1 F. No.II-43/2013-IA.III Government of India Ministry of Environment & Forests (la-iii Section) Room No. 143, Paryavaran Bhawan, CGO Complex, Lodhi Road, New Delhi , To The Head-Technical Services Group (Corporate Projects), MIs Indian Hotels Company Ltd., Oxford House , NF Road, Apollo Bunder, Mumbai Contact Person Details: Dr. Ananya Gandotra, ananya.gandotra@tajhotels.com Dated: May 2,2014 Subject: CRZ Clearance for construction of 5 star resort "Vivanta by Taj" at Havelock, Port Blair, Havelock Island, Andaman & Nicobar Islands by MIs Indian Hotels Company Limited - Reg. Sir, *** This has reference to your proposal forwarded by Member Secretary, A&N Coastal Zone Management Authority (A&NCZMA)vide letter No: CF/EPA/83-Vol.VIII/98(a) dated and your letter dated seeking prior CRZ Clearance for the above project under the Coastal Regulation Zone (CRZ) Notification, The proposal has been appraised as per prescribed procedure in the light of provisions under the CRZ Notification, 2011, on the basis of the mandatory documents enclosed with the application viz., the Questionnaire, minutes of State Coastal Zone Management Authority, EIA Report and the additional clarifications furnished in response to the observations of the Expert Appraisal Committee constituted by the competent authority in its meetings held on 19th - 218t September, 2013, 28 th -30 th October, 2013 and 20 th - 23 rd November, It is inter-alia, noted that the project involves construction of a premium 5 star resort "Vivanta by Taj at Havelock" at 11 59'8. 76"N and 92 57' 19.00"E, Plot No: 149/1, 149/3, 150/3/2, 150/3/3, 150/3/4 at village - Radha Nagar, Gram Panchyat - Govinda Nagar, Tehsil - Port Blair, Havelock Island, Dist. Andaman, Andaman & Nicobar Islands. The project will be completed in two phase. In 1 8t phase, 50 keys will be constructed over a period of around 2 years (commencement of construction: March 2013 and completion of construction: December, 2015). In addition, 10 public buildings and 5 staff accommodation buildings will be constructed and in 2 nd Phase, another 50 keys will be constructed to raise the inventory!-
2 to 100 keys. The total plot area is sqm ( hal. The FSI area for this project is sq.m and non FSI area is sq.m. The total built up area for this project is sq.m. The total water requirement is 110 KLD in dry season and 88 KLD in wet season, power requirement is 100 KVAin construction phase and 2123 KVAin operation phase. Sewage Treatment Plant of capacity 100KL will be installed and the treated water will be used for gardening. Vermi-composting shall be provided for converting bio-degradable waste to manure and non-biodegradable waste will be sold to prospective buyers. Rain water harvesting will be done. The total parking spaces provided for Car-43, Two Wheelers-35, Cycles-25 and for Buses-2. The total cost of the project is Rs.80 Crores. 3. Regarding highest ingress of water during tsunami etc it has been explained that an average Tsunami height of 3 meters was observed. It has been explained that suitable design parameters have been considered to address the tsunami hazards. The evacuation plan to tackle emergencies during natural disaster has been accounted. One structure should be designed on the base of tsunami shelter. The proposed project is designated under Island Coastal Regulation Zone (ICRZ)and falls under ICRZ-III. 4. The Expert Appraisal Committee, after due consideration of the relevant documents submitted by the project proponent and additional clarifications furnished in response to its observations, have recommended for the grant of CRZ Clearance for the project. Accordingly, the Ministry hereby accords necessary CRZ Clearance for the above project as per the provisions of CRZ Notification, 2011 and its subsequent amendments, subject to strict compliance of the terms and conditions as follows: 5. Specific Conditions: (i) "Consent for Establishment" shall be obtained from Andaman & Nicobar Pollution Control Committee under Air and Water Act and a copy shall be submitted to the Ministry before start of any construction work at the site. (ii) 50 meters buffer should be observed from the HTL of the creek. (iii) All construction shall be on stilts. The slab height shall be maintained at 3.5 mts high above the HTLthroughout. (iv) Approval from the CGWA shall be obtained for extraction of ground water. (v) As committed, vermi-composting shall be adopted for handling 100% conversion of organic solid waste into compost. The manure so generated shall be used for gardening purpose within hotel premises. All the inorganic waste like paper, tin, bottle, glass etc must be carted away to reprocessing units in the island. ~.
3 (vi) Package Sewage Treatment Plant should be established for treatment of waste water. The treated effluent shall be recycled/reused 100% within the resort boundaries for toilet flushing, gardening etc. (vii) Project Proponent should correct and discard the site map which shows land level next to the sea front at 99 meters. Ground proofing of such maps should be done. (viii) Provision for bus parking and parking for taxies/ cabs shall also be made within the complex. (ix) The project proponent shall not undertake any construction within 200 metres in the landward side of High Tide Line and within the area between Low Tide Line and High Tide Line; (x) The proposed constructions shall be beyond the hazard line or 200mts from the High Tide Line whichever is more; (xi) (xii) Live fencing and barbed wire fencing with vegetative cover may be allowed around private properties subject to the condition that such fencing shall in no way hamper public access to the beach; No flattening of sand dunes shall be carried out; (xiii) No permanent structures for sports facilities shall be permitted except construction of goal posts, net posts and lamp posts; (xiv) (xv) (xvi) Construction of basement may be allowed subject to the condition that no objection certification is obtained from the State Ground Water Authority to the effect that such construction will not adversely affect fee flow of groundwater in that area; The State Ground Water Authority shall take into consideration the guidelines issued by Central Government before granting such no objection certificate; Though no construction is allowed in the no development zone for the purposes of calculation of Floor Space Index, the area of entire plot including the portion which falls within the no development zone shall be taken into account; (xvii) The total plot size shall not be less than 0.4 hectares and the total covered area on all floors shall not exceed 33 percent of the plot size i.e., the Floor Space Index shall not exceed 0.33 and the open area shall be suitably landscaped with appropriate vegetal cover;
4 (xviii)the construction shall be consistent with the surrounding landscape and local architectural style; (xix) The overall height of construction upto the highest ridge of the roof, shall not exceed 9metres and the construction shall not be more than two floors (ground floor plus one upper floor); (xx) Groundwater shall not be tapped within 200metre of the High Tide Line; within the 200metre 500metre zone it can be tapped only with the concurrence of the Central or State Ground Water Board; (xxi) Extraction of sand, leveling or digging of sandy stretches except for structural foundation of building, swimming pool shall not be permitted within 500metres of the High Tide Line; (xxii) The quality of treated effluents, solid wastes, emissions and noise levels and the like, from the project area must conform to the standards laid down by the competent authorities including the Central or State Pollution Control Board and under the Environment (Protection) Act, 1986; (xxiii)necessary arrangements for the treatment of the effluents and solid wastes must be made and it must be ensured that the untreated effluents and solid wastes are not discharged into the water or on the beach; and no effluent or solid waste shall be discharged on the beach; (xxiv)to allow public access to the beach, atleast a gap of 20metres width shall be provided between any two hotels or beach resorts; and in no case shall gaps be less than 500metres apart; and (xxv) If the project involves diversion of forestland for non-forest purposes, clearance as required under the Forest (Conservation) Act, 1980 shall be obtained and the requirements of other Central and State laws as applicable to the project shall be met with; and (xxvi)approval of the State or Union territory Tourism Department shall be obtained. (xxvii)under the provisions of Environment (Protection) Act, 1986, legal action shall be initiated against the project proponent if it was found that construction of the project has been started without obtaining clearance. 6. General Conditions: (i) The construction of the structures should be undertaken as per the plans approved by the concerned local authorities/local administration, meticuio~onforming to the existing local
5 and Central rules and regulations including the provistons of Coastal Regulation Zone Notification, 2011 and the approved Coastal Zone Management Plan of Andaman & Nicobar Islands. (ii) Traffic congestion near the entry and exit points from the roads adjoining the proposed project site must be avoided. Parking should be fully internalized and no public space should be utilized. (iii) Energy conservation measures like installation of CFLs/TFLs for the lighting the areas outside the building should be integral part of the project design and should be in place before project commissioning. Use CFLs and TFLs should be properly collected and disposed off/ sent for recycling as per the prevailing guidelines/rules of the regulatory authority to avoid mercury contamination. Use of solar panels may be done to the extent possible. (iv) Adequate measures should be taken to prevent odour problem from solid waste processing plant and STP. (v) Provision shall be made for the housing of construction labour within the site with all necessary infrastructure and facilities such as fuel for cooking, mobile toilets, mobile STP, safe drinking water, medical health care, creche etc. The housing may be in the form of temporary structures to be removed after the completion of the project. (vi) Construction spoils, including bituminous material and other hazardous materials, must not be allowed to contaminate watercourses and the dump sites for such material must be secured so that they should not leach into the ground water. (vii) A First Aid Room will be provided in the project both during construction and operation of the project. (viii) All the topsoil excavated during construction activities should be stored for use in horticulture/landscape development within the project site. (ix) Disposal of muck during construction phase should not create any adverse effect on the neighboring communities and be disposed taking the necessary precautions for general safety and health aspects of people, only in approved sites with the approval of competent authority. (x) Vehicles hired for bringing construction material to the site should be in good condition and should have a pollution check certificate and should conform to applicable air and noise emission standards and should be operated only during nonpeak hours. ~
6 (xi) (xii) Fly ash should be used as building material in the construction as per the provisions of Fly Ash Notification of September, 1999 and amended as on 27th August, 2003 if the site is located within the 100 Km of Thermal Power Stations. Ready mixed concrete must be used in building construction. (xiii) Storm water control and its re-use as per CGWB and BIS standards for various applications. (xiv) Water demand during construction should be reduced by use of pre-mixed concrete, curing agents and other best practices referred. (xv) In the event of any change in the project profile a fresh reference shall be made to the Ministry of Environment and Forests. (xvi) This Ministry reserves the right to revoke this clearance, if any, of the conditions stipulated are not complied with to the satisfaction of this Ministry. (xvii) This Ministry or any other competent authority may stipulate any additional conditions subsequently, if deemed necessary, for environmental protection, which shall be complied with. (xviii) A copy of the clearance letter shall be marked to the concerned Panchayat./Iocal NGO, if any, from whom any suggestion / representation has been received while processing the proposal. (xix) Full support should be extended to the officers of this Ministry's Regional Office at Bhubaneswar and the offices of the Central and State Pollution Control Board/Committee by the project proponents during their inspection for monitoring purposes, by furnishing full details and action plans including the action taken reports in respect of mitigative measures and other environmental protection activities. 7. These stipulations would be enforced among others under the provisions of water (Prevention and Control of Pollution) Act, 1974 the Air (Prevention and Control of Pollution) Act 1981, the Environment (Protection) Act, 1986, the Public Liability (Insurance) Act, 1991 and Municipal Solid Wastes (Management and Handling) Rules, 2000 including the amendments and rules made thereafter. 8. All other statutory clearances such as the approvals for storage of diesel from Chief Controller of Explosives, Fire Department, Civil Aviation Department, Forest Conservation Act, 1980 and Wildlife (Protection) Act, 1972 etc. shall be obtained, as applicable by project proponents from the respective competent authorities. ~
7 9. The project proponent should advertise in at least two local Newspapers widely circulated in the region, one of which shall be in the vernacular language informing that the project has been accorded CRZ Clearance and copies of clearance letters are available with the State Pollution Control Board/Committee and may also be seen on the website of the Ministry of Environment and Forests at The advertisement should be made within 10 days from the date of receipt of the Clearance letter and a copy of the same should be forwarded to the Regional office of this Ministry at Bhu baneswar. 10. This Clearance is subject to final order of the Hon'ble Supreme Court of India in the matter of Goa Foundation Vs. Union of India in Writ Petition (Civil)No.460 of 2004 as may be applicable to this project. 11. Any appeal against this clearance shall lie with the National Green Tribunal, if preferred, within a period of 30 days as prescribed under Section 16 of the National Green Tribunal Act, A copy of the clearance letter shall be sent by the proponent to concerned Panchayat, Zilla Parisad/Municipal Corporation, Urban Local Body and the Local NGO, if any, from whom suggestions/ representations, if any, were received while processing the proposal. The clearance letter shall also be put on the website of the company by the proponent. 13. Status of compliance to the various stipulated environmental conditions and environmental safeguards will be uploaded by the project proponent in its website. 14. The project proponent shall also submit six monthly reports on the status of compliance of the stipulated Clearance conditions including results of monitored data (both in hard copies as well as by ) to the respective Regional Office of MoEF, the respective Zonal Office of CPCB and the SPCB. 15. The environmental statement for each financial year ending 31 st March in Form-Vas is mandated to be submitted by the project proponent to the concerned State Pollution Control Board/Committee as prescribed under the Environment (Protection) Rules, 1986, as amended subsequently, shall also be put on the website of the company along with the status of compliance of Clearance conditions and shall also be sent to the respective Regional Office of MoEF by . Copy to: jkapurj Director (la-iii) (i) The Chief Secretary, Andaman and Nicobar Administration, Andaman and Nicobar Islands, Port Blair.
8 (ii) The Chairman, CPCB, Parivesh Bhawan, CBD-cum-Office Complex, East Arjun Nagar, Delhi (iii) The Member Secretary, Andaman & Nicobar Coastal Zone Management Authority, Conservator of Forests (Development and Utilization), Nodal Officer CRZ, Andaman and Nicobar Islands Administration, Chatham, Port Blair (iv) The Member Secretary, Andaman & Nicobar Pollution Control Committee, Andaman and Nicobar Islands. (v) The Chief Conservator of Forests, Ministry of Environment and Forests, Regional Office (EZ),Aj3, Chandersekharpur, Bhubaneswar (vi) Guard File. (vii) Monitoring Cell. ~ (Lalit Kapur) Director (la-iii)
Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu
Chemplast Sanmar Limited Marine Terminal Facility, Chitrapettai Village Cuddalore District, Tamil Nadu Compliance Report for Environmental Clearance No.11.63/2005.1A.III dated 19.12.2005 Specific Conditions
More informationNo. J-l1015/313/2010-IA.II (M) Government of India Ministry of Environment & Forests
No. J-l1015/313/2010-IA.II (M) Government of India Ministry of Environment & Forests Paryavaran Bhavan, C.G.O. Complex, Lodi Road, New Delhi-110 003. Dated the 28th June, 2013 To, M/ s Arbind Kumar Singh
More informationSIX MONTHLY COMPLIANCE REPORT JUNE- 2015
SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,
More informationSr.No Condition Status A. SPECIFIC CONDITIONS:
J.K. CEMENT WORKS, MANGROL (RAJ.) Compliance report of Mangrol Lime stone mine (For the period from April 2011 to September 2011) Sub:- Conditions of Environment Clearance from MOEF, New Delhi Letter No.
More informationENVIRONMENTAL IMPACT ASSESSMENT AND YOU
ENVIRONMENTAL IMPACT ASSESSMENT AND YOU PARTICIPATING IN PUBLIC CONSULTATIONS FOR: COAL FUELED THERMAL POWER PLANTS C A G Citizen consumer and civic Action Group 1. What are Thermal Power Plants? Electricity
More information4. The ambient air quality monitoring stations We are monitoring the ambient air quality
GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions
More informationSTANDARD OPERATING PROCEDURE
STANDARD OPERATING PROCEDURE Consent to Established/Operate Procedural Guidelines Consent to Establish NOC Check List Consent to Operate NOC Check List Renewal to Consent to Operate Check List Time Frame
More informationV.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN
V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN HALF YEARLY REPORT FOR THE PERIOD OCTOBER, 2011 to MARCH 2012 V. S. Lignite Power Pvt. Ltd. Name of the Project : 1x 135 MW Lignite
More informationHALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS
HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 1. Name of the Project: M/s MCC PTA India Corp. Private Limited Haldia ( WB) Note: Company Name was change from MCC PTA India Corp.Private
More informationCHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA.
CHECK LIST OF DOCUMENTS / OTHER REQUISITES FOR OBTAINING VARIOUS CLEARANCES FROM THE STATE POLLUTION CONTROL BOARD, ODISHA. A. CONSENT TO ESTABLISH UNDER THE PROVISIONS OF WATER (PREVENTION & CONTROL OF
More informationLIST OF CONDITIONS FORPROPOSED SMART CITY AT TRIANON BY HERMES PROPERTIES LTD [ENV/DOE/EIA/1695]
LIST OF CONDITIONS FORPROPOSED SMART CITY AT TRIANON BY HERMES PROPERTIES LTD [ENV/DOE/EIA/1695] 1. Notwithstanding all other permits and clearances, the following clearances shall be obtained prior to
More information.in Dated 9th August, Sharma ;
F. No. J-11011/151/2010-IA II (I) Government of India Ministry of Environment and Forests (I.A. Division) Paryavaran Bhawan CGO Complex, Lodhi Road New Delhi -110 003.. To, Ankleshwar E-mail: pb.rastoai@nic.in
More informationENVIRONMENTAL IMPACT ASSESSMENT AND YOU
ENVIRONMENTAL IMPACT ASSESSMENT AND YOU PETROCHEMICAL PLANTS C A G Citizen consumer and civic Action Group 1. What are the pollution problems associated with petrochemical plants? Petrochemical plants
More informationNo. 138 /PS-MS/MPPCB/SEAC/TOR (75)/2011 Bhopal, dt. 03 /06/2011. Env. Consultant: Créative Enviro Service, Bhopal. (SN-29)
1 By: Speed-Post State Level Expert Appraisal Committee (Formed as per S.O. no. 1533 dated 14 th Sept 2006 of Government of India, Ministry of Environment & Forests) PARYAWARAN PARISAR, E-5, ARERA COLONY,
More informationTorrent Pharmaceuticals Ltd. Indrad EC Compliance Report
Status of Compliance of stipulated conditions of the Environment Clearance J- 01 It is noted that total water consumption will increase from 1000-1200 m 3 /day to 1200-1300 m 3 /day. Fresh water requirement
More information------------------------------------------------------------------------------------------------------------ Standard Operating Procedure for Processing the Proposals for Utilization of Hazardous Waste
More informationFor PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra
Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech
More informationMax. building height (m)
Environmental Management Plan (EMP) for Himalaya Falaknuma by Himalaya Developers Ahmedabad No. Particulars Details 1. Proposal for New Project 2. Type of Project and Commercial Building Construction Project
More informationMinistry of Environment and Forests Notification New Delhi, the 4 th February ( As amended up to )
Ministry of Environment and Forests Notification New Delhi, the 4 th February 2011. ( As amended up to 2.7.2011) (Amendment carried out vide notification no. S.O. 1527 (E) dated 2.07.2011 have been shown
More informationSection 9A 9A Purpose of the Hazardous Substances Provisions
Section 9A 9A Purpose of the Hazardous Substances Provisions The Council has a function under section 31 of the RMA to control any actual or potential effects of the use, development or protection of land
More informationInfrastructure Development and Environment
Infrastructure Development and Environment Few Stories Lift irrigation from Chambal River No Development Zone around Numaligarh Refinery NH - 31 C passing through Jaldapara, Mahananda and Buxa Nh-72 cutting
More informationRED CATEGORY CONSENT & AUTHORIZATION ORDER BY REGISTERED POST WITH ACKNOWLEDGEMENT DUE
ANDHRA PRADESH POLLUTION CONTROL BOARD Paryavarana Bhavan, A-III, Industrial Estate, Sanathnagar, Hyderabad-500 018 Phone : 040-23887500, Website : www.appcb.ap.nic.in RED CATEGORY CONSENT & AUTHORIZATION
More informationRajasthan State Pollution Control Board
M/s Raj West Power Private Limited Village- Bhadresh, Tehsil:Barmer District:Barmer Sub: Ref: Sir, Consent to Operate under section 25/26 of the Water (Prevention & Control of Pollution) Act, 1974 and
More informationTHE PLASTICS MANUFACTURE, SALE AND USAGE RULES, 1999
THE PLASTICS MANUFACTURE, SALE AND USAGE RULES, 1999 MINISTRY OF ENVIRONMENT AND FORESTS NOTIFICATION New Delhi, the 2nd September, 1999 1 [S. 0.705 (E-).-Whereas draft rules in exercise of the powers
More informationForest (Conservation) Rules, 1981
Forest (Conservation) Rules, 1981 (as amended up to May 1992) G.S.R. 719... in exercise of the powers conferred by sub-section (i) of section 4 of the Forest (Conservation) Act, 1980 (69 of 1980), the
More informationGOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE. LOK SABHA STARRED QUESTION No. 334 TO BE ANSWERED ON
GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE LOK SABHA STARRED QUESTION No. 334 TO BE ANSWERED ON 09.08.2016 Ecological Impact of Mining *334. SHRI JANARDAN SINGH SIGRIWAL state:
More information0 23/05/16 FOR REFERENCE GPCB SP/BPS NV Rev. Date Description of revision Originator Checked by Approved By DD-MM-YY Owners : HAZIRA LNG & PORT
SR NO-2504 PHYSICAL COPY LOCATION CODES : 1--HAZIRA- HSEM-NIL 2-A`VAD RECORD ROOM- NIL 3-DCC-HAZIRA-CABINET-11-4 0 23/05/16 FOR REFERENCE GPCB SP/BPS NV Rev. Date Description of revision Originator Checked
More informationEnvironmental Impact Assessment
Environmental Impact Assessment A brief discussion Presented by: Apekshit Solanki Kirti Neetu Yadav Sameera Vishakha Shankar Introduction EIA is a formal process to predict the environmental consequences
More informationBuilder Agreement. Access to build in Mountainside Village constitutes agreement to abide by the following:
Builder Agreement Access to build in Mountainside Village constitutes agreement to abide by the following: 1. It shall be the responsibility of each builder in Mountainside Village ( Builder ) that the
More informationExisting vegetation with each tree detail like species, girth, canopy etc. Contours with levels Natural features like water body, stream etc.
Project name:- Project Code :- Registration Category :- General Comments :- Drawings Feedback:- 1st feedback No Dwg Name Dwg Description Recommendation 1 Site survey plan Site plan showing following in
More informationHINDUSTAN SHIPYARD LIMITED : : VISAKHAPATNAM (A Government of India Undertaking) *** ADVT NO.HR/ES(O)/0102/02/2016 DATED 24 AUG 2016
HINDUSTAN SHIPYARD LIMITED : : VISAKHAPATNAM 530 005 (A Government of India Undertaking) *** ADVT NO.HR/ES(O)/0102/02/2016 DATED 24 AUG 2016 HSL is the pioneer Shipbuilding and Ship repair Yard functioning
More informationHANDBOOK OF Forest (Conservation) Act, 1980 (With Amendments made in 1988) 3 area and regenerate the forest cover through compensatory afforestation process. Till INDEX A Part Subject Forest (Conservation)
More information2. Member Secretary, Maharashtra Pollution Control Board, Sion, Mumbai
13 th February 2017 To, The Director Regional Office (West Central Zone), Ministry of Environment, Forest and Climate Change, Ground Floor, East wing, New Secretariat Building, Civil lane, Nagpur-440001
More informationTHE RAMCO CEMENTS LIMITED
1 P a g e 2 P a g e THE RAMCO CEMENTS LIMITED (Formerly Madras Cements Ltd.) COMPLIANCE REPORT FOR ENVIRONMENTAL CLEARANCE JAYANTHIPURAM NORTH BAND MINING LEASE 2.0 MILLION TPA CAPACITY EC Lr. No. : J-11015/377/2006-IA.II
More informationAddition to Section 4 - Special Use Regulations
Large-Scale Ground-Mounted Solar Photovoltaic Installations Addition to Section 4 - Special Use Regulations 4.4 Large Scale Ground-Mounted Solar Photovoltaic Installations 4.4.1 Purpose The purpose of
More informationF. No. 19-2/2013-IA-III Government of India. Ministry of Environment, Forest and Climate Change (Impact Assessment Division) **** OFFICE MEMORANDUM
F. No. 19-2/2013-IA-III Government of India. Ministry of Environment, Forest and Climate Change (Impact Assessment Division) **** Indira Paryavaran Bhawan Aliganj, Jor Bagh Raod New Delhi-110 003 OFFICE
More information8.8 WIRELESS COMMUNICATION FACILITIES IN DOUGLAS COUNTY THE COUNTY BOARD OF SUPERVISORS OF THE COUNTY OF DOUGLAS DOES ORDAIN AS FOLLOWS:
8.8 WIRELESS COMMUNICATION FACILITIES IN DOUGLAS COUNTY THE COUNTY BOARD OF SUPERVISORS OF THE COUNTY OF DOUGLAS DOES ORDAIN AS FOLLOWS: SECTION I. INTRODUCTION WHEREAS, the Federal Communications Commission
More informationFrom. The Chief Administrator, HUDA, Panchkula.
From To The Chief Administrator, HUDA, Panchkula. 1. All the Zonal Administrators, HUDA in the State. 2. All the Estate Officers, HUDA in the State Memo No.SA-HUDA-09/2186 Dated: 8-6-2009 Subject:- Guidelines
More informationEIA for Proposed Additional Butibori Industrial Area, Tehsil and District Nagpur, State Maharashtra.
PUBLIC CONSULTATION PUBLIC HEARING According to EIA Notification 2006 and its subsequent amendments, the proposed project comes under the project activity of 7 (c) & (a), Industrial estates /parks, complexes/area
More informationEnvironmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department
2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote
More informationCONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999
(No. JPBN. 1509/27 Vol. II CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999 In exercise of the powers conferred by section 5 of the Conservation
More informationF. No.12-40/2013-HSMD Government of India Ministry of Environment & Forest & climate Change
J F. No.12-40/2013-HSMD Government of India Ministry of Environment & Forest & climate Change l - HSM Division OFFICE MEMORANDUM 2nd Floor, Jal Block Indira ParyavaranBhawan JorBagh Road, Aliganj New Delhi
More informationPOLLUTION CONTROL ACTS, RULES AND NOTIFICATIONS ISSUED THEREUNDER
POLLUTION CONTROL LAW SERIES: PCLS/02/2006(Fifth Edition) POLLUTION CONTROL ACTS, RULES AND NOTIFICATIONS ISSUED THEREUNDER CENTRAL POLLUTION CONTROL BOARD (Ministry of Environment & Forests, Govt. of
More informationTHE HAZARDOUS WASTES (MANAGEMENT AND HANDLING) RULES, 1989
THE HAZARDOUS WASTES (MANAGEMENT AND HANDLING) RULES, 989 MINISTRY OF ENVIRONMENT & FORESTS NOTIFICATION (New Delhi, the 8 th July, 989) S.O.594(E)- In exercise of the powers conferred by section 6, 8
More information(d) Please ensure that the Mobile No. and address of the contact person is mentioned in the forwarding letter of the application.
Instructions to follow with respect to Import/ Export of Hazardous Wastes/ Other Wastes under Hazardous Wastes (Management, Handling and Trans-boundary Movement) Rules, 2008. (a) The application shall
More informationHind Energy & Coal Beneficiation (India) Ltd.
SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to
More informationActivity Aspects Impacts/ Nuisances Construction phase - Site preparation. - Generation of excavated soil, debris and construction wastes
MINISTRY OF ENVIRONMENT AND NDU ENVIRONMENTAL GUIDELINE No. 31 Asphalt Plant Set Up Temporarily For The Purposes Of A Project By A Public Department 1.0 Purpose of guideline This environmental guideline
More informationRural-Residential Rural-Residential Explanatory Statement Significant Issues Objectives and Policies...
Section Contents Rural-Residential... 2 16. Rural-Residential... 2 Explanatory Statement... 2 16.1 Significant Issues... 2 16.2 Objectives and Policies... 3 16.3 Activity Lists... 3 16.4 Activity Performance
More informationClearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004
Name of the Project: Jaypee Rewa Plant, Unit of M/s Jaiprakash Associates Limited for expansion Of cement production from 2.5 MTPA to 3.5 MTPA at Jaypee Nagar, District Rewa, Madhya Pradesh Project Code:
More informationCOMMONWEALTH GAMES VILLAGE 2010 : A GREEN VILLAGE
COMMONWEALTH GAMES VILLAGE 2010 : A GREEN VILLAGE 1.0 Background India, the largest democracy and second most populated country in the world is one of the member countries of the Commonwealth, which has
More informationSubject: Sir, Environment Clearance for Hotel and Beach Resort Project
Environment department, Room No. 217, 2nd floor, Mantralaya, Annexe, Mumbai- 400 032. Date:May 4, 2017 To, Mr. Saranjit Singh Bawa (Authorized Signatory) at Village Sagartirth: 2, HISSA no. 3 B 4, HISSA
More informationProposed Smart City at Trianon by Hermes Properties Ltd EXECUTIVE SUMMARY
EXECUTIVE SUMMARY Hermes Properties Ltd (HPL), hereinafter referred to as the project promoter or proponent, is a private company incorporated in Mauritius involved in the property investment and development
More information(d) Please ensure that the Mobile No. and address of the contact person is mentioned in the forwarding letter of the application.
Instructions to follow w.r.t. Import/ Export of Hazardous Wastes/ Other Wastes under Hazardous Wastes (Management, Handling and Trans-boundary Movement) Rules, 2008. (a) The application shall be addressed
More informationFORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS
FORM - I-A CHECK LIST OF ENVIRONMENTAL IMPACTS 1. LAND ENVIRONMENT QUERY 1.1 Will the existing land use get significantly altered from the project that is not consistent with the surroundings? Attach Maps
More information2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.
Environmental Clearance Point Wise Half Yearly Compliance Report (October 2014 to March 2015) Cement Plant - EC No: F.No. J-11011/450/2007-IA II(I) Dated: 24 th March 2008 A. SPECIFIC CONDITIONS : S.NO.
More informationIAF Mandatory Document. Accreditation Assessment of Conformity Assessment Bodies with Activities in Multiple Countries. Issue 2 IAF MD 12:2016
IAF Mandatory Document Accreditation Assessment of Conformity Assessment Bodies with Activities in Multiple Countries Issue 2 IAF MD 12:2016 2016 Issue 2 Accreditation Assessment of Conformity Page 2 of
More informationORISSA TOURISM DEVELOPMENT CORPORATION LIMITED
ORISSA TOURISM DEVELOPMENT CORPORATION LIMITED (A Govt. of Orissa Undertaking) Panthanivas, (Old Block), Lewis Road, Bhubaneswar-14 No. BP- 23/11 Date: 30.07.2011 ADVERTISEMENT Applications are invited
More informationREQUEST FOR TENDER - SERVICES RFT HOUSE DEMOLITION 7958 BEAVERDAMS RD., NIAGARA FALLS, ON.
REQUEST FOR TENDER - SERVICES 1. PURPOSE AND SCOPE This specification is intended to govern the supply of all labour, materials and equipment for the dismantling, demolition of a single dwelling on the
More informationEnvironmental, Health and Safety Policy for Contractors
Environmental, Health and Safety Policy for Contractors The attached policy is a tool to help contractors understand and comply with RBC's Environmental, Health and Safety rules. The information that follows
More informationDivision 8 Intensive Animal Husbandry Code
Division 8 Intensive Animal Husbry Code 12.8.1 Intensive Animal Husbry Code (1) The provisions in this division comprise the Intensive Animal Husbry Code. (2) They are compliance with the Intensive Animal
More informationMonitoring the Implementation of Environmental Safeguards
Monitoring the Implementation of Environmental Safeguards Ministry of Environment & Forest Western Region, Regional Office, Bhopal MONITORING REPORT PART I DATA SHEET RASHTRIYA CHEMICAS AND FERTILISERS
More informationSTATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II
STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II MUNICIPAL SEPARATE STORM SEWER SYSTEMS May 1, 2003 1 Generic Permit for Discharge of Stormwater
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT For ToR of Proposed Project of MANUFACTURING OF SYNTHETIC ORGANIC DYES (5 f B IND II) By SHREEJI BAPA DYE CHEM PLOT NO 1319 & 1320, PHASE-III, GIDC, VATVA, AHEMADABAD-382445, GUJARAT,
More informationCITY OF TORONTO. BY-LAW No (OMB)
CITY OF TORONTO BY-LAW No. 364-2010(OMB) To amend the General Zoning By-law No. 438-86 of the former City of Toronto with respect to the lands municipally known as 1201 Dundas Street East. WHEREAS the
More informationInformation on the focal point for the Convention. Information on the point of contact for the Convention
Questionnaire for the REPORT OF MONTENEGRO ON THE IMPLEMENTATION OF THE CONVENTION ON ENVIRONMENTAL IMPACT ASSESSMENT IN A TRANSBOUNDARY CONTEXT in the period 2006 2009 Information on the focal point for
More informationExamination: Within 2-3 weeks of completion of Course, 80% Attendance is required to appear in the exam.
Dear Professional Members, A warm greeting from the Committee for Cooperatives & NPO sectors. As you may kindly be aware that, the Committee for Cooperatives & NPO Sectors of the ICAI is taking various
More informationFORM I I. BASIC INFORMATION S. No. Proposed Mixed Use Development Project SPR Binny 2 S. no. in the schedule 8 (b) 1 Name of the project
FORM I I. BASIC INFORMATION. Item Details 1 Name of the project Proposed Mixed Use Development Project SPR Binny 2 no. in the schedule 8 (b) 3 Proposed area Area Details: Total land area: 200243.50 Sqm
More informationAMDAL Procedure. Flowchart of Indonesian Environmental Clearance 1
AMDAL Procedure (This is only indicative and for reference purposes. This is not exhaustive and therefore, the Consultants are requested to familiarize themselves with all the laws, rules, regulations,
More informationPermit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:
Permit Requirements: Any owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install,
More informationSagarmala Development Company Limited
COMPANYPROFILE Sagarmala Development Company Limited The Government of India has formed a special purpose vehicle (SPV), Sagarmala Development Company Ltd. (SDCL), as a public limited company under Companies
More information-65- INDIA GATEWAY TERMINAL PRIVATE LIMITED SCALE OF RATES FOR INTERNATIONAL CONTAINER TRANSHIPMENT TERMINAL Jan-Dec
-65- Annex - VII PREFACE INDIA GATEWAY TERMINAL PRIVATE LIMITED SCALE OF RATES FOR INTERNATIONAL CONTAINER TRANSHIPMENT TERMINAL 2015 Jan-Dec This Scale of Rates sets out the charges payable to India Gateway
More informationCHAPTER 3 POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK
CHAPTER 3 POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK 3.1 Introduction Current national environmental policies are based on the need to take an integrated approach to environmental management and the need
More informationHAZARDOUS WASTES (MANAGEMENT AND HANDLING) RULES, 1989
HAZARDOUS WASTES (MANAGEMENT AND HANDLING) RULES, 1989 1. Short title and commencement 2. Application 3. Definitions 4. Responsibility of the occupier for handling of wastes 5. Grant of authorisation for
More information9.3.9 Industry uses code
9.3.9 Industry uses code 9.3.9.1 Application (1) This code applies to accepted development and assessable development identified as requiring assessment against the Industry uses code by the tables of
More information9 Hazardous Substances and Contaminated Land
9 Hazardous Substances and Contaminated Land Section 9A 9A Purpose of the Hazardous Substances Provisions... 1 9A.1 Objectives and Policies: Hazardous Substances... 1 9A.2 Activity Status Rules: Hazardous
More informationNATIONAL METEOROLOGICAL AND HYDROLOGICAL SERVICES
A SURVEY 1 ON THE ROLE AND OPERATION OF NATIONAL METEOROLOGICAL AND HYDROLOGICAL SERVICES This Questionnaire was developed in response to the decisions of the WMO Executive Council, which at its sixtieth
More informationJhabua Power Ltd. NOTICE INVITING BIDS
Jhabua Power Ltd. 2nd Floor, Centrum plaza, Golf Course Road, Sector- 53, Gurgaon-122002 Ph.: +91-124-4392000 Fax: +91-124-4376496 NOTICE INVITING BIDS BY JHABUA POWER LIMITED (JPL) 2nd Floor, Centrum
More informationPRESENTATION ON DEVELOPMENT OF NEW POWER PROJECTS APPROACH & WAY FORWARD
PRESENTATION ON DEVELOPMENT OF NEW POWER PROJECTS APPROACH & WAY FORWARD Presentation By N.K.Srivastava General Manager (Engg. Services & R&M) 20.04.2012 PROJECT DEVELOPMENT AT NTPC PROJECT IS DEVELOPED
More informationAnnex F Scoping Checklist
Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve
More informationPhotographic Processing Facility Sector Control Policy
Photographic Processing Facility Sector Control Policy Persigo Wastewater Treatment Plant Industrial Pretreatment Division 2145 River Road Grand Junction, CO 81505 970-256-4180 I. INTRODUCTION The United
More informationBasel Convention on the Control of Transboundary Movements of Hazardous Wastes and Their Disposal
Basel Convention on the Control of Transboundary Movements of Hazardous Wastes and Their Disposal 1 BASEL CONVENTION ON THE CONTROL OF TRANSBOUNDARY MOVEMENTS OF HAZARDOUS WASTES AND THEIR DISPOSAL 1 The
More informationDilipbhai D. Patel. BLOCK NO. 43, F.P. NO. 45,O.P NO. 40 T.P.S. No- 17 (PUNA), Ta: SURAT CITY, DIST: SURAT
Annexure B Land Possession letters & N.A. permission letters Annexure C Photograph of the Site Annexure D Details of Buildings Area Calculation Annexure 1 Topo Sheet Annexure 2 Soil Analysis Report Annexure
More informationRepublic of Mauritius. Ministry of Labour, Industrial Relations, Employment and Training. Guidelines
Republic of Mauritius Ministry of Labour, Industrial Relations, Employment and Training Guidelines NOVEMBER 2016 Table of Contents 1.0 DEFINITION... 3 2.0 OBJECTIVE... 3 3.0 OPERATION OF... 3 3.1 Modus
More informationTOILET FACILITIES AND SEWAGE DISPOSAL REGULATIONS
REPUBLIC OF THE MARSHALL ISLANDS ENVIRONMENTAL PROTECTION AUTHORITY TOILET FACILITIES AND SEWAGE DISPOSAL REGULATIONS 1990 INDEX PART I - GENERAL PROVISIONS 1. Authority 2. Purpose 3. Effective date 4.
More informationSOCIETY OF INTEGRATED COASTAL MANAGEMENT (SICOM) MINISTRY OF ENVIRONMENT AND FORESTS GOVERNMENT OF INDIA
A. Advertisement No. 2/2010 - SICOM SOCIETY OF INTEGRATED COASTAL MANAGEMENT (SICOM) MINISTRY OF ENVIRONMENT AND FORESTS GOVERNMENT OF INDIA Ministry of Environment and Forests is implementing World Bank
More informationDust generation/ Air pollution. Noise and vibration. Water pollution. Drainage and sedimentation
Energy Resilience for Climate Adaptation Project (ERCAP) Environmental Code of Practice (ECOP) for COMPONENT 2: Demonstration Measures to Enhance Resilience of Energy Sector (Pilot for Strengthening Transmission
More informationFLOODPLAIN DEVELOPMENT AND BUILDING ORDINANCE
Town of Rye 10 Central Road Rye, NH 03870-0429 FLOODPLAIN DEVELOPMENT AND BUILDING ORDINANCE Item I. Definitions of Terms Item II. Permit Requirement Item III. Building Safety Review Item IV. Sanitary
More informationDetails of Project. Underground source
Details of Project The project proponent wants to develop a Residential complex with all modern amenities at R.S./L.R. Dag No - (442,447,453,454, 443,444), J.LNo-29 Of Khamar Mouja & R.S./L.R. Dag No-(99(P),101,102(P),103,105,106,107,108,109,110,111,112,113(P),114(P),115,125,126,
More informationTOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:
TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION 355-7575 Ext. 395 Needed to Obtain Permit: 1. Building Permit Application, and/or residential plumbing permit application, as applicable, to be
More informationSOLID WASTE DISPOSAL FACILITY CONSTRUCTION/DEMOLITION LANDFILL PERMIT APPLICATION PACKAGE. ADEM Form
SOLID WASTE DISPOSAL FACILITY CONSTRUCTION/DEMOLITION LANDFILL PERMIT APPLICATION PACKAGE ADEM Form 305 8-02 1 July 10, 2002 M E M O R A N D U M TO: FROM: RE: Applicants Seeking a Permit for Solid Waste
More informationSustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015
Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015 1 Ministry of Environmental Conservation and Forestry (MOECAF) Environmental
More information4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:
4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:
More informationWater Supply Corporation here by adopts the following regulations and restrictions on the delivery and consumption of water.
DROUGHT CONTINGENCY PLAN MUSTANG WATER SUPPLY CORPORATION APRIL 17,2000 Section I: Declaration of Policy, Purpose, and Intent In order to conserve the available water supply and protect the integrity of
More informationTHE NATIONAL PENSIONS FUND
VACANCIES VACANCIES THE NATIONAL PENSIONS FUND The National Pensions Fund (NPF) which operates under the aegis of the Ministry of Social Security, National Solidarity and Reform Institutions invites applications
More informationFORM-1 A (only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS
APPENDIX II (See paragraph 6) FORM-1 A (only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS 1. LAND ENVIRONMENT (Attach panoramic view of the project
More informationM/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA
1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which
More informationEnvironment Impact Assessment (EIA) Notification 2006
Environment Impact Assessment (EIA) Notification 2006 Information Sources: 1.) Environment Impact Notification 2006; Gazette of India, 14th September, 2006 2.) Green Tapism; Environment Support Group;
More informationA. Background and Context:
TERMS OF REFERENCE (ToR) FOR SUPERVISION CONSULTANT (SC) for rehabilitation of Bhairahawa pavement works and construction of steel truss shed at Birgunj ICD under NIRTTP A. Background and Context: 1. Nepal
More informationThe mine is opened on The reasons for delay for starting mining operations are:
1 P a g e 2 P a g e THE RAMCO CEMENTS LIMITED (Formerly known as Madras Cements Ltd.) COMPLIANCE REPORT FOR ENVIRONMENTAL CLEARANCE BUDAWADA LIMESTONE MINE - 1.10 MILLION TPA CAPACITY EC Lr. No : J-11015/150/2008-IA.II
More information24.1 Residential Buildings on plots (other than flatted group housing)
24.1 Residential Buildings on plots (other than flatted group housing) (1) Ground coverage, Floor Area Ratio, height and setbacks shall be as per Table-I appended to these regulations. However, the set
More information