BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT FOR EXISTING AND PLANNED SECTIONS OF US 19
|
|
- Lynne Williams
- 5 years ago
- Views:
Transcription
1 BICYCLE/PEDESTRIAN ACCESS TO TRANSIT SAFETY ASSESSMENT FOR EISTING AND PLANNED SECTIONS OF US 19 September 2015 A JOINT EFFORT OF THE PINELLAS METROPOLITAN PLANNING ORGANIZATION AND THE FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT 7
2 Meeting Agenda Review of Technical Memorandum #1 Project Purpose Summary of Historic, Existing and Proposed Conditions Outreach Efforts Conditions and Prioritized Tables Current and Upcoming Work Discussion
3 Project Purpose PSTA Route 19 Is the Highest Ridership Transit Route in Pinellas US Highway 19 Is A Key North-South Regional Arterial Highway, and Has A History of Serious Pedestrian Accidents Access to Transit Along the Corridor Likely Involves Getting Across US 19 This Study Will Look for Ways to Understand and Improve Transit Access and Crossings for Existing and Proposed Conditions
4 Progress Update Completed TASK 1: EVALUATE CROSSING ISSUES Create Crossing Inventory Local Plans and Policies Review Review EIS and Preferred Design Alternatives Transit Ridership Boarding and Alighting Analysis Breakdown of Average Age, Income, and Journey to Work Socioeconomic Data On-Board Survey of PSTA Ridership Small Discussion Group Workshops Analyze Existing and Future Land Use Map Out Existing and Projected Population and Jobs Existing and Proposed Last Mile Sidewalk and Trails Map First Project Advisory Committee Counts of Bicycle and Pedestrian Crossings
5 Progress Update Completed TASK 1: EVALUATE CROSSING ISSUES Summarize All Crashes and Breakout by Crash Type Evaluate Subset of Bicycle and Pedestrian Crashes by Location Conduct Interviews with PSTA Operators Meet with FDOT Project Managers for Upcoming Scoping Process Summarize Crossing Needs By Location and Priority for Scoping Identify Crossing Needs Document findings in Technical Memorandum Second Project Advisory Committee Meeting Identify Locations for Short Term Evaluation Summarize Potential Enhancements & Cost-Benefit Methodology Conduct Last Mile Site Visits Create Exhibits for Crash Diagrams for Top Locations
6 Progress Update Completed TASK 2: DOCUMENT OPERATING ASSUMPTIONS Summarize Transit Development Plan Transit Conditions Summarize Desired Corridor Land Use Changes Create Updated Task Work Plan Third Project Advisory Committee Meeting Draft Purpose and Need Statement for US 19 Update Cost/Benefit Analysis Methodology Document High Level/Order of Magnitude Costs Fourth Project Advisory Committee Meeting Committee and Board Presentations
7 Progress Update Draft Summary of Technical Data Posted to Project Website: US19Corridor
8 Draft Technical Memo Overview Report Sections 1. Introduction and Overview 2. Summary of Conditions 3. Input Received 4. Tabular Summary by Location
9 Provides Background on Project and Organization of Report Section 1: Introduction and Overview
10 Section 2: Summary of Conditions Summarizes Wide Ranging Datasets Crossing Inventory Plans and Policies Land Use People & Jobs Socioeconomic Data Crash History Transit Activity Crossing Activity
11 Section 2: Summary of Conditions Plans and Policies Review Provides Context for Local Governments.
12 Section 2: Summary of Conditions Plans Reviewed Pinellas Countywide Plan PSTA TDP Clearwater US 19 Corridor Plan Clearwater Greenprint Largo Strategic Plan Tarpon Springs Comp. Plan Dunedin Comp. Plan TBARTA Master Plan Pinellas County US 19 TIGER Application Tarpon Land Development Code Pinellas Land Development Code Clearwater Community Development Code Pinellas Park Development Code US 19 EIS and Preferred Design Alternatives
13 Section 2: Summary of Conditions US 19 Flyovers Have Been Planned Since the Late 1980 s Countryside Mall under construction at US 19 and SR 580 circa 1975
14 Section 2: Summary of Conditions Planned Grade Separation Expected to Reduce Travel Time and Improve Safety Potential Crossings and Bus Stop Locations Become More Limited Future Projects Should Consider Reasonable Spacing for Crossing Opportunities, Stop Placement
15 Section 2: Summary of Conditions Walk/Bike/Bus to Work Areas Where Percent of Transit Commuters is Higher Than Average Need Bus Stop Access
16 Section 2: Summary of Conditions Population Density Pockets Density Greater Than 7 Persons Per Acre More Productive to Serve with Transit
17 Section 2: Summary of Conditions Employment Density Pockets Clusters of Jobs (10 Employees Per Acre) Provide Concentration of Destinations, Focus for Transit Plans
18 Section 2: Summary of Conditions Transit Oriented Planning Transit Access Needed for Clearwater Multimodal Corridor and Activity Centers in Tarpon and Pinellas Park
19 Section 2: Summary of Conditions More Residential, Higher Density Retail Shifts to Mixed Use More Industrial Less Publicly Owned Land Use Shifts Towards More Intensity, Becomes Easier to Serve With Transit
20 Section 2: Summary of Conditions Future Land Use Changes 2015 Civic/Public Industrial Other Commercial Residential (All Density) Residential High Density Residential Low Density 19% 19% 23% 22% 46% 16% 5% 8% 9% 2% 31% Previous Future Land Use Adopted Future Land Use
21 Section 2: Summary of Conditions Alderman Road (382) Tampa Road (706) Curlew Road (604) Nebraska Ave (270) SR 580 (251) Top 5 Intersections for Number of Crashes
22 Section 2: Summary of Conditions Pedestrian Crashes Account for A Disproportionate Share of Fatal Crashes Bike-Ped Crashes 4.4% 37.3% All Crashes By Type Fatal Crashes By Type
23 Section 2: Summary of Conditions Total Bicycle/Pedestrian Crashes by Location On/Off Ramp, 1% Other, 2% Driveway / Access, 16% At Intersection, 45% Non-Intersection, 30% Intersection Related, 6%
24 Section 2: Summary of Conditions Bicycle Pedestrian Crashes Near Bus Stop Within 1/4 Mile 84% Within 500ft 72% Within 200ft 41% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90%
25 Section 3: Input Received Project Advisory Committee On Board Survey Operator Interviews Focus Group Workshops Project Website
26 Section 3: Input Received On-Board Survey and Operator Interviews: Plans for US 19 Need to Assume Increasing Importance of Transit for Future Designs It Is the Spine for Transit North of Clearwater
27 Section 3: Input Received Important Transit Considerations Countywide Origins and Destinations Route 19 is Key Transfer Route Most Bus Riders Connecting to Jobs Connect to Pasco County Public Transit (PCPT) via Tarpon Springs
28 Section 4: Tabular Summary Work Program Coordination: Meetings with FDOT Project Managers Objective Incorporate Data Into Scoping Process for Upcoming Design Projects Empower Design Professionals with Empirical Data When Making Typical Design Choices Outcome: Issues Affecting Access to Transit Summarized In A Table By Location (Mileposts). Crossing Issues Emphasized
29 Section 4: Tabular Summary Tabular Summary of Conditions Work Program Coordination: Past Projects, Short- Term Projects, Future Projects Prioritizing Safety #1 Safety #2 Mobility #3 Need
30 What We re Working On Project Website Updates/ Meetings Scoping Support and Identify Shorter-Term Enhancements (Task 1) Document Operating Assumptions (Task 2) Close Out TM#1 Review (October) Last Mile Site Visits Crash Diagram Exhibits Cost-Benefit Methodology Purpose & Need Statement Identify Long Term Strategies
31 DISCUSSION
32 Further Information Project website: FDOT Contact: Elba Lopez Regional Transit/Intermodal Systems Planning FDOT District 7 Intermodal Systems Development (ISD) Phone: elba.lopez@dot.state.fl.us Pinellas MPO Contact: Sarah Perch Principal Planner Pinellas County Metropolitan Planning Organization (MPO) Phone: sperch@pinellascounty.org Consultant Contact: James Fogarty Phone: Jfogarty@TindaleOliver.com
TBARTA 2015 Regional Transportation Master Plan 2040 Regional Long Range Transportation Plan AUGUST 2015
TBARTA 2015 Regional Transportation Master Plan AUGUST 2015 Table of Contents 1.0 Introduction... 2 1.1 Updating the Master Plan... 2 1.2 About this Document... 2 2.0 Regional Long Range Transportation
More information2040 Addendum Performance-Based Planning November 2018
2040 Long Range Transportation Plan 2040 Addendum Performance-Based Planning November 2018 Adopted June 13, 2018 250 S. Orange Ave, Suite 200, Orlando, FL 32801 407-481-5672 www.metroplanorlando.org MetroPlan
More informationLong Range Transportation Plan
Charlotte County-Punta Gorda Metropolitan Planning Organization Long Range Transportation Plan Adopted October 2015 Board Charlotte County Commissioner Christopher G. Constance (Chair) Commissioner Stephen
More informationPINELLAS COUNTY MOBILITY PLAN SUMMARY REPORT
PINELLAS COUNTY MOBILITY PLAN SUMMARY REPORT In September, 2013, the Pinellas County Mobility Plan Report was approved by the Metropolitan Planning Organization (MPO). This action endorsed a countywide
More informationCHAPTER 2. VISION, GOALS AND MTP FRAMEWORK
CHAPTER 2. VISION, GOALS AND MTP FRAMEWORK MTP VISION In order to create a framework for the 2040 Metropolitan Transportation Plan (MTP), a vision statement was drafted by the Vision/Goals Committee and
More informationCMNAA. Central Manatee Network Alternatives Analysis Alternatives Public Meeting CMNAA STUDY PROCESS. STUDY AREA 17th St. W
District One CMNAA Central Manatee Network Alternatives Analysis December 12, 2017 5:00 pm - 7:00 pm First Baptist Church 1306 Manatee Ave. W, Bradenton, FL 34205 Central Manatee Network Alternatives Analysis
More informationCongestion Management Process in the US A Federal Requirement
Congestion Management Process in the US A Federal Requirement ITS Argentina November 6, 2013 U.S. Department of Transportation Federal Highway Administration Outline of Seminar Discussion of Congestion
More informationDale Mabry Pedestrian Overpass Technical Feasibility Analysis. March 2017
Dale Mabry Pedestrian Overpass Technical Feasibility Analysis March 2017 Overview Two Part Study: 1. Feasibility of Alternatives for a Pedestrian Overpass Across Dale Mabry Hwy Near I 275 2. Walk/Bike
More informationIntegrated Transportation Plan. TAC Meeting September 16, 2014
Integrated Transportation Plan TAC Meeting September 16, 2014 Project Schedule Today TAC Meeting October 10 TAC Meeting (teleconference) October 29 Public Workshop December 9 JIM Presentation Plan Contents
More informationACTIVE TRANSPORTATION ADVISORY COMMITTEE. Memphis MPO March 30, 2015
ACTIVE TRANSPORTATION ADVISORY COMMITTEE Memphis MPO March 30, 2015 Agenda Welcome & Introductions Announcements and Briefings Livability 2040: Regional Transportation Plan Congestion Management Process
More informationChapter 2 Transportation Element Goals, Objectives and Policies
Chapter 2 Transportation Element Goals, Objectives and Policies City of Belleview Comprehensive Plan Adopted by Ord 2016-10 on July 5, 2016 GOALS, OBJECTIVES AND POLICIES Goal 2 Transportation...1 Objective
More informationAutonomous/Connected Vehicle Guidance. Dan Beaty, AICP HNTB
Florida Department of TRANSPORTATION Autonomous/Connected Vehicle Guidance Dan Beaty, AICP HNTB Metropolitan Planning Organization Advisory Council Staff Directors Meeting June 1, 2017 Outline Purpose
More information2040 Transportation Policy Plan Conversion to Performance Based Planning Basis. 25 th Annual CTS Transportation Research Conference May 21, 2014
2040 Transportation Policy Plan Conversion to Performance Based Planning Basis 25 th Annual CTS Transportation Research Conference May 21, 2014 1 About the plan Long-range transportation plan for the Twin
More informationHILLSBOROUGH COUNTY METROPOLITAN PLANNING ORGANIZATION
HILLSBOROUGH COUNTY METROPOLITAN PLANNING ORGANIZATION 2035 Long Range Transportation Plan Needs Assessment Segment Summary: Prepared for: Hillsborough County Metropolitan Planning Organization P.O. Box
More informationHighest Priority Performance Measures for the TPP
Highest Priority Performance Measures for the TPP The following list of measures are the highest priority performance measures as identified by modal working groups. These groups consist of staff from
More informationAPPENDIX A PLANNING PROCESS FOR RURAL AREAS OF THE STATE
APPENDIX A PLANNING PROCESS FOR RURAL AREAS OF THE STATE Background SCDOT Statewide Transportation Planning Process Consultation Cooperation with Local Officials in Non-Metropolitan (Rural) Areas SCDOT
More information2060 Florida Transportation Plan
2060 Florida Transportation Plan Tampa Bay Regional Planning Council March 14, 2011 Huiwei Shen Office of Policy Planning Florida Department of Transportation What Is the Florida Transportation Plan? Florida
More informationContents i Contents Page 1 A New Transportation Plan Community Involvement Goals and Objectives... 11
Contents i Contents 1 A New Transportation Plan... 1 Why develop a new plan?... 1 What area does the LRTP focus on?... 2 Why is this LRTP important?... 3 Meeting Requirements for Transportation Planning...
More informationPasco County MPO: Congestion Management Process PROCEDURES HANDBOOK
: Congestion Management Process PROCEDURES HANDBOOK Final: March 2016 TABLE OF CONTENTS CONGESTION MANAGEMENT PROCEDURES HANDBOOK OVERVIEW... i Chapter 1: INTRODUCTION... 1-1 Causes of Congestion... 1-2
More informationCentral Manatee Network Alternatives Analysis
District One CMNAA Central Manatee Network Alternatives Analysis Central Manatee Network Alternatives Analysis The Florida Department of Transportation (FDOT) is conducting the Central Manatee Network
More informationLake Oswego to Portland Transit Project Health Impact Assessment
Lake Oswego to Portland Transit Project Health Impact Assessment Summary Health Impact Assessment (HIA) is an emerging practice that evaluates the impact of specific plans, policies, and projects on the
More informationAttachment E. Logistics. Ridge Road Extension Alternatives Analysis
Attachment E Logistics for: Ridge Road Extension Alternatives Analysis PREPARED FOR: Pasco County Engineering Services Department PREPARED BY: NV5, INC. 6989 E. FOWLER AVENUE TAMPA, FLORIDA 33617 April
More informationPinellas County Metropolitan Planning Organization 2035 Long Range Transportation Plan Environmental Resource Evaluation Methodology
Pinellas County Metropolitan Planning Organization 2035 Long Range Transportation Plan Environmental Resource Evaluation Methodology The Pinellas County Metropolitan Planning Organization s 2035 Long Range
More information1 INTRODUCTION 1-1 CTPS
1 INTRODUCTION This report of the Congestion Management System (CMS) for the Boston Region Metropolitan Planning Organization (MPO) documents the region s mobility concerns. (The region is shown in Figure
More informationPennDOT Office of Planning
Every Voice Counts PennDOT Office of Planning Environmental Justice Plan Executive Summary Developed for: Pennsylvania Department of Transportation Office of Planning Center for Program Development and
More informationPlanning Assumptions Technical Memorandum
Planning Assumptions Technical Memorandum This project has been developed in compliance with Title VI of the Civil Rights Act of 1964 and other federal and state nondiscrimination authorities. Neither
More informationTECHNICAL MEMORANDUM
TECHNICAL MEMORANDUM DATE: TO: FROM: RE: 1 November 15, 2018 Boston Region Metropolitan Planning Organization Certification Activities Staff Draft Needs Assessment Summary and Recommendations BACKGROUND
More informationAlternatives Evaluation Methodology
Alternatives Evaluation Methodology www.vision54 56.com B 1 Phase 2 Alternatives Evaluation Methodology PASCO COUNTY METROPOLITAN PLANNING ORGANIZATION 8731 Citizens Drive New Port Richey, FL 34654 Ph
More informationCongestion Management Process (CMP)
Congestion Management Process (CMP) Introduction The Congestion Management Process (CMP) is a systematic, data-driven, and regionally accepted approach that aims to improve the performance of the transportation
More information12 Evaluation of Alternatives
12 Evaluation of Alternatives This chapter evaluates the effectiveness of the No-Build Alternative and the proposed METRO Blue Line Light Rail Transit (BLRT) Extension project based on the information
More informationThe Role of Florida Transit Agencies in Providing Pedestrian and Bicycle Access Improvements to Transit Stops and Stations
The Role of Florida Transit Agencies in Providing Pedestrian and Bicycle Access Improvements to Transit Stops and Stations BDV25 943-33 August 2016 The Role of Florida Transit Agencies in Providing Pedestrian
More informationAppendix F 2008 Travel Demand Modeling
Appendix F 2008 Travel Demand Modeling TRAVEL DEMAND MODELING Purpose: The Jackson/Teton County Comprehensive Plan Update is revisiting land use and transportation planning policies to ensure they can
More informationREVIEW OF MPO LONG RANGE TRANSPORTATION PLANS AND REGIONAL MPO PLANNING ACTIVITIES AND PRODUCTS
REVIEW OF MPO LONG RANGE TRANSPORTATION PLANS AND REGIONAL MPO PLANNING ACTIVITIES AND PRODUCTS Research Support for the Florida Transportation Plan Update Final Technical Memorandum Prepared for: Florida
More informationPrepared for: January Tindale-Oliver & Associates, Inc Ashley Drive, Suite 100 Tampa, Florida ph (813) , fax (813)
EAST LAKE/MCMULLEN BOOTH ROAD BUS RAPID TRANSIT FEASIBILITY STUDY Phase 1 Fatal Flaw Assessment Final Report Prepared for: PINELLAS COUNTY METROPOLITAN PLANNING ORGANIZATION 600 Cleveland Street, Suite
More informationMEMORANDUM #4. DATE: November 4, Warrenton TSP Project Management Team. Ray Delahanty, AICP, DKS Associates Kate Petak, EIT, DKS Associates
MEMORANDUM #4 DATE: November 4, 2015 TO: FROM: SUBJECT: Warrenton TSP Project Management Team Ray Delahanty, AICP, DKS Associates Kate Petak, EIT, DKS Associates Warrenton Transportation System Plan Update
More informationChapter 14 Work Program
Chapter 14 Work Program The Metropolitan Council will carry out or participate in many studies and plans over the next three years. This is not an exhaustive list of all work to be completed by the Metropolitan
More informationChapter 5 Transportation Draft
Chapter 5 Transportation Draft Discussion Similar to the other elements in the Comprehensive Plan, the transportation element impacts the quality of life, economic development and public safety of the
More informationROCOG TRANSPORTATION PLANNING WORK PROGRAM
ROCOG TRANSPORTATION PLANNING WORK PROGRAM 2018-2019 SEPTEMBER 2017 Preparation of this document is financed in part by the U.S. DOT as referenced in the ROCOG 2017 Transportation Work Program under Work
More informationNORTH I-75 MASTER PLAN Summary Report
NORTH I-75 MASTER PLAN Summary Report Interstate 75 (SR 93) From the Florida s Turnpike Interchange to the I-10 Interchange Alachua, Bradford, Clay, Citrus, Columbia, Duval, Levy, Marion, and Sumter Counties,
More informationWebinar Series for Comprehensive Plan Updates. Transportation Overview
Webinar Series for Comprehensive Plan Updates Transportation Overview Presented by Michael Larson and Mark Filipi August 18, 2016 2040 Transportation Policy Plan Adopted January 14 th, 2015 Multimodal
More informationLand Use Vision and Transportation Strategy
Phase 1: Land Use and Transportation Strategy June 3, 2015 ing Workshop #2 Phase 1: Land Use and Transportation Strategy Welcome March 12 Workshop Summary Discussion Strategies to Implement the Next Steps
More informationCHAPTER 8 TRANSPORTATION ELEMENT
CHAPTER 8 TRANSPORTATION ELEMENT Section 8.01 Purpose: The purpose of this Chapter (element) is to establish the desired and projected transportation system within Niceville and to plan for future motorized
More information2040 Long Range Transportation Plan
2040 Long Range Transportation Plan Presented by Iowa Northland Regional Council of Governments October 22, 23, and 24, 2013 Liaison for federal transportation funding that goes to local cities and counties
More informationChapter 2 Public Participation
Chapter 2 Public Participation The OTO Public Participation Plan recommends that a plan-specific process be developed for the Long Range Transportation Plan. The OTO has employed a variety of methods to
More informationSR 60 Grade Separation over CSX Railroad Traffic Technical Memorandum
To: Marlon Bizerra, PE From: Thirulokesh Krishnan Email: thirulokesh.krishnan@atkinsglobal.com Phone: 210.321.2019 Date: Nov 25, 2014 Ref: cc: Kim Warren, Doug Reed, PE Subject: SR 60 Grade Separation
More informationEXHIBIT A SCOPE OF SERVICES INTERCHANGE JUSTIFICATION REPORT (IJR) FOR INTERSTATE 75 AT OVERPASS ROAD
Scope of Services 12/08/2008 EXHIBIT A SCOPE OF SERVICES INTERCHANGE JUSTIFICATION REPORT (IJR) FOR INTERSTATE 75 AT OVERPASS ROAD TABLE OF CONTENTS Section Pace I. 0 PROJECT DESCRIPTION........................,............................................................
More informationFinal Air Quality Report
Florida Department of Transportation - District VII County Line Road (C.R. 578) Project Development and Environment Study From U.S. 19 (S.R. 55) to U.S. 41 (S.R. 45) Work Program Item Segment Number: 257298
More informationSafety Performance Measurement
Safety Performance Measurement Sandy Misiewicz, AICP Capital District Transportation Committee NYSAMPO Safety Working Group 2015 NYSAMPO Conference June 22, 2015 SAFETEA-LU (2005) New Planning Factor Increase
More informationSection 1: Introduction
Section 1: Introduction Overview Park-and-ride facilities provide collection points for travelers to transfer from the auto mode to the transit mode or between auto modes (from single-occupant vehicle
More informationCHAPTER 8. Congestion Management
CHAPTER 8 Congestion Management CHAPTER 8: Congestion Management The CMP is a management system and process conducted to improve traffic operations and safety through operational improvements and strategies
More informationThe Relationship of Comprehensive Plan Objectives to the Issues
The Relationship of Comprehensive Plan Objectives to the Issues Ensuring Quality Communities Mobility Matching Development Opportunities with Natural Resource and Infrastructure Constraints Protecting
More informationTampa Bay Transportation Management Area (TMA) Leadership Group
Tampa Bay Transportation Management Area (TMA) Leadership Group Representing the MPOs in Pasco, Pinellas, & Hillsborough Counties Meeting Objectives Friday, May 11, 2018 9:30 a.m. - 12:30 p.m. Pasco County
More informationFTP/SIS Steering Committee Work Plan and PPI Update
FTP/SIS Steering Committee Work Plan and PPI Update Work Plan and PPI Update Presented by: Dana Reiding September 30, 2015 FTP and SIS Update Process and Schedule Issues Identification Jan Feb Potential
More informationIII. Regional TSM&O Overview from the 2040 Regional Transportation Plan (Jessica Josselyn, Kittelson & Associates, Inc.)
Regional Transportation Technical Advisory Committee (RTTAC) Transportation System Management & Operations (TSM&O) Subcommittee Meeting Agenda June 23, 2015 1:30 PM FDOT District Four Headquarters Auditorium
More informationGUIDING PRINCIPLES MEMORANDUM
M E T R O P O L I TAN TRA NS P O RTATI O N PLAN GUIDING PRINCIPLES MEMORANDUM El Paso Metropolitan Planning Organization INTRODUCTION The guiding principles for development of the El Paso MPO s Destino
More informationWill County Freight Advisory Council Meeting. April 11, 2017
Will County Freight Advisory Council Meeting April 11, 2017 1 Agenda Summary of Last Meeting Plan Progress and Update Performance Measures Break-Out Discussion Projects and Project Evaluation Criteria
More informationRegional Transportation Performance Measures
Regional Transportation Performance Measures March 5, 2014 Presented by Tom Murtha Regional Transportation Performance 2 Measures: Introduction Regional Transportation Performance Measures address needs
More informationPrincipal Arterial Intersection Conversion Study
Principal Arterial Intersection Conversion Study Technical Advisory Committee February 1, 2017 Presentation Overview Background Need for Study, Objectives Phase I Screening (Completed Spring 2016) 374
More informationChapter 1: The MPO Board includes representatives of four local governments and four transportation authorities
Safe, Accountable, Flexible, And Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU). The Imagine 2040 Plan will follow the guidelines as outlined in the current Federal Transportation
More informationChapter 6: Regional Transportation
Chapter 6: Regional Transportation Continued growth and development throughout the region magnifies the significance of connections to surrounding counties as economic and social interactions continue
More informationWELCOME COMMUNITY ADVISORY GROUP MEETING #2
WELCOME COMMUNITY ADVISORY GROUP MEETING #2 Joliet Junior College OUTLINE / AGENDA Recap of CAG #1 Presentation Recap of CAG #1 Workshop Context Audit / Survey Results Draft Problem Statement Draft Purpose
More informationPOLK COUNTY TPO Polk County 2060 Transportation Vision Plan Final Report. ADOPTED June 18, 2009
POLK COUNTY TPO Polk County 2060 Transportation Vision Plan Final Report ADOPTED June 18, 2009 TABLE OF CONTENTS CHAPTER 1 Introduction and Prior Planning Effort...Page 1-1 CHAPTER 2 Population and Employment
More informationFreight & Modal Data Program. MPOAC Freight Committee Quarterly Meeting January 26, 2017 Sunrise, Florida
Freight & Modal Data Program MPOAC Freight Committee Quarterly Meeting January 26, 2017 Sunrise, Florida Overview Mission & Goals Freight Data Programs Recent and Upcoming Activities Mission & Goals FDOT
More informationExecutive Summary. Study Background
Executive Summary ES 1.1 Introduction The Capitol Region Council of Governments (CRCOG) and the Connecticut Department of Transportation (CTDOT) initiated the (BTS) in 2006 to identify near and long-term
More informationThe Metropolitan Transportation Plan. Public Meetings February 2016
The Metropolitan Transportation Plan for North Central Texas Public Meetings February 2016 Presentation Agenda Mobility 2040 Draft Recommendations RTC Policy Bundle Concept Transportation Improvement Program
More informationHB2 Implementation Policy Guide
report HB2 Implementation Policy Guide prepared for Commonwealth Transportation Board date August 1, 2015 6.0 Appendix A: Safety Measures Table 6.1 Safety Factor Measures Summary ID Measure Name Weight
More informationUnified Planning Work Program (UPWP)
Unified Planning Work Program (UPWP) Federal Fiscal Year 2018 (October 1, 2017 September 30, 2018) Prepared by: Missoula Metropolitan Planning Organization And Missoula Urban Transportation District In
More informationPINELLAS SUNCOAST TRANSIT AUTHORITY 2007 TRANSIT DEVELOPMENT PLAN
PINELLAS SUNCOAST TRANSIT AUTHORITY 2007 TRANSIT DEVELOPMENT PLAN Final Report PREPARED FOR: PINELLAS SUNCOAST TRANSIT AUTHORITY 3201 SCHERER DRIVE ST. PETERSBURG, FLORIDA 33716 ph (727) 540-1800, fax
More informationRegional Transit System Plan
Policy, Program Development & Intergovernmental Relations Committee Item III-A October 14, 2010 Regional Transit System Plan Washington Metropolitan Area Transit Authority Board Action/Information Summary
More informationJoint Meeting- Stakeholder Committee & Technical Committee
Joint Meeting- Stakeholder Committee & Technical Committee Wednesday, February 26, 2014 Cobb County DOT Squad Room Cobb County Comprehensive Transportation Plan Update 2040 www.cobbinmotion.com - Guiding
More informationWednesday, October 10, 1:30pm AGENDA 3. APPROVE AGENDA APPROVE A. PAVEMENT, BRIDGE, AND SYSTEM PERFORMANCE TARGETS
MARTIN METROPOLITAN PLANNING ORGANIZATION JOINT CITIZEN S/ TECHNICAL ADVISORY COMMITTEE MEETING Martin County Administrative Building 4 th Floor Workshop Conference Room 2401 SE Monterey Road, Stuart,
More informationCorpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:
Introduction: Traffic congestion in the Corpus Christi Metropolitan area is not as much a function of population growth as the function of the increase in single occupant trips. Using census data, the
More information2018 Comprehensive Guide Plan Steering Committee. Wednesday, October 11, Minnehaha Room, Minnetonka City Hall. 6:00 8:00 p.m.
2018 Comprehensive Guide Plan Steering Committee Wednesday, October 11, 2017 Minnehaha Room, Minnetonka City Hall 6:00 8:00 p.m. Agenda: 6:00 6:15 Dinner 6:15 6:45 Transportation planning overview 6:45
More informationBOSTON REGION METROPOLITAN PLANNING ORGANIZATION MEMORANDUM
BOSTON REGION METROPOLITAN PLANNING ORGANIZATION State Transportation Building Ten Park Plaza, Suite 2150 Boston, MA 02116-3968 Tel. (617) 973-7100 Fax (617) 973-8855 TTY (617) 973-7089 www.bostonmpo.org
More informationIntroduction. McLennan County Transit Need Study
Introduction McLennan County Transit Need Study What is a Transit Need Study? 1. Identify Resources (Supply) Providers Vehicles Drivers 3. Perform a Gap Analysis Over supply or duplication of service Under
More informationSummary of transportation-related goals and objectives from existing regional plans
SMTC 2050 Long Range Transportation Plan Appendix A: Summary of transportation-related goals and objectives from existing regional plans SMTC 2050 Long Range Transportation Plan Summary of transportation-related
More information3. STATION SPACING AND SITING GUIDELINES
3. STATION SPACING AND SITING GUIDELINES The station spacing and siting guidelines are summarized in Table 3-1. Table 3-1 also includes benchmark information for local transit service and express bus as
More informationCommunity Development Department
City of Safety Harbor Community Development Department TO: CHAIRMAN AND MEMBERS, PLANNING AND ZONING BOARD FROM: MATT McLACHLAN, AICP, COMMUNITY DEVELOPMENT DIRECTOR DATE: MARCH 3, 2011 RE: ANNUAL UPDATE
More informationII. Approval of June 23, 2015 Meeting Notes. IV. Recap of the 2040 Regional Transportation Plan (Jessica Josselyn, Kittelson & Associates, Inc.
Regional Transportation Technical Advisory Committee (RTTAC) Transportation System Management & Operations (TSM&O) Subcommittee Meeting Agenda July 20, 2016 10:00 AM FDOT District Four Headquarters Auditorium
More informationMEETING SUMMARY FOR APRIL 13, 2017
SARASOTA/MANATEE METROPOLITAN PLANNING ORGANIZATION Performance Measures/Project Prioritization Process Ad Hoc Committee 7632 15 th Street East Sarasota, Florida 34243 3:00-5:00 PM MEETING SUMMARY FOR
More informationMOBILITY 2045: A FOCUS ON TRANSPORTATION CHOICE:
Mobility 2045: The Metropolitan Transportation Plan for North Central Texas is the defining vision for the multimodal transportation system in the Dallas- Fort Worth Metropolitan Planning Area. The plan,
More informationSOUTHWEST LRT (METRO GREEN LINE EXTENSION)
8 Evaluation of Alternatives This chapter evaluates the effectiveness of the No Build Alternative and the Southwest Light Rail Transit (LRT) Project (the Project) based on the information contained in
More informationEXHIBIT "A" SCOPE OF SERVICES (STAGE 1) SYSTEMS PLANNING TRAVEL FORECASTING MODELING F.P.I.D. NO
EXHIBIT "A" SCOPE OF SERVICES (STAGE 1) SYSTEMS PLANNING TRAVEL FORECASTING MODELING F.P.I.D. NO. 202075-1-12-07 Table of Contents TABLE OF CONTENTS... 2 PURPOSE... 3 SERVICES... 4 A. FLORIDA STANDARD
More informationSouth Sounder Capital Improvements Program
Subarea South King/Pierce Primary Mode Commuter Rail Facility Type Infrastructure Improvement Length Date Last Modified July 1, 2016 PROJECT AREA AND REP RESENTATIVE ALIGNMENT SHORT PROJECT DESCRIPTION
More informationEXHIBIT A SCOPE OF SERVICES FOR MODAL DEVELOPMENT (MD) SUPPORT - CONTINUING. Financial Project Nos
EXHIBIT A SCOPE OF SERVICES FOR MODAL DEVELOPMENT (MD) SUPPORT - CONTINUING Financial Project Nos. 411461-1-12-10 422799-2-12-12 FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT SEVEN Revised: 07/16/18 07/10/18
More informationClosing the Loop Improving Transit through Crowd sourced Information
Closing the Loop Improving Transit through Crowd sourced Information Sean J. Barbeau, Ph.D. Center for Urban Transportation Research University of South Florida Center for Urban Transportation Research
More informationPerformance Measures Workshop, May 18, 2017
Measuring What Matters: Above and Beyond Requirements Performance Measures Workshop, May 18, 2017 Presentation Overview Background - origin and evolution of the Regional Outcomes Framework. Regional Outcomes
More informationAppendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance
APPENDICES Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance D.1 Functional classification identifies the role a highway or street plays in the transportation
More informationCartersville-Bartow County Metropolitan Planning Organization. Long-Range Regional Transportation Plan Project Evaluation Process
Cartersville-Bartow County Metropolitan Planning Organization Long-Range Regional Transportation Plan Project Evaluation Process Joint Policy Committee & Transportation Coordinating Committee Meeting September
More informationLivability 2050 Regional Transportation Plan Update. RTPAC #4 October 16, 2018
Livability 2050 Regional Transportation Plan Update RTPAC #4 October 16, 2018 1 Meeting Agenda Timeline Financial Plan Update o Adopted Funding Scenario o Revenue Projections Prioritization Process Round
More informationIntelligent Transportation Systems Master Plan
Space Coast Transportation Planning Organization Intelligent Transportation Systems Master Plan April 15, 2014 Version 1.0 Prepared for: Space Coast Transportation Planning Organization 2725 Judge Fran
More informationJoe Santos Transportation Safety Engineer Florida Department of Transportation
Joe Santos Transportation Safety Engineer Florida Department of Transportation D7 Safety Summit, June 8, 2011 D7 Safety Summit Purpose & Goals: Despite significant progress, crash rates in the Tampa Bay
More informationRiverview Corridor Pre-Project Development Study
Riverview Corridor Pre-Project Development Study American Society of Civil Engineers - Minnesota May 25, 2016 Work in Progress; Subject to Change 1 History 2000: Major Investment Study (MIS) offered several
More informationDistrict One Freight Mobility & Trade Study and Implementation Plan Joint Charlotte & Sarasota/Manatee MPO Board Meeting January 25, 2016 Keith
District One Freight Mobility & Trade Study and Implementation Plan Joint Charlotte & Sarasota/Manatee MPO Board Meeting January 25, 2016 Keith Robbins District Freight Coordinator, FDOT District One Purpose
More informationLivability 2050 Regional Transportation Plan Update. RTPAC #3 July 26, 2018
Livability 2050 Regional Transportation Plan Update RTPAC #3 July 26, 2018 1 Meeting Agenda Timeline Funding Scenarios Funding Availability Project Review Prioritization Process Ground Rules Next Steps
More information10.0 Congestion Management Process
Livability 2040 Regional Transportation Plan 10-1 10.0 Congestion Management Process 10.1 CMP Summary The identification and evaluation of projects for the Livability 2040 Regional Transportation Plan
More informationFairfax County Countywide Transit Network Study
Fairfax County Countywide Transit Network Study Proposed High Quality Transit Network Concept Metropolitan Washington Council of Governments Travel Forecasting Subcommittee September 20, 2013 1 Presentation
More informationATTACHMENT A. Detailed Study Scope. I-66 (Inside) Multi-modal Study Scope
ATTACHMENT A Detailed Study Scope I-66 (Inside) Multi-modal Study Scope EXECUTIVE SUMMARY The Virginia Department of Transportation (VDOT) seeks consultant assistance in identifying and evaluating a range
More information1: INTRODUCTION AND PROCESS OVERVIEW
GPATS Long-Range Transportation Plan 1: INTRODUCTION AND PROCESS OVERVIEW INTRODUCTION affects everyone in many ways and plays a critical role in shaping a region s physical and social infrastructure.
More informationAn Introduction to the. Safety Manual
An Introduction to the Highway Safety Manual An Introduction to the HIGHWAY SAFETY MANUAL Table of Contents Section 1: HSM Overview... 1 What is the Highway Safety Manual?... 1 How is the HSM Applied?...
More information