1 3 1.0 Introduction

2 4 1.0 Introduction 1.1 Overview 1.2 The Environmental Impact Assessment and the Environmental Statement 1.3 Environmental Permit 1.4 Availability of the Environmental Statement Overview This Environmental Statement (ES) is provided to support the proposal by Egnedol Wales Limited (the Applicant), to construct and operate a Biomass to Energy Facility and Eco-park at Blackbridge and Waterston, Milford Haven. The site incorporates land occupied by the former Royal Navy Armament Depot (RNAD) and the former Gulf Oil Refinery. The postal address for the site is: Egnedol Wales Limited The White House Newton Road Blackbridge Milford Haven SA73 1DR. The location of the proposed development site is shown in Figure 1.1a below. Figure 1.1a: Site location

3 5 The site was formerly in two ownerships, the south western parcel (RNAD Blackbridge) being formerly owned by Pembrokeshire County Council and the north eastern parcel (Waterston) being formerly owned by Welsh Government. The centre of the Blackbridge site is located at Grid Reference (GR): SM and the centre of the Waterston site is located at Grid Reference SM The site lies adjacent to the Milford Haven Waterway. The Milford Haven Waterway is a registered Site of Special Scientific Interest (SSSI) and Special Area of Conservation (SAC). The site also lies within the registered historical landscape of the Milford Haven Waterway The proposed development includes the following Key Project Elements, namely: - Refurbishment and use of the existing jetty; Construction of a 49.9 MW Biomass to Energy facility (BtEf); Facility for the advanced conversion of carbon to liquid fuel and gas; Aquaculture facility to include Fish farm and Prawn farm; Algae production units; Cheese production unit; Greenhouses; Facility for the preparation and sales of farmed produce; Research and development facilities; New grid connection. The masterplan layout of the facility is provided on Figure 1.1b on the following page. The Biomass to Energy Facility has been categorised as a Development of National Significance by the Planning Inspectorate under the Developments of National Significance (DNS) (Specified Criteria and Prescribed Secondary Consents) (Wales) Regulations Permission for its development will therefore be determined by the Planning Inspectorate within Welsh Government. The Eco Park developments have been classified as Secondary Consents, which will also be determined by the Planning Inspectorate. The refurbishment of the jetty and connection to the national grid at Pembroke Power Station will require a Marine Works License. The environmental impact of the whole project has been assessed with respect to both its terrestrial and marine impact and where required, mitigation strategies have been developed to either off set the impacts or where possible to improve the environmental status of the area. The Planning Inspectorate require that the DNS application only considers the terrestrial elements of the project. This guidance was reiterated in the pre-application advice letter issued by Pembrokeshire County Council on 13th of May Consequently, the marine elements of the scheme are outlined within a separate application which requires a Marine Works Licence and which is regulated by National Resources Wales (NRW). The Marine works license application for the jetty and grid connection is to be submitted under separate cover to NRW. In order to provide a complete overview of the proposals, a summary of the marine elements of the project are included within this EIA.

4 6 Key Blackbridge and Biomass to Energy Facility 1 Pyrolyser Building Existing building extensively refurbished and increased in overall height (Approx 150m x 45m x 24m high) 2 Gas to liquid technology, methanation and residue storage area Approx 30m x 45m of Existing Building 3 Grinding Hall Existing building refurbished 62m x 45m x 7m to top of barrel roof 4 Storage Building Storage Building 180m x 50m x 24m high New Building 5 Engine House Engine House 80m x 33m x 15m high - New Building 6 Stack 4No. 3m Diameter, 60m Tall Stacks in Concrete Chimney. 7 Gas Storage Area Open storage with secure enclosure 8a Car Park Area Approx 3000m2 8b Car Park Area Approx 3000m2 9 Exhaust Gas and feedstock Conditioning and Algae Propogation 108m x 63m x 8m high New Building 10 Dryer Hall Dryer Hall 96m x 52m x 15m high New Building 11a Jetty Enclosed Conveyor 5m x 5m high 11b Jetty 2No. Pneumatic Towers 5m x 15m high 12 Control Building Control Room Existing Refurbished Building 13 Cold Ironing Building Old Ironing Building Cold ironing building 10m x 6m x 6m high 14 Offices Existing building refurbished 15 Algae Bioreactor Units 4 No 50m x 50m x 6m 16 Green Houses 2 Greenhouse units each comprising 50No. 24m x 8m structures 2.1m to Gutter, 2.9m to Ridge 17 MV Room 14m x 27m x 15m high 18 Transformer Yard Area 40m x 80m 19 Bio Fuel Storage Tank 5m Diameter, 5m Tall, Double Skinned and Bunded within lean-to structure from building Key Waterston Eco Park Layout 20 Heat Exchange and Storage Building This unit split to accommodate heat exchange units and feed store 76m x 20m x 6m high 21 Aquaculture Units 3No. new buildings 76m x 20m x 6m high 22 Aquaculture Units 2No. new buildings 142m x 41m x 6m high 23 Greenhouses Algae Water Treatment 12No. 48m x 24m 24 Packaging Facility 47m x 20m x 6m high New building 25 Cheese Factory 47m x 20m x 6m high New building 26 3No. Gate Houses 4m x 3m New buildings 27 New Construction and Operational Car Park For Blackbridge and Waterston sites 80m x 235m Figure 1.1b: Masterplan layout

5 7 Low grade heat from the BtEf will be used to promote the development of and reduce costs of operation of downstream industries. The refurbishment of the jetty will enable delivery of biomass and feedstock into the site and the removal of residues from it. Electricity from the BtEf will be connected to the National Grid via a new cable to the existing facility at Pembroke Power Station. The BtEf will also produce produce liquid fuels and gas for export. The project has been designed to meet the energy, sustainability and job creation criteria established in both national and government policy. 1.2 The Environmental Impact Assessment and the Environmental Statement This document has been prepared on behalf of Egnedol, and details the findings of a comprehensive study into the potential environmental impacts of the proposed development. Where predicted impacts have been identified, appropriate mitigation measures have been developed and are detailed within this document. The Environmental Impact Assessment for the project has been compiled in accordance with the EIA (Wales) Regulations This Environmental Statement is a result of a thorough investigation of the baseline environmental conditions in and around the site of the proposed development. The assessment includes the predicted impacts, together with the mitigation measures necessary to protect the environment from the impacts of the development. Where possible environmental enhancement has also been incorporated into the project design. The developers recognise the importance of dialogue with stakeholders and the involvement of the local community. They have actively encouraged and sought their participation in the planning proposal to ensure all relevant concerns are considered and addressed in the assessment process Scoping Exercise A detailed scoping and consultation exercise has been undertaken, under the provisions of both the Development of National Significance (DNS) regulations and the EIA Regulations, in order to identify the potential environmental issues associated with the construction and operation of the facility and to guide the environmental assessment process. Consultation with interested parties has continued throughout assessment of the EIA process for the proposed development via meetings and exchanges of correspondence Structure of the Environmental Statement This ES comprises the following documents: - A Non Technical Summary;

6 8 Volume 1: The full text of the ES covering all relevant topic areas. Each topic is covered in a separate chapter, as set out in the contents list. Chapters 1 to 4 provide a general overview. Chapters 5 to 17 discuss each of the EIA assessment topics in line with the EIA Regulations. Chapter 18 of the ES discusses the consultation undertaken and Chapter 19 of the ES discusses cumulative impact assessment and the interrelationships, in terms of likely significant effects, between multiple assessment topics on individual sensitive receptors and outlines appropriate mitigation measures that will implemented; Volume 2: Drawings, photographs and photomontages to support the ES; Volume 3: Appendices Habitats Regulations Assessment The Applicant is required to undertake a Habitat Risk Assessment to assess the potential effects of the project upon the conservation status of the Pembrokeshire Marine Special Area of Conservation (SAC), the Pembrokeshire Bat Sites and Bosherston Lake SAC, the Limestone Coast of South and West Wales SAC, the Castlemartin and Coast and Skokholm and Skomer SPAs and the Cleddau Rivers SAC that are either adjacent or close to the Application Site. The HRA has been prepared in parallel with the EIA. 1.3 Environmental Permit Following pre-applicaiton discussions, an Environmental Permit application will be required from Natural Resources Wales (NRW) for the facility. Additional permissions required for the operation of the site will be dealt with outside the scope of the application. 1.4 Availability of the Environmental Statement The ES is available for inspection during opening hours at Egnedol Limited, The White House, Newton Road, Blackbridge, Milford Haven, SA73 1DR. The full ES and associated application documentation are viewable at Paper copies of the Non Technical Summary (in English and Welsh) are available by contacting info@egnedol.com. Paper copies of Volumes 1, 2 and 3 of the ES are available on request to the address above or at the White House, but please note that a charge of 400 per paper copy will be made to cover the costs of production and dispatch. Copies can also be provided electronically on compact disc at a nominal charge of 10 per copy.

Sustainable Energy Facility, Milford Haven

Sustainable Energy Facility, Milford Haven November 2016 Prepared for: Egnedol Wales Limited 1 St Mary s Street Carmarthen SA31 1TN Sustainable Energy Facility, Milford Haven Efficient Energy and Value Recovery 2 Document Control Sheet Project

More information

Wylfa Newydd Project ES Volume A - Introduction to the project and approach to the EIA A1 - Introduction

Wylfa Newydd Project ES Volume A - Introduction to the project and approach to the EIA A1 - Introduction ENERGY WORKING FOR BRITAIN Wylfa Newydd Project 6.1.1 ES Volume A - Introduction to the project and approach to the EIA A1 - Introduction PINS Reference Number: EN010007 Application Reference Number: 6.1.1

More information

1 INTRODUCTION 1.1 TERMS OF REFERENCE FOR THIS ENVIRONMENTAL IMPACT ASSESSMENT REPORT

1 INTRODUCTION 1.1 TERMS OF REFERENCE FOR THIS ENVIRONMENTAL IMPACT ASSESSMENT REPORT 1 INTRODUCTION 1.1 TERMS OF REFERENCE FOR THIS ENVIRONMENTAL IMPACT ASSESSMENT REPORT This Environmental Impact Assessment Report (EIA Report) has been prepared by Environmental Resources Management Ltd

More information

Hydropower Guidance Note: HGN 4 Designated Sites

Hydropower Guidance Note: HGN 4 Designated Sites Guidance Note Hydropower Guidance Note: HGN 4 Designated Sites This guidance note is not intended as a statement of law. It should be read in combination with, and in the context of, the relevant enactments

More information

1. Marine Works (Environmental Impact Assessment) Regulations 2007 (as amended), Regulation 22 - EIA Consent Decision

1. Marine Works (Environmental Impact Assessment) Regulations 2007 (as amended), Regulation 22 - EIA Consent Decision 1. Marine Works (Environmental Impact Assessment) Regulations 2007 (as amended), Regulation 22 - EIA Consent Decision 1.1 Title: Deposit of an underground cable using Horizontal Directional Drill (HDD)

More information

Memorandum of Understanding for the Teesmouth and Cleveland Coast Special Protection Area and proposed extension

Memorandum of Understanding for the Teesmouth and Cleveland Coast Special Protection Area and proposed extension Memorandum of Understanding for the Teesmouth and Cleveland Coast Special Protection Area and proposed extension Date 31 st October 2017 1 Contents: 1. Foreword... 3 2. Introduction... 4 2.1 Background...

More information

Thorpe Marsh CCGT Power Station ENVIRONMENTAL STATEMENT SUPPLEMENTARY INFORMATION

Thorpe Marsh CCGT Power Station ENVIRONMENTAL STATEMENT SUPPLEMENTARY INFORMATION Thorpe Marsh CCGT Power Station ENVIRONMENTAL STATEMENT SUPPLEMENTARY INFORMATION Final June 2011 Thorpe Marsh CCGT Power Station ENVIRONMENTAL STATEMENT SUPPLEMENTARY INFORMATION Final June 2011 SKM Enviros

More information

4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT

4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT 4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT 4.1 INTRODUCTION This section describes the broad principles of the methodology adopted for the EIA of the Proposed Development. EIA is a procedure required

More information

Northacre Renewable Energy

Northacre Renewable Energy Northacre Renewable Energy Proposed development at Stephenson Road, Northacre Trading Estate, Westbury, BA13 4WD Non-technical summary December 2014 Introduction Northacre Renewable Energy Ltd (a company

More information

Marine Licence: 12/45/MLv1

Marine Licence: 12/45/MLv1 Natural Resources Wales 29 Newport Road Cambria House Cardiff CF24 0TP Ffôn Tel: 0300 065 3000 Ebost email: marinelicensing@naturalresourceswales.gov.uk MARINE AND COASTAL ACCESS ACT 2009: PART 4 MARINE

More information

Northacre Renewable Energy

Northacre Renewable Energy Northacre Renewable Energy Revision of the layout and design of the Advanced Thermal Treatment Facility permitted under consent 14/12003/WCM at Stephenson Road, Northacre Trading Estate, Westbury, BA13

More information

PROPOSED ENERGY RECOVERY FACILITY Whistleberry Road, Hamilton

PROPOSED ENERGY RECOVERY FACILITY Whistleberry Road, Hamilton PROPOSED ENERGY RECOVERY FACILITY Whistleberry Road, Hamilton Clean Power owns a 4.5ha site at Whistleberry Road, Hamilton - the site of the former Craighead School. This site, which neighbours the East

More information

Hydropower Guidance Note: HGN 7 Competing Schemes

Hydropower Guidance Note: HGN 7 Competing Schemes Guidance Note Hydropower Guidance Note: HGN 7 Competing Schemes This guidance is not intended as a statement of law and should be read in combination with and in the context of the relevant enactments

More information

Northacre Renewable Energy

Northacre Renewable Energy Northacre Renewable Energy Revision of the layout and design of the Advanced Thermal Treatment Facility permitted under consent 14/12003/WCM at Stephenson Road, Northacre Trading Estate, Westbury, BA13

More information

xxxxxx xxxxxx VOLUME 5: FOLDER 1 Consultation Report Chapter 4. PHASE 1B: EIA scoping

xxxxxx xxxxxx VOLUME 5: FOLDER 1 Consultation Report Chapter 4. PHASE 1B: EIA scoping xxxxxx xxxxxx VOLUME 5: FOLDER 1 Consultation Report Chapter 4. PHASE 1B: EIA scoping www.tidallagoonswanseabay.com www.tidallagoonswanseabay.com Consultation Report Chapter 4 Tidal Lagoon Swansea Bay

More information

Natural Heritage assessment of small scale wind energy projects which do not require formal Environmental Impact Assessment (EIA).

Natural Heritage assessment of small scale wind energy projects which do not require formal Environmental Impact Assessment (EIA). Guidance Natural Heritage assessment of small scale wind energy projects which do not require formal Environmental Impact Assessment (EIA). March 2008 Table of Contents Page INTRODUCTION... 2 DEFINITIONS...

More information

ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK. for the. Partial Risk Guarantees Project for Independent Power Producers in Kenya DRAFT

ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK. for the. Partial Risk Guarantees Project for Independent Power Producers in Kenya DRAFT ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK for the Partial Risk Guarantees Project for Independent Power Producers in Kenya DRAFT May 2011 INTRODUCTION The World Bank, through IDA funding, is proposing

More information

Proposed Tidal Lagoon Development, Cardiff, South Wales

Proposed Tidal Lagoon Development, Cardiff, South Wales Proposed Tidal Lagoon Development, Cardiff, South Wales Evidence Plan Framework August 2015 www.tidallagooncardiff.com Document title Evidence Plan Framework Document reference Revision number 0.4 Date

More information

In-combination and Cumulative Effects Assessment

In-combination and Cumulative Effects Assessment P O R T I S H E A D B R A N C H L I N E P R E L I M I N A R Y ENV I R O N M E N T A L I N F O R M A T I O N R E P O R T V O L U M E 2 C H A P T E R 18 In-combination and Cumulative Effects Assessment Table

More information

CHAPTER 8 Energy Efficiency, and Renewable Energy. Kildare County Development Plan , Volume 1

CHAPTER 8 Energy Efficiency, and Renewable Energy. Kildare County Development Plan , Volume 1 Chapter 6 Rural Housing Strategy CHAPTER 8 Energy Efficiency, and Renewable Energy 157 8 ENERGY EFFICIENCY AND RENEWABLE ENERGY 8.1 Background The development of renewable energy sources is a priority

More information

APPENDIX V. Response to Meath County Council s Request for Further Information on the Environmental Impact Statement for Platin Cement Works Extension

APPENDIX V. Response to Meath County Council s Request for Further Information on the Environmental Impact Statement for Platin Cement Works Extension APPENDIX V Response to Meath County Council s Request for Further Information on the Environmental Impact Statement for Platin Cement Works Extension For inspection purposes only. 19 Response to Request

More information

Viridor Energy from Waste Facility. Environmental Statement Non-Technical Summary

Viridor Energy from Waste Facility. Environmental Statement Non-Technical Summary Viridor Energy from Waste Facility Environmental Statement Non-Technical Summary September 2012 Viridor Energy from Waste Facility Environmental Statement Non-Technical Summary Introduction Viridor has

More information

An analysis of economic activity dependent on the Milford Haven Waterway. The Haven Economy

An analysis of economic activity dependent on the Milford Haven Waterway. The Haven Economy An analysis of economic activity dependent on the Milford Haven Waterway The Haven Economy Key Findings The Milford Haven Waterway supports over 5,000 jobs in Wales as a whole, of which around 4,000 are

More information

8 Geology, Hydrology & Hydrogeology

8 Geology, Hydrology & Hydrogeology Inverneill Wind Farm Scoping Report Page 42 8 Geology, Hydrology & Hydrogeology 8.1 Introduction The EIA will consider the potential issues arising from the construction, operation and decommissioning

More information

LANEnC34 (SQA Unit Code - HA0V 04) Plan and oversee field surveys. Overview

LANEnC34 (SQA Unit Code - HA0V 04) Plan and oversee field surveys. Overview Overview This standard covers planning and overseeing field surveys. It could also apply to planning and overseeing surveillance and monitoring. The standard includes confirming the purpose, scope and

More information

HENDY WIND FARM SUMMARY OF PRINCIPLE APPLICATION DOCUMENTS (ECOLOGY) & SUMMARY OF MAIN ELEMENTS OF DEVELOPMENT

HENDY WIND FARM SUMMARY OF PRINCIPLE APPLICATION DOCUMENTS (ECOLOGY) & SUMMARY OF MAIN ELEMENTS OF DEVELOPMENT ANNEX B CPRW BRECON & RADNOR PoE ECOLOGY & SAC HENDY WIND FARM SUMMARY OF PRINCIPLE APPLICATION DOCUMENTS (ECOLOGY) & SUMMARY OF MAIN ELEMENTS OF DEVELOPMENT There is a strong relation between the ecological

More information

STANDARD TECHNIQUE : EW1AB/1

STANDARD TECHNIQUE : EW1AB/1 Company Directive STANDARD TECHNIQUE : EW1AB/1 Relating to the Requirement for Environmental Impact Assessments ST:EW1AB/1 November 2011-1 of 10 - IMPLEMENTATION PLAN Introduction This document describes

More information

Environmental Statement Non Technical Summary. Anthony s Way Frindsbury June creative minds safe hands

Environmental Statement Non Technical Summary. Anthony s Way Frindsbury June creative minds safe hands Environmental Statement Non Technical Summary Anthony s Way Frindsbury June 2010 www.wyg.com creative minds safe hands Contents Section A Introduction Part 1 Background Part 2 Environmental Assessment

More information

WELSH GOVERNMENT RESPONSE TO RECOMMENDATIONS FROM THE CLIMATE CHANGE, ENVIRONMENT AND RURAL AFFAIRS COMMITTEE REPORT:

WELSH GOVERNMENT RESPONSE TO RECOMMENDATIONS FROM THE CLIMATE CHANGE, ENVIRONMENT AND RURAL AFFAIRS COMMITTEE REPORT: WELSH GOVERNMENT RESPONSE TO RECOMMENDATIONS FROM THE CLIMATE CHANGE, ENVIRONMENT AND RURAL AFFAIRS COMMITTEE REPORT: FEEDBACK ON THE WELSH GOVERNMENT S DRAFT WELSH NATIONAL MARINE PLAN JUNE 2018 Background

More information

A10 Electronic Interference: Application 1 - RBKC

A10 Electronic Interference: Application 1 - RBKC A10 Electronic Interference: Application 1 - RBKC Addendum to the Environmental Statement Volume I January 2012 Introduction A10.1 This Chapter of the Addendum to the June 2011 Environmental Statement

More information

5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT. The scope of the EIA falls under three broad categories:

5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT. The scope of the EIA falls under three broad categories: 5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT 5.1 INTRODUCTION The scope of the EIA falls under three broad categories: technical scope; spatial scope; and temporal scope. The scoping process for the

More information

Preliminary Environmental Information Report

Preliminary Environmental Information Report Riverside Energy Park Preliminary Environmental Information Report CHAPTER: 02 PLANNING INSPECTORATE REFERENCE NUMBER: EN010093 REGULATORY AND POLICY BACKGROUND June 2018 Revision 0 Planning Act 2008 Infrastructure

More information

Code of Construction Practice Part B: Site Specific Requirements

Code of Construction Practice Part B: Site Specific Requirements Thames Tideway Tunnel Thames Water Utilities Limited Application for Development Consent Application Reference Number: WWO10001 Code of Construction Practice Part B: Site Specific Requirements Cremorne

More information

CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999

CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999 (No. JPBN. 1509/27 Vol. II CONSERVATION OF ENVIRONMENT ENACTMENT 1996 CONSERVATION OF ENVIRONMENT (PRESCRIBED ACTIVITIES) ORDER 1999 In exercise of the powers conferred by section 5 of the Conservation

More information

1.4. Wrexham Power Limited has employed a project team comprising:

1.4. Wrexham Power Limited has employed a project team comprising: Wrexham Power Limited Proposed Wrexham Energy Centre Project summary INTRODUCTION 1.1. Wrexham Power Limited is promoting the development of a new gas fired power station at Wrexham in North Wales. The

More information

Information Paper 10 Waste Water and Sewage Sludge

Information Paper 10 Waste Water and Sewage Sludge DRAFT Consultation Document East Sussex, South Downs and Brighton & Hove Waste and Minerals Development Framework Information Paper 10 Waste Water and Sewage Sludge October 2011 DRAFT Information Paper

More information

Freshwater Neighbourhood Plan. Habitats Regulations Assessment Report

Freshwater Neighbourhood Plan. Habitats Regulations Assessment Report Freshwater eighbourhood Plan Habitats Regulations Assessment Report October 2016 COTETS ITRODUCTIO... 2 Figure 1: Location Map showing Freshwater Parish and eighbourhood Plan Area.... 2 LEGISLATIO... 3

More information

6 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 6.1 INTRODUCTION

6 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 6.1 INTRODUCTION 6 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 6.1 INTRODUCTION Cumulative and indirect effects result from the combined impacts of multiple projects / plans. Their consideration is important as the impacts

More information

Flood Consequence Assessment. Proposed Commercial Development, Tank Farm Way, Sully

Flood Consequence Assessment. Proposed Commercial Development, Tank Farm Way, Sully Flood Consequence Assessment Proposed Commercial Development, Tank Farm Way, Sully Client O Reilly Concrete Group Larchfield Kingscourt County Cavan Ireland By RVW Consulting 6 Neptune Court Vanguard Way

More information

Developments of National Significance

Developments of National Significance Developments of National Significance Guidance for Applicants Version History: Document Date Summary of Changes Version Published 1.0 May-2017 Document created Review Date: May 2018 Published by: Natural

More information

WRITTEN STATEMENT LINDI RICH ON BEHALF OF GWENT WILDLIFE TRUST. In the matter of:

WRITTEN STATEMENT LINDI RICH ON BEHALF OF GWENT WILDLIFE TRUST. In the matter of: WRITTEN STATEMENT LINDI RICH ON BEHALF OF GWENT WILDLIFE TRUST In the matter of: Public Local Inquiry into the M4 relief road around Newport: The effects of the proposed M4 extension across the Gwent Levels

More information

INFORMATION MEMORANDUM

INFORMATION MEMORANDUM INFORMATION MEMORANDUM Welsh Eco Park Anglesey, North Wales We think now for the needs of the future CONTENT Our mission 1. Summary of the Project 2. Hydroponics Produce Greenhouse 3. Aquaculture Fish

More information

Appendix 4.2. Outline Operation Environmental Management Plan

Appendix 4.2. Outline Operation Environmental Management Plan Appendix 4.2 Outline Operation Environmental Management Plan Tidal Lagoon Swansea Bay Appendix 4.2 The Outline Operational Environmental Management Plan (Outline OEMP) idal Lagoon Swansea Bay Operation

More information

Arcow Quarry, North Yorkshire

Arcow Quarry, North Yorkshire Arcow Quarry, North Yorkshire Non Technical Summary Planning applications for a railhead and associated development REVISION SCHEDULE Rev Date Details Prepared by Reviewed by Approved by 0 December 2013

More information

Appropriate Assessment under Article 6 of the Habitats Directive: guidance for Planning Authorities

Appropriate Assessment under Article 6 of the Habitats Directive: guidance for Planning Authorities For the attention of the County / City Manager 11 March 2010 Circular NPW 1/10 & PSSP 2/10 Appropriate Assessment under Article 6 of the Habitats Directive: guidance for Planning Authorities I refer to

More information

SCOPING OPINION Proposed Glyn Rhonwy Pumped Storage Scheme

SCOPING OPINION Proposed Glyn Rhonwy Pumped Storage Scheme SCOPING OPINION Proposed Glyn Rhonwy Pumped Storage Scheme February 2015 Scoping Opinion for the proposed Glyn Rhonwy Pumped Storage CONTENTS EXECUTIVE SUMMARY 1.0 INTRODUCTION... 1 2.0 THE PROPOSED DEVELOPMENT...

More information

The Cleddau & Pembrokeshire Coastal Rivers Abstraction Licensing Strategy May A licensing strategy to manage water resources sustainably

The Cleddau & Pembrokeshire Coastal Rivers Abstraction Licensing Strategy May A licensing strategy to manage water resources sustainably The Cleddau & Pembrokeshire Coastal Rivers Abstraction Licensing Strategy May 2014 A to manage water resources sustainably On 1 April 2013 Natural Resources Wales brought together the work of the Countryside

More information

NORTH WESSEX DOWNS AONB POSITION STATEMENT RENEWABLE ENERGY

NORTH WESSEX DOWNS AONB POSITION STATEMENT RENEWABLE ENERGY NORTH WESSEX DOWNS AONB POSITION STATEMENT RENEWABLE ENERGY October 2012 1 NORTH WESSEX DOWNS AONB POSITION STATEMENT RENEWABLE ENERGY October 2012 Position Statement Status The purpose behind this Position

More information

EDUQAS A Level Biology Course Options For teaching from September 2015

EDUQAS A Level Biology Course Options For teaching from September 2015 FIELD STUDIES COUNCIL Dale Fort Field Centre EDUQAS A Level Biology Course EDUQAS A Level Biology Course Options For teaching from September 2015 Dale Fort was built in 1856 in an attempt to deter the

More information

Area 2: City of Cardiff Council: LANDMAP Change Detection: Visual & Sensory Aspect Monitoring Report Final: March 2015 Bronwen Thomas. Rev No 3.

Area 2: City of Cardiff Council: LANDMAP Change Detection: Visual & Sensory Aspect Monitoring Report Final: March 2015 Bronwen Thomas. Rev No 3. Area 2: City of Council: LANDMAP Change Detection: Visual & Sensory Aspect Monitoring Report Final: March 2015 Bronwen Thomas Rev No 3 Date Contents 1.0. Introduction 2.0. Methodology Stage 1: Baseline

More information

Neart na Gaoithe Offshore Wind Farm. Scoping Report. May 2017 UK MRP-NNG SCOPING REPORT 2017-RPT-A1

Neart na Gaoithe Offshore Wind Farm. Scoping Report. May 2017 UK MRP-NNG SCOPING REPORT 2017-RPT-A1 May 2017 UK02-0504-0673-MRP-NNG SCOPING REPORT 2017-RPT-A1 Document Release and Authorisation Record Report Ref: Date: Client Name: Client Contact(s): UK02-0504-0673-MRP-NNG SCOPING REPORT 2017-RPT-A1

More information

Sustainable Shellfish aquaculture the Ecosystem approach

Sustainable Shellfish aquaculture the Ecosystem approach Sustainable Shellfish aquaculture the Ecosystem approach Shellfish Growing in Ireland Fish Farmers 1,716 Processing 2,860 Ancillary 1,140 Shellfish 172 million - 4.53 from 4920 tonnes In total in N Ireland

More information

A proposed new gas-fired power station on the Wilton International site

A proposed new gas-fired power station on the Wilton International site TEES CCPP PROJECT A proposed new gas-fired power station on the Wilton International site Welcome This event is intended to provide you with information about the proposed Tees Combined Cycle Power Plant

More information

High Pressure Natural Gas Pipeline Pembroke Refinery. Environmental Statement Non-technical Summary

High Pressure Natural Gas Pipeline Pembroke Refinery. Environmental Statement Non-technical Summary High Pressure Natural Gas Pipeline Pembroke Refinery Environmental Statement Non-technical Summary July 2010 1. Introduction 1.1 Overview 1. Chevron Limited (Ltd) is seeking detailed planning permission

More information

Wear Point Wind Farm. Environmental Statement Volume 1. Non Technical Summary. September Cover image for illustrative purpose only

Wear Point Wind Farm. Environmental Statement Volume 1. Non Technical Summary. September Cover image for illustrative purpose only Environmental Statement Volume 1 Non Technical Summary September 2009 Cover image for illustrative purpose only Images for illustrative purposes only For further information please contact: Lorraine Dallmeier

More information

determine the effect of the Proposed Development together with the other planned changes within defined areas of influence;

determine the effect of the Proposed Development together with the other planned changes within defined areas of influence; 14 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 14.1 INTRODUCTION Cumulative and indirect effects result from the combined impacts of multiple projects / plans. Their consideration is important as the impacts

More information

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton

Viridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton Viridor Waste Management Proposed Development of an In-Vessel Composting Facility Land at Exide Batteries, Salford Road, Bolton Non-Technical Summary January 2009 Introduction Viridor Waste Management

More information

OCR AS Level Biology Course Options For teaching from September 2015

OCR AS Level Biology Course Options For teaching from September 2015 FIELD STUDIES COUNCIL Dale Fort Field Centre OCR AS Level Biology Course OCR AS Level Biology Course Options For teaching from September 2015 Dale Fort was built in 1856 in an attempt to deter the forces

More information

Chapter 17 Cumulative Impacts

Chapter 17 Cumulative Impacts Chapter 17 Cumulative Impacts CONTENTS 17. Cumulative Effects... 2 17.1 Introduction... 2 17.2 Summary of Relevant Legislation, Planning Policy and Guidance... 2 17.3 Methods... 5 17.4 Consultation...

More information

Ferrybridge Multifuel 2 (FM2) Power Station

Ferrybridge Multifuel 2 (FM2) Power Station Welcome Multifuel Energy Ltd is proposing to build a second multifuel power station at Ferrybridge (FM2). This formal consultation is an opportunity for you to provide feedback and comment on the Proposed

More information

Sizewell B Dry Fuel Store. Environmental Statement Non-Technical Summary

Sizewell B Dry Fuel Store. Environmental Statement Non-Technical Summary Sizewell B Dry Fuel Store Environmental Statement Non-Technical Summary NON TECHNICAL SUMMARY 1 INTRODUCTION This Non Technical Summary (NTS) is submitted as part of the application to extend the existing

More information

The Isles Wind Farm Newsletter

The Isles Wind Farm Newsletter May 0 The Isles Wind Farm Newsletter Stag s Holt Wind Farm, Cambridgeshire for illustrative purposes only. Welcome to this newsletter which explains the progress we ve made on the proposed Isles Wind Farm

More information

A coastal concordat for England - draft v.6

A coastal concordat for England - draft v.6 A coastal concordat for England - draft v.6 1 Executive Summary This coastal concordat is an agreement between the Department for Environment, Food and Rural Affairs (Defra), Department for Communities

More information

Planning, Transport, Regeneration Overview and Scrutiny Committee

Planning, Transport, Regeneration Overview and Scrutiny Committee 4 March 2014 ITEM: 5 Planning, Transport, Regeneration Overview and Scrutiny Committee London Gateway Report of: Matthew Gallagher, Principal Planner (Major Applications) Wards and communities affected:

More information

Introduction to Environmental Impact Assessment for Masterplan Sites 25 April 2018

Introduction to Environmental Impact Assessment for Masterplan Sites 25 April 2018 Introduction to Environmental Impact Assessment for Masterplan Sites 25 April 2018 Environmental Impact Assessment Session Introduction and purpose of the presentation Key Topics for Discussion: Environmental

More information

Norfolk Minerals and Waste Local Plan. Sustainability Appraisal Report Part B

Norfolk Minerals and Waste Local Plan. Sustainability Appraisal Report Part B Norfolk Minerals and Waste Local Plan Minerals Site Specific Allocations Development Plan Document (DPD) Single Issue Silica Sand Review Sustainability Appraisal Report Part B March 2016 Norfolk County

More information

Crossrail Environmental Statement Volume 1

Crossrail Environmental Statement Volume 1 Crossrail Environmental Statement Volume 1 Project description The environmental impact assessment process The need for Crossrail Planning policy context Route development and alternatives 1 If you would

More information

Matter 4: Specific Locations Policy - Policy 4 Mitchell Shackleton, Salford (Additional Site SL11)

Matter 4: Specific Locations Policy - Policy 4 Mitchell Shackleton, Salford (Additional Site SL11) 1 Matter 4: Specific Locations Policy - Policy 4 Mitchell Shackleton, Salford (Additional Site SL11) 1. Introduction Entec UK Ltd is acting on behalf of Sky Properties in respect of the omission of Site

More information

ATLANTIC ARRAY OFFSHORE WINDFARM INITIAL CONSULTATION AVIATION INTERESTS

ATLANTIC ARRAY OFFSHORE WINDFARM INITIAL CONSULTATION AVIATION INTERESTS ATLANTIC ARRAY OFFSHORE WINDFARM AVIATION INTERESTS Document Information Document title Author Produced by Atlantic Array Offshore Windfarm Initial Consultation Andrew Radforth, Cyrrus Limited Cyrrus Ltd

More information

Land to the South of Old Mill Road, Sandbach Environmental Impact Assessment Environmental Statement: Non-Technical Summary

Land to the South of Old Mill Road, Sandbach Environmental Impact Assessment Environmental Statement: Non-Technical Summary Environmental Impact Assessment Report prepared by: Ecus Ltd. Brook Holt 3 Blackburn Road Sheffield S61 2DW 0114 266 9292 September 2013 Page Left Intentionally Blank 2 INTRODUCTION This Non Technical

More information

BAY OF ISLANDS PLANNING LIMITED 2 Totara Place, Kerikeri PO Box 795

BAY OF ISLANDS PLANNING LIMITED 2 Totara Place, Kerikeri PO Box 795 Far North District Council John Butler Centre Kerikeri Road Kerikeri Attention Ms Louise Wilson 30 May 2018 Dear Louise, BAY OF ISLANDS PLANNING LIMITED 2 Totara Place, Kerikeri PO Box 795 Kerikeri Phone

More information

Linfairn Wind Farm Addendum Chapter A3: Project Description

Linfairn Wind Farm Addendum Chapter A3: Project Description A3. PROJECT DESCRIPTION 3.1 Introduction This chapter provides a description of the changes to the Project since the ES was published. An outline Construction Environmental Management Plan (CEMP) is included

More information

Site 5: Kirk Mills, Chipping (aka Berry's Factory)

Site 5: Kirk Mills, Chipping (aka Berry's Factory) Site 5: Kirk Mills, Chipping (aka Berry's Factory) Site Assessment Report Title Figure 1 Map showing general layout Berry s furniture mill in Chipping (also know as Kirk Mill) was originally a corn mill,

More information

Dŵr Cymru Welsh Water

Dŵr Cymru Welsh Water Report 13 February 2015 Client: Dŵr Cymru Welsh Water Title: Project No: CC1040 Date of Issue: 13 February 2015 Status: Version No: 1.0 Produced By Authorised for Release By.. Dr Kat Liney Principal Environmental

More information

March Environmental Statement Chapter 4 Environmental Impact Assessment Process. Application Reference: 6.4

March Environmental Statement Chapter 4 Environmental Impact Assessment Process. Application Reference: 6.4 March 2014 Environmental Statement Chapter 4 Environmental Impact Assessment Process Application Reference: 6.4 Cover photograph: Installation of turbine foundations in the North Sea F-OFL-CH-004_Issue

More information

Proposed Natura 2000 designation

Proposed Natura 2000 designation Proposed Natura 2000 designation Impact Assessment Document - draft for consultation Proposed site: Liverpool Bay / Bae Lerpwl potential Special Protected Area (pspa) November 2016 Mae'r ddogfen hon yn

More information

Copyright United Utilities Water Limited

Copyright United Utilities Water Limited Copyright United Utilities Water Limited 2016 1 Contents 1. Aims... 2 2. Background... 2 3. Tracking supply-demand in West Cumbria... 3 4. Contingency plan... 3 5. River Ehen Special Area of Conservation

More information

Berth 9 Quay Extension Environmental Statement Non-Technical Summary

Berth 9 Quay Extension Environmental Statement Non-Technical Summary Berth 9 Quay Extension Hutchison Ports UK Ltd July 2013 Final Report 9Y0150 CONTENTS Page 1 PROJECT BACKGROUND 1 2 NEED FOR THE PROPOSED SCHEME 4 3 DESCRIPTION OF THE CONSTRUCTION PHASE 4 4 DESCRIPTION

More information

F2: INFRASTRUCTURE MAINTENANCE DEPOT STRATEGY

F2: INFRASTRUCTURE MAINTENANCE DEPOT STRATEGY HIGH SPEED TWO INFORMATION PAPER F2: INFRASTRUCTURE MAINTENANCE DEPOT STRATEGY This paper outlines the reasons for the proposed infrastructure maintenance depot strategy for HS2. It will be of particular

More information

Appendix 4.3 Consultation Responses

Appendix 4.3 Consultation Responses Appendix 4.3 Consultation Responses Appendix 4.3 - Consultation Responses Table 1: Environmental Statement Structure Table 2: Project Description Table 3: Flexibility Table 4: Proposed Access, Construction,

More information

In compliance with Art October 2001 PD issued: First party objection received: Third party objections: One, An Taisce,

In compliance with Art October 2001 PD issued: First party objection received: Third party objections: One, An Taisce, M E M O R A N D U M DATE: 1 March 2002 TO: FROM: RE: The Members of the Board Technical Committee Objection to a Proposed Determination (PD) for Electricity Supply Board Shannonbridge, Co Offaly. IPC Register

More information

SCOPING OPINION Proposed Hirwaun Power Project

SCOPING OPINION Proposed Hirwaun Power Project SCOPING OPINION Proposed Hirwaun Power Project July 2013 Scoping Opinion - Hirwaun Power Project.doc Scoping Opinion - Hirwaun Power Project.doc CONTENTS EXECUTIVE SUMMARY 1.0 INTRODUCTION... 1 2.0 THE

More information

Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until Non Technical Summary

Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until Non Technical Summary Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until 2035 Non Technical Summary SLR Consulting Limited Project Ref: 403.00079.00474

More information

PROPOSED TIDAL LAGOON SWANSEA BAY (GENERATING STATION), DEVELOPMENT CONSENT ORDER

PROPOSED TIDAL LAGOON SWANSEA BAY (GENERATING STATION), DEVELOPMENT CONSENT ORDER The Planning Inspectorate Temple Quay House 2 The Square Temple Quay Bristol BS1 6PN Ein cyf / Our ref: SH/2014/116403 Planning Inspectorate ref. EN010049 Dyddiad/Date: 11 April 2014 Annwyl Syr/Madam /

More information

Non-technical summary. Canford. Extension of composting facility. Non-technical summary

Non-technical summary. Canford. Extension of composting facility. Non-technical summary Canford Extension of composting facility Introduction NTS1 NTS2 NTS3 NTS4 (NESG) and WH White Ltd submitted a planning application to the Borough of Poole Council (BPC) which was registered on 9 May 2008

More information

S e c t i o n S u b d i vision

S e c t i o n S u b d i vision S e c t i o n 2. 6 - S u b d i vision Subdivision is a process of defining and redefining land parcel boundaries and can provide a framework for future land use and development. Integrated, well planned

More information

Submission on the Draft Renewable Energy Strategy for County Mayo

Submission on the Draft Renewable Energy Strategy for County Mayo Irish Wind Energy Association, Sycamore House, Millennium Park, Osberstown, Naas, Co. Kildare. Iain Douglas Senior Planner Mayo County Council Áras an Chontae The Mall Castlebar Co Mayo Date: 28 January

More information

5.6 Details of Other Consents and Licenses

5.6 Details of Other Consents and Licenses The Millbrook Power (Gas Fired Power Station) Order 5.6 Details of Other Consents and Licenses Planning Act 2008 The Infrastructure Planning (Applications: Prescribed Forms and Procedure) 2009 PINS Reference

More information

BLACKBRIDGE, MILFORD HAVEN GROUND BASED TREE SURVEY 1.0 EXECUTIVE SUMMARY... 1

BLACKBRIDGE, MILFORD HAVEN GROUND BASED TREE SURVEY 1.0 EXECUTIVE SUMMARY... 1 BLACKBRIDGE, MILFORD HAVEN GROUND BASED TREE SURVEY Contents Page 1.0 EXECUTIVE SUMMARY... 1 2.0 INTRODUCTION... 2 2.1 Objectives... 2 2.2 Proposed Development... 2 3.0 METHODOLOGY... 3 4.0 RESULTS AND

More information

3.0 Description of Proposed Development

3.0 Description of Proposed Development 3.0 Description of Proposed Development 3.1 Introduction 3.1.1 This chapter outlines the main characteristics of the proposed development that have been assessed as part of the EIA, covering both the construction,

More information

Walney Extension Offshore Wind Farm

Walney Extension Offshore Wind Farm WALNEY EXTENSION OFFSHORE WIND FARM Walney Extension Offshore Wind Farm Statement of Common Ground Between: 1. DONG Energy Walney Extension (UK) Limited 2. Whale and Dolphin Conservation In relation to

More information

ANKERLIG POWER STATION CONVERSION AND TRANSMISSION INTEGRATION PROJECT

ANKERLIG POWER STATION CONVERSION AND TRANSMISSION INTEGRATION PROJECT ANKERLIG POWER STATION CONVERSION AND TRANSMISSION INTEGRATION PROJECT VISUAL ASSESSMENT - INPUT FOR SCOPING REPORT AND TRANSMISSION POWER LINE ALTERNATIVE SELECTION Produced for: Eskom Holdings Limited

More information

Central NSW Regional Contaminated Land Policy Template

Central NSW Regional Contaminated Land Policy Template Central NSW Regional Contaminated Land Policy Template Contamination Central: Supporting safe, stable and sustainable redevelopment of land in Central West NSW. Funded by the New South P a g e 1 {Instruction

More information

Crossrail. Environmental Statement. Volume 9c. Appendices. Westbourne Park Bus Garage Extension. Volume 2 Appendices

Crossrail. Environmental Statement. Volume 9c. Appendices. Westbourne Park Bus Garage Extension. Volume 2 Appendices Crossrail Environmental Statement Volume 9c Appendices Westbourne Park Bus Garage Extension Environmental Statement Volume 2 Appendices 9c If you would like information about Crossrail in your language,

More information

IRISH CEMENT PLATIN INVESTING IN OUR FUTURE

IRISH CEMENT PLATIN INVESTING IN OUR FUTURE IRISH CEMENT PLATIN INVESTING IN OUR FUTURE INTRODUCTION Investing in our future. The next phase of investment in Platin will see further energy efficiency improvements with on site electricity generation

More information

Environmental Impact Assessment (EIA) Owen Struthers Development Management Branch Welsh Government

Environmental Impact Assessment (EIA) Owen Struthers Development Management Branch Welsh Government Environmental Impact Assessment (EIA) Owen Struthers Development Management Branch Welsh Government Environmental Impact Assessment Introduction New Directive: Directive 2014/52/EU of the European Parliament

More information

CHAPTER 1 INTRODUCTION

CHAPTER 1 INTRODUCTION SEVERN ROAD RESOURCE RECOVERY CENTRE CHAPTER 1 INTRODUCTION SLR REF 402.0036.00374 September 2009 CONTENTS Introduction 2 Surrounding Area 3 Access 3 The Applicant 3 Summary of Development 4 Traffic and

More information

MANAGEMENT OF DEMOLITION PROJECTS GUIDANCE FOR CLIENTS & ADMINISTRATORS CONSTRUCTION (DESIGN & MANAGEMENT) REGULATIONS 2015

MANAGEMENT OF DEMOLITION PROJECTS GUIDANCE FOR CLIENTS & ADMINISTRATORS CONSTRUCTION (DESIGN & MANAGEMENT) REGULATIONS 2015 The Institute of Demolition Engineers MANAGEMENT OF DEMOLITION PROJECTS GUIDANCE FOR CLIENTS & ADMINISTRATORS CONSTRUCTION (DESIGN & MANAGEMENT) REGULATIONS 2015 This document has been produced to guide

More information

OBJ0047 LDH Plant Limited

OBJ0047 LDH Plant Limited 1 OBJ0047 LDH Plant Limited The Welsh Ministers (the M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and the M48 Motorway (Junction 23 (East of Magor)

More information

Drax DRAX REPOWER PROJECT. Preliminary Environmental Information Report Non-Technical Summary _PEIR_NTS

Drax DRAX REPOWER PROJECT. Preliminary Environmental Information Report Non-Technical Summary _PEIR_NTS Drax Preliminary Environmental Information Report Non-Technical Summary 70037047_PEIR_NTS JANUARY 2018 PUBLIC Drax Preliminary Environmental Information Report Non-Technical Summary TYPE OF DOCUMENT (VERSION)

More information