1 ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK for the Partial Risk Guarantees Project for Independent Power Producers in Kenya DRAFT May 2011
2 INTRODUCTION The World Bank, through IDA funding, is proposing a series of Partial Risk Guarantees (PRGs) provided in support of payment obligations of Kenya Power and Lighting Company (KPLC) under individual Power Purchase Agreements (PPAs) with Independent Power Producers (IPPs) that are being considered by the Government of Kenya. The proposed Bank project (Partial Risk Guarantees for IPPs in Kenya) would support, among other possible investments, the installation of up to three MW capacity Medium Speed Diesel (MSD) Power Plants. These power plants would be constructed by IPPs under a 20-year Build Own Operate (BOO) arrangement. Each IPP also will be responsible for the construction of a fuel storage facility at each plant site as well as interconnection facilities (switchyards) to allow for the transmission of power by KPLC to the national grid. This Environmental and Social Management Framework (ESMF) is prepared for the three MSD power plants. KPLC initially identified a parcel of land in an Export Processing Zone (EPZ) on the southwest side of the town of Athi River for three proposed MSD thermal power plants. Due to the potential cumulative environmental impacts of siting three such power plants within the same parcel of land, KPLC sought to acquire land in three separate locations. Key selection criteria included: sites with minimal environmental and social impacts; sites from which power could be easily evacuated; sites available for sale immediately; and sites adequate in size. KPLC used print media, estate agents, local authorities, and the public to identify suitable candidate sites. The three sites selected and purchased by KPLC are: the initial site within an unused part of the EPZ southwest of Athi River town, a site near Thika town, and a site along the Nairobi- Mombasa highway to the east of Athi River. Given their respective generating capacities, prevailing winds, and distances from each other, the airsheds of the three projects are not expected to overlap such that cumulative adverse impacts occur on ambient air quality. KPLC conducted preliminary environmental and social assessment work for each of the three sites and was able to determine that there were likely to be no significant environmental and social risks associated with the three sites in terms of natural habitat, land use, or other characteristics associated with the site itself. Rather, the likely impacts would be associated with the construction and operation of the proposed thermal power plant at each site, e.g., construction-related impacts; air emissions and impacts on ambient air quality; solid and liquid waste management; noise; the transport, handling, and storage of fuel; etc. The responsibility, however, for preparing an Environmental and Social Impact Assessment (ESIA) relies with each of the IPPs that successfully wins the bid for building and operating a power plant on the designated site. The ESIA for each project would likely have very similar issues and impacts to address, but the details of the impact analysis would depend on the specifics of the proposed design and management of each facility. ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK In preparing the proposed project, the Bank recognized that an Environmental and Social Management Framework (ESMF) would be required to meet the requirements of Bank Policy OP 4.01 (Environmental Assessment) for the three MSD thermal power plants. An ESMF is
3 prepared during project preparation as per OP 4.01 when the nature of the proposed investments is well understood, but details (either locations, designs, or both) of the specific investments in the project are not yet known, and therefore a detailed ESIA cannot be prepared. The purpose of the ESMF is: (i) to provide as much information as possible about environmental and social impacts (including possible land acquisition and resettlement) at the project s current state of preparation; (ii) to inform project planning and design process by comparing potential impacts of alternative locations, configurations, and construction techniques that are under consideration; and (iii) to describe procedures for subsequent assessment of impacts and development of appropriate impact management instruments when the details of the project become available. The scope and coverage of an ESMF generally includes the following key tasks: Task 1: Screening and Scoping of Issues Task 2: Environmental Policy and Regulatory Framework Task 3: Identification of Key Environmental and Social Issues Task 4: Description of Typical Mitigation Measures to Avoid or Minimize Impacts Task 5: Outlines of Environmental and Social Management Plans Task 6: Public Consultation and Disclosure Process The preparation of an ESMF is designed to provide stakeholders and decisionmakers with a broad understanding of what are likely to be the key issues and impacts, and how they can be addressed. It also serves as a guide to the preparation of subsequent site-specific Safeguards documents such as an Environmental and Social Impact Assessment, Environmental Management Plan, Emergency Response Plan, or similar documents that are appropriate to the nature of the project, once specific sites and project designs are selected and can be subject to detailed impact assessment. The limitation of an ESMF, however, is that it often tends to be a more generic analysis and assessment of impacts, since details of project design, or location (or both), are not yet known. In the case of the current project in Kenya to provide PRGs to IPPs that will build MSD thermal power plants at the three sites purchased for this purpose by KPLC, progress is being made in preparing ESIAs for all three projects by the respective IPPs. The first draft ESIA has been received by the Bank for one of the projects, located east of Athi River. The Bank has determined that the Draft ESIA dated April 2011, prepared by Nutek Solutions for Gulf Power Ltd. (the IPP for the proposed MSD power plant at Athi River), is of sufficient quality to be disclosed as a draft ESIA in accordance with Bank practice, and this has now been done by the Bank both locally in the Bank s Public Information Center in Kenya, and in the Bank s InfoShop. Moreover, the timely preparation of this Draft ESIA also provides the level of detail and analysis that is typically expected in an ESMF for investments of this type in this region of Kenya. Therefore, with the permission of the responsible IPP, Gulf Power Ltd., and their consultants, Nutek Solutions, the Bank is taking the innovative approach of disclosing their
4 document not only as an ESIA for their specific investment, but also as the ESMF for the Bank s Partial Risk Guarantees for IPPs in Kenya Project because their document reflects the scope and coverage of an ESMF as indicated above, but on the basis of a real case study, rather than the more generic approach normally taken in preparation of an ESMF. This innovative approach is being taken because the attached draft ESIA provides a broad understanding of what are likely to be the key issues and impacts, and how they can be addressed, in the construction and operation of an MSD thermal power plant of approximately MW capacity in this region of Kenya. KEY ENVIRONMENTAL ISSUES INMSD THERMAL POWER PLANT OPERATIONS Key environmental issues typically of concern in the operations of a MSD thermal power plant, which typically use reciprocating engines and burn various forms of diesel fuel, primarily include the following: Air emissions Noise Water consumption Solid wastes Hazardous materials and oil In thermal power plants of the proposed size range (80-90 MW) using heavy fuel oil, the primary air emission parameters of concern is SO 2, and to a lesser extent, NO x. Installation of pollution control equipment, such as scrubbers, is generally not economical on such power plants at that scale; rather, other measures, such as choice of fuel quality and use of engines that increase energy conversion efficiency, are recognized as Good International Industry Practice (GIIP) to most effectively reduce emissions of multiple air pollutants. Limiting sulfur content of the fuel to 2 percent sulfur or less in such a power plant is generally recognized as an effective measure to comply with World Bank Group Environmental Health and Safety Guidelines for air emissions from thermal power plants. Designing stack heights according to GIIP also can be used to avoid excessive ground level concentrations and minimize impacts. Principal sources of noise in thermal power plants include the turbine generators and auxiliaries; boilers and auxiliaries; reciprocating engines; fans and ductwork; pumps; compressors; condensers; piping and valves; motors; transformers; and cooling towers. Use of noise control techniques is normal practice, and GIIP techniques may include as appropriate: using acoustic machine enclosures; selecting structures according to their noise isolation effect to envelop the building; using mufflers or silencers in intake and exhaust channels; using sound-absorptive materials in walls and ceilings; using vibration isolators and flexible connections; and applying a carefully detailed design to prevent possible noise leakage through openings or to minimize pressure variations in piping. All of these measures can be considered in ensuring that the engines will be located within a power house that will be acoustically designed. Modification of the plant layout, or use of noise barriers such as berms and vegetation to limit ambient noise at plant property lines, especially where sensitive noise receptors may be present, is also a common noise attenuation measure. Noise levels from the facility must meet the requirements of Kenyan legislation on noise and ISO 15664:2001. Noise impacts shall not exceed the World Bank guideline levels or result in a maximum increase in background levels of 3 db(a) at the nearest
5 receptor off-site. The Proponent will ensure compliance with the requirements of Kenyan legislation on noise, specifically L.N. 25: The Factories and Other Places of Work (Noise Prevention and Control) Regulations, 2005 and L.N. 61: Environmental Management and Coordination (Noise and Vibration Pollution Control) Regulations, There will be minimal water requirements during the operational phase for drinking and sanitation. An on-site water tank will hold water for cooling and sufficient for fire-fighting purposes. A standalone fire protection system will be provided for the power plant with all of the requisite fire-fighting equipment in accordance with relevant local and international codes. Sewage and waste will be dealt with in accordance with local by-laws and other relevant Kenyan legislation. It is normal practice to store oily sludges from the fuel cleaning process and return them to either the fuel supplier or directly to a refinery for reprocessing into other usable products. The bulk liquid storage tanks will be bunded and provided with a closed system drain where the water will be treated prior to release. ACKNOWLEDGEMENTS The Bank wishes to acknowledge the generous agreement of Gulf Power Ltd. and Nutek Solutions to allow the Bank and Borrower to use their document not only as the ESIA for their project, but also as an innovative approach to development of an Environmental and Social Management Framework for the Bank s project.
ENVIRONMENTAL NOISE CONTROL FOR SEMICONDUCTOR MANUFACTURING FACILITIES
Presented at Inter-Noise 99 The 1999 Congress and Exposition on Noise Control Engineering December 8, 1999, Fort Lauderdale, Florida ENVIRONMENTAL NOISE CONTROL FOR SEMICONDUCTOR MANUFACTURING FACILITIES
More informationApplied Noise Control. D. W. Herrin, Ph.D., P.E. University of Kentucky Department of Mechanical Engineering
D. W. Herrin, Ph.D., P.E. Department of Mechanical Engineering Outline of Topics 1. Introduction 2. Noise Control at Source 3. Noise Control of Transmission Path 4. Protection at Receiver 5. Summary 2
More information9 October Town of Medway 155 Village Street Medway, MA Chair, Medway Board of Selectmen
Town of Medway 155 Village Street Medway, MA 02053 Attention: Subject: John Foresto Chair, Medway Board of Selectmen Acoustical Consulting Services Application Review for Two 100 MWe Combustion Turbine
More informationB. System Design and Performance Requirements
15625 Water Chillers This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or in notes
More informationYour partner for the right solution
Your partner for the right solution Project engineering of power stations Environment protection in energy sector Equipment supplying Supervision of installation of the equipment supplied Commissioning
More informationPublic Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sectors Project ID Borrower Responsible Agency Report No. PID6537
More informationA proposed new gas-fired power station on the Wilton International site
TEES CCPP PROJECT A proposed new gas-fired power station on the Wilton International site Welcome This event is intended to provide you with information about the proposed Tees Combined Cycle Power Plant
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 10/28/2009 INTEGRATED SAFEGUARDS DATASHEET
More informationSummary of Preparatory Study
Summary of Preparatory Study 1. Title of the Cooperation Project, Relevant Project Report Preparatory Survey on the Project for the Establishment of Rural Water Supply System in Kambia Town in the Republic
More informationHALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS
HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 1. Name of the Project: M/s MCC PTA India Corp. Private Limited Haldia ( WB) Note: Company Name was change from MCC PTA India Corp.Private
More informationRenewable energy: Investing in Africa
1. Who is responsible for energy policy? 2. To what extent have generation, transmission and distribution activities been unbundled? 3. Who owns and operates the (grid-connected) generation, transmission
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 23-Jul-2014
More informationEnvironmental and Social Review Summary. Kribi and Dibamba Operations
Environmental and Social Review Summary Kribi and Dibamba Operations This Environmental and Social Review Summary (ESRS) is prepared by MIGA staff and disclosed prior to the date on which MIGA s Board
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3946. Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION. A. Basic Project Data
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION A. Basic Project Data INTEGRATED
More informationNaturEner Wild Rose 1 Energy Inc.
Decision 2013-348 Amendment to Wild Rose 1 Wind Power Plant September 13, 2013 The Alberta Utilities Commission Decision 2013-348: Amendment to Wild Rose 1 Wind Power Plant Application No. 1609685 Proceeding
More informationCogeneration. Thermal Chillers. and. .. ASHRAE National Capital Chapter. Arlington, VA 10/10/2012
Cogeneration and Thermal Chillers.. ASHRAE National Capital Chapter. Arlington, VA 10/10/2012 Agenda Cogeneration Interest and Application Basics Equipment Matching Thermal Chiller Overview Steam Components
More informationNOISE IMPACT STUDY - HORIZONTAL DIRECTIONAL DRILLING FOR BLUEWATER RIVER CROSSING REPLACEMENT PROJECT
Stantec Consulting Ltd. 300-675 Cochrane Drive West Tower Markham ON L3R 0B8 Tel: (905) 944-7777 Fax: (905) 474-9889 August 9, 2012 File: 160960699 NOISE IMPACT STUDY - HORIZONTAL DIRECTIONAL DRILLING
More informationNoise Control Case Studies TIM WIENS CONESTOGA-ROVERS & ASSOCIATES
Noise Control Case Studies TIM WIENS CONESTOGA-ROVERS & ASSOCIATES A bit about your speaker Presentation Overview 1. Some Case Studies 2. Mystery 3. Drama 4. Danger Environmental Noise Impact an Overview
More information2. TECHNICAL DESCRIPTION OF THE PROJECT
2. TECHNICAL DESCRIPTION OF THE PROJECT 2.1. What is a Combined Cycle Gas Turbine (CCGT) Plant? A CCGT power plant uses a cycle configuration of gas turbines, heat recovery steam generators (HRSGs) and
More informationModuline. Acoustic Enclosure System. Rugged Noise Control Structures Using Acoustically Rated & Field Proven Demountable Components
Moduline Acoustic Enclosure System Rugged Noise Control Structures Using Acoustically Rated & Field Proven Demountable Components Lab certified acoustic ratings Broad range of performance levels 63 Hz
More informationAcoustic Consulting Australia PtyLtd. I Consultants on Noise and Vibration P0 Box 332
Pg 'P. Acoustic Consulting Australia PtyLtd. I Consultants on Noise and Vibration P0 Box 332 Heidelberg i#i..wr. David, u.,0 Victoria 3054 Phone 0412 375 234 Email: acausteblgpond.corn ABN 49 095 932 092
More informationAdvances in Dry Cooling Deployed at South African Power Stations
Advances in Dry Cooling Deployed at South African Power Stations Steve Lennon Divisional Executive Eskom 2011 Summer Seminar August 1, 2011 Eskom s Move to Dry-Cooling Eskom historically utilized wet-cooled
More informationAppendix I Noise Impact Assessment
Appendix I Noise Impact Assessment Genesee Generating Station Units 4 & 5 Project Noise Impact Assessment Project #: 123510975 Prepared for: Capital Power Corporation 1200 10423 101 St. N.W. Edmonton,
More informationSANY ASPHALT BATCHING PLANT
SANY ASPHALT BATCHING SANY Industry Town, Changsha Economic and Technological Development Zone, Hunan Province, China Service Line: +86 4006 098 318 E-mail: crd@sany.com.cn www.sanygroup.com Date: MAR
More informationJapanese ODA Loan. Ex-Ante evaluation
Japanese ODA Loan Ex-Ante evaluation 1. Project Country: People's Republic of Bangladesh Name of the Project: Matarbari Ultra Super Critical Coal-Fired Power Project (I) Loan Agreement: June 16, 2014 Loan
More informationAN INTEGRATED VIRTUAL PIPELINE SYSTEM Proven Clean Energy Compression technology harmonized to deliver optimal return on investment.
OffgridCNG AN INTEGRATED VIRTUAL PIPELINE SYSTEM Proven Clean Energy Compression technology harmonized to deliver optimal return on investment. FULLFILL AND MAXOFFLOAD TECHNOLOGY Up to 10% more fuel being
More information1.0. Introduction. Environmental Impact Assessment Prepared for Egnedol Wales Limited
3 1.0 Introduction 4 1.0 Introduction 1.1 Overview 1.2 The Environmental Impact Assessment and the Environmental Statement 1.3 Environmental Permit 1.4 Availability of the Environmental Statement 04 07
More informationNoise Control. Commercial, Industrial, and Environmental Products and Solutions.
Noise Control Commercial, Industrial, and Environmental Products and Solutions www.kineticsnoise.com Commercial Duct Silencers Kinetics Noise Control offers the design and engineering assistance to integrate
More informationA COMPLICATED PROJECT FOR POWER AND WATER CO- GENERATION: THE RAF SITE
A COMPLICATED PROJECT FOR POWER AND WATER CO- GENERATION: THE RAF SITE Authors: Presenter: M. Garzoglio, L. Riccardo M. Garzoglio [Process Senior Eng. Fisia Italimpianti Italy] Abstract The Ras Abu Fontas
More information5600. LARGE-SCALE GROUND-MOUNTED SOLAR PHOTOVOLTAIC INSTALLATIONS
To Wit: To see if the Town will vote to amend the Town of Westborough Zoning Bylaws, Article 2, District Regulations, Section 2300, Use Regulations Schedule; and to amend Article 4, Special Regulations
More informationDESIGN BASIS FOR AIR CONDITIONING AND VENTILATION SYSTEM FOR SUBSTATION AND CONTROL BUILDING HINDUSTAN PETROLEUM CORPORATION LTD.
CONDITIONING AND VENTILATION FOR SUBSTATION AND CONTROL BUILDING HINDUSTAN PETROLEUM CORPORATION LTD. VISAKH REFINERY DHT PROJECT TEIL JOB NO.: 6261 DOCUMENT NO.: 6261-HVAC-PKG-300 TEIL SPECIFICATION NO.:---
More informationEmergency Engine and Turbine Requirements
1.0 Purpose and Applicability 1.1 The purpose of these guidelines is to identify the processes and requirements that must be followed to ensure compliance with the Massachusetts Department of Environmental
More informationIndonesia - Lahendong II Geothermal Power Project (P096677) Environmental and Social Due Diligence
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Indonesia - Lahendong II Geothermal Power Project (P096677) and Social Due Diligence
More informationThe H-25/H-15 Gas Turbine A Product of Hitachi Quality
DMLieferant www.dmliefer.ru The H-25/H-15 Gas Turbine A Product of Hitachi Quality The H-25 s fuel savings will repay your investment within a few years while allowing you a range of fuels from distillate
More informationGOLD STANDARD PASSPORT
GOLD STANDARD PASSPORT CONTENTS A. Project title B. Project description C. Proof of project eligibility D. Unique Project Identification E. Outcome stakeholder consultation process F. Outcome sustainability
More informationSustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015
Sustainability Roadmap for Myanmar (Environment Perspective) Dr. San Oo Director Environmental Conservation Department 20 January 2015 1 Ministry of Environmental Conservation and Forestry (MOECAF) Environmental
More informationWest County Treatment Plant Noise and Odor Control Project Update. June 29, 2004
West County Treatment Plant Noise and Odor Control Project Update June 29, 2004 West County Meeting Purpose 1. Brief history of odor and noise control project 2. Describe odor and noise control systems
More information4. The ambient air quality monitoring stations We are monitoring the ambient air quality
GLOBAL CALCIUM PRIVATE LTD., 125&126, SIPCOT COMPLEX, HOSUR 635 126 Ref : No. J-11011/411/2006-IA-II(I) dated 1 st August 2007. Compliance Report for the Period ending 31.3.2015 Sl. Specific Conditions
More informationNEC Acostix. Sound Attenuation Calculations and Design Software. General Information
NEC Acostix Sound Attenuation Calculations and Design Software General Information NEC Acostix TM is an Excel-Based programmable sheets to help engineers and manufacturers design acoustic enclosures, rectangular
More informationPJM Manual 21: Rules and Procedures for Determination of Generating Capability Revision: 12 Effective Date: January 1, 2017
PJM Manual 21: Rules and Procedures for Determination of Generating Capability Revision: 12 Effective Date: January 1, 2017 Prepared by System Planning Department PJM 2017 Table of Contents Table of Contents
More informationPackaged AHR (Advanced Heat Recovery) Systems for Engines, Gas Turbines, & Industrial Waste Heat. Tom Pierson
Packaged AHR (Advanced Heat Recovery) Systems for Engines, Gas Turbines, & Industrial Waste Heat Tom Pierson Last Field Erected CHP Project- Calpine Clear Lake, TX 1999 Evolution of Packaged Concept 500,000+
More informationEnvironmental Governance in Myanmar. U Than Aye Director Environmental Conservation Department
Environmental Governance in Myanmar U Than Aye Director Environmental Conservation Department 1 Strategy for Environmental Safeguards To work for Economic Development in Parallel with Environmental Conservation
More informationFor PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra
Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech
More informationEnvironmental and social impacts of smallscale. Issues and Challenges. Glenn Morgan (LCSEN) World Bank Water Week February 18, 2009
Environmental and social impacts of smallscale hydropower: Issues and Challenges Glenn Morgan (LCSEN) World Bank Water Week February 18, 2009 Presentation objectives Review the nature and scale of environmental
More informationPengrowth Lindbergh SAGD Project
aci Acoustical Consultants Inc. 5031 210 Street Edmonton, Alberta, Canada T6M 0A8 Phone: (780) 414-6373, Fax: (780) 414-6376 www.aciacoustical.com Environmental Noise Impact Assessment For Pengrowth Lindbergh
More informationQuestionnaire (Conventional Energy)
Questionnaire (Conventional Energy) QUESTIONNAIRE FOR CONVENTIONAL ENERGY (SECTOR-RELATED QUESTIONS) The completion of this questionnaire is voluntary. However, replying to the relevant questions as completely
More informationOverview of cogeneration technology and application
Overview of cogeneration technology and application Cogeneration Week Hanoi, 6 April 2004 Melia Hotel, Hanoi Leif Mortensen, Coal Expert Cogeneration or Combined Heat and Power (CHP) Sequential generation
More informationEnvironmental and Social Data Sheet
Environmental and Social Data Sheet Overview Project Name: Project Number: 2013-0342 OUARZAZATE II (PARABOLIC) Country: MOROCCO Project Description: Construction and operation of a 200 MW CSP Parabolic
More informationHigh Bridge Combined Cycle Plant
High Bridge Combined Cycle Plant Location: Down town St. Paul, on the Mississippi River Plant Description: High Bridge is a combined cycle generating facility. A combined cycle plant produces electricity
More informationPower Plant Near-Field Noise Considerations
Power Plant Near-Field Noise Considerations Authored by: Charles Powers Program Manager Environmental and Acoustic Engineering GE Energy Andrew Dicke Senior Acoustic Engineer Environmental and Acoustic
More informationNoise Impact Assessment
APPENDIX C Noise Impact Assessment CBCL Limited Appendices NOISE IMPACT ASSESSMENT PUGWASH WIND FARM, NOVA SCOTIA Client Pugwash Wind Farm Inc. Contact Charles Demond Document No Issue B Status Classification
More informationRequest for Quotations Acoustic Consultant Services
Request for Quotations Acoustic Consultant Services DESCRIPTION The Cape Cod Commission is seeking an experienced, qualified acoustic consultant to assist the Commission in developing a methodology for
More informationBarilla Cogeneration Power Plant main tips
main tips Client Location Total contract Scope of work Fenice SpA Contract value 13.3 M$ Contract period 2007-2010 The Plant has been built within the premises of the Barilla factory in Parma (IT), at
More informationCombined Cooling, Heating and Power (CCHP) in Distributed Generation (DG)
Combined Cooling, Heating and Power (CCHP) in Distributed Generation (DG) Ruhai Hao Department of Electrical Engineering Michigan Technological University EE5250 Term Project April 21, 2006 Introduction
More informationSyllabus Cogeneration: Definition, Need, Application, Advantages, Classification, Saving potentials
7. COGENERATION Syllabus Cogeneration: Definition, Need, Application, Advantages, Classification, Saving potentials 7.1 Need for cogeneration Thermal power plants are a major source of electricity supply
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/29/2007 INTEGRATED SAFEGUARDS DATASHEET
More informationPost Combustion CO 2 Capture Scale Up Study
Post Combustion CO 2 Capture Scale Up Study Prachi Singh and Mike Haines International Greenhouse Gas R&D programme 6 th International Conference on Clean Coal Technologies (CCT 2013) 12-16 th May 2013
More informationGeothermal Power Plant
Geothermal Power Plant Star Energy Geothermal (Wayang Windu) Ltd., Indonesia Wayang Windu Geothermal Power Plant 1 110MW and 1 117MW 01A3-E-0020 14 Outline Wayang Windu Geothermal Power Plant is located
More information5.2 MW Solar Mobile Power Unit
5.2 MW Solar Mobile Power Unit Ventilation air intake Ventilation air exhaust Air inlet & silencer Exhaust Silencer Power Control Room & Trailer -13.8 KV switchgear -CO2 fire system -480 VAC MCCC for turbine
More informationNOTE: Some guidance on a performance approach to natural ventilation systems design is provided in the Supplement to this Standard.
19 SECTION 3 NATURAL VENTILATION 3.1 SCOPE OF SECTION This Section specifies the means of achieving the quantity of outdoor air required in a naturally ventilated enclosure. The provisions described include
More informationINDONESIA S NEW DEVELOPMENT IN POWER AND RENEWABLE ENERGY SECTORS by Hapsari Arumdati
INDONESIA S NEW DEVELOPMENT IN POWER AND RENEWABLE ENERGY SECTORS by Hapsari Arumdati Introduction Indonesian power sector is one of the business sectors in Indonesia which is strictly regulated. For the
More informationWelcome to our Open House!
Welcome to our Open House! Please sign in at the front desk and provide your contact information if you would like to receive project updates. We invite you to walk around and look at the displays. If
More informationADVANCED PUMP TECHNOLOGY.
FAIRBANKS NIJHUIS ADVANCED PUMP TECHNOLOGY www.fairbanksnijhuis.com A worldwide service organization Downtime is Money Our service department offers financially attractive service and maintenance contracts
More informationPratt & Whitney. Power Systems MOBILEPAC. Gas Turbine Package. It s in our power.
Power Systems Pratt & Whitney Power Systems MOBILEPAC Gas Turbine Package TM It s in our power. Pratt & Whitney FT8 MOBILEPAC Gas Turbine Package The MOBILEPAC gas turbine package requires the smallest
More informationSteam Power Station (Thermal Station)
Steam Power Station (Thermal Station) A generating station which converts heat energy into electrical energy through turning water into heated steam is known as a steam power station. A steam power station
More informationControlling noise on offshore installation during design and commissioning West Elara case
Controlling noise on offshore installation during design and commissioning West Elara case Philippe Loustau engineering manager October 18, 2012 Offshore noise control What are the challenges for offshore
More informationEnvironmental Impact Assessment
Environmental Impact Assessment A brief discussion Presented by: Apekshit Solanki Kirti Neetu Yadav Sameera Vishakha Shankar Introduction EIA is a formal process to predict the environmental consequences
More informationSUNDANCE 7 January 2014
Artist rendering of a combined-cycle natural gas power plant. SUNDANCE 7 January 2014 Project Information Booklet Table of Contents Introduction to Sundance 7 1 TransAlta and MidAmerican 1 Project location
More informationBlackstone: flexible and environmentally friendly power plant
May-June 2002 Turbomachinery Blackstone: flexible and environmentally friendly power plant INTERNATIONAL Two single shaft combined cycle blocks - each with centrally-mounted generator and SSS Clutch Blackstone:
More informationGuangdong Provincial Green Freight Demonstration Project by Grant of GEF
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Grant Project of Global Environment Facility (GEF) Guangdong Provincial Green Freight
More informationAUXILIARY POWER MEASUREMENT, OPTIMIZATION & ANALYSIS. Steag Energy Training Center EEC WORKSHOP to
AUXILIARY POWER MEASUREMENT, OPTIMIZATION & ANALYSIS Steag Energy Training Center EEC WORKSHOP-25.09.2013 to 27.09.2013 Heat Input into a Large Coal Fueled Power Plant- Sub Critical design. 3% Stack Clean-up
More informationWESTINGHOUSE PLASMA GASIFICATION. Hazardous Waste Management
WESTINGHOUSE PLASMA GASIFICATION Hazardous Waste Management Hazardous waste is just that hazardous. Medical, industrial and petrochemical wastes are all types of hazardous waste and pose threats to human
More informationHitachi H-25 & H-80 Gas Turbine. Bucharest, Apr.23, 2013
Hitachi H-25 & H-80 Gas Turbine Bucharest, Apr.23, 2013 Doc No. : GKKP-13-009 Rev.0 Hitachi, Ltd. 2013. All rights reserved. 1 Table of Contents Hitachi Gas Turbine Business H-25 Performance and Applications
More informationT U R B O B L O W E R S
A e r z e n T U R B O B L O W E R S New Aerzen Turbo Blower Units Volume Flow Intakes from 1,000 m³/h to 13,200 m³/h A E R Z E N E R M A S C H I N E N F A B R I K G M B H GODREJ & Boyce Mfg. Co. Ltd. -
More informationKawasaki Gas Turbines-Americas Gas Turbines Power Generation Technology & Applications
Kawasaki Gas Turbines-Americas Gas Turbines Power Generation Technology & Applications Gas Turbine (GT) Technology Overview Gas Turbine Theory GT - Centrifugal Compressor FUEL INLET COMBUSTION CHAMBER
More informationSummary of Environmental Impacts associated with the Vlore Thermal Power Station
Summary of Environmental Impacts associated with the Vlore Thermal Power Station 0. Background The European Bank for Reconstruction and Development (EBRD) has been requested by Korporata Elektroenergjetike
More informationActivity Aspects Impacts/ Nuisances Construction phase - Site preparation. - Generation of excavated soil, debris and construction wastes
MINISTRY OF ENVIRONMENT AND NDU ENVIRONMENTAL GUIDELINE No. 31 Asphalt Plant Set Up Temporarily For The Purposes Of A Project By A Public Department 1.0 Purpose of guideline This environmental guideline
More informationCOOLING TOWER DESIGN FOR CENTRAL GENERATORS OF CUET, BANGLADESH. Mohammad Sharif Khan, Golam Mainuddin, Abu Sadat Mohammad Sayem, Nadeem Nafis
Proceedings of the 4 th BSME-ASME International Conference on Thermal Engineering 7-9 December, 008, Dhaka, Bangladesh COOLING TOWER DESIGN FOR CENTRAL GENERATORS OF CUET, BANGLADESH. Mohammad Sharif Khan,
More informationAddition to Section 4 - Special Use Regulations
Large-Scale Ground-Mounted Solar Photovoltaic Installations Addition to Section 4 - Special Use Regulations 4.4 Large Scale Ground-Mounted Solar Photovoltaic Installations 4.4.1 Purpose The purpose of
More informationThe rezoning application and proposed transportation facility warrants consideration.
Date: November 11, 2014 To: Re: Chair and Members Planning & Development Committee PDE File Number: REZ1400020 275 Conception Bay South Bypass Road, Ward 5 Application to Rezone Land to Industrial General
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.:51272 Project Name
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report.:51272 Project Name CBF Sidi
More informationChapter 2.7: Cogeneration
Chapter 2.7: Cogeneration Part-I: Objective type questions and answers 1. In cogeneration, the system efficiencies can go up to ------ a) 70% b) 80% c) 90% d) 60% 2. Cogeneration is the simultaneous generation
More informationSIPAPER Reject Power. Environmental Product Declaration. Pulp and Paper Technologies
SIPAPER Reject Power Environmental Product Declaration Pulp and Paper Technologies Environmental mission statement Design for environment Our knowledge and our solutions are helping to create a better
More informationNoise Control Solutions For Power Generation, Oil and Gas Applications
Noise Control Solutions For Power Generation, Oil and Gas Applications Power Generation Solutions IAC Acoustics, your leading partner in providing noise control solutions for the power generation, oil
More information7. Electrical Facility Ratings
7. Electrical Facility Ratings 7.1 Accredited Net Generating Capacity This Section shall be used to determine the annual and seasonal accredited net generating capacity of generators in calculating the
More informationEnvironmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department
2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote
More informationContent. Cooling Tower Water Treatment...1. Maintaining Water Quality...1. Startup Conditions...1. Blowdown...1. Chemical Treatment...
Content Cooling Tower Water Treatment...1 Maintaining Water Quality...1 Startup Conditions...1 Blowdown...1 Chemical Treatment...2 Cooling Tower Water Filtration...4 Layout Guidelines...5 Introduction...5
More informationDyno Test Rooms Professional Chassis, Engine & Specialty Test Rooms for the PowerSports & Product Testing Market
INC s Professional Chassis, Engine & Specialty Test Rooms for the PowerSports & Product Testing Market Proven performance Contains noise and removes exhaust Rugged modular steel panel construction Safe
More informationEquipment Design. Detailed Plant Conceptual Design. Version 9.0
Equipment Design Version 9.0 Detailed Plant Conceptual Design SOAPP CT sizes all major plant equipment, based on your Project Input, the process configuration derived from this input, and the results of
More informationVTU Energy concentrates on consultancy and software systems for the power and energy-intensive process industries.
VTU Energy is part of the VTU Group with headquarters in Grambach, Austria. VTU is the abbreviation for the German words Verfahren (process) Technologie (technology) Umwelt (environment) which actually
More informationGE Energy H SYSTEM WORLD S MOST ADVANCED COMBINED CYCLE TECHNOLOGY
GE Energy H SYSTEM WORLD S MOST ADVANCED COMBINED CYCLE TECHNOLOGY World s Most Advanced Combined Cycle Gas Turbine Technology GE s H System the world s most advanced combined cycle system and the first
More informationSOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN
SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN (EXECUTIVE SESSION) November, 2007 JAPAN EXTERNAL TRADE ORGANIZATION JAPAN CONSULTING INSTITUTE SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN 1. Power Generation
More informationANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP. 1. Objectives. The aim of the study is to achieve the following objectives:
ANNEXE 2: THE TERMS OF REFERENCE FOR ESIA AND RAP 1. Objectives The aim of the study is to achieve the following objectives: Review of existing EIA and RAP reports on sections of the line which are not
More informationEnvironmental Conditions Laboratories (for commercial use) Group
GBR No. 20 Environmental Conditions Laboratories (for commercial use) Group ERA regulates the environmental impact of enterprises through two key mechanisms. Smaller scale activities are regulated through
More informationKEPCO KEPRI Kim eui hwan
2015 KEPIC PERFORMANCE TEST SEMINAR New Start! Open Soft Speed AGAIN KEPCO! 2015. 9. 22 KEPCO KEPRI Kim eui hwan 1 2 3 test Steam turbine test 2/42 3/42 Thermal analysis of Power Plant Cycle Grasp of the
More informationSIX MONTHLY COMPLIANCE REPORT JUNE- 2015
SIX MONTHLY COMPLIANCE REPORT JUNE- 2015 Group Housing Complex My woods AT Plot no. GH-04, Sector -16 C, Noida Extension, Greater Noida, U.P. Being developed by M/s Mahagun India Pvt. Ltd. A-19, Sector-63,
More informationBuilding & Ductwork Airtightness Standards
Building & Ductwork Airtightness Standards Version 1.02, August 2013 Standard Reference Technical Body Title ICS (International Classification for Standards) Scope Door and Windows EN 12207:1999 Windows
More informationORDINANCE NO. VI-III A WIND ENERGY DEVICE ORDINANCE EMMET COUNTY, IOWA AN ORDINANCE ADDRESSING STANDARDS, CONDITIONS, APPLICATION, REVIEW AND
ORDINANCE NO. VI-III A WIND ENERGY DEVICE ORDINANCE EMMET COUNTY, IOWA AN ORDINANCE ADDRESSING STANDARDS, CONDITIONS, APPLICATION, REVIEW AND APPROVAL FOR THE CONSTRUCTION AND MAINTENANCE OF WIND ENERGY
More informationVFDs driving the boiler feed water pump of #11-13 Combined Cycled Generation Unit in Yangpu Thermal Power Plant by Bin Li
VFDs driving the boiler feed water pump of #11-13 Combined Cycled Generation Unit in Yangpu Thermal Power Plant by Bin Li Brief introduction to Author: Li Bin, born in 1969, graduated from Beihang University
More informationTransPacific Energy Advantage: Case Studies
TransPacific Energy Advantage: Case Studies Typical Power Plant TPE-ORC 0.60 KWh ORC 2.3 KWh LP steam 0.35 KWh 30% (maximum) 2.05 KWh CHP Typical Power Generated 1.1 KWh Typical Power Wasted 2.31 KWh Typical
More information