Request for a Technical Amendment to Industrial Emissions licence Register No. P , held by MSD International GMBH, CRO No.

Size: px
Start display at page:

Download "Request for a Technical Amendment to Industrial Emissions licence Register No. P , held by MSD International GMBH, CRO No."

Transcription

1 This report has been cleared for submission by Sean O'Donoghue. Grainne Power, 20/05/ :54 OFFICE OF ENVIRONMENTAL SUSTAINIBILITY To: FROM: C.C: Licensing Programme Memorandum Mr. Dara Lynott, Director Gavin Clabby Frank Clinton DATE: 20 May 2016 RE: Background Request for a Technical Amendment to Industrial Emissions licence Register No. P , held by MSD International GMBH, CRO No MSD international GMBH (hereafter referred to as MSD, or the licensee) has requested a Technical Amendment (TA) to Industrial Emissions Licence Reg No. P , relating to emissions to air. MSD was originally licensed on the 29 December Numerous revised licences (and amendments) have subsequently been issued by the Agency; with the most recent licence (P ) issued on the 12 January The installation is currently licensed under class of the First Schedule of the EPA Act 1992 as amended.the licensable activity is the bulk manufacture of active pharmaceutical ingredients (APIs). The installation is located at Kilsheelan, Ballydine, approximately 15km from Clonmel in South Tipperary and operates on a 24 hour basis. Technical Amendment Request MSD submitted a request to the Agency, on the 21 April 2016, for a TA to its licence. As part of Phase 1 of a boiler replacement project the licensee proposes to install a new twin core boiler emissions stack for a new replacement boiler, which will ultimately replace the existing stack. 2 1 Class 5.16 (The production of pharmaceutical products including intermediates) is the main class of activity at the installation; other classes of activity are; 11.2(e), 11.6, 11.2 (c) and 11.1 which relate to the recovery or disposal of waste. 2 In Phase 1 a new boiler will replace one of three existing boilers at the installation. This new boiler will discharge to air through the proposed new emission point A1-2A. The two remaining old boilers will continue to discharge through the existing licenced emission point A1-1. In Phase 2 (2018) an additional new boiler will replace the two old boilers and will also discharge through A1-2A (rendering A1-1 redundant). Only the Phase 1 alterations are being considered in this assessment; the required licence amendments for Phase 2 will form part of a separate licence alteration request. Page 1 of 5

2 The licensee wishes to have licence P amended to incorporate this new emission point and associated emissions. There are no additional emissions associated with this licence alteration request. Assessment For this TA request, the licensee provided the following information: Details of the requested alteration Supporting information relating to prior contact with the Office of Environmental Enforcement (OEE) Details of the relevant current and proposed schedules in the licence Tabular information on the relevant current and proposed emission points Detailed report on the boiler replacement project Air quality impact assessment report Screening for Appropriate Assessment for proposed boiler and associated stack Confirmation from planning authority that EIA was not required From the above information it can be determined that the alteration request relates to a replacement boiler and associated stack, and that there no additional emissions. Furthermore, it is evident from the proposed schedules that the replacement boiler will result in the reduction of mass emissions from the installation. (Examination of the proposed schedules shows that the sum of the combined volumetric flow limits, from A1-1 and the proposed A1-2A, is less than the volumetric flow limits currently permitted for A1-1, while at the same time, the proposed concentration limits for A1-2A are identical to A1-1.) The air quality impact assessment report submitted by the licensee, incorporated air modelling 3 which demonstrated that the proposed alterations will not result in any off-site exceedances of the relevant air quality standards. A letter from the planning authority (Tipperary County Council) included with the alteration request, confirmed that an environmental impact assessment was not required for the replacement boiler and associated stack. An Appropriate Assessment screening report included with the alteration request, concluded that there is no likely significant effects on any European sites arising from the Phase 1 boiler replacement project. The Agency has also carried an Appropriate Assessment screening of the project, which is detailed below. 3 The modelling approach was based on the adoption of the following worst case scenario : The three boilers (two existing, via A1-1 and one new, via A1-2a) and the remaining licenced combustion emission points, RTO No. 4 and TO No. 3, operating at full load, for 24hrs per day and 365 days per year. According to the licensee, the reality is that all 3 boilers will not operate in unison; the typical operating scenario during Phase 1 will entail only the new replacement boiler (A1-2a) running on full load, and one of the two existing boilers (A1-1) operating on running standby at any one time. Also, in the event that the new boiler is offline for maintenance then the fall-back position is that one of the existing boilers will be the duty boiler with the second boiler in running standby mode. Page 2 of 5

3 Appropriate Assessment The installation is located in the valley floor of the River Suir approximately mid-way between Clonmel and Carrick-on-Suir in South Tipperary. It is bounded on its southern end by the River Suir and on the northern side by the main Limerick to Waterford Road. The activity as a whole was screened for Appropriate Assessment as part of the last review of the licence (P ). The proposed alterations to this licence are limited to air emissions from the activity, which result in the reduction of the overall permitted emissions to air from the installation. Consequently, there are three European sites considered within the zone of influence (within 15 km) of the proposed alterations to the activity: the Lower River Suir SAC (site code: ); the Nire Valley Woodlands SAC (site code: ) and Comeragh Mountains SAC (site code: ). A screening for Appropriate Assessment was undertaken to assess, in view of best scientific knowledge and the conservation objectives of the site, if the activity, individually or in combination with other plans or projects is likely to have a significant effect on any European Site. In this context, particular attention was paid to the European sites on the Lower River Suir (002137), in the Nire Valley woodlands (000608) and the Comeragh Mountains (001952), and the Agency considered, for the reasons set out below, the proposed activity is not directly connected with or necessary to the management of those sites as European Sites and that it can be excluded on the basis of objective scientific information, that the proposed activity, individually or in combination with other plans or projects, will have a significant effect on any European site, and accordingly the Agency determined that an Appropriate Assessment of the proposed activity is not required. This determination is based on the nature and scale of the proposed alterations to the activity. The licence, as altered by this technical amendment, is not expected to result in the activity having an impact on the European sites listed above. The altered licence does not permit any additional discharge of pollutants to the receiving environment. Given the nature of the proposed activity and the potential reduction in emissions from the installation, it has been determined that there will be no resulting significant negative impact on the designated European Sites as a result of the proposed amendments. Recommendation For the reasons outlined above I recommend that the requested licence amendment be approved under Section 96(1)(c) of the EPA Acts as amended, as set out in the attached Recommended Technical Amendment. Signed: Gavin Clabby Page 3 of 5

4 Inspector, OES. Appendix European Site (site code) Distance/ Direction from installation Qualifying interests (* denotes a priority habitat) objectives Atlantic salt meadows (Glauco- Puccinellietalia maritimae) [1330] Mediterranean salt meadows (Juncetalia maritimi) [1410] Water courses of plain to montane levels with the Ranunculion fluitantis and Callitricho-Batrachion vegetation [3260] objectives for Lower River Suir SAC [002137]. Generic Version 4.0 Hydrophilous tall herb fringe communities of plains and of the montane to alpine levels [6430] Old sessile oak woods with Ilex and Blechnum in the British Isles [91A0] Alluvial forests with Alnus glutinosa and Fraxinus excelsior (Alno-Padion, Alnion incanae, Salicion albae)* [91E0] Taxus baccata woods of the British Isles* [91J0] Species: Freshwater Pearl Mussel Margaritifera margaritifera [1029] White-clawed Crayfish Austropotamobius pallipes [1092] Sea Lamprey Petromyzon marinus [1095] Brook Lamprey Lampetra Page 4 of 5

5 planeri [1096] River Lamprey Lampetra fluviatilis [1099] Twaite Shad Alosa fallax fallax [1103] Salmon Salmo salar [1106] Nire Valley Woodlands SAC (Site ) code: 11 km approx. Otter Lutra lutra [1355] Old sessile oak woods with Ilex and Blechnum in the British Isles [91A0] objectives for the Nire Valley Woodlands SAC [000608]. Generic Version 4.0 Comeragh Mountains SAC (001952) 8 km approx. Oligotrophic to mesotrophic standing waters with vegetation of the Littorelletea uniflorae and/or Isoeto-Nanojuncetea [3130] Water courses of plain to montane levels with the Ranunculion fluitantis and Callitricho-Batrachion vegetation [3260] objectives for the Comeragh Mountains SAC [001952]. Generic Version 4.0 Northern Atlantic wet heaths with Erica tetralix [4010] European dry heath [4030] Alpine and Boreal heaths [4060] Calcareous rocky slopes with chasmophytic vegetation [8210] Species: Slender Green Feather-moss Drepanocladus vernicosus [1393] Page 5 of 5

OFFICE OF ENVIRONMENTAL SUSTAINABILITY

OFFICE OF ENVIRONMENTAL SUSTAINABILITY OFFICE OF ENVIRONMENTAL SUSTAINABILITY ENVIRONMENTAL LICENSING PROGRAMME TO: Directors FROM: Brian Meaney Environmental Licensing Programme DATE: 14 March 2016 RE: Technical Amendment to Industrial Emissions

More information

Irish Water Report. Natura Impact Statement as part of the Ballylynan Waste Water Discharge Licence Application: D

Irish Water Report. Natura Impact Statement as part of the Ballylynan Waste Water Discharge Licence Application: D Irish Water Report Natura Impact Statement as part of the Ballylynan Waste Water Discharge Licence Application: D0291-01 Contents Introduction 3 Legislative Context 3 Methodology 5 Guidance Followed 5

More information

1) TO: Dara Lynott, Director

1) TO: Dara Lynott, Director wa *o Environmental A n unhn mrtt vm Protectwn Ckmnm bmhhwr! 0 F F I C I This memo has been cleared for submission to the Director by Programme Marjager, Frank Clinton Signed : cxm:,,

More information

APPENDIX I NATURA IMPACT STATEMENT

APPENDIX I NATURA IMPACT STATEMENT APPENDIX I NATURA IMPACT STATEMENT IN SUPPORT OF THE APPROPRIATE ASSESSMENT OF THE PROPOSED MULKEAR VIEW DEVELOPMENT NEWPORT, CO. TIPPERARY IN ACCORDANCE WITH THE REQUIREMENTS OF ARTICLE 6(3) OF THE EU

More information

Appropriate Assessment. Prepared by RPS on behalf of Clonmel Borough Council & South Tipperary County Council.

Appropriate Assessment. Prepared by RPS on behalf of Clonmel Borough Council & South Tipperary County Council. Appropriate Assessment Prepared by RPS on behalf of Clonmel Borough Council & South Tipperary County Council. TABLE OF CONTENTS Executive Summary... 5 1. Introduction... 6 1.1 Appropriate Assessment of

More information

APPROPRIATE ASSESSMENT SCREENING REPORT

APPROPRIATE ASSESSMENT SCREENING REPORT APPROPRIATE ASSESSMENT SCREENING REPORT For the Proposed Increase in Compost Throughput at Existing Miltown Composting Facility ISSUE/REVISION INDEX Revision # Prep. Rev. Date Pages Revised Remarks PA

More information

National Parks and Wildlife Service

National Parks and Wildlife Service ISSN 2009-4086 National Parks and Wildlife Service Conservation Objectives Series Lower River Suir SAC 002137 Page 1 of 35 National Parks and Wildlife Service, Department of Arts, Heritage, Regional, Rural

More information

Appropriate Assessment. Natura Impact Report

Appropriate Assessment. Natura Impact Report Appropriate Assessment Natura Impact Report for the proposed Variation No.1 (Strandhill Mini-Plan) of the Sligo County Development Plan 2011-2017 Prepared by 5 February 2013 Contents 1. Introduction 1

More information

Environmental Report Appendices for Laois-Kilkenny Reinforcement Project

Environmental Report Appendices for Laois-Kilkenny Reinforcement Project Environmental Report Appendices for Laois-Kilkenny Reinforcement Project Appendix 6.2 Natura Impact Statement Laois Kilkenny Reinforcement Project Environmental Reports Natura Impact Statement Submission

More information

Proposed bus/car park and a new footpath / cycle lane from this site at Rock road to connect to High street junction and ancillary site works

Proposed bus/car park and a new footpath / cycle lane from this site at Rock road to connect to High street junction and ancillary site works Proposed bus/car park and a new footpath / cycle lane from this site at Rock road to connect to High street junction and ancillary site works Appropriate Assessment Screening Report November 2017 Brief

More information

See Tables 3.4a (for SACs) and 3.4b (for SPAs) regarding potential impacts.

See Tables 3.4a (for SACs) and 3.4b (for SPAs) regarding potential impacts. Natura 2000 Site Code OWENRIFF CATCHMENT Natura 2000 Sites Natura 2000 Site Qualifying features Key Environmental conditions to support site integrity Possible impacts arising from the Sub-Basin Plan 1095

More information

Sligo County Council. Proposed Amendments to. Tobercurry Local Area Plan Habitats Directive Assessment Screening Statement

Sligo County Council. Proposed Amendments to. Tobercurry Local Area Plan Habitats Directive Assessment Screening Statement Sligo County Council Proposed Amendments to Tobercurry Local Area Plan 2015-2021 Habitats Directive Assessment Screening Statement Prepared by the Heritage Office of Sligo County Council 25 September 2015

More information

NATURA IMPACT REPORT: APPENDIX I

NATURA IMPACT REPORT: APPENDIX I NATURA IMPACT REPORT: APPENDIX I IN SUPPORT OF THE APPROPRIATE ASSESSMENT OF THE PROPOSED MATERIAL ALTERATIONS (NO. 1, 2, 3 AND 11) TO THE DRAFT TUAM LOCAL AREA PLAN 2018-2024 IN ACCORDANCE WITH THE REQUIREMENTS

More information

2015 Drought Plan. HRA Screening Report. July 2015

2015 Drought Plan. HRA Screening Report. July 2015 2015 Drought Plan HRA Screening Report July 2015 In this HRA scoping study, we have reviewed the drought options developed within the main report of our drought plan and assessed their potential impact

More information

APPENDIX I APPROPRIATE ASSESSMENT DRAFT TUAM LOCAL AREA PLAN OF SCREENING REPORT. Galway County Council. for: CAAS Ltd.

APPENDIX I APPROPRIATE ASSESSMENT DRAFT TUAM LOCAL AREA PLAN OF SCREENING REPORT. Galway County Council. for: CAAS Ltd. APPENDIX I OF SCREENING REPORT IN SUPPORT OF THE APPROPRIATE ASSESSMENT FOR THE DRAFT TUAM LOCAL AREA PLAN 2018-2024 IN ACCORDANCE WITH THE REQUIREMENTS OF ARTICLE 6(3) OF THE EU HABITATS DIRECTIVE for:

More information

Screening for Appropriate Assessment Proposed residential development at Slievekeale, Waterford City. 13 April 2018

Screening for Appropriate Assessment Proposed residential development at Slievekeale, Waterford City. 13 April 2018 Proposed residential development at City 13 April 2018 NM Ecology Ltd Consultant Ecologists 276 Harold s Grange Road, Dublin 16 Website: www.nmecology.com Email: info@nmecology.com Tel: 087 6839771 Executive

More information

Irish Water Report. Natura Impact Statement as part of the Riverstown Waste Water Certificate of Authorisation

Irish Water Report. Natura Impact Statement as part of the Riverstown Waste Water Certificate of Authorisation Irish Water Report Natura Impact Statement as part of the Riverstown Waste Water Certificate of Authorisation Contents Introduction 4 Legislative Context 4 Methodology 6 Guidance Followed 6 Stages Involved

More information

Low Hanging Fruits. Mora Aronsson ETC-BD/SLU

Low Hanging Fruits. Mora Aronsson ETC-BD/SLU Mora Aronsson ETC-BD/SLU 2016-10-5/7 Vilnius Low Hanging Fruits (Vilnius 2016-10-5/7) Mora Aronsson ETC-BD/SLU A short history Background LHF Method Result Further work A short history First round of Natura

More information

Habitats Regula ons Assessment. Callow & Haywood Group Neighbourhood Area

Habitats Regula ons Assessment. Callow & Haywood Group Neighbourhood Area Habitats Regula ons Assessment Callow & Haywood Group Neighbourhood Area November 2014 Contents 1.0 Introduction 1 2.0 The requirement to undertake HRA of NDPs 2 3.0 Methodology 3 4.0 Results of the initial

More information

7. Update the Natura Impact Statement (NIS) to address emissions from the Bioatlantis operation [Regulation 9(2)(k)].4.

7. Update the Natura Impact Statement (NIS) to address emissions from the Bioatlantis operation [Regulation 9(2)(k)].4. NCCCL Licence Application P1051-01 Request for Further Information Feb 2017 AWN Consulting Limited 7. Update the Natura Impact Statement (NIS) to address emissions from the Bioatlantis operation [Regulation

More information

Possible impacts arising. See Tables 3.4a (for SACs) and 3.4b (for SPAs) regarding potential impacts.

Possible impacts arising. See Tables 3.4a (for SACs) and 3.4b (for SPAs) regarding potential impacts. Natura 2000 Site Code IE000330 DAWROD CATCHMENT Natura 2000 Sites Tully Mountain SAC Natura 2000 Site Qualifying features Key Environmental conditions to support site integrity 4030 European dry heaths

More information

Appropriate Assessment Screening Dysert Bridge, Co. Kerry

Appropriate Assessment Screening Dysert Bridge, Co. Kerry Appropriate Assessment Screening Dysert Bridge, Co. Kerry November 2016 rpsgroup.com/ireland Kerry, Cork and Clare Bridge Rehabilitations, 2016: AA Screening Dysert Bridge, Co. Kerry Document Control Sheet

More information

WASTE WATER DISCHARGE LICENCE INSPECTORS REPORT D

WASTE WATER DISCHARGE LICENCE INSPECTORS REPORT D This Report has been cleared for submission to the Board by Dr. Karen Creed, Senior Inspector Signed: 06/08/2013 U D0026-01 Mew (inlbkdl OFFICE OF CLIMATE, LICENSING & 1 RESOURCE USE. WASTE WATER DISCHARGE

More information

APPROPRIATE ASSESSMENT SCREENING REPORT

APPROPRIATE ASSESSMENT SCREENING REPORT APPROPRIATE ASSESSMENT SCREENING REPORT For the Proposed use of an Existing Integrated Constructed Wetland (ICW) at the Miltown Composting Licensed Site (Ref. W0270-01) for the Discharge of Surface Water

More information

Offaly County Development Plan

Offaly County Development Plan Offaly County Development Plan 2014 2020 Natura Impact Report Prepared for Offaly County Council 27 th November 2014 This report has been prepared by Doherty Environmental with all reasonable skill, care

More information

@Pa TO : OFFICE OF ENVIRONMENTAL SUSTAIN ABILITY. Page 1 of5. Director. Environmental Licensing Programme

@Pa TO : OFFICE OF ENVIRONMENTAL SUSTAIN ABILITY. Page 1 of5. Director. Environmental Licensing Programme This report has been cleared for submission by Sean O'Donoghue. Eve O'Sullivan, 03/10/2016 14:17 @Pa b. Lnvimnrnrnrat L."*-rl&.. Pmtection m-w '&M Merry OFFICE OF ENVIRONMENTAL SUSTAIN ABILITY TO : Director

More information

National Parks and Wildlife Service

National Parks and Wildlife Service National Parks and Wildlife Service Conservation Objectives River Barrow and River Nore SAC 002162 Page 1 of 39 Introduction The overall aim of the Habitats Directive is to maintain or restore the favourable

More information

Ems Niedersachsen - Near-natural river dynamics on the River Ems in Lower Saxony LIFE03 NAT/D/000006

Ems Niedersachsen - Near-natural river dynamics on the River Ems in Lower Saxony LIFE03 NAT/D/000006 Ems Niedersachsen - Near-natural river dynamics on the River Ems in Lower Saxony LIFE03 NAT/D/000006 Project description Environmental issues Beneficiaries Administrative data Read more Contact details:

More information

CLIFDEN LOCAL AREA PLAN

CLIFDEN LOCAL AREA PLAN APPENDIX I OF THE NATURA IMPACT REPORT IN SUPPORT OF THE APPROPRIATE ASSESSMENT OF THE CLIFDEN LOCAL AREA PLAN 2018-2024 IN ACCORDANCE WITH THE REQUIREMENTS OF ARTICLE 6(3) OF THE EU HABITATS DIRECTIVE

More information

SLIGO COUNTY DEVELOPMENT PLAN APPROPRIATE ASSESSMENT - SCREENING REPORT - Sligo County Council. CAAS Ltd.

SLIGO COUNTY DEVELOPMENT PLAN APPROPRIATE ASSESSMENT - SCREENING REPORT - Sligo County Council. CAAS Ltd. SLIGO COUNTY DEVELOPMENT PLAN 2011-2017 APPROPRIATE ASSESSMENT - SCREENING REPORT - IN ACCORDANCE WITH THE REQUIREMENTS OF ARTICLE 6(3) OF THE EU HABITATS DIRECTIVE for: Sligo County Council County Hall

More information

APPROPRIATE ASSESSMENT SCREENING REPORT APPENDIX I PROPOSED MATERIAL ALTERATIONS DRAFT CLIFDEN LOCAL AREA PLAN Galway County Council.

APPROPRIATE ASSESSMENT SCREENING REPORT APPENDIX I PROPOSED MATERIAL ALTERATIONS DRAFT CLIFDEN LOCAL AREA PLAN Galway County Council. APPROPRIATE ASSESSMENT SCREENING REPORT APPENDIX I FOR PROPOSED MATERIAL ALTERATIONS TO THE DRAFT CLIFDEN LOCAL AREA PLAN 2018-2024 IN ACCORDANCE WITH THE REQUIREMENTS OF ARTICLE 6(3) OF THE EU HABITATS

More information

Lady's slipper - Conservation of Cypripedium calceolus and Saxifraga hirculus in Northern Finland LIFE00 NAT/FIN/007059

Lady's slipper - Conservation of Cypripedium calceolus and Saxifraga hirculus in Northern Finland LIFE00 NAT/FIN/007059 Lady's slipper - Conservation of Cypripedium calceolus and Saxifraga hirculus in Northern Finland LIFE00 NAT/FIN/007059 Project description Environmental issues Beneficiaries Administrative data Read more

More information

TTACH 0. Consent of copyright owner required for any other use. For inspection purposes only. EPA Export :23:45:39

TTACH 0. Consent of copyright owner required for any other use. For inspection purposes only. EPA Export :23:45:39 TTACH I EPA Export 6-6-213:23:45:39 ' EPA Export 6-6-213:23:45:39 Aughinish Alumina Extraction Plant, Installation of Gas Fired Boilers and Exhaust Stacks Appropriate Assessment Screening Report Client:

More information

River Blackwater SAC Management Plan

River Blackwater SAC Management Plan IRD DuhallowLIFE+ (LIFE09 NAT/IE/000220 Blackwater SAMOK) Page 1 River Blackwater Special Area of Conservation (SAC: 002170) Management Plan IRD Duhallow LIFE Project (Blackwater SAM OK LIFE09 NAT/IE/000220)

More information

IN SUPPORT OF THE FOR THE OF THE. Galway County Development Plan

IN SUPPORT OF THE FOR THE OF THE. Galway County Development Plan APPENDIX I OF NATURA IMPACT REPORT IN SUPPORT OF THE APPROPRIATE ASSESSMENT FOR THE PROPOSED VARIATION NO. 2(B) OF THE Galway County Development Plan 2015-2021 IN ACCORDANCE WITH THE REQUIREMENTS OF ARTICLE

More information

APPROPRIATE ASSESSMENT

APPROPRIATE ASSESSMENT APPENDIX 2 APPROPRIATE ASSESSMENT Carrick on Suir Town Council 178 P age Contents 1 Introduction to Habitats Directive and Article 6 Assessment...194 2 Guidance on the implementation of Article 6...195

More information

AN DAINGEAN (DINGLE) FISHERY HARBOUR, CO. KERRY DREDGING OF NAVIGATION CHANNEL

AN DAINGEAN (DINGLE) FISHERY HARBOUR, CO. KERRY DREDGING OF NAVIGATION CHANNEL AN DAINGEAN (DINGLE) FISHERY HARBOUR, CO. KERRY DREDGING OF NAVIGATION CHANNEL APPROPRIATE ASSESSMENT SCREENING REPORT MARCH 2017 NICHOLAS O'DWYER LTD. AN DAINGEAN (DINGLE) FISHERY HARBOUR, CO. KERRY DREDGING

More information

Houting - Urgent actions for the endangered Houting "Coregonus oxyrhunchus" LIFE05 NAT/DK/000153

Houting - Urgent actions for the endangered Houting Coregonus oxyrhunchus LIFE05 NAT/DK/000153 Houting - Urgent actions for the endangered Houting "Coregonus oxyrhunchus" LIFE05 NAT/DK/000153 Project description Environmental issues Beneficiaries Administrative data Read more Contact details: Project

More information

Project title: Sustainable land use management for the conservation of freshwater pearl mussel. Project acronym: LIFE Kerry (KerryLIFE)

Project title: Sustainable land use management for the conservation of freshwater pearl mussel. Project acronym: LIFE Kerry (KerryLIFE) Project title: Sustainable land use management for the conservation of freshwater pearl mussel Project acronym: LIFE Kerry (KerryLIFE) Program strand: Nature Expected start date: 01/07/2014 Expected end

More information

Invasive ligneous plant species in Danube Delta

Invasive ligneous plant species in Danube Delta Danube Delta National Institute for Research and Development Invasive ligneous plant species in Danube Delta Doroftei Mihai, Covaliov Silviu EUROPEAN WORKSHOP ON CONTROL AND ERADICATION OF INVASIVE ALIEN

More information

OFFICE OF ENVIRONMENTAL SUSTAINABILITY

OFFICE OF ENVIRONMENTAL SUSTAINABILITY This report has been cleared for submission by Patrick Byrne. Eve O'Sullivan, 21/11/2016 11:33 OFFICE OF ENVIRONMENTAL SUSTAINABILITY ENVIRONMENTAL LICENS ING PROGRAMME TO: FROM: Programme Manager Marian

More information

Supporting elements for. the Atlantic Natura 2000 review seminar

Supporting elements for. the Atlantic Natura 2000 review seminar Technical paper N 2/2016 Supporting elements for the Atlantic Natura 2000 review seminar (1 st part: Core document) Dominique Richard, Jérôme Bailly Maitre, Mora Aronsson & Luboš Halada 18 October 2016

More information

Appendix 1 - Distinctiveness Bands for the Biodiversity Offsetting Pilot

Appendix 1 - Distinctiveness Bands for the Biodiversity Offsetting Pilot Appendix 1 - Distinctiveness Bands for the Biodiversity Offsetting Pilot This Appendix is designed to be used alongside the Guidance for offset providers, and the Guidance for developers. Both these documents

More information

Cornwall & Isles of Scilly Shoreline Management Plan 2: Habitat Regulation Assessment Scoping Report Stage 2

Cornwall & Isles of Scilly Shoreline Management Plan 2: Habitat Regulation Assessment Scoping Report Stage 2 Cornwall & Isles of Scilly Shoreline Management Plan 2: Habitat Regulation Assessment Scoping Report Stage 2 July 2009 Draft Report 9T8801 Stratus House Emperor Way Exeter, Devon EX1 3QS United Kingdom

More information

Site Improvement Plan. River Kent SAC. Improvement Programme for England's Natura 2000 Sites (IPENS) Planning for the Future

Site Improvement Plan. River Kent SAC. Improvement Programme for England's Natura 2000 Sites (IPENS) Planning for the Future Improvement Programme for England's Natura 2000 Sites (IPENS) Planning for the Future Site Improvement Plan River Kent Site Improvement Plans (SIPs) have been developed for each Natura 2000 site in England

More information

LIFE ALNUS - Restoration, conservation and governance of the Alnus aluvial forests in the Mediterranean Region LIFE16 NAT/ES/000768

LIFE ALNUS - Restoration, conservation and governance of the Alnus aluvial forests in the Mediterranean Region LIFE16 NAT/ES/000768 LIFE ALNUS - Restoration, conservation and governance of the Alnus aluvial forests in the Mediterranean Region LIFE16 NAT/ES/000768 Project description Environmental issues Beneficiaries Administrative

More information

Proposed 38kV Underground Electric Grid Connection to permitted wind farm at Cullenagh, Co. Laois. Appropriate Assessment Screening

Proposed 38kV Underground Electric Grid Connection to permitted wind farm at Cullenagh, Co. Laois. Appropriate Assessment Screening Proposed 38kV Underground Electric Grid Connection to permitted wind farm at Cullenagh, Co. Laois Appropriate Assessment Screening July 2016 Proposed 38kV Underground Electric Grid Connection to permitted

More information

Appendix 8 Designated Site Natura 2000 Standard Data Forms

Appendix 8 Designated Site Natura 2000 Standard Data Forms Habitats Regulations Assessment Information to Inform an Appropriate Assessment: SAC Watercourses Appendix 8 Designated Site Natura 2000 Standard Data Forms Mouchel 2017 99 Site code: IE0002301 NATURA

More information

Natural Capital, Ecosystem Services and Local Environmental Records Centres

Natural Capital, Ecosystem Services and Local Environmental Records Centres Natural Capital, Ecosystem Services and Local Environmental Records Centres Jo Treweek/Bill Butcher ecountability Ltd Copyright ecountability Ltd 2017 1 Alister Hayes Acknowledgements The whole of this

More information

BRYNGLAS TUNNEL REFURBISHMENT PROJECT Statement to Inform the Appropriate Assessment (SIAA) FEBRUARY 2016

BRYNGLAS TUNNEL REFURBISHMENT PROJECT Statement to Inform the Appropriate Assessment (SIAA) FEBRUARY 2016 BRYNGLAS TUNNEL REFURBISHMENT PROJECT Statement to Inform the Appropriate Assessment (SIAA) FEBRUARY 2016 CONTACTS JOHN PHILLIPS Technical Advisor dd 029 2092 6700 df 02920 925281 m 07793980737 e John.Phillips@arcadis.com

More information

Habitats Regulations Appraisal Local Development Plan (At post examinations stage, in the form proposed for adoption) November 2016

Habitats Regulations Appraisal Local Development Plan (At post examinations stage, in the form proposed for adoption) November 2016 Habitats Regulations Appraisal Local Development Plan (At post examinations stage, in the form proposed for adoption) November 2016 1 CONTENTS SECTION 1 - INTRODUCTION... 4 SECTION 2 - REQUIREMENTS OF

More information

Site Improvement Plan. River Axe SAC. Improvement Programme for England's Natura 2000 Sites (IPENS) Planning for the Future

Site Improvement Plan. River Axe SAC. Improvement Programme for England's Natura 2000 Sites (IPENS) Planning for the Future Improvement for England's Natura 2000 Sites (IPENS) Planning for the Future Site Improvement Plan River Axe Site Improvement Plans (SIPs) have been developed for each Natura 2000 site in England as part

More information

Habitats Directive Article 6. Appropriate Assessment Screening. Camping Site Policy

Habitats Directive Article 6. Appropriate Assessment Screening. Camping Site Policy Habitats Directive Article 6 Appropriate Assessment Screening Camping Site Policy Proposed Variation No. 4 to; Waterford County Development Plan 2011-2017 Waterford City Development Plan 2013-2019 Dungarvan

More information

4 EXISTING ENVIRONMENT

4 EXISTING ENVIRONMENT 4 EXISTING ENVIRONMENT 4.1 GEOLOGY, HYDROLOGY & HYDROGEOLOGY The Geological Survey of Ireland (GSI) website and the Hydrogeology, Hydrology and Geology Screening Assessment prepared by Hydro Environmental

More information

Natura Impact Statement

Natura Impact Statement Limerick Smarter Travel Route 2: Natura Impact Statement January 2015 Limerick Smarter Travel Route 2 Shared Pedestrian and Cycleway Facility Natura Impact Statement Version: 13 th January 2015 (Final)

More information

Mark Horton Ballinderry AMI Coordinator. Presented by

Mark Horton Ballinderry AMI Coordinator. Presented by Mark Horton Ballinderry AMI Coordinator Presented by Laverne Bell Ballinderry Riverfly Monitoring Team Volunteer Eileen Mallon Northern Ireland Environment Agency The Ballinderry River, Co. Tyrone County

More information

Monitoring Potential Climateinduced Impacts on Woodland Habitats with Earth Observation Methods

Monitoring Potential Climateinduced Impacts on Woodland Habitats with Earth Observation Methods Image_ RapidEye Neusiedler See Monitoring Potential Climateinduced Impacts on Woodland Habitats with Earth Observation Methods Michael Förster, Tobias Schmidt, Birgit Kleinschmit Photo: author This project

More information

Appropriate Assessment Screening & Natura Impact Report on the Proposed Material Alterations to the Draft Headford Local Area Plan

Appropriate Assessment Screening & Natura Impact Report on the Proposed Material Alterations to the Draft Headford Local Area Plan Appropriate Assessment Screening & Natura Impact Report on the Proposed Material Alterations to the Draft Headford Local Area Plan 2015-2021 July 2015 Forward Planning Galway County Council Áras an Chontae

More information

A review of beaver (Castor spp.) impacts on biodiversity, and potential impacts following a reintroduction to Scotland

A review of beaver (Castor spp.) impacts on biodiversity, and potential impacts following a reintroduction to Scotland Scottish Natural Heritage Commissioned Report No. 815 A review of beaver (Castor spp.) impacts on biodiversity, and potential impacts following a reintroduction to Scotland COMMISSIONED REPORT Commissioned

More information

CORE MANAGEMENT PLAN INCLUDING CONSERVATION OBJECTIVES FOR AFONYDD CLEDDAU / CLEDDAU RIVERS SAC (SPECIAL AREA OF CONSERVATION)

CORE MANAGEMENT PLAN INCLUDING CONSERVATION OBJECTIVES FOR AFONYDD CLEDDAU / CLEDDAU RIVERS SAC (SPECIAL AREA OF CONSERVATION) CYNGOR CEFN GWLAD CYMRU COUNTRYSIDE COUNCIL FOR WALES CORE MANAGEMENT PLAN INCLUDING CONSERVATION OBJECTIVES FOR AFONYDD CLEDDAU / CLEDDAU RIVERS SAC (SPECIAL AREA OF CONSERVATION) Version: 8 (Minor map

More information

RECEIVING WATER IMPACT ASSESSMENT. Swan WwTP. For inspection purposes only. Draft: December Prepared on behalf of:

RECEIVING WATER IMPACT ASSESSMENT. Swan WwTP. For inspection purposes only. Draft: December Prepared on behalf of: Laois County Council RECEIVING WATER IMPACT ASSESSMENT Swan WwTP Draft: December 2009 Prepared on behalf of: WATER SERVICES LAOIS COUNTY COUNCIL County Hall Portlaoise Co. Laois Tait Business Centre; Dominic

More information

Irish Water VARTRY WATER SUPPLY PROJECT VARTRY RESERVOIR IMPROVEMENTS AA SCREENING REPORT

Irish Water VARTRY WATER SUPPLY PROJECT VARTRY RESERVOIR IMPROVEMENTS AA SCREENING REPORT Irish Water VARTRY WATER SUPPLY PROJECT VARTRY RESERVOIR IMPROVEMENTS AA SCREENING REPORT SEPTEMBER 2015 NICHOLAS O'DWYER LTD. VARTRY WATER SUPPLY PROJECT VARTRY RESERVOIR IMPROVEMENTS AA SCREENING REPORT

More information

2 PROJECT DESCRIPTION

2 PROJECT DESCRIPTION 2 PROJECT DESCRIPTION 2.1 LOCATION The proposed Connemara Greenway Clifden to Oughterard is located for the majority of its route along the dismantled Great Western Railway route from Oughterard to Clifden

More information

Habitats Regulation Compensation Package

Habitats Regulation Compensation Package Itchen Drought Order Habitats Regulation Compensation Package Draft 20 March 2018 This document has been prepared following consultation with the Environment Agency, Natural England and the Hampshire &

More information

ApPENDIX No. 26 ASSESSMENT OF SIGHTLINES AT ENTRANCE NRGE L TO, MOORESFORT, LATTIN, CO. TIPPERARY FUTURE PIGS LTD

ApPENDIX No. 26 ASSESSMENT OF SIGHTLINES AT ENTRANCE NRGE L TO, MOORESFORT, LATTIN, CO. TIPPERARY FUTURE PIGS LTD FUTURE PIGS LTD ApPENDIX No. 26 ASSESSMENT OF SIGHTLINES AT ENTRANCE MAY2010 NRGE L TO, MOORESFORT, LATTIN, CO. TIPPERARY EPA Export 27-08-2011:03:53:02 Assessment of Sightlines at the entrance to Future

More information

PROVISION OF INFORMATION TO SUPPORT SCREENING FOR APPROPRIATE ASSESSMENT OF VARIATION NO. 1 TO THE BOYLE LOCAL AREA PLAN

PROVISION OF INFORMATION TO SUPPORT SCREENING FOR APPROPRIATE ASSESSMENT OF VARIATION NO. 1 TO THE BOYLE LOCAL AREA PLAN PROVISION OF INFORMATION TO SUPPORT SCREENING FOR APPROPRIATE ASSESSMENT OF VARIATION NO. 1 TO THE BOYLE LOCAL AREA PLAN 2015-2021 ROSCOMMON COUNTY COUNCIL Project Reference: 170065 Rev. Status Author

More information

Discharge Licence applications Further information.

Discharge Licence applications Further information. Discharge Licence applications Further information. Discharge Licence D0279-01 Dromahaire Further information. 1 At how many times dry weather flow will discharges occur from the stormwater overflow, located

More information

APIS indicative critical load values: Recommended values within nutrient nitrogen critical load ranges for use in air pollution impact assessments

APIS indicative critical load values: Recommended values within nutrient nitrogen critical load ranges for use in air pollution impact assessments APIS indicative critical load values: Recommended values within nutrient nitrogen critical load ranges for use in air pollution impact assessments Introduction Critical load values for nutrient nitrogen

More information

25* September 'h February 'h September Ewa Babiarczyk

25* September 'h February 'h September Ewa Babiarczyk ~ I INSPECTOR'S REPORT ON A WASTE WATER DISCHARGE LICENCE APPLICATION To: From: DIRECTORS Ewa Babiarczyk Environmental Licensing Programme Date: 3' December 2009 RE: Application for a Waste Water Discharge

More information

OFFICE OF LICENSING & GUIDANCE

OFFICE OF LICENSING & GUIDANCE OFFICE OF LICENSING & GUIDANCE INSPECTORS REPORT ON A LICENCE APPLICATION To: Directors From: MARIE O CONNOR - LICENSING UNIT Date: 19 April 2007 RE: Application for a Review of IPPC Licence from Cara

More information

Habitats Regulations Assessment

Habitats Regulations Assessment Habitats Regulations Assessment Report of Information to Inform an Appropriate Assessment: 718736-3000-R-017 A5 Western Transport Corridor April 2014 Produced for Roads Service Northern Ireland Prepared

More information

OFFICE OF CLIMATE, LICENSING, RESOURCES & RESEARCH

OFFICE OF CLIMATE, LICENSING, RESOURCES & RESEARCH This report has been cleared for submission to Director/Board by Breen Higgins. Grainne Power, 03/11/2015 14:44 OFFICE OF CLIMATE, LICENSING, RESOURCES & RESEARCH INSPECTORS REPORT ON A WASTE WATER DISCHARGE

More information

LIFE Flusserlebnis Isar - Restoration of the river Isar and its floodplains in the region of the lower Isar valley LIFE14 NAT/DE/000278

LIFE Flusserlebnis Isar - Restoration of the river Isar and its floodplains in the region of the lower Isar valley LIFE14 NAT/DE/000278 LIFE Flusserlebnis Isar - Restoration of the river Isar and its floodplains in the region of the lower Isar valley LIFE14 NAT/DE/000278 Project description Environmental issues Beneficiaries Administrative

More information

In compliance with Art October 2001 PD issued: First party objection received: Third party objections: One, An Taisce,

In compliance with Art October 2001 PD issued: First party objection received: Third party objections: One, An Taisce, M E M O R A N D U M DATE: 1 March 2002 TO: FROM: RE: The Members of the Board Technical Committee Objection to a Proposed Determination (PD) for Electricity Supply Board Shannonbridge, Co Offaly. IPC Register

More information

For inspection purposes only.

For inspection purposes only. APPROPRIATE ASSESSMENT SCREENING REPORT TO ASSESS THE POTENTIAL IMPACTS FROM A PROPOSED INCREASE TO CARBON MONOXIDE LIMIT FOR AN ENGINE AT BALLYDONAGH LANDFILL, WESTMEATH OCTOBER 2014 TABLE OF CONTENTS

More information

2015 Wildlife Action Plan Habitats Crosswalk

2015 Wildlife Action Plan Habitats Crosswalk 2015 Wildlife Action Plan Habitats Crosswalk A crosswalk guide between Wildlife Action Plan Habitats and other habitat classification schemes. Ecosystem Comments NH WAP 2015 NHNHB System Open Water (NLCD-NHD

More information

COMHAIRLE CONTAE CHIARRAi KERRY COUNTY COUNCIL. For inspection purposes only.

COMHAIRLE CONTAE CHIARRAi KERRY COUNTY COUNCIL. For inspection purposes only. An Roinn Seirbhisi Uisce Comhai,le Contae Chiarrai, Rath Teas, Tra Li, Co. Chiarral. COMHAIRLE CONTAE CHIARRAi Water Services Kerry County Council, Rathass, Tralee, Co. Kerry. Guthan I Tel 0667183503 Fairs

More information

Lince Andalucía - Population recovery of Iberian Lynx in Andalusia LIFE02 NAT/E/008609

Lince Andalucía - Population recovery of Iberian Lynx in Andalusia LIFE02 NAT/E/008609 Lince Andalucía - Population recovery of Iberian Lynx in Andalusia LIFE02 NAT/E/008609 Project description Environmental issues Beneficiaries Administrative data Read more Contact details: Project Manager:

More information

Implications of Climate Change for FFH- Forest Habitat Types

Implications of Climate Change for FFH- Forest Habitat Types Photo: Shatsk National Park Implications of Climate Change for FFH- Forest Habitat Types - Examples from the Biosphere Reserve Vessertal- Thuringian Forest within the framework of the EU-Project HABIT-CHANGE

More information

COMHAIRLE CONTAE CHIARRAi KERRY COUNTY COUNCIL. For inspection purposes only.

COMHAIRLE CONTAE CHIARRAi KERRY COUNTY COUNCIL. For inspection purposes only. An Roinn Seirbhisi Uisce Comhairle Contae Chiarrai, Roth Teas, Tra li, Co. Chiarrai. & COMHAIRLE CONTAE CHIARRAi Guthan I Tel 0667183503 Faies I Fax 0667181639 Rphost I Email waterservices@kerryco o.ie

More information

Appropriate Assessment (Screening)

Appropriate Assessment (Screening) Appropriate Assessment (Screening) Draft Claremorris Local Area Plan 2012 2018 In accordance with Articles 6(3) & (4) of the Habitats Directive 92/43/EEC & Part XAB of the Planning & Development Acts 2000-2010

More information

Draft for Comment and Consultation

Draft for Comment and Consultation River Lugg Restoration Plan Management Report Draft for Comment and Consultation January 2015 Revision 2 Document Control Sheet BPP 04 F8 Version 16; October 2013 Project: Wye and Lugg SSSI Restoration

More information

River Barrow and River Nore SAC (site code 2162) Conservation objectives supporting documentwoodland

River Barrow and River Nore SAC (site code 2162) Conservation objectives supporting documentwoodland NPWS River Barrow and River Nore SAC (site code 2162) Conservation objectives supporting documentwoodland habitats Version 1 May 2011 Introduction The Barrow/Nore river system contains a considerable amount

More information

Hydropower Guidance Note: HGN 4 Designated Sites

Hydropower Guidance Note: HGN 4 Designated Sites Guidance Note Hydropower Guidance Note: HGN 4 Designated Sites This guidance note is not intended as a statement of law. It should be read in combination with, and in the context of, the relevant enactments

More information

This report has been cleared for submission to Director/Board by Patrick Byrne. Eve O'Sullivan, 22/09/ :27

This report has been cleared for submission to Director/Board by Patrick Byrne. Eve O'Sullivan, 22/09/ :27 This report has been cleared for submission to Director/Board by Patrick Byrne. Eve O'Sullivan, 22/09/2014 16:27 OFFICE OF CLIMATE, LICENSING & RESOURCE USE. INSPECTORS REPORT ON A WASTE WATER DISCHARGE

More information

CORE MANAGEMENT PLAN INCLUDING CONSERVATION OBJECTIVES FOR AFON TEIFI / RIVER TEIFI SAC (SPECIAL AREA OF CONSERVATION)

CORE MANAGEMENT PLAN INCLUDING CONSERVATION OBJECTIVES FOR AFON TEIFI / RIVER TEIFI SAC (SPECIAL AREA OF CONSERVATION) CYNGOR CEFN GWLAD CYMRU COUNTRYSIDE COUNCIL FOR WALES CORE MANAGEMENT PLAN INCLUDING CONSERVATION OBJECTIVES FOR AFON TEIFI / RIVER TEIFI SAC (SPECIAL AREA OF CONSERVATION) Version: 2 (Minor map edit,

More information

OFFICE OF ENVIRONMENTAL SUSTAINABILITY

OFFICE OF ENVIRONMENTAL SUSTAINABILITY This Report has been cleared for submission to the Director by Frank Clinton, Programme Manager Signed: -0- ' Date 26/04/7 f OFFCE OF ENVRONMENTAL SUSTANABLTY Dara Lynott, Director FROM : Brian Meaney,

More information

Number: WG Welsh Government Consultation Document

Number: WG Welsh Government Consultation Document Number: WG 16557 Welsh Government Consultation Document November 2012 M4 Corridor Enhancement Measures (CEM) Strategic Habitats Regulations Assessment (SHRA) Statement to inform Appropriate Assessment

More information

This document has been cleared for submission to the Board by the Programme Manager Frank Clinton Signed:l\l -f&wy Date&&?

This document has been cleared for submission to the Board by the Programme Manager Frank Clinton Signed:l\l -f&wy Date&&? This document has been cleared for submission to the Board by the Programme Manager Frank Clinton Signed:l\l -f&wy Date&&? 0rrrb.c VI w b - m - m - - LICENSING & RESOURCE USE 1 TO: DIRECTORS FROM: Patrick

More information

United Utilities Habitats Regulations Assessment of the draft Water Resources Management Plan

United Utilities Habitats Regulations Assessment of the draft Water Resources Management Plan United Utilities Habitats Regulations Assessment of the draft Water Resources Management Plan Addendum to draft Habitats Regulations Assessment AMEC Environment & Infrastructure UK Limited Copyright and

More information

N60 Castlebar Balla Road (Manulla) Improvement Scheme. Alternatives Assessment Report. June 2015

N60 Castlebar Balla Road (Manulla) Improvement Scheme. Alternatives Assessment Report. June 2015 N60 Castlebar Balla Road (Manulla) Improvement Scheme Alternatives Assessment Report June 2015 Document Control Sheet BPP 04 F8 Version 16; Oct 2013 Project: Client: Document Title: Ref. No: ORIGINAL N60

More information

Lower River Shannon SAC (site code 2165) Conservation objectives supporting documentwoodland. Version 1

Lower River Shannon SAC (site code 2165) Conservation objectives supporting documentwoodland. Version 1 Lower River Shannon SAC (site code 2165) Conservation objectives supporting documentwoodland habitats Version 1 March 2012 Introduction The Lower River Shannon SAC lies mostly within an intensively managed

More information

1 Discharges from agglomerations with

1 Discharges from agglomerations with P rl e wa Environmental 'r 60- I.r If *r("rrrl.l, This report has been cleared for submission to the Board by the Karen Creed. SignedmL- Protenan ( A~~~~ -h,p0 Date,cl!Id/, OFFICE OF CLIMATE, LICENSING

More information

Harvesting "lowhanging

Harvesting lowhanging Harvesting "lowhanging fruits" Improving conservation status of habitats and species together in the biogeographic context Ad-hoc WG on Natura 2000 and Forests 7.12.2016 Angelika Rubin, DG ENV.D3 Background

More information

Portumna Local Area Plan Strategic Environmental Assessment- Non Technical Report

Portumna Local Area Plan Strategic Environmental Assessment- Non Technical Report Portumna Local Area Plan 2016-2022 Strategic Environmental Assessment- Non Technical Report Forward Planning Galway County Council June 2016 TABLE OF CONTENTS Section 1 Introduction... 5 1.1 Background...

More information

Draft Portumna Local Area Plan Strategic Environmental Assessment- Non Technical Report

Draft Portumna Local Area Plan Strategic Environmental Assessment- Non Technical Report Draft Portumna Local Area Plan 2016-2022 Strategic Environmental Assessment- Non Technical Report Forward Planning Galway County Council July 2015 TABLE OF CONTENTS Section 1 Introduction... 5 1.1 Background...

More information

Schütt-Dobratsch - Schütt-Dobratsch LIFE00 NAT/A/ Project description Environmental issues Beneficiaries Administrative data Read more

Schütt-Dobratsch - Schütt-Dobratsch LIFE00 NAT/A/ Project description Environmental issues Beneficiaries Administrative data Read more Schütt-Dobratsch - Schütt-Dobratsch LIFE00 NAT/A/007055 Project description Environmental issues Beneficiaries Administrative data Read more Contact details: Project Manager: Bernhard GUTLEB Tel: +43/463

More information

Forest Management in Natura 2000 Areas

Forest Management in Natura 2000 Areas Forest Management in Natura 2000 Areas Dr. Kirchmeir 6. October 2014 Ferlach. E.C.O. Institut für Ökologie Kinoplatz 6, 9020 Klagenfurt office@e-c-o.at Content Total Forest Cover, Naturalness of forests

More information

Guidance for analysis of sensitivity to pressures of water dependent habitats & species listed in the Habitats and Birds Directives (Milestone)

Guidance for analysis of sensitivity to pressures of water dependent habitats & species listed in the Habitats and Birds Directives (Milestone) Working paper N B/2016 Guidance for analysis of sensitivity to pressures of water dependent habitats & species listed in the Habitats and Birds Directives (Milestone) Andreas Graf, Ulf Stein and Sophie

More information

INTEGRATED PLANNING FOR FOREST AREAS USING A SPATIAL DECISION SUPPORT SYSTEM

INTEGRATED PLANNING FOR FOREST AREAS USING A SPATIAL DECISION SUPPORT SYSTEM INTEGRATED PLANNING FOR FOREST AREAS USING A SPATIAL DECISION SUPPORT SYSTEM Navalho, I.; Alegria, C.; Quinta-Nova, L. Polytechnic Institute of Castelo Branco 11.september.2017 Objectives Development of

More information