1 Suwannee River Water Management District March 10, Agricultural Water Use Monitoring Report 9225 C.R. 49 Live Oak, FL

2 2014 Agricultural Water Use Monitoring Report Suwannee River Water Management District Governing Board George M. Cole, Ph.D. Donald Ray Curtis, Don Quincey, Jr. Kevin W. Brown Alphonas Alexander Virginia H. Johns Virginia Sanchez Guy N. Williams Gary Jones Executive Director Ann B. Shortelle, Ph. D.

3 Table of Contents Background... 1 Introduction... 2 Monitoring Methods... 8 Monitoring Status Monitoring Results Future of Agricultural Water Use Monitoring Table of Figures Figure 1. Preliminary USGS Estimated Groundwater Use in North Florida Counties: Figure Groundwater Permitted Allocation by Major Category... 3 Figure 3. Agricultural Permit Size Relative to Total Agricultural Allocation... 5 Figure 4. Irrigated Areas by Major River Basin... 6 Figure Irrigated Area by County... 7 Figure 6. Permitted Active and Proposed Groundwater Allocation by County... 7 Figure 7. Typical Datalogger, With Cover Removed Figure 8. Approximate Area Served By Electrical Cooperatives... 9 Figure 9. Typical Electric Meter Figure 10. Portable Flowmeter Attached to Irrigation System for Flow Measurement.11 Figure 11. Monitoring Types by County Figure 12. Withdrawal Points Slated for Monitoring In 2015 by County Figure 13 District-Wide Percentage of Monitored and Unmonitored Wells by Acreage Figure 14. District-Wide Percentage of Monitored and Unmonitored Wells by Allocation Figure 15. Average Withdrawals From Monitored Users As A Percentage of Their Permit Allocations Figure 16. Average Monthly Application Rate Figure 17. Average Monthly Application Rate And Rainfall,

4 List of Tables Table 1. Typical Costs For Direct And Electrically-Monitored Withdrawal Points Table 2. Irrigated Area And Status Of Wells Table 3. Allocation Of Monitored Wells... 14

5 Drip irrigation system Background Without actual use data, efforts to plan future new withdrawals or to model the effects of withdrawals on the aquifer are reliant on estimation methods. In 2013, the District Governing Board, recognizing that accurate data for planning and modeling is essential for water management, enacted a water use monitoring rule requiring monitoring of withdrawals from wells with an inside diameter of 8 or greater and on surface water withdrawals with a pipe size of 6 or greater on new permits or permits subject to renewal or modification. In anticipation of the new rule, in September 2012 the Governing Board approved a directive that provided assistance for water use reporting for agricultural users. It was the intent of the Board to offer a convenient, inexpensive, and unobtrusive alternative to self-reporting by giving permittees the option, at no charge, to have District staff collect water use data from their irrigation systems. The Board recognized that District resources could be more effectively applied to the actual collection of water use data, rather than the administration needed to enforce self-reported data, and that direct monitoring would result in high quality, impartial data. It was the further intent of the Board that the data be used only for estimation purposes in planning and modeling. In order to expand data collection beyond new permits, modifications, and renewals, the District offered a permit extension for existing users as an incentive to voluntarily enter the program. The directive was designed to work in conjunction with permit conditions to ensure automated reporting of water use data for maximum reliability and the least amount of cost. The following report summarizes agricultural water use for the first full year of implementation. 1

6 Introduction The District completed a water supply assessment (WSA) in The results of the 2010 WSA identified four water supply planning regions which were declared Water Resource Caution Areas by the District Governing Board. The 2010 WSA concluded that declining water levels are apparently the result of groundwater withdrawals originating in the District, the St. John s River Water Management District (SJRWMD), and the State of Georgia. Figure 1. Preliminary USGS Estimated Groundwater Use in North Florida Counties: 2010 Data compiled by the US Geological Survey. Total Groundwater use per county provided in Million Gallons per Day. Groundwater uses over 10 MGD are identified by user group within each county The 2010 WSA highlighted the shared groundwater resources between the District and the SJRWMD. As a result, an Interagency Agreement was executed on September 13, 2011, between the District, the SJRWMD, and the Florida Department of Environmental Protection. The main components of the Agreement include a literature review, development of a joint regional groundwater flow model, data collection and sharing, and the development of a joint regional water supply plan. The Agreement prompted initiation of the joint development of the North Florida Southeast Georgia Regional Groundwater Flow Model and the creation of the North Florida Regional Water Supply Partnership Stakeholder Advisory Committee in order to get stakeholder input during the joint regional water supply planning process. Development of a regional groundwater flow model, which is an integral part of the regional water supply planning process, requires the best data available. One of the primary calibration 2

7 inputs to the model is water use data. The collection of water use data is critical to the planning process to make the most accurate predictions possible for future water use estimates. Historically the District has collected water use data from some public supply and industrial users, but no long-term data from agricultural users. The District collected data from up to 176 agricultural withdrawal points at 48 volunteer farms between 2008 and 2012, which was the most intensive data collection attempted up to that time. By the close of 2014, permitted agricultural water use made up 36% of the total District surface water and groundwater allocation and 66% of the groundwater allocation (Figure 2). Currently the vast majority of all agricultural water use in the District is withdrawn from groundwater. Figure Groundwater Permitted Allocation by Major Category 5 MGD 32 MGD 151 MGD 369 MGD Agricultural (66 %) Commercial/Industrial/Mining (27 %) Landscape/Recreation/Aesthetic (1 %) Public Supply (6 %) Agricultural use accounted for 66% of the total groundwater allocation District Agricultural Permitting, Allocations, and Irrigated Area District rules require individual consumptive use permits for groundwater withdrawals greater than 100,000 gallons per day and wells 8 or larger, or systems of a combined capacity of 1 MGD or greater. As of the end of 2014, there were 1,673 agricultural water use permits with a total allocation of 369 million gallons per day (MGD). For perspective, the allocation is about 8% of the average annual flow of the Suwannee River near Branford. The District began using the Agricultural Field Scale Irrigation Requirements Simulation (AFSIRS) supplemental irrigation model in July 2013 for the evaluation of the water demands of new agricultural water use permits. Supplemental irrigation is the amount of water needed for a particular crop in addition to rainfall. The model was developed by the University of Florida Institute of Food and Agricultural Sciences (IFAS) and it simulates daily water balance of the 3

8 crop root zone using historic climate data (rainfall and evapotranspiration). This effect significantly improves the estimation of irrigation water needs. Model inputs include crop type(s), irrigation system type and efficiency, planting season(s), soil type(s), soil water holding capacity, water table depth, and other parameters. The District evaluates supplemental irrigation needs based on the 1-in-10 year drought conditions, which reflect below-average rainfall and above-average evapotranspiration. The assumed drought conditions mean that allocations likely over-represent the groundwater actually pumped during normal or wet years. AFSIRS predictions of agricultural supplemental irrigation water needs are more accurate than models used previously by SRWMD. The model is also used in water supply planning estimates of current and future agricultural water use demands, which will ultimately align with permitted allocations. AFSIRS is accessed through an online GIS-Based Water Resources and Agricultural Permitting and Planning System (GWRAPPS) interface. Field of young soybeans in Suwannee County 4

9 Of the nearly 1700 agricultural water use permits in the District, 55% have allocations of less than 100,000 gallons per day. The largest 5% of permits hold 39% of the agricultural water use allocation. The top 10% hold 55% of that total, while the top 50% represent 94% of the total agricultural allocation, meaning 50% (over 800 permits) account for only 6% of the allocated use (Figure 3). Figure 3. Agricultural permit size relative to total agricultural allocation Agricultural Permit Size Relative to Total Agricultural Allocation 100% 90% Percent of Total Agricultural Allocation 80% 70% 60% 50% 40% 30% 20% 10% 0% Largest Permits Smallest Permits Permits Ranked from Largest to Smallest The largest 100 permits account for over 40% of the agricultural allocation 5

10 An estimated 75% of the allocated agricultural groundwater allocation and 90% of the irrigated acreage occurs in the Suwannee River and lower Santa Fe River basins. Figure 4 shows the concentration of irrigated acreage in these basins. Figure 4. Irrigated Areas by Major River Basin Estimated 2010 Florida Statewide Agricultural Irrigation Demand (FSAID) coverage courtesy of FDACS. Waccasassa acreage includes acreage east of the basin boundary As of 2014, there were an estimated 142,000 acres with active or proposed irrigation systems. Suwannee County had by far the highest acreage with 37,839 acres. Taylor County had the lowest acreage associated with a permitted use, followed by Bradford and Union counties (Figure 5). 6

11 Figure Irrigated Area by County Alachua Bradford Columbia Dixie Gilchrist Hamilton Jefferson Lafayette Levy Madison Suwannee Taylor Union 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40, Estimated Active and Proposed Irrigated Area (Acres) Total estimated acreage is 142,000. Source: SJRWMD, 2012 SRWMD county total irrigated acreage from Table B-1, Estimating Florida Statewide Agricultural Irrigation Demand (FSAID) using Economics and Engineering Models Report by the Balmoral Group, dated 9/22/14, with permitted data added by SRWMD. Because allocations within the District s permitting database were derived using more than one method and the allocations are considered to represent higher-than-typical usage, allocation values are not used directly in planning or modeling. However, in the absence of actual use data they are used to spatially distribute estimated actual use. Allocations by county generally follow the pattern of irrigated acreage, with Suwannee County having the highest total allocation (88.9 MGD) of permitted actual and proposed groundwater use (Figure 6). Figure 6. Permitted Active and Proposed Groundwater Allocation by County Alachua Bradford Columbia Dixie Gilchrist Hamilton Jefferson Lafayette Levy Madison Suwannee Taylor Union Allocation (MGD) 7

12 District Monitoring Program As an incentive to increase the number of monitored wells, the District offered a permit extension for water users who voluntarily sign up for the monitoring program. In addition, water users who are involved in District water-conservation cost-share programs are required to enroll in the monitoring. The directive expires in September 2017, unless extended by the Board. Monitoring Methods Direct Monitoring: Once the monitoring rule was implemented in March of 2013, District staff began deploying monitoring devices on qualifying systems. The devices use a datalogger that monitors the presence or absence of threshold pressure that indicates whether the system is pressurized or not. The units are stand-alone, with the only connection to the system being a ¼ pressure line. The monitoring units are equipped with cellular modems that transmit hourly data to the District. Cellular data costs are about 20 cents per month per unit. The Florida Department of Agriculture and Consumer Services (FDACS) provided funding for most of the units in use. Where possible, staff re-purposed equipment from the voluntary water use program. For the new program, staff chose equipment that was consistent with existing District hydrologic data collection to streamline purchasing and eliminate redundant datahandling software. Maintenance consists of cleaning solar panels and replacement of desiccant, and is scheduled for twice a year when crop types are recorded. Data is stored as both hourly and monthly run time, in hours. Figure 7 shows a typical logger/pressure sensor/modem device. Figure 7. Typical Datalogger, with Cover Removed. 8

13 Electrical Use Monitoring: Pumps that use electricity outnumber diesel-run pumps by almost two-to-one for withdrawal points that are subject to District monitoring. Staff recognized that electrical energy use could be used as a proxy for direct monitoring. Staff understood that asking water users to submit power bills or read their meters would be a formidable administrative challenge, and proposed that electrical use data be sent directly from the power companies, provided that the water users authorize the reporting. The District worked with four electrical cooperatives that provide the majority of service in the area to produce reports of electrical use for qualifying systems (Figure 8). Figure 8. Approximate Area Served by Electrical Cooperatives The first agreement was signed in November 2013, and the last in March Two other utilities declined participation. The cooperatives provide energy use reports in kilowatt-hours and peak 15-minute demand in kilowatts for each billing cycle with the permission of the account holders. Run-time in hours is computed from these reports and stored in mostly 30-day increments. The method is suitable for most of the systems that run on electricity, but is not suitable for complex, interconnected systems or ones that have highly variable flow rates. 9

14 Figure 9. Typical Electric Meter Meter information is recorded in the field and provided to the local cooperative along with a signed permission form from the electrical account holder For both methods, flow rates are either measured using an ultrasonic flow meter (Figure 10), or estimated based on irrigation system size or well capacity. Approximate costs for both methods are shown in Table 1. Table 1. Typical Costs for Direct and Electrically-Monitored Withdrawal Points Direct Electrical-Use Cost per Withdrawal Point Monitored Monitored Equipment $1, $0.00 Installation $ $0.00 Permissions and Meter Information Acquisition $0.00 $90.00 Flow Measurement (1 hour) $60.00 $60.00 Set-up Costs Total $1, $ Maintenance/Crop Entry (biannual) $80.00 $ % Equipment replacement $60.00 $0.00 Quality Assurance / Quality Control $24.00 $24.00 Data plan(annual)* $3.00 $10.00 Maintenance costs (annual) $ $54.00 *Varies Staffing for the program in 2014 consisted of one full-time hydrologic data collection specialist, one three-quarter-time Engineer 1, one quarter-time program supervisor, and help from permitting and water resources staff. 10

15 Figure 10. Portable ultrasonic flowmeter attached to irrigation system for flow measurement. Accurate measurements require several feet of straight pipe upstream and downstream of the meter. Monitoring Status As of December 31, 2014, over 200 monitoring devices were installed and 235 wells were monitored through power use (Figure 11). Around 90 of the monitoring devices were installed where electrical use estimation is applicable. Data from these devices were compared to the power use estimation, and found to be within 3-4% on systems with consistent flow rates. Monitoring devices from these sites will be moved to diesel-powered systems, although a few will be left in order to provide continued assurance that the electrical-use method is accurate. Figure 11. Monitoring Types by County 60 Number of Wells Electrically Monitored Directly Monitored Both Methods

16 Staff initially focused on larger projects, resulting in a faster rollout since the larger projects have fewer points of contact and have multiple wells that are close to each other. Fewer than 4% of the total agricultural permits have allocations greater than 1 MGD. Of these large permits, 70% have monitoring conditions with almost half being monitored. On the other end of the spectrum, 55% of agricultural permits have allocations of 0.1 MGD or less. Six percent of these small permits have monitoring conditions. More than 300 applications for new permits, renewals, and modifications were received in 2013 and 2014, resulting in a backlog of wells with monitoring conditions. Figure 12 shows the number of wells with monitoring conditions awaiting sign-up into the program. About one-third of these wells had not been drilled as of December 31, Figure 12. Withdrawal Points Slated for Monitoring in 2015 by County Wells Slated for Monitoring in 2015 by County 120 Active Wells with Monitoring Condition Proposed Wells with Monitoring Condition 100 Number of Wells Active wells have been drilled. Proposed wells have been permitted, but not drilled as of December 31,

17 By the end of 2014, 31% of the District s estimated irrigated acreage was being monitored, with an additional 25% signed up for monitoring. An additional 13 percent of qualifying total acreage was identified as associated with proposed wells that is, wells that were permitted in but were not drilled by the end of The 31% of actively monitored acreage is equal to the acreage associated with permits that do not have monitoring conditions. In the unlikely event no more wells are signed into the program and all proposed wells are drilled, when the backlog is caught up about 70% of the District s irrigated acreage will be monitored. Table 2 shows the breakdown of acreage associated with monitored wells, active and proposed wells with monitoring conditions, and wells without monitoring conditions by county. Table 2. Irrigated Area and Status of Wells By County Monitored 31% Enrolled and Drilled 25% Figure 13 District-wide percentage of monitored and unmonitored wells by acreage Not Enrolled 31% Enrolled but Not Drilled 13% 13

18 In the absence of actual use data, permitted allocations are used for spatially distributing estimated actual water use in planning and modeling. Table 3 shows the breakdown of permitted allocations associated with monitored wells, active wells with monitoring conditions, proposed wells with monitoring conditions, and wells without monitoring conditions. Slightly more than 50% of the District s agricultural allocation is currently not subject to monitoring, whereas only 31% of the acreage is not. This is likely due to a bias in the dataset, where newer permits with monitoring conditions have had allocations derived using the more conservative GWRAPPS model discussed earlier in this report. Table 3. Allocation of monitored wells Monitored 23% Enrolled and Drilled 17% Enrolled but Not Drilled 9% Figure 14. District-wide percentage of monitored and unmonitored wells by allocation. Not Enrolled 51% 14

19 Monitoring Results Overall, water use in 2014 by monitored users was 47% of their permit allocations (Figure 15). In terms of volume pumped, total monitored use was 40 MGD out of an allocation of 85 MGD. Figure 15. Average withdrawals from monitored users as a percentage of their permit allocations. Monitored Allocation 40 MGD 47% of Total Monitored Allocation 85 MGD Monthly data shows the seasonality of irrigation in the District. April, May, and June have the highest water use, based on monitored overhead systems with records beginning in On average, these three months accounted for almost 50% of the withdrawals for the year (Figure 16). Winter months, usually the time of highest aquifer recharge, had the lowest rates. Data since 2008 also shows variability across months according to rainfall patterns, although variability is also highly dependent on crop types, which include field corn, peanuts, soybeans, and carrots. While 2014 had above-average rainfall overall, the distribution was uneven, with one of the wettest winter-spring periods since the 1990s and in most areas the driest summer since the 1950s. Overhead irrigation rates in April and May of 2014, both much wetter than normal and following a wet winter, were the lowest in the 7 years of records (Figure 17). Figure 18 shows average monthly application rates and rainfall since Figure 16. Average monthly application rate, Average Application Rate Per Month Inches April Jan 2008 Jan 2009 Jan 2010 Jan 2011 Jan 2012 Jan 2013 Jan 2014 Jan 2015 May June 15

20 Figure 17. Average monthly application rate and rainfall, Wetter than normal month Drier than normal month Normal month Monthly Rainfall Rates were calculated from overhead systems over a variety of crops and crop rotations. Rainfall totals are the average of Madison, Suwannee, and Hamilton county rainfall, since most of the irrigation systems in the dataset were located in these counties. 16

21 Future of Agricultural Water Use Monitoring The program s primary goal in 2015 is to continue adding new wells into the database. Other goals include: Use data to verify existing irrigation demand models, which include statewide values that may not correspond to local soils, climate, and practice. Use data to identify relationships between water use and variations in local rainfall and soil type. Use data to provide a solid anchor for the next cycle of water use projections and in support of groundwater modeling. Investigate ways to further reduce monitoring costs. Subsurface drip irrigation for corn crop July

22 March 10, 2015 For additional information please contact Suwannee River Water Management District 9225 CR 49, Live Oak, FL

MEMORANDUM. Suwannee River Water Management District Governing Board. Tom Mirti, Interim Division Director, Water Resources

MEMORANDUM. Suwannee River Water Management District Governing Board. Tom Mirti, Interim Division Director, Water Resources MEMORANDUM TO: FROM: THRU: Suwannee River Water Management District Governing Board Tom Mirti, Interim Division Director, Water Resources Noah Valenstein, Executive Director DATE: January, 2015 RE: December

More information

Florida Statewide Agricultural Irrigation Demand (FSAID): Predicting the amounts and spatial distribution of irrigation water use (2015 to 2035)

Florida Statewide Agricultural Irrigation Demand (FSAID): Predicting the amounts and spatial distribution of irrigation water use (2015 to 2035) Florida Statewide Agricultural Irrigation Demand (FSAID): Predicting the amounts and spatial distribution of irrigation water use (2015 to 2035) 2015 AWRA Annual Water Resources Conference Florida s Water

More information

Altamonte Springs FDOT I-4 Storm water Capture and Reclaimed Water Project Phase I

Altamonte Springs FDOT I-4 Storm water Capture and Reclaimed Water Project Phase I St. Johns River Water Management District Wekiva Spring Altamonte Springs FDOT I-4 Storm water Capture and Reclaimed Water Project Phase I Project includes construction of a 5.8 mile 20-inch diameter reclaimed

More information

Contents Background... 2 Recommended MFLs... 3

Contents Background... 2 Recommended MFLs... 3 Minimum Flows Determination and Status Evaluation of Four Outstanding Florida Springs: Falmouth Spring, Lafayette Blue Spring, Peacock Springs, and Troy Spring May 15, 2017 Suwannee River Water Management

More information

Regional Water Supply Planning

Regional Water Supply Planning Regional Water Supply Planning 2015 Annual Report i Front Photo: Ichetucknee Springs State Park Courtesy of Kathleen Greenwood Table of Contents Executive Summary... i Regional Water Supply Planning...

More information

AGRICULTURAL WATER USE IN GEORGIA: RESULTS FROM THE AG. WATER PUMPING PROGRAM

AGRICULTURAL WATER USE IN GEORGIA: RESULTS FROM THE AG. WATER PUMPING PROGRAM AGRICULTURAL WATER USE IN GEORGIA: RESULTS FROM THE AG. WATER PUMPING PROGRAM D. L. Thomas 1, K. A. Harrison 1, J. E. Hook 2, G. Hoogenboom 3, R. W. McClendon 4 and L. R. Wheeler 1 AUTHORS: 1 Biological

More information

Water Resource Management in the Mississippi Delta

Water Resource Management in the Mississippi Delta Water Resource Management in the Mississippi Delta Dave Kelly Water Resource Specialist Yazoo Mississippi Delta Joint Water Management District Stoneville, Mississippi Mississippi River Valley Alluvial

More information

SRWMD Strategic Plan

SRWMD Strategic Plan SRWMD Strategic Plan 0 SRWMD STRATEGIC PLAN A message from the Chairman During Fiscal Year 2014-2015 the District made significant strides in refining its foundation of science-based decisions by introducing

More information

Basin Management Action Plan Suwannee River

Basin Management Action Plan Suwannee River Division of Environmental Assessment and Restoration Basin Management Action Plan Suwannee River Terry.hansen@dep.state.fl.us September, 2013 Welcome Recent DO Criteria, Rule 62-302.533, Florida Administrative

More information

Central Florida has historically utilized

Central Florida has historically utilized FWRJ Leveraging Conjunctive Use to Develop a Cost-Effective Regional Alternative Water Supply Project Brian J. Megic, Oscar Vera, Kevin Felblinger, Deb Beatty, Michael Hudkins, Mark Addison, and Ted McKim

More information

2016 Reuse Inventory ii

2016 Reuse Inventory ii 2016 Inventory May 2017 Florida Department of Environmental Protection Division of Water Resource Management Water Program 2016 Inventory ii 2016 Inventory iii 2016 Inventory Water Program Florida Department

More information

AGRICULTURAL WATER CONSUMPTION IN THE ACT/ACF RIVER BASINS: APPROACHES FOR PROJECTING IRRIGATED ACREAGE AND AMOUNTS

AGRICULTURAL WATER CONSUMPTION IN THE ACT/ACF RIVER BASINS: APPROACHES FOR PROJECTING IRRIGATED ACREAGE AND AMOUNTS AGRICULTURAL WATER CONSUMPTION IN THE ACT/ACF RIVER BASINS: APPROACHES FOR PROJECTING IRRIGATED ACREAGE AND AMOUNTS Elizabeth R. Blood 1, James E. Hook2, and Kerry A. Harrison 3 AUTHORS: 1 J.W. Jones Ecological

More information

Executive Summary... 1 Chapter 1 Introduction Part 1. Introduction... 17

Executive Summary... 1 Chapter 1 Introduction Part 1. Introduction... 17 i DRAFT Table of Contents Executive Summary... 1 Chapter 1 Introduction... 7 Part 1. Introduction... 7 Part 2. Outreach and Coordination... 9 Part 3. Organization and Content of the Water Supply Assessment...

More information

THE EFFECT OF IRRIGATION TECHNOLOGY ON GROUNDWATER USE

THE EFFECT OF IRRIGATION TECHNOLOGY ON GROUNDWATER USE 3rd Quarter 2010 25(3) THE EFFECT OF IRRIGATION TECHNOLOGY ON GROUNDWATER USE Lisa Pfeiffer and C.-Y. Cynthia Lin JEL Classifications: Q15, Q25, Q38 The High Plains (Ogallala) Aquifer is the largest freshwater

More information

Groundwater Recharge: A Role for Almonds? December 9, 2015

Groundwater Recharge: A Role for Almonds? December 9, 2015 Groundwater Recharge: A Role for Almonds? December 9, 2015 Speakers Gabriele Ludwig, Almond Board (Moderator) Daniel Mountjoy, Sustainable Conservation Joel Kimmelshue, Land IQ Helen Dahlke, University

More information

Irrigation Association 2014 Irrigation Show & Education Conference Technical Sessions

Irrigation Association 2014 Irrigation Show & Education Conference Technical Sessions Irrigation Association 2014 Irrigation Show & Education Conference Technical Sessions How Can Agricultural Producers Organize to Stretch Limited Aquifer Supplies to Sustain Themselves and Their Rural Communities?

More information

LIMITED IRRIGATION OF FOUR SUMMER CROPS IN WESTERN KANSAS. Alan Schlegel, Loyd Stone, and Troy Dumler Kansas State University SUMMARY

LIMITED IRRIGATION OF FOUR SUMMER CROPS IN WESTERN KANSAS. Alan Schlegel, Loyd Stone, and Troy Dumler Kansas State University SUMMARY LIMITED IRRIGATION OF FOUR SUMMER CROPS IN WESTERN KANSAS Alan Schlegel, Loyd Stone, and Troy Dumler Kansas State University SUMMARY Research was initiated under sprinkler irrigation to evaluate limited

More information

The City of Cocoa (City) is located in east

The City of Cocoa (City) is located in east FWRJ Reclaimed Water and Stormwater: A Perfect Pair to Meet Total Maximum Daily Load Wasteload Allocations? Danielle Honour, James Wittig, John A. Walsh, and Don Stevens Danielle Honour, P.E., D.WRE, and

More information

POLK COUNTY SOUTHEAST WELLFIELD DESCRIPTION OF PROJECT PLANNING LEVEL PROJECT DETAILS. (Water Supply Options project number 28)

POLK COUNTY SOUTHEAST WELLFIELD DESCRIPTION OF PROJECT PLANNING LEVEL PROJECT DETAILS. (Water Supply Options project number 28) POLK COUNTY SOUTHEAST WELLFIELD (Water Supply Options project number 28) DESCRIPTION OF PROJECT The proposed Polk County Southeast Wellfield project includes the construction of a new water treatment plant

More information

Numerical Groundwater Model for the Kaweah Delta Water Conservation District

Numerical Groundwater Model for the Kaweah Delta Water Conservation District Numerical Groundwater Model for the Kaweah Delta Water Conservation District Nels Ruud and Peter Leffler Fugro West, Inc. Larry Dotson Kaweah Delta Water Conservation District Presentation Outline Background

More information

in the Midsouth Management Chris Henry, Ph.D., P.E. Assistant Professor and Water Management Engineer Merritt McDougal Graduate Research Assistant

in the Midsouth Management Chris Henry, Ph.D., P.E. Assistant Professor and Water Management Engineer Merritt McDougal Graduate Research Assistant Lessons Pasture Learned / Hay from Irrigation Pump options Monitoring and in the Midsouth Management Chris Henry, Ph.D., P.E. Assistant Professor and Water Management Engineer Merritt McDougal Graduate

More information

Capital Area Ground Water Conservation Commission

Capital Area Ground Water Conservation Commission Capital Area Ground Water Conservation Commission Purpose and Scope Plan for Management of the Southern Hills Aquifer System in the Baton Rouge Area April 8, 2014 The Southern Hills Aquifer System (aquifer

More information

SPECIAL BOARD OF DIRECTORS MEETING. 1:00 p.m.

SPECIAL BOARD OF DIRECTORS MEETING. 1:00 p.m. 4677 Overland Avenue San Diego, California 92123 SPECIAL BOARD OF DIRECTORS MEETING Board Room February 13, 2014 1:00 p.m. 1. Call to order. 2. Roll call Determination of a quorum. A. Report on proxies

More information

STORMWATER HARVESTING FOR ALTERNATIVE WATER SUPPLY IN VOLUSIA COUNTY, FLORIDA

STORMWATER HARVESTING FOR ALTERNATIVE WATER SUPPLY IN VOLUSIA COUNTY, FLORIDA STORMWATER HARVESTING FOR ALTERNATIVE WATER SUPPLY IN VOLUSIA COUNTY, FLORIDA Lena Rivera, P.E., D.WRE (CDM); Lee P. Wiseman, P.E., BCEE (CDM); Scott Mays, P.E. (Volusia County); and George Recktenwald

More information

PIMA COUNTY COMPREHENSIVE PLAN CO PIMA COUNTY REGIONAL COMPREHENSIVE PLAN POLICY MAJOR PLAN AMENDMENT

PIMA COUNTY COMPREHENSIVE PLAN CO PIMA COUNTY REGIONAL COMPREHENSIVE PLAN POLICY MAJOR PLAN AMENDMENT PIMA COUNTY COMPREHENSIVE PLAN CO7-07-04 PIMA COUNTY REGIONAL COMPREHENSIVE PLAN POLICY MAJOR PLAN AMENDMENT Arizona law [A.R.S. 11-821(C)(3)] requires: Planning for water resources that addresses: a)

More information

OPERATING CONTROLLED DRAINAGE AND SUBIRRIGATION SYSTEMS

OPERATING CONTROLLED DRAINAGE AND SUBIRRIGATION SYSTEMS OPERATING CONTROLLED DRAINAGE AND SUBIRRIGATION SYSTEMS Prepared by: Robert Evans, Extension Specialist and Wayne Skaggs,William Neal Reynolds Professor Department of Biological and Agricultural Engineering

More information

2017 Crop Market Outlook

2017 Crop Market Outlook 2017 Crop Market Outlook Presented at the Row Crop Short Course Jackson County Agriculture Conference Center March 2, 2017 Adam N. Rabinowitz, PhD Assistant Professor and Extension Specialist Agricultural

More information

Progress Report. August 2000 Report No Purpose. 1 Section 11.45(7)(f), F.S. 2 Review of the Reuse of Reclaimed Water, OPPAGA Report

Progress Report. August 2000 Report No Purpose. 1 Section 11.45(7)(f), F.S. 2 Review of the Reuse of Reclaimed Water, OPPAGA Report Progress Report August 2000 Report No. 00-04 Wastewater Reuse Reduces Discharges and Provides Alternative Water Supplies at a glance Reuse of wastewater has significantly reduced the discharge of effluent

More information

G.B. Sonny Hall, PhD. Veronika Thiebach

G.B. Sonny Hall, PhD. Veronika Thiebach G.B. Sonny Hall, PhD Technical Program Manager Veronika Thiebach Senior Assistant General Counsel St. Johns River Water Management District 1 SJRWMD MFLs Method MFLs Method Premises Case studies Lake Hiawassee

More information

NFRWSP: Conservation/Irrigation Efficiency Methods Briefing. Jennifer Gihring SJRWMD February 17, 2015

NFRWSP: Conservation/Irrigation Efficiency Methods Briefing. Jennifer Gihring SJRWMD February 17, 2015 NFRWSP: Conservation/Irrigation Efficiency Methods Briefing Jennifer Gihring SJRWMD February 17, 2015 Water Supply Plan Projected Demand - Estimated Conservation Potential = Net Demand Net Demand Water

More information

Launch Internet Explorer Browser.lnk

Launch Internet Explorer Browser.lnk Launch Internet Explorer Browser.lnk Table of Contents Overview of the Ground Water Reporting Program... 1 History of the Ground Water Reporting Program... 1 2006 Ground Water Summary Report... 1 Reporting

More information

Adoption of Energy and Water-Conserving Irrigation Technologies in Florida 1

Adoption of Energy and Water-Conserving Irrigation Technologies in Florida 1 Fact Sheet EES 103 March 1994 Adoption of Energy and Water-Conserving Irrigation Technologies in Florida 1 Alan W. Hodges, Gary D. Lynne, Mohammad Rahmani, and C. Franklin Casey 2 ENERGY USED FOR IRRIGATION

More information

CENTRAL FLORIDA WATER INITIATIVE

CENTRAL FLORIDA WATER INITIATIVE CENTRAL FLORIDA WATER INITIATIVE... A collaborative regional water supply endeavor to protect, conserve and restore our water resources The CFWI document is a constantly evolving document. It is intended

More information

Chapter 6 Water Resources

Chapter 6 Water Resources Chapter 6 Water Resources Elemental Geosystems 5e Robert W. Christopherson Charles E. Thomsen 1 Water Resources The Hydrologic Cycle Groundwater Resources Our Water Supply The Hydrologic Cycle A Hydrologic

More information

Embedded Energy in Water Studies Study 1: Statewide and Regional Water-Energy Relationship

Embedded Energy in Water Studies Study 1: Statewide and Regional Water-Energy Relationship Embedded Energy in Water Studies Study 1: Statewide and Regional Water-Energy Relationship Prepared by GEI Consultants/Navigant Consulting, Inc. Prepared for the California Public Utilities Commission

More information

Central Florida Water Initiative Northern Everglades and Estuaries Springs Water Quality, Supply and Planning

Central Florida Water Initiative Northern Everglades and Estuaries Springs Water Quality, Supply and Planning Roger Sims, Holland & Knight Ernie Barnett, Water and Land Advisors, INC. Rich Budell, Budell Water Group, LLC FAWQC Webinar May 20, 2016 Central Florida Water Initiative Northern Everglades and Estuaries

More information

Florida. Logistics & Distribution Industry Edition. Source: Florida Department of Economic Opportunity, Bureau of Labor Market Statistics

Florida. Logistics & Distribution Industry Edition. Source: Florida Department of Economic Opportunity, Bureau of Labor Market Statistics L a b o r M a r k e t I n d u s t r y P r o f i l e Florida Logistics & Distribution Industry 2017 Edition Source: Florida Department of Economic Opportunity, Bureau of Labor Market Statistics Florida

More information

Dr. Larry R. Parsons. Reclaimed Water A Sustainable Source for Florida s Growing Water Demands. Citrus Research & Education Center Lake Alfred, FL

Dr. Larry R. Parsons. Reclaimed Water A Sustainable Source for Florida s Growing Water Demands. Citrus Research & Education Center Lake Alfred, FL UNIVERSITY OF FLORIDA Institute of Food and Agricultural Sciences Reclaimed Water A Sustainable Source for Florida s Growing Water Demands Dr. Larry R. Parsons Citrus Research & Education Center Lake Alfred,

More information

The following words and terms shall have the following meanings unless the context indicates otherwise:

The following words and terms shall have the following meanings unless the context indicates otherwise: SUBCHAPTER 6. WATER SUPPLY MANAGEMENT ACT RULES 7:19-6.1 Scope and Authority (a) The Statewide Water Supply Master Plan represents the planning mechanism by which the State approaches its water needs.

More information

PASO ROBLES GROUNDWATER BASIN: WATER SUPPLY FRAMEWORK, HISTORY, AND CURRENT CONDITIONS. CCVT Sustainable Ag Expo.

PASO ROBLES GROUNDWATER BASIN: WATER SUPPLY FRAMEWORK, HISTORY, AND CURRENT CONDITIONS. CCVT Sustainable Ag Expo. PASO ROBLES GROUNDWATER BASIN: WATER SUPPLY FRAMEWORK, HISTORY, AND CURRENT CONDITIONS CCVT Sustainable Ag Expo November 18, 2013 Paul A. Sorensen, PG, CHg Principal Hydrogeologist Fugro Consultants, Inc.

More information

St. Johns River Water Management District. Technical Publication SJ ' ^'-hfssfe usiilss^. ;i>'mss*:*^ x^si mr "&&'

St. Johns River Water Management District. Technical Publication SJ ' ^'-hfssfe usiilss^. ;i>'mss*:*^ x^si mr &&' Technical Publication SJ 96-1 ^-c*^^x?^y " vfefe "&&' &*i. v,,\fl '*"' *.??.? JM- 1 *** " " > % ^fiikill,,j4y «,.-x :-'^, v'nwhkf*'" ^^p:::;;/;?,&.:!?!;, ;, v ^.Sifit i-vfe: -'.- ^ S^v < M S- -. -.-.j.-i^js.^*;

More information

2016 ANNUAL ICR AND TRR WELL FIELD REPORT ICR WATER USERS ASSOCIATION

2016 ANNUAL ICR AND TRR WELL FIELD REPORT ICR WATER USERS ASSOCIATION 2016 ANNUAL ICR AND TRR WELL FIELD REPORT Prepared for ICR WATER USERS ASSOCIATION Prepared By William Meyer 1 2016 ANNUAL ICR AND TRR WELL FIELD REPORT PURPOSE OF THE REPORT This report is one of an annual

More information

City of Portsmouth Department of Public Works

City of Portsmouth Department of Public Works City of Portsmouth Department of Public Works April 7, 2017 Portsmouth Water Supply Status Report Overview The following Portsmouth Water Supply Status Report provides the Portsmouth Water customers an

More information

Irrigation Demand. Florida Statewide Agricultural. Appendix E Technical Information

Irrigation Demand. Florida Statewide Agricultural. Appendix E Technical Information 2017 Florida Statewide Agricultural Irrigation Demand Appendix E Technical Information THE BALMORAL GROUP 165 Lincoln Ave Winter Park, FL 32789 407-629-2185 407-629-2183 Appendix E Technical Information

More information

The Sustainability of Floods Pond

The Sustainability of Floods Pond The Sustainability of Floods Pond Bangor Water District s Public Water Supply Presented By: Rick Pershken Bangor Water District Overview Brief BWD History Watershed Characteristics Lake Characteristics

More information

Integrated Water Management Strategies for the City and County of El Paso

Integrated Water Management Strategies for the City and County of El Paso Southern Illinois University Carbondale OpenSIUC 2006 Conference Proceedings 7-19-2006 Integrated Water Management Strategies for the City and County of El Paso Bill Hutchison El Paso Water Utilities Follow

More information

Progress Report on the Implementation of the Strategic Intermodal System (SIS)

Progress Report on the Implementation of the Strategic Intermodal System (SIS) Progress Report on the Implementation of the Strategic Intermodal System (SIS) Supplement to the Review of the Department of Transportation Tentative Work Program FY 2006/07 through 2010/11 Supplement

More information

Bradford/Union County Proposed Phosphate Mine Project Map

Bradford/Union County Proposed Phosphate Mine Project Map Bradford/Union County Proposed Phosphate Mine Project Map Union County Project Boundary 5,421.91 acres Bradford County Project Boundary 5,282.92 acres 1 The Future of the Santa Fe River Basin? The Peace

More information

Managed Groundwater Recharge to Support Sustainable Water Management. A Sacramento Valley Perspective November 8, 2017

Managed Groundwater Recharge to Support Sustainable Water Management. A Sacramento Valley Perspective November 8, 2017 To advance the economic, social and environmental sustainability of Northern California by enhancing and preserving the water rights, supplies and water quality. Managed Groundwater Recharge to Support

More information

Seepage Losses for the Rio Grande Project (Franklin Canal Case Study)

Seepage Losses for the Rio Grande Project (Franklin Canal Case Study) Seepage Losses for the Rio Grande Project (Franklin Canal Case Study) Zhuping Sheng, Ph.D., P.E. Yaqi Wanyan, M.S., EIT Luis S. Aristizabal Kadambari Reddy, M.S., EIT TAMU, Agricultural Research and Extension

More information

The University of Georgia Cooperative Extension College of Agricultural and Environmental Sciences

The University of Georgia Cooperative Extension College of Agricultural and Environmental Sciences The University of Georgia Cooperative Extension College of Agricultural and Environmental Sciences July 3, 2012 www.ugacotton.com Irrigation Management for the 2012 Crop 1 US and Georgia 2012 Cotton Acreage

More information

Econometric versus Engineering Prediction of Water Demand and Value for Irrigation

Econometric versus Engineering Prediction of Water Demand and Value for Irrigation Econometric versus Engineering Prediction of Water Demand and Value for Irrigation Swagata Ban Banerjee PO Box 197, Delta Research and Extension Center, Mississippi State University, Stoneville, MS 38776

More information

Castle Pines North Metropolitan District

Castle Pines North Metropolitan District Castle Pines North Metropolitan District Water Conservation Plan August 2006. Prepared by: A 1331 17th Street, Suite 1200 Denver, CO 80202 Contents Executive Summary Section 1 Introduction 1.1 Purpose...

More information

Introduction and Background

Introduction and Background Memorandum To: Mr. Robert Nilles Date: March 5, 2012 City of El Mirage, Arizona From: Kevin Burnett, Project Manager Re: City of El Mirage Water-Only Customer Recharge Fee Introduction and Background The

More information

The Springs and. Aquifer System of Florida. Debra Segal, M.S. Volunteer for the Howard T. Odum Florida Springs Institute. Rock Springs, Orange County

The Springs and. Aquifer System of Florida. Debra Segal, M.S. Volunteer for the Howard T. Odum Florida Springs Institute. Rock Springs, Orange County The Springs and Rock Springs, Orange County Aquifer System of Florida Debra Segal, M.S. Volunteer for the Howard T. Odum Florida Springs Institute Who Has Visited a Spring in Florida? Photos by John Moran

More information

Water Talk Series

Water Talk Series Kansas Water Talk Series - 2017 Joel A. Willhoft, NRCS Resource Conservationist 785.624.3127 joel.willhoft@ks.usda.gov NRCS Conservation Programs NRCS provides eligible producers financial assistance to

More information

Raw water sources, facilities, and infrastructure

Raw water sources, facilities, and infrastructure WATER AND WASTEWATER SERVICES IN STEAMBOAT SPRINGS Prepared by Jay Gallagher, General Manager Mt. Werner Water and Sanitation District (February, 2015) Raw water sources, facilities, and infrastructure

More information

Aquifer Science Staff, January 2007

Aquifer Science Staff, January 2007 Guidelines for Hydrogeologic Reports and Aquifer Tests Conducted Within the Jurisdictional Boundaries of the Barton Springs / Edwards Aquifer Conservation District I. Introduction Aquifer Science Staff,

More information

Sterling and Gilcrest/LaSalle High Groundwater Analysis

Sterling and Gilcrest/LaSalle High Groundwater Analysis FINAL REPORT Prepared for The State of Colorado, Department of Natural Resources Sterling and Gilcrest/LaSalle High Groundwater Analysis July 2015 Sterling and Gilcrest/LaSalle High Groundwater Analysis

More information

MEMORANDUM. RAI Responses Related to East Lake Road Wellfield Drawdown Analysis, WUP No SDI Project No. PCF-180.

MEMORANDUM. RAI Responses Related to East Lake Road Wellfield Drawdown Analysis, WUP No SDI Project No. PCF-180. SDI Environmental Services, Inc. 13911 N. Dale Mabry Hwy. Suite 201, Tampa, FL 33618; (813) 961-1935 MEMORANDUM TO: FROM: SUBJECT: Dave Slonena, P.G., Pinellas County Cathleen Beaudoin Jonas RAI Responses

More information

Contents. ECFT Model Documentation in Support of the 2014 Draft CFWI RWSP

Contents. ECFT Model Documentation in Support of the 2014 Draft CFWI RWSP Contents Chapter 1. Introduction... 1 CFWI Project Overview... 1 Location... 1 CFWI Partners and Project Teams... 1 Need for the CFWI... 3 Objectives of the CFWI Hydrologic Analysis Team... 3 ECFT Model

More information

Weather Effects on Expected Corn and Soybean Yields

Weather Effects on Expected Corn and Soybean Yields United States Department of Agriculture A Report from the Economic Research Service www.ers.usda.gov FDS-13g-01 July 2013 Weather Effects on Expected Corn and Soybean Yields Paul C. Westcott, westcott@ers.usda.gov

More information

Evaluation of Castle Pines North Metropolitan District Water Level and Well Production Data Technical Memorandum

Evaluation of Castle Pines North Metropolitan District Water Level and Well Production Data Technical Memorandum Evaluation of Castle Pines North Metropolitan District Water Level and Well Production Data Technical Memorandum To: Jim McGrady, Castle Pines North Metropolitan District From: Camp Dresser and McKee Inc.,

More information

Alabama Department of Agriculture & Industries. Commissioner John McMillan

Alabama Department of Agriculture & Industries. Commissioner John McMillan Alabama Department of Agriculture & Industries Commissioner John McMillan 24 th Annual Nonpoint Source Conference DATA Our stakeholders must have an accurate inventory of our state s water resources before

More information

RULES AND REGULATIONS KANSAS WATER APPROPRIATION ACT (Excerpted) June, 2012

RULES AND REGULATIONS KANSAS WATER APPROPRIATION ACT (Excerpted) June, 2012 RULES AND REGULATIONS KANSAS WATER APPROPRIATION ACT (Excerpted) June, 2012 K.A.R. 5-17-1. Definitions for water banking. As used in these water banking regulations, in the Kansas water banking act, K.S.A.

More information

PUBLIC PRIVATE PARTNERSHIPS

PUBLIC PRIVATE PARTNERSHIPS PUBLIC PRIVATE PARTNERSHIPS A Better Way to Manage Water in Florida? 3 rd UF Water Institute Symposium W. Kirk Martin, P.G., CPG, CGWP February 2012 Public/Private Solutions for Better Water Supply Management

More information

An Analysis of Historical Trends in the Farmgate Report. Brigid A. Doherty and John C. McKissick (1) Center for Agribusiness and Economic Development

An Analysis of Historical Trends in the Farmgate Report. Brigid A. Doherty and John C. McKissick (1) Center for Agribusiness and Economic Development An Analysis of Historical Trends in the Farmgate Report Brigid A. Doherty and John C. McKissick (1) Center for Agribusiness and Economic Development The University of Georgia CR-00-13 August 2000 Each

More information

Crop Water Use Program for Irrigation

Crop Water Use Program for Irrigation Crop Water Use Program for Irrigation Divisions of Plant Sciences, Applied Social Sciences, Food Sciences and Bioengineering, and Soil, Environmental, and Atmospheric Sciences Water is an important factor

More information

WATER RESOURCE PROGRAM

WATER RESOURCE PROGRAM SOUTH PLATTE WATER RESOURCE PROGRAM Establishing a lasting legacy of abundant clean water for waterfowl, wildlife and people Water is an essential resource for life and good health. It is vitally important

More information

Modeling framework for water resources management under uncertain conditions: a case study

Modeling framework for water resources management under uncertain conditions: a case study Milestone Workshop 11 April 213, Nogales AZ Modeling framework for water resources management under uncertain conditions: a case study NOAA Climate and Societal Interactions Sectoral Applications Research

More information

Utilization of the SWAT Model and Remote Sensing to Demonstrate the Effects of Shrub Encroachment on a Small Watershed

Utilization of the SWAT Model and Remote Sensing to Demonstrate the Effects of Shrub Encroachment on a Small Watershed Utilization of the SWAT Model and Remote Sensing to Demonstrate the Effects of Shrub Encroachment on a Small Watershed Jason Afinowicz Department of Biological and Agricultural Engineering Texas A&M University

More information

Implementing the Irrigation Reporting Portion of the Illinois Water Use Act

Implementing the Irrigation Reporting Portion of the Illinois Water Use Act Implementing the Irrigation Reporting Portion of the Illinois Water Use Act Steve Wilson & Karen Bridges Groundwater Science Section Illinois State Water Survey Water Use Reporting in Illinois - Illinois

More information

Option 11. Divert Water from Miocene and Hendricks Canal to Supply the Ridge

Option 11. Divert Water from Miocene and Hendricks Canal to Supply the Ridge Integrated Water Resources Plan Option 11 Divert Water from Miocene and Hendricks Canal to Supply the Ridge This option would use water from the Miocene Canal and/or Hendricks Canal for municipal supplies

More information

Montana Ground-Water Assessment Statewide Monitoring Well Network

Montana Ground-Water Assessment Statewide Monitoring Well Network Montana Ground-Water Assessment Statewide Monitoring Well Network Montana Ground-Water Assessment Water-level Monitoring and Drought: January - March 2003 Tom Patton - Montana Bureau of Mines and Geology

More information

EL DORADO IRRIGATION DISTRICT DROUGHT PREPAREDNESS PLAN DROUGHT ACTION PLAN

EL DORADO IRRIGATION DISTRICT DROUGHT PREPAREDNESS PLAN DROUGHT ACTION PLAN EL DORADO IRRIGATION DISTRICT DROUGHT PREPAREDNESS PLAN DROUGHT ACTION PLAN This Drought Action Plan is a summary of drought stages and actions that are described, along with their development, in detail,

More information

City and County of Broomfield, Colorado CITY COUNCIL AGENDA MEMORANDUM. 11f - Page 1

City and County of Broomfield, Colorado CITY COUNCIL AGENDA MEMORANDUM. 11f - Page 1 To: From: Prepared by: Agenda Title: CITY COUNCIL AGENDA MEMORANDUM Mayor and City Council Charles Ozaki, City and County Manager Jim Becklenberg, Assistant City and County Manager David Allen, Director

More information

PO No. POEC1121. Prepared By: The Balmoral Group, LLC 165 Lincoln Avenue Winter Park, FL Phone: Fax:

PO No. POEC1121. Prepared By: The Balmoral Group, LLC 165 Lincoln Avenue Winter Park, FL Phone: Fax: PO No. POEC1121 Prepared By: The Balmoral Group, LLC 165 Lincoln Avenue Winter Park, FL 32789 Phone: 407-629-2185 Fax: 407-629-2183 Table of Contents List of Abbreviations... 1 Acknowledgments... 1 Executive

More information

Issue paper: Aquifer Water Balance

Issue paper: Aquifer Water Balance Issue paper: Aquifer Water Balance 1. Introduction And Background 1.1. Purpose and Scope The population in Kitsap County has grown rapidly in recent years and is expected to increase substantially in the

More information

CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL

CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL INTRODUCTION The District developed a hydraulic model of the sanitary sewer system as part the 2000 Wastewater Comprehensive Plan. The output from this model

More information

Water Use for Oil & Gas Operations in Oklahoma

Water Use for Oil & Gas Operations in Oklahoma Water Use for Oil & Gas Operations in Oklahoma 2015 GWPC Annual Meeting National Rural Water Association Interstate Oil and Gas Compact Commission Oklahoma City, OK ep 27-30, 2015 Dr. Robert Puls Robert

More information

4.2 Step 2 Profile of Water Demands and Historical Demand Management

4.2 Step 2 Profile of Water Demands and Historical Demand Management 4.2 Step 2 Profile of Water Demands and Historical Demand Management Step 2 involves an overview of the historical water demand trends as well as the influence of historical water demand management on

More information

South Florida Water Management District Future Directions. Melissa Meeker, Executive Director

South Florida Water Management District Future Directions. Melissa Meeker, Executive Director South Florida Water Management District Future Directions Melissa Meeker, Executive Director September 15, 2011 District Overview Oldest and largest of five water management districts Covers 18,000 square

More information

Investigation of the Coastal Lowlands Aquifer System

Investigation of the Coastal Lowlands Aquifer System Investigation of the Coastal Lowlands Aquifer System Michael Bradley, Linzy Foster, and Brian Clark U.S. Geological Survey Alabama Water Resources Conference and Symposium Sept 7-9, 2016 The information

More information

District Management System Program IMPLEMENTATION OF A DISTRICT MANAGEMENT SYSTEM IN THE LOWER RIO GRANDE VALLEY OF TEXAS (1)

District Management System Program IMPLEMENTATION OF A DISTRICT MANAGEMENT SYSTEM IN THE LOWER RIO GRANDE VALLEY OF TEXAS (1) Page 1 of 11 IMPLEMENTATION OF A DISTRICT MANAGEMENT SYSTEM IN THE LOWER RIO GRANDE VALLEY OF TEXAS (1) Guy Fipps and Craig Pope(2) ABSTRACT The Lower Rio Grande Valley of Texas is undergoing rapid population

More information

Artificial recharge in the Las Vegas Valley: An Operational history

Artificial recharge in the Las Vegas Valley: An Operational history Publications (WR) Water Resources 6-1997 Artificial recharge in the Las Vegas Valley: An Operational history Michael Johnson Erin Cole Kay Brothers Las Vegas Valley Water District Follow this and additional

More information

Tucson Water s Rainwater Harvesting Incentive Workshop Provided as a community service by

Tucson Water s Rainwater Harvesting Incentive Workshop Provided as a community service by Tucson Water s Rainwater Harvesting Incentive Workshop Provided as a community service by A 501(c)3 Non-profit organization Rainwater Harvesting Systems Capturing rainwater for beneficial use 1. Harvest

More information

NGWA INFORMATION BRIEF

NGWA INFORMATION BRIEF Several techniques are employed to artificially recharge aquifers Streamflow is directed to an artificial recharge basin, where water percolates downward to the underlying aquifer. A recharge well is used

More information

water spouts Upcoming 2017 NDSU Field Days Greetings In this issue: Major Irrigated Crop Acreage and Tours

water spouts Upcoming 2017 NDSU Field Days Greetings In this issue: Major Irrigated Crop Acreage and Tours www.ag.ndsu.edu/extension-aben/irrigation/water-spouts water spouts No. 291 May 2017 In this issue: Upcoming 2017 NDSU Field Days and Tours Irrigation Scheduling Spreadsheet for North Dakota and Minnesota

More information

Contribution of Irrigation Seepage to Groundwater-Surface Water Interactions on the Eastern Snake River Plain

Contribution of Irrigation Seepage to Groundwater-Surface Water Interactions on the Eastern Snake River Plain Contribution of Irrigation Seepage to Groundwater-Surface Water Interactions on the Eastern Snake River Plain Rob Van Kirk, HSU Department of Mathematics http://www.humboldt.edu/henrysfork/ BSU Geosciences

More information

Requirements and Irrigation Scheduling

Requirements and Irrigation Scheduling Pecan Water Requirements and Irrigation Scheduling Lenny Wells, University of Georgia Department of Horticulture Water has more of an effect on pecan production than does any other environmental factor.

More information

2015 Water Resources Status Report

2015 Water Resources Status Report CITY OF SAN LUIS OBISPO 2015 Water Resources Status Report This Report Covers the Time Period of October 1, 2014 through September 30, 2015 Salinas Reservoir Dam, February 2015. Photo credit: County of

More information

EVALUATING WATER REQUIREMENTS OF DEVELOPING WALNUT ORCHARDS IN THE SACRAMENTO VALLEY

EVALUATING WATER REQUIREMENTS OF DEVELOPING WALNUT ORCHARDS IN THE SACRAMENTO VALLEY EVALUATING WATER REQUIREMENTS OF DEVELOPING WALNUT ORCHARDS IN THE SACRAMENTO VALLEY Allan Fulton ABSTRACT Most of the research on irrigation of walnuts has primarily focused on plant water relations and

More information

Irrigation Scheduling: Checkbook Method

Irrigation Scheduling: Checkbook Method Know how. Know now. EC709 Irrigation Scheduling: Checkbook Method Steven R. Melvin, Extension Educator C. Dean Yonts, Extension Irrigation Specialist Irrigation scheduling helps determine when and how

More information

KanSched An ET-Based Irrigation Scheduling Tool for Kansas Summer Annual Crops

KanSched An ET-Based Irrigation Scheduling Tool for Kansas Summer Annual Crops KanSched An ET-Based Irrigation Scheduling Tool for Kansas Summer Annual Crops Gary A. Clark, Professor Danny H. Rogers, Extension Engineer, Irrigation Steven Briggeman, Extension Assistant Biological

More information

Alternative Livestock/Dryland Forage Systems in the Texas Panhandle

Alternative Livestock/Dryland Forage Systems in the Texas Panhandle Alternative Livestock/Dryland Forage Systems in the Texas Panhandle David G. Lust Assistant Professor of Agriculture Department of Agricultural Sciences, West Texas A&M University, WTAMU Box 60998, Canyon,

More information

Project Labor Agreements. Board Meeting February 11, 2014

Project Labor Agreements. Board Meeting February 11, 2014 Project Labor Agreements Board Meeting February 11, 2014 Outline PLA Background PLA History at the District Other Agency Experiences Pilot PLA Recommended Next Steps PLA Background Project-specific agreement

More information

The City and MID adopted this 2010 UWMP in Copies of the adoption resolutions are included in Appendix B. ES-1

The City and MID adopted this 2010 UWMP in Copies of the adoption resolutions are included in Appendix B. ES-1 ES.1 INTRODUCTION This (UWMP) has been prepared for the City of Modesto (City) and the Modesto Irrigation District (MID) by West Yost Associates (West Yost) as a joint UWMP. This 2010 UWMP for the City

More information

Uncertainty and Urban Water Recharge for Managing Groundwater Availability: A Case Study and Methods Development for Karst Aquifers ABSTRACT

Uncertainty and Urban Water Recharge for Managing Groundwater Availability: A Case Study and Methods Development for Karst Aquifers ABSTRACT Uncertainty and Urban Water Recharge for Managing Groundwater Availability: A Case Study and Methods Development for Karst Aquifers ABSTRACT Quantifying groundwater availability is dependent upon sound

More information

Economics of Controlled Drainage and Subirrigation Systems

Economics of Controlled Drainage and Subirrigation Systems Economics of Controlled Drainage and Subirrigation Systems Prepared by: Robert Evans, Extension Agricultural Engineering Specialist Wayne Skaggs and Ronald E. Sneed Professors of Biological and Agricultural

More information

DEVELOPMENT OF A WATER SUPPLY PLAN FOR POLK COUNTY & ITS MUNICIPALITIES

DEVELOPMENT OF A WATER SUPPLY PLAN FOR POLK COUNTY & ITS MUNICIPALITIES DEVELOPMENT OF A WATER SUPPLY PLAN FOR POLK COUNTY & ITS MUNICIPALITIES Gary ReVoir II, P.E., Marc Cannata, P.E., Brandon Bryant, Devan Henderson, E.I., Gary Fries, P.E., Robert Beltran, P.E., BCEE, Audrie

More information