1 TODAY S PARADIGM FOR HEAT RECOVERY PART 2 Engineered Systems Webinar Thursday, July 12, 2012 at 2 pm EST/11 am PST Tom Brooke PE, CEM, MBA, ASHRAE Member tombrooke@cox.net

2 Both Part 1 and Part 2 webinars are archived at: r&presentations.html Both Part 1 and Part 2 supporting white papers are archived at: Papers.html 2 Today's Paradigm for Heat Recovery - Part 2

3 Part 1 - Four New Models 1 of 4 - Recovery Efficiency Ratio (RER) 1. AHRI Guideline V 2003: applies to all Air-to-Air Heat Exchangers (AAHX) 2. Energy Saved/Energy Required to obtain that Savings a. Includes all peripheral energy losses (Both airside pressure losses, wheel drive motor watts, circulating pump watts, purge losses because uses lower CFM) b. RER forcedly links Effectiveness and pressure drop 3. Similar to Unitary EER and Applied kw/ton 4. S, L and T RER 5. Two selections can have same Effectiveness but one has superior RER 6. Dimensionless unless combined with associated equipment 3 Today's Paradigm for Heat Recovery - Part 2

4 Part 1 - Four New Models 2 of 4 Three Additional Designs Available are: a. Adjacent, parallel airflows (design optimized for parallel instead of counter) b. Separate airflows (condenser above in winter) c. Separate airflows, pump assisted (condenser below in winter) AIR FLOW AIR FLOW 4 Today's Paradigm for Heat Recovery - Part 2

5 Part 1 - Four New Models 3 of 4 1. Heat pipes have been preferred for years in the more critical applications (labs, medical, clean rooms, etc.) because of their benefits compared to the trade-offs 2. Heat pipes are now also selectively replacing enthalpic AAHX in less critical applications Item 2 is the Subject of Today s Webinar! 5 Today's Paradigm for Heat Recovery - Part 2

6 Part 1 - Four New Models 4 of 4 - Heat Pipes are Technically and Economically Preferred to Glycol Pumped Systems, up to 100 separation % Effectiveness RER 20 Yr LCC (Savings) Capital Cost $ Today's Paradigm for Heat Recovery - Part 2

7 3. Heat Pipes Can Selectively Replace Enthalpic AAHX a. Why - Product Benefits vs. Trade-offs b. Standards and Codes c. Engineering Judgment 7 Today's Paradigm for Heat Recovery - Part 2

8 WHY - PRODUCT BENEFITS VS. TRADE-OFFS 8 Today's Paradigm for Heat Recovery - Part 2

9 Benefits vs. Trade-offs 1. No moving parts, so inherently: More reliable Less maintenance Longer service life 9 Today's Paradigm for Heat Recovery - Part 2

10 Benefits vs. Trade-offs 2. Designed for high pressure differential, so Fan locations can be disregarded No cross contamination 10 Today's Paradigm for Heat Recovery - Part 2

11 Benefits vs. Trade-offs 3. Rectangular cross section more efficiently matches AHU, so reduced mechanical footprint H W L 11 Today's Paradigm for Heat Recovery - Part 2

12 Benefits vs. Trade-offs 4. No electrical connections, so installation and maintenance savings 12 Today's Paradigm for Heat Recovery - Part 2

13 Benefits vs. Trade-offs 5. Heat pipes available for adjacent parallel and separated airflows, so more opportunities for designer to use and less mechanical footprint AIR FLOW AIR FLOW 13 Today's Paradigm for Heat Recovery - Part 2

14 Benefits vs. Trade-offs 6. Coatings for corrosive, toxic and other specialized applications can be applied to heat pipes 14 Today's Paradigm for Heat Recovery - Part 2

15 Benefits vs. Trade-offs 7. Higher efficiency, as defined by AHRI s Recovery Efficiency Ratio, so raises entire HVAC efficiency more 15 Today's Paradigm for Heat Recovery - Part 2

16 Benefits vs. Trade-offs 8. Comparable or lower capital cost 16 Today's Paradigm for Heat Recovery - Part 2

17 1. No moving parts, so inherently: More reliable Less maintenance Longer service life 2. Designed for high pressure differential, so: Fan locations can be disregarded No cross contamination 3. Rectangular cross section more efficiently matches AHU, so reduced mechanical footprint 4. No electrical connections, so installation and maintenance savings 5. Heat pipes available for adjacent parallel and separated airflows, so more opportunities for designer to use and less mechanical footprint 6. Coatings for corrosive, toxic and other specialized applications can be applied to heat pipes 7. Similar or higher efficiency, as defined by AHRI s Recovery Efficiency Ratio, so raises entire HVAC efficiency more 8. Lower capital cost Benefits Trade-Offs 1. Only sensible energy is exchanged by heat pipes, rather than sensible plus latent for enthalpic devices 2. Effectiveness is sometimes less for heat pipes compared to energy wheels 17 Today's Paradigm for Heat Recovery - Part 2

18 STANDARDS AND CODES 18 Today's Paradigm for Heat Recovery - Part 2

19 Two Basic Code Requirements Requirement determined by: 1. Climate Zone 2. Combination of SA CFM and OA% of SA Requirement for.50 Total Effectiveness Change in enthalpy can be latent, sensible or a combination 19 Today's Paradigm for Heat Recovery - Part 2

20 ENGINEERING JUDGMENT 20 Today's Paradigm for Heat Recovery - Part 2

21 First Subject for Engineering Judgment Facts: 1. Enthalpic AAHX have same total effectiveness for summer and winter 2. Sensible AAHX s summer effectiveness is percentage points lower than winter effectiveness 3. Nationally, most savings are in winter by far 21 Today's Paradigm for Heat Recovery - Part 2

22 Engineering Judgment 1. ASHRAE does not mean to favor one type of device over another 2. It s not fair to require one effectiveness for one type of AAHX and a higher effectiveness for another type of AAHX Question: What Effectiveness should be used for design? 22 Today's Paradigm for Heat Recovery - Part 2

23 My May, 2012 notification of the situation and request for an informal interpretation have been acknowledged by the ASHRAE Manager of Standards. I believe a reasonable answer would be to design to the winter or summer Effectiveness based on which provides the higher total BTU savings at the facility s location. I also would point out that if a heat pipe is selected for winter total.50 Effectiveness, using Indirect Evaporative Cooling raises the summer total Effectiveness to higher than Today's Paradigm for Heat Recovery - Part 2

24 Second Subject for Engineering Judgment Does it make fundamental good sense to use a sensible heat pipe instead of an enthalpic energy wheel? Many OA hours are outside of ASHRAE 55 comfort zone Sensible AAHX address those to left and right What about those above (and perhaps in winter) needing latent exchange? As will be explained shortly, the example shows Climate zone 5A, as represented by Chicago with retail operating hours. 24 Today's Paradigm for Heat Recovery - Part 2

25 Procedure How to Answer that Question 1. Recognize that ASHRAE Std does establish the maximum dew point for comfort conditioning to be ºFDP. 25 Today's Paradigm for Heat Recovery - Part 2

26 Procedure (Cont d) 2. Use the hourly recorded OA temperatures and humidities throughout the climate zones established by ASHRAE Std as the full map of weather data to be compared against Std 55 s comfort zone. 26 Today's Paradigm for Heat Recovery - Part 2

27 Procedure (Cont d) 3. To simplify the data management, a 2009 Pacific Northwest National Laboratory /DOE report established particular cities as the best representative of their climate zone. Climate Zone City 1A Miami 2A Houston 2B Phoenix 3A Atlanta 3B Los Angeles 3C San Francisco 4A Baltimore 4B Albuquerque 4C Seattle 5A Chicago 5B Denver 6A Minneapolis 6B Helena 7 Duluth 8 Fairbanks 27 Today's Paradigm for Heat Recovery - Part 2

28 Procedure (Cont d) 4. Establish rules for data management: a. Use TMY3 data b. Annual hours above established max dew point must be < 1% c. Winter data points also shown for reference d. Incorporate the fact that different types of facilities have different operating hours Profile Specific Hours Annual Hours Code Full Time All Hours 8,760 F Retail Hours Sun-Sat, 9am-10pm 4,745 R Office Hours Mon-Fri, 8am-6pm 2,610 O K-12 School Hours Mon-Fri, Sep-Jun, 7am-5pm 2,170 K 28 Today's Paradigm for Heat Recovery - Part 2

29 Procedure (Cont d) 5. Each data point is one hour at its average temperature and humidity. Plot each of the 15 x 4 = 60 locations data points on a psychrometric chart preloaded with Std 55 s comfort range. The example is for school hours in zone 2B as represented by Phoenix. 29 Today's Paradigm for Heat Recovery - Part 2

30 Results Higher Priority All Hours Within ASHRAE Std 55 s Comfort Humidity 2B K, 3B FR, 3C FROK, 4B FROK, 4C FROK, 5B FROK, 6B FROK, 8 FROK Climate Zones Lower Priority Significant Hours Above ASHRAE Std 55 s Comfort Humidity 1A FROK, 2A FROK, 2B FRO, 3A FROK, 3B OK, 4A FROK, 5A FROK, 6A FROK, 7 FROK 31 of 60 total zone/hour combinations already have all the OA below Std 55 s maximum comfort humidity, so those are a higher priority to gain the benefits of heat pipes. The plotted results for all locations is available in the accompanying explanatory white paper. 30 Today's Paradigm for Heat Recovery - Part 2

31 Further Examples: Climate Zone 3C (SanFrancisco, 8760) 31 Today's Paradigm for Heat Recovery - Part 2

32 Climate Zone 4C (Seattle, Office) 32 Today's Paradigm for Heat Recovery - Part 2

33 What about Winter Humidification? 1. Enthalpic AAHX also humidify in the winter. 2. For backup capability, all central HVAC systems (cooling, heating, dehumidification, humidification) are generally sized as if the AAHX system were not installed. Therefore, there is no additional capital cost for winter humidification. 3. When a heat pipe is used for energy recovery, there is a slight increase in overall HVAC system operating cost to provide the humidification that the enthalpic device would otherwise provide. Neither type of AAHX provides all the humidification needed. 33 Today's Paradigm for Heat Recovery - Part 2

34 Benefits 1. No moving parts, so inherently: More reliable Less maintenance Longer service life 2. Designed for high pressure differential, so: Fan locations can be disregarded No cross contamination 3. Rectangular cross section more efficiently matches AHU, so reduced mechanical footprint 4. No electrical connections, so installation and maintenance savings 5. Heat pipes available for adjacent parallel and separated airflows, so more opportunities for designer to use and less mechanical footprint 6. Coatings for corrosive, toxic and other specialized applications can be applied to heat pipes 7. Similar or higher efficiency, as defined by AHRI s Recovery Efficiency Ratio, so raises entire HVAC efficiency more 8. Comparable or lower capital cost Trade-Offs 1. Only sensible energy is exchanged by heat pipes, rather than sensible plus latent for enthalpic devices 2. Effectiveness is often less for heat pipes compared to energy wheels 34 Today's Paradigm for Heat Recovery - Part 2

35 Conclusions and Recommendations 1. Understand heat pipe s many benefits compared to enthalpic AAHX and how they apply to a particular project. 35 Today's Paradigm for Heat Recovery - Part 2

36 Conclusions and Recommendations 1. Understand heat pipe s many benefits compared to enthalpic AAHX and how they apply to a particular project. 2. As best can be done, quantify them. Note that many (reliability, no catastrophic failure, no cross contamination, longer service life, less maintenance) could have values an order of magnitude greater than energy savings. 36 Today's Paradigm for Heat Recovery - Part 2

37 Conclusions and Recommendations 1. Understand heat pipe s many benefits compared to enthalpic AAHX and how they apply to a particular project. 2. As best can be done, quantify them. Note that many (reliability, no catastrophic failure, no cross contamination, longer service life, less maintenance) could have values an order of magnitude greater than energy savings. 3. Determine the additional energy saved by an enthalpic AAHX. Note that while the Effectiveness is often lower with heat pipes, their Efficiency (RER) is always higher. 37 Today's Paradigm for Heat Recovery - Part 2

38 Conclusions and Recommendations 1. Understand heat pipe s many benefits compared to enthalpic AAHX and how they apply to a particular project. 2. As best can be done, quantify them. Note that many (reliability, no catastrophic failure, no cross contamination, longer service life, less maintenance) could have values an order of magnitude greater than energy savings. 3. Determine the additional energy saved by an enthalpic AAHX. Note that while the Effectiveness is often lower with heat pipes, their Efficiency (RER) is always higher. 4. Understand and use the location priorities established earlier. Include the facility s operating schedule in the analysis. USING THE PRINCIPLES OUTLINED IN THIS WEBINAR WILL IMPROVE YOUR HVAC SYSTEM. 38 Today's Paradigm for Heat Recovery - Part 2

39 Today s Paradigm for Heat Recovery Part 2 Thank You! Please give us feedback on the exit survey. Tom Brooke PE, CEM, MBA, ASHRAE Member tombrooke@cox.net 39 Today's Paradigm for Heat Recovery - Part 2

A Primer on Recovery Efficiency Ratio

A Primer on Recovery Efficiency Ratio A Primer on Recovery Efficiency Ratio By Tom Brooke PE, CEM 2/29/12 INTRODUCTION As well it should be, probably the most used metric in the applied HVAC equipment industry is the concept of Efficiency.

More information

A Paradigm Shift in ERV Technology. Paul Ehrlich, PE President Building Intelligence Group PLLC

A Paradigm Shift in ERV Technology. Paul Ehrlich, PE President Building Intelligence Group PLLC A Paradigm Shift in ERV Technology Paul Ehrlich, PE President Building Intelligence Group PLLC August 9, 2013 Existing Buildings and Energy Existing buildings: Floor space: Floor space per building: Energy

More information

Calculating the Efficiency of Energy Recovery Ventilation and its Effect on Efficiency and Sizing of Building HVAC Systems

Calculating the Efficiency of Energy Recovery Ventilation and its Effect on Efficiency and Sizing of Building HVAC Systems AHRI Guideline V (I-P) 20 Guideline for Calculating the Efficiency of Energy Recovery Ventilation and its Effect on Efficiency and Sizing of Building HVAC Systems IMPORTANT SAFETY DISCLAIMER AHRI does

More information

Rebel commercial packaged rooftop systems

Rebel commercial packaged rooftop systems Rebel commercial packaged rooftop systems Advanced technologies propel performance and energy savings to uncommon levels 3-28 tons Rebel features and benefits 18 13 6 5 3 6 4 43% Energy Savings 5 11 12

More information

Rebel commercial packaged rooftop systems

Rebel commercial packaged rooftop systems Rebel commercial packaged rooftop systems Advanced technologies propel performance and energy savings to uncommon levels 3-28 tons Capitalize with 43% more energy savings If you are a commercial building

More information

Implementing Demand Controlled Ventilation to Meet ASHRAE Standard By KlasC. Haglid, P.E., R.A., CEM

Implementing Demand Controlled Ventilation to Meet ASHRAE Standard By KlasC. Haglid, P.E., R.A., CEM Implementing Demand Controlled Ventilation to Meet ASHRAE Standard 62.1-2010 By KlasC. Haglid, P.E., R.A., CEM 1 Klas C. Haglid, P.E., R.A., CEM - Bio ASHRAE Distinguished Service Award 2011 ASHRAE Handbook,

More information

Advanced Cooling Technology with Thermally Activated Building Surfaces and Model Predictive Control

Advanced Cooling Technology with Thermally Activated Building Surfaces and Model Predictive Control *Manuscript Click here to view linked References Advanced Cooling Technology with Thermally Activated Building Surfaces and Model Predictive Control T. Zakula a,, L. Norford b, P.R. Armstrong c a University

More information

EnergyPro Building Energy Analysis. Single-story School Building

EnergyPro Building Energy Analysis. Single-story School Building EnergyPro Building Energy Analysis Single-story School Building EnergyPro Building Energy Analysis for a single-story school bulding Project Scope The purpose of the EnergyPro energy model was to evaluate

More information

APPLICATIONS Air-to-Air Energy Recovery

APPLICATIONS Air-to-Air Energy Recovery APPLICATIONS Air-to-Air Energy Recovery Technical Development Program Technical Development Programs (TDP) are modules of technical training on HVAC theory, system design, equipment selection and application

More information

Evaluating the Performance and Economics of Transpired Solar Collectors for Commercial Applications

Evaluating the Performance and Economics of Transpired Solar Collectors for Commercial Applications ABSTRACT Evaluating the Performance and Economics of Transpired Solar Collectors for Commercial Applications Eric Kozubal, Michael Deru, Steven Slayzak, and Paul Norton, National Renewable Energy Laboratory

More information

Laboratory Building Energy Analysis

Laboratory Building Energy Analysis Laboratory Building Energy Analysis Course No: M4-11 Credit: 4 PDH Steven Liescheidt, P.E., CCS, CCPR Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony Point, NY 198 P: (877) 322-58

More information

Depth: Mechanical Redesign

Depth: Mechanical Redesign Depth: Mechanical Redesign Redesign Objectives The most important objective of the mechanical redesign is to provide Greenbriar East with ventilation that meets the requirements of ASHRAE Standard 62-2001.

More information

EnergyPro Building Energy Analysis. Nine-story Office Building

EnergyPro Building Energy Analysis. Nine-story Office Building EnergyPro Building Energy Analysis Nine-story Office Building EnergyPro Building Energy Analysis for an office building Project Scope The purpose of the EnergyPro energy model was to evaluate the energy

More information

OUTDOOR AIR, HEAT WHEELS AND JCPENNEY: A NEW APPROACH TO RETAIL VENTILATION

OUTDOOR AIR, HEAT WHEELS AND JCPENNEY: A NEW APPROACH TO RETAIL VENTILATION OUTDOOR AIR, HEAT WHEELS AND JCPENNEY: A NEW APPROACH TO RETAIL VENTILATION Christopher S. Smith, E.I.T. and Thomas A. Bartlett, P.E. JCPenney Company, Inc. Construction Services Mechanical Engineering

More information

Next Generation: High Efficiency Energy Recovery Ventilator (ERV) 11/14/11 Dais Analytic Corporation

Next Generation: High Efficiency Energy Recovery Ventilator (ERV) 11/14/11 Dais Analytic Corporation Next Generation: High Efficiency Energy Recovery Ventilator (ERV) 11/14/11 Dais Analytic Corporation Why use an ERV? Required by code in many states (ASHRAE & IBC) Pre-condition incoming fresh air using

More information

Evaluating Alternative Fume Hood System Technologies Using Advanced Building Simulation

Evaluating Alternative Fume Hood System Technologies Using Advanced Building Simulation Evaluating Alternative Fume Hood System Technologies Using Advanced Building Simulation William J. Kosik, P.E., C.E.M. 1 Karl Aveard, AIA Associate 2 Heather R. Beaudoin, P.E., C.E.M. 3 Erik L. Olsen 3

More information

SHIYUN CHEN ADVISOR: DR. BAHNFLETH. 1 Executive Summary Building Summary 3. 3 Existing Mechanical System. 4

SHIYUN CHEN ADVISOR: DR. BAHNFLETH. 1 Executive Summary Building Summary 3. 3 Existing Mechanical System. 4 Table of Contents 1 Executive Summary... 1 2 Building Summary 3 3 Existing Mechanical System. 4 4 Mechanical Design Objectives..... 4 5 Mechanical System Evaluation. 5 5.1 Air Distribution System Evaluation....

More information

2-Pipe fan coil terminal units were selected as the parallel system to handle the remaining sensible cooling load.

2-Pipe fan coil terminal units were selected as the parallel system to handle the remaining sensible cooling load. Redesign Introduction This report is an in depth analysis of the mechanical systems of the Outreach Innovation Building located in University Park, PA and the impact these changes had on other systems

More information

AN INNOVATIVE DEDICATED OUTDOOR AIR APPLICATION FOR A GOVERNMENT OFFICE TOWER. MICHAEL HALLENBECK, PE, CEM Southland Industries

AN INNOVATIVE DEDICATED OUTDOOR AIR APPLICATION FOR A GOVERNMENT OFFICE TOWER. MICHAEL HALLENBECK, PE, CEM Southland Industries AN INNOVATIVE DEDICATED OUTDOOR AIR APPLICATION FOR A GOVERNMENT OFFICE TOWER MICHAEL HALLENBECK, PE, CEM Southland Industries BRAC 133 OVERVIEW PROJECT OVERVIEW FAN POWERED INDUCTION UNIT CENTRAL UTILITY

More information

HVAC SYSTEM CONFIGURATIONS, AN ENERGY ASPECT

HVAC SYSTEM CONFIGURATIONS, AN ENERGY ASPECT HVAC SYSTEM CONFIGURATIONS, AN ENERGY ASPECT Y Zhang 1,*, JA Wright 2 and VI Hanby 1 1 Institute of Energy and Sustainable Development, De Montfort University, Leicester, LE1 9BH, UK 2 Department of Civil

More information

PSYCHROMETRICS. A bit of new; a bit of review. Ball State Architecture ENVIRONMENTAL SYSTEMS 2 Grondzik 1. What is Psychrometrics?

PSYCHROMETRICS. A bit of new; a bit of review. Ball State Architecture ENVIRONMENTAL SYSTEMS 2 Grondzik 1. What is Psychrometrics? PSYCHROMETRICS A bit of new; a bit of review Ball State Architecture ENVIRONMENTAL SYSTEMS 2 Grondzik 1 What is Psychrometrics? A word manufactured from the Greek psychros (cold) and Middle English meter

More information

Georgetown University New Science Center

Georgetown University New Science Center Georgetown University New Science Center Final Thesis Proposal PENN STATE UNIVERSITY Prepared For: Dr. William P. Bahnfleth Department of Architectural Engineering Prepared By: Kevin M Edstrom Mechanical

More information

Grunenwald Science and Technology Building

Grunenwald Science and Technology Building Grunenwald Science and Technology Building Clarion University- Clarion, PA AE 482 Mechanical Project Proposal: Proposal for Alternative Designs Shane Helm The Pennsylvania State University Architectural

More information

Energy Recovery Ventilation Equipment

Energy Recovery Ventilation Equipment ANSI/AHRI Standard 1060 (I-P) 2014 Standard for Performance Rating of Airto-Air Exchangers for Energy Recovery Ventilation Equipment Approved by ANSI on May 15, 2015 IMPORTANT SAFETY DISCLAIMER AHRI does

More information

CLIMATE ENERGY INDEX AND BUILDING ENERGY INDEX: NEW INDICES TO ASSESS AND BENCHMARK BUILDING ENERGY PERFORMANCE

CLIMATE ENERGY INDEX AND BUILDING ENERGY INDEX: NEW INDICES TO ASSESS AND BENCHMARK BUILDING ENERGY PERFORMANCE CLIMATE ENERGY INDEX AND BUILDING ENERGY INDEX: NEW INDICES TO ASSESS AND BENCHMARK BUILDING ENERGY PERFORMANCE Don McLean, Ya Roderick, Richard Quincey, David McEwan, Integrated Environmental Solutions

More information

IN THIS ISSUE INTRODUCTION BACKGROUND. March 2018 High Humidity in Winter: Analysis for Multi-Family Passive House Projects

IN THIS ISSUE INTRODUCTION BACKGROUND. March 2018 High Humidity in Winter: Analysis for Multi-Family Passive House Projects Page 1 High Humidity in Winter: Analysis for Multi-Family Passive House Projects IN THIS ISSUE Passive House for multi-family residential applications Analysis of high humidity levels in winter Impact

More information

Therma-Fuser Energy Analysis Report 2016

Therma-Fuser Energy Analysis Report 2016 Therma-Fuser Energy Analysis Report 2016 Executive Summary This study compares the annual HVAC energy use of a Therma-Fuser VAV system to that of a conventional VAV box system. A typical 68,800 square

More information

LAHU Heat Recovery System Optimal Operation and Control Schedules

LAHU Heat Recovery System Optimal Operation and Control Schedules Yujie Cui Nexant, Inc., 44 South Broadway, 5th Floor, White Plains, NY 10601 e-mail: ycui@nexant.com Mingsheng Liu Architectural Engineering, University of Nebraska Lincoln, 206C, PKI, 1110 S. 67th St.,

More information

SPEAKMAN HYBRID ROOFTOP UNIT PERFORMANCE: WESTERN COOLING CHALLENGE LABORATORY TEST RESULTS

SPEAKMAN HYBRID ROOFTOP UNIT PERFORMANCE: WESTERN COOLING CHALLENGE LABORATORY TEST RESULTS Design & Engineering Services SPEAKMAN HYBRID ROOFTOP UNIT PERFORMANCE: WESTERN COOLING CHALLENGE LABORATORY TEST RESULTS Report Prepared by: Design and Engineering Services Customer Service Business Unit

More information

A new application of an old idea

A new application of an old idea Thermal Energy Storage A new application of an old idea As the second-most populated country on this planet, India s ever-growing demand for energy has shown no signs of dwindling. A clearly strained electricity

More information

Performance Rating of Air-to-Air Exchangers for Energy Recovery Ventilation Equipment

Performance Rating of Air-to-Air Exchangers for Energy Recovery Ventilation Equipment AHRI Standard 1061 (SI) 2018 Standard for Performance Rating of Air-to-Air Exchangers for Energy Recovery Ventilation Equipment IMPORTANT SAFETY DISCLAIMER AHRI does not set safety standards and does not

More information

Eurovent Association Eurovent Certification Activities related to ENERGY EFFICIENCY

Eurovent Association Eurovent Certification Activities related to ENERGY EFFICIENCY Eurovent Association Eurovent Certification Activities related to ENERGY EFFICIENCY INTRODUCTION Eurovent Association: Working Groups Eurovent Certification: For a fair competition on the market Energy

More information

Managing. Delta T in Buildings

Managing. Delta T in Buildings dp(ft) 83 dp (ft) 35 dp (ft) 41 105 140 180 188 1,800 GPM Tout(F)= 50 Tin (F)= 40 9000 MBH Managing Tout(F)= 50 1,800 GPM AHU 2 Delta T in Buildings Tout(F)= 50.0 1,800 GPM 192.5 FT 5,400 GPM 77 309 HP

More information

Performance Rating of Air-to-Air Exchangers for Energy Recovery Ventilation Equipment

Performance Rating of Air-to-Air Exchangers for Energy Recovery Ventilation Equipment AHRI Standard 1060 (I-P) 2018 Standard for Performance Rating of Air-to-Air Exchangers for Energy Recovery Ventilation Equipment IMPORTANT SAFETY DISCLAIMER AHRI does not set safety standards and does

More information

Energy Auditing for Schools. Maryland Energy Administration Eric Oliver, EMO Energy Solutions, LLC May 10, 2007

Energy Auditing for Schools. Maryland Energy Administration Eric Oliver, EMO Energy Solutions, LLC May 10, 2007 Energy Auditing for Schools Maryland Energy Administration Eric Oliver, EMO Energy Solutions, LLC May 10, 2007 Schools Consumption breakdown 19% 6% 9% Space Heating 46% Water Heating Lighting Cooling 20%

More information

EQ ENERGY SAVING PRODUCTS

EQ ENERGY SAVING PRODUCTS FW ENERGY DAY EQ ENERGY SAVING PRODUCTS 19/10/2016 DOCUMENT X Energy efficient Ecodesign compliant LCC in focus Integrated functions Quick and reliable installation Flexible Hygiene Robust casing Fläkt

More information

Sample Reports. for. HAP v4.90 Example Problem

Sample Reports. for. HAP v4.90 Example Problem Sample Reports for HAP v4.90 Example Problem December, 2014 Carrier Software Systems Copyright 2014 Carrier Corporation, All Rights Reserved Introduction This document contains reports generated using

More information

Proposal: Mechanical System Redesign

Proposal: Mechanical System Redesign Proposal: Mechanical System Redesign The 959 Eighth Avenue 10019 Faculty Advisor: Dr. James Freihaut December 12, 2005 Table of Contents 1.0 Executive Summary 2.0 3.0 Proposal Obectives 4.0 Preliminary

More information

Joint-Frequency Bins versus Conventional Bin Weather Data in Analysis of HVAC System Operation

Joint-Frequency Bins versus Conventional Bin Weather Data in Analysis of HVAC System Operation ESLIC091132 JointFrequency Bins versus Conventional Bin Weather Data in Analysis of HVAC System Operation Alaina Jones Graduate Research Assistant JuanCarlos Baltazar, Ph.D. Associate Research Engineer

More information

DEA Clandestine Laboratory Training Center

DEA Clandestine Laboratory Training Center DEA Clandestine Laboratory Training Center David M. Potchak Penn State University Architectural Engineering Mechanical Option Background Information Existing Mechanical Systems Redesign Objectives Alternate

More information

Intelligent System Design

Intelligent System Design Intelligent System Design Justin Wieman Chiller Systems Engineer Trane, A Division of Ingersoll-Rand Member AHRI Systems Committes ASHRAE Member since 2000 When you buy a HVAC System would you rather buy:

More information

Building Energy Simulation of A. Run-Around Membrane Energy Exchanger (RAMEE) A Thesis Submitted to the College of. Graduate Studies and Research

Building Energy Simulation of A. Run-Around Membrane Energy Exchanger (RAMEE) A Thesis Submitted to the College of. Graduate Studies and Research Building Energy Simulation of A Run-Around Membrane Energy Exchanger (RAMEE) A Thesis Submitted to the College of Graduate Studies and Research In Partial Fulfillment of the Requirements For the Degree

More information

South Jefferson High School Huyett Road Charles Town, WV 25414

South Jefferson High School Huyett Road Charles Town, WV 25414 Thesis Proposal Mechanical System Redesign Report Charles Town, WV 25414 Prepared for Dr. Jelena Srebric The Pennsylvania State University By Jonathon Gridley Friday, December 15, 2006 1.0 Table of Contents

More information

Load Estimation. Ir. Dr. Sam C. M. Hui Faculty of Science and Technology

Load Estimation. Ir. Dr. Sam C. M. Hui Faculty of Science and Technology SPD4121 HVAC Technology for Plumbing Engineers http://ibse.hk/spd4121/ Load Estimation Ir. Dr. Sam C. M. Hui Faculty of Science and Technology E-mail: cmhui@vtc.edu.hk Jul 2016 Contents Basic Concepts

More information

Changes to the Minnesota Commercial Energy Code. Presented by: Andy Thielen, PE

Changes to the Minnesota Commercial Energy Code. Presented by: Andy Thielen, PE Changes to the Minnesota Commercial Energy Code Presented by: Andy Thielen, PE Warning! The following is an outline of proposed code changes. There is no guarantee that the final code adopted by the State

More information

Acknowledgements 4. Executive Summary 5

Acknowledgements 4. Executive Summary 5 Table of Contents Acknowledgements 4 Executive Summary 5 Building Overview.. 6 Building Summary.. 6 Site. 6 Evaluation of Existing Mechanical System. 7 Mechanical System Overview 7 Design Objective 7 Outdoor

More information

SPEAKMAN HYBRID ROOFTOP UNIT PERFORMANCE: WESTERN COOLING CHALLENGE LABORATORY TEST RESULTS

SPEAKMAN HYBRID ROOFTOP UNIT PERFORMANCE: WESTERN COOLING CHALLENGE LABORATORY TEST RESULTS Design & Engineering Services SPEAKMAN HYBRID ROOFTOP UNIT PERFORMANCE: WESTERN COOLING CHALLENGE LABORATORY TEST RESULTS HT.10.SCE.232 Report Prepared by: Western Cooling Efficiency Center University

More information

Energy Recovery Process Cooling Example. Presentation - Overview. Air Change Australia Pty Ltd. Air Change Energy Recovery Range

Energy Recovery Process Cooling Example. Presentation - Overview. Air Change Australia Pty Ltd. Air Change Energy Recovery Range 2 Presentation - Overview Energy Recovery Range + Designing Plant Rooms for Energy Efficiency The Company and the Technology Energy Recovery Product Range Product Range Pre-conditioners vs ERV-AHU s Energy

More information

2. The requirements of Sections 502, 503, 504 and 505. In addition, commercial buildings shall comply with either Section 506.2, or

2. The requirements of Sections 502, 503, 504 and 505. In addition, commercial buildings shall comply with either Section 506.2, or Public Comment 3: Dave Hewitt, representing New Buildings Institute, Jessyca Henderson, representing American Institute of Architects, Ron Majette, representing U.S. Department of Energy requests Approval

More information

Energy Recovery Ventilation & ERV Basics The New Custom Express Tool

Energy Recovery Ventilation & ERV Basics The New Custom Express Tool Energy Recovery Ventilation & ERV Basics The New Custom Express Tool Presented by: Dinesh Patel dinesh.patel@nationalgrid.com David Gaudet david.gaudet2@nationalgrid.com 1 What is and Why ERV? The recovery

More information

Energy aspects of HVAC system configurations problem definition and test cases

Energy aspects of HVAC system configurations problem definition and test cases Loughborough University Institutional Repository Energy aspects of HVAC system configurations problem definition and test cases This item was submitted to Loughborough University's Institutional Repository

More information

NORTH AMERICAN MONITORING OF A HOTEL WITH ROOM SIZE GSHPS

NORTH AMERICAN MONITORING OF A HOTEL WITH ROOM SIZE GSHPS NORTH AMERICAN MONITORING OF A HOTEL WITH ROOM SIZE GSHPS Hugh I. Henderson, Jr. P.E.*, Steven W. Carlson, P.E., and Adam C. Walburger CDH Energy Corp. Cazenovia, NY USA ABSTRACT This paper presents the

More information

The Case for Energy Recovery in addressing Commercial Building Indoor Air Quality

The Case for Energy Recovery in addressing Commercial Building Indoor Air Quality The Case for Energy Recovery in addressing Commercial Building Indoor Air Quality Fundamentals Common Misconceptions Performance Certification Applications Learning Objectives Improve and broaden dialog

More information

Mechanical Depth. Redesign and Analysis

Mechanical Depth. Redesign and Analysis Depth Redesign and Analysis 14 Analysis Scope The scope of my mechanical redesign will include the 2 nd and 3 rd floors of the SW hospital wing which includes Semi-Private, Private and Isolations rooms.

More information

Xavier Energy Initiative

Xavier Energy Initiative Xavier Energy Initiative By Ron Perkins Report of August Site Visit To paraphrase Blaise Pascal, if I had more time I would have written a shorter report. In deference to those who do not share my enthusiasm

More information

Development of New Self-Comparison Test Suites for EnergyPlus

Development of New Self-Comparison Test Suites for EnergyPlus Development of New Self-Comparison Test Suites for EnergyPlus Michael J. Witte Robert H. Henninger GARD Analytics, Inc., Arlington Hts., IL Drury B. Crawley U.S. Department of Energy, Washington, DC IBPSA-USA

More information

SUSTAINABILITY FOR LABS

SUSTAINABILITY FOR LABS SUSTAINABILITY FOR LABS COLORADO STATE UNIVERSITY CHEMISTRY BUILDING ASHRAE 2017 TECHNICAL CONFERENCE April 28 th, 2017 PRESENTERS SEAN CONVERY, PE PRINCIPAL MECHANICAL ENGINEER ERIC RINGOLD BUILDING PERFORMANCE

More information

Sample Reports. for. HAP v4.80 Example Problem

Sample Reports. for. HAP v4.80 Example Problem Sample Reports for HAP v4.80 Example Problem October, 2013 Carrier Software Systems Copyright 2013 Carrier Corporation, All Rights Reserved Introduction This document contains reports generated using the

More information

Rooftops High performance, proven reliability and easy installation

Rooftops High performance, proven reliability and easy installation Rooftops High performance, proven reliability and easy installation 1 Airfinity Rooftops Comfort and economy When it comes to installing and maintaining an HVAC system, every cent counts. From your initial

More information

Mechanical Systems Project Proposal

Mechanical Systems Project Proposal Mechanical Systems Project Proposal December 15, 2006 Table of Contents 1.0 Executive Summary... 2 2.0 Building Background... 3 3.0 Proposal Objectives... 5 4.0 Initial Considerations... 6 5.0 Proposed

More information

Developing Exhaust Air Energy Recovery Credits for the Florida Energy Code

Developing Exhaust Air Energy Recovery Credits for the Florida Energy Code Developing Exhaust Air Energy Recovery Credits for the Florida Energy Code FSEC-CR-2003-15 Final Report May 27, 2015 Submitted to Department of Business and Professional Regulation Office of Codes and

More information

Meeting the Variable Needs of Energy- Efficient Mechanical Ventilation When and Where You Need It

Meeting the Variable Needs of Energy- Efficient Mechanical Ventilation When and Where You Need It Meeting the Variable Needs of Energy- Efficient Mechanical Ventilation When and Where You Need It Charles Withers Jr. 1 Introduction Effectively providing mechanical ventilation in commercial buildings

More information

Energy Efficiency Analysis for a Multi-Story Research Office Building (LG Multi V Water IV Heat Recovery VRF System)

Energy Efficiency Analysis for a Multi-Story Research Office Building (LG Multi V Water IV Heat Recovery VRF System) Energy Efficiency Analysis for a Multi-Story Research Office Building (LG Multi V Water IV Heat VRF System) (* Source: http://kr.lgeaircon.com/) Commercial Air-Conditioning Engineering Study ES-MultiVWaterIV_EnergyAnalysis-08-14

More information

Operating Engineers Seminar Bob Ford Jeff Volovsek

Operating Engineers Seminar Bob Ford Jeff Volovsek Operating Engineers Seminar 2017 Bob Ford Jeff Volovsek Overview Annual energy consumption to demand Heat recovery updated requirements Process cooling best practices How does District Energy compare?

More information

DOE Commercial Building Benchmark Models

DOE Commercial Building Benchmark Models DOE Commercial Building Benchmark Models Paul Torcellini, Michael Deru, Brent Griffith, and Kyle Benne National Renewable Energy Laboratory Mark Halverson and David Winiarski, Pacific Northwest National

More information

Coppin State University Physical Education Complex - Technical Report 2

Coppin State University Physical Education Complex - Technical Report 2 Coppin State University Physical Education Complex - Technical Report 2 Building and Plant Energy Analysis Report Kaylee M Damico Advisor: Dr. Jelena Srebric Location: Baltimore, MD Table of Contents Contents

More information

Energy Recovery: Rotary Heat Exchanger. Rotary Heat Exchanger (Enthalpy Wheel) Schematics

Energy Recovery: Rotary Heat Exchanger. Rotary Heat Exchanger (Enthalpy Wheel) Schematics Energy Recovery: Rotary Heat Exchanger Adding a rotary heat exchanger to both air handling units would decrease the energy consumption of each resulting in lower operating costs. The proceeding in depth

More information

Energy Savings of Cellular Shades

Energy Savings of Cellular Shades Energy Savings of Cellular Shades City of Santa Clara with Silicon Valley Power Cheryn Metzger, Jian Zhang, Katie Cort Pacific Northwest National Laboratory PNNL-SA-134378 What are Window Attachments?

More information

CAE 331/513 Building Science Fall 2017

CAE 331/513 Building Science Fall 2017 CAE 331/513 Building Science Fall 2017 November 14, 2017 Heating load calculations Advancing energy, environmental, and sustainability research within the built environment www.built-envi.com Twitter:

More information

A Bottom-Up Engineering Estimate of the Aggregate Heating and Cooling Loads of the Entire US Building Stock

A Bottom-Up Engineering Estimate of the Aggregate Heating and Cooling Loads of the Entire US Building Stock A Bottom-Up Engineering Estimate of the Aggregate Heating and Cooling Loads of the Entire US Building Stock Yu Joe Huang, Lawrence Berkeley National Laboratory Jim Brodrick, D&R International ABSTRACT

More information

ENSURING A PRODUCTIVE ENERGY MODELING PROCESS

ENSURING A PRODUCTIVE ENERGY MODELING PROCESS ENSURING A PRODUCTIVE ENERGY MODELING PROCESS ASHRAE Rocky Mountain Technical Conference April 15, 2011 Kendra Tupper, P.E. (RMI) Sue Reilly, P.E., BEMP (Group 14) Michael Brendle, FAIA (RNL) OVERVIEW

More information

Building Energy Efficiency Analysis for a High School

Building Energy Efficiency Analysis for a High School Building Energy Efficiency Analysis for a High School (LG Multi V III VRF System) School Building Air-Conditioning Engineering Study VRF-ES-BH-002-US 013A30 Executive Summary Contents Executive Summary...2

More information

Energy Modeling Applications for Existing Buildings

Energy Modeling Applications for Existing Buildings Energy Modeling Applications for Existing Buildings Presented by: Clark Denson PE, CEM, BEMP, LEED AP BD+C 4/27/12 Learning Objectives 1. List available methods and tools for energy modeling 2. Explain

More information

Model Based Building Chilled Water Loop Delta-T Fault Diagnosis

Model Based Building Chilled Water Loop Delta-T Fault Diagnosis Model Based Building Chilled Water Loop Delta-T Fault Diagnosis Lei Wang, Ph.D., P.E. James Watt, P.E. Juan Zhao, Ph.D., P.E Energy Systems Laboratory, Texas A&M University College Station, Texas Abstract

More information

Mechanical Product Overview

Mechanical Product Overview Mechanical Product Overview The founding principles of Price have never changed business integrity, first class service, innovation and a commitment to people. PURPOSE BUILT FOR YOUR APPLICATION Whether

More information

Metrics (and Methodologies) for Evaluating Water Saving Alternatives in a Typical Chemical Plant

Metrics (and Methodologies) for Evaluating Water Saving Alternatives in a Typical Chemical Plant Metrics (and Methodologies) for Evaluating Water Saving Alternatives in a Typical Chemical Plant Presentation to the: June 19, 2013 Tom Carter, P.E. Sr. Program Manager, Heat Rejection Technology Johnson

More information

EMD SERONO RESEARCH CENTER EXISTING

EMD SERONO RESEARCH CENTER EXISTING EMD SERONO RESEARCH CENTER EXISTING BILLERICA, MA SHIYUN (SHARON) CHEN MECHANICAL AE SENIOR THESIS Building System Dedicated Outdoor Air System/ Systems Breadth Building Design Team Building: EMD Serono

More information

Modeling the Performance of ECM and SCR Series Fan-Powered Terminal Units in Single-Duct VAV Systems

Modeling the Performance of ECM and SCR Series Fan-Powered Terminal Units in Single-Duct VAV Systems CH-12-017 Modeling the Performance of ECM and SCR Series Fan-Powered Terminal Units in Single-Duct VAV Systems Michael A. Davis, PhD John A. Bryant, PhD, PE Dennis L. O Neal, PhD, PE Member ASHRAE Member

More information

Improving the Energy Performance of HVAC Systems in Operating Theatres by Using Heat Recovery Devices

Improving the Energy Performance of HVAC Systems in Operating Theatres by Using Heat Recovery Devices Improving the Performance of HVAC Systems in Operating Theatres by Using Heat Recovery Devices Mohammad Ahmadzadehtalatapeh* *Department of Mechanical Engineering, Chabahar Maritime University, Iran. (m_ahmadzadeh56@yahoo.com)

More information

COOLING COIL (35% ETHYLENE GLYCOL)

COOLING COIL (35% ETHYLENE GLYCOL) APPENDIX Contents A1.1 Existing Mechanical Equipment Schedules A1.2 Existing Mechanical System Schematic Drawings A2. Building Design Loads, Energy Loads and Cost Data Tables A3. Standard 62n-2001 Ventilation

More information

Furnace Blower Electricity: National and Regional Savings Potential

Furnace Blower Electricity: National and Regional Savings Potential Furnace Blower Electricity: National and Regional Savings Potential Authors Victor Franco, James Lutz, and Alex Lekov, Lawrence Berkeley National Laboratory Lixing Gu, Florida Solar Energy Center Original

More information

Reducing Hospital Energy Use and Maintaining Savings. Glen Anderson, PE

Reducing Hospital Energy Use and Maintaining Savings. Glen Anderson, PE Reducing Hospital Energy Use and Maintaining Savings Glen Anderson, PE AIA Quality Assurance The Building Commissioning Association is a Registered Provider with The American Institute of Architects Continuing

More information

Air-Water Systems. Chilled Ceilings and Beams TROX USA. Principle of Operation. Radiant Effect on Occupants. Early 1980 s. Chilled Ceiling Panels

Air-Water Systems. Chilled Ceilings and Beams TROX USA. Principle of Operation. Radiant Effect on Occupants. Early 1980 s. Chilled Ceiling Panels Air-Water Systems and Beams Early 1980 s 1980 1990 2005 Buildings well insulated for heating Advent of personal computers Need to remove heat from space Limited space available TROX USA 1 2 Principle of

More information

Potential Energy Savings from Optimized Schedule & Economizer Cycles in the Moody Library Building at UTMB

Potential Energy Savings from Optimized Schedule & Economizer Cycles in the Moody Library Building at UTMB ESL-TR-93/10-08 Potential Energy Savings from Optimized Schedule & Economizer Cycles in the Moody Library Building at UTMB Submitted to the by the Monitoring and Analysis Group (Task E) Dr. Mingsheng Liu

More information

Life Cycle Costing for HVAC Systems

Life Cycle Costing for HVAC Systems Technical Development Program COMMERCIAL HVAC APPLICATIONS Life Cycle Costing for HVAC Systems PRESENTED BY: Colby Fischer Copyright Carrier Corp. 2005 Objectives 1. Understand why Life Cycle Cost studies

More information

Whole Building Energy Performance Evaluation through. Similar Control Strategies

Whole Building Energy Performance Evaluation through. Similar Control Strategies Whole Building Energy Performance Evaluation through Similar Control Strategies S.H. Cheon 1, Y.H. Kwak 1, C.Y. Jang 2, and J.H. Huh 1* 1 Department of Architectural Engineering, University of Seoul, Seoul

More information

Valent Packaged Rooftop Units A Fresh Choice for High-Percentage Outdoor Air Designs. Valent is a business of Unison Comfort Technologies.

Valent Packaged Rooftop Units A Fresh Choice for High-Percentage Outdoor Air Designs. Valent is a business of Unison Comfort Technologies. Valent Packaged Rooftop Units A Fresh Choice for High-Percentage Outdoor Air Designs Valent is a business of Unison Comfort Technologies. When your HVAC system design calls for high-percentage or 100%

More information

Hourly Analysis Program v.4.1 Page 1 of 1

Hourly Analysis Program v.4.1 Page 1 of 1 Air System Design Load Summary for Zona 11 DESIGN COOLING DESIGN HEATING COOLING DATA AT Dec 1700 HEATING DATA AT DES HTG COOLING OA DB / WB 33.1 C / 23.5 C HEATING OA DB / WB -0.6 C / -3.2 C Sensible

More information

AMENDMENT NO. 4 AUGUST 2010 TO IS 1391 (PART 1) : 1992 ROOM AIR CONDITIONERS SPECIFICATION

AMENDMENT NO. 4 AUGUST 2010 TO IS 1391 (PART 1) : 1992 ROOM AIR CONDITIONERS SPECIFICATION AMENDMENT NO. 4 AUGUST 2010 TO IS 1391 (PART 1) : 1992 ROOM AIR CONDITIONERS SPECIFICATION PART 1 UNITARY AIR CONDITIONERS ( Second Revision ) (Page 9, clause 11.1.1) Substitute the following for the existing:

More information

Dew Point Evaporative Comfort Cooling

Dew Point Evaporative Comfort Cooling Dew Point Evaporative Comfort Cooling Energy and Water Projects Demonstration Plan SI-0821 TP-7A40-56256-1 November 2012 Jesse Dean, Lesley Herrmann, Eric Kozubal, and Jesse Geiger (National Renewable

More information

Albedo, Climate, & Urban Heat Islands

Albedo, Climate, & Urban Heat Islands Albedo, Climate, & Urban Heat Islands Jeremy Gregory and CSHub research team: Xin Xu, Liyi Xu, Adam Schlosser, & Randolph Kirchain CSHub Webinar February 15, 2018 (Slides revised February 21, 2018) Albedo:

More information

Analysis of Differences between 2018 IECC R406 Code Compliance and ANSI/RESNET/ICC Standard 301

Analysis of Differences between 2018 IECC R406 Code Compliance and ANSI/RESNET/ICC Standard 301 Analysis of Differences between 2018 IECC R406 Code Compliance and ANSI/RESNET/ICC Standard 301 FSEC-CR-2081-18 Final Report May 16, 2018 Submitted to Residential Energy Services Network, Inc. P.O. Box

More information

Three Case Studies of the Application of Energy Systems Optimization Best Practices for Automatic Demand Response

Three Case Studies of the Application of Energy Systems Optimization Best Practices for Automatic Demand Response Three Case Studies of the Application of Energy Systems Optimization Best Practices for Automatic Demand Response Yifu Shi Kelly Guiberteau Carlos Yagua, P.E. James Watt, P.E. Energy Systems Laboratory,

More information

Hourly Analysis Program v.4.1 Page 1 of 1

Hourly Analysis Program v.4.1 Page 1 of 1 Air System Design Load Summary for Zona 6 DESIGN COOLING DESIGN HEATING COOLING DATA AT Feb 1600 HEATING DATA AT DES HTG COOLING OA DB / WB 34.5 C / 23.7 C HEATING OA DB / WB -0.6 C / -3.2 C Sensible Latent

More information

Walter Reed National Military Medical Center Bethesda, MD

Walter Reed National Military Medical Center Bethesda, MD Walter Reed National Military Medical Center Bethesda, MD Technical Report Three: Mechanical Systems Existing Conditions Evaluation Prepared For: Dr. James D. Freihaut Prepared By: Justin Herzing Date:

More information

Building Energy Efficiency Analysis for a High School

Building Energy Efficiency Analysis for a High School Building Energy Efficiency Analysis for a High School (LG Multi V Water II VRF System) School Building Air-Conditioning Engineering Study VRF-ES-BF-002-US 013A16 Contents Executive Summary...3 Introduction...4

More information

ET16SDG1011: Waste-heat recovery from an air conditioner for swimming pool heating

ET16SDG1011: Waste-heat recovery from an air conditioner for swimming pool heating ET16SDG1011: Waste-heat recovery from an air conditioner for swimming pool heating Submitted to San Diego Gas & Electric Submitted January 2018 Prepared by Curtis Harrington, Jose Garcia, and Theresa Pistochini

More information

A Method for On-Going Commissioning of VRV Package Systems Using a. Simulation Model

A Method for On-Going Commissioning of VRV Package Systems Using a. Simulation Model A Method for On-Going Commissioning of VRV Package Systems Using a Simulation Model Motoi Yamaha Ken Sekiyama Shinya Misaki Associate Professor Graduate Student Chubu University Chubu University Sunloft

More information

Optimisation of an HVAC system for energy saving and thermal comfort in a university classroom

Optimisation of an HVAC system for energy saving and thermal comfort in a university classroom Optimisation of an HVAC system for energy saving and thermal comfort in a university classroom Giovanni Semprini DIN / CIRI, University of Bologna, Bologna, Italy Cosimo Marinosci DIN / CIRI, University

More information

Façade Existing Conditions

Façade Existing Conditions Façade Existing Conditions Façade Existing Conditions Current Design The use of 5000 psi concrete. Split face brick with 6 backing of concrete. Total panel depth = 1-5 Nominal panel = 12 X22 Weight = 23,000

More information