1 Asbestos/ Survey At: Camp Lejeune Bldg. 500 Repair Indoor Physical Fitness Center Prepared for: The Walker Group Architecture Inc. PO Box 541 New Bern, NC PEI Project No.: Walker Group Project No.: AL Date: Inspectors: June 20, 2017 Jonathan Guetta, Michael Krupa NC Asbestos Inspectors: 11936/12880 NC Lead Inspector/Risk Assessor Prepared by: 3802 Cherry Ave. Wilmington, NC Tel: (910) Fax: (

2 3802 Cherry Ave. Wilmington, NC Tel: Fax: June 19, 2017 The Walker Group Architecture, Inc. Attn: Beth Walker PO Box 541 New Bern, NC Re: Asbestos Bulk Sampling & Analysis at: Camp Lejeune Building 500 Repair Indoor Physical Fitness Center Contract No. N D-0857 Client Project No.: PEI Project No.: AL On June 14, 2017, Jonathan Guetta and Michael Krupa (NC Asbestos Building Inspector Accreditation Nos and 12880, respectively) of Precision Environmental, Inc. (Precision) conducted an asbestos survey within the above referenced building. The inspection included all materials scheduled to be disturbed/removed during the upcoming renovation project as described in the written scope of work supplied to Precision by the Client. The purpose of the survey was to verify the presence or absence of asbestos-containing materials (ACM) associated with the building prior to renovation procedures. Prior to sample collection, a visual inspection was conducted in order to determine homogeneous materials/areas and sample locations. Asbestos-containing materials are defined as materials that contain greater than 1% asbestos via Polarized Light Microscopy (PLM). Homogeneous Areas (HGA) are determined by the material s color and texture. Asbestos-containing materials are defined by the following descriptions: surfacing material (SM), thermal system insulation (TSI) and miscellaneous materials (M). Both friable and non-friable materials were included in the inspection. Friable materials are defined as those that can be pulverized by hand pressure. Bulk sampling of suspect ACM was conducted in accordance with the sampling requirements promulgated by the United States Environmental Protection Agency s Asbestos-Containing Materials in Schools Rule (40 CFR 763, Subpart E), commonly referred to as the Asbestos Hazard Emergency Response Act or AHERA regulations. Specific compliance to these requirements include, but are not limited to, the type and number of samples to be collected. Sample locations were selected at random. As a result, a total of thirty-seven (37) bulk samples were collected from sixteen (16) suspect asbestos-containing materials. A listing of identified suspect ACM materials and the number of samples collected from each homogeneous area (HGA) is provided in Table 1 below: Table 1: Identified Suspect Asbestos Materials Suspect material (HGA) Description Friable/Nonfriable Sample Location No. of Samples Collected 1. Textured wall plaster SM F 1 st Floor Main Gym Area 5 2. Textured ceiling material SM F 1 st Floor Front Lobby Area 3 3. Wallboard M F 1 st Floor Storage Room below stairs, 2 nd Floor Hallway 2 4. Joint compound M F 1 st Floor Storage Room below stairs, 2 nd Floor Hallway 2 5. Stone pattern linoleum flooring M NF 1 st Floor Men s Bathroom (top layer) 2 6. Black floor tile/mastic M NF 1 st Floor Men s Bathroom (bottom layer) 2

3 The Walker Group Architecture, Inc. Repair Indoor Physical Fitness Center Bldg 500, Camp Lejeune, NC Asbestos Survey Report June 19, 2017 Page 2 of 4 Suspect material (HGA) Description No. of Samples Friable/Nonfriable Sample Location Collected 7. Felt paper below Gym hardwood flooring M NF 1 st Floor Main Gym Area 2 8. Mastic below rubber floor tiles M NF 1 st Floor Rear Locker Room 2 9. Hard wall plaster SM F Rear Gym Vestibules x 12 beige marbled floor tile/mastic M NF 2 nd Floor Hallway x 12 white floor tile/mastic M NF 2 nd Floor Center Office 2 12.Covebase mastic M NF 2 nd Floor Hallway Gray duct mastic M NF Attic White exterior window caulking M NF Exterior windows White exterior door caulking M NF Exterior doors Roofing shingles M NF Rooftop 2 SM=Surfacing material/tsi=thermal system insulation/m= Miscellaneous material/f=friable/nf=non-friable Collected samples were given a unique identification number, which included the date, building number (500) and sample number, logged onto a chain of custody form and shipped to an accredited laboratory for analysis. All samples were analyzed by Polarized Light Microscopy (PLM) via EPA method 600/M4/82/020. Multi layered samples were separated prior to analysis and analyzed separately per EPA protocol. In an effort to reduce cost, Precision instructed the laboratory to STOP analysis at the first positive sample for each suspect material HGA and not to analyze the remaining samples from the same HGA. As a result, a total of thirty-nine (39) samples were analyzed. Results Laboratory analysis of the bulk samples collected revealed that suspect material 1 contains asbestos in quantities greater than 1% and is considered to be an asbestos-containing material. The remaining suspect materials revealed no asbestos detected and may be treated as NON-ACM. Listing of identified ACM and NON-ACM materials is provided in Table 2 below: Table 2: Identified ACM and NON-ACM Materials Material Description Friable/ Non-friable Location Laboratory Result Approx. Quantity 1. Textured wall plaster SM F 1 st Floor Main Gym Area 2. Textured ceiling material SM F 1 st Floor Front Lobby Area 2% Chrysotile asbestos Trace Chrysotile asbestos 2,555 SF N/A 3. Wallboard M F Throughout building None detected N/A 4. Joint compound M F Throughout building None detected N/A 5. Stone pattern linoleum flooring M NF 1 st Floor Men s Bathroom (top layer) and Rear Locker Room Area Bathrooms None detected N/A 1 st Floor Men s Bathroom (bottom layer) None detected N/A 6. Black floor tile/mastic M NF 7. Felt paper below Gym hardwood flooring M NF 1 st Floor Main Gym Area None detected N/A

4 The Walker Group Architecture, Inc. Repair Indoor Physical Fitness Center Bldg 500, Camp Lejeune, NC Asbestos Survey Report June 19, 2017 Page 3 of 4 Material Description Approx. Friable/ Location Laboratory Quantity Non-friable Result 8. Mastic below rubber floor tiles M NF 1 st Floor Rear Locker Room None detected N/A 9. Hard wall plaster SM F Throughout building None detected N/A x 12 beige marbled floor tile/mastic M NF Throughout 2 nd Floor None detected N/A x 12 white floor tile/mastic M NF Throughout 2 nd Floor None detected N/A 12.Covebase mastic M NF Throughout 2 nd Floor None detected N/A 13. Gray duct mastic M NF Throughout building None detected N/A 14. White exterior window caulking M NF Exterior windows None detected N/A 15. White exterior door caulking M NF Exterior doors None detected N/A 16. Roofing shingles M NF Rooftop None detected N/A SF = Square Feet N/A = Not Applicable Based on the sample analysis, the following materials should be considered to be Asbestos-Containing Materials: Textured wall plaster located in the 1 st Floor Main Gym Area (approximately 2,555 square feet) Asbestos-containing materials are regulated materials and must be handled accordingly. If the materials are to be disturbed/removed, the materials must be removed in accordance with all applicable Federal, State and Local regulations. In addition, the materials must be disposed of as asbestos-containing waste and may not be disposed of as construction debris. A physical/visual inspection revealed the following: No destructive investigation techniques were used during this inspection. It should be understood that suspect asbestos-containing pipe insulation materials may exist within presently concealed wall and/or ceiling cavities and pipe chase spaces. Non-suspect ceramic tile floors were noted in bathrooms within the building. Non-suspect FRP wall board material was noted within interior bathrooms. Non-suspect T1-11 boards were noted within the Gym area. Non-suspect wood base molding was noted in various areas within the building. Non-suspect fiberglass pipe insulation and associated fiberglass and/or PVC fittings were noted throughout the interior spaces (including bathrooms) within the building. Non-suspect rubber flooring material was noted in the locker rooms. Non-suspect fiberglass duct insulation was noted on the ductwork in the locker rooms. The ceiling of the main gymnasium space was noted to consist of confirmed non-asbestos-containing wallboard and joint compound materials. Non-suspect fiberglass pipe insulation and fiberglass duct insulation were noted in the attic. Piping within the confined space steam pit at the rear of the building appeared to be insulated with non-suspect fiberglass pipe insulation. Non-suspect fiberglass pipe insulation and duct insulation materials were noted within the crawlspace. The exterior soffit/overhang was noted to consist of non-suspect concrete. No suspect asbestos-containing window glazing compound was noted at the windows. Non-suspect vinyl siding was noted at the upper exterior facades of the building. All efforts were made to discover/sample all suspect asbestos-containing materials. If additional materials not addressed during this inspection are to be disturbed, Precision strongly recommends that those materials either be assumed to be asbestoscontaining, or that bulk samples be collected to determine the materials asbestos content prior to their disturbance.

5 The Walker Group Architecture, Inc. Repair Indoor Physical Fitness Center Bldg 500, Camp Lejeune, NC Asbestos Survey Report June 19, 2017 Page 4 of 4 All bulk samples analytical results as well sample location are outlined in detail on the attached BULK SAMPLE DATA AND CHAIN OF CUSTODY form and laboratory s BULK ASBESTOS ANALYSIS RESULTS form. Attached please find the following: Bulk Asbestos Analysis Sheet Bulk Sample Data And Chain Of Custody Form Laboratory and Personnel Certificates If you have any questions or require additional information, please do not hesitate to contact me at (910) Sincerely, Precision Environmental, Inc. Michael Krupa NC Asbestos Inspector Accreditation #12880

6

7

8

9

10

11

12

13

14

15 3802 Cherry Ave. Wilmington, NC Tel: Fax: June 19, 2017 The Walker Group Architecture, Inc. Attn: Beth Walker PO Box 541 New Bern, NC Re: Bulk Sampling & Analysis at: Camp Lejeune Bldg. 500 Repair Indoor Physical Fitness Center Contract No. N D-0857 Client Project No.: PEI Project No.: AL Precision Environmental Inc. (Precision) was retained by The Walker Group Architecture, Inc. to conduct a lead paint survey and analysis of coated surfaces associated with the above referenced facility. The inspection included all materials scheduled to be disturbed/removed during the upcoming renovation project as described in the written scope of work supplied to Precision by the Client. The purpose of the survey was to determine if lead painted components exist within and on the exterior of the the structure prior to renovation procedures. The bulk sampling was performed by Precision s representative, Jonathan Guetta (NC Risk Assessor/ Lead Inspector Certificate No ) on June 14, As a result, a total of twenty-two (22) different suspect lead based paint (LBP) coatings were identified. A listing of the identified LBP coatings and the number of bulk samples collected per suspect material is provided in Table 1 below: Table 1: Identified suspect LBP coatings materials Suspect Material Location No. of Samples Collected 1. White painted wood T-111 Walls Gymnasium 2 2. White painted metal exterior door systems Exterior doors 2 3. White painted wood base board Gymnasium 2 4. White painted plaster walls Gymnasium 2 5. White painted wallboard ceiling Gymnasium 2 6. Black painted metal stair railing Stairways 2 7. Black painted concrete stair tread Stairways 2 8. White painted wallboard walls 2 nd floor walls 2 9. White painted metal interior door systems 2 nd floor interior doors White painted metal radiator covers 2 nd floor radiators White painted metal toilet partition Toilet partitions Orange painted metal I-beams Attic Yellow painted metal interior stairway safety paint Stairways Gray painted concrete floor At rear entry 2

16 Suspect Material Location 15. White painted brick walls Locker room White painted horizontal concrete beams Locker room mezzanine Gray painted metal I-beams Locker room mezzanine Cream/gray painted metal exterior stair system Rear stair system Gray painted metal exterior door system Front and side exterior entries White painted metal columns Exterior, front White painted concrete overhang ceilings Front overhangs White painted metal side entry lintels Side entries 2 The Walker Group Architecture, Inc. Repair Indoor Physical Fitness Center Bldg 500, Camp Lejeune, NC Survey Report Precision No AL Page 2 of 4 No. of Samples Collected Collected samples were given a unique identification number, which included the date, building number (500), and periodic table of elements lead symbol (Pb), sample number, logged onto a lead paint chip chain of custody form and shipped to an accredited laboratory for analysis. The bulk samples collected from the above listed materials (Table 1) were analyzed by Flame Atomic Absorption (AA) via EPA SW and 3050B Method. Analysis of the samples revealed that multiple suspect coatings contain lead in concentrations above the Detection Limit. Laboratory results obtained are provided in detail in the attached laboratory report and summarized in the Table 2 below: Table 2: Summary of Laboratory Results Suspect Material Location Highest Lead Concentration % by weight 1. White painted wood T-111 Walls Gymnasium < White painted metal exterior door systems Exterior doors < White painted wood base board Gymnasium White painted plaster walls Gymnasium White painted wallboard ceiling Gymnasium Black painted metal stair railing Stairways Black painted concrete stair tread Stairways White painted wallboard walls 2 nd floor walls White painted metal interior door systems 2 nd floor interior doors White painted metal radiator covers 2 nd floor radiators White painted metal toilet partition Toilet partitions Orange painted metal I-beams Attic Yellow painted metal interior stairway safety paint Stairways Gray painted concrete floor At rear entry White painted brick walls Locker room Detection Limit % by weight

17 Suspect Material Location The Walker Group Architecture, Inc. Repair Indoor Physical Fitness Center Bldg 500, Camp Lejeune, NC Survey Report Precision No AL Page 3 of 4 Highest Lead Concentration % by weight 16. White painted horizontal concrete beams Locker room mezzanine Gray painted metal I-beams Locker room mezzanine Cream/gray painted metal exterior stair system Rear stair system Gray painted metal exterior door system Front and side exterior entries White painted metal columns Exterior, front White painted concrete overhang ceilings Front overhangs White painted metal side entry lintels Side entries Detection Limit % by weight Based on the laboratory analysis, the following components associated with the structure are confirmed to be coated with lead based paint and shall be handled in accordance will all applicable regulations: All white painted wood baseboard All white painted plaster walls All white painted wallboard ceilings All black painted metal stair railings All black painted concrete stair treads All White painted wallboard walls All white painted metal interior door systems All white painted metal radiator covers All white painted metal toilet partitions All orange painted metal I-beams All yellow painted metal interior stairway safety paint All gray painted concrete floors All white painted brick walls All white painted horizontal concrete beams All gray painted metal I-beams All cream/gray painted metal stair systems All gray painted metal exterior door systems All white painted exterior metal columns All white painted concrete overhang ceilings All white painted metal side entry lintels Note: OSHA defines any detectable level of lead in paint a concern when renovations/demolition will impact lead coated surfaces. A visual inspection revealed the following: Metal HVAC duct in the attic is unpainted Bathroom partitions are coated in veneer Recommendations/Control Options If renovation or demolition activities are to impact lead coated surfaces, all work should be conducted by workers trained in lead safe work practices as outlined by the Occupational Safety and Health Administration (OSHA). In addition all lead coated components or paint removed from lead coated components should be disposed of in accordance with all Federal, State, and Local regulations.

18 The Walker Group Architecture, Inc. Repair Indoor Physical Fitness Center Bldg 500, Camp Lejeune, NC Survey Report Precision No AL Page 4 of 4 If additional materials not addressed during this inspection are to be disturbed, Precision strongly recommends that those materials either be assumed to be coated with lead based paint or that sampling is conducted to confirm the presence of absence of lead based paint prior to the disturbance of the materials. If you have any questions or require additional information, please do not hesitate to contact me at (910) Sincerely, PRECISION ENVIRONMENTAL INC. Jonathan Guetta NC Lead Inspector/Risk Assessor #: Attachments: Paint Chip Sample Data and Chain of Custody Laboratory Data Sheets Laboratory and Inspector Certificates

19 30105 Beverly Road Romulus, MI Ph: ; Fax: Certificate of Analysis: Lead In Paint by EPA SW and 3050B* Client : Attn : Phone : Precision Environmental 161 Arlington Dr. Wilmington, NC J. Guetta Fax : jguetta@precision-enviro.com AAT Project : Sampling Date : 06/14/2017 Date Received : Date Analyzed : Date Reported : 6/20/2017 8:00:38PM Client Project : Project Location : AL Repair Indoor Physical Fitness Center Bldg 500 Lab Sample ID Client Code Sample Description PPM Result Lead (% by weight) Calculated R L (% by weight) PB-01 T-111 WALLS GYM WHITE WOOD <25 < PB-02 T-111 WALLS GYM WHITE WOOD <16 < PB-03 EXTERIOR DOOR SYSTEMS WHITE METAL <11 < PB-04 EXTERIOR DOOR SYSTEMS WHITE METAL <14 < PB-05 BASE BOARD GYM WHITE WOOD PB-06 BASE BOARD GYM WHITE WOOD PB-07 GYM WALLS WHITE PLASTER PB-08 GYM WALLS WHITE PLASTER PB-09 GYM CEILING WHITE WALLBOARD PB-10 GYM CEILING WHITE WALLBOARD <19 < PB-11 STAIR RAILINGS BLACK METAL PB-12 STAIR RAILINGS BLACK METAL PB-13 STAIR TREAD BLACK CONCRETE PB-14 STAIR TREAD BLACK CONCRETE PB-15 2ND FL OFFICE AREA WALLS WHITE WLB PB-16 2ND FL OFFICE AREA WALLS WHITE WLB <17 < PB-17 2ND FL INTERIOR DOOR SYSTEMS WHITE <20 < PB-18 2ND FL INTERIOR DOOR SYSTEMS WHITE PB-19 2ND FL RADIATOR COVERS WHITE PB-20 2ND FL RADIATOR COVERS WHITE <19 < PB-21 2ND FL TOILET PARTITION WHITE RL= Reporting Limit * For true values assume (2) significant figures. The method and batch QC is acceptable unless otherwise stated. Current EPA/HUD Interim Standard for lead in paint samples is: 5000 PPM (parts per million) or ug/g which is equivalent to 0.5% by weight. AAT internal sop S203. The laboratory operates in accord with ISO guidelines and holds limited scopes of accreditation under AIHA-LAP and NY State DOH ELAP programs. These results are submitted pursuant to AAT LLC current terms and conditions of sale, including the company's standard warranty and limitation of liability provisions.analytical results relate to the samples as received by the lab. AAT will not assume any liability or responsibility for the manner in which the results are used or interpreted. Reproduction of this document other than in its entirety is not permitted. All Quality control requirements for the samples this report contains have been met. AAT does not blank correct reported values. Sample data apply only to items analyzed. *= Validated modified method AIHA LAP- Lab ID #100986, NY State DOH ELAP -Lab ID #11864, State of Ohio- Lab ID # Date Printed: 8:02PM AAT Project: Page 1 of 4

20 Lab Sample ID Client Code Sample Description PPM Result Lead (% by weight) Calculated R L (% by weight) PB-22 2ND FL TOILET PARTITION WHITE PB-23 ATTIC I BEAMS ORANGE METAL PB-24 ATTIC I BEAMS ORANGE METAL PB-25 INTERIOR STAIRWAY SAFETY PAINT YLW PB-26 INTERIOR STAIRWAY SAFETY PAINT YLW PB-27 FL BY REAR SIDE ENTRYWAY GRAY PB-28 FL BY REAR SIDE ENTRYWAY GRAY PB-29 LOCKER ROOM REAR WALL WHITE PB-30 LOCKER ROOM REAR WALL WHITE PB-31 LOCKER RM MEZZ SUPPORT SYS WHITE PB-32 LOCKER RM MEZZ SUPPORT SYS WHITE <23 < PB-33 I BEAM LOCKER ROOM MEZZ GRAY PB-34 I BEAM LOCKER RM MEZZ GRAY PB-35 EXTERIOR STAIR RAIL REAR CREAM GRAY PB-36 EXTERIOR STAIR RAIL REAR CREAM GRAY PB-37 EXTERIOR DOOR SYSTEM FRONT GRAY PB-38 EXTERIOR DOOR SYSTEM SIDE GRAY PB-39 FRONT COLUMNS EXT WHITE PB-40 FRONT COLUMNS EXT WHITE PB-41 FRONT OVERHANG CEILING WHITE PB-42 FRONT OVERHANG CEILING WHITE PB-43 SIDE ENTRY LINTELS WHITE PB-44 SIDE ENTRY LINTELS WHITE Analyst Signature RL= Reporting Limit * For true values assume (2) significant figures. The method and batch QC is acceptable unless otherwise stated. Current EPA/HUD Interim Standard for lead in paint samples is: 5000 PPM (parts per million) or ug/g which is equivalent to 0.5% by weight. AAT internal sop S203. The laboratory operates in accord with ISO guidelines and holds limited scopes of accreditation under AIHA-LAP and NY State DOH ELAP programs. These results are submitted pursuant to AAT LLC current terms and conditions of sale, including the company's standard warranty and limitation of liability provisions.analytical results relate to the samples as received by the lab. AAT will not assume any liability or responsibility for the manner in which the results are used or interpreted. Reproduction of this document other than in its entirety is not permitted. All Quality control requirements for the samples this report contains have been met. AAT does not blank correct reported values. Sample data apply only to items analyzed. *= Validated modified method AIHA LAP- Lab ID #100986, NY State DOH ELAP -Lab ID #11864, State of Ohio- Lab ID # Date Printed: 8:02PM AAT Project: Page 2 of 4

21 30105 Beverly Road Romulus, MI Ph: ; Fax: To : Precision Environmental 161 Arlington Dr. Wilmington, NC Attn : J. Guetta jguetta@precision-enviro.com Phone : Project Location : Repair Indoor Physical Fitness Center Bldg 500 AAT Project : Client Project : Date Reported : AL 6/20/2017 8:00:38PM Sample Client Code Analysis Requested Completed Analyst PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB-27 This report is intended for use solely by the individual or entity to which it is addressed. It may contain information that is privileged, confidential and otherwise exempt by law from disclosure. If the reader of this information is not the intended recipient or an employee of its intended recipient, you are herewith notified that any dissemination, distribution or copying of this information is strictly prohibited. If you have received this information in error, please notify AAT immediately. Thank you. AIHA LAP- Lab ID #100986, NY State DOH ELAP -Lab ID #11864, State of Ohio- Lab ID # Date Printed: 8:02PM AAT Project: Page 3 of 4

22 Sample Client Code Analysis Requested Completed Analyst PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB PB-44 Reviewed By Quality Assurance Coordinator - Robert A Theys This report is intended for use solely by the individual or entity to which it is addressed. It may contain information that is privileged, confidential and otherwise exempt by law from disclosure. If the reader of this information is not the intended recipient or an employee of its intended recipient, you are herewith notified that any dissemination, distribution or copying of this information is strictly prohibited. If you have received this information in error, please notify AAT immediately. Thank you. AIHA LAP- Lab ID #100986, NY State DOH ELAP -Lab ID #11864, State of Ohio- Lab ID # Date Printed: 8:02PM AAT Project: Page 4 of 4

23

24

25

26

27

28

29

30

31

November 12, Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California

November 12, Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California November 12, 2014 Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California 95993-2240 RE: Pre-Renovation Asbestos Survey Report 5862 Rupert Avenue, Marysville, California

More information

PIER 26 and 28 BULKHEAD LIMITED ASBESTOS and LEAD SURVEY NTE Project No.: NT-3278

PIER 26 and 28 BULKHEAD LIMITED ASBESTOS and LEAD SURVEY NTE Project No.: NT-3278 PIER 26 and 28 BULKHEAD LIMITED ASBESTOS and LEAD SURVEY NTE Project No.: NT-3278 PREPARED FOR: Mr. Roberto Aguirre City of San Francisco DPW, SAR, BCM 1680 Mission Street San Francisco, California PREPARED

More information

Asbestos Consulting Radon Measurements Lead Assessments Indoor Air Quality Testing Mold Investigations. Project Number: Page 1 of 22

Asbestos Consulting Radon Measurements Lead Assessments Indoor Air Quality Testing Mold Investigations. Project Number: Page 1 of 22 Page 1 of 22 Asbestos Survey Project Summary Pursuant to your request; Environmental, Inc., has performed an Asbestos Building Survey on 8/13/2014 and limited to the above referenced location. The Interior/Exterior/Roof

More information

HERRON Enterprises USA, Inc.

HERRON Enterprises USA, Inc. Phone (303) 763 9639 To: City of Montrose / Mr. Mark Armstrong HERRON Project No.: 1120145 Job No.: Verbal Location: Multiple Buildings, 950 and 970 Chipeta Rd., Montrose, CO 81403 Dates of Service: November

More information

Limited Asbestos Demolition Survey

Limited Asbestos Demolition Survey Limited Asbestos Demolition Survey Limited Asbestos Demolition Survey Former Fire Station Facility 25 to 45 S. Orlando Avenue Cocoa Beach, Florida Client: City of Cocoa Beach Public Works Department 1600

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-2270

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Asbestos Inspection Cover Letter

Asbestos Inspection Cover Letter Asbestos Inspection Cover Letter Date Issued: January 27, 2016 Site Name/Location Residential Structure 4 Cauthen Street Rock Hill, South Carolina Asbestos Inspection Performed For Hank Williams Right

More information

Dale Livingston, Asbestos Group, Environmental Health and Safety, 153 U-Tech Building, 2331 University Avenue S.E., Minneapolis, MN 55414

Dale Livingston, Asbestos Group, Environmental Health and Safety, 153 U-Tech Building, 2331 University Avenue S.E., Minneapolis, MN 55414 July 5, 2007 REPORT: Full Building Survey TO: Linda McCracken-Hunt, Project Development, 400 Shops Building Fay Thompson, Department of Environmental Health and Safety, Director Tim Nelson, Facilities

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-381X

More information

Crothers Environmental Group, LLC

Crothers Environmental Group, LLC , LLC Morrisville, Vermont 05661 Phone 802-888-1936 info@crothersiaq.com June 26, 2009 Mr. Joe Aja, Project Engineer State of Vermont - Department of Buildings & General Services 5 Perry Street, Suite

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Learn Charter School Excel Campus

Learn Charter School Excel Campus ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

Explain in writing if the address of the building is different than the address on this form:

Explain in writing if the address of the building is different than the address on this form: ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO

More information

ASBESTOS INSPECTION AND LEAD TESTING REPORT FOR INSPECTORS. For

ASBESTOS INSPECTION AND LEAD TESTING REPORT FOR INSPECTORS. For ASBESTOS INSPECTION AND LEAD TESTING REPORT FOR CITY OF ROCK HILL 150 Johnston Street Rock Hill, SC 29731 (803) 448-3351 LOCATION Vacant Building 302 Sidney Street Rock Hill, South Carolina INSPECTION

More information

Report of. Asbestos Survey

Report of. Asbestos Survey Report of Asbestos Survey of Curtis Block and Marlowe Buildings 14501, 14505, 14509, 14511 & 14515 Detroit Avenue and 1412 Marlowe Avenue Lakewood, Ohio 44107 Prepared for City of Lakewood 12650 Detroit

More information

Tim Nelson, Facilities Management's Asbestos Coordinator, 400 Donhowe Building Dan Allen, Associate Director, Recreation Sports, 108 Cooke Hall

Tim Nelson, Facilities Management's Asbestos Coordinator, 400 Donhowe Building Dan Allen, Associate Director, Recreation Sports, 108 Cooke Hall July 3, 2007 REPORT: Full Building Survey TO: Tim Nelson, Facilities Management's Asbestos Coordinator, 400 Donhowe Building Dan Allen, Associate Director, Recreation Sports, 108 Cooke Hall FROM: Bryan

More information

Limited Hazardous Materials Survey Report

Limited Hazardous Materials Survey Report Limited Hazardous Materials Survey Report Contra Costa Community College Applied Arts Building Chiller Replacement Project 2600 Mission Bell San Pablo, California RGA Project No: R1167404 June 29, 2016

More information

Asbestos Containing Building Material Survey

Asbestos Containing Building Material Survey Former 55 th Street South Trust Bank - ACBM Survey Asbestos Containing Building Material Survey Former South Trust Bank Property 9 55 th Street South Birmingham, AL Submitted to: Kelleigh Gamble Housing

More information

ADDENDUM # 1 To: File IFB for: 24 Gus Garcia Demolition and Reconstruction

ADDENDUM # 1 To: File IFB for: 24 Gus Garcia Demolition and Reconstruction 818 S. FLORES ST. SAN ANTONIO, TEXAS 78204 www.saha.org Procurement Department ADDENDUM # 1 To: File 1601-909-62-4465 - IFB for: 24 Gus Garcia Demolition and Reconstruction Please note the following change:

More information

ASBESTOS ASSESSMENT Cartier Court Memorial University of Newfoundland St. John s, NL

ASBESTOS ASSESSMENT Cartier Court Memorial University of Newfoundland St. John s, NL Project #: 13916 ASBESTOS ASSESSMENT Cartier Court Memorial University of Newfoundland St. John s, NL Prepared for: Sheila Miller Director, Department of Health and Safety Memorial University of Newfoundland

More information

ASBESTOS INSPECTION AND LEAD TESTING REPORT FOR

ASBESTOS INSPECTION AND LEAD TESTING REPORT FOR ASBESTOS INSPECTION AND LEAD TESTING REPORT FOR SPARTANBURG COUNTY Community Development Department 366 North Church Street Spartanburg, South Carolina 29303 LOCATION 281 Old Howard Gap Road Spartanburg,

More information

Asbestos Management Program April 27, 2017

Asbestos Management Program April 27, 2017 Asbestos Management Program April 27, 2017 1. INTRODUCTION 1.1. Purpose Indiana University Environmental Health and Safety (IUEHS) has developed this Program to identify practices and procedures for the

More information

LIMITED ASBESTOS-CONTAINING BUILDING MATERIALS SURVEY. Wal-Mart # Highway 51 North Ripley, TN ATC Project Number

LIMITED ASBESTOS-CONTAINING BUILDING MATERIALS SURVEY. Wal-Mart # Highway 51 North Ripley, TN ATC Project Number LIMITED ASBESTOS-CONTAINING BUILDING MATERIALS SURVEY Wal-Mart #0097 628 Highway 51 North Ripley, TN 38063 ATC Project Number 30.75300.0612 Prepared for: Wal-Mart Stores, Inc. Ms. Vicki Ingram Store Planning

More information

Asbestos-Containing Material Inspection Mount Vernon Apartments 677 West Alexandrine Street Detroit, Michigan. Mount Vernon Apartments II LDHA, LP

Asbestos-Containing Material Inspection Mount Vernon Apartments 677 West Alexandrine Street Detroit, Michigan. Mount Vernon Apartments II LDHA, LP Asbestos-Containing Material Inspection Mount Vernon Apartments 677 West Alexandrine Street Detroit, Michigan Mount Vernon Apartments II LDHA, LP February 26, 2016 Asbestos-Containing Material Inspection

More information

ASBESTOS BUILDING INSPECTION

ASBESTOS BUILDING INSPECTION ASBESTOS BUILDING INSPECTION LOCATION: BURT HALL 2651 SW ORCHARD AVENUE CORVALLIS, OREGON 97331 NOVEMBER 28, 2008 FORENSIC ANALYTICAL PROJECT NO. PJ6263 PREPARED FOR: OREGON STATE UNIVERSITY 127 OAK CREEK

More information

Hazardous Building Material Survey of the Former Willamette Industries Mill Site in Sweet Home, Oregon

Hazardous Building Material Survey of the Former Willamette Industries Mill Site in Sweet Home, Oregon A SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS Environmental Remediation Asbestos/Lead/Mold/PCBs/Heat & Moisture Detection/Dry Ice Blasting/Demolition/Radon A COMMITMENT TO EXCELLENCE 23525 Hwy. 99 E.

More information

Report No: ACM October 29, 2012

Report No: ACM October 29, 2012 PbO3 ENVIRONMENTAL INCORPORATED TESTING & SVC. CO. Report No: ACM-0223-10-29-12-022 October 29, 2012 Client: Lunacon Construction Group 16890 South Dixie Highway Miami, Florida 33157 Attn: Ozzie Gomez

More information

April 30, 2015 PREPARED FOR: Stantec, Inc. 55 Green Mountain Drive South Burlington, VT 05403

April 30, 2015 PREPARED FOR: Stantec, Inc. 55 Green Mountain Drive South Burlington, VT 05403 ASBESTOS INSPECTION REPORT 1079/ 1081, 1253 & 1371 Airport Drive, 3 & 4 Delaware Street, 53 North Henry Court, and 11 & 49 South Henry Court South Burlington, VT 05403 AIP 88 April 30, 2015 PREPARED FOR:

More information

April 29, 2015 PREPARED FOR: Stantec, Inc. 55 Green Mountain Drive South Burlington, VT 05403

April 29, 2015 PREPARED FOR: Stantec, Inc. 55 Green Mountain Drive South Burlington, VT 05403 ASBESTOS INSPECTION REPORT 1089, 1233, 1383 Airport Drive, 69 Dumont Street, 238 Kirby Road, 5, 8, 11, 15/17 Ledoux Terrace, 13, 17 Maryland Street, 420 White Street South Burlington, VT 05403 AIP 94 April

More information

Asbestos Survey. Site: Prepared for: Edmundson Elementary School Grayland Avenue, Norwalk, CA 90650

Asbestos Survey. Site: Prepared for: Edmundson Elementary School Grayland Avenue, Norwalk, CA 90650 Asbestos Survey Site: Edmundson Elementary School 15121 Grayland Avenue, Norwalk, CA 90650 Prepared for: Norwalk-La Mirada Unified School District 12820 Pioneer Boulevard, Norwalk, CA 90650 October 24th,

More information

HERRON Enterprises USA, Inc.

HERRON Enterprises USA, Inc. Phone (33) 763 9639 HERRON Enterprises USA, Inc. Fax (33) 763 9686 E-Mail Lennie.Herron@comcast.net Hazardous Materials*Mold*Asbestos*Lead Paint www.herron-enterprises.com Environmental Services*Industrial

More information

Asbestos-Containing Material and Hazardous Material Survey Summary Report

Asbestos-Containing Material and Hazardous Material Survey Summary Report Asbestos-Containing Material and Hazardous Material Survey Summary Report Site: Haas Park Fieldhouse PS1757 2404 North Washtenaw Street Chicago, Illinois 60647 Survey Date: January 15, 2010 PBCC Project

More information

If the address on this form is different than the address of the building, submit a written explanation.

If the address on this form is different than the address of the building, submit a written explanation. ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: CHICAGO SCHOOL DIST 299 SCHOOL ID NUMBER: 14-016-2990-3013

More information

1116 Willow Pass Court DESTRUCTIVE TESTING Concord, CA SFUSD PROJECT NO SAN FRANCISCO UNIFIED SCHOOL DISTRICT

1116 Willow Pass Court DESTRUCTIVE TESTING Concord, CA SFUSD PROJECT NO SAN FRANCISCO UNIFIED SCHOOL DISTRICT SUMMARY OF HAZARDOUS MATERIALS WORK DESTRUCTIVE TESTING 1.01 GENERAL A. The San Francisco Unified School District (SFUSD) is soliciting proposals for conducting asbestos related work to support Destructive

More information

ADDENDUM NO.: 1 TO THE CONTRACT DOCUMENTS For SCC SWING SPACE FOR MOHR HALL MODERNIZATION (Existing Temps)

ADDENDUM NO.: 1 TO THE CONTRACT DOCUMENTS For SCC SWING SPACE FOR MOHR HALL MODERNIZATION (Existing Temps) Los Rios Community College District Sacramento City College ADDENDUM NO.: 1 TO THE CONTRACT DOCUMENTS For SCC SWING SPACE FOR MOHR HALL MODERNIZATION (Existing Temps) GENERAL This addendum forms a part

More information

1. Sign-in sheet from the Pre-Proposal Conference on April 19, 2017 at Atherton Elementary.

1. Sign-in sheet from the Pre-Proposal Conference on April 19, 2017 at Atherton Elementary. DATE: April 20, 2017 ARLINGTON INDEPENDENT SCHOOL DISTRICT 1203 W. Pioneer Parkway Arlington, Texas 76013 ADDENDUM II FROM: Tammy Craig Director Purchasing RE: CSP 17-79 Amos & Atherton Elementary Renovations

More information

SOUND ENVIRONMENTAL SOLUTIONS, Inc.

SOUND ENVIRONMENTAL SOLUTIONS, Inc. SOU ENVIRONMENTAL SOLUTIONS, Inc. Indoor Air Quality Industrial Hygiene Safety Training Environmental Compliance October 13, 2011 Mr. John Kaniss Construction Manager Pacific Lutheran University Tacoma,

More information

FINAL REPORT. Asbestos-Containing Building Material Assessment

FINAL REPORT. Asbestos-Containing Building Material Assessment FINAL REPORT Asbestos-Containing Building Material Assessment Toronto Catholic District School Board Nativity of Our Lord Catholic School 35 Saffron Crescent Etobicoke, Ontario PROJECT NO. 1025760 PROJECT

More information

PREPARED FOR: City of Beverly Hills 345 North Foothill Road Beverly Hills, California 90210

PREPARED FOR: City of Beverly Hills 345 North Foothill Road Beverly Hills, California 90210 HAZARDOUS BUILDING MATERIAL SURVEY BEVERLY GARDENS PARK RESTROOM STRUCTURE SANTA MONICA BOULEVARD AND NORTH BEVERLY DRIVE BEVERLY HILLS, CALIFORNIA 90210 PREPARED FOR: City of Beverly Hills 345 North Foothill

More information

SUMMARY OF BID ITEMS

SUMMARY OF BID ITEMS Addendum 4 Request for Information Village of North Palm Beach Contractor Solicitation Roof Replacement Library & Public Works Facility Invitation for Bids Bid Opening October 9, 2014 3:00 PM E.S.T. Following

More information

Test Report: Asbestos Analysis of Bulk Materials by PLM via the NY State ELAP Method

Test Report: Asbestos Analysis of Bulk Materials by PLM via the NY State ELAP Method 031214474 Phone: (518) 453-0146 Received: 05/11/12 9:59 AM Analysis Date: Project: Test Report: Analysis of Bulk Materials by PLM via the NY State ELAP 198.1 Method Non- Sample Description Appearance %

More information

FINAL REPORT. Asbestos-Containing Building Material Assessment. Toronto Catholic District School Board

FINAL REPORT. Asbestos-Containing Building Material Assessment. Toronto Catholic District School Board FINAL REPORT Asbestos-Containing Building Material Assessment Toronto Catholic District School Board Loretto Abbey Secondary School 101 Mason Boulevard Toronto, ONTARIO PROJECT NO. 1025760 PROJECT NO.

More information

LIMITED ASBESTOS IN NSPECTION 1262 BOOKCLIFF AVENUE GRAND JUNCTION, COLORADO

LIMITED ASBESTOS IN NSPECTION 1262 BOOKCLIFF AVENUE GRAND JUNCTION, COLORADO LIMITED ASBESTOS INSPECTION 1262 BOOKCLIFF AVENUEE GRAND JUNCTION, COLORADO Inspected by Grande River Environmental, LLC CDPHE CONSULTING FIRM #18631 October 3, 2177 LIMITED ASBESTOS INSPECTION 1262 BOOKCLIFF

More information

Washington University Asbestos Operations and Maintenance Plan

Washington University Asbestos Operations and Maintenance Plan 1. Purpose 2. Asbestos Washington University Asbestos Operations and Maintenance Plan 1.1. The purpose of this Asbestos Operations and Maintenance (O&M) Plan is to minimize the potential for exposure to

More information

FINAL REPORT. Asbestos-Containing Building Material Assessment. Toronto Catholic District School Board

FINAL REPORT. Asbestos-Containing Building Material Assessment. Toronto Catholic District School Board FINAL REPORT Asbestos-Containing Building Material Assessment Toronto Catholic District School Board Regina Mundi Catholic School, 70 Playfair Avenue North York, Ontario PROJECT NO. 1025760 PROJECT NO.

More information

Asbestos. Asbestos is a naturally occurring fibrous mineral that is mined from the earth and

Asbestos. Asbestos is a naturally occurring fibrous mineral that is mined from the earth and Asbestos What is asbestos? Asbestos is a naturally occurring fibrous mineral that is mined from the earth and found in many parts of the world. Its composition is such that it can be separated into smaller

More information

ASBESTOS SURVEY & LEAD-BASED PAINT INSPECTION REPORT GARFIELD ELEMENTARY SCHOOL BUILDING "A" & CLASSROOM A "B" STREET SELMA, CALIFORNIA

ASBESTOS SURVEY & LEAD-BASED PAINT INSPECTION REPORT GARFIELD ELEMENTARY SCHOOL BUILDING A & CLASSROOM A B STREET SELMA, CALIFORNIA T. BROOKS & ASSOCIATES ASBESTOS SURVEY & LEAD-BASED PAINT INSPECTION REPORT GARFIELD ELEMENTARY SCHOOL BUILDING "A" & CLASSROOM A125 2535 "B" STREET SELMA, CALIFORNIA February 16, 2017 PREPARED FOR: Mr.

More information

City of Richmond Zoning Ordinance Page 12-1

City of Richmond Zoning Ordinance Page 12-1 ARTICLE 12 BUILDING DESIGN AND COMPOSITION Section 12.01 Purpose. High quality architectural design and building composition are important elements in reinforcing a comfortable, human-scale environment,

More information

Office of Design & Construction State University Plaza Albany, New York

Office of Design & Construction State University Plaza Albany, New York Instructions: Consultant should meet with the Campus and Fund at the work area(s) prior to completing this Checklist. At least two (2) meetings are required, one prior to Schematic Phase submission and

More information

ST. LUKE CATHOLIC ELEMENTARY SCHOOL

ST. LUKE CATHOLIC ELEMENTARY SCHOOL ST. LUKE CATHOLIC ELEMENTARY SCHOOL Final 2017 ACM Re-Assessment Report Project Location: 345 Albright Road Hamilton, ON Prepared for: Hamilton Wentworth Catholic District School Board 57 Stuart Street

More information

HAZARDOUS MATERIALS BUILDING INSPECTION ARTS AND SCIENCE CENTER PROJECT NEW RIVER COMMUNITY & TECHNICAL COLLEGE LEWISBURG, WEST VIRGINIA

HAZARDOUS MATERIALS BUILDING INSPECTION ARTS AND SCIENCE CENTER PROJECT NEW RIVER COMMUNITY & TECHNICAL COLLEGE LEWISBURG, WEST VIRGINIA HAZARDOUS MATERIALS BUILDING INSPECTION ARTS AND SCIENCE CENTER PROJECT NEW RIVER COMMUNITY & TECHNICAL COLLEGE LEWISBURG, WEST VIRGINIA DECEMBER, 2011 JANUARY, 2012 1 HAZARDOUS MATERIALS BUILDING INSPECTION

More information

REPORT. Asbestos-Containing Building Materials Assessment Report - Silverwood Golf Course Pump House CITY OF SASKATOON.

REPORT. Asbestos-Containing Building Materials Assessment Report - Silverwood Golf Course Pump House CITY OF SASKATOON. CITY OF SASKATOON Asbestos-Containing Building Materials Assessment Report - Silverwood Golf Course Pump House REPORT Submitted to: The City of Saskatoon 1101 Avenue P North Saskatoon, SK S7L 7K6 Report

More information

REAL ESTATE & FACILITIES MANAGEMENT Facilities Planning & Development

REAL ESTATE & FACILITIES MANAGEMENT Facilities Planning & Development HAZARDOUS MATERIAL SURVEY Kerrisdale Community Centre Pool 2016-03-21 REAL ESTATE & FACILITIES MANAGEMENT Facilities Planning & Development Hazardous Materials Survey of: KERRISDALE COMMUNITY CENTRE POOL

More information

Asbestos Elevator Industry Workshop November 25, 2015

Asbestos Elevator Industry Workshop November 25, 2015 Asbestos Elevator Industry Workshop November 25, 2015 BOB SWING CONTACT INFO EMAIL: Bob.Swing@ThyssenKrupp.com Phone: 604-499-5714 SOME ASBESTOS-CONTAINING MATERIALS Cement Pipes Cement Wallboard Cement

More information

Project Monitoring & Air Sampling

Project Monitoring & Air Sampling Project Monitoring & Air Sampling 1. Qualifications of Air Sampling Personnel. The project air sampling shall be conducted by an asbestos project air sampling technician who has been trained in the selected

More information

Transmitted via electronic mail to

Transmitted via electronic mail to October 1, 2016 Alex Sewell Town Manager Town of Wadesboro 124 E. Wade Street Wadesboro, NC Transmitted via electronic mail to wadesboromanager@windstream.net Re: 125 S. Washington Street Asbestos Sampling

More information

ASBESTOS MANAGEMENT PROGRAM

ASBESTOS MANAGEMENT PROGRAM California Institute of Technology ASBESTOS MANAGEMENT PROGRAM Caltech Environment, Health, and Safety Office 1200 E. California Blvd., M/C 25-6 Pasadena, CA 91125 Phone: 626.395.6727 Fax: 626.577.6028

More information

Common Household Contaminants: The Hazards and the Laws

Common Household Contaminants: The Hazards and the Laws The National Center for Healthy Housing (NCHH) developed this summary to serve as a short guide for health and housing professionals on common household contaminants. It is not comprehensive. As a guide,

More information

BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02

BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02 BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02 Department Title: Safety Department Page: 2 Department Title: Safety Department Page:

More information

Division 09 FINISHES TABLE OF CONTENTS

Division 09 FINISHES TABLE OF CONTENTS Division 09 FINISHES TABLE OF CONTENTS 09 1000 GENERAL... 3 A. RELATED SECTIONS... 3 B. MAINTENANCE OF FINISHES... 3 C. PUBLIC AREAS... 3 D. CUTTING AND PATCHING... 3 E. CLEANING... 3 F. RECOMMENDED FLOORING

More information

P b O, E*vtnoNMENrAr Tesrrr,to & svc. co.

P b O, E*vtnoNMENrAr Tesrrr,to & svc. co. P b O, E*vtnoNMENrAr Tesrrr,to & svc. co. IMtr+OM?D March 13,2013 Report No: ANC-A&A-AA-1 A&A Trucking [Art of Destru.ction Demolition] 2090 NW 35'n St. Ocala, FL34475 352-351-2A42 Attn: Project: Lisa

More information

Asbestos Awareness Training Handout For Custodial/Housekeeping Workers and Class IV Asbestos Workers

Asbestos Awareness Training Handout For Custodial/Housekeeping Workers and Class IV Asbestos Workers This handout is provided to meet the requirements of the OSHA asbestos awareness refresher training for custodial and housekeeping workers and Class IV asbestos workers. This training allows you to: HEPA

More information

THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM SHALL BECOME A PART OF THIS SOLICITATION. Amend Invitation to Bid 14-MC-2240 as follows:

THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM SHALL BECOME A PART OF THIS SOLICITATION. Amend Invitation to Bid 14-MC-2240 as follows: Denver Public Schools Purchasing Department 1617 S. Acoma St. Denver, Colorado 8223 INVITATION TO ID 14-MC-224 ADDEUM NUMER ONE August 7, 214 THIS ADDEUM MUST E ACKNOWLEDGED. THIS ADDEUM SHALL ECOME A

More information

ASBESTOS, PCB CAULKING & UNIVERSAL WASTE SURVEY REPORT

ASBESTOS, PCB CAULKING & UNIVERSAL WASTE SURVEY REPORT ASBESTOS, PCB CAULKING & UNIVERSAL WASTE SURVEY REPORT HUNTER COLLEGE - Hunter High School and Hunter Elementary School (The Campus Schools) HVAC UPGRADE 71 EAST 94 th STREET NEW YORK, N.Y. 10128 PREPARED

More information

Subject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3

Subject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3 MEMORANDUM To: Ashley Rosenthal Payne, Indianapolis Historic Preservation Commission Adrienne Schmetzer, Indiana Housing and Community Development Authority Architecture Preservation Interior Design Landscape

More information

ASBESTOS & HAZARDOUS MATERIALS INSPECTION

ASBESTOS & HAZARDOUS MATERIALS INSPECTION ASBESTOS & HAZARDOUS MATERIALS INSPECTION of 2819 Shadeland Avenue Pittsburgh, Pennsylvania Prepared for Facilities Division Pittsburgh Public Schools 1305 Muriel Street 15203-1513 Prepared by L. ROBERT

More information

Material Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey sqft.spf] Page 1 of 5

Material Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey sqft.spf] Page 1 of 5 Material Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey 01-2320 sqft.spf] Page 1 of 5 PREPARATION PRELIM PERMITS & FEES Building Permit 1 each 2200.00 _ 2200.00

More information

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES If your home or business incurred damage, the engineering department, in conjunction with the Flood Mitigation Officer, will

More information

DF Technical & Consulting Services Ltd Avenue, Edmonton, AB T6B 2N2 Ph: Fax: Toll Free:

DF Technical & Consulting Services Ltd Avenue, Edmonton, AB T6B 2N2 Ph: Fax: Toll Free: 4407 68 Avenue, Edmonton, AB T6B 2N2 Ph: 780.468.3131 Fax: 780.468.3224 Toll Free: 855.668.3131 August 31, 2015 ClaimsPro #200, 11530 97 Avenue Grande Prairie, Alberta T8V 6R8 Attention: Mr. Kyler Moore

More information

OLM Environmental, LLC PHONE: (919) LOCKWOOD FOLLY LANE; RALEIGH, NC CELLPHONE: (919)

OLM Environmental, LLC PHONE: (919) LOCKWOOD FOLLY LANE; RALEIGH, NC CELLPHONE: (919) OLM Environmental, LLC PHONE: (919) 212-3019 2317 LOCKWOOD FOLLY LANE; RALEIGH, NC 27610 CELLPHONE: (919) 931-0629 July 31, 2016 Zapolski Real Estate, LLC 501 Washington Street Durham, North Carolina 27701

More information

SUMMARY OF ASBESTOS LOCATIONS HAMILTON HEALTH SCIENCES, MCMASTER SITE

SUMMARY OF ASBESTOS LOCATIONS HAMILTON HEALTH SCIENCES, MCMASTER SITE Page 1 of 19 SUMMARY OF ASBESTOS LOCATIONS HAMILTON HEALTH SCIENCES, MCMASTER SITE Material For Full Asbestos Management Program Document See Engineering Supervisor or Project Manager Revised 09 March

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS USACE / NAVFAC / AFCEC / NASA UFGS-09 06 00 (May 2009) Change 1-11/13 ----------------------------- Preparing Activity: USACE Superseding UFGS-09 06 90 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

TABLE OF CONTENTS 4. PREPARATION, COMMUNICATIONS, AND CONTROLS

TABLE OF CONTENTS 4. PREPARATION, COMMUNICATIONS, AND CONTROLS TABLE OF CONTENTS SECTION PAGE NO. 1. INTRODUCTION... 1-1 1.1 Background... 1-1 1.2 Conceptual Site Model... 1-1 1.3 Plan Organization... 1-2 1.4 Certification... 1-3 2. SAMPLE COLLECTION, ANALYSIS, AND

More information

Exhibit A Declaration of Restrictions Development and Design Standards For Ridge Park Estates

Exhibit A Declaration of Restrictions Development and Design Standards For Ridge Park Estates Exhibit A Declaration of Restrictions Development and Design Standards For Ridge Park Estates Spokane County, Washington For All Property Owners The following Development and Design Standards shall be

More information

Sky Valley Education Center PCB air and wipe sampling in Annex Building EHSI Project

Sky Valley Education Center PCB air and wipe sampling in Annex Building EHSI Project 1011 SW Klickitat Way, Ste. 104 Seattle, Washington 98134 Phone 206-381-1128 Toll Free 800-666-2959 Fax 206-254-4279 January 15, 2016 Mr. Devlin Piplic Director of Facilities and Operations Monroe School

More information

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS St. Louis County Department of Public Works Division of Code Enforcement HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS This guide is intended to provide the homeowner or contractor with the

More information

RESIDENTIAL NEW CONSTRUCTION PLAN REVIEW CHECKLIST

RESIDENTIAL NEW CONSTRUCTION PLAN REVIEW CHECKLIST This list is provided as a guide to help you understand the information that must be contained on the construction drawings. This list is not all-inclusive of all building codes but is used as a general

More information

Property Condition Assessment

Property Condition Assessment Property Condition Assessment Pewaukee, WI 53072 Inspection Date: 1/6/15 Prepared For: Report Number: Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar Dr. Pewaukee, WI 53072

More information

THE RESTORE LOUISIANA REIMBURSEMENT ESTIMATE

THE RESTORE LOUISIANA REIMBURSEMENT ESTIMATE THE RESTORE LOUISIANA REIMBURSEMENT ESTIMATE Reimbursement estimates are component by component assessments of the value of completed repairs. They are produced through the use of Xactimate assessment

More information

Homes at Pine Ridge - NEW CONSTRUCTION SPECS

Homes at Pine Ridge - NEW CONSTRUCTION SPECS 1) STYLE: Custom design as per blueprints in attached hereto. Final agreed upon working blueprints shall be signed, dated and witnessed by both Buyer and Seller. 2) FOUNDATION: Footing and walls 3000 psi

More information

Pre-demolition Hazardous Building Materials Survey Report

Pre-demolition Hazardous Building Materials Survey Report Pre-demolition Hazardous Building Materials Survey Report 607 Cliff Avenue Enderby, BC Prepared for: City of Enderby PO Box 400, 619 Cliff Avenue Enderby, BC V0E 1V0 Attention: Mr. Tate Bengtson Chief

More information

(August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS **************************************************************************

(August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** USACE / NAVFAC / AFCEC / NASA UFGS-02 42 91 (May 2010) ------------------------- Preparing Activity: USACE Nontechnical Title Revision (August 2015) UNIFIED FACILITIES GUIDE SPECIFICATIONS SECTION TABLE

More information

LECKIE ELEMENTARY SCHOOL

LECKIE ELEMENTARY SCHOOL INITIAL YEAR BUILT 1970 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 471 ENROLLMENT 2008 321 WARD 8 PROPOSED PROGRAM CAPACITY 400 Site Plan LECKIE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Velma F Thomas Early Childhood Center

Velma F Thomas Early Childhood Center Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual

More information

STRUCTURAL CONDITION ASSESSMENT

STRUCTURAL CONDITION ASSESSMENT STRUCTURAL CONDITION ASSESSMENT ALLEN JAY ROCK GYM 1201 FAIRFIELD ROAD HIGH POINT, NC Prepared for: Prepared by: Guilford County Schools 617 West Market Street Greensboro, NC Adrian S. Durham, PE, SE,

More information

Façade Characterization Report

Façade Characterization Report Preliminary Façade Characterization Report Remediation and Deconstruction of Fiterman Hall, 30 West Broadway, New York, New York Prepared for: Dormitory Authority of the State of New York & The City University

More information

Edouard AVANT GROVE U I C U I C. Modern Living Made Easy uichomes.com

Edouard AVANT GROVE U I C U I C. Modern Living Made Easy uichomes.com Edouard Modern Living Made Easy uichomes.com - new construction - 3 stories + full basement - 4 bedrooms - 2.5 baths - 2,380 s.f. call 314.881.2333 or e-mail sales@uicstl.com PLAN NTS DECK 13' 0" X 12'-0"

More information

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project

More information

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit: TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION 355-7575 Ext. 395 Needed to Obtain Permit: 1. Building Permit Application, and/or residential plumbing permit application, as applicable, to be

More information

Building Codes and Ordinances ARC 227

Building Codes and Ordinances ARC 227 Building Codes and Ordinances ARC 227 Week 6 Fire Resistive Construction 03.02.10 Instructor: Rick Staub, AIA Email: staub@pointonearchitects.com Phone: 860-434-7707 Fire Resistive Construction Passive

More information

Asbestos Awareness Program

Asbestos Awareness Program Safety Manual 1 of 9 Safety Manual Sect: 1.0 Purpose 2.0 Scope Rel. Date: Last Review: This program covers Ardent policy related to asbestos, either discovered or suspected in the workplace. Ardent recognizes

More information

The Inspection Process. Waxhaw N.C.

The Inspection Process. Waxhaw N.C. The Inspection Process In Waxhaw N.C. This information is provided by the Waxhaw Enforcement Division to assist you in the progression of your project. Nothing in this document should be considered "Code"

More information

DP ASBESTOS MANAGEMENT

DP ASBESTOS MANAGEMENT DP 057 1997-12-03 ASBESTOS MANAGEMENT Table of Contents 1. Background 2. Policy 3. Scope 4. Definitions 5. Roles and Responsibilities 6. Guidelines 1. Implementation 2. Monitoring 7. Procedures 8. Compliance

More information

SECTION UNIT PRICES. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION UNIT PRICES. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 012200 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

BuildingName The Description of the Project P DOCUMENTS

BuildingName The Description of the Project P DOCUMENTS ARCHITECTURE, ENGINEERING AND CONSTRUCTION P00000000 0000 DOCUMENTS ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION

More information

PHASE (pre-drywall) INSPECTION REPORT

PHASE (pre-drywall) INSPECTION REPORT PHASE (pre-drywall) INSPECTION REPORT Prepared For: (Name of Client) Concerning: Phase Sample 2014 (Address or Other Identification of Inspected Property) By: Dean Limbaugh #4599 2014 (Name and License

More information

Building Inspection Report

Building Inspection Report Building Inspection Report Sample Commercial Inspection Report Inspection Date: Prepared For: Prepared By: Professional Property Inspection Consultants 4857 Winterset Drive Columbus, OH 43220 (614) 459-5941

More information

Historic Preservation Commission

Historic Preservation Commission Historic Preservation Commission APPLICATION F CERTIFICATE OF APPROPRIATENESS PROPERTY ADDRESS: DATE: APPLICANT S NAME: APPLICANT S MAILING ADDRESS: CITY:. ZIP: TELEPHONE # HOME/CELL: WK: EMAIL: PROPERTY

More information