1 : 26/08/2008 TIME : 09:58:33 PAGE : 1 FURTHER INFORMATION /VALID APPLICATIONS 08/100 Mary Donnellan, P 21/08/2008 F For the removal of existing septic tank and percolation area and connection of existing bungalow to public mains, planning permission also sought to erect 3 no. fully serviced dormer bungalows, connection to public mains, 1 no. new entrance to public road and all associated site works at Clegna Townland Cootehall 08/119 Kevin Stritch, P 20/08/2008 F to erect dwelling house, garage and effluent treatment plant and all associated works at Knocknagawna Townland Hillstreet Carrick-on-Shannon Co Roscommon. 08/375 John Higgins, R 19/08/2008 F of and PERMISSION to complete dwelling house, wastewater treatment system, domestic garage and fuel store on previous permission number PD/04/394 and to retain and complete machinery shed and entrance and associated siteworks at Cahir Townland,

2 : 26/08/2008 TIME : 09:58:33 PAGE : 2 FURTHER INFORMATION /VALID APPLICATIONS 08/451 Mountside Properties Ltd., P 22/08/2008 F For a 100 MW open cycle gas turbine power station with a turbine hall 8.75m high, maintenance bay, exhaust stack 20m high, air vent 20m high, air cooler, water cooler, power control module, main and auxiliary transformers, bunded fuel oil tank 1800m, raw water tank 580m, water treatment module, treated water tank 580m, firewater module, tanker unloading area, office/workshop and associated site development works. This application refers to an activity for which an Integrated Pollution Prevention and Control (IPPC) licence will be applied at Monksland Townland, Athlone, 08/509 David McLoughlin, P 22/08/2008 F To construct a 2 bedroom dwelling house, connection to public sewer and all ancillary site work at Knockroe Townland, 08/613 Paul O`Shaughnessy & Teresa Mulvey P 19/08/2008 F To construct a dwelling house, garage, septic tank unit and treatment system with percolation area at Lisfelim Townland, Lecarrow,

3 : 26/08/2008 TIME : 09:58:33 PAGE : 3 FURTHER INFORMATION /VALID APPLICATIONS 08/656 BioPower Ltd. P 19/08/2008 F For the development of a BioPark and its associated buildings.this BioPark will involve: The consruction of three (30mx24m (12m to apex)) buildings to house the process of Rape Seed Processing, BioDiesel production and Fuel Pelleting. The construction of one (30mx24m (12m to apex)) building for raw material storage. The construction of an Anaerobic Digester (20,000 t/a). The Anerobic Digerter is made up of: Two 25mx10m (8.1 to the apex) buildings for the reception buildings and Solid Seperation building. Two 13.2 radius digestate tanks (6.28m high). Two 10m radius digester tanks (6.28m high). Two 7m radius reception tanks (3.24m high). One control/boiler room (12mx5m (4.4m high)). An energy efficent site office will also be constructed. A weighbridge will be constructed. The process of Anerobic digestion will require a Waste License. An EIS has been submitted with this application. The development is at Ballinphuill, Tibohine, 08/664 Michael Murray, P 18/08/2008 F To construct a dwelling house and install a proprietary effluent treatment system with percolation area at Corry Townland, Kilroosky,

4 : 26/08/2008 TIME : 09:58:33 PAGE : 4 FURTHER INFORMATION /VALID APPLICATIONS 08/745 Michael Keane, R 19/08/2008 F of entrance and PERMISSION to construct machinery shed and associated site works at Drumatemple, Ballymoe, 08/754 O2 Communications Ireland Ltd, R 20/08/2008 F Of the existing 18-metre telecommunications support structure carrying 3 No. antennas and 1 No. link dish together with associated equipment container, security fence and access track at Cuiltyconeen Townland, Cortober, Co Roscommon. 08/798 Aidan & Antoinette Gallagher, P 22/08/2008 F To erect a dwelling house, garage and construct septic tank with a wastewater treatment system at Togher Townland, Ballinasloe, 08/800 Ms. Catherine Dooney, P 22/08/2008 F To construct a dwelling house and garage with proprietary effluent treatment system and raised percolation area and new entrance onto public road at Cloonlumney Townland, Ballaghaderreen,

5 : 26/08/2008 TIME : 09:58:33 PAGE : 5 FURTHER INFORMATION /VALID APPLICATIONS 08/818 John Finn (Stephen), P 22/08/2008 F To construct a dwelling house with proprietary effluent treatment system, percolation area and new entrance onto public road at Buckill Townland, Fairymount, 08/845 Keith O'Neill & Claire Browne P 20/08/2008 F To construct dwelling, septic tank and percolation area at Coolagarry Townland, Curraghboy, 08/869 Patrick Kenny, O 21/08/2008 F to construct a dwelling house with advanced treatment system and percolation area at Moneen Townland, Total: 15 *** END OF REPORT **

APPLICATIONS BY BORD NA MÓNA TO KCC WITHIN THE BLUE LINE BOUNDARY (BORD NA MÓNA LANDHOLDING)

APPLICATIONS BY BORD NA MÓNA TO KCC WITHIN THE BLUE LINE BOUNDARY (BORD NA MÓNA LANDHOLDING) APPLICATIONS BY BORD NA MÓNA TO KCC WITHIN THE BLUE LINE BOUNDARY (BORD NA MÓNA LANDHOLDING) Reg. Ref.: 04222 Description: an engineered landfill site (footprint 21.2 hectares (ha) to accept up to 120,000

More information

P L A N N I N G A P P L I C A T I O N S PLANNING APPLICATIONS RECEIVED FROM 08/01/2006 TO 14/01/2006 DEVELOPMENT DESCRIPTION AND LOCATION

P L A N N I N G A P P L I C A T I O N S PLANNING APPLICATIONS RECEIVED FROM 08/01/2006 TO 14/01/2006 DEVELOPMENT DESCRIPTION AND LOCATION : 17/01/2006 KILKENNY COUNTY COUNCIL PLANNING APPLICATIONS FROM 08/01/2006 TO 14/01/2006 TIME : 15:24:19 PAGE : 1 06/10 Kathleen Walsh Coolcullen P 09/01/2006 for the following (a) Site development works

More information

NORTH TIPP COUNTY COUNCIL

NORTH TIPP COUNTY COUNCIL : 22/04/2014 TIME : 13:56:17 PAGE : 1 PLANNING APPLICATIONS FROM 07/04/14 TO 11/04/14 under section 34 of the Act the applications for permission may be granted permission, subject to or without conditions,

More information

DEVELOPMENT DESCRIPTION AND LOCATION

DEVELOPMENT DESCRIPTION AND LOCATION : 08/08/2017 Sligo County Council TIME : 12:53:03 PAGE : 1 PLANNING APPLICATIONS FROM 31/07/17 TO 06/08/17 under section 34 of the Act the applications for permission may be granted permission, subject

More information

M.O. DATE FILE APP. M.O. 21/09/ /71

M.O. DATE FILE APP. M.O. 21/09/ /71 TIME : 15:24:28 PAGE : 1 15/71 James Coyle P 14/05/2015 (1) construct a 6 bay shed, 3 bays of which were previously granted permission under planning reference PL12/9, elevations and floor layout will

More information

LAOIS COUNTY COUNCIL

LAOIS COUNTY COUNCIL DATE : 13/3/218 TIME : 14:13:48 PAGE : 1 PLANNING APPLICATIONS RECEIVED FROM 5/3/18 TO 9/3/18 Acts 1988-23 and may result in action by the Data Protection Commissioner, against the sender, including prosecution

More information

Winery FAST & Floating FAST

Winery FAST & Floating FAST Aerobic Treatment Technologies for the Wine Industry Winery FAST & Floating FAST Presented by: Joe Gill Smith & Loveless New Zealand, Ltd. Smith & Loveless Inc. Founded 1946 Based in Kansas City Manufacturing

More information

M.O. DATE FILE APP. M.O. 28/01/ /87

M.O. DATE FILE APP. M.O. 28/01/ /87 TIME : 14:45:53 PAGE : 1 15/87 Rosary Hill Nursing Homes Ltd. P 20/02/2015 (1) single storey extension to existing nursing home, (2) demolition of part of existing nursing home and construction of a 2

More information

Draft Policy Review. Use of Shipping Containers

Draft Policy Review. Use of Shipping Containers Draft Policy Review Use of Shipping Containers Policy Number: Policy Section: Policy Title: T.01.02 Town Planning Use of Shipping Containers File Reference: OBJECTIVES: 1. To maintain the amenity of the

More information

How to safely spread sludge from your septic tank

How to safely spread sludge from your septic tank How to safely spread sludge from your septic tank Information for farmers who want to spread sludge from their own septic tanks or wastewater treatment systems on their own agricultural land. systemsafe

More information

GUIDE TO THE PREPARATION OF A WORKING PLAN SCRAPYARD / ELV FACILITY

GUIDE TO THE PREPARATION OF A WORKING PLAN SCRAPYARD / ELV FACILITY GUIDE TO THE PREPARATION OF A WORKING PLAN SCRAPYARD / ELV FACILITY A working plan is an essential document and consists of a written statement accompanied by plans, drawings and specifications detailing

More information

Environmental Objectives (Groundwater) Regulations Ann Marie Donlon Environmental Licensing Programme Thursday 24 th May 2012, Horse & Jockey

Environmental Objectives (Groundwater) Regulations Ann Marie Donlon Environmental Licensing Programme Thursday 24 th May 2012, Horse & Jockey Environmental Objectives (Groundwater) Regulations 2010 Ann Marie Donlon Environmental Licensing Programme Thursday 24 th May 2012, Horse & Jockey Overview of Presentation Environmental Objectives (Groundwater)

More information

IRISH CEMENT PLATIN INVESTING IN OUR FUTURE

IRISH CEMENT PLATIN INVESTING IN OUR FUTURE IRISH CEMENT PLATIN INVESTING IN OUR FUTURE INTRODUCTION Investing in our future. The next phase of investment in Platin will see further energy efficiency improvements with on site electricity generation

More information

Annual Environmental Report. For. Bergin Waste Disposal limited. Waste Licence no. W

Annual Environmental Report. For. Bergin Waste Disposal limited. Waste Licence no. W 2010 Annual Environmental Report For Bergin Waste Disposal limited Waste Licence no. W0163-01 Prepared by: ANN CLARKE FACILITY MANAGER BERGIN WASTE DISPOSAL LTD. 1.0 Reporting Period 4 2.0 Waste Activities

More information

NORTH TIPP COUNTY COUNCIL

NORTH TIPP COUNTY COUNCIL : 28/01/2014 TIME : 14:11:44 PAGE : 1 PLANNING APPLICATIONS FROM 20/01/14 TO 24/01/14 under section 34 of the Act the applications for permission may be granted permission, subject to or without conditions,

More information

Annual Environmental Report. For. Bergin Waste Disposal limited. Waste Licence no. W

Annual Environmental Report. For. Bergin Waste Disposal limited. Waste Licence no. W 2010 Annual Environmental Report For Bergin Waste Disposal limited Waste Licence no. W0163-01 Prepared by: ANN CLARKE FACILITY MANAGER BERGIN WASTE DISPOSAL LTD. 1.0 Reporting Period 4 2.0 Waste Activities

More information

Sustainability in commercial laundering processes

Sustainability in commercial laundering processes Leonardo da Vinci Project Sustainability in commercial laundering processes Module 1 Usage of water Chapter 6 a Waste water requirements Module 1 Usage of water Chapter 6 Special requirements 1 Content

More information

Complying Development Checklist for Alterations (not Additions) to Dwellings & Ancillary Development. under the NSW Housing Alterations Code

Complying Development Checklist for Alterations (not Additions) to Dwellings & Ancillary Development. under the NSW Housing Alterations Code ABN 26 807 194 868 Suite 1 146 Oak Road KIRRAWEE NSW Phone 8880 4480 Email: info@mybuildingcertifier.com.au Complying Development Checklist for Alterations (not Additions) to Dwellings & Ancillary Development

More information

ODOUR IMPACT ASSESSMENT FOR GROVE TURKEYS LIMITED PROCESSING & WASTE WATER TREATMENT FACILITY LOCATED AT SMITHBOROUGH, CO MONAGHAN

ODOUR IMPACT ASSESSMENT FOR GROVE TURKEYS LIMITED PROCESSING & WASTE WATER TREATMENT FACILITY LOCATED AT SMITHBOROUGH, CO MONAGHAN Panther Environmental Solutions Ltd, Unit 4, Innovation Centre, Institute of Technology, Green Road, Carlow, Ireland. Mobile: 087-8519284 Telephone /Fax: 059-9134222 Email: info@pantherwms.com Website:

More information

TABLE OF CONTENTS. Title page Table of contents List of tables List of figures Non- technical summary

TABLE OF CONTENTS. Title page Table of contents List of tables List of figures Non- technical summary TABLE OF CONTENTS Title page Table of contents List of tables List of figures Non- technical summary Page i ii vii viii ix CHAPTER 1: INTRODUCTION 1 1.1 Project Background 1 1.2 Aims and Objectives 3 1.3

More information

HOW TO OBTAIN A BUILDING PERMIT

HOW TO OBTAIN A BUILDING PERMIT HOW TO OBTAIN A BUILDING PERMIT A GUIDE TO THE HOMEOWNER Copies of this Guide can be obtained from the Building Department upon request THE CORPORATION OF THE TOWNSHIP OF GEORGIAN BAY BUILDING DEPARTMENT

More information

Tel: +353 (0) Fax: +353 (0) Website: ARRAN CHEMICAL COMPANY LTD

Tel: +353 (0) Fax: +353 (0) Website:  ARRAN CHEMICAL COMPANY LTD ARRAN CHEMICAL COMPANY LTD Ireland Monksland Industrial Estate Athlone, Co Roscommon, Tel: +353 (0)90 6494807 Fax: +353 (0)90 6494809 Email: info@arranchemical.ie Website: www.arranchemical.ie ARRAN CHEMICAL

More information

Uilding Engineering Programmatic Review - Phase 2. School of Building & Civil Engineering

Uilding Engineering Programmatic Review - Phase 2. School of Building & Civil Engineering Uilding Programmatic Review - Phase 2 School of Building & Civil March 18 th March 19 th 2014 Panel Members Dr. Stephen Cassidy Dean of Academic Quality Enhancement, Cork Institute of Technology Mr. Jack

More information

Site Closure Plan Report For Silvercrest Foods

Site Closure Plan Report For Silvercrest Foods Site Closure Plan Report For Silvercrest Foods Silvercrest Foods Page 1 of 5 1.o I NTROD U CTl ON Silvercrest Foods operates under a county council licence to discharge trade effluent. The licence was

More information

PREPARED FOR: Ballymanus Pig Farm, Sheskernagh, Ballymanus, Castlepollard, Co. Westmeath. IN RELATION TO: IPC Licence Reg. No.

PREPARED FOR: Ballymanus Pig Farm, Sheskernagh, Ballymanus, Castlepollard, Co. Westmeath. IN RELATION TO: IPC Licence Reg. No. PREPARED FOR: Ballymanus Pig Farm, Sheskernagh, Ballymanus, Castlepollard, Co. Westmeath. IN RELATION TO: IPC Licence Reg. No. PO433-1 PREPARED BY: Ballymanus Pig Farm, Sheskernagh, Ballymanus, Castlepollard,

More information

BMEC Authorization Number Date of Issuance September 25, 2008 BMEC Application A Date of Expiration September 25, 2013

BMEC Authorization Number Date of Issuance September 25, 2008 BMEC Application A Date of Expiration September 25, 2013 nd 777 Bay Street, 2 Floor 777, rue Bay, 2 e etage Toronto, Ontario, M5G 2E5 Toronto, Ontario, M5G 2E5 T: 416 585 4234 T: 416 585 4234 F: 416 585 7531 TC: 416 585 7531 W: www.ontario.ca/buildingcode/ W:

More information

ARTICLE VI - RESIDENTIAL DISTRICT R-1. be for one or more of the following uses:

ARTICLE VI - RESIDENTIAL DISTRICT R-1. be for one or more of the following uses: ARTICLE VI - RESIDENTIAL DISTRICT R-1 6-1 USE REGULATIONS In Residential District R-1, structures to be erected or land to be used shall be for one or more of the following uses: 6-1.1 Single-family dwellings.

More information

Mr Pat Waters Manager Cooksgrove Limited trading as Euro Farm Foods Cooksgrove Duleek County Meath

Mr Pat Waters Manager Cooksgrove Limited trading as Euro Farm Foods Cooksgrove Duleek County Meath I Environmental Protection Agency An Ghniomhorreocht om Chaomhnu Comhrhaorl Mr Pat Waters Manager Cooksgrove Limited trading as Euro Farm Foods Cooksgrove Duleek County Meath Regional Inspectorate McCumiskey

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. 0.96 MTPA Wet type Coal Washery at Birgahani Village, Baloda Tehsil Janjgir-Champa District, Chhattisgarh

More information

Table of Contents. 1.0 Introduction Environmental Policy Statement Environmental Management Programme... 7

Table of Contents. 1.0 Introduction Environmental Policy Statement Environmental Management Programme... 7 Table of Contents 1.0 Introduction... 3 2.0 Environmental Policy Statement... 4 3.0 Environmental Management Programme... 7 4.0 Water and Wastewater EcoMap... 8 5.0 Air, Noise, Dust EcoMap... 12 6.0 Wastes

More information

VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY

VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY S1014-0340-0008MPW NTS Rev1.doc Print Date 19 February 2009 ISSUE NUMBER 1 DATE 19/02/09 AUTHOR CHECKED MPW SMO Title Page

More information

DEVELOPMENT CONTROL PLAN BUILDING LINE

DEVELOPMENT CONTROL PLAN BUILDING LINE NARRABRI SHIRE COUNCIL POLICY REGISTER DCP BUILDING LINE BUILDING LINE HB.147-96.2 To ensure the integrity of the streetscape through the provision of an appropriate building setback. BUILDING LINE (Set

More information

Soltec (Ireland) Ltd Waste Licence No W /12/12

Soltec (Ireland) Ltd Waste Licence No W /12/12 1 Soltec (Ireland) Ltd EPA License W0115-01 Report Type: AER Reporting Period: 1 st Jan 2012-31 st Dec 2012 Document Name Function Date Signature Written by Mary Lynam - Dunne Accounts Manager 7-1-13 Edited

More information

ARTICLE VIII. (SF-A, SF-TH) SINGLE-FAMILY ATTACHED AND TOWNHOUSE RESIDENTIAL DISTRICTS

ARTICLE VIII. (SF-A, SF-TH) SINGLE-FAMILY ATTACHED AND TOWNHOUSE RESIDENTIAL DISTRICTS (Ord. No. 2835; 07/01/03) SECTION A. PURPOSE. ARTICLE VIII. (SF-A, SF-TH) SINGLE-FAMILY ATTACHED AND TOWNHOUSE RESIDENTIAL DISTRICTS 1. The (SF-A, SF-TH) Single-Family Residential Districts are intended

More information

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department 2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote

More information

Attachment 12 Stage 1 Flood Risk Assessment (IE RP-0001)

Attachment 12 Stage 1 Flood Risk Assessment (IE RP-0001) IE0311133-22-RP-0001, Issue A 17/10/2013 Attachment 12 Stage 1 Flood Risk Assessment (IE0311133-30-RP-0001) IE0311133-22-RP-0001_A_02.DOC Flood Risk Assessment Celebrating 40 Years in Business Jazz Pharmaceuticals

More information

On-lot System Component Requirements

On-lot System Component Requirements On-lot System Component Requirements All system components used with an on-lot system employing an Eljen GSF System must meet either the requirements of Title 25, Chapter 73 or the Eljen GSF Listing. The

More information

4. Project Description

4. Project Description 4. Project Description 4.1 Introduction This chapter provides information on the principal elements of the proposed redevelopment of St Louis Power Station. A description of the existing site and surrounding

More information

LEVENSEAT GASIFICATION PLANT NON-TECHNICAL SUMMARY

LEVENSEAT GASIFICATION PLANT NON-TECHNICAL SUMMARY LEVENSEAT GASIFICATION PLANT NON-TECHNICAL SUMMARY S1481-0320-0004IRT Levenseat Waste Management - Non-Technical Summary Page 1 LEVENSEAT GASIFICATION PLANT NON-TECHNICAL SUMMARY Document Production &

More information

TI/131 TECHNICAL ADVICE ON THE SITING OF CLASS 1 TYPE OIL STORAGE INSTALLATIONS FOR SINGLE FAMILY DWELLINGS

TI/131 TECHNICAL ADVICE ON THE SITING OF CLASS 1 TYPE OIL STORAGE INSTALLATIONS FOR SINGLE FAMILY DWELLINGS TI/131 TECHNICAL ADVICE ON THE SITING OF CLASS 1 TYPE OIL STORAGE INSTALLATIONS FOR SINGLE FAMILY DWELLINGS Cover Price 10 (ex. VAT and p&p) (Please note this information sheet is available from the OFTEC

More information

MADISON COUNTY BUILDING PERMIT APPLICATION FORM

MADISON COUNTY BUILDING PERMIT APPLICATION FORM Madison County Government Planning and Development Department Matt Brandmeyer, AICP - Administrator Madison County Planning Administration Building 157 N. Main Street Suite 254 Edwardsville, IL 62025-1964

More information

ATTACHMENT No. E EMISSIONS TABLE OF CONTENTS

ATTACHMENT No. E EMISSIONS TABLE OF CONTENTS ATTACHMENT No. E EMISSIONS TABLE OF CONTENTS E.1. Emissions to Atmosphere...2 E.2. Emissions to Surface Waters...6 E.3. Emissions to Sewer...8 E.4. Emissions to Ground...8 E.5. Noise Emissions...8 E -

More information

AIR POLLUTION AND ENVIRONMENTAL CONSULTANCY

AIR POLLUTION AND ENVIRONMENTAL CONSULTANCY APPENDIX 5.5.2 ODOUR IMPACT OF EMISSIONS FROM THE WASTEWATER TREATMENT PLANT ---------- NEWMARKET CO-OPERATIVE CREAMERIES LTD. SCARTEEN LWR, NEWMARKET CO. CORK ---------- AIR POLLUTION AND ENVIRONMENTAL

More information

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD

PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PRE-FEASIBILITY REPORT FOR OM SAIRAM STEEL AND ALLOYS PVT LTD PLOT No. F-1,2,3,8,9,10, ADDL. MIDC, PHASE II, AND GUT NO. 46 & 63, VILLAGE DAREGAON, TEHSIL: JALNA DIST: JALNA, MAHARASHTRA 2014-15 1. Executive

More information

Education on Common Household Sewage Treatment Systems Found In Allen County, OH

Education on Common Household Sewage Treatment Systems Found In Allen County, OH Education on Common Household Sewage Treatment Systems Found In Allen County, OH The Allen County Public Health Environmental Health Division would like to provide you with diagrams of some common, discontinued

More information

DEPARTMENT OF CODE ENFORCEMENT CITY OF NIAGARA FALLS, NEW YORK FEE SCHEDULE

DEPARTMENT OF CODE ENFORCEMENT CITY OF NIAGARA FALLS, NEW YORK FEE SCHEDULE DEPARTMENT OF CODE ENFORCEMENT CITY OF NIAGARA FALLS, NEW YORK 1/1/15 FEE SCHEDULE No permit shall be issued by the Director of Code Enforcement until fees hereinafter prescribed have been paid to the

More information

BMEC Authorization Number Date of Issuance September 26, 2013 BMEC Application A Date of Expiration September 26, 2018

BMEC Authorization Number Date of Issuance September 26, 2013 BMEC Application A Date of Expiration September 26, 2018 777 Bay Street, 2 nd Floor Toronto, Ontario, M5G 2E5 T: 416 585 4234 F: 416 585 7531 W: www.ontario.ca/buildingcode/ 777, rue Bay, 2 e etage Toronto, Ontario, M5G 2E5 T: 416 585 4234 TC: 416 585 7531 W:

More information

How the BAT requirements will be met at the O Toole Composting Facility. BAT Conclusion relevant to the installation

How the BAT requirements will be met at the O Toole Composting Facility. BAT Conclusion relevant to the installation The BAT (Best Available Techniques) Reference Document (BREF), entitled Waste Treatments Industries reflects an information exchange carried out under Article 16(2) of Council Directive 96/61/EC (IPPC

More information

Fingal County Council Comhairle Contae Fhine Gall

Fingal County Council Comhairle Contae Fhine Gall Fingal County Council Comhairle Contae Fhine Gall Ms. Noeleen Roche Licensing Unit Office of Licensing and Guidance Environmental Protection Agency Headquarters, PO Box 3000,.. Johnstown Castle Estate

More information

ATTACHMENT J ACCIDENT PREVENTION & EMERGENCY RESPONSE

ATTACHMENT J ACCIDENT PREVENTION & EMERGENCY RESPONSE ATTACHMENT J ACCIDENT PREVENTION & EMERGENCY RESPONSE Attachment J Industrial Emissions Licence Application J.1 Accident Prevention This Accident Prevention information sets out the various measures at

More information

The Mersey Valley Processing Centre (Shell Green), a strategic digested sludge incineration scheme, is an existing

The Mersey Valley Processing Centre (Shell Green), a strategic digested sludge incineration scheme, is an existing Mersey Valley Processing Centre [MVPC] Shell Green Extension, Widnes Digested Sludge Recovery Centre by Richard Lancaster, BSc CEng MICE and Andrew B Gilbert, BSc CEng MIChemE The Mersey Valley Processing

More information

GUIDELINES FOR SEPTIC SYSTEM DESIGN

GUIDELINES FOR SEPTIC SYSTEM DESIGN GUIDELINES FOR SEPTIC SYSTEM DESIGN Single Family Residential For multi family or commercial buildings, Or If in the Oakdale area, contact the Department of Environmental Resources Regarding septic system

More information

Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd. SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT OF Hind Energy & Coal Beneficiation (India) Ltd. (Change in Technology) at Hindadih Village, Masturi Tehsil Bilaspur District, Chhattisgarh Submitted to

More information

West Virginia Department of Health & Human Resources Department of Health

West Virginia Department of Health & Human Resources Department of Health SS-182A Rev 6/07 West Virginia Department of Health & Human Resources Department of Health Application for a Permit to Install or Modify an Onsite Sewage Disposal System Property Owner Phone (H) (W) Address

More information

EAGLE BLUFF HOMEOWNERS ASSOCIATION P.O. Box Chattanooga, TN

EAGLE BLUFF HOMEOWNERS ASSOCIATION P.O. Box Chattanooga, TN EAGLE BLUFF HOMEOWNERS ASSOCIATION P.O. Box 16187 Chattanooga, TN 37416-0187 Eagle Bluff Architectural Review Committee Duties: The EB ARC is charged with insuring that all new building in this community

More information

Status of the FRM-II Project at Garching. Hans-Jürgen Didier, Gunter Wierheim Siemens AG, Power Generation (KWU), D Erlangen

Status of the FRM-II Project at Garching. Hans-Jürgen Didier, Gunter Wierheim Siemens AG, Power Generation (KWU), D Erlangen IGORR7 7 th Meeting of the International Group on Research Reactors October 26-29, 1999 Bariloche, Argentina Status of the FRM-II Project at Garching Hans-Jürgen Didier, Gunter Wierheim Siemens AG, Power

More information

SUBURBAN COMMERCIAL ZONE - RULES

SUBURBAN COMMERCIAL ZONE - RULES Suburban Commercial Zone Chapter 18 SUBURBAN COMMERCIAL ZONE - RULES INTRODUCTION This chapter contains rules managing land uses that take place within the suburban shopping centres of the City. This includes

More information

BUILDING PERMIT APPLICATION

BUILDING PERMIT APPLICATION Town of Dansville 1487 Day Road Arkport, NY 14807 607-295-7223 http://townofdansvilleny.com/ Page 1 of 5 Date Recd: Fee Pd: How Pd: Recd by: Permit #: BUILDING PERMIT APPLICATION Please review all pages.

More information

Procedures for an Application For Septic Permit

Procedures for an Application For Septic Permit Updated October 1, 2014 Procedures for an Application For Septic Permit The following items are required and form part of a complete application: 1. If you are doing any new construction or additions to

More information

*Note: Please contact the Soil Erosion Specialist at with questions regarding application requirements

*Note: Please contact the Soil Erosion Specialist at with questions regarding application requirements APPLICATION FOR RAZE PERMIT COVER SHEET Page 1 of 2 Project Address The following items must be completed and submitted as a packet: Razing permit application (this item is all that is needed for residential

More information

Licence application received: 09/06/98 Notices under article 11(2)(b)(ii) issued: 06/08/99 Information under article 11(2)(b)(ii) received:

Licence application received: 09/06/98 Notices under article 11(2)(b)(ii) issued: 06/08/99 Information under article 11(2)(b)(ii) received: M E M O R A N D U M DATE: 10 th August 1999 TO: Each Board Member FROM: Dr Tom Stafford RE: Submission on application for IPC licence from E. Smithwick & Sons Ltd. (Trading as St. Francis Abbey Brewery)

More information

Decommissioning Management Plan. For. Lagan Cement Limited

Decommissioning Management Plan. For. Lagan Cement Limited Decommissioning Management Plan For Lagan Cement Limited EPA Export 26-07-2013:19:22:05 Document Control Details Control Item Details Document Owner/ Brian Reynolds Curator Security Classification Confidential

More information

1420 Miner Street Des Plaines, IL P: desplaines.org COMMERCIAL STRUCTURES (INCLUDING ALTERATIONS AND ADDITIONS)

1420 Miner Street Des Plaines, IL P: desplaines.org COMMERCIAL STRUCTURES (INCLUDING ALTERATIONS AND ADDITIONS) 1420 Miner Street Des Plaines, IL 60016 P: 847.391.5380 desplaines.org COMMERCIAL STRUCTURES (INCLUDING ALTERATIONS AND ADDITIONS) Five sets of stamped plans and specifications (six sets if food establishment),

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Hughbert Haverkamp 45407 Jamestown Rd North Perth, Ontario N4W 3G7 Ministry of the Environment and Climate Change Ministère de l Environnement et de l Action en matière de changement

More information

Residential Design Standards Draft 9 August 2013

Residential Design Standards Draft 9 August 2013 RESIDENTIAL DESIGN STANDARDS ORDINANCE DRAFT 9 AUGUST 2013 17.25 Residential Design Standards 17.25.010 Purpose The purpose of this chapter is to establish minimum design standards for new residential

More information

Tipperary Co. Co. DEVELOPMENT DESCRIPTION AND LOCATION LIC. 16/ /02/2016 construction of an entrance, dwellinghouse, private Seymour

Tipperary Co. Co. DEVELOPMENT DESCRIPTION AND LOCATION LIC. 16/ /02/2016 construction of an entrance, dwellinghouse, private Seymour : 18/02/2016 TIME : 12:47:17 PAGE : 1 PLANNING APPLICATIONS FROM 08/02/16 TO 12/02/16 under section 34 of the Act the applications for permission may be granted permission, subject to or without conditions,

More information

K_`j `e]fidxk`fe `j Yifl^_k kf pfl Yp Fncj?Xcc <em`ifed\ekxc nfib`e^ `e gxike\ij_`g n`k_ BcXi^\jk\i gif[lzkj% '/+, *., (/'(

K_`j `e]fidxk`fe `j Yifl^_k kf pfl Yp Fncj?Xcc <em`ifed\ekxc nfib`e^ `e gxike\ij_`g n`k_ BcXi^\jk\i gif[lzkj% '/+, *., (/'( Excellent Treatment PD0064, Issue 1 INSTALLATION INSTRUCTIONS FOR N3 to N5 NITRIFICATION BIODISCS Introduction PD0064, Issue 1 Klargester BioDiscs are manufactured in Glass Fibre Reinforced Polyester (GRP).

More information

Bioenergy New Zealand

Bioenergy New Zealand Bioenergy New Zealand Biogass Renewables Economic Viability of Commercial Anaerobic Digestion Jandakot Bioenergy Facility in focus September 2017 Joseph Oliver, General Manager About Biogass Renewables

More information

CITY OF AURORA OHIO Architectural Board of Review Meeting Minutes December 14, 2017

CITY OF AURORA OHIO Architectural Board of Review Meeting Minutes December 14, 2017 CITY OF AURORA OHIO Architectural Board of Review Meeting Minutes December 14, 2017 The Architectural Board of Review met in a scheduled meeting on Thursday, December 14, 2017, in Council Chambers of City

More information

Overview of Value Added Products Advanced Technologies in Manure Management and the Chesapeake Bay

Overview of Value Added Products Advanced Technologies in Manure Management and the Chesapeake Bay Overview of Value Added Products Advanced Technologies in Manure Management and the Chesapeake Bay Chesapeake Goal Line 2025: Opportunities for Enhancing Agricultural Conservation October 6, 2010 Charge

More information

FUNDING OUR GREEN BUSINESS

FUNDING OUR GREEN BUSINESS Irish Country Meats FUNDING OUR GREEN BUSINESS Presentation by: Robert Kirwan, Environmental Manager 10 th June 2015 Irish Country Meats Presentation Content Company Introduction ICM Environmental Interaction

More information

OFFICE OF LICENSING & GUIDANCE

OFFICE OF LICENSING & GUIDANCE OFFICE OF LICENSING & GUIDANCE INSPECTORS REPORT ON A LICENCE APPLICATION To: DIRECTORS From: SEÁN O DONOGHUE - LICENSING UNIT Date: 5/4/04 RE: APPLICATION FOR AN IPC LICENCE FROM LUFTHANSA SHANNON TURBINE

More information

City of Norwalk. Residential Development Permit Process

City of Norwalk. Residential Development Permit Process City of Norwalk Residential Development Permit Process City of Norwalk Zoning Department 38 Whittlesey Avenue, PO Box 30 Norwalk, OH 44857 (419) 663-6736 www.norwalkoh.com 1 TABLE OF CONTENTS OVERVIEW...

More information

Clogrennane Lime Ltd. Toonagh Lime Works AER Licence # P

Clogrennane Lime Ltd. Toonagh Lime Works AER Licence # P Clogrennane Lime Ltd Toonagh Lime Works AER 2010 Licence # P0 771-01 Section 1 Overview. 3 1.0 Introduction 1.1 Description of Activities 1.2 Responsibility for Environmental Management 1.3 Environmental

More information

Environmental Conditions Laboratories (for commercial use) Group

Environmental Conditions Laboratories (for commercial use) Group GBR No. 20 Environmental Conditions Laboratories (for commercial use) Group ERA regulates the environmental impact of enterprises through two key mechanisms. Smaller scale activities are regulated through

More information

Tipperary Co. Co. APP. TYPE FILE NUMBER 18/ DATE RECEIVED DEVELOPMENT DESCRIPTION AND LOCATION PROT. STRU EIS RECD. APPLICANTS NAME IPC WASTE

Tipperary Co. Co. APP. TYPE FILE NUMBER 18/ DATE RECEIVED DEVELOPMENT DESCRIPTION AND LOCATION PROT. STRU EIS RECD. APPLICANTS NAME IPC WASTE : 14/06/2018 TIME : 09:50:03 PAGE : 1 PLANNING APPLICATIONS FROM 04/06/18 TO 08/06/18 18/600703 Tim Hyde P 05/06/2018 to construct a stable barn, haybarn, lunging ring, muck pit, loading ramp, new site

More information

Greater Dublin Drainage Project

Greater Dublin Drainage Project Greater Dublin Drainage Project The Wastewater Treatment Process: How Does it Work? June 2013 The Greater Dublin Drainage initiative aims to provide the drainage infrastructure needed to allow the Greater

More information

Architectural and Landscape Guidelines

Architectural and Landscape Guidelines Architectural and Landscape Guidelines Introduction The document outlines the opportunities and constraints associated with the Wolf Creek Village development and provides a set of subdivision guidelines

More information

CHAPTER 12 Prevention of Major Accidents. Kildare County Development Plan , Volume 1

CHAPTER 12 Prevention of Major Accidents. Kildare County Development Plan , Volume 1 Chapter 6 Rural Housing Strategy CHAPTER 12 Prevention of Major Accidents 189 Chapter 12 Prevention of Major Accidents 12 PREVENTION OF MAJOR ACCIDENTS 12.1 Background The Seveso II Directive 96/82/EC

More information

TOWN OF PALM BEACH Town Manager s Office

TOWN OF PALM BEACH Town Manager s Office TOWN OF PALM BEACH Town Manager s Office TOWN COUNCIL MEETING TENTATIVE - SUBJECT TO REVISION TOWN HALL COUNCIL CHAMBERS-SECOND FLOOR 360 SOUTH COUNTY ROAD AGENDA WEDNESDAY, MAY 15, 2013 9:30 AM For information

More information

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT JAYPEE NIGRIE SUPER THERMAL POWER PROJECT (A Unit of M/s Jaiprakash Power Ventures Limited) Villages: Nigrie, Tehsil :Sarai District: Singrauli 2014 2015 SUBMITTED M.P. POLLUTION CONTROL BOARD BHOPAL (M.P.)

More information

UNDERGROUND DRAIN, SEWER, SURFACE WATER & DUCT

UNDERGROUND DRAIN, SEWER, SURFACE WATER & DUCT www.brettmartin.com UNDERGROUND DRAIN, SEWER, SURFACE WATER & DUCT QUALITY UNDERGROUND SYSTEMS When you select an underground system you need to be sure of its pedigree, convinced of its ability to perform,

More information

SECTION 14 - GENERAL INDUSTRIAL ZONE (M2) REGULATIONS

SECTION 14 - GENERAL INDUSTRIAL ZONE (M2) REGULATIONS SECTION 14 - GENERAL INDUSTRIAL ZONE (M2) REGULATIONS 14.1 GENERAL USE REGULATIONS 14.1.1 PERMITTED USES No land, building, or structures shall be used or erected in the General Industrial Zone (M2) unless

More information

Glenmore Biogas Ltd.: Reg. No. P Response to FI Letter

Glenmore Biogas Ltd.: Reg. No. P Response to FI Letter Ref: ENV-1367/CS/06 Date: 23 rd March 2015 Ms Elizabeth Leacy Administration Officer Office of Climate, Licensing and Resource Use Environmental Protection Agency Johnstown Castle Estate County Wexford

More information

PROCEDURE FOR REQUESTING A BUILDING PERMIT

PROCEDURE FOR REQUESTING A BUILDING PERMIT PROCEDURE FOR REQUESTING A BUILDING PERMIT A. CHECKLIST OF REQUIREMENTS FOR BUILDING PERMIT APPLICATION: The following checklist indicates the requirements based on the type of Building Permit being requested.

More information

Natural Resources Defense Council et al, January 2014,

Natural Resources Defense Council et al, January 2014, June 13, 2014 The Honorable Maggie Hassan Governor of New Hampshire 2014 Chair of New England Governors-Eastern Canadian Premiers Conference State House 107 North Main Street Concord, NH 03301 Dear Governor

More information

Sewage System Inspection Requirements and Reporting Form Algonquin Provincial Park Cottage Lot Program

Sewage System Inspection Requirements and Reporting Form Algonquin Provincial Park Cottage Lot Program Sewage System Inspection Requirements and Reporting Form Algonquin Provincial Park Cottage Lot Program As outlined in section 4.3 of the Algonquin Provincial Park Cottage Lot Policy (2018-2038), all sewage

More information

RESIDENTIAL BUILDING PERMIT

RESIDENTIAL BUILDING PERMIT A APPLICATION FOR A RESIDENTIAL BUILDING PERMIT JACKSON CO. MS. PLAN CASE NUMBER: PERMIT NUMBER: ACCEPTED BY: APPROVED BY: Application is hereby made for a permit under the provisions of the Comprehensive

More information

Nuclear installations at Jaslovské Bohunice. Annex No. 1

Nuclear installations at Jaslovské Bohunice. Annex No. 1 Nuclear installations at Jaslovské Bohunice Annex No. 1 THE LIST OF STRUCTURES OF JADROVÁ A VYRAĎOVACIA SPOLOČNOSŤ, A.S. A1 NPP 28 GAS MANAGEMENT 30 REACTOR BUILDING 32 CONNECTING TURBINE HALL 32/A SWITCHBOARD

More information

EUSWM01 Manage the reception of waste

EUSWM01 Manage the reception of waste Overview This national occupational standard defines the competences required for managing the procedures for receiving waste and controlling its reception, inspection and validation. It requires the implementation

More information

System Design & Installation Manual

System Design & Installation Manual System Design & Installation Manual February 2016 CORPORATION Innovative Environmental Products & Solutions Since 1970 www.eljen.com Table of Contents Topic Page Numbers Glossary of Terms 3 Mantis Series

More information

DESIGN OF A DECENTRALISED WASTEWATER TREATMENT PLANT FOR NYARI ESTATE

DESIGN OF A DECENTRALISED WASTEWATER TREATMENT PLANT FOR NYARI ESTATE UNIVERSITY OF NAIROBI SCHOOL OF ENGINEERING DEPARTMENT OF ENVIRONMENTAL AND BIOSYSTEMS ENGINEERING DESIGN OF A DECENTRALISED WASTEWATER TREATMENT PLANT FOR NYARI ESTATE REG NO.: F21/17272/2010 NAME: MBUCHI

More information

Shareholder s plantation visit April 2016 The world of natural rubber. The Connection to the world of Sustainable Tropical Agriculture

Shareholder s plantation visit April 2016 The world of natural rubber. The Connection to the world of Sustainable Tropical Agriculture Shareholder s plantation visit April 2016 The world of natural rubber The Connection to the world of Sustainable Tropical Agriculture Synthetic vs natural rubber Synthetic vs natural rubber (in KTON) 18

More information

CHAPTER 6 Supplemental Standards

CHAPTER 6 Supplemental Standards CHAPTER 6 Supplemental Standards 6.00.00 GENERALLY...2 6.01.00 TELECOMMUNICATIONS FACILITIES...2 6.01.01 Generally...2 6.01.02 Collocation of Antennas Required...2 6.01.03 Permissible Locations for Telecommunications

More information

Tipperary Co. Co. DEVELOPMENT DESCRIPTION AND LOCATION IPC WASTE 18/600297

Tipperary Co. Co. DEVELOPMENT DESCRIPTION AND LOCATION IPC WASTE 18/600297 : 22/03/2018 TIME : 10:32:23 PAGE : 1 PLANNING APPLICATIONS FROM 12/03/18 TO 16/03/18 under section 34 of the Act the applications for permission may be granted permission, subject to or without conditions,

More information

FORM V (See rule 14) Environmental Statement for the financial year ending 31 st March 2014 PART A

FORM V (See rule 14) Environmental Statement for the financial year ending 31 st March 2014 PART A FORM V (See rule 14) Environmental Statement for the financial year ending 31 st March 2014 i) Name and address of the owner / Occupier ii) Industry category Primary (STC Code) Secondary (SIC Code) PART

More information

THE CORPORATION OF THE TOWNSHIPSHIP OF ADELAIDE METCALFE

THE CORPORATION OF THE TOWNSHIPSHIP OF ADELAIDE METCALFE THE CORPORATION OF THE TOWNSHIPSHIP OF ADELAIDE METCALFE BY-LAW #69-2011 Being a by-law respecting Construction, Demolition and Change of Use Permits and Inspections for the Township of Adelaide Metcalfe

More information

I-SEM Business Liaison Group (BLG) NEMO. 21 st June 2017 Minutes & Notes

I-SEM Business Liaison Group (BLG) NEMO. 21 st June 2017 Minutes & Notes I-SEM Business Liaison Group (NEMO) 21 st June 2017 Minutes & Notes Meeting Details Meeting Purpose Location Chair Secretariat I-SEM Business Liaison Group (BLG) NEMO EirGrid, Dublin / Lync Mark Needham(I-SEM

More information

ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK. for the. Partial Risk Guarantees Project for Independent Power Producers in Kenya DRAFT

ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK. for the. Partial Risk Guarantees Project for Independent Power Producers in Kenya DRAFT ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK for the Partial Risk Guarantees Project for Independent Power Producers in Kenya DRAFT May 2011 INTRODUCTION The World Bank, through IDA funding, is proposing

More information