1 Market Highlights 1 (January 24 February 6) The average DLAP price in the integrated forward market was $3.55. The maximum and minimum DLAP prices were $86.15 and $1.8, respectively. The maximum and minimum PNode prices in the integrated forward market were $71.14 and -$6.59 respectively. The top two interties congested in the integrated forward market were NOB_ITC and MALIN5. Congestion rents in these two weeks totaled $16,938, The average day-ahead ancillary service prices were between $. and $ Approximately percent of the RUC requirements were met from RA units. The average real-time FMM DLAP price was $3.12, with a maximum price of $ and a minimum price of -$.49. The maximum and minimum PNode prices in the FMM were $ and -$52.5, respectively. Out of the total 1,344 FMM intervals, 3 intervals saw DLAP prices above $25, and intervals saw DLAP prices below -$15. Out of the total 1,344 FMM intervals, 7 intervals saw ELAP prices above $25 and 2 intervals saw ELAP prices below -$15. The average real-time FMM ELAP price was $2.96, with a maximum price of $34.16 and a minimum price of -$ The average real-time RTD DLAP price was $28.82, with a maximum price of $1,14.46 and a minimum price of -$ The maximum and minimum PNode prices in the RTD were $1,642.9 and -$718., respectively. Out of the total 4,32 RTD intervals, 21 intervals saw DLAP prices above $25 and interval saw DLAP prices below -$15. Out of the total 4,32 RTD intervals, 18 intervals saw ELAP prices above $25 and 7 intervals saw ELAP prices below -$15. The average real-time RTD ELAP price was $19.63, with a maximum price of $ and a minimum price of - $ Root cause for daily high price events are noted in Tables 1 and 2. Trade Date FMM Jan 28 HE 17 FMM Jan 29 HE 18 FMM Jan 3 HE 9,1 Table 1 FMM Intervals Root Cause Load changes and change of renewable forecast. Congestion on 24138_SERRANO _5_24137_SERRANO _23_XF_1 _P. Congestion on OMS MG_BK81_NG. 1 A description of the metrics presented in this report is available at Market Quality and Renewable Integration/L.Hernandez 1

2 GW Trade Date RTD Jan 24 HE 16; Jan 29 HE 17; Feb 2 HE 17 RTD Jan 24 HE 18 RTD Jan 29 HE 16 RTD Jan 3 HE 18 RTD Jan 3 HE 8, 23 RTD Jan 3 HE 1,11; Jan 31 HE 17 RTD Feb 2 HE 21; Feb 5 HE 7 RTD Feb 6 HE 17 Table 2 RTD Intervals Root Cause Load changes and renewable deviation. Congestion on OMS CRY-MCC_651_NG and load changes. Congestion on 24138_SERRANO _5_24137_SERRANO _23_XF_1 _P and re-dispatch of resources. Congestion on 24138_SERRANO _5_24137_SERRANO _23_XF_1 _P and 782_TL234_IV_SPS_NG. Congestion on OMS MG_BK81_NG. Congestion on 24138_SERRANO _5_24137_SERRANO _23_XF_1 _P and congestion on 782_TL 23S_OVERLOAD_NG. Load changes and reduction of imports. Load changes, renewable deviation, and reduction of imports. Figure 1: Day-Ahead (IFM) LAP LMP and Cleared Bid-In Demand PGAE SCE SDGE VEA Cleared Bid-In Demand (GW) Market Quality and Renewable Integration/L.Hernandez 2

3 Congestion Rents (in Millions) Figure 2: Day-Ahead Congestion Rents $2.5 $2. $1.5 $1. $.5 $. Flow-Gates NOB_ITC MALIN5 Figure 3: Day-Ahead Congestion Rents for Flow-Based Constraints Congestion Transmission Constraint Rent 24138_SERRANO _5_24137_SERRANO _23_XF_1 _P $8,153, _DOUBLTTP_138_223_FRIARS _138_BR_1 _1 $3,281, _LUGO _5_2615_VICTORVL_5_BR_1 _1 $691,59 782_TL 23S_OVERLOAD_NG $389,741 OMS MG_BK81_NG $162, _CRESTA _23_333_RIO OSO _23_BR_1 _1 $63, _GOODRICH_23_2476_LAGUBELL_23_BR_1 _1 $56,472 OMS Caribou Bank $5,648 HUMBOLDT_IMP_NG $23,56 782_TL234_IV_SPS_NG $21, _ANTELOPE_66._2442_NEENACH _66._BR_1 _1 $2, _HPLND JT_6._3126_HPLND JT_115_XF_2 $19, _GEYERS56_115_3122_EGLE RCK_115_BR_1 _1 $18, _CORTINA _23_346_VACA-DIX_23_BR_1 _1 $14, _HGHLNDJ2_115_3195_CORTINA _115_BR_1 _1 $6, _J.HINDS2_23_2486_MIRAGE _23_BR_1 _1 $3, _CLER LKE_6._31338_KONOCTI6_6._BR_1 _1 $1, _HPLND JT_6._3137_CLVRDLJT_6._BR_1 _1 $1,54 IID-SCE_BG $1,382 Market Quality and Renewable Integration/L.Hernandez 3

4 Figure 3: Day-Ahead Congestion Rents for Flow-Based Constraints (cont) Congestion Transmission Constraint Rent 22484_MIRAMAR1_69._22492_MIRAMRTP_69._BR_1 _1 $ _GLENCLIF_69._22328_GLNCLFTP_69._BR_1 _1 $ _SANMATEO_115_33315_RAVENSWD_115_BR_1 _1 $ _DRUM _6._32376_BONNIE N_6._BR_1 _1 $ _PENSQTOS_69._22164_DELMARTP_69._BR_1 _1 $2 222_DUNHILTP_69._22196_DUNHILL _69._BR_1 _1 $33 Total $ 8,153, Figure 4: Day-Ahead (IFM) Average A/S Price Non Spin Spin Reg Up Reg Dn Mile Up Mile Dn Market Quality and Renewable Integration/L.Hernandez 4

5 Figure 5: Day-Ahead Average RUC Price Figure 6: Real-Time FMM Average A/S Price Non Spin Spin Reg Up Reg Dn Mile Up Mile Dn Market Quality and Renewable Integration/L.Hernandez 5

6 Figure 7: Real-Time FMM DLAP LMP PGAE SCE SDGE VEA Figure 8: Real-Time RTD DLAP LMP PGAE SCE SDGE VEA Market Quality and Renewable Integration/L.Hernandez 6

7 Figure 9: Real-Time FMM ELAP LMP PGE PACW PACE NEVP AZPS -2 PSEI Figure 1: Real-Time RTD ELAP LMP AZPS NEVP PACE Market Quality and Renewable Integration/L.Hernandez PACW -8 PGE PSEI 7

Market Performance Report February 2017

Market Performance Report February 2017 Market Performance Report February 217 April 7, 217 ISO Market Quality and Renewable Integration CAISO 25 Outcropping Way Folsom, California 9563 (916) 351-44 Executive Summary 1 The market performance

More information

Market Performance Report January 2015

Market Performance Report January 2015 Market Performance Report January 2015 February 27, 2015 ISO Market Quality and Renewable Integration CAISO 250 Outcropping Way Folsom, California 95630 (916) 351-4400 Executive Summary 1 The market performance

More information

Market Performance Report May 2014

Market Performance Report May 2014 Market Performance Report May 2014 June 30, 2014 ISO Market Quality and Renewable Integration CAISO 250 Outcropping Way Folsom, California 95630 (916) 351-4400 Executive Summary 1 The market performance

More information

Market Performance Report January 2014

Market Performance Report January 2014 Market Performance Report January 2014 February 25, 2014 ISO Market Quality and Renewable Integration CAISO 250 Outcropping Way Folsom, California 95630 (916) 351-4400 Executive Summary 1 The market performance

More information

Market Performance Report February 2014

Market Performance Report February 2014 Market Performance Report February 2014 March 26, 2014 ISO Market Quality and Renewable Integration CAISO 250 Outcropping Way Folsom, California 95630 (916) 351-4400 Executive Summary 1 The market performance

More information

California ISO. Q Report on Market Issues and Performance. July 10, Prepared by: Department of Market Monitoring

California ISO. Q Report on Market Issues and Performance. July 10, Prepared by: Department of Market Monitoring California Independent System Operator Corporation California ISO Q1 2017 Report on Market Issues and Performance July 10, 2017 Prepared by: Department of Market Monitoring TABLE OF CONTENTS Executive

More information

Discussion on flexible ramping product

Discussion on flexible ramping product Discussion on flexible ramping product Lin Xu, Ph.D. Senior Advisor Engineering Specialist, Market Analysis Market Surveillance Committee Meeting General Session September 8, 2017 2017 CAISO Public Page

More information

California ISO. Q Report on Market Issues and Performance. August 21, Prepared by: Department of Market Monitoring

California ISO. Q Report on Market Issues and Performance. August 21, Prepared by: Department of Market Monitoring California Independent System Operator Corporation California ISO Q2 2013 Report on Market Issues and Performance August 21, 2013 Prepared by: Department of Market Monitoring Table of Contents Executive

More information

Load Granularity Refinements Issue Paper

Load Granularity Refinements Issue Paper Load Granularity Refinements Issue Paper September 22, 2014 Table of Contents I. Introduction... 3 II. Background... 3 III. Scope of Initiative and Plan for Stakeholder Engagement... 4 IV. FERC s Reasons

More information

Market Disruption Report October 16, 2018 to November 15, 2018

Market Disruption Report October 16, 2018 to November 15, 2018 Market Disruption Report October 16, 2018 to November 15, 2018 December 17, 2018 CAISO Market Quality and Renewable Integration California CAISO 250 Outcropping Way Folsom, California 95630 (916) 351-4400

More information

Market Disruption Report September 16, 2018 to October 15, 2018

Market Disruption Report September 16, 2018 to October 15, 2018 Market Disruption Report September 16, 2018 to October 15, 2018 November 15, 2018 CAISO Market Quality and Renewable Integration California ISO 250 Outcropping Way Folsom, California 95630 (916) 351-4400

More information

Western EIM Benefits Report Fourth Quarter 2017

Western EIM Benefits Report Fourth Quarter 2017 Western EIM Benefits Report Fourth Quarter 2017 January 30, 2018 Contents EXECUTIVE SUMMARY... 3 EIM BENEFITS IN Q4 2017... 4 INTER-REGIONAL TRANSFERS... 4 WHEEL THROUGH TRANSFERS... 8 REDUCED RENEWABLE

More information

Western EIM Benefits Report Second Quarter 2017

Western EIM Benefits Report Second Quarter 2017 Western EIM Benefits Report Second Quarter 2017 July 31, 2017 www.westerneim.com Table of Contents EXECUTIVE SUMMARY... 3 EIM BENEFITS IN Q2 2017... 4 INTER-REGIONAL TRANSFERS... 4 REDUCED RENEWABLE CURTAILMENT

More information

Load Granularity Refinements. Pricing Study Description and Implementation Costs Information Request

Load Granularity Refinements. Pricing Study Description and Implementation Costs Information Request Pricing Study Description and Implementation Costs Information Request October 28, 2014 Table of Contents I. Introduction... 3 II. Background... 3 III. Stakeholder Process and Next Steps... 4 IV. Pricing

More information

California ISO. Structural competitiveness of the energy imbalance market: Arizona Public Service Balancing Area. April 10, 2018

California ISO. Structural competitiveness of the energy imbalance market: Arizona Public Service Balancing Area. April 10, 2018 California Independent System Operator Corporation California ISO Structural competitiveness of the energy imbalance market: Arizona Public Service Balancing Area April 10, 2018 Department of Market Monitoring

More information

APS Stakeholder Meeting. September 9 th 2016

APS Stakeholder Meeting. September 9 th 2016 APS Stakeholder Meeting September 9 th 2016 APS: EIM Implementation & Customer Impact Review 9/9/2016 Emerging Market Opportunity CAISO: Energy Imbalance Market Existing Markets 3 Changing Electrical Grid

More information

10.1 Scope of CMRI Reports available to SCs

10.1 Scope of CMRI Reports available to SCs 10.1 Scope of CMRI Reports available to SCs Exhibit 10-1.1 summarizes the reports that are available to SCs through the CAISO Market Results Interface (CMRI). Details of the report contents are provided

More information

December 17, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

December 17, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 California Independent System Operator Corporation December 17, 2018 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

Briefing on proposed energy imbalance market benefit methodology

Briefing on proposed energy imbalance market benefit methodology Briefing on proposed energy imbalance market benefit methodology Lin Xu, Ph.D. Lead Market Development Engineer Market Surveillance Committee General Session August 22, 2014 Measure EIM Benefit EIM benefit

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 27 CAISO Markets And Processes... 2 27.1 LMPs And Ancillary Services Marginal Prices... 2 27.1.1 Locational Marginal Prices For Energy... 3 27.1.2 Ancillary Service Prices... 4 27.1.3

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 34. Real-Time Market... 3 34.1 Inputs To The Real-Time Market... 3 34.1.1 Day-Ahead Market Results as Inputs to the Real-Time Market... 3 34.1.2 Market Model and System Information...

More information

FERC Order 764 Settlements

FERC Order 764 Settlements FERC Order 764 Settlements Spring Release 2014 The information contained in these materials is provided for general information only and does not constitute legal or regulatory advice. The ultimate responsibility

More information

Day Ahead Market Enhancements

Day Ahead Market Enhancements Day Ahead Market Enhancements Don Tretheway Senior Advisor, Market Design Policy Regional Issues Forum March 9, 2018 Day-ahead market enhancements address net load curve and uncertainty previously left

More information

Load Granularity Refinements Pricing Analysis Study

Load Granularity Refinements Pricing Analysis Study August 8, 2013 Table of Contents I. Introduction... 3 II. Comparison of DLAP and SLAP prices... 3 A. Overview of SLAP and DLAP price differences... 4 B. PG&E price differences... 10 C. SCE price differences...

More information

California ISO. Structural competiveness of the energy imbalance market: Analysis of market power of the Berkshire Hathaway entities.

California ISO. Structural competiveness of the energy imbalance market: Analysis of market power of the Berkshire Hathaway entities. California Independent System Operator Corporation California ISO Structural competiveness of the energy imbalance market: Analysis of market power of the Berkshire Hathaway entities June 29, 2017 Prepared

More information

Day-Ahead Market Enhancements Phase 1: Fifteen-Minute Granularity. Second Revised Straw Proposal

Day-Ahead Market Enhancements Phase 1: Fifteen-Minute Granularity. Second Revised Straw Proposal Day-Ahead Market Enhancements Phase 1: Fifteen-Minute Granularity August 27, 2018 Intentionally left blank D.Tretheway, M.Poage, E.Nethercutt Page 2 August 27, 2018 Day-Ahead Market Enhancements Phase

More information

Benefits for Participating in EIM February 1, 2016

Benefits for Participating in EIM February 1, 2016 Benefits for Participating in EIM February 1, 2016 www.caiso.com Revision History Date Version Description Author 01/27/2016 1.0 Lin Xu 02/02/2016 1.1 Corrects the November benefit amount referenced in

More information

EIM Settlements Load Customer Training September 13, 2016

EIM Settlements Load Customer Training September 13, 2016 EIM Settlements Load Customer Training September 13, 2016 EIM Settlements Customer Training Review EIM 101 EIM terminology Participating / Non-Participating Base Schedules and etags Settlements and Disputes

More information

January 15, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

January 15, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 California Independent System Operator Corporation January 15, 2019 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

Technical Bulletin Comparison of Lossy versus Lossless Shift Factors in the ISO Market Optimizations

Technical Bulletin Comparison of Lossy versus Lossless Shift Factors in the ISO Market Optimizations Technical Bulletin 2009-06-03 Comparison of Lossy versus Lossless Shift Factors in the ISO Market Optimizations June 15, 2009 Comparison of Lossy versus Lossless Shift Factors in the ISO Market Optimizations

More information

Business Practice Manual for Market Instruments

Business Practice Manual for Market Instruments Business Practice Manual for Market Instruments Version 4546 Last Revised: October 630, 2017, Approval History Approval Date: March 27, 2009 Effective Date: March 31, 2009 BPM Ow ner: David Delparte BPM

More information

Flexible Ramping Products

Flexible Ramping Products Flexible Ramping Products Revised Draft Final Proposal August 16, 2012 Lin Xu, Ph.D. Senior Market Development Engineer Don Tretheway Senior Market Design and Policy Specialist Agenda Time Topic Presenter

More information

Briefing on intertie deviation settlement proposal

Briefing on intertie deviation settlement proposal Briefing on intertie deviation settlement proposal Brad Cooper Manager, Market Design Policy EIM Governing Body Meeting General Session January 24, 2019 Management proposes to revise the intertie transaction

More information

Imbalance Conformance Enhancements. Revised Draft Final Proposal

Imbalance Conformance Enhancements. Revised Draft Final Proposal Imbalance Conformance Enhancements March 14, 2018 Intentionally left blank CAISO/M&ID/MDP/M.Poage Page 2 March 14, 2018 Imbalance Conformance Enhancements Table of Contents 1. Purpose... 5 2. Scope Changes

More information

Decision on intertie deviation settlement proposal

Decision on intertie deviation settlement proposal Decision on intertie deviation settlement proposal Brad Cooper Manager, Market Design Policy Board of Governors Meeting General Session February 7, 2019 Management proposes to revise the intertie nondelivery

More information

Secretary. Dear Secretary Bose: February. 16, 2013 to. Anna McKenna. Deputy General Counsel. Folsom, CA

Secretary. Dear Secretary Bose: February. 16, 2013 to. Anna McKenna. Deputy General Counsel. Folsom, CA April 15, 2013 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California Independent System Operator Corporation Docket Nos.

More information

Energy Imbalance Market Year 1 Enhancements Phase 2. Draft Final Proposal

Energy Imbalance Market Year 1 Enhancements Phase 2. Draft Final Proposal Energy Imbalance Market Year 1 Enhancements Phase 2 Draft Final Proposal September 8, 2015 Energy Imbalance Market Year 1 Enhancements Phase 2 Draft Final Proposal Table of Contents 1 Introduction... 3

More information

3. Overview of Market Instruments

3. Overview of Market Instruments 3. Overview of Market Instruments 3.2 Ancillary Services Bids Four types of Ancillary Services are used by CAISO in its markets Regulation Up, Regulation Down, Spinning Reserve, and Non-Spinning Reserve.

More information

Load Granularity Refinements. Pricing Study Results and Implementation Costs and Benefits Discussion

Load Granularity Refinements. Pricing Study Results and Implementation Costs and Benefits Discussion Pricing Study Results and Implementation Costs and Benefits Discussion January 14, 2015 Table of Contents I. Executive Summary... 3 II. Introduction... 3 III. Stakeholder Process... 4 IV. Pricing Study

More information

and on peak new ISO the monthly

and on peak new ISO the monthly March 1, 20122 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C. 20426 RE: California Independent System Operator Corporation Docket No.

More information

August 15, Secretary. Dear Secretary Bose: July 15, Anna McKenna. Folsom, CA

August 15, Secretary. Dear Secretary Bose: July 15, Anna McKenna. Folsom, CA August 15, 20122 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California Independent System Operator Corporation Docket Nos.

More information

Business Requirements Specification

Business Requirements Specification Business s Specification Energy Storage and Distributed Energy Resources Phase 3 (ESDER 3) Current Version Date: 2/1/2019 Doc ID: GNFDMDEHU6BB-46-53 Page 1 of 22 Disclaimer All information contained in

More information

Eligible Intermittent Resource Dispatch Operating Target EIR DOT

Eligible Intermittent Resource Dispatch Operating Target EIR DOT Eligible Intermittent Resource Dispatch Operating Target EIR DOT CSSA Training August 2018 Stakeholder Learning Objectives Explain the difference between an Operating Instruction and a Dispatch Instruction

More information

Energy Storage and Distributed Energy Resources Phase 3

Energy Storage and Distributed Energy Resources Phase 3 Energy Storage and Distributed Energy Resources Phase 3 Draft Final Proposal July 11, 2018 Market & Infrastructure Policy Table of Contents 1 Introduction... 3 2 Stakeholder Process... 4 3 Energy Imbalance

More information

Potential Changes in Market Design Rule Limiting the Pool of Resources Considered in Integrated Forward Market

Potential Changes in Market Design Rule Limiting the Pool of Resources Considered in Integrated Forward Market California Independent System Operator Corporation Potential Changes in Market Design Rule Limiting the Pool of Resources Considered in Integrated Forward Market Department of Market Monitoring June 12,

More information

California ISO. Q Report on Market Issues and Performance. November 1, Department of Market Monitoring

California ISO. Q Report on Market Issues and Performance. November 1, Department of Market Monitoring California Independent System Operator Corporation California ISO Q3 2018 Report on Market Issues and Performance November 1, 2018 Department of Market Monitoring TABLE OF CONTENTS Executive summary...

More information

Market Performance and Planning Forum. August 29, 2018

Market Performance and Planning Forum. August 29, 2018 Market Performance and Planning Forum August 29, 2018 ISO Objective: Enable dialogue on implementation planning and market performance issues Review key market performance topics Share updates to 2018

More information

Flexible Ramping Products Straw Proposal Incorporating FMM and EIM

Flexible Ramping Products Straw Proposal Incorporating FMM and EIM Flexible Ramping Products Straw Proposal Incorporating FMM and EIM Lin Xu, Ph.D. Lead Market Development Engineer Don Tretheway Lead Market Design and Policy Specialist August 20, 2014 Agenda Time Topic

More information

GridView Review 2026 Common Case Version 2.0

GridView Review 2026 Common Case Version 2.0 GridView Review 2026 Common Case Version 2.0 Colby Johnson Staff Engineer December 14, 2017 2 Overview GridView Review What is it/what does it do? Inputs and Outputs 2026 Common Case Version 2.0 Changes

More information

ACKNOWLEDGEMENT. The following staff members of the Department of Market Monitoring contributed to this report:

ACKNOWLEDGEMENT. The following staff members of the Department of Market Monitoring contributed to this report: ACKNOWLEDGEMENT The following staff members of the Department of Market Monitoring contributed to this report: Eric Hildebrandt Jeffrey McDonald Brad Cooper Bryan Swann Dan Yang David Robinson Douglas

More information

Demand Response Working Group and Stakeholder Meeting Agenda January 15, 2009

Demand Response Working Group and Stakeholder Meeting Agenda January 15, 2009 Demand Response Working Group and Stakeholder Meeting Agenda January 15, 2009 Time 11:00 11:10 11:10 11:40 11:40 12:00 12:00 12:45 12:45 2:15 2:15 2:30 2:30 3:30 3:30 4:30 4:30 5:00 Topic Introduction

More information

Flexible Resource Adequacy Criteria and Must Offer Obligation Phase 2. Working Group Meeting. Karl Meeusen, Ph.D. June 18, 2018

Flexible Resource Adequacy Criteria and Must Offer Obligation Phase 2. Working Group Meeting. Karl Meeusen, Ph.D. June 18, 2018 Flexible Resource Adequacy Criteria and Must Offer Obligation Phase 2 Working Group Meeting Karl Meeusen, Ph.D. June 18, 2018 FRACMOO 2 Working Group Meeting Agenda 6/18/2018 Time Topic Presenter 10:00

More information

2.1.1 Market Power Mitigation & Reliability Requirements Determination Market Power Mitigation & Reliability Requirements Determination

2.1.1 Market Power Mitigation & Reliability Requirements Determination Market Power Mitigation & Reliability Requirements Determination 2.1.1 Market Power Mitigation & Reliability Requirements Determination The Market Power Mitigation and Reliability Requirements Determination (MPM-RRD) function consists of two processes. The MPM is to

More information

Day Ahead Market Enhancements: Issue Paper/Straw Proposal

Day Ahead Market Enhancements: Issue Paper/Straw Proposal Day Ahead Market Enhancements: Issue Paper/Straw Proposal Don Tretheway Senior Advisor, Market Design Policy Megan Poage Senior Market Design & Regulatory Policy Developer March 7, 2018 Agenda Time Topic

More information

Price Correction Report Week of Nov 30-Dec 4, 2015

Price Correction Report Week of Nov 30-Dec 4, 2015 Overview This document is intended to meet the requirements of ISO Tariff section 35.6, and provides the Market Participants with a summary of all price corrections that occured during the week. For example,

More information

Day Ahead Market Enhancements: Revised Straw Proposal. April 18, 2018

Day Ahead Market Enhancements: Revised Straw Proposal. April 18, 2018 Day Ahead Market Enhancements: Revised Straw Proposal April 18, 2018 Agenda Time Topic Presenter 10:00 10:15 Welcome and Introductions Kristina Osborne 10:15 11:00 General Overview Megan Poage 11:00 12:00

More information

June 23, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

June 23, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 June 23, 2016 Re: California Independent

More information

Local Market Power Mitigation Options Under Convergence Bidding

Local Market Power Mitigation Options Under Convergence Bidding California Independent System Operator Corporation I. Background Local Market Power Mitigation Options Under Convergence Bidding Department of Market Monitoring October 2, 2009 The introduction of convergence

More information

the most promising locations for new renewables in the Imperial CREZ.

the most promising locations for new renewables in the Imperial CREZ. March 3, 2016 Imperial Irrigation District (IID) appreciates the opportunity to comment on the California Independent System Operator (CAISO) presentation during its 2/18/16 Stakeholder meeting discussing

More information

Renewables and electricity market design

Renewables and electricity market design Peter Cramton University of Cologne and University of Maryland 11 May 2018 Renewables and electricity market design 1 Goal of electricity markets: Reliable electricity at least cost Short-run efficiency

More information

Stepped Constraint Parameters. Issue Paper

Stepped Constraint Parameters. Issue Paper Stepped Constraint Parameters May 5, 2016 Table of Contents 1. Introduction... 3 2. Plan for Stakeholder Engagement... 4 3. Transmission constraint relaxation parameter... 5 4. Shift factor effectiveness

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 34. Real-Time Market... 2 34.1 Inputs To The Real-Time Market... 3 34.2 Real-Time Unit Commitment... 3 34.2.1 Commitment Of Fast Start And Short Start Units... 4 34.2.2 Real-Time Ancillary

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 30. Bid and Self-Schedule Submission for all CAISO Markets... 2 30.1 Bids, Including Self-Schedules... 2 30.1.1 Day-Ahead Market... 2 30.1.2 Real-Time Market... 2 30.2 Bid Types... 3

More information

California ISO 2009 Annual Report on Market Issues and Performance

California ISO 2009 Annual Report on Market Issues and Performance California Independent System Operator Corporation California ISO 2009 Annual Report on Market Issues and Performance Special Revised Executive Summary June 30, 2010 Prepared by: Department of Market Monitoring

More information

Western Power Trading Forum comments on CRR Analysis. Ellen Wolfe for WPTF December 19,

Western Power Trading Forum comments on CRR Analysis. Ellen Wolfe for WPTF December 19, Western Power Trading Forum comments on CRR Analysis Ellen Wolfe for WPTF December 19, 2017 ewolfe@resero.com 916 791-4533 Summary Study is thorough and points to a number of underlying drivers Study did

More information

Utah Compressed Air Energy Storage (CAES) Project Phase 1 Economic Evaluation using PLEXOS

Utah Compressed Air Energy Storage (CAES) Project Phase 1 Economic Evaluation using PLEXOS Utah Compressed Air Energy Storage () Project Phase 1 Economic Evaluation using PLEXOS Tao Guo, Ph.D., Regional Director, WEST Coast - USA Guangjuan Liu, Ph.D., Senior Consultant Xiaolong Wang, Consultant

More information

Price Formation. Eric Ciccoretti Attorney-Advisor Office of Energy Policy and Innovation Federal Energy Regulatory Commission June 13, 2017

Price Formation. Eric Ciccoretti Attorney-Advisor Office of Energy Policy and Innovation Federal Energy Regulatory Commission June 13, 2017 Price Formation Eric Ciccoretti Attorney-Advisor Office of Energy Policy and Innovation Federal Energy Regulatory Commission June 13, 2017 The views and opinions presented are mine alone and do not reflect

More information

Flexible Resource Adequacy Criteria and Must Offer Obligation Working Group Meeting

Flexible Resource Adequacy Criteria and Must Offer Obligation Working Group Meeting Flexible Resource Adequacy Criteria and Must Offer Obligation Working Group Meeting Karl Meeusen, Ph.D. September 26, 2017 2017 CAISO - Public Page 1 FRACMOO 2 Working Group Meeting Agenda 9/26/2017 Time

More information

Opportunity Cost of Flexible Ramping Constraint. Draft Final Proposal

Opportunity Cost of Flexible Ramping Constraint. Draft Final Proposal Opportunity Cost of Flexible Ramping Constraint Draft Final Proposal July 20, 2011 Opportunity Cost of Flexible Ramping Constraint Draft Final Proposal Table of Contents 1 Introduction... 3 2 Changes from

More information

Docket Nos. ER and EL September 2018 Exceptional Dispatch Report (Chart 1 data)

Docket Nos. ER and EL September 2018 Exceptional Dispatch Report (Chart 1 data) California Independent System Operator Corporation November 15, 2018 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 Frist Street, NE Washington, DC 20426 Re: California

More information

Energy Imbalance Market Year 1 Enhancements

Energy Imbalance Market Year 1 Enhancements Energy Imbalance Market Year 1 Enhancements Don Tretheway Lead Market Design and Regulatory Policy Developer February 18, 2015 Agenda Time Topic Presenter 10:00 10:15 Introduction Kristina Osborne 10:15

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 8. Ancillary Services... 3 8.1 Scope... 3 8.2 Ancillary Services Standards... 4 8.2.1 Determination of Ancillary Service Standards... 4 8.2.2 Time-Frame for Revising Ancillary Service

More information

Flexible Ramping Products and Cost Allocation

Flexible Ramping Products and Cost Allocation Flexible Ramping Products and Cost Allocation Revised Straw Proposal, December 5, 2011 Lin Xu, Ph.D. Senior Market Development Engineer and Donald Tretheway Senior Market Design and Policy Specialist Agenda

More information

MARKET ISSUES BULLETIN

MARKET ISSUES BULLETIN Fifteen Minute Schedules Settlement Date: April 27 th, 201 www.caiso.com 250 Outcropping Way, Folsom, CA 95630 916.351.4400 Author: Table of Contents EXECUTIVE SUMMARY... 3 BACKGROUND... 3 MARKET ISSUE...

More information

Convergence Bidding Monitoring Process Walkthrough. January 13, 2011

Convergence Bidding Monitoring Process Walkthrough. January 13, 2011 Convergence Bidding Monitoring Process Walkthrough January 13, 2011 Agenda Overview Convergence Bidding Monitoring Scenarios Market Impact Reporting and Analysis Operational Monitoring Settlements Proactive

More information

Third Generation California Electricity Market Design

Third Generation California Electricity Market Design Third Generation California Electricity Market Design Dr. Chris Mensah-Bonsu Senior Market Design Engineer California ISO San Francisco Chapter Meeting IEEE Power Engineering Society San Francisco, California,

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents California Independent System Operator Corporation 8. Ancillary Services... 3 8.1 Scope... 3 8.2 Ancillary Services Standards... 4 8.2.1 Determination Of Ancillary Service Standards...

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents 31. Day-Ahead Market... 2 31.1 Bid Submission and Validation in the Day-Ahead Market... 2 31.2 Day-Ahead MPM Process... 2 31.2.1 The Market Power Mitigation Process... 3 31.2.2 Bid Mitigation

More information

Spring 2014 Release Training

Spring 2014 Release Training Spring 2014 Release Training January 22 and 23, 2014 Cynthia Hinman California ISO The information contained in these materials is provided for general information only and does not constitute legal or

More information

Docket Nos. ER and EL November 2018 Exceptional Dispatch Report (Chart 1 data)

Docket Nos. ER and EL November 2018 Exceptional Dispatch Report (Chart 1 data) California Independent System Operator Corporation January 15, 2019 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 Frist Street, NE Washington, DC 20426 Re: California

More information

5-Minute Settlements Roadmap

5-Minute Settlements Roadmap 5-Minute Settlements Roadmap As of March 20, 2018 www.pjm.com Overview Proposed implementation date now April 1, 2018 FERC Order 825 Sub-Hourly Settlements Align settlement and dispatch intervals by: Settling

More information

Competitive Wholesale Electricity Market, Transactions, Pricing and LMP Decomposition

Competitive Wholesale Electricity Market, Transactions, Pricing and LMP Decomposition Competitive Wholesale Electricity Market, Transactions, Pricing and LMP Decomposition Chris Mensah-Bonsu, Ph.D., Principal Consulting Advisor GRIDCo Bernard Modey, Director, System Operations - GRIDCo

More information

Price Inconsistency Market Enhancements. Draft Final Proposal

Price Inconsistency Market Enhancements. Draft Final Proposal Price Inconsistency Market Enhancements Draft Final Proposal August 31, 2012 Price Inconsistency Market Enhancements Table of Contents 1 Introduction... 4 2 Plan for Stakeholder Engagement... 4 3 Background...

More information

Intertie Deviation Settlement. Addendum to Draft Final Proposal

Intertie Deviation Settlement. Addendum to Draft Final Proposal Intertie Deviation Settlement Addendum to Draft Final Proposal January 7, 2018 Introduction The CAISO held a stakeholder call on December 19, 2018 to discuss the draft final proposal for the Intertie Deviation

More information

Flexible Resource Adequacy Criteria and Must Offer Obligation Phase 2. Revised Draft Framework Proposal

Flexible Resource Adequacy Criteria and Must Offer Obligation Phase 2. Revised Draft Framework Proposal Flexible Resource Adequacy Criteria and Must Offer Obligation Phase 2 Revised Draft Framework Proposal Karl Meeusen, Ph.D. Stakeholder Meeting February 7, 2018 FRACMOO 2 Stakeholder Meeting Agenda 2/7/2018

More information

Conceptual Design for Convergence Bidding

Conceptual Design for Convergence Bidding Conceptual Design for Convergence Bidding Margaret Miller Senior Market and Product Economist Market Surveillance Committee Meeting/ Stakeholder Meeting June 6, 2007 Agenda - Convergence Bidding Additionally,

More information

6.1.9 IFM Initial Conditions

6.1.9 IFM Initial Conditions 6.1.9 IFM Initial Conditions A Generating Unit that was committed in the previous day s Day-Ahead Market (IFM or RUC) run (TD-2 for TD-1) but was de-committed before HE24 would normally be considered initially

More information

California ISO Operating Procedures Index List

California ISO Operating Procedures Index List California ISO Operating s Index List Number Title Version 1210 Running the Day-Ahead 17.4 9/28/2017 þ o o o 1310 1210B Units Requiring Staggered Start-Up or Staggered Shut Down (Includes ELC and Day Ahead

More information

Extended Short-Term Unit Commitment. Issue Paper/Straw Proposal

Extended Short-Term Unit Commitment. Issue Paper/Straw Proposal Extended Short-Term Unit Commitment May 15, 2018 Intentionally left blank CAISO/MDP/M.Poage & B.Dean Page 2 May 15, 2018 Extended STUC Issue Paper & Straw Proposal Table of Contents 1. Purpose... 4 1.1.

More information

Energy Storage and Distributed Energy Resources Phase 3

Energy Storage and Distributed Energy Resources Phase 3 Energy Storage and Distributed Energy Resources Phase 3 Revised Straw Proposal April 30, 2018 Market & Infrastructure Policy Table of Contents 1 Introduction... 3 2 Stakeholder Process... 4 3 Energy Imbalance

More information

Powerex Comments on CAISO October 31, 2013 Revised Draft Order No. 764 Tariff Changes. Submitted By Company Date Submitted Gifford Jung

Powerex Comments on CAISO October 31, 2013 Revised Draft Order No. 764 Tariff Changes. Submitted By Company Date Submitted Gifford Jung Powerex Comments on CAISO October 31, 2013 Revised Draft Order No. 764 Tariff Changes Submitted By Company Date Submitted Gifford Jung 604-891-6040 Powerex Corp. November 12, 2013 I. INTRODUCTION Powerex

More information

Price Correction Report Week of April 9 April 13, 2018, 2017

Price Correction Report Week of April 9 April 13, 2018, 2017 Overview Price Correction Report This document is intended to meet the requirements of ISO Tariff section 35.6, and provides the Market Participants with a summary of all price corrections that occured

More information

The DAM consists of the following functions performed in sequence: the MPM-RRD, IFM, and RUC.

The DAM consists of the following functions performed in sequence: the MPM-RRD, IFM, and RUC. FERC ELECTRIC TARIFF First Revised Sheet No. 589 FOURTH REPLACEMENT VOLUME NO. I Superseding Original Sheet No. 589 31 Day-Ahead Market. The DAM consists of the following functions performed in sequence:

More information

Self-Schedules Bid Cost Recovery Allocation and Lower Bid Floor

Self-Schedules Bid Cost Recovery Allocation and Lower Bid Floor Summary Self-Schedules Bid Cost Recovery Allocation and Lower Bid Floor Draft Final Proposal Comments by Department of Market Monitoring August 23, 2016 The ISO proposal to lower the energy bid floor from

More information

Energy Imbalance Market Update

Energy Imbalance Market Update Energy Imbalance Market Update Topics Covered: Background Implementation Update & Timeline Operational Overview Settlements Overview Appendix A - Charge Codes & Allocation Method Appendix B Information

More information

5-Minute Settlements. As of September PJM 2017

5-Minute Settlements. As of September PJM 2017 5-Minute Settlements As of September 2017 Overview FERC Order 825 Sub-Hourly Settlements Align settlement and dispatch intervals by: Settling energy transactions in its real-time markets at the same time