occupants of the site, construction workers, buildings and infrastructure and environmental receptors, such as groundwater Potential sources of contamination have been identified from historical, current and proposed land uses. The site has been used for residential purposes since Up to three air raid/bomb shelters are known to be present at the site. Prior to 1830 the site was used for agricultural purposes. Page 16

20 6.6.6 Intrusive investigations targeted the potential sources of contamination, and found that lead is present in the shallow made ground. A potential risk to health and damage to buildings were identified as potential risks in the absence of mitigation as a result of soil gases, which are also present in the made ground. The potential for the accumulation of soil gas on site will be mitigated by removal of the ground at one particular location Potential impacts for both the demolition/construction phase and the completed development were identified. A measure of risk was determined for each, taking into consideration the likelihood of occurrence and the significance of effect (which is a reflection of receptor sensitivity and the magnitude of impact). Where the risk of significant impact is assessed to be moderate or greater, mitigation or management has been recommended where possible, to reduce the level of risk Measures would be put in place prior to excavation to reduce the risks of construction workers and surrounding residents and businesses being exposed to elevated lead soil. This would include, for example, the use of personal protective equipment, and the wetting of soil surfaces in dry conditions Other potential impacts during demolition and construction include accidental oil and fuel spills, exposure to asbestos, and runoff of water containing contaminants through excavation and piling. Mitigation measures proposed in respect of these impacts includes: implementation of pollution prevention guidance; implementation of safe fuel storage; undertaking piling works in accordance with Environment Agency and CL:AIRE guidance which is designed to protect groundwater during piling and ensure appropriate waste procedures are followed Impacts for the completed development were identified as impacts on human health and on buried structures and services from contaminated material within the shallow soils. Impacts on the former would be reduced by implementation of a remedial strategy, including installation of a cover layer in those areas of the development that will not be covered by buildings or hardstanding. Impacts on the latter would be mitigated through adoption of appropriate construction methods and materials Following mitigation, all impacts related to demolition and construction will be reduced to moderate/minor or lower risk levels. All of the impacts identified in relation to the completed development will be reduced to down to moderate/minor levels or lower post-mitigation The residual likely effects relating to geology and soils are therefore considered not significant. Built Heritage Chapter 11: Built Heritage of the ES presents an assessment of the likely effect on built heritage receptors, including their setting A study area of 250m was used to identify built heritage receptors that may be affected. Professional judgement was been used to scope out those built heritage receptors that will not be affected by the Proposed Development The design of the Proposed Development is important to minimising effects on built heritage during operation. Effects have been minimised through consultation and visual analysis, layout, height and massing, and appearance and materials. The design of the new blocks is sympathetic to the surrounding area The existing Sutton Estate is a non-designated heritage asset. However, the blocks have some historic value as they are an early example of social housing, but with limited architectural interest. Thirteen of fifteen blocks within the Estate will be demolished. This has been assessed as a moderate adverse during construction and therefore a significant adverse effect. Page 17

21 6.7.5 Before demolition, historic building recording will be carried out to mitigate the loss of the blocks identified as being part of the Sutton Estate. Nevertheless, the residual effect will remain significant The Proposed Development will see the retention of existing Blocks L and M and new development on the remainder of the site. There will be beneficial effects associated with the retention of Blocks L and M to the built heritage of the area, through the provision of new landscaped areas and high quality urban design. Given the extent of change from demolition, however, the operational effects on the Sutton Estate are also considered according to a reasonable worst case approach moderate and therefore significant adverse. National planning policy requires a balanced judgement of the scale of any harm or loss and the heritage value (in this case, a non-designated asset) versus public benefits In addition to the Estate itself, other built heritage assets were considered in terms of whether they would be positively or adversely affected. Most assets were found to experience nil to minor adverse effects during construction, and therefore nonsignificant effects. These included St Luke s Church (Grade I), St Luke s Registered Park and Garden (Grade II), and Chelsea Conservation Area. This is because of their relative distance from the site, the alignment of roads and/or viewing points, and the nature of the existing setting and/or the nature of their architectural and/or historic interest During operation, most of these same assets will experience non-significant minor beneficial to nil effects. The Proposed Development will lead to minor beneficial improvements in the setting (and therefore heritage value) of the following built heritage receptors during operation: St Luke s Church; (even) Sydney Street; and Chelsea Conservation Area. Archaeology Chapter 12: Archaeology of the ES presents an assessment of the potential impacts of the Proposed Development on archaeological remains A desktop analysis of archaeology was carried out for the site itself as well as archaeological features located within 100m ( inner study area ) and 500m ( outer study area ) from the site boundary Before the Sutton Estate was constructed, the area consisted of farmland forming part of Chelsea Common and was subsequently occupied by some residential properties, a post office and a distillery. It is likely that the physical evidence of these earlier landuses was removed through the construction of the Sutton Estate in However, there is the potential for two archaeological assets to be located within the footprint of the Proposed Development site. The first is three underground air raid shelters constructed during the First World War. Because this type of asset is well understood the significance of this impact has been assessed as slight The second archaeological asset to be located within the footprint of the Proposed Development site is Marlborough Place, a 19 th century development of residential properties around a triangular garden square. Again, the significance of this impact has been assessed as slight Twenty nine other archaeological assets are located within 500m of the site boundary. These archaeological assets mainly include public spaces, parks and roads. These are unlikely to be affected by the Proposed Development Four listed buildings are located within 100m of the site boundary. It is unlikely that these include archaeological remains that extend beyond the asset footprints and therefore no physical impact is predicted During operation, after recording any archaeological remains identified during construction of the Proposed Development, and publication of the results, no operation phase effects on archaeological remains are anticipated. Page 18

Longbridge Town Centre Planning Application

Longbridge Town Centre Planning Application Longbridge Town Centre Planning Application Non-Technical Summary of the Environmental Statement January 2011 Introduction An application for Planning Permission has been submitted to Birmingham City Council

More information

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton Viridor Waste Management Proposed Development of an In-Vessel Composting Facility Land at Exide Batteries, Salford Road, Bolton Non-Technical Summary January 2009 Introduction Viridor Waste Management

More information

New U.S. Embassy, Nine Elms Lane ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY

New U.S. Embassy, Nine Elms Lane ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY 1. Introduction The Government of the United States of America (specifically the Unites States Department of State - hereafter referred to as the Applicant ) is seeking to build a new Embassy in London

More information

Land to the South of Old Mill Road, Sandbach Environmental Impact Assessment Environmental Statement: Non-Technical Summary

Land to the South of Old Mill Road, Sandbach Environmental Impact Assessment Environmental Statement: Non-Technical Summary Environmental Impact Assessment Report prepared by: Ecus Ltd. Brook Holt 3 Blackburn Road Sheffield S61 2DW 0114 266 9292 September 2013 Page Left Intentionally Blank 2 INTRODUCTION This Non Technical

More information

Earls Court. Reserved Matters Application Royal Borough of Kensington & Chelsea. Development Specification December 2013

Earls Court. Reserved Matters Application Royal Borough of Kensington & Chelsea. Development Specification December 2013 Earls Court Reserved Matters Application Royal Borough of Kensington & Chelsea Development Specification December 2013 Prepared for EC Properties Ltd by DP9 EARLS COURT DEVELOPMENT SPECIFICATION Prepared

More information

PROPOSED MIXED USE DEVELOPMENT

PROPOSED MIXED USE DEVELOPMENT J Routledge & Sons PROPOSED MIXED USE DEVELOPMENT Land at Tanhouse Lane, Widnes Environmental Statement: Non-Technical Summary Planning Application: 05/00057/OUTEIA Tanhouse Lane Environmental Statement

More information

Squire and Partners. Homebase Site 195 Warwick Road, London W14. Non Technical Summary WSP Environment and Energy. On Behalf of St Edward Homes Ltd

Squire and Partners. Homebase Site 195 Warwick Road, London W14. Non Technical Summary WSP Environment and Energy. On Behalf of St Edward Homes Ltd Squire and Partners Homebase Site 195 Warwick Road, London W14 Non Technical Summary WSP Environment and Energy On Behalf of Ltd July 2010 QM Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks

More information

Environmental Statement Non-Technical Summary Rectory Farm, Hounslow

Environmental Statement Non-Technical Summary Rectory Farm, Hounslow Environmental Statement Non-Technical Summary Rectory Farm, Hounslow Introduction This document is the Non-Technical Summary (NTS) of the Environmental Statement (ES) for a proposed development at the

More information

2 ENVIRONMENTAL IMPACT ASSESSMENT

2 ENVIRONMENTAL IMPACT ASSESSMENT 2 ENVIRONMENTAL IMPACT ASSESSMENT Introduction 2.1 Environmental Impact Assessment (EIA) is required for certain categories of projects and involves a process of drawing together, in a systematic way,

More information

CONCLUSIONS 14 CONTENTS

CONCLUSIONS 14 CONTENTS CONTENTS Introduction... 14-1 Traffic... 14-1 Air Quality... 14-1 Noise and Vibration... 14-2 Geology and Hydrology... 14-2 Landscape and Visual... 14-3 Ecology... 14-4 Cultural Heritage... 14-4 Population

More information

4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT

4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT 4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT 4.1 INTRODUCTION This section describes the broad principles of the methodology adopted for the EIA of the Proposed Development. EIA is a procedure required

More information

Crossrail. Environmental Statement. Volume 9c. Appendices. Westbourne Park Bus Garage Extension. Volume 2 Appendices

Crossrail. Environmental Statement. Volume 9c. Appendices. Westbourne Park Bus Garage Extension. Volume 2 Appendices Crossrail Environmental Statement Volume 9c Appendices Westbourne Park Bus Garage Extension Environmental Statement Volume 2 Appendices 9c If you would like information about Crossrail in your language,

More information

Environmental Statement Non Technical Summary. Anthony s Way Frindsbury June creative minds safe hands

Environmental Statement Non Technical Summary. Anthony s Way Frindsbury June creative minds safe hands Environmental Statement Non Technical Summary Anthony s Way Frindsbury June 2010 www.wyg.com creative minds safe hands Contents Section A Introduction Part 1 Background Part 2 Environmental Assessment

More information

5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT. The scope of the EIA falls under three broad categories:

5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT. The scope of the EIA falls under three broad categories: 5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT 5.1 INTRODUCTION The scope of the EIA falls under three broad categories: technical scope; spatial scope; and temporal scope. The scoping process for the

More information

FIS001: Land to the east of Lindis Road, Boston Sustainability Objective

FIS001: Land to the east of Lindis Road, Boston Sustainability Objective FIS001: Land to the east of Lindis Road, Boston Sustainability Objective Indicative development scenario: Total site area: 7.46ha Potential open space: 0.75ha Development area: 6.71ha Potential no of dwellings:

More information

ENVIRONMENT. Lewisham Gateway Developments Limited. Lewisham Gateway Phase 1B SUPPLEMENTARY ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY

ENVIRONMENT. Lewisham Gateway Developments Limited. Lewisham Gateway Phase 1B SUPPLEMENTARY ENVIRONMENTAL STATEMENT NON-TECHNICAL SUMMARY ENVIRONMENT Lewisham Gateway Developments Limited Lewisham Gateway Phase 1B SUPPLEMENTARY ENVIRONMENTAL STATEMENT www.bwbconsulting.com ENVIRONMENT Lewisham Gateway Developments Limited Lewisham Gateway

More information

28 JULY 2015 PLANNING COMMITTEE. 5i 14/1315 Reg d: Expires: Ward: OW. of Weeks on Cttee Day:

28 JULY 2015 PLANNING COMMITTEE. 5i 14/1315 Reg d: Expires: Ward: OW. of Weeks on Cttee Day: 5i 14/1315 Reg d: 25.11.2014 Expires: 29.04.15 Ward: OW Nei. Con. Exp: 14.01.15 BVPI Target Minor (13) Number of Weeks on Cttee Day: 21/8 On Target? No LOCATION: PROPOSAL: TYPE: London House, 134 High

More information

Table of Contents. O Devaney Gardens. Page i. Page Number. Section. 1 Introduction

Table of Contents. O Devaney Gardens. Page i. Page Number. Section. 1 Introduction Section 1 Introduction Page Number 1.1 Introduction 2 1.2 Screening - Requirement for an EIA 5 1.3 Purpose of this EIA 6 1.4 Objectives of this EIA 6 1.5 Scoping 10 1.6 Format and Structure of this EIS

More information

Norfolk Minerals and Waste Local Plan. Sustainability Appraisal Report Non-technical summary

Norfolk Minerals and Waste Local Plan. Sustainability Appraisal Report Non-technical summary Norfolk Minerals and Waste Local Plan Minerals Site Specific Allocations Development Plan Document (DPD) Single Issue Silica Sand Review Sustainability Appraisal Report Non-technical summary March 2016

More information

Sustainability Statement. Gainsford Road. For Pocket Living. XCO2 energy. April 2016

Sustainability Statement. Gainsford Road. For Pocket Living. XCO2 energy. April 2016 For Pocket Living April 2016 XCO2 energy w: www.xco2energy.com :: e: mail@xco2energy.com t: +44 (0) 20 7700 1000 :: f: +44 (0) 20 7183 6620 17-18 Hayward s Place :: Clerkenwell :: London :: EC1R 0EQ Contents

More information

Central Park Mixed Use Development

Central Park Mixed Use Development Central Park Mixed Use Development Environmental Statement Non Technical Summary June 2012 Contents Section A Introduction Part 1 Part 2 Part 3 Background Environmental Assessment Site Description Section

More information

18 Cumulative Impacts and Interaction of Effects

18 Cumulative Impacts and Interaction of Effects 18 Cumulative Impacts and Interaction of Effects 18.1 Introduction This chapter addresses the cumulative impacts and main interactions between different aspects of the environment likely to be significantly

More information

Non-Technical Summary

Non-Technical Summary Non-Technical Summary i. Introduction and background Introduction The Environment Agency (generally referred to in this non-technical summary as we or us ) has prepared an Environmental Statement (ES)

More information

Viridor Energy from Waste Facility. Environmental Statement Non-Technical Summary

Viridor Energy from Waste Facility. Environmental Statement Non-Technical Summary Viridor Energy from Waste Facility Environmental Statement Non-Technical Summary September 2012 Viridor Energy from Waste Facility Environmental Statement Non-Technical Summary Introduction Viridor has

More information

Portbury Dock Renewable Energy Plant. Cumulative Impact Assessment Non-Technical Summary September 2009

Portbury Dock Renewable Energy Plant. Cumulative Impact Assessment Non-Technical Summary September 2009 Portbury Dock Renewable Energy Plant Cumulative Impact Assessment Non-Technical Summary September 2009 INTRODUCTION On 28 th August 2009 E.ON Climate & Renewables UK Developments Limited (EC&R) submitted

More information

Sizewell B Dry Fuel Store. Environmental Statement Non-Technical Summary

Sizewell B Dry Fuel Store. Environmental Statement Non-Technical Summary Sizewell B Dry Fuel Store Environmental Statement Non-Technical Summary NON TECHNICAL SUMMARY 1 INTRODUCTION This Non Technical Summary (NTS) is submitted as part of the application to extend the existing

More information

Sustainability Statement

Sustainability Statement Thames Tideway Tunnel Thames Water Utilities Limited Application for Development Consent Application Reference Number: WWO10001 Sustainability Statement Doc Ref: 7.07 Appendix B.21 Greenwich Pumping Station

More information

Environmental Impact Assessment Non-Technical Summary. June 2015

Environmental Impact Assessment Non-Technical Summary. June 2015 Environmental Impact Assessment Non-Technical Summary June 2015 Contents 1. Introduction 3 2. Site and Surrounding Area, Proposed Development and Policy 6 3. Summary of Topics 9 4. Further Information

More information

A1 JUNCTION IMPROVEMENTS DROMORE ROAD, HILLSBOROUGH

A1 JUNCTION IMPROVEMENTS DROMORE ROAD, HILLSBOROUGH A1 JUNCTION IMPROVEMENTS DROMORE ROAD, HILLSBOROUGH DRD ROADS SERVICE, SOUTHERN DIVISION Environmental Statement, Volume 1 November 2005 Non Technical Summary i Introduction The Department for Regional

More information

5. Environmental issues and methodology

5. Environmental issues and methodology 5. Environmental issues and methodology 5 Environmental issues and methodology Introduction 5.1 The methodology used to carry out the environmental impact assessment (EIA) is set out in this chapter. This

More information

Silverhill Winchester Number 1 Ltd Silverhill, Winchester Volume 1: Environmental Statement - Non-Technical Summary

Silverhill Winchester Number 1 Ltd Silverhill, Winchester Volume 1: Environmental Statement - Non-Technical Summary Volume 1: Environmental Statement - Non-Technical Summary REP/218699/EIA1 Issue 21 July 2014 This report takes into account the particular instructions and requirements of our client. It is not intended

More information

Vista at Chelsea Bridge Wharf. Volume 1: Non-Technical Summary. Prepared for: Berkley Homes (Central London) Limited. Prepared by: ENVIRON London, UK

Vista at Chelsea Bridge Wharf. Volume 1: Non-Technical Summary. Prepared for: Berkley Homes (Central London) Limited. Prepared by: ENVIRON London, UK Prepared for: Berkley Homes (Central London) Limited Prepared by: ENVIRON London, UK Date: March 2015 Project or Issue Number: UK11-21263 Contract No: Issue: Author (signature): UK11-21263 Final Henry

More information

BUT001: Land to the east of Benington Road, Butterwick Sustainability Objective

BUT001: Land to the east of Benington Road, Butterwick Sustainability Objective BUT001: Land to the east of Benington Road, Butterwick Sustainability Objective 1. Provide a miture of sustainably designed new housing to provide everybody in South East Lincolnshire with the opportunity

More information

Chapter 17 Cumulative Impacts

Chapter 17 Cumulative Impacts Chapter 17 Cumulative Impacts CONTENTS 17. Cumulative Effects... 2 17.1 Introduction... 2 17.2 Summary of Relevant Legislation, Planning Policy and Guidance... 2 17.3 Methods... 5 17.4 Consultation...

More information

1 INTRODUCTION 1.1 TERMS OF REFERENCE FOR THIS ENVIRONMENTAL IMPACT ASSESSMENT REPORT

1 INTRODUCTION 1.1 TERMS OF REFERENCE FOR THIS ENVIRONMENTAL IMPACT ASSESSMENT REPORT 1 INTRODUCTION 1.1 TERMS OF REFERENCE FOR THIS ENVIRONMENTAL IMPACT ASSESSMENT REPORT This Environmental Impact Assessment Report (EIA Report) has been prepared by Environmental Resources Management Ltd

More information

Affinity Water Draft Water Resources Management Plan. Strategic Environmental Assessment Environmental Report. Prepared by Jacobs for Affinity Water

Affinity Water Draft Water Resources Management Plan. Strategic Environmental Assessment Environmental Report. Prepared by Jacobs for Affinity Water Affinity Water Draft Water Resources Management Plan Strategic Environmental Assessment Environmental Report Prepared by Jacobs for Affinity Water May 2013 Document Control Sheet BPP 04 F8 Version 14 July

More information

In-combination and Cumulative Effects Assessment

In-combination and Cumulative Effects Assessment P O R T I S H E A D B R A N C H L I N E P R E L I M I N A R Y ENV I R O N M E N T A L I N F O R M A T I O N R E P O R T V O L U M E 2 C H A P T E R 18 In-combination and Cumulative Effects Assessment Table

More information

9.3.9 Industry uses code

9.3.9 Industry uses code 9.3.9 Industry uses code 9.3.9.1 Application (1) This code applies to accepted development and assessable development identified as requiring assessment against the Industry uses code by the tables of

More information

Napier Gateway Environmental Statement Non-technical Summary

Napier Gateway Environmental Statement Non-technical Summary Napier Gateway Environmental Statement Non-technical Summary ENVIRONMENT J2 Global Corporation Ltd Napier NON-TECHNICAL SUMMARY www.bwbconsulting.com ENVIRONMENT J2 Global Corporation Ltd Napier NON-TECHNICAL

More information

DELEGATED REPORT. Reason To ensure that any impermeable areas created during the filming process does not have a permanent impact on the site runoff.

DELEGATED REPORT. Reason To ensure that any impermeable areas created during the filming process does not have a permanent impact on the site runoff. DELEGATED REPORT APPLICATION NO. 16/03324/PRIOR LOCATION Hartland Park Bramshot Lane Fleet Hampshire PROPOSAL Notification for Prior Approval for the Temporary Use of Building or Land for the Purpose of

More information

Chapter 4 Environmental Impact Assessment

Chapter 4 Environmental Impact Assessment Chapter 4 Environmental Impact Assessment Legacy Communities Scheme: Environmental Statement Chapter 4: Environmental Impact Assessment 4-1 4 Environmental Impact Assessment 4.1 Introduction This chapter

More information

Non-Technical Summary

Non-Technical Summary 1. Introduction and Background 1.1 Following consultation Barwood Land and Estates Limited (Barwood Land) is making a number of minor amendments to and providing related additional information for the

More information

MIXED ACTIVITY ZONE. Chapter 4. Mixed Activity Zone

MIXED ACTIVITY ZONE. Chapter 4. Mixed Activity Zone Chapter 4 Mixed Activity Zone 4. MIXED ACTIVITY ZONE 4.1 RESOURCE MANAGEMENT ISSUES 1. Activities adjoining main arterial roads can adversely affect the safety, sustainability and efficiency of the network.

More information

Cottonmount Landfill Stable Non Reactive (SNR) Asbestos Cell. Volume 2 NON TECHNICAL SUMMARY. December 2012 SLR Ref:

Cottonmount Landfill Stable Non Reactive (SNR) Asbestos Cell. Volume 2 NON TECHNICAL SUMMARY. December 2012 SLR Ref: Cottonmount Landfill Stable Non Reactive (SNR) Asbestos Cell Volume 2 NON TECHNICAL SUMMARY December 2012 SLR Ref: 419.00034.00473 INTRODUCTION 1. This Non Technical Summary (NTS) has been produced by

More information

Sandy Knowe Wind Farm. Non-Technical Summary Addendum

Sandy Knowe Wind Farm. Non-Technical Summary Addendum Sandy Knowe Wind Farm Non-Technical Summary Addendum Sandy Knowe Wind Farm Ltd November 2013 SANDY KNOWE WIND FARM ii NON-TECHNICAL SUMMARY Contents 1 Background 1 2 Availability of the ES Addendum 2 3

More information

Annex F Scoping Checklist

Annex F Scoping Checklist Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve

More information

Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until Non Technical Summary

Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until Non Technical Summary Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until 2035 Non Technical Summary SLR Consulting Limited Project Ref: 403.00079.00474

More information

Northacre Renewable Energy

Northacre Renewable Energy Northacre Renewable Energy Revision of the layout and design of the Advanced Thermal Treatment Facility permitted under consent 14/12003/WCM at Stephenson Road, Northacre Trading Estate, Westbury, BA13

More information

Ironstone Quarry Wind Energy Project Environmental Statement

Ironstone Quarry Wind Energy Project Environmental Statement Ironstone Quarry Wind Energy Project Environmental Statement Non Technical Summary April 2011 Introduction Waste Recycling Group (WRG) Ltd is seeking permission to construct and operate a four turbine

More information

Ferrybridge Multifuel 2 (FM2) Power Station

Ferrybridge Multifuel 2 (FM2) Power Station Welcome Multifuel Energy Ltd is proposing to build a second multifuel power station at Ferrybridge (FM2). This formal consultation is an opportunity for you to provide feedback and comment on the Proposed

More information

Management Plan: Hazardous Materials Removal & Demolition

Management Plan: Hazardous Materials Removal & Demolition Management Plan: Hazardous Materials Removal & Demolition Kingswood School (Upper Site), Corby 1.0 Introduction 1.1 Background Lambert Smith Hampton has been instructed by Northamptonshire County Council

More information

Introduction to Environmental Impact Assessment for Masterplan Sites 25 April 2018

Introduction to Environmental Impact Assessment for Masterplan Sites 25 April 2018 Introduction to Environmental Impact Assessment for Masterplan Sites 25 April 2018 Environmental Impact Assessment Session Introduction and purpose of the presentation Key Topics for Discussion: Environmental

More information

Ponds Farm, Environmental Statement Non-Technical Summary

Ponds Farm, Environmental Statement Non-Technical Summary Ponds Farm, Cogent Land LLP QUALITY MANAGEMENT Issue/revision Issue 1 Revision 1 Final Date 03/05/2012 04/05/2012 09/05/2012 Prepared by Matthew Shepherd Caroline Burn Caroline Burn Signature Checked by

More information

Royal Edinburgh Hospital Masterplan

Royal Edinburgh Hospital Masterplan Royal Edinburgh Hospital Masterplan ENVIRONMENTAL STATEMENT VOLUME 1 (OF 4): NON TECHNICAL SUMMARY October 2013 ENVIRONMENTAL STATEMENT VOLUME 1 (OF 4): NON TECHNICAL SUMMARY October 2013 Sinclair Knight

More information

A684 Bedale, Aiskew and Leeming Bar Bypass Environmental Statement. Non Technical Summary. Business and Environmental Services

A684 Bedale, Aiskew and Leeming Bar Bypass Environmental Statement. Non Technical Summary. Business and Environmental Services A684 Bedale, Aiskew and Leeming Bar Bypass Environmental Statement Non Technical Summary Business and Environmental Services A responsive County Council providing excellent and efficient local services

More information

7. EIA Assessment Methodology

7. EIA Assessment Methodology 7. EIA Assessment Methodology Introduction 7.1 This Chapter of the PEIR sets out the process and methodology that has been adopted in undertaking the draft EIA. Whilst the overall approach and methodology

More information

Northacre Renewable Energy

Northacre Renewable Energy Northacre Renewable Energy Revision of the layout and design of the Advanced Thermal Treatment Facility permitted under consent 14/12003/WCM at Stephenson Road, Northacre Trading Estate, Westbury, BA13

More information

GC001: Lambert s Transport/Europa Tyres, Station Road, Gosberton Risegate

GC001: Lambert s Transport/Europa Tyres, Station Road, Gosberton Risegate GC001: Lambert s Transport/Europa Tyres, Station Road, Gosberton Risegate Sustainability Objective 1. To provide a mix of sustainably designed new housing to provide everybody in South East Lincolnshire

More information

Preface. Gaia Power Ltd 71A High Street Yarm TS15 9BG. Tel: Web:

Preface. Gaia Power Ltd 71A High Street Yarm TS15 9BG. Tel: Web: Preface This document comprises the Environmental Statement and its Non- Technical Summary, which have been prepared in support of an application for planning consent for the construction of a biomass

More information

Refer to Chapter 3.0 (Description of Development) for a detailed site and development description.

Refer to Chapter 3.0 (Description of Development) for a detailed site and development description. 7. WATER: HYDROGEOLOGY & HYDROLOGY 7.1 Introduction This chapter of the EIAR comprises of an assessment of the likely impact of the proposed development on the surrounding surface water and hydrogeological

More information

Storm Water Management

Storm Water Management Storm Water Management Policy September 2014 2 Sustainable drainage feature designed to control and manage flows through a series of check dams 3 Document Name: Storm Water Management Controlled Copy No:

More information

Mercia EnviRecover PROPOSED DEVELOPMENT OF A RENEWABLE ENERGY PLANT ON LAND AT HARTLEBURY TRADING ESTATE, HARTLEBURY, WORCESTERSHIRE

Mercia EnviRecover PROPOSED DEVELOPMENT OF A RENEWABLE ENERGY PLANT ON LAND AT HARTLEBURY TRADING ESTATE, HARTLEBURY, WORCESTERSHIRE Mercia EnviRecover PROPOSED DEVELOPMENT OF A RENEWABLE ENERGY PLANT ON LAND AT HARTLEBURY TRADING ESTATE, HARTLEBURY, WORCESTERSHIRE Environmental Statement Regulation 19 Submission (3a) Other Information

More information

introduction 1 On behalf of db symmetry we are pleased to welcome you to view our emerging plans for a new logistics park at Rugby.

introduction 1 On behalf of db symmetry we are pleased to welcome you to view our emerging plans for a new logistics park at Rugby. introduction 1 On behalf of db symmetry we are pleased to welcome you to view our emerging plans for a new logistics park at Rugby. The site comprises the employment element of the South West Rugby allocation

More information

Non-Technical Summary

Non-Technical Summary Non-Technical Summary Introduction and Background The Environment Agency owns Rye Harbour Farm in East Sussex and has developed a scheme to enhance the nature conservation value of the Farm, which lies

More information

A10 Electronic Interference: Application 1 - RBKC

A10 Electronic Interference: Application 1 - RBKC A10 Electronic Interference: Application 1 - RBKC Addendum to the Environmental Statement Volume I January 2012 Introduction A10.1 This Chapter of the Addendum to the June 2011 Environmental Statement

More information

WELCOME. Redevelopment of land at Merrylees Industrial Estate, Desford LE9 9FE. This Public Exhibition. About Flogas

WELCOME. Redevelopment of land at Merrylees Industrial Estate, Desford LE9 9FE. This Public Exhibition. About Flogas WELCOME Thank you for taking the time to come along and view our proposals for Merrylees Industrial Estate. About Flogas We re a leading LPG (Liquefied Petroleum Gas) supplier with more than 30 years experience

More information

Lewisham Gateway S73 Application 2018

Lewisham Gateway S73 Application 2018 Lewisham Gateway S73 Application 2018 Environmental Statement Addendum Non Technical Summary January 2018 ENVIRONMENT Lewisham Gateway Developments Limited Lewisham Gateway - Phase 2 S73 APPLICATION ENVIRONMENTAL

More information

IEMA ES Review Criteria

IEMA ES Review Criteria IEMA ES Review Criteria Structure of the Criteria The criteria are split into three sections and a review report is structured accordingly: Section 1 addresses all of the information contained within an

More information

Marlow Flood Alleviation Scheme Environmental Statement Non-Technical Summary. Final. WNGLDC Environment Agency Title

Marlow Flood Alleviation Scheme Environmental Statement Non-Technical Summary. Final. WNGLDC Environment Agency Title Marlow Flood Alleviation Scheme Environmental Statement Non-Technical Summary Final WNGLDC Environment Agency Title We are The Environment Agency. It's our job to look after your environment and make it

More information

West Brompton Village

West Brompton Village West Brompton Village Detailed Planning Application Royal Borough of Kensington & Chelsea Basement Construction Methodology November 2013 Prepared for EC Properties Ltd by ARUP To EC Properties Ltd Date

More information

West Calf. Close. Water Point. Hazelbank Farm. Moss End Cottage. Oughtershaw C/13/187. Stone

West Calf. Close. Water Point. Hazelbank Farm. Moss End Cottage. Oughtershaw C/13/187. Stone Beck Yorkshire Dales National Park Authority Application Code: Committee Date: 13/03/2018 Location: Barn, Oughtershaw Low Bull Ing West Calf Little Calf FB Oughtershaw Cattle Grid fall Stone West Calf

More information

6 Risk assessment methodology

6 Risk assessment methodology Risk assessment methodology 6 Risk assessment methodology 6.1 Introduction INPEX has committed to a systematic risk assessment process as a means of achieving best practice in environmental management

More information

MOU001: Land to the west of Eaugate Road, Moulton Chapel Sustainability Objective

MOU001: Land to the west of Eaugate Road, Moulton Chapel Sustainability Objective MOU001: Land to the west of Eaugate Road, Moulton Chapel Sustainability Objective Indicative development scenario: Total site area: 0.24ha Potential open space: 0.03ha Development area: 0.21ha Potential

More information

SgurrEnergy Ltd Linfairn Wind Farm Environmental Statement: Chapter 4

SgurrEnergy Ltd Linfairn Wind Farm Environmental Statement: Chapter 4 4 THE EIA PROCESS 4.1 OVERVIEW The purpose of an EIA is to provide a systematic analysis of the impacts of a project in relation to the existing (baseline) environment. The findings of an EIA are presented

More information

Planning Application Boundary

Planning Application Boundary 1. Introduction Ballymore Group (the Applicant ) is seeking planning consent for the redevelopment of land (the Site ) located to the south of the River Thames between Chelsea Bridge and Vauxhall Bridge,

More information

RT-10 and RT-10N Districts Schedule

RT-10 and RT-10N Districts Schedule Districts Schedule 1 Intent The intent of this Schedule is to encourage development of multiple small houses and duplexes on large lots and assembled sites, while continuing to permit lower intensity development

More information

SUBURBAN RESIDENTIAL. QLDC PROPOSED DISTRICT PLAN [PART THREE] DECISIONS VERSION 7 lower density SUBURBAN residential

SUBURBAN RESIDENTIAL. QLDC PROPOSED DISTRICT PLAN [PART THREE] DECISIONS VERSION 7 lower density SUBURBAN residential 7 LOWER DENSITY SUBURBAN RESIDENTIAL 7.1 Zone Purpose The Lower Density Suburban Residential Zone is the largest residential zone in the District. The District Plan includes such zoning that is within

More information

Western Rail Link To Heathrow

Western Rail Link To Heathrow Non-T echnical Summar y - Initi al Envir onmental Infor mati on R eport Networ k R ail Western Rail Link To Heathrow Network Rail Non-Technical Summary - Initial Environmental 129088-JAC-REP-HEN-000014

More information

Developers Guide for Surface Water Management.

Developers Guide for Surface Water Management. Developers Guide for Surface Water Management www.southwark.gov.uk Contents 1. Introduction... 2 2. Requirements for Flood Risk Assessments and Drainage Strategies... 3 2.1 Planning Applications... 3 2.2

More information

Marine Industries Production Campus

Marine Industries Production Campus Photograph Ministry of Defence Environmental Statement Volume 3: Non-Technical Summary Prepared for: +City Deal, Plymouth City Council Economic Development Department Marine Industries Production Campus

More information

Draft Code of Construction Practice

Draft Code of Construction Practice Draft Code of Construction Practice This factsheet outlines how it is expected the nominated undertaker will manage the effects of the construction of the Proposed Scheme on communities and the environment

More information

Wellington Dock Planning Application, Liverpool. Non-Technical Summary for Environmental Statement

Wellington Dock Planning Application, Liverpool. Non-Technical Summary for Environmental Statement Wellington Dock Planning Application, Liverpool Non-Technical Summary for Environmental Statement INTRODUCTION United Utilities PLC (UU) has applied for planning permission for an extension to Liverpool

More information

Strategic Environmental Assessment/ Sustainability Appraisal Non-Technical Summary. Draft for Public Consultation

Strategic Environmental Assessment/ Sustainability Appraisal Non-Technical Summary. Draft for Public Consultation South East Lincolnshire Local Plan 2011-2036 Strategic Environmental Assessment/ Sustainability Appraisal Non-Technical Summary Draft for Public Consultation January 2016 Contents 1. INTRODUCTION 3 2.

More information

6 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 6.1 INTRODUCTION

6 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 6.1 INTRODUCTION 6 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 6.1 INTRODUCTION Cumulative and indirect effects result from the combined impacts of multiple projects / plans. Their consideration is important as the impacts

More information

ENVIRONMENTAL APPRAISAL NON-TECHNICAL SUMMARY

ENVIRONMENTAL APPRAISAL NON-TECHNICAL SUMMARY ENVIRONMENTAL APPRAISAL NON-TECHNICAL SUMMARY Figure 1: Site Location 1. Introduction The Ministry of Defence (MoD) hereafter referred to as the Applicant is seeking detailed planning permission for a

More information

NON TECHNICAL SUMMARY

NON TECHNICAL SUMMARY NON TECHNICAL SUMMARY CONTENTS Introduction... 1 The Proposed Development... 1 Planning Policy and Need... 2 Landscape and Visual Impact... 3 Noise... 4 Ecology... 4 Hydrogeology... 5 Land Quality... 6

More information

Ardley Waste Management Facility. Non Technical Summary

Ardley Waste Management Facility. Non Technical Summary Non Technical Summary CONTENTS 1.0 Introduction 2.0 Site Description 3.0 The Development 4.0 Alternatives 5.0 Potential Environmental Effects 6.0 Conclusions 1.0 Introduction 1.1 The Applicant 1.2 The

More information

3. Better homes: A high quality residential neighbourhood

3. Better homes: A high quality residential neighbourhood 3. Better homes: A high quality residential neighbourhood 25 3. Better homes: A high quality residential neighbourhood 3.1 Background 3.1.1 This section deals with the number of new homes, their size and

More information

(1) Site Suitability PURPOSE

(1) Site Suitability PURPOSE 3.3 Code for Development and Use of Rural Service Industries PURPOSE This purpose of this code is to encourage the development and use of suitable rural service industries on rural, industrial or suitable

More information

Environmental Statement Further Information Report Non-Technical Summary

Environmental Statement Further Information Report Non-Technical Summary Environmental Statement Further Information Report Non-Technical Summary Brent Cross Cricklewood: Phase 1B (North) Reserved Matters Application May 2017 Waterman Infrastructure & Environment Limited Pickfords

More information

Introduction to presentation structure

Introduction to presentation structure 1 Introduction to presentation structure 2 EIA ensures that the environment is considered during decision-making by planning committee (note: EIA applications are not generally made under delegated powers

More information

Lee Green Regeneration Environmental Statement Non-Technical Summary

Lee Green Regeneration Environmental Statement Non-Technical Summary Lee Green Regeneration Environmental Statement Non-Technical Summary Lee Green Regeneration Environmental Statement Non- Technical Summary For St. Modwen Developments Feburary 2015 Contents 1 Introduction

More information

Crossrail Environmental Statement Volume 1

Crossrail Environmental Statement Volume 1 Crossrail Environmental Statement Volume 1 Project description The environmental impact assessment process The need for Crossrail Planning policy context Route development and alternatives 1 If you would

More information

EIA Screening. Proposed Mixed Use Development at Jacobs Island, Cork. Montip Horizon Limited

EIA Screening. Proposed Mixed Use Development at Jacobs Island, Cork. Montip Horizon Limited EIA Screening Proposed Mixed Use Development at Jacobs Island, Cork Montip Horizon Limited June 2018 1. Introduction This Environmental Impact Assessment Screening has been prepared to determine whether

More information

Tees Valley Renewable Energy Facility

Tees Valley Renewable Energy Facility Renewable Energy Facility The Environmental Statement: Volume 3 Non-Technical Summary Air Products PLC Hersham Place Technology Park Molesey Road Hersham Surrey KT12 4RZ Tel 020 3170 8465 tell me more

More information

Berth 9 Quay Extension Environmental Statement Non-Technical Summary

Berth 9 Quay Extension Environmental Statement Non-Technical Summary Berth 9 Quay Extension Hutchison Ports UK Ltd July 2013 Final Report 9Y0150 CONTENTS Page 1 PROJECT BACKGROUND 1 2 NEED FOR THE PROPOSED SCHEME 4 3 DESCRIPTION OF THE CONSTRUCTION PHASE 4 4 DESCRIPTION

More information

5.9 Water (Drainage, Supply, Flood Risk and Groundwater)

5.9 Water (Drainage, Supply, Flood Risk and Groundwater) 5.9 Water (Drainage, Supply, Flood Risk and Groundwater) 5.9.1 Introduction This Chapter of the EIAR presents the water assessment for the Demolition, Construction and Operational Phase of the proposed

More information

Environmental Policy and Guide December 2010

Environmental Policy and Guide December 2010 Environmental Policy and Guide December 2010 Page 1 of 11 ENVIRONMENTAL POLICY A responsible and forward-looking approach to environmental issues is an important factor in Intu Properties plc s continuing

More information

Code of Construction Practice Part B: Site Specific Requirements

Code of Construction Practice Part B: Site Specific Requirements Thames Tideway Tunnel Thames Water Utilities Limited Application for Development Consent Application Reference Number: WWO10001 Code of Construction Practice Part B: Site Specific Requirements Deptford

More information

an Inspector appointed by the Secretary of State for Communities and Local Government

an Inspector appointed by the Secretary of State for Communities and Local Government Appeal Decision Site visit made on 20 September 2016 by John Dowsett MA DipURP DipUD MRTPI an Inspector appointed by the Secretary of State for Communities and Local Government Decision date: 7 th November

More information