ASBESTOS ABATEMENT AT UTILITIES SERVICES CENTER

Size: px
Start display at page:

Download "ASBESTOS ABATEMENT AT UTILITIES SERVICES CENTER"

Transcription

1 ASBESTOS ABATEMENT AT UTILITIES SERVICES CENTER Informational Presentation March 7, 2016 Matt Zoccali Chad Mapp DeEtta Carr

2 Agenda Introductions Asbestos- What is it? Building & Project Background Abatement/Remodel Scope of Work ACM Floor Plans Questions, Comments & Concerns

3 Asbestos Awareness What is asbestos and why is it a hazard? City Asbestos Management Policy

4 Asbestos- what is it? Naturally occurring mineral Prevalent in the environment Derived from Greek word for incombustible High tensile strength Fire Resistance Poor heat and electrical conductivity Impervious to chemical damage

5 Physical Properties Long silky hollow fibers Durable Inert to acid and alkaline solutions Stable at high temperatures Very good insulator Flexible Very strong Cheap and easy to use

6 Use History Asbestos has been known and used since the first century (100 A.D.) Greeks and Romans 1800 s in Canada Asbestos is thought to be contained in over 3000 domestically produced or used products

7 Asbestos Mining

8 Friable vs. Non-Friable Friable: crushed easily with hand pressure popcorn ceiling textures Air Cell pipe insulation Non-friable: cannot crush easily with hand-pressure Floor tiles Asbestos-cement pipes

9 Friable Materials

10 Non-Friable Materials

11 Important Definitions Asbestos-Containing Material (ACM) Any material containing greater than 1% asbestos fibers Trace Asbestos-Containing Material Any material containing less than 1% asbestos fibers Presumed asbestos-containing material (OSHA) Thermal Insulation or Surfacing materials installed prior to 1981

12 Potential Health Effects Associated with Asbestos Exposure Occupational and non-occupational Exposure Risk depends on duration and intensity of exposure Dose-Response Effect What Properties are responsible? The health risk to most building occupants appears to be very low

13 Regulatory Overview An extremely regulated substance: EPA/CDPHE: Solid waste Hazardous substance Building material Clean Water Act Clean Air Act OSHA regulates asbestos in work-related settings, Consumer Product Safety Commission regulates asbestos in consumer products. The D.O.T. regulates the transportation of asbestos

14 I thought Asbestos was banned? 1989 Ban and Phase Out Rule was vacated by the Fifth Circuit Court of Appeals in October of In 1994, EPA published a Final Rule which established the following as still subject to the original Ban and Phase Out Rule: Corrugated paper Rollboard Commercial paper Specialty paper Flooring Felt New uses of asbestos

15 When is Asbestos a Problem? When friable ACM is damaged or disturbed fibers are released potential to inhale fibers increases potential health problems arise.

16 City Asbestos Management Program Managing asbestos in-place Must identify and label known ACM Must perform physical and visual inspections of ACM Must notify workers and buildings occupants of ACM locations Must have system to control work activities that may disturb ACM May involve periodic air monitoring

17 Building Background

18 Project Background & Goals Building Issues 1. Leaky - thermal comfort issues 2. HVAC equipment at end of life 3. Energy hog 4. Space issues Project Goals 1. Improved facilities for L&P Crews 2. Optimize & integrate space 3. Reduce energy & water use 4. Enhance indoor environmental quality

19 Remodel Scope of Work Replace HVAC System Lake source geo-exchange distributed heat pump system Major envelope sealing & insulation New Windows Minor Architectural Renovations Lobby Remodel Space for L&P crews: open workstations, new locker rooms

20 Remodel Phasing & Schedule

21 ACM Floor Plan Sections

22 ACM Floor Plan Section 1

23 ACM Floor Plan Section 2

24 ACM Floor Plan Section 3

25 Questions, Comments & Concerns?

Washington University Asbestos Operations and Maintenance Plan

Washington University Asbestos Operations and Maintenance Plan 1. Purpose 2. Asbestos Washington University Asbestos Operations and Maintenance Plan 1.1. The purpose of this Asbestos Operations and Maintenance (O&M) Plan is to minimize the potential for exposure to

More information

Asbestos Refresher Training (26 Mar 15) A naturally occurring fibrous mineral

Asbestos Refresher Training (26 Mar 15) A naturally occurring fibrous mineral Asbestos Refresher Training (26 Mar 15) A naturally occurring fibrous mineral References Asbestos Hazard Emergency Response Act (AHERA) AHERA Accredited Inspector Training Manuel For Asbestos Control What

More information

Asbestos. Asbestos is a naturally occurring fibrous mineral that is mined from the earth and

Asbestos. Asbestos is a naturally occurring fibrous mineral that is mined from the earth and Asbestos What is asbestos? Asbestos is a naturally occurring fibrous mineral that is mined from the earth and found in many parts of the world. Its composition is such that it can be separated into smaller

More information

McMaster University Asbestos Awareness

McMaster University Asbestos Awareness McMaster University Asbestos Awareness Presented by Christopher Hurley Environmental & Occupational Health Support Services Topics Covered Properties of asbestos Uses of asbestos Health hazards of asbestos

More information

ASBESTOS AWARENESS. What is Asbestos? Asbestos

ASBESTOS AWARENESS. What is Asbestos? Asbestos ASBESTOS AWARENESS 1of 63 What is Asbestos? Asbestos is the name for a group of naturally occurring minerals that separate into very fine fibers that are very durable and extremely heat resistant. Because

More information

Asbestos Management Program April 27, 2017

Asbestos Management Program April 27, 2017 Asbestos Management Program April 27, 2017 1. INTRODUCTION 1.1. Purpose Indiana University Environmental Health and Safety (IUEHS) has developed this Program to identify practices and procedures for the

More information

Asbestos Elevator Industry Workshop November 25, 2015

Asbestos Elevator Industry Workshop November 25, 2015 Asbestos Elevator Industry Workshop November 25, 2015 BOB SWING CONTACT INFO EMAIL: Bob.Swing@ThyssenKrupp.com Phone: 604-499-5714 SOME ASBESTOS-CONTAINING MATERIALS Cement Pipes Cement Wallboard Cement

More information

ASBESTOS MANAGEMENT PLAN PROCEDURE

ASBESTOS MANAGEMENT PLAN PROCEDURE ADMINISTRATIVE PROCEDURE Approval Date January 2011 Review Date 2016 Contact Person/Department Superintendent of Business Replacing All Previous Procedures Page 1 of 6 Identification BU-3565 ASBESTOS MANAGEMENT

More information

UI Procedures for Asbestos Management

UI Procedures for Asbestos Management UI Procedures for Asbestos Management The University of Iowa Rev.10/22/08, 10/15/09 These procedures apply to employees and contractors involving the identification, work on, removal, or repair of asbestos-containing

More information

Rowan University Asbestos Management Program

Rowan University Asbestos Management Program Rowan University Asbestos Management Program Table of Contents I. Introduction II. Regulatory Compliance III. Department Responsibilities for Asbestos A. EHS (Safety Specialist Staff) B. EHS (Asbestos

More information

Safety Policy and Procedure

Safety Policy and Procedure Safety Policy and Procedure Policy Number 045 Authorized By: The Cianbro Companies Alan Burton Title: Asbestos Operations Effective Date: 03/25/09 Page 1 of 10 1 Status 1.1 Update of existing policy, effective

More information

Asbestos Awareness OSHA Class IV

Asbestos Awareness OSHA Class IV Asbestos Awareness OSHA Class IV Stacy Kahatapitiya, CHMM, LEED GA & Peter Nketia-Akonnor Characteristics Naturally occurring mineral found in rock formations Most ACM mined/produced in Canada Comes from

More information

National Guidance: Best Management Practices for Preparing Vessels Intended to Create Artificial Reefs

National Guidance: Best Management Practices for Preparing Vessels Intended to Create Artificial Reefs U.S. Environmental Protection Agency U.S. Maritime Administration This document is one section from the National Guidance: Best Management Practices for Preparing Vessels Intended to Create Artificial

More information

Limited Asbestos Demolition Survey

Limited Asbestos Demolition Survey Limited Asbestos Demolition Survey Limited Asbestos Demolition Survey Former Fire Station Facility 25 to 45 S. Orlando Avenue Cocoa Beach, Florida Client: City of Cocoa Beach Public Works Department 1600

More information

INTRODUCTION TO THE PROGRAM

INTRODUCTION TO THE PROGRAM INTRODUCTION TO THE PROGRAM Structure and Organization Information in this program is presented in a definite order, so that employees will see the relationships between the various groups of information

More information

DUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM

DUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM DUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM Revised January 2017 Prepared by: Environmental Health and Safety Department TABLE OF CONTENTS Page Introduction 1 Scope 1 Policy Statement

More information

Asbestos Consulting Radon Measurements Lead Assessments Indoor Air Quality Testing Mold Investigations. Project Number: Page 1 of 22

Asbestos Consulting Radon Measurements Lead Assessments Indoor Air Quality Testing Mold Investigations. Project Number: Page 1 of 22 Page 1 of 22 Asbestos Survey Project Summary Pursuant to your request; Environmental, Inc., has performed an Asbestos Building Survey on 8/13/2014 and limited to the above referenced location. The Interior/Exterior/Roof

More information

PIER 26 and 28 BULKHEAD LIMITED ASBESTOS and LEAD SURVEY NTE Project No.: NT-3278

PIER 26 and 28 BULKHEAD LIMITED ASBESTOS and LEAD SURVEY NTE Project No.: NT-3278 PIER 26 and 28 BULKHEAD LIMITED ASBESTOS and LEAD SURVEY NTE Project No.: NT-3278 PREPARED FOR: Mr. Roberto Aguirre City of San Francisco DPW, SAR, BCM 1680 Mission Street San Francisco, California PREPARED

More information

LIMITED POTENTIALLY HAZARDOUS MATERIAL BUILDING INSPECTION REPORT AND ASBESTOS BUILDING INSPECTION REPORT. for

LIMITED POTENTIALLY HAZARDOUS MATERIAL BUILDING INSPECTION REPORT AND ASBESTOS BUILDING INSPECTION REPORT. for LIMITED POTENTIALLY HAZARDOUS MATERIAL BUILDING INSPECTION REPORT AND ASBESTOS BUILDING INSPECTION REPORT for Michigan State University Physical Plant Division Engineering and Architectural Services Department

More information

ASBESTOS ASSESSMENT Cartier Court Memorial University of Newfoundland St. John s, NL

ASBESTOS ASSESSMENT Cartier Court Memorial University of Newfoundland St. John s, NL Project #: 13916 ASBESTOS ASSESSMENT Cartier Court Memorial University of Newfoundland St. John s, NL Prepared for: Sheila Miller Director, Department of Health and Safety Memorial University of Newfoundland

More information

Asbestos Awareness Program

Asbestos Awareness Program Safety Manual 1 of 9 Safety Manual Sect: 1.0 Purpose 2.0 Scope Rel. Date: Last Review: This program covers Ardent policy related to asbestos, either discovered or suspected in the workplace. Ardent recognizes

More information

Bioscience Research Building

Bioscience Research Building Bioscience Research College Park, Maryland Presentation Agenda and Construction Features Analysis Analysis Research Features Presentation Agenda Construction Features: CM at Risk 2 year schedule (July

More information

1. Asbestos Facts NEW SOP

1. Asbestos Facts NEW SOP In this issue of the Environmental Health and Safety (EHS) Listserv, June 8, 2015: 1. Asbestos Facts NEW SOP 2. Dewatering NEW SOP 3. Promoting an Academic Safety Culture - Recap 4. National Forklift Safety

More information

ASBESTOS CEMENT WATER MAIN REPLACEMENT

ASBESTOS CEMENT WATER MAIN REPLACEMENT ASBESTOS CEMENT WATER MAIN REPLACEMENT Presenter: Bryon Killian, PE bkillian@entecheng.com References Drinking Water Operator Certification Training Modules. Pennsylvania Department of Environmental Protection

More information

TSI SAMPLE MANAGEMENT PLANNER INITIAL. Training Services International, Inc. Qualifications & Functions

TSI SAMPLE MANAGEMENT PLANNER INITIAL. Training Services International, Inc. Qualifications & Functions MANAGEMENT PLANNER INITIAL Asbestos Training Course Federal Edition Training Services International www.training.com What management planning qualifications exist? How do I become certified to perform

More information

SURVEY REPORT FOR ASBESTOS AND LEAD-BASED PAINT

SURVEY REPORT FOR ASBESTOS AND LEAD-BASED PAINT SURVEY REPORT FOR ASBESTOS AND LEAD-BASED PAINT Prepared For: TALLEY & SMITH ARCHITECTURE, INC. 409 EAST MARION STREET SHELBY, NORTH CAROLINA 28150 Regarding: DELIVERY ORDER NO. 0051 FY 15 DEMOLISH FACILITIES,

More information

Asbestos Management Plan. Program originated: 02/2000 Last updated: 6/2015. Wendel Reece University Safety Manager

Asbestos Management Plan. Program originated: 02/2000 Last updated: 6/2015. Wendel Reece University Safety Manager Asbestos Management Plan Program originated: 02/2000 Last updated: 6/2015 Wendel Reece University Safety Manager TABLE OF CONTENTS I. Introduction II. Purpose III. Operations and Maintenance Asbestos Related

More information

OWNER S DUTIES. Designated Substances on construction projects BEFORE CONTRACTS ARE FINALIZED, THE PROJECT OWNER MUST DO THE FOLLOWING

OWNER S DUTIES. Designated Substances on construction projects BEFORE CONTRACTS ARE FINALIZED, THE PROJECT OWNER MUST DO THE FOLLOWING In Ontario, section 30 of the Occupational Health and Safety Act requires that a project owner identify designated substances on the project and provide a list to prospective constructors before contracts

More information

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT ASBESTOS

Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT ASBESTOS Keeping People Safe CHURCH HEALTH & SAFETY TOOLKIT ASBESTOS Asbestos Asbestos is a naturally occurring, fibrous material which if inhaled can cause serious diseases. These include cancers of the lungs

More information

J. Brent Kynoch Managing Director, EIA

J. Brent Kynoch Managing Director, EIA J. Brent Kynoch Managing Director, EIA Frank R. Lautenberg Chemical Safety for the 21 st Century Act Signed into law by President Obama on June 22, 2016 First revision to the TSCA law originally enacted

More information

Tim Nelson, Facilities Management's Asbestos Coordinator, 400 Donhowe Building Dan Allen, Associate Director, Recreation Sports, 108 Cooke Hall

Tim Nelson, Facilities Management's Asbestos Coordinator, 400 Donhowe Building Dan Allen, Associate Director, Recreation Sports, 108 Cooke Hall July 3, 2007 REPORT: Full Building Survey TO: Tim Nelson, Facilities Management's Asbestos Coordinator, 400 Donhowe Building Dan Allen, Associate Director, Recreation Sports, 108 Cooke Hall FROM: Bryan

More information

BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02

BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02 BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02 Department Title: Safety Department Page: 2 Department Title: Safety Department Page:

More information

PROJECT NO REPORT TO CITY OF STRATFORD ASBESTOS CONTAINING MATERIALS SURVEY ROW HOUSES STRATFORD, ONTARIO CONDUCTED BY:

PROJECT NO REPORT TO CITY OF STRATFORD ASBESTOS CONTAINING MATERIALS SURVEY ROW HOUSES STRATFORD, ONTARIO CONDUCTED BY: PROJECT NO. 1197 REPORT TO CITY OF STRATFORD ON ASBESTOS CONTAINING MATERIALS SURVEY ROW HOUSES STRATFORD, ONTARIO CONDUCTED BY: 1099 KINGSTON ROAD, SUITE 260 PICKERING, ONTARIO L1V 1B5 Tel: (416) 410-4333

More information

HERRON Enterprises USA, Inc.

HERRON Enterprises USA, Inc. Phone (303) 763 9639 To: City of Montrose / Mr. Mark Armstrong HERRON Project No.: 1120145 Job No.: Verbal Location: Multiple Buildings, 950 and 970 Chipeta Rd., Montrose, CO 81403 Dates of Service: November

More information

Dale Livingston, Asbestos Group, Environmental Health and Safety, 153 U-Tech Building, 2331 University Avenue S.E., Minneapolis, MN 55414

Dale Livingston, Asbestos Group, Environmental Health and Safety, 153 U-Tech Building, 2331 University Avenue S.E., Minneapolis, MN 55414 July 5, 2007 REPORT: Full Building Survey TO: Linda McCracken-Hunt, Project Development, 400 Shops Building Fay Thompson, Department of Environmental Health and Safety, Director Tim Nelson, Facilities

More information

STUDIO 2LR ARCHITECTURE + INTERIORS

STUDIO 2LR ARCHITECTURE + INTERIORS STUDIO 2LR ARCHITECTURE + INTERIORS University of South Carolina Longstreet Theatre Exterior Renovations 1300 Greene Street, Columbia, South Carolina State Project Number: H27-6100-G May 22, 2015 ADDENDUM

More information

CHAPTER 34 ASBESTOS. Where is it Found? 34 ASBESTOS. What is Asbestos?

CHAPTER 34 ASBESTOS. Where is it Found? 34 ASBESTOS. What is Asbestos? CHAPTER 34 ASBESTOS 34 ASBESTOS This chapter provides some brief information about asbestos in construction. If you encounter asbestos on the job, you will need more information. Here are the two main

More information

Asbestos Guide. Scope. Safety Guidelines. 1 P a g e C H S _ P I C A G V

Asbestos Guide. Scope. Safety Guidelines. 1 P a g e C H S _ P I C A G V 1 P a g e Asbestos Guide It is the responsibility of every occupant, owner, tenant, contractor, employee & visitor and ALL users of this facility to ensure they take all reasonably practical steps to ensure

More information

Asbestos/Lead Paint Survey

Asbestos/Lead Paint Survey Asbestos/ Survey At: Camp Lejeune Bldg. 500 Repair Indoor Physical Fitness Center Prepared for: The Walker Group Architecture Inc. PO Box 541 New Bern, NC 28563 PEI Project No.: Walker Group Project No.:

More information

Asbestos is the generic name that refers to six unique minerals: Chrysotile Amosite Crocidolite Anthophyllite Tremolite Actinolite PPT-SM-A 2018

Asbestos is the generic name that refers to six unique minerals: Chrysotile Amosite Crocidolite Anthophyllite Tremolite Actinolite PPT-SM-A 2018 Asbestos Asbestos is the generic name that refers to six unique minerals: Chrysotile Amosite Crocidolite Anthophyllite Tremolite Actinolite 2 These naturally occurring mineral fibers were widely used in

More information

Post Fire IAQ and Clean-up Issues

Post Fire IAQ and Clean-up Issues Po Post Fire IAQ and Clean-up Issues Emergency Line 1-866-530-4086 Introduction When a disaster such as the Fort McMurray fire strikes, part of the task of restoring a property to its former use or occupancy

More information

ASBESTOS SAFETY MANUAL

ASBESTOS SAFETY MANUAL ASBESTOS SAFETY MANUAL ENVIRONMENTAL HEALTH & SAFETY Copyright ª 1992 Iowa State University Research Foundation, Inc. Iowa State University Ames, Iowa I. INTRODUCTION Iowa State University has a responsibility

More information

POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT. for. SSOE, Inc Wilshire Drive Suite 260 Troy, Michigan 48084

POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT. for. SSOE, Inc Wilshire Drive Suite 260 Troy, Michigan 48084 POTENTIALLY HAZARDOUS MATERIALS BUILDING INSPECTION REPORT for SSOE, Inc. 1050 Wilshire Drive Suite 260 Troy, Michigan 48084 at Michigan State University Physics Astronomy Building (Now Psychology) East

More information

Thames Valley District School Board. The Board has assigned the following responsibilities to ensure compliance with the above Policy and Legislation.

Thames Valley District School Board. The Board has assigned the following responsibilities to ensure compliance with the above Policy and Legislation. Thames Valley District School Board PROCEDURE Title ASBESTOS PROCEDURES Procedure No. 2005a Department ORGANIZATIONAL SUPPORT SERVICES (HUMAN RESOURCES) Reference(s) Policy: Health and Safety - Occupational

More information

"ASBESTOS AWARENESS IN THE WORKPLACE"

ASBESTOS AWARENESS IN THE WORKPLACE MAJOR PROGRAM POINTS "ASBESTOS AWARENESS IN THE WORKPLACE" Training For THE OSHA ASBESTOS STANDARD Quality Safety and Health Products, for Today...and Tomorrow Outline of Major Points Covered in the "Asbestos

More information

AUBURN UNIVERSITY RISK MANAGEMENT & SAFETY

AUBURN UNIVERSITY RISK MANAGEMENT & SAFETY AUBURN UNIVERSITY RISK MANAGEMENT & SAFETY ASBESTOS CONTROL PROGRAM September 22, 2006 Table of Contents 1.0 Introduction... 4 2.0 Purpose and Applicability... 4 3.0 Roles and Responsibilities... 5 3.1

More information

FACILITY ASBESTOS MANAGEMENT PLAN

FACILITY ASBESTOS MANAGEMENT PLAN WASHINGTON ADVENTIST UNIVERSITY DEPARTMENT OF PUBLIC SAFETY DIVISION FACILITY ASBESTOS MANAGEMENT PLAN TAKOMA PARK CAMPUS REVIEWED and APPROVED BY: Patrick Farley WAU- V.P. of Finance Steven Lapham WAU-Executive

More information

Common Household Contaminants: The Hazards and the Laws

Common Household Contaminants: The Hazards and the Laws The National Center for Healthy Housing (NCHH) developed this summary to serve as a short guide for health and housing professionals on common household contaminants. It is not comprehensive. As a guide,

More information

November 12, Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California

November 12, Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California November 12, 2014 Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California 95993-2240 RE: Pre-Renovation Asbestos Survey Report 5862 Rupert Avenue, Marysville, California

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Asbestos Management Plan

Asbestos Management Plan Asbestos Management Plan Management Plan Statement The following management plan has been produced and will be implemented so that the risks associated with known or presumed asbestos containing materials

More information

What is Asbestos? Asbestos was also used in household items, such as: oven gloves ironing board pads simmer mats for stoves fire blankets.

What is Asbestos? Asbestos was also used in household items, such as: oven gloves ironing board pads simmer mats for stoves fire blankets. All About Asbestos Read this booklet to learn more about: identifying asbestos-containing material in your home the health risks of asbestos what you can do about asbestos. What is Asbestos? Asbestos is

More information

Health, Safety and Fire Specialists Ltd

Health, Safety and Fire Specialists Ltd 17 Chescombe Road, Yatton, North Somerset, BS49 4EE. 0784 1916 730 01934 832 851 HealthSafetyAndFire@gmail.co.uk www.healthsafetyandfire.co.uk ASBESTOS RISK MANAGEMENT : For those WORKING on buildings..

More information

Learn Charter School Excel Campus

Learn Charter School Excel Campus ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

DP ASBESTOS MANAGEMENT

DP ASBESTOS MANAGEMENT DP 057 1997-12-03 ASBESTOS MANAGEMENT Table of Contents 1. Background 2. Policy 3. Scope 4. Definitions 5. Roles and Responsibilities 6. Guidelines 1. Implementation 2. Monitoring 7. Procedures 8. Compliance

More information

WILLIAM PATERSON UNIVERSITY ASBESTOS MANAGEMENT PLAN

WILLIAM PATERSON UNIVERSITY ASBESTOS MANAGEMENT PLAN WILLIAM PATERSON UNIVERSITY ASBESTOS MANAGEMENT PLAN 1. INTRODUCTION 1.1 OBJECTIVES Asbestos-containing materials (ACM) have been used widely in the construction industry. Although use of ACM in buildings

More information

FINAL REPORT. Asbestos-Containing Building Material Assessment

FINAL REPORT. Asbestos-Containing Building Material Assessment FINAL REPORT Asbestos-Containing Building Material Assessment Toronto Catholic District School Board Nativity of Our Lord Catholic School 35 Saffron Crescent Etobicoke, Ontario PROJECT NO. 1025760 PROJECT

More information

Determination of Clearance Criteria Following Mercury Decontamination Projects

Determination of Clearance Criteria Following Mercury Decontamination Projects Determination of Clearance Criteria Following Mercury Decontamination Projects PO-115 American Industrial Hygiene Conference and Exposition May 13-16, 2006 David Regelbrugge, CIH, CSP Gary N. Crawford,

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

ASBESTOS PROGRAM. C. Asbestos Containing Materials (ACM) are defined as any material or product which contains more than 1% (by weight) asbestos.

ASBESTOS PROGRAM. C. Asbestos Containing Materials (ACM) are defined as any material or product which contains more than 1% (by weight) asbestos. PAGE: 1 OF 14 I. PURPOSE ASBESTOS PROGRAM The Lake Charles Asbestos Program has been developed to establish work practices, engineering controls, training programs, industrial hygiene monitoring, and medical

More information

Asbestos Management Policy University of Wisconsin-Platteville Reviewed 4/2016

Asbestos Management Policy University of Wisconsin-Platteville Reviewed 4/2016 Asbestos Management Policy University of Wisconsin-Platteville Reviewed 4/2016 1.0 Purpose This written program is intended to comply with both state and federal asbestos regulations. Asbestos containing

More information

Asbestos Abatement for Business Owners: Identifying a Least-Cost Approach. Nathan Biasotti. Oregon State University

Asbestos Abatement for Business Owners: Identifying a Least-Cost Approach. Nathan Biasotti. Oregon State University Running Head: Least-Cost Approach to Asbestos Abatement 1 Asbestos Abatement for Business Owners: Identifying a Least-Cost Approach Nathan Biasotti Oregon State University Least-Cost Approach to Asbestos

More information

Asbestos Management Plan. Approved by TRCA Strategy Committee: May 19, 2016

Asbestos Management Plan. Approved by TRCA Strategy Committee: May 19, 2016 Asbestos Management Plan Approved by TRCA Strategy Committee: May 19, 2016 Table of Contents 1.Objectives... 3 1.1 Purpose and Scope... 3 1.2 Elements of the Asbestos Management Plan... 4 1.3 Roles and

More information

1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work:

1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work: 125 Syndicate Avenue, Thunder Bay, Ontario Page 1 of 5 Part 1 General 1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work:.1 Removing asbestos-containing transite

More information

Office of Design & Construction State University Plaza Albany, New York

Office of Design & Construction State University Plaza Albany, New York Instructions: Consultant should meet with the Campus and Fund at the work area(s) prior to completing this Checklist. At least two (2) meetings are required, one prior to Schematic Phase submission and

More information

Asbestos in the Home

Asbestos in the Home Asbestos in the Home This document will help you understand asbestos: what it is, its health effects, where it is in your home, and what to do about it. What Is Asbestos? Asbestos is a mineral fiber. It

More information

ST. LUKE CATHOLIC ELEMENTARY SCHOOL

ST. LUKE CATHOLIC ELEMENTARY SCHOOL ST. LUKE CATHOLIC ELEMENTARY SCHOOL Final 2017 ACM Re-Assessment Report Project Location: 345 Albright Road Hamilton, ON Prepared for: Hamilton Wentworth Catholic District School Board 57 Stuart Street

More information

Letter of Intent 1026 Sherman Ave

Letter of Intent 1026 Sherman Ave Letter of Intent 1026 Sherman Ave Overview We would like to tear down the existing structure which is not fit for occupancy or renovation and build a new home which is appropriate to the feel, class, size

More information

Project Monitoring & Air Sampling

Project Monitoring & Air Sampling Project Monitoring & Air Sampling 1. Qualifications of Air Sampling Personnel. The project air sampling shall be conducted by an asbestos project air sampling technician who has been trained in the selected

More information

NARRATIVE REPORT 1.0 BUILDING INFORMATION 2.0 ASBESTOS SURVEY INFORMATION

NARRATIVE REPORT 1.0 BUILDING INFORMATION 2.0 ASBESTOS SURVEY INFORMATION NARRATIVE REPORT 1.0 BUILDING INFORMATION Bentson Bunker Fieldhouse was originally constructed in 1931; the building has had several renovations, notably, a 1976-1980 multi-phase renovation throughout

More information

FACILITIES MAINTENANCE WORKER

FACILITIES MAINTENANCE WORKER FACILITIES MAINTENANCE WORKER Summary Statement: Under supervision, is responsible for performing routine building maintenance tasks and assisting Building Maintenance Supervisor with the performance of

More information

SURVEY FINDINGS Building: 1101

SURVEY FINDINGS Building: 1101 SURVEY FINDINGS Building: 1101 Friable ACM identified DESCRIPTION LOCATION Date Quantity No friable ACM records found in database Non-friable ACM identified DESCRIPTION LOCATION Date Quantity ROOFING SEALANT,

More information

OLM Environmental, LLC PHONE: (919) LOCKWOOD FOLLY LANE; RALEIGH, NC CELLPHONE: (919)

OLM Environmental, LLC PHONE: (919) LOCKWOOD FOLLY LANE; RALEIGH, NC CELLPHONE: (919) OLM Environmental, LLC PHONE: (919) 212-3019 2317 LOCKWOOD FOLLY LANE; RALEIGH, NC 27610 CELLPHONE: (919) 931-0629 July 31, 2016 Zapolski Real Estate, LLC 501 Washington Street Durham, North Carolina 27701

More information

Net Zero / Passive Homes Building Efficiency for the Future

Net Zero / Passive Homes Building Efficiency for the Future Net Zero / Passive Homes Building Efficiency for the Future Presented by: Curtis Mercer B. Comm, President and CEO of K & P Contracting Ltd Quality Contracting Since 1976 Slide 1 1. Explanation of a. Net

More information

1-B. Asbestos Exposure Assessment and Control in Occupational Settings

1-B. Asbestos Exposure Assessment and Control in Occupational Settings 1-B. Asbestos Exposure Assessment and Control in Occupational Settings Contents a) Methodologies related to the environmental monitoring of asbestos Asbestos in air Asbestos in bulk materials b) Work practices

More information

NAVSEA STANDARD ITEM. 1.1 Title: Asbestos-Containing Material (ACM); control

NAVSEA STANDARD ITEM. 1.1 Title: Asbestos-Containing Material (ACM); control NAVSEA STANDARD ITEM ITEM NO: 009-10 DATE: 18 NOV 2016 CATEGORY: I 1. SCOPE: 1.1 Title: Asbestos-Containing Material (ACM); control 2. REFERENCES: 2.1 29 CFR 1915.1001, Occupational Safety and Health Standards

More information

PRE-DEMOLITION ASBESTOS INSPECTION REPORT FOR VACANT RESIDENCE 326 NE 7 TH TERRACE OCALA, FLORIDA. Prepared for

PRE-DEMOLITION ASBESTOS INSPECTION REPORT FOR VACANT RESIDENCE 326 NE 7 TH TERRACE OCALA, FLORIDA. Prepared for ENVIRONMENTAL SERVICES, LLC PRE-DEMOLITION ASBESTOS INSPECTION REPORT FOR VACANT RESIDENCE 326 NE 7 TH TERRACE OCALA, FLORIDA Prepared for CITY OF OCALA REVITILIZATION STRATEGIES-CODE ENFORCEMENT DIVISION

More information

Asbestos / Lead Paint Management Plan

Asbestos / Lead Paint Management Plan Asbestos / Lead Paint Management Plan 2017 http://www.dshs.state.tx.us/asbestos/rules.shtm http://www.dshs.state.tx.us/elp/rules.shtm Prepared by the Environmental, Health and Safety Department 6300 Ocean

More information

Insulation Technologies and Installation Specifications for Better Energy Performance of Commercial Buildings

Insulation Technologies and Installation Specifications for Better Energy Performance of Commercial Buildings Insulation Technologies and Installation Specifications for Better Energy Performance of Commercial Buildings WoodWorks West Wood Products Council is a Registered Provider with The American Institute of

More information

July 13, 2011 TTL Project No NESHAP Asbestos and Limited Hazardous Materials Survey Report 500 North Congress Street Ypsilanti, Michigan

July 13, 2011 TTL Project No NESHAP Asbestos and Limited Hazardous Materials Survey Report 500 North Congress Street Ypsilanti, Michigan July 13, 2011 TTL Project No. 7615.02 Ms. Paula Boase Downriver Community Conference Brownfield Consortium 15100 Northline Road Southgate, Michigan 48195 Dear Ms. Boase: NESHAP Asbestos and Limited Hazardous

More information

UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN

UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN Revision Date Nature of Revision Prepared by Approved by 1 July 2014 Approved Plan Jon Fahie This, the University

More information

ASBESTOS MANAGEMENT PROGRAM

ASBESTOS MANAGEMENT PROGRAM California Institute of Technology ASBESTOS MANAGEMENT PROGRAM Caltech Environment, Health, and Safety Office 1200 E. California Blvd., M/C 25-6 Pasadena, CA 91125 Phone: 626.395.6727 Fax: 626.577.6028

More information

A/55/135. General Assembly. United Nations

A/55/135. General Assembly. United Nations United Nations General Assembly Distr.: General 13 July 2000 Original: English A/55/135 Fifty-fifth session Item 118 of the provisional agenda * Proposed programme budget for the biennium 2000-2001 Review

More information

Asbestos Code of Practice

Asbestos Code of Practice Revised date: 2010-06-26 Asbestos Code of Practice Issued date: 2009-07-21 Version: 1.0 Creator: Occupational Health 1.0 Purpose Custodian: H&S Programs & Projects The purpose of the Asbestos Code of Practice

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

The Consumer s Guide to. Basement Renovations. The Consumer s Guide to Basement Remodeling Total Renovations

The Consumer s Guide to. Basement Renovations. The Consumer s Guide to Basement Remodeling Total Renovations The Consumer s Guide to Basement Renovations What Do I Create With My Basement s Space? Renovating your basement is a popular and cost-effective way to maximize existing square-footage. It is your blank

More information

CLASS I AND II ABATEMENT PROJECT SUBMITTALS

CLASS I AND II ABATEMENT PROJECT SUBMITTALS 5.1 Pre-Work Submittals CLASS I AND II ABATEMENT PROJECT SUBMITTALS Abatement contractors shall submit the following in a bound notebook to AU or our designated representative at the mandatory pre-construction

More information

CHAPTER 22 ASBESTOS A. INTRODUCTION... 1 B. DEFINITIONS... 2 C. CHAPTER-SPECIFIC ROLES AND RESPONSIBILITIES... 3 D. HAZARD IDENTIFICATION...

CHAPTER 22 ASBESTOS A. INTRODUCTION... 1 B. DEFINITIONS... 2 C. CHAPTER-SPECIFIC ROLES AND RESPONSIBILITIES... 3 D. HAZARD IDENTIFICATION... CHAPTER 22 ASBESTOS A. INTRODUCTION... 1 B. DEFINITIONS... 2 C. CHAPTER-SPECIFIC ROLES AND RESPONSIBILITIES... 3 D. HAZARD IDENTIFICATION... 7 E. HAZARD CONTROL... 8 1. Restrictions on Purchase and New

More information

Asbestos Awareness Training Handout For Custodial/Housekeeping Workers and Class IV Asbestos Workers

Asbestos Awareness Training Handout For Custodial/Housekeeping Workers and Class IV Asbestos Workers This handout is provided to meet the requirements of the OSHA asbestos awareness refresher training for custodial and housekeeping workers and Class IV asbestos workers. This training allows you to: HEPA

More information

OSHA s Enforcement of Asbestos Standards in the Construction Industry

OSHA s Enforcement of Asbestos Standards in the Construction Industry Open Journal of Safety Science and Technology, 2014, 4, 157-165 Published Online December 2014 in SciRes. http://www.scirp.org/journal/ojsst http://dx.doi.org/10.4236/ojsst.2014.44017 OSHA s Enforcement

More information

AHERA ASBESTOS INSPECTION & MANAGEMENT PLAN. for. Grounds Building 3644 Lee Road Shaker Heights, Ohio

AHERA ASBESTOS INSPECTION & MANAGEMENT PLAN. for. Grounds Building 3644 Lee Road Shaker Heights, Ohio AHERA ASBESTOS INSPECTION & MANAGEMENT PLAN for Grounds Building 3644 Lee Road Shaker Heights, Ohio March 2017 CONTENTS OF INSPECTION REPORT AND MANAGEMENT PLAN PART I BUILDING INSPECTION/REINSPECTION

More information

ADDENDUM NO.: 1 TO THE CONTRACT DOCUMENTS For SCC SWING SPACE FOR MOHR HALL MODERNIZATION (Existing Temps)

ADDENDUM NO.: 1 TO THE CONTRACT DOCUMENTS For SCC SWING SPACE FOR MOHR HALL MODERNIZATION (Existing Temps) Los Rios Community College District Sacramento City College ADDENDUM NO.: 1 TO THE CONTRACT DOCUMENTS For SCC SWING SPACE FOR MOHR HALL MODERNIZATION (Existing Temps) GENERAL This addendum forms a part

More information

Guide for Asbestos Management

Guide for Asbestos Management Guide for Asbestos Management May 2017 TABLE OF CONTENTS Introduction...2 Regulatory Information...5 Asbestos Management...7 1. Asbestos Inventory...8 2. Asbestos Control Plan...16 3. Training...24 4.

More information

ADDENDUM # 1 To: File IFB for: 24 Gus Garcia Demolition and Reconstruction

ADDENDUM # 1 To: File IFB for: 24 Gus Garcia Demolition and Reconstruction 818 S. FLORES ST. SAN ANTONIO, TEXAS 78204 www.saha.org Procurement Department ADDENDUM # 1 To: File 1601-909-62-4465 - IFB for: 24 Gus Garcia Demolition and Reconstruction Please note the following change:

More information

A Guide to Asbestos for Industry

A Guide to Asbestos for Industry A Guide to Asbestos for Industry Thomas O Connell Series Editor N.C. Department of Labor Division of Occupational Safety and Health 4 W. Edenton St. Raleigh, NC 27601-1092 Cherie K. Berry Commissioner

More information

FACILITY ASSESSMENT PRESENTATION 11 October SCHRADERGROUP architecture

FACILITY ASSESSMENT PRESENTATION 11 October SCHRADERGROUP architecture FACILITY ASSESSMENT PRESENTATION 11 October 2017 SCHRADERGROUP architecture AGENDA 1. 1 Facility Assessment Review 2. 2 Prioritizing the Scope of Work with Associated Costs 3 Timeline of Work 3. 4 Procurement

More information

Asbestos-Containing Material and Hazardous Material Survey Summary Report

Asbestos-Containing Material and Hazardous Material Survey Summary Report Asbestos-Containing Material and Hazardous Material Survey Summary Report Site: Haas Park Fieldhouse PS1757 2404 North Washtenaw Street Chicago, Illinois 60647 Survey Date: January 15, 2010 PBCC Project

More information

Asbestos. Rules of Abatement. What you need to know about removal and maintenance

Asbestos. Rules of Abatement. What you need to know about removal and maintenance Asbestos Rules of Abatement What you need to know about removal and maintenance D Asbestos Rules of Abatement What you need to know about removal and maintenance D Table of Contents Background... 6 Work

More information

Project & Environmental Review. Guidelines Demolition. May 2016

Project & Environmental Review. Guidelines Demolition. May 2016 Project & Environmental Review Guidelines Demolition May 2016 TABLE OF CONTENTS 1. Introduction... 3 2. Objectives... 3 3. Applicability and Building Permits... 3 4. Guidelines for Preparing a Project

More information