1 Technical Memorandum Date: To: Prepared by: Reviewed by: Project: Subject: Rick Koon District Manager Phone: (805) Cayucos Sanitary District 200 Ash Avenue Cayucos, CA Dylan Wade, P.E., Daniel Heimel, P.E. Jeffery Szytel, P.E. Cayucos Sanitary District CONCEPTUAL WASTEWATER TREATMENT ALTERNATIVES TECHNICAL MEMORANDUM This TM is organized into the following sections: Section 1. Purpose and Background... 2 Section 2. Approach... 2 Cost Estimates... 3 Section 3. Summary of Available Data... 3 Section 4. Flow Analysis Cayucos WWTF MBCSD Upgraded CMC WWTP Section 6. Summary and Recommendations Recommendations Section 7. Works Cited... 20

2 Section 1. Purpose and Background Section 1. Purpose and Background To comply with the Regional Water Quality Control Board s (RWQCB) requirement for full secondary treatment at the Morro Bay-Cayucos Sanitary District Wastewater Treatment Plant (MBCSD), the Cayucos Sanitary District (District) and the City of Morro Bay (Morro Bay) have been collectively working on an upgrade to their existing facility since However, at the request of Morro Bay, the California Coastal Commission (CCC) denied the Coastal Development Permit to build an upgraded WWTP at the location of the current MBCSD. Therefore, the District finds itself needing to evaluate alternatives for the sustainable treatment and disposal and/or reuse of its wastewater. The District hired Water Systems Consulting (WSC) to develop a Conceptual Wastewater Treatment s Technical Memorandum (TM) to identify representative conceptual wastewater treatment alternatives for further consideration. This TM is intended to be used as a guide for the District s Board of Directors as they work with Morro Bay and the various resource agencies that will be involved in future efforts to develop or modify wastewater treatment facilities to serve the needs of the District s customers. The TM is not intended to be a comprehensive alternatives analysis, but should rather be viewed as information gathering and conceptual alternatives development to help guide the District s decision making. Morro Bay and the District have made significant financial and time investments in their effort to upgrade the existing MBCSD. To the extent possible, WSC has made use of those documents in the preparation of this TM. These reference documents are listed in Section 3 of this report. Section 2. Approach The goal of the TM is to provide the District with information on conceptual wastewater collection and treatment alternatives to help guide their pursuit of a preferred wastewater treatment alternative to replace/modify the existing MBCSD. The specific objectives of the TM include: 1) Selection of conceptual wastewater treatment alternatives for evaluation; 2) Development of descriptions for each of the identified conceptual alternatives; and 3) Preparation of preliminary capital and O&M cost estimates. The TM identifies and describes several wastewater treatment alternatives developed during a workshop with the District and WSC (Project Team). During the workshop, the Project Team reviewed the project background, evaluated the needs of the community of Cayucos, developed the project goals and objectives and identified representative conceptual wastewater treatment alternatives. Each conceptual wastewater treatment alternative description included: 1) representative site location; 2) disposal and/or reuse strategy; 3) level of treatment required; 4) representative treatment technologies; and 5) planning-level capital and O&M cost estimates. Using this conceptual wastewater treatment alternative definition, the Project Team identified several initial conceptual wastewater treatment alternatives for further evaluation. These alternatives were refined by the Project Team as the project progressed to incorporate the needs of the community and to reflect the practical application of current technology. The alternative descriptions contained in this TM do not include an analysis of feasibility of implementation (i.e. regulatory requirements, political considerations, etc.) which are beyond the scope of this TM. Conceptual Wastewater Treatment s TM_CSD.docx 2

3 Section 3. Summary of Available Data Cost Estimates To develop the cost estimates for the TM, WSC reviewed available cost estimating references and previously completed cost estimates for wastewater treatment facilities in the region. Wastewater treatment facility cost estimates were developed from previously completed cost estimates for similar projects and from the Environmental Protection Agency s (EPA) Construction Costs for Wastewater Treatment Plant reference (1). Pump station cost estimates were established using index adjusted cost curves that incorporate flow rate and total dynamic head (2). Membrane treatment cost estimates were obtained using index adjusted cost curves from a treatment cost estimating reference (3). Pipeline cost estimates were developed from previously completed wastewater studies in the region. All capital cost estimates include non-construction costs (e.g. permitting, planning, design, administration, engineering and contingency). The cost estimates do not include land or right-of-way acquisition costs, which are potentially significant for several of these alternatives. The capital cost estimates in this report do not include upgrades to the existing MBCSD outfall nor any annualized reserve to cover the cost of replacing that facility when it reaches the end of its useful life. The O&M cost estimates only include the costs to deliver the wastewater to the proposed treatment location, the cost of treatment and the cost of disposal. These estimates do not include the District s current cost to operate its collection system or reflect the potential savings from not operating the existing MBCSD. The cost estimates included in this TM should be considered order of magnitude or planning level costs only. For reference purposes, these cost estimates are in 2013 dollars (ENR CCI ). Section 3. Summary of Available Data Numerous feasibility studies and alternatives analyses have been completed to evaluate potential alternatives for upgrading, replacing, and/or relocating the existing MBCSD. WSC s initial step in developing this TM included review of previously completed studies, and extraction of relevant data for use in identifying and developing cost estimates for the conceptual wastewater treatment alternatives. The reference sources reviewed by WSC are shown in the list below: City of Morro Bay Wastewater Treatment Plant Study (5/2007) Morro Bay-Cayucos WWTP Facility Master Plan (9/2007) Morro Bay-Cayucos WWTP Facility Master Plan Amendment 1 (8/2009) Morro Bay- Cayucos WWTP Facility Master Plan Amendment 2 (7/2010) Morro Bay-Cayucos WWTP Draft Rough and Fine Screening Sites Evaluation (11/2011) Draft Recycled Water Feasibility Study (4/2012) Current plant flow totals (2006 to present) Lift Station #5 pumping records (2006 to present) Status Report of a Major Maintenance & Repair Plan (MMRP) for the WWTP (6/2013) Conceptual Wastewater Treatment s TM_CSD.docx 3

4 Section 4. Flow Analysis Section 4. Flow Analysis To develop the conceptual wastewater alternatives, WSC performed an analysis of the available flow data and developed estimates of future flow data for the District, shown in Table 1. The plant design values in Table 1 were taken from the MBCSD WWTP Upgrade Revised Flows and Loadings TM prepared by MWH as part of their WWTP upgrade project (4). As part of the process of preparing that TM, MWH reviewed flow data from and developed estimates of current Annual Average Daily Flow (AADF) and Average Daily Maximum Month Flow (ADMMF). This flow was then increased to reflect build-out conditions for the District and Morro Bay. Rather than reproduce that effort to develop estimates for future Cayucos flows, a single factor was generated to convert between total plant flows and Cayucos flows. For the purpose of this analysis, WSC reviewed flow data from to develop a simplified understanding of the flow relationship between Morro Bay and Cayucos and developed a Cayucos flow factor based on the average flow relationship. This factor was used to convert from total plant flows to Cayucos flows (5). Table 1. District future flow estimates Parameter Plant Design Value (MGD) AADF 1.5 Flow Factor Estimated District Flows (MGD) ADMMF Section 5. Conceptual Descriptions To help provide the District with information on the potential wastewater treatment and disposal alternatives, the Project Team developed the conceptual treatment and disposal alternatives outlined in Table 2. To select these conceptual alternatives, the Project Team reviewed previously completed siting studies and reference materials, and discussed a range of other potential solutions. These conceptual alternatives are intended to provide the District with a range of representative alternatives, including options for treating wastewater at a Cayucos Wastewater Treatment Facility (WWTF), at the existing MBCSD and at a regionally operated facility at the California Men s Colony Wastewater Treatment Plant (CMC WWTP). While this is not a comprehensive list of the potential alternatives considered, these alternates were selected to provide the District with a broad enough range of representative options to inform future evaluation and project development efforts. Conceptual Wastewater Treatment s TM_CSD.docx 4

5 Conceptual Table 2. Conceptual wastewater treatment and disposal alternatives Location Disposal and/or Reuse Method(s) Treatment Level Representative Treatment Technology 1a Cayucos Outfall Secondary Aerated Lagoon Oxidation Ditch Ag Reuse Tertiary (plus salt 1b Cayucos Microfiltration Outfall (Brine) reduction) Reverse Osmosis 2 MBCSD Outfall Secondary Trickling Filters 3 1 CMC WWTP Creek Discharge Ag Reuse Outfall (Brine) Tertiary (plus salt reduction) Nitrogen Reduction Oxidation Ditch Media Filtration Reverse Osmosis 1. Cayucos WWTF 1 includes the development of a new WWTF to exclusively serve the District service area. The specific location, disposal method and treatment level parameters for the WWTF ( 1) are general enough to allow the District flexibility to evaluate a variety of different site locations, disposal options and treatment level combinations. To develop the cost estimates for 1, two sub-alternatives were developed ( 1a and 1b), with 1a designed to represent low cost alternative and 1b designed to represent the high cost alternative for a Cayucos WWTF alternative. Proposed Facility Location The specific locations for s 1a and 1b have not been identified. Given the limited number of potential locations for a Cayucos WWTF, the Project Team elected to evaluate two representative site locations to present a range of costs that are intended to provide book-end cost estimates for the potential site locations. One of the primary factors impacting the costs associated with each potential site location is the infrastructure requirements to deliver wastewater to the WWTF and to convey treated wastewater to the disposal location. A site located somewhere at the southern end of the District s service area would require the least amount of new conveyance infrastructure, as this is the direction that wastewater is currently routed; this site alternative was used to develop the low-end cost estimate ( 1a). A site location somewhere at the northern end of the District s service area would require the construction of a force main from the southern end of the District s service area, or a re-configuration of the existing collection system; this site alternative was used to develop the high-end cost estimate ( 1b). Figure 1 shows the extent of the District s service area. 1 The parameters for Conceptual 3 represent the proposed treatment and disposal process for a regional CMC WWTP, not the current treatment process. Conceptual Wastewater Treatment s TM_CSD.docx 5

6 Figure 1. District service area Conceptual Wastewater Treatment s TM_CSD.docx 6

7 Disposal Method Options The Project Team identified two effluent disposal methods to represent the range of possible methods for 1. For the lower cost disposal option ( 1a), the Project Team selected use of the existing MBCSD outfall. This option would require minimal conveyance infrastructure realignment and, per the Clean Water Act as well as the terms of the settlement agreement with the RWQCB, secondary wastewater treatment. For the higher cost option ( 1b), the Project Team selected agriculture irrigation and groundwater percolation (wetlands). This disposal option would require recycled water conveyance infrastructure, realignment of collection and conveyance infrastructure, a high level of treatment, salt removal and wetland facilities for wet weather storage. This alternative does not include costs for effluent disposal through groundwater injection, which could require additional treatment. Level of Treatment Options The range of treatment options evaluated for 1 were selected to represent a broad range of cost estimates, as well as to be compatible with the disposal methods described above. For the outfall disposal option ( 1a), the Project Team assumed that secondary treatment would be sufficient and that the use of an aerated lagoon would be a cost effective treatment option. Figure 2 shows the process flow diagram for the outfall disposal option. For the agriculture reuse and wetland disposal option ( 1b), the Project Team selected a treatment process that included an oxidation ditch, filtration and reverse osmosis. This treatment process would provide tertiary treated wastewater, along with salt reduction. Additionally, this treatment option would require use of the existing WWTP outfall for disposal of the brine generated from the reverse osmosis process. Figure 3 shows the process flow diagram for the Ag reuse disposal option. Figure 2. Outfall disposal process flow diagram ( 1a) Conceptual Wastewater Treatment s TM_CSD.docx 7

8 Cost Estimates Figure 3. 1b - Ag reuse disposal process flow diagram ( 1b) Capital Cost The capital cost estimates for s 1a and 1b were developed using index adjusted EPA wastewater treatment cost curves, cost estimates for similar wastewater facility projects in the region, and reference text cost estimates. Given the limited size of the District s collection system and increased peaking factors typically associated with smaller systems, the cost estimates for the Cayucos alternatives were estimated using the ADMMF rate as the design flow rate (see Table 1). The cost estimates for 1b do not include costs for recycled water distribution infrastructure. The estimated range of construction costs for 1 is shown in Table 3. Table 3. 1 Cayucos capital cost estimate summary Treatment Capital Cost ($M) Conceptual Wastewater Treatment s TM_CSD.docx 8 Conveyance Infrastructure Capital Cost ($M) Total Capital Cost ($M) 1a - Outfall b - Ag Re-use O&M Cost O&M cost estimates for the Cayucos alternatives (1a and 1b) include the estimated cost of treating the wastewater to the required level of treatment for each alternative and the estimated energy costs for sewage and brine pumping. Table 4 outlines the estimated O&M costs for 1a and 1b. Table 4. 1 Cayucos O&M cost estimate summary Annual Treatment O&M Cost ($k) Annual Conveyance Infrastructure O&M Cost ($k) Total Annual O&M Cost ($K) 1a - Outfall b - Ag Re-use

9 2. MBCSD 2 includes utilization of the existing MBCSD to continue to provide treatment for the District s wastewater. Due to the existing MBCSD s deteriorating condition, the cost estimates for 2 include several upgrades required for the MBCSD to reliably treat wastewater from the District. In this alternative, it is assumed that Morro Bay would select an alternate location for the treatment of its wastewater. Proposed Facility Location The current MBCSD is located near the intersection of Highway 41 and Highway 1 in Morro Bay. Figure 4 shows the location of the MBCSD relative to the District service area and Figure 5 shows an aerial photo of the current MBCSD. Wastewater collected by the District is pumped from Lift Station #5, located at the southern end of the District s service area, to the northern end of the City of Morro Bay, where it flows by gravity to the MBCSD. Conceptual Wastewater Treatment s TM_CSD.docx 9

10 Figure MBCSD site location map Conceptual Wastewater Treatment s TM_CSD.docx 10

11 Figure 5. MBCSD aerial photo Disposal Method For this alternative, it is assumed that the existing ocean outfall would continue to be used for disposal of treated secondary effluent. Level of Treatment Given that the assumed disposal method for 2 is via the existing ocean outfall, 2 is based on providing secondary treatment consistent with existing regulatory requirements. To enable the MBCSD to treat the District s wastewater to secondary standards during peak flow events, it was assumed that additional onsite storage would be required. Figure 6 shows the anticipated treatment process for the MBCSD. Conceptual Wastewater Treatment s TM_CSD.docx 11

12 Figure 6. MBCSD process flow diagram Cost Estimates Capital Cost To develop cost estimates for 2, the 2007 Facility Master Plan Report prepared by Carollo for the WWTP Upgrade project, which included a review of the major treatment processes and deficiencies found in them, was used to obtain costs to repair deteriorating equipment (6). The MBCSD Major Maintenance & Repair Plan (MMRP) was then reviewed to identify upgrades that the District and Morro Bay are intending to complete prior to the construction of a new WWTP for Morro Bay (7). The proposed MMRP upgrades and costs associated with them were then subtracted from the repair costs identified in the 2007 Facility Master Plan Report to estimate the capital costs for 2. Additionally, the MBCSD as it sits today has the potential to experience flooding during storm events that are less than the 100 year flood. In order to advance this alternative, a detailed analysis of the processes, facilities and the impact of flooding would need to be developed. WSC has used the same $2,500,000 place holder, adjusted to 2013 dollars, to review, design, and flood proof this site as was included in the 2007 Facility Master Plan Report (6). For 2, it was assumed that no conveyance infrastructure improvements would be required. Table 5 shows the capital cost estimates for 2. Table 5. 2 MBCSD capital cost estimates Treatment Capital Cost ($M) Conveyance Infrastructure Capital Cost ($M) Total Capital Cost ($M) 2 MBCSD Conceptual Wastewater Treatment s TM_CSD.docx 12

13 O&M Cost O&M costs for 2 were estimated by scaling the existing O&M costs for the MBCSD to match the anticipated annual average daily flow rate for the District s collection system. Table 6 outlines the estimated O&M costs for 2. Table 6. MBCSD O&M cost estimates Annual Treatment O&M Cost ($k) Annual Conveyance Infrastructure O&M Cost ($k) Total Annual O&M Cost ($k) 2 MBCSD Upgraded CMC WWTP 3 includes transmission infrastructure from the MBCSD to California Men s Colony (CMC) and the expansion of the CMC WWTP to provide treatment for wastewater from the District and Morro Bay (Upgraded CMC WWTP). The existing CMC WWTP treats wastewater from the CMC, Cuesta College, Camp San Luis Obispo, and County of San Luis Obispo Operations Center. Table 7 provides the anticipated breakdown of flows at the Upgraded CMC WWTP. Currently the wastewater is treated to tertiary standards for disposal to Chorro Creek and for landscape irrigation reuse at Dairy Creek Golf Course and at Cal Poly. The CMC WWTP does not currently possess excess capacity and would require capacity upgrades to accommodate flows from the District and Morro Bay (8). Table 7. Upgraded CMC WWTP flow ratio Agency Anticipated Flow (MGD) Flow Ratio District Morro Bay Existing CMC Agencies Total Flow For this alternative it was assumed that both Morro Bay and the District would participate. While it would be possible for the District to transfer flow to CMC without the participation of Morro Bay, Morro Bay would derive the greatest benefits from a regional CMC facility, due to augmented flows in Chorro Creek and the stream flow conditions that limit Morro Bay s ability to pump water from Chorro Creek. If Morro Bay chooses not to participate in this alternative, the costs for the District would increase as some of the economies of scale would be lost. This cost increase without Morro Bay participation has not been quantified. Expansion of the CMC WWTP and increased wastewater treatment discharges would provide a high potential for recycled water reuse in the Chorro Valley. Releases from the CMC WWTP could be extracted by down gradient water users for use as irrigation. Conceptual Wastewater Treatment s TM_CSD.docx 13

14 Proposed Facility Location The current CMC WWTP is located along Chorro creek, west of Cuesta College and just south of Highway 1. Figure 7 shows the location of the CMC WWTP relative the District service area and Figure 8 shows an aerial photo of the current CMC WWTP. For the purposes of developing costs estimates for 3, it was assumed that wastewater from the District s service area would flow to a location near the current MBCSD, where it would be blended with the wastewater from Morro Bay and pumped to the Upgraded CMC WWTP. Conceptual Wastewater Treatment s TM_CSD.docx 14

15 Figure 7. 3 Upgraded CMC WWTP site location map Conceptual Wastewater Treatment s TM_CSD.docx 15

16 Figure 8. CMC WWTP aerial photo Disposal Method For the purposes of developing costs estimates for 3, it was assumed that disposal from the Upgraded CMC WWTP would be achieved through discharge to Chorro Creek and continued reuse at Dairy Creek Golf Course, Cal Poly and other potential users in the future (e.g. ag reuse in Chorro Valley). Level of Treatment The discharge permit for the existing CMC WWTP includes limitations on the concentrations of certain water quality characteristics that can be discharged to Chorro creek. Currently, the CMC Permit requires that the monthly average TDS concentration be less than 500 mg/l. The concentration of TDS measured at the headworks of the MBCSD in ranged from 710 to 1,700 mg/l and averaged approximately 1,100 mg/l and thus the treatment process for the Upgraded CMC WWTP will most likely require salt reduction (9). As Salt and Nutrient management plans are developed, it is possible that the discharge limits for salt will decrease as well, leading to more stringent salt removal requirements for the CMC WWTP. Given the current and future anticipated discharge requirements, the level of treatment for 3 includes secondary and tertiary treatment, along with filtration and reverse osmosis for salt reduction. Figure 9 shows the anticipated treatment process for the Upgraded CMC WWTP. Adding salt reduction and additional redundancy to the existing CMC WWTP would be a valuable modernization for the CMC WWTP, increasing its reliability and improving its effluent quality. Conceptual Wastewater Treatment s TM_CSD.docx 16

17 Figure 9. Upgraded CMC WWTP process flow diagram Cost Estimates Capital Cost The capital cost estimates for the Upgraded CMC WWTP were based on cost estimates prepared in previous wastewater studies related to the MBCSD and CMC WWTP. To develop the Upgraded CMC WWTP cost estimate, it was assumed that the current treatment process would be expanded to provide capacity for wastewater from Morro Bay and Cayucos. Additionally, it was assumed that reverse osmosis treatment would be added for fifty percent of plant flows providing all agencies treating wastewater at CMC WWTP with salt reduction. Additionally, cost estimates were developed for the pump stations and force mains that would be required to deliver the wastewater to the Upgraded CMC WWTP and return the brine to the existing outfall at the MBCSD. It was assumed that costs for the WWTP upgrade, lift station and force main would be shared, based on flow, between the District and Morro Bay. Costs for the reverse osmosis treatment process and the brine return line were assumed to be shared between all of the agencies participating in the regional treatment facility that the CMC WWTP would become. Table 8 outlines the total estimated cost to upgrade the CMC WWTP and construct the necessary conveyance infrastructure. Table 9 outlines the District s portion of the capital cost for 3. Table 8. Total Upgraded CMC WWTP capital cost estimate Treatment Capital Cost ($M) Conveyance Infrastructure Capital Cost ($M) Total Capital Cost ($M) 3 - Upgraded CMC WWTP Conceptual Wastewater Treatment s TM_CSD.docx 17

18 Section 6. Summary and Recommendations Table 9. District's portion of the Upgraded CMC WWTP capital cost estimate District's Portion Treatment Capital Cost ($M) District's Portion Conveyance Infrastructure Capital Cost ($M) District s Portion Total Capital Cost ($M) 3 - Upgraded CMC WWTP O&M Cost O&M cost estimates were developed by correlating previously completed O&M costs estimates for similar facilities to the Upgraded CMC WWTP and by calculating the required energy to pump sewage and brine to and from the Upgraded CMC WWTP. Table 10 outlines the total estimated cost and the District s portion to operate and maintain the Upgraded CMC WWTP. Table 11 outlines the District s portion of the O&M cost for 3. Table 10. Total Upgraded CMC WWTP O&M cost estimate Annual Treatment O&M Cost ($k) Annual Conveyance Infrastructure O&M Cost ($k) Total Annual O&M Cost ($K) 3 - Upgraded CMC WWTP 6, ,928 Table 11. District's portion of the Upgraded CMC WWTP O&M cost estimate District's Portion Annual Treatment O&M Cost ($k) District's Portion Annual Conveyance Infrastructure O&M Cost ($k) District's Portion Total Annual O&M Cost ($K) 3 - Upgraded CMC WWTP Section 6. Summary and Recommendations The Project Team identified and investigated a number of conceptual wastewater alternatives to provide the District with additional information to guide their continued evaluation of wastewater treatment options. Table 12 provides a summary of the District s capital cost estimates, Table 13 provides a summary of the District s O&M cost estimates and Table 14 provides a summary of the combined Net Present Value project cost estimates for the District for the selected conceptual alternatives. Conceptual Wastewater Treatment s TM_CSD.docx 18

19 Section 6. Summary and Recommendations Table 12. Capital cost summary Treatment Capital Cost ($M) Conveyance Infrastructure Capital Cost ($M) Total Capital Cost ($M) 1a Outfall b Ag Re-use MBCSD Upgraded CMC WWTP Table 13. O&M cost summary Annual Treatment O&M Cost ($k) Annual Conveyance Infrastructure O&M Cost ($k) Total Annual O&M Cost ($K) 1a Outfall b Ag Re-use 1, ,456 2 MBCSD Upgraded CMC WWTP Table 14. NPV Project Cost Summary District s 20 Year Net Present Value Project Cost ($M) 1 1a Outfall b Ag Re-use MBCSD Upgraded CMC WWTP 24.2 Recommendations The Project Team has defined conceptual alternatives for the conveyance and treatment of the District s wastewater. The costs and the ability of the District to successfully implement these alternatives range significantly. These conceptual alternatives were chosen to approximate a range of potential projects that might be implemented by the District. WSC recommends that the District coordinate with the other stakeholder agencies to consider these conceptual alternatives broadly, establish an evaluation and screening methodology, and select a set of preferred alternatives and sub-alternatives for more detailed evaluation and feasibility assessment. 1 Assumes all capital costs are financed at 3.5% over 20 years, a 6% discount rate and do not include costs for land acquisition or reclaimed water infrastructure. Conceptual Wastewater Treatment s TM_CSD.docx 19

20 Section 7. Works Cited Section 7. Works Cited 1. EPA. Construction Costs for Municipal Wastewater Treatment Plans: Jones, Garr M, et al., et al. Pumping Station Design. Burlington : Butterworth-Heinemann, Revised Thrid Edition. 3. McGivney, William T and Kawamura, Susumu. Cost Estimating Manual for Water Treatment Facilities. Hoboken : John Wiley & Sons, Inc., MWH. Flows and Loadings Technical Memorandum Morro Bay/Cayucos JPGA. Morro Bay Cayucos WWTP Flow Data Carollo Engineers. City of Morro Bay Cayucos Sanitary District Wastewater Treatment Plant Facility Master Plan Report Keogh, Bruce. Status Report of a Major Maintenance & Repair Plan (MMRP) for the WWTP Carollo Engineers. Los Osos Wastewater Project Development Regional Treatment Technical Memorandum Cannon Associates. City of Morro Bay Wastewater Treatment Plant Study Conceptual Wastewater Treatment s TM_CSD.docx 20

WASTEWATER TREATMENT PLANT UPGRADE PROJECT APPEAL NO. A-3-MRB

WASTEWATER TREATMENT PLANT UPGRADE PROJECT APPEAL NO. A-3-MRB WASTEWATER TREATMENT PLANT UPGRADE PROJECT APPEAL NO. A-3-MRB-11-001 CCC Briefing Booklet April 2012 A copy of this briefing booklet has been provided to the Central Coast District Staff. Project Description

More information

DRAFT Master Water Reclamation Plan. City Council Meeting March 28, 2017

DRAFT Master Water Reclamation Plan. City Council Meeting March 28, 2017 DRAFT Master Water Reclamation Plan City Council Meeting March 28, 2017 Presentation Overview Tonight s Overall Goals Acknowledge Input City has Received Reminder: Where We are in the Process Present the

More information

APPENDIX C 2012 RECYCLED WATER FEASIBILITY STUDY PUBLIC COMMENT RESPONSES

APPENDIX C 2012 RECYCLED WATER FEASIBILITY STUDY PUBLIC COMMENT RESPONSES APPENDIX C 2012 RECYCLED WATER FEASIBILITY STUDY PUBLIC COMMENT RESPONSES Prepared by: Dennis Delzeit, P.E., Project Manager Reviewed by: Tom Falk, P.E., Dudek Date: April 26, 2012 1. Can the treated effluent

More information

Morro Bay Water Reclamation Facility Draft Environmental Impact Report Public Meeting

Morro Bay Water Reclamation Facility Draft Environmental Impact Report Public Meeting Morro Bay Water Reclamation Facility Draft Environmental Impact Report Public Meeting May 1, 2018 3:00 PM Meeting Agenda Purpose of Meeting California Environmental Quality Act (CEQA) Overview and Process

More information

MEMORANDUM TERESA MCCLISH, COMMUNITY DEVELOPMENT DIRECTOR

MEMORANDUM TERESA MCCLISH, COMMUNITY DEVELOPMENT DIRECTOR MEMORANDUM TO: FROM: CITY COUNCIL TERESA MCCLISH, COMMUNITY DEVELOPMENT DIRECTOR SUBJECT: CONSIDERATION OF A REVISED SCOPE OF WORK FOR THE SOUTH SAN LUIS OBISPO COUNTY SANITATION DISTRICT RECYCLED WATER

More information

Open House Overview. We Need Your Input! Location Options Environmental Issues Treatment and Water Reuse Architecture and Visual Issues

Open House Overview. We Need Your Input! Location Options Environmental Issues Treatment and Water Reuse Architecture and Visual Issues CITY OF MORRO BAY Community Open House April 7 and 10, 2016 Introductions Mike Nunley, Program Manager John Rickenbach, Deputy Program Manager Debbie Rudd, Outreach Coordinator Brad Hemken, Facility Master

More information

Water Reclamation Facility Master Plan. Community Workshop November 14, 2016

Water Reclamation Facility Master Plan. Community Workshop November 14, 2016 Water Reclamation Facility Master Plan Community Workshop November 14, 2016 Presentation Overview Introduction Project Goals Project Background Recent and Upcoming Schedule WRF Program Overview Big Picture

More information

NOTICE OF PREPARATION

NOTICE OF PREPARATION NOTICE OF PREPARATION Date: August 5, 2016 To: Subject: Project: Lead Agency: California Office of Planning and Research, Responsible and Trustee Agencies, and Other Interested Parties of an Environmental

More information

The alternatives addressed in this EIR were selected in consideration of one or more of the following factors:

The alternatives addressed in this EIR were selected in consideration of one or more of the following factors: CHAPTER 5 Project Alternatives 5.1 Introduction The purpose of the alternatives analysis in an environmental impact report (EIR) is to describe a range of reasonable alternatives to the project that could

More information

WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES

WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES A range of potential ammonia limits were identified for alternatives evaluation, as discussed in Section 2.2.5. This chapter

More information

DRAFT (MARCH 9, 2012) 2012 Recycled Water Feasibility Study

DRAFT (MARCH 9, 2012) 2012 Recycled Water Feasibility Study DRAFT (MARCH 9, 2012) Prepared for the City of Morro Bay and Cayucos Sanitary District Wastewater Treatment Plant Upgrade Project Prepared By March 9, 2012 THIS PAGE INTENTIONALLY LEFT BLANK Printed on

More information

Water Recycling Facility Project

Water Recycling Facility Project Water Recycling Facility May 15, 2006 How did we get here? December 2002 City facing $8,000,000 fines from the Regional Water Quality Control Board (RWQCB) for Wastewater Discharge Violations. Existing

More information

Recommendations for Changes to the Requirements of Section (9), Florida Statutes - Domestic Wastewater Ocean Outfalls

Recommendations for Changes to the Requirements of Section (9), Florida Statutes - Domestic Wastewater Ocean Outfalls Recommendations for Changes to the Requirements of Section 403.086(9), Florida Statutes - Domestic Wastewater Ocean Outfalls Division of Water Resource Management Department of Environmental Protection

More information

APPENDIX A: Previous Recycled Water Reports Review TM

APPENDIX A: Previous Recycled Water Reports Review TM APPENDIX A: Previous Recycled Water Reports Review TM THIS PAGE IS INTENTIONALLY BLANK November 2014 Technical Memorandum DATE: April 16, 2014 SUBJECT: Summary of Previously Completed Recycled Water Reports

More information

Water Reclamation Facility Master Plan. Community Workshop November 14, 2016

Water Reclamation Facility Master Plan. Community Workshop November 14, 2016 Water Reclamation Facility Master Plan Community Workshop November 14, 2016 Presentation Overview Introduction Project Goals Project Background Recent and Upcoming Schedule WRF Program Overview Big Picture

More information

To: John Clemons Phone: (805) South San Luis Obispo County Sanitation District 1600 Aloha Pl Oceano, CA 93475

To: John Clemons Phone: (805) South San Luis Obispo County Sanitation District 1600 Aloha Pl Oceano, CA 93475 Technical Memorandum Date: 11/2/2015 To: John Clemons Phone: (805) 489-6666 South San Luis Obispo County Sanitation District 1600 Aloha Pl Oceano, CA 93475 Prepared by: Reviewed by: Project: SUBJECT: Kaylie

More information

City of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS:

City of Redlands Wastewater Treatment Plant. Redlands, CA LOCATION: Carollo Engineers; CH2M HILL MBR MANUFACTURER: COMMENTS: FACILITY: City of Redlands Wastewater Treatment Plant LOCATION: Redlands, CA GEO. AREA: Southern California STATUS 07/14: Operational CONSTRUCTION: ENGINEERING: Carollo Engineers; CH2M HILL MBR MANUFACTURER:

More information

8.4 West Central Brazos Water Distribution System

8.4 West Central Brazos Water Distribution System 8.4 West Central Brazos Water Distribution System 8.4.1 Description of Option The West Central Brazos Water Distribution System (WCBWDS) is a relatively unused system that could potentially provide raw

More information

MEMORANDUM SUBJECT: CONSIDERATION OF SUBMISSION OF A LETTER OF SUPPORT FOR THE SOUTH SAN LUIS OBISPO COUNTY SANITATION DISTRICT S REDUNDANCY PROJECT

MEMORANDUM SUBJECT: CONSIDERATION OF SUBMISSION OF A LETTER OF SUPPORT FOR THE SOUTH SAN LUIS OBISPO COUNTY SANITATION DISTRICT S REDUNDANCY PROJECT MEMORANDUM TO: FROM: CITY COUNCIL GEOFF ENGLISH, PUBLIC WORKS DIRECTOR SUBJECT: CONSIDERATION OF SUBMISSION OF A LETTER OF SUPPORT FOR THE SOUTH SAN LUIS OBISPO COUNTY SANITATION DISTRICT S REDUNDANCY

More information

Water Resource Task Force Meeting. Broward County Effluent Disposal and Reclaimed Water Conceptual Master Plan. January 28,

Water Resource Task Force Meeting. Broward County Effluent Disposal and Reclaimed Water Conceptual Master Plan. January 28, Water Resource Task Force Meeting Broward County Effluent Disposal and Reclaimed Water Conceptual Master Plan January 28, 2011 1 44228-703-07 Hydrology and environmental protection have driven effluent

More information

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY EXECUTIVE SUMMARY EXECUTIVE SUMMARY INTRODUCTION AND BACKGROUND The Village of Algonquin, located along the Fox River in McHenry County, provides wastewater collection and treatment services to the entire

More information

CHAPTER 8 Wastewater and Recycled Water

CHAPTER 8 Wastewater and Recycled Water CHAPTER 8 Water Code 10633 The plan shall provide, to the extent available, information on recycled water and its potential for use as a water source in the service area of the urban water supplier. The

More information

SMCSD Headworks, Primary and Secondary Treatment Pre-Design

SMCSD Headworks, Primary and Secondary Treatment Pre-Design Technical Memorandum SMCSD Headworks, Primary and Secondary Treatment Pre-Design Water andenvironment Subject: Prepared For: Prepared by: Reviewed by: SMCSD Mark Takemoto, Dennis Gellerman Steve Clary

More information

Issues in the Provision of Sanitation Services and Wastewater Reuse Iranian/US Workshop on Water Management

Issues in the Provision of Sanitation Services and Wastewater Reuse Iranian/US Workshop on Water Management Issues in the Provision of Sanitation Services and Wastewater Reuse Iranian/US Workshop on Water Management William R. Mills, General Manager, Retired (1987 2002) Orange County Water District August, 2008

More information

DRAFT. TO: Stephanie Griffin, P.E. PROJECT: Region C Water Supply Plan Freese and Nichols, Inc.

DRAFT. TO: Stephanie Griffin, P.E. PROJECT: Region C Water Supply Plan Freese and Nichols, Inc. 1320 South University, Suite 300 Fort Worth, Texas 76107-5764 Phone: 817.806.1700 Fax: 817.870.2536 DATE: September 15, 2008 PROJECT #: 0312-034-01 Memo TO: Stephanie Griffin, P.E. PROJECT: Region C Water

More information

Section Water Supply Element

Section Water Supply Element 3.3.2. Water 4-2-12 Section 3.3.2. Water Supply Element Pursuant to Sections 163.3167, 163.3177, and 163.318 Florida Statutes and Chapter 9J-5.011(2) of the Florida Administrative Code. Background Discussion

More information

Lombardo Associates, Inc. Representative Project Descriptions

Lombardo Associates, Inc. Representative Project Descriptions Lombardo Associates, Inc. Representative Project Descriptions Municipal & Private Wastewater Applications Mayo, MD Town of Woodstock, NY Town of Mashpee, MA Los Osos, San Luis Obispo, CA Little Neck- Ipswich,

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS State-Mandated Chloride (Salt) Requirements in Santa Clarita Valley About the Santa Clarita Valley Sanitation District 1. Who is the Santa Clarita Valley Sanitation District? The Santa Clarita Valley Sanitation

More information

SECTION 2.0 WASTEWATER TREATMENT PLANT AND DISPOSAL SYSTEM DESCRIPTION

SECTION 2.0 WASTEWATER TREATMENT PLANT AND DISPOSAL SYSTEM DESCRIPTION SECTION 2.0 WASTEWATER TREATMENT PLANT AND DISPOSAL SYSTEM DESCRIPTION Analytical Environmental Services 2-1 Jamul Indian Village Wastewater Treatment Plant Analytical Environmental Services 2-2 Jamul

More information

PROGRESS REPORT ON PRELIMINARY BRINE DISPOSAL SCREENING ANALYSIS

PROGRESS REPORT ON PRELIMINARY BRINE DISPOSAL SCREENING ANALYSIS PROGRESS REPORT ON PRELIMINARY BRINE DISPOSAL SCREENING ANALYSIS MAY 2015 SUMMARY In 2002, the California Regional Water Quality Control Board-Los Angeles Region ( Regional Board ), a state agency, adopted

More information

Comprehensive Plan Update - Sanitary Sewer Section Planning Commission Workshop: November 10, 2014

Comprehensive Plan Update - Sanitary Sewer Section Planning Commission Workshop: November 10, 2014 Comprehensive Plan Update - Sanitary Sewer Section Planning Commission Workshop: November 10, 2014 Application type Agency Review Comments Applicable Plan Sections Staff Planner Staff Recommendation Publicly

More information

Texas Municipal League Water Conference

Texas Municipal League Water Conference Texas Municipal League Water Conference January 8, 2015 Darron Leiker City Manager Wichita Falls, Texas Water Supply Summary Population served w/ water ~ 150,000 Includes 15 wholesale customers Area cities

More information

SANTA ANA WATERSHED BASIN STUDY

SANTA ANA WATERSHED BASIN STUDY SANTA ANA WATERSHED BASIN STUDY INLAND EMPIRE INTERCEPTOR APPRAISAL ANALYSIS SUMMARY REPORT APRIL 2013 (FINAL - JUNE 2013) prepared by: Thomas R. Nichols, P.E. U.S. Department of the Interior Bureau of

More information

CHAPTER 6. EFFLUENT DISCHARGE/REUSE ALTERNATIVES

CHAPTER 6. EFFLUENT DISCHARGE/REUSE ALTERNATIVES CHAPTER 6. EFFLUENT DISCHARGE/REUSE ALTERNATIVES This chapter presents discharge and treatment alternatives for treatment plant effluent (effluent or final effluent) within the Pt. Hadlock sewer service

More information

Effluent Disposal Feasibility Alternatives Study of Morro Valley

Effluent Disposal Feasibility Alternatives Study of Morro Valley Final Report Effluent Disposal Feasibility Alternatives Study of Morro Valley Morro Bay, California Prepared for Michael K. Nunley & Associates and the City of Morro Bay August 2016 Prepared by Table of

More information

INFRASTRUCTURE ELEMENT

INFRASTRUCTURE ELEMENT Goals, Objectives and Policies INFRASTRUCTURE ELEMENT SANITARY SEWER GOAL 4.A.1.: PROVIDE ADEQUATE CENTRAL SANITARY SEWAGE FACILITIES FOR RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT AND REDEVELOPMENT IN

More information

CRITICAL CRITERIA FOR EVALUATING MEMBRANES FOR WATER SOFTENING

CRITICAL CRITERIA FOR EVALUATING MEMBRANES FOR WATER SOFTENING CRITICAL CRITERIA FOR EVALUATING MEMBRANES FOR WATER SOFTENING Ohio AWWA 2016 Annual Conference Peter Kube, PE September 15, 2016 Outline Softening Water Discuss 4 Factors when Evaluating Membranes for

More information

The City of Cocoa (City) is located in east

The City of Cocoa (City) is located in east FWRJ Reclaimed Water and Stormwater: A Perfect Pair to Meet Total Maximum Daily Load Wasteload Allocations? Danielle Honour, James Wittig, John A. Walsh, and Don Stevens Danielle Honour, P.E., D.WRE, and

More information

Brackish Desalination Water Supply Planning for Resiliency and Growth

Brackish Desalination Water Supply Planning for Resiliency and Growth Brackish Desalination Water Supply Planning for Resiliency and Growth Joe Mouawad, P.E. November 17, 2016 1 emwd.org EMWD Overview Established in 1950 Unique agency, serving: Water/wastewater/recycled

More information

PRELIMINARY WASTEWATER CAPACITY STUDY

PRELIMINARY WASTEWATER CAPACITY STUDY PRELIMINARY WASTEWATER CAPACITY STUDY Tentative Tract Map No. 18955 CITY OF HESPERIA Prepared for: HESPERIA VENTURES I, LLC 10410 Roberts Road Calimesa, CA 92320 Tel (714) 785 2381 Mr. John Ohanian Prepared

More information

Environmental Task Force SSSMP Summary, September 18, 2011 Scheduled for City Council Approval September 26, 2017

Environmental Task Force SSSMP Summary, September 18, 2011 Scheduled for City Council Approval September 26, 2017 Attachment 1 Environmental Task Force SSSMP Summary, September 18, 2011 Scheduled for City Council Approval September 26, 2017 Sanitary Sewer System Master Plan Summary Points - City s sanitary system

More information

Appendix 18 Stage 2 Refined Options Technical Memo Summary of Capex and Opex

Appendix 18 Stage 2 Refined Options Technical Memo Summary of Capex and Opex Appendix 18 Stage 2 Refined Options Technical Memo Summary of Capex and Opex Memorandum To: Wolfgang Kanz Date: 4 July 2017 From: Rachael Shaw Our Ref: 6512659 Copy: Garry Macdonald Subject: Gisborne Stage

More information

WASTEWATER TREATMENT MASTER PLAN SUPPLEMENT EXECUTIVE SUMMARY

WASTEWATER TREATMENT MASTER PLAN SUPPLEMENT EXECUTIVE SUMMARY City of Modesto Wastewater Treatment Master Plan Jennings Road Secondary Treatment Facility WASTEWATER TREATMENT MASTER PLAN SUPPLEMENT EXECUTIVE SUMMARY DRAFT June 2008 2700 YGNACIO VALLEY ROAD, SUITE

More information

Water Reclamation Facility Master Plan. City Council Presentation December 13, 2016

Water Reclamation Facility Master Plan. City Council Presentation December 13, 2016 Water Reclamation Facility Master Plan City Council Presentation December 13, 2016 Presentation Overview Introduction Project Goals Project Background Recent and Upcoming Schedule WRF Program Overview

More information

AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE

AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE PLAN SUMMARY AUTHORITY OF THE BOROUGH OF CHARLEROI WASHINGTON COUNTY, PENNSYLVANIA ACT 537 SEWAGE FACILITIES PLAN UPDATE The Pennsylvania Sewage Facilities Act (Act 537) was enacted by the Pennsylvania

More information

Planning Today For Water Tomorrow

Planning Today For Water Tomorrow Planning Today For Water Tomorrow Planning ahead is always smart, especially when it comes to something as important as drinking water. The Tampa Bay region expects to gain half a million people by 2030,

More information

Section 8 Stevinson Water District Study Area

Section 8 Stevinson Water District Study Area Stevinson Water District Study Area Figure 8-1. Location of Stevinson Water District & the Merquin County Water District (SWD 2005). 8.1 Introduction and Overview The Stevinson Water District (SWD) is

More information

20. UTILITIES AND SERVICE SYSTEMS

20. UTILITIES AND SERVICE SYSTEMS June 28, 2018 Page 20-1 20. UTILITIES AND SERVICE SYSTEMS This EIR chapter describes existing conditions for and distribution, collection and, and solid waste disposal and recycling in the planning area.

More information

Lathrop, CA. FACILITY: City of Lathrop Water Recycling Plant No. 1 LOCATION: MBR MANUFACTURER:

Lathrop, CA. FACILITY: City of Lathrop Water Recycling Plant No. 1 LOCATION: MBR MANUFACTURER: FACILITY: City of Lathrop Water Recycling Plant No. 1 LOCATION: Lathrop, CA GEO. AREA: Northern California STATUS 07/14: Operational CONSTRUCTION: ENGINEERING: MBR MANUFACTURER: Unknown OPERATED BY: FUNDED

More information

Decentralized Scalping Plants

Decentralized Scalping Plants Decentralized Scalping Plants Kirstin Byrne College of Engineering, California State University Long Beach 1250 Bellflower Blvd., Long Beach, CA 90840 (714) 580-0364; klb.byrne@gmail.com Abstract: With

More information

Webcast August 9, R. Shane Trussell, Ph.D., P.E., BCEE Principal Investigator. Gordon J. Williams, Ph.D., P.E.

Webcast August 9, R. Shane Trussell, Ph.D., P.E., BCEE Principal Investigator. Gordon J. Williams, Ph.D., P.E. Reclaimed Water Desalination Technologies: A Full-Scale Performance and Cost Comparison Between Electrodialysis Reversal and Microfiltration/ Reverse Osmosis Webcast August 9, 2012 R. Shane Trussell, Ph.D.,

More information

EXHIBIT A. City of Reno TMWRF/Huffaker Reservoir Effluent Interconnection Pipeline Evaluation

EXHIBIT A. City of Reno TMWRF/Huffaker Reservoir Effluent Interconnection Pipeline Evaluation EXHIBIT A City of Reno TMWRF/Huffaker Reservoir Effluent Interconnection Pipeline Evaluation SCOPE OF SERVICES Stantec Consulting Services, Inc. (Stantec) is pleased to offer its services to assist in

More information

QUINCY 1WATER UTILITY TDS CONTROL. Lloyd Emil Voges Brown and Caldwell 701 Pike St. Suite 1200 Seattle, WA

QUINCY 1WATER UTILITY TDS CONTROL. Lloyd Emil Voges Brown and Caldwell 701 Pike St. Suite 1200 Seattle, WA QUINCY 1WATER UTILITY TDS CONTROL Lloyd Emil Voges Brown and Caldwell 701 Pike St. Suite 1200 Seattle, WA 98101 evoges@brwncald.com 206-749-2268 Abstract The city of Quincy, Washington has an industrial

More information

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND Brett T. Messner, PE, Tetra Tech, Inc., 201 E Pine St, Suite 1000, Orlando, FL 32801 Brett.Messner@tetratech.com, Ph: 239-851-1225 Fred

More information

Chapter 2 Screening Approach and Criteria

Chapter 2 Screening Approach and Criteria Chapter 2 Screening Approach and Criteria CHAPTER 2 SCREENING APPROACH AND CRITERIA 2.1 INTRODUCTION As discussed in Chapter 1, the purpose of this report is to identify and screen alternative technologies,

More information

Wastewater Treatment Systems, Wastewater Issues and Permits

Wastewater Treatment Systems, Wastewater Issues and Permits Wastewater Treatment Systems, Wastewater Issues and Permits Lucas Gregory Texas Water Resources Institute November 29, 2017 Debbie Magin Guadalupe Blanco River Authority Ryan Gerlich Texas A&M AgriLife

More information

San Luis Obispo County IRWM Region FULL PROJECT LIST - DRAFT March 30, 2017

San Luis Obispo County IRWM Region FULL PROJECT LIST - DRAFT March 30, 2017 REGION GOAL or PROJECT/PROGRAM NAME PROJECT SPONSOR STATUS NOTES REGIONAL or MULTIPLE SUB-REGIONS 2007 Project Regional Ecosystem Invasive Species Program County of San Luis Obispo 2007 Concept Regional

More information

Florida Ocean Outfall Legislation: What it Means for Utilities and What They Are Doing to Comply

Florida Ocean Outfall Legislation: What it Means for Utilities and What They Are Doing to Comply PD-Sw210 Florida Ocean Outfall Legislation: What it Means for Utilities and What They Are Doing to Comply May 1, 2015 Monique Durand, PE FIPA Spring Workshop 1 1 Outline Background Regulatory overview

More information

Baltimore City Department of Public Works

Baltimore City Department of Public Works Baltimore City Department of Public Works Back River WWTP Process and Construction Overview Michael F. Gallagher, Chief Wastewater Facilities Division Wastewater Treatment Chesapeake Bay Restoration Water

More information

CITY OF ASHLAND EXECUTIVE SUMMARY WATER CONSERVATION AND REUSE STUDY FINAL. June 2011

CITY OF ASHLAND EXECUTIVE SUMMARY WATER CONSERVATION AND REUSE STUDY FINAL. June 2011 CITY OF ASHLAND EXECUTIVE SUMMARY WATER CONSERVATION AND REUSE STUDY FINAL June 2011 720 SOUTHWEST WASHINGTON STREET, SUITE 550 PORTLAND, OREGON 97205-3507 (503) 227-1885 FAX (503) 227-1747 pw://carollo/documents/client/or/ashland/8406a00/deliverables/wcrs/executive

More information

City of San Diego Pure Water Project October 2014

City of San Diego Pure Water Project October 2014 City of San Diego Pure Water Project October 2014 SDCTA Position: SUPPORT Rationale for Position: Substantial study has demonstrated a potable reuse project within the City of San Diego would be safe,

More information

WATER POLLUTION CONTROL PLANT

WATER POLLUTION CONTROL PLANT WATER POLLUTION CONTROL PLANT Welcome to the Sunnyvale Water Pollution Control Plant For 60 years, Sunnyvale s Water Pollution Control Plant has worked tirelessly 24 hours a day and 7 days a week. Rain

More information

Pajaro River Watershed Integrated Regional Water Management Plan Update Project Solicitation Form

Pajaro River Watershed Integrated Regional Water Management Plan Update Project Solicitation Form Pajaro River Watershed Integrated Regional Water Management Plan Update PROJECT OVERVIEW General Project Information Project Title: South County Recycled Water Pipeline - Short-Term CIP Implementation

More information

ACWA Annual Conference Mount Bachelor Village Resort Bend, OR July 25, 26, & 27, 2012

ACWA Annual Conference Mount Bachelor Village Resort Bend, OR July 25, 26, & 27, 2012 WASTEWATER TREATMENT TRENDS IN THE 21ST CENTURY ACWA Annual Conference Mount Bachelor Village Resort Bend, OR July 25, 26, & 27, 2012 George Tchobanoglous Department of Civil and Environmental Engineering

More information

2015 Water Resources Status Report

2015 Water Resources Status Report CITY OF SAN LUIS OBISPO 2015 Water Resources Status Report This Report Covers the Time Period of October 1, 2014 through September 30, 2015 Salinas Reservoir Dam, February 2015. Photo credit: County of

More information

Hollister Urban Area Water and Wastewater Master Plan Update

Hollister Urban Area Water and Wastewater Master Plan Update Hollister Urban Area Water and Wastewater Master Plan Update City of Hollister, San Benito County Water District, and Sunnyslope County Water District June 2017 Robert H. Ellis NO. 24679 EXP. 12/31/17

More information

CHAPTER 4 SYSTEM DESIGN CRITERIA

CHAPTER 4 SYSTEM DESIGN CRITERIA INTRODUCTION CHAPTER 4 SYSTEM DESIGN CRITERIA Adequate design of the District s wastewater conveyance facilities requires the determination of the quantity of wastewater from contributing sources. The

More information

Brackish Desalination Water Supply Planning for Resiliency and Growth

Brackish Desalination Water Supply Planning for Resiliency and Growth Brackish Desalination Water Supply Planning for Resiliency and Growth Paul D. Jones II February 2, 2017 1 emwd.org EMWD Agency Overview Established in 1950 Unique agency, serving: Water/wastewater/recycled

More information

December 13, 2017 UPDATE

December 13, 2017 UPDATE December 13, 2017 UPDATE Topics 1. Timeline 2. Scope of This Effort 3. Master Plan Findings 4. Next Steps Timeline Timeline of the Master Plan and Related Efforts Date 7/2008, 7/2009, 2/2010 Item Dates

More information

APPENDIX A. 1. Background. 1.1 Existing Facilities. Page 1

APPENDIX A. 1. Background. 1.1 Existing Facilities. Page 1 APPENDIX A PRELIMINARY TECHNICAL SPECIFICATIONS FOR BIOSOLIDS MANAGEMENT SERVICES JEA Buckman Residuals Management Facility 1. Background JEA is seeking biosolids management services from experienced biosolids

More information

NOTICE OF PREPARATION. California Office of Planning and Research, Responsible Agencies, Trustee Agencies, and Other Interested Parties

NOTICE OF PREPARATION. California Office of Planning and Research, Responsible Agencies, Trustee Agencies, and Other Interested Parties COUNTY SANITATION DISTRICTS OF LOS ANGELES COUNTY 1955 Workman Mill Road, Whittier, CA 90601-1400 Mailing Address: P.O. Box 4998, Whittie r, CA 90607-4998 Telephone: (562) 699-7411, FAX: (562) 699-5422

More information

WASTEWATER INTRODUCTION ENVIRONMENTAL SETTING

WASTEWATER INTRODUCTION ENVIRONMENTAL SETTING 3.14.4 WASTEWATER INTRODUCTION This section of the Draft EIR describes the wastewater disposal conditions in the area surrounding the project site. The analysis focuses on potential impacts to wastewater

More information

Miami Upgrades. Deficiencies in Florida s

Miami Upgrades. Deficiencies in Florida s Miami Upgrades Florida s Miami-Dade Water and Sewer Department creates a $13.5 billion capital improvement plan to provide safe and high-quality service. by Janice Hoppe Deficiencies in Florida s Miami-Dade

More information

June 4, Mr. Arden Wallum General Manager Mission Springs Water District Second Street Desert Hot Springs, CA Dear Mr.

June 4, Mr. Arden Wallum General Manager Mission Springs Water District Second Street Desert Hot Springs, CA Dear Mr. June 4, 2015 Mr. Arden Wallum General Manager Mission Springs Water District 66575 Second Street Desert Hot Springs, CA 92240 Dear Mr. Wallum: Thank you for your letter and participation in the Coachella

More information

Rehoboth Beach Effluent Disposal Study. Evaluation of Wastewater Discharge Alternatives. Center for the Inland Bays STAC Meeting January 13, 2006

Rehoboth Beach Effluent Disposal Study. Evaluation of Wastewater Discharge Alternatives. Center for the Inland Bays STAC Meeting January 13, 2006 Rehoboth Beach Effluent Disposal Study Evaluation of Wastewater Discharge Alternatives Center for the Inland Bays STAC Meeting January 13, 2006 1 Agenda Background Objectives/Goals Land Search Discharge

More information

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W Facility Overview The recently upgraded and expanded Henry N. Wochholz Regional Water Reclamation Facility (WRWRF) treats domestic wastewater generated from the Yucaipa-Calimesa service area. The WRWRF

More information

EXECUTIVE SUMMARY A. INTRODUCTION B. FINDINGS AND CONCLUSIONS. 1. Conveyance System

EXECUTIVE SUMMARY A. INTRODUCTION B. FINDINGS AND CONCLUSIONS. 1. Conveyance System EXECUTIVE SUMMARY A. INTRODUCTION NACA has committed to planning, designing and constructing regional wastewater conveyance and treatment facilities to serve several municipalities in Northwest Arkansas.

More information

Salinity Management Strategies During Drought

Salinity Management Strategies During Drought EASTERN MUNICIPAL WATER DISTRICT Salinity Management Strategies During Drought Jayne Joy, P.E. Director of Environmental and Regulatory Compliance October 1, 2015 www.emwd.org 1 Agenda Overview of EMWD

More information

Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project

Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project ABSTRACT & POWERPOINT PRESENTATION Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project Tim Smith Principal Engineer Helix Water District La Mesa,

More information

Public Information Meeting Wastewater Master Plan

Public Information Meeting Wastewater Master Plan Public Information Meeting Wastewater Master Plan October 23, 2007 Presentation Outline Introduction and History Break for Questions Wastewater 101 Break for Questions Regulatory Framework Wastewater Master

More information

Indirect Potable Reuse for Groundwater Recharge Succession Strategy for Recycled Water

Indirect Potable Reuse for Groundwater Recharge Succession Strategy for Recycled Water EASTERN MUNICIPAL WATER DISTRICT Indirect Potable Reuse for Groundwater Recharge Succession Strategy for Recycled Water Paul D. Jones II, P.E. General Manager, Eastern Municipal Water District March 11,

More information

The Future of Ventura s Water Supply

The Future of Ventura s Water Supply The Future of Ventura s Water Supply Daniel Cormode East Ventura Community Council Planning & Development Committee 2016 02 25 02/28/2016 11 We re running short of water? 02/28/2016 2 1/1/2025 Allocation

More information

CHAPTER 6 SANITARY SEWER SUB-ELEMENT

CHAPTER 6 SANITARY SEWER SUB-ELEMENT CHAPTER 6 SANITARY SEWER SUB-ELEMENT Page 1 of 10 CHAPTER 6 SANITARY SEWER SUB-ELEMENT A. OVERVIEW The following Future Land Use categories are considered to be urban and require the provision of sanitary

More information

CERTIFICATION PROPOSAL

CERTIFICATION PROPOSAL WASTEWATER TREATMENT PLANT IMPROVEMENTS Revised: May 11, 2015 WASTEWATER TREATMENT PLANT IMPROVEMENTS INDEX EXECUTIVE SUMMARY 2 1. ELIGIBILITY 4 2. CERTIFICATION CRITERIA 2.1 Technical Criteria 2.1.1.

More information

Ocean Outfall Legislation Compliance

Ocean Outfall Legislation Compliance Ocean Outfall Legislation Compliance City of Hollywood Department of Public Utilities LARGE USER MEETING October 2, 2008 1 Agenda Regulatory Review Baseline Establishment Nutrient Reduction Options Reuse

More information

Findings from Updated Site Comparison Report. City Council Presentation September 26, 2017

Findings from Updated Site Comparison Report. City Council Presentation September 26, 2017 Findings from Updated Site Comparison Report City Council Presentation September 26, 2017 Link to WRF Site Video Provide direction as necessary. Options include directing staff to: Proceed with planning

More information

Sewer Facilities 102. Hampstead Sewer Service Area. Carroll County Water & Sewer Master Plan. Current Conditions

Sewer Facilities 102. Hampstead Sewer Service Area. Carroll County Water & Sewer Master Plan. Current Conditions Sewer Facilities 102 Hampstead Sewer Service Area Current Conditions Carroll County owns and operates the public sewer system that serves both the Town of Hampstead and adjoining areas in the county. The

More information

Assessment. Appendix I: Water Supply Assessment

Assessment. Appendix I: Water Supply Assessment I Appendix I: Water Supply Assessment Please see the next page. CITY OF SAN LUIS OBISPO ASSESSMENT OF WATER SUPPLY Water Code 10910 et seq. To: City of San Luis Obispo 990 Palm Street San Luis Obispo,

More information

Sulaibiya world s largest membrane water reuse project

Sulaibiya world s largest membrane water reuse project Water Technologies & Solutions technical paper Sulaibiya world s largest membrane water reuse project background In May 2001, a consortium including Mohammed Abdulmohsin Al-Kharafi and Sons (The Kharafi

More information

West Hernando County Sewer Master Plan SECTION 7.0 RECLAIMED WATER

West Hernando County Sewer Master Plan SECTION 7.0 RECLAIMED WATER SECTION 7.0 RECLAIMED WATER 7.1 Introduction The use of highly treated wastewater effluent, or reclaimed water, has expanded greatly in Florida over the past several decades. In particular, the use of

More information

New Investments in Water Portfolios

New Investments in Water Portfolios California Water Plan Update 2010 New Investments in Water Portfolios California Water and Environmental Water Forum Annual Meeting February 27, 2007 Todd Hillaire hillaire@water.ca.gov California Department

More information

Water Reuse: Orlando s Experiences & Perspectives. Rick Howard, PE Public Works Director

Water Reuse: Orlando s Experiences & Perspectives. Rick Howard, PE Public Works Director Water Reuse: Orlando s Experiences & Perspectives Rick Howard, PE Public Works Director Water Reuse The process of using wastewater that has been thoroughly treated and disinfected to remove harmful organisms

More information

Pima County Regional Optimization Master Plan

Pima County Regional Optimization Master Plan Pima County Regional Optimization Master Plan Proposed extent of screen enclosure Existing and Expanded Ina Road WPCF Approximately 160 acres Sports Park Michael Gritzuk, P.E., Director Edward Curley,

More information

Wastewater System Environmental Setting Wastewater Conveyance Facilities

Wastewater System Environmental Setting Wastewater Conveyance Facilities February 20, 2017 To: Mr. Ryan Sawyer AICP Analytical Environmental Services 1801 7 th Street Sacramento, CA 95811 Subject: Comments on the Crystal Geyser Draft EIR (DEIR) Dear Mr. Sawyer: This letter

More information

CHAPTER IV EXISTING SEWAGE TREATMENT FACILITIES IN THE PLANNING AREA

CHAPTER IV EXISTING SEWAGE TREATMENT FACILITIES IN THE PLANNING AREA CHAPTER IV EXISTING SEWAGE TREATMENT FACILITIES IN THE PLANNING AREA A. EXISTING FACILITIES 1. Westtown-Chester Creek Plant Westtown Township acquired the Westtown-Chester Creek Treatment Plant (WCC Plant)

More information

WATER CONSERVATION AND REUSE CASE STUDY IN PHARMACEUTICAL INDUSTRY. Joseph G. Cleary, P.E., BCEE HydroQual, Inc MacArthur Blvd.

WATER CONSERVATION AND REUSE CASE STUDY IN PHARMACEUTICAL INDUSTRY. Joseph G. Cleary, P.E., BCEE HydroQual, Inc MacArthur Blvd. WATER CONSERVATION AND REUSE CASE STUDY IN PHARMACEUTICAL INDUSTRY Joseph G. Cleary, P.E., BCEE HydroQual, Inc. 1200 MacArthur Blvd. Mahwah, NJ 07430 ABSTRACT A pharmaceutical company in Puerto Rico was

More information

CHAPTER 2.0 EXISTING FACILITIES

CHAPTER 2.0 EXISTING FACILITIES CHAPTER 2.0 EXISTING FACILITIES CHAPTER 2 EXISTING FACILITIES 2.1 HISTORY OF LANCASTER WATER RECLAMATION PLANT District No. 14 was formed in 1938 and the discharge of treated effluent to Amargosa Creek

More information

From Brine to Devine A Story of Waste to Wetlands MSSC Annual Salinity Summit January 28, 2015

From Brine to Devine A Story of Waste to Wetlands MSSC Annual Salinity Summit January 28, 2015 From Brine to Devine A Story of Waste to Wetlands 2016 MSSC Annual Salinity Summit January 28, 2015 City of Goodyear Bullard Water Campus, Arizona USGS 2001 Bullard Water Campus Bullard Water Campus Reverse

More information

MOUNTAIN HOUSE MASTER PLAN CHAPTER THIRTEEN WASTEWATER TREATMENT AND COLLECTION SYSTEM

MOUNTAIN HOUSE MASTER PLAN CHAPTER THIRTEEN WASTEWATER TREATMENT AND COLLECTION SYSTEM CHAPTER THIRTEEN WASTEWATER TREATMENT AND COLLECTION SYSTEM CHAPTER THIRTEEN: WASTEWATER TREATMENT AND COLLECTION SYSTEM 13.1 INTRODUCTION 13.1 13.2 ASSUMPTIONS 13.1 13.3 WASTEWATER GENERATION 13.1 13.4

More information

Goals, Objectives, and Policies Infrastructure Element Introduction

Goals, Objectives, and Policies Infrastructure Element Introduction Goals, Objectives, and Policies Infrastructure Element Introduction Pursuant to Section 163.3177 (6) (c), FS and Sections 9J-5.011 (2)(b) and (c), FAC, the following represents the Potable Water, Sanitary

More information