PROJECT NATURE LOCATION
|
|
- George Beasley
- 5 years ago
- Views:
Transcription
1 APPLICATION FOR RECTIFICATION IN TERMS OF SECTION 24G OF THE NATIONAL ENVIRONMENTAL MANAGEMENT ACT (ACT NO. 107 OF 1998) FOR THE UNLAWFUL COMMENCEMENT OF VARIOUS LISTED ACTIVITIES FOR THE UNDERGROUND COAL GASIFICATION (PHASE 1 PILOT PLANT) PROJECT INCLUDING ASSOCIATED INFRASTRUCTURE IN SUPPORT OF CO-FIRING GAS AT MAJUBA POWER STATION, AMERSFOORT, MPUMALANGA (DEA REF: 14/12/16/3/3/1/54) Notice is hereby given in terms of Section 24G of the National Environmental Management Act, 1998 (Act No. 107 of 1998) (as amended) [NEMA] that Eskom Holdings SOC Ltd ( Eskom ) has submitted a rectification application to the Department of Environmental Affairs for the unlawful commencement of various listed activities associated with the Underground Coal Gasification (UCG) (Phase 1 Pilot Plant) Project. PROJECT NATURE LOCATION LISTED ACTIVITIES REVIEW OF THE DRAFT EIAR AND EMPR INVITATION TO PUBLIC MEETING HOW TO REGISTER CONTACT DETAILS The application entails the rectification of the construction of the following infrastructure: Pipelines internal to site: main pipeline to Majuba Power Station crosses one (1) perennial stream and one (1) river Raw water dam: ± 3,000 m 3 situated within the Gasifier 1 footprint serving as emergency water supply Condensate (process water) dam: ± 12,000 m 3 in size situated within Gasifier 1 s footprint Borrow pit: ± 2.5 ha, established on the farm Roodekopjes 67HS developed to fill up an old borrow pit on the same farm and for construction of the project s roads Access and service roads: new roads developed to access the Pilot Plant infrastructure of approximately ± 6.7 km, crossing 4 (four) watercourses Gas Treatment Plant (GTP): simplified pilot version established with a footprint of 30 x 60 m consisting of (a) heat exchanger, (b) liquid separation vessels, (c) emergency gas flare stack, (d) auxiliary pumps and motors, and (e) other small equipment Hazardous substance storage: bulk storage diesel tanks 2 x 23 m 3 (46 m 3 ) within a bunded area Water treatment plant (WTP): water filtration plant with 2 x 23 m 3 (46 m 3 ) tanks that are used for the separation of water and waste. UCG plant operations and associated infrastructure are located on the farm Roodekopjes 67HS (Portion 1, 2, 3 and remaining extent). Applicable Legislation Listed Activity/ies Environmental Conservation Act 1(c), 2(c), 7 & 9 (Act No. 73 of 1989), GNR.1182 EIA Regulations (2006), GNR.386 1(n), 1(p), 4, 7, 13, 15, 16 & 17 EIA Regulations (2006), GNR.387 1(e), 1(i) & 1(q) EIA Regulations (2010), GNR For the full wording and linking of listed activities to the above project nature, please contact the EAP as detailed below. All I&APs are hereby notified that the draft Environmental Impact Assessment Report (EIAR) will be available for public comment from 18 October 2013 to 30 November 2013 and will be available at the following places: Volksrust Public Library, Cnr Joubert & Laingsnek Street (Volksrust) Amersfoort Public Library, Cnr Plein & Bree Street (Amersfoort) UCG Mine Site Offices, Majuba Colliery, Bergvliet, (Amersfoort) Office of Royal HaskoningDHV, 78 Kalkoen Street, Monument Park (Pretoria) Royal HaskoningDHV website ( rhdhv.co.za/pages/services/environmental/current-projects.php) All interested and/or affected parties (I&APs) are invited to attend the public meeting. The EIA team will be available to discuss and answer any questions you may have regarding the findings of the draft EIAR and EMPr. The date, time and venue for the public meeting is as follows: Date: 19 November 2013; Time: 17h00 18h30, Venue: ezamokuhle Community Hall, Amersfoort You can register as an Interested and Affected Party (I&AP) or request additional information, by contacting Royal HaskoningDHV. Contact details are provided below. As part of the registration, I&APs are further requested to provide their name and surname, contact information, and, interest in the project to the EAP. Sibongile Hlomuka Royal HaskoningDHV PO Box 867, Gallo Manor, 2052 Tel: Fax: sibongile.hlomuka@rhdhv.com 8082
2 Appendix E5: Notification of review of the Draft EIAR and Meeting/s
3
4
5
6 Reddy, Prashika From: Sent: To: Cc: Subject: Attachments: Importance: Reddy, Prashika 16 October :06 AM Maswangane, Boitumelom; 'Ronel Duvenage'; 'Lou Duvenage'; Hlomuka, Sibongile UITNODIGING NA FOKUS GROEP VERGADERING - ESKOM UCG 24G Notific_review meeting_11_10_13_lo_final_afr.pdf High Dear Interested and Affected Party Please find attached notice on a meeting to be held on: Datum Tyd Plek 20 November h30 08h30 Ou Bergvliet Myn Gebou, Majuba Colliery, Amersfoort Distrik As well as information on the availability of the draft Environmental Impact Assessment Report for review and comment from 18 October 30 November Regards Prashika Reddy (Pr Sci Nat /10) Principal Associate: General Environmental Services T +27 (0) D +27 (12) M E Prashika.Reddy@rhdhv.com W Royal HaskoningDHV (Pty) Ltd trading as Royal HaskoningDHV Reg No. 1966/001916/07 Fountain Square, 78 Kalkoen Street Monument Park Ext 2, Pretoria, 0181 PO Box 25302, Monument Park, Pretoria 0105, South Africa Please, consider your environment. Before printing this ask yourself: "Do I need a hard copy?" This and any files transmitted with it are confidential and intended solely for the authorised use of the individual or entity to whom they are addressed. If you have received this in error, Please notify mailadm-za@rhdhv.com and delete all copies of the . Any views or opinions expressed in this are not necessarily those of, nor endorsed by, the Royal HaskoningDHV Group. Information disclosed in this may not be accurate, current or complete and the Royal HaskoningDHV Group disclaims all liability in this regard. Tracking: 1
7 Reddy, Prashika From: Sent: To: Cc: Subject: Attachments: Importance: Reddy, Prashika 16 October :26 AM 'Ronel Duvenage' UITNODIGING NA FOKUS GROEP VERGADERING - ESKOM UCG 24G Notific_review meeting_11_10_13_lo_final_afr.pdf High Dear Interested and Affected Party Please find attached notice on a meeting to be held on: Datum Tyd Plek 20 November h30 08h30 Ou Bergvliet Myn Gebou, Majuba Colliery, Amersfoort Distrik As well as information on the availability of the draft Environmental Impact Assessment Report for review and comment from 18 October 30 November Regards Prashika Reddy (Pr Sci Nat /10) Principal Associate: General Environmental Services T +27 (0) D +27 (12) M E Prashika.Reddy@rhdhv.com W Royal HaskoningDHV (Pty) Ltd trading as Royal HaskoningDHV Reg No. 1966/001916/07 Fountain Square, 78 Kalkoen Street Monument Park Ext 2, Pretoria, 0181 PO Box 25302, Monument Park, Pretoria 0105, South Africa Please, consider your environment. Before printing this ask yourself: "Do I need a hard copy?" This and any files transmitted with it are confidential and intended solely for the authorised use of the individual or entity to whom they are addressed. If you have received this in error, Please notify mailadm-za@rhdhv.com and delete all copies of the . Any views or opinions expressed in this are not necessarily those of, nor endorsed by, the Royal HaskoningDHV Group. Information disclosed in this may not be accurate, current or complete and the Royal HaskoningDHV Group disclaims all liability in this regard. 1
8 Reddy, Prashika From: Sent: To: Cc: Subject: Attachments: Importance: Reddy, Prashika 17 October :51 AM 'Ronel Duvenage' UITNODIGING NA FOKUS GROEP VERGADERING - ESKOM UCG 24G Notific_review meeting_11_10_13_lo_final_afr.pdf High Dear Interested and Affected Party Please find attached notice on a meeting to be held on: Datum Tyd Plek 20 November h30 08h30 Ou Bergvliet Myn Gebou, Majuba Colliery, Amersfoort Distrik As well as information on the availability of the draft Environmental Impact Assessment Report for review and comment from 18 October 30 November Regards Prashika Reddy (Pr Sci Nat /10) Principal Associate: General Environmental Services T +27 (0) D +27 (12) M E Prashika.Reddy@rhdhv.com W Royal HaskoningDHV (Pty) Ltd trading as Royal HaskoningDHV Reg No. 1966/001916/07 Fountain Square, 78 Kalkoen Street Monument Park Ext 2, Pretoria, 0181 PO Box 25302, Monument Park, Pretoria 0105, South Africa Please, consider your environment. Before printing this ask yourself: "Do I need a hard copy?" This and any files transmitted with it are confidential and intended solely for the authorised use of the individual or entity to whom they are addressed. If you have received this in error, Please notify mailadm-za@rhdhv.com and delete all copies of the . Any views or opinions expressed in this are not necessarily those of, nor endorsed by, the Royal HaskoningDHV Group. Information disclosed in this may not be accurate, current or complete and the Royal HaskoningDHV Group disclaims all liability in this regard. 1
9 14 October 2013 DEA Reference: 14/12/16/3/3/1/54 Our Reference: E02.JNB Dear Interested and Affected Party (I&AP) NOTICE OF APPLICATION FOR RECTIFICATION IN TERMS OF SECTION 24G OF THE NATIONAL ENVIRONMENTAL MANAGEMENT ACT (ACT NO. 107 OF 1998) FOR THE UNLAWFUL COMMENCEMENT OF VARIOUS LISTED ACTIVITIES FOR THE UNDERGROUND COAL GASIFICATION (PHASE 1 PILOT PLANT) PROJECT INCLUDING ASSOCIATED INFRASTRUCTURE IN SUPPORT OF CO-FIRING GAS AT MAJUBA POWER STATION, AMERSFOORT, MPUMALANGA Notice is hereby given in terms of Section 24G of the National Environmental Management Act, 1998 (Act No. 107 of 1998) (as amended) [NEMA] that Eskom Holdings SOC Ltd ( Eskom ) has submitted a rectification application to the Department of Environmental Affairs (DEA) for the unlawful commencement of various listed activities associated with the Underground Coal Gasification (UCG) (Phase 1 Pilot Plant) Project. Project Background: An integrated EIA and waste management licensing process (DEA Ref 14/12/16/3/3/3/61) is currently underway for the co-firing of gas, produced by the Underground Coal Gasification (UCG) operations, at the Majuba Power Station. This includes all associated infrastructure i.e. production and injection wells, monitoring boreholes, wastewater treatment works, new service roads, and, a new condensate (process water) dam. On 02 April 2013, the final Environmental Scoping Report (ESR) was accepted by the DEA. The compilation of the draft Environmental Impact Assessment Report (EIAR) was drafted thereafter. It should however be noted that during the ESR phase irregularities in the permitting of the existing Pilot Plant were noted and thus a rectification process was entered into for portions of the existing infrastructure not covered by the existing permits. As such the draft EIAR cannot be concluded at this point as it may not be submitted prior to the environmental authorisation for rectification being issued by the DEA. The application entails the rectification of the construction of the following infrastructure: Pipelines internal to site: main pipeline to Majuba Power Station crosses one (1) perennial stream and one (1) river. Raw water dam: ± 3,000 m 3 situated within the Gasifier 1 footprint serving as emergency water supply. Condensate (process water) dam: ± 12,000 m 3 in size situated within Gasifier 1 s footprint. Borrow pit: ± 2.5 ha, established on the farm Roodekopjes 67HS developed to fill up an old borrow pit on the same farm and for construction of the project s roads. Access and service roads: new roads developed to access the Pilot Plant infrastructure of approximately ± 6.7 km, crossing 4 (four) watercourses. Gas Treatment Plant (GTP): simplified pilot version established with a footprint of 30 x 60 m consisting of (a) heat exchanger, (b) liquid separation vessels, (c) emergency gas flare stack, (d) auxiliary pumps and motors, and (e) other small equipment. Hazardous substance storage: bulk storage diesel tanks 2 x 23 m 3 (46 m 3 ) within a bunded area. Water treatment plant (WTP): water filtration plant with 2 x 23 m 3 (46 m 3 ) tanks that are used for the separation of water and waste. All illegal activities commenced on the farm Roodekopjes 67 HS (Portions 1, 2, 3 and remaining extent) where the UCG Pilot Plant and associated infrastructure are located. The farm as well as the above-mentioned portions are owned by Eskom.
10 - 2 - The following listed activities have been applied for: Relevant Legislation and Listed Activities Activity Details Listed activities in terms of Environmental Conservation Act (Act No 73 of 1989), GN. R (c) The construction or upgrading of: (c) infrastructure for the transportation of any substance which is dangerous or hazardous and is controlled by national legislation. 2 (c) The change of land use from: (c) agriculture or zoned undetermined use or an equivalent zoning, to any other land use. 7 The reclamation of land in inland water including wetlands. 9 Scheduled processes listed in the second schedule to the Atmospheric Pollution Prevention Act, 1965 (Act No, 45 of 1965). Listed activities in terms EIA Regulations (2006), GN. R (n) The off-stream storage of water, including dams and reservoirs, with a capacity of cubic metres or more, unless such storage falls within the ambit of the activity listed in item 6 of Government Notice No. R. 387 of (p) The temporary storage of hazardous waste. 4 The dredging, excavation, infilling, removal or moving of soil, sand or rock exceeding 5 cubic metres from a river, floodplain or wetland. 7 The above ground storage of a dangerous good, including petrol, diesel, liquid petroleum gas or paraffin, in containers with a combined capacity of more than 30 cubic metres but less than cubic metres at any one location or site. 13 The abstraction of groundwater at a volume where any general authorisation issued in terms of the National Water Act, 1998 (Act No. 36 of 1998) will be exceeded. 15 The construction of a road that is wider than 4 metres or that has a reserve wider than 6 metres. 16 The transformation of undeveloped, vacant or derelict land to (b) residential, mixed, retail, commercial, industrial or institutional use where such development does not constitute infill and where the total area to be transformed is bigger than 1 hectare. 17 Phased activities where any one phase of the activity may be below a threshold specified in this Schedule but where a combination of the phases, including expansions or extensions, will exceed a specified threshold. Listed activities in terms EIA Regulations (2006), GN. R (e) The construction of facilities or infrastructure, including associated structures or infrastructure, for - any process or activity which requires a permit or license in terms of legislation governing the generation or release of emissions, pollution, effluent or waste and which is not identified in Government Notice No. R. 386 of (i) The extraction or processing of natural gas including gas from landfill sites. 1 (q) The incineration, burning, evaporation, thermal treatment, roasting or heat sterilisation of waste or effluent, including the cremation of human or animal tissue. Listed activities in terms EIA Regulations (2010) GN. R The infilling or depositing of any material of more than 5 cubic metres into, or the dredging, excavation, removal or moving of soil, sand, shells, shell grit, pebbles or rock from a watercourse- but including... (no inclusion relevant).
11 - 2 - NOTICE OF AVAILABILITY OF THE DRAFT ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) FOR PUBLIC REVIEW All I&APs are hereby notified that the draft Environmental Impact Assessment Report (EIAR) will be available for public comment from 18 October 2013 to 30 November 2013 and will be available at the following places: Volksrust Public Library, Cnr Joubert & Laingsnek Street (Volksrust) Amersfoort Public Library, Cnr Plein & Bree Street (Amersfoort) UCG Mine Site Offices, Majuba Colliery, Bergvliet, Amersfoort Office of Royal HaskoningDHV, 78 Kalkoen Street, Monument Park (Pretoria) Royal HaskoningDHV website ( INVITATION TO PUBLIC MEETING You are hereby invited to attend a public meeting to be held at the venue listed below. The EIA team will be available to discuss and answer any questions you may have regarding the findings of the draft EIAR. The date, time and venue for the public meeting is as follows: Date Time Venue 19 November h00 18h30 ezamokuhle Community Hall, Amersfoort Should you wish to attend any of the meetings kindly RSVP to the consultant mentioned below by 15 November Sibongile Hlomuka Royal HaskoningDHV PO Box 867, Gallo Manor, 2052 Tel: Fax: sibongile.hlomuka@rhdhv.com Yours sincerely, Sibongile Hlomuka
12 Reddy, Prashika From: Maswangane, Boitumelom Sent: 17 October :32 AM To: Subject: UNDERGROUND COAL GASIFICATION (PHASE 1 PILOT PLANT) PROJECT - SECTION 24G - REVIEW OF DRAFT EIAR Attachments: Notific_review & meeting_general I&AP_Final.pdf Importance: High Dear Interested and Affected Party (I&AP) Herewith attached notice of availability of the draft environmental impact assessment report (EIAR) for public review All I&APs are hereby notified that the draft Environmental Impact Assessment Report (EIAR) for the above mentioned project will be available for public comment from 18 October 2013 to 30 November 2013 and will be available at the following places: Volksrust Public Library, Cnr Joubert & Laingsnek Street (Volksrust) Amersfoort Public Library, Cnr Plein & Bree Street (Amersfoort) UCG Mine Site Offices, Majuba Colliery, Bergvliet, Amersfoort Office of Royal HaskoningDHV, 78 Kalkoen Street, Monument Park (Pretoria) Royal HaskoningDHV website ( INVITATION TO PUBLIC MEETING You are hereby invited to attend a public meeting to be held at the venue listed below. The EIA team will be available to discuss and answer any questions you may have regarding the findings of the draft EIAR. The date, time and venue for the public meeting is as follows: Date Time Venue 19 November h00 18h30 ezamokuhle Community Hall, Amersfoort Should you wish to attend the meeting kindly RSVP to the consultant mentioned below by 15 November Sibongile Hlomuka Royal HaskoningDHV PO Box 867, Gallo Manor, 2052 Tel: Fax: sibongile.hlomuka@rhdhv.com 1
13 Boitumelo M T +27 (0) D +27 (0) M E Boitumelo.Maswangane@rhdhv.com W Royal HaskoningDHV (Pty) Ltd trading as Royal HaskoningDHV Reg No. 1966/001916/07 Fountain Square, 78 Kalkoen Street Monument Park Ext 2, Pretoria, 0181 PO Box 25302, Monument Park, Pretoria 0105, South Africa Please, consider your environment. Before printing this ask yourself: "Do I need a hard copy?" This and any files transmitted with it are confidential and intended solely for the authorised use of the individual or entity to whom they are addressed. If you have received this in error, Please notify mailadm-za@rhdhv.com and delete all copies of the . Any views or opinions expressed in this are not necessarily those of, nor endorsed by, the Royal HaskoningDHV Group. Information disclosed in this may not be accurate, current or complete and the Royal HaskoningDHV Group disclaims all liability in this regard. 2
14 Reddy, Prashika From: Maswangane, Boitumelom Sent: 17 October :04 PM To: Subject: UNDERGROUND COAL GASIFICATION (PHASE 1 PILOT PLANT) PROJECT - SECTION 24G - REVIEW OF DRAFT EIAR Attachments: Notific_review & meeting_general I&AP_Final.pdf Importance: High Dear Interested and Affected Party (I&AP) Herewith attached notice of availability of the draft environmental impact assessment report (EIAR) for public review All I&APs are hereby notified that the draft Environmental Impact Assessment Report (EIAR) for the above mentioned project will be available for public comment from 18 October 2013 to 30 November 2013 and will be available at the following places: Volksrust Public Library, Cnr Joubert & Laingsnek Street (Volksrust) Amersfoort Public Library, Cnr Plein & Bree Street (Amersfoort) UCG Mine Site Offices, Majuba Colliery, Bergvliet, Amersfoort Office of Royal HaskoningDHV, 78 Kalkoen Street, Monument Park (Pretoria) Royal HaskoningDHV website ( INVITATION TO PUBLIC MEETING You are hereby invited to attend a public meeting to be held at the venue listed below. The EIA team will be available to discuss and answer any questions you may have regarding the findings of the draft EIAR. The date, time and venue for the public meeting is as follows: Date Time Venue 19 November h00 18h30 ezamokuhle Community Hall, Amersfoort Should you wish to attend the meeting kindly RSVP to the consultant mentioned below by 15 November Sibongile Hlomuka Royal HaskoningDHV PO Box 867, Gallo Manor, 2052 Tel: Fax: sibongile.hlomuka@rhdhv.com 1
15 Boitumelo M T +27 (0) D +27 (0) M E Boitumelo.Maswangane@rhdhv.com W Royal HaskoningDHV (Pty) Ltd trading as Royal HaskoningDHV Reg No. 1966/001916/07 Fountain Square, 78 Kalkoen Street Monument Park Ext 2, Pretoria, 0181 PO Box 25302, Monument Park, Pretoria 0105, South Africa Please, consider your environment. Before printing this ask yourself: "Do I need a hard copy?" This and any files transmitted with it are confidential and intended solely for the authorised use of the individual or entity to whom they are addressed. If you have received this in error, Please notify mailadm-za@rhdhv.com and delete all copies of the . Any views or opinions expressed in this are not necessarily those of, nor endorsed by, the Royal HaskoningDHV Group. Information disclosed in this may not be accurate, current or complete and the Royal HaskoningDHV Group disclaims all liability in this regard. 2
16 Reddy, Prashika From: Maswangane, Boitumelom Sent: 17 October :27 PM To: Subject: UNDERGROUND COAL GASIFICATION (PHASE 1 PILOT PLANT) PROJECT - SECTION 24G - REVIEW OF DRAFT EIAR Attachments: Notific_review & meeting_general I&AP_Final.pdf Importance: High Dear Interested and Affected Party (I&AP) Herewith attached notice of availability of the draft environmental impact assessment report (EIAR) for public review All I&APs are hereby notified that the draft Environmental Impact Assessment Report (EIAR) for the above mentioned project will be available for public comment from 18 October 2013 to 30 November 2013 and will be available at the following places: Volksrust Public Library, Cnr Joubert & Laingsnek Street (Volksrust) Amersfoort Public Library, Cnr Plein & Bree Street (Amersfoort) UCG Mine Site Offices, Majuba Colliery, Bergvliet, Amersfoort Office of Royal HaskoningDHV, 78 Kalkoen Street, Monument Park (Pretoria) Royal HaskoningDHV website ( INVITATION TO PUBLIC MEETING You are hereby invited to attend a public meeting to be held at the venue listed below. The EIA team will be available to discuss and answer any questions you may have regarding the findings of the draft EIAR. The date, time and venue for the public meeting is as follows: Date Time Venue 19 November h00 18h30 ezamokuhle Community Hall, Amersfoort Should you wish to attend the meeting kindly RSVP to the consultant mentioned below by 15 November Sibongile Hlomuka Royal HaskoningDHV PO Box 867, Gallo Manor, 2052 Tel: Fax: sibongile.hlomuka@rhdhv.com 1
17 Boitumelo M T +27 (0) D +27 (0) M E Boitumelo.Maswangane@rhdhv.com W Royal HaskoningDHV (Pty) Ltd trading as Royal HaskoningDHV Reg No. 1966/001916/07 Fountain Square, 78 Kalkoen Street Monument Park Ext 2, Pretoria, 0181 PO Box 25302, Monument Park, Pretoria 0105, South Africa Please, consider your environment. Before printing this ask yourself: "Do I need a hard copy?" This and any files transmitted with it are confidential and intended solely for the authorised use of the individual or entity to whom they are addressed. If you have received this in error, Please notify mailadm-za@rhdhv.com and delete all copies of the . Any views or opinions expressed in this are not necessarily those of, nor endorsed by, the Royal HaskoningDHV Group. Information disclosed in this may not be accurate, current or complete and the Royal HaskoningDHV Group disclaims all liability in this regard. 2
18 Reddy, Prashika From: Maswangane, Boitumelom Sent: 17 October :14 PM To: Subject: UNDERGROUND COAL GASIFICATION (PHASE 1 PILOT PLANT) PROJECT - SECTION 24G - REVIEW OF DRAFT EIAR Attachments: Notific_review & meeting_general I&AP_Final.pdf Importance: High Dear Interested and Affected Party (I&AP) Herewith attached notice of availability of the draft environmental impact assessment report (EIAR) for public review All I&APs are hereby notified that the draft Environmental Impact Assessment Report (EIAR) for the above mentioned project will be available for public comment from 18 October 2013 to 30 November 2013 and will be available at the following places: Volksrust Public Library, Cnr Joubert & Laingsnek Street (Volksrust) Amersfoort Public Library, Cnr Plein & Bree Street (Amersfoort) UCG Mine Site Offices, Majuba Colliery, Bergvliet, Amersfoort Office of Royal HaskoningDHV, 78 Kalkoen Street, Monument Park (Pretoria) Royal HaskoningDHV website ( INVITATION TO PUBLIC MEETING You are hereby invited to attend a public meeting to be held at the venue listed below. The EIA team will be available to discuss and answer any questions you may have regarding the findings of the draft EIAR. The date, time and venue for the public meeting is as follows: Date Time Venue 19 November h00 18h30 ezamokuhle Community Hall, Amersfoort Should you wish to attend the meeting kindly RSVP to the consultant mentioned below by 15 November Sibongile Hlomuka Royal HaskoningDHV PO Box 867, Gallo Manor, 2052 Tel: Fax: sibongile.hlomuka@rhdhv.com 1
ENVIRONMENTAL IMPACT ASSESSMENT SCOPING PHASE MINUTES OF THE FOCUS GROUP MEETING PIXLEY KA SEME LOCAL MUNICIPALITY
ENVIRONMENTAL IMPACT ASSESSMENT SCOPING PHASE MINUTES OF THE FOCUS GROUP MEETING PIXLEY KA SEME LOCAL MUNICIPALITY HELD ON TUESDAY, 27 NOVEMBER 2012 AT 11H00 AT PIXLEY KA SEME LOCAL MUNICIPAL OFFICES VOLKSRUST
More informationBACKGROUND INFORMATION DOCUMENT SEPTEMBER 2014 MDEDET REF NUMBER: 17/2/3N-389
ENVIRONMENTAL AUTHORISATION PROCESS AND APPLICATION FOR REQUIRED LICENCES FOR THE PHOLA COAL PROCESSING PLANT, EMALAHLENI LOCAL MUNICIPALITY, MPUMALANGA PROVINCE BACKGROUND INFORMATION DOCUMENT SEPTEMBER
More informationPROPOSED WAAIHOEK WIND ENERGY FACILITY UTRECHT KWA-ZULU NATAL
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED WAAIHOEK WIND ENERGY FACILITY UTRECHT KWA-ZULU NATAL BACKGROUND INFORMATION DOCUMENT April 2014 (2 nd Edition) Project developer: South Africa Mainstream
More informationFigure 4. The proposed location of the Zalu Dam a) basin and b) wall.
A B Figure 4. The proposed location of the Zalu Dam a) basin and b) wall. Figure 5. Detailed layout of the proposed Zalu Dam (Source: Feasibility Study for the Augmentation of the Lusikisiki Regional Water
More informationBASIC ENVIRONMENTAL IMPACT ASSESSMENT for the BEER PROPERTY MANAGEMENT FILLING STATION
BASIC ENVIRONMENTAL IMPACT ASSESSMENT for the BEER PROPERTY MANAGEMENT FILLING STATION DEDEA Ref: EC04/C/LN1/M/53-2014 BACKGROUND INFORMATION DOCUMENT & INVITATION TO COMMENT: Return address for comments:
More informationBOLAND ENVIRONMENTAL CONSULTANTS CC
BOLAND ENVIRONMENTAL CONSULTANTS CC y ENVIRONMENTAL IMPACT ASSESSMENT PROCESS Proposed Photo-Voltaic Solar Power Plant On Farm Nuwerus, No. 450 Portion 6, Worcester DEA REF. NO: 12/12/20/2019 BACKGROUND
More informationBACKGROUND INFORMATION DOCUMENT PROPOSED HAZARDOUS SUBSTANCE STORAGE FACILITIES AT THE SALDANHA BAY INDUSTRIAL DEVELOPMENT ZONE
BACKGROUND INFORMATION DOCUMENT PROPOSED HAZARDOUS SUBSTANCE STORAGE FACILITIES AT THE SALDANHA BAY INDUSTRIAL DEVELOPMENT ZONE 1. INTRODUCTION The Saldanha Bay Industrial Development Zone (IDZ) is located
More informationEIA Listed activities & Time Lines
EIA Listed activities & Time Lines UPDATED: JANUARY 2015 Background In terms of the Bill of Rights, included in the Constitution of the Republic of South Africa of 1996, everyone has the right to have
More informationBACKGROUND INFORMATION DOCUMENT FOR A PROPOSED SEWER IN GROOT DRAKENSTEIN, WESTERN CAPE
Purpose of this Document The purpose of this Background Information Document (BID) is to provide Interested and Affected Parties (I&APs) with background information about the proposed project and to introduce
More informationINSTALLATION OF A SOLAR PHOTOVOLTAIC POWER PLANT AT ESKOM S DUVHA POWER STATION: ENVIRONMENTAL IMPACT ASSESSMENT
INSTALLATION OF A SOLAR PHOTOVOLTAIC POWER PLANT AT ESKOM S DUVHA POWER STATION: ENVIRONMENTAL IMPACT ASSESSMENT ENVIRONMENTAL IMPACT REPORT APPENDIX B6: ISSUES AND RESPONSES REPORT VERSION 3 November
More informationNOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
11 August 2017 Dear Stakeholder ENVIRONMENTAL IMPACT ASSESSMENT AND PUBLIC PARTICIPATION PROCESS DEVELOPMENT OF THE RICHARDS BAY COMBINED CYCLE POWER PLANT (CCPP) AND ASSOCIATED INFRASTRUCTURE ON A SITE
More informationNOTICE OF A PUBLIC PARTICIPATION PROCESS FOR AN ENVIRONMENTAL IMPACT ASSESSMENT DEA&DP Ref.: 16/3/3/6/7/1/F4/6/3072/16
2016-05-11 NOTICE OF A PUBLIC PARTICIPATION PROCESS FOR AN ENVIRONMENTAL IMPACT ASSESSMENT DEA&DP Ref.: 16/3/3/6/7/1/F4/6/3072/16 Notice is hereby given of a public participation process in terms of Environmental
More informationBACKGROUND INFORMATION DOCUMENT
BACKGROUND INFORMATION DOCUMENT ENVIRONMENTAL AUTHORISATIONS FOR THE PROPOSED KLIPSPRUIT EXTENSION: WELTEVREDEN PROJECT Project Number Prepared for BHP Billiton Energy Coal South Africa (Pty) Limited (BECSA)
More informationNOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS: APPLICATION FOR THE MINING OF SAND AT BORROW PIT MR771/8.6/R/80, VAN WYKSVLEI, NORTHERN CAPE.
ENVIRONMENTAL AUTHORISATION AMENDMENT APPLICATION NOTICE OF ENVIRONMENTAL IMPACT ASSESSMENT PROCESS: APPLICATION FOR THE MINING OF SAND AT BORROW PIT MR771/8.6/R/80, VAN WYKSVLEI, NORTHERN CAPE. BACKGROUND
More informationCape Environmental Assessment Practitioners(Pty) Ltd
Cape Environmental Assessment Practitioners(Pty) Ltd Reg. No. 2008/004627/07 Telephone: (044) 874 0365 Facsimile: (044) 874 0432 17 Progress Street, George Web: www.cape-eaprac.co.za PO Box 2070, George,
More information(24 July 2015 to date) NATIONAL ENVIRONMENTAL MANAGEMENT: WASTE ACT 59 OF 2008
(24 July 2015 to date) NATIONAL ENVIRONMENTAL MANAGEMENT: WASTE ACT 59 OF 2008 (Gazette No. 32000, Notice No. 278. Commencement date: 1 July 2009 save for sections 28(7)(a), sections 35 to 41 and section
More informationEskom Holdings SOC Ltd
Environmental Scoping Report for the Underground Coal Gasification Project and Associated Infrastructure in support of co-firing of gas at the Majuba Power Station, Amersfoort, Mpumalanga Draft Eskom Holdings
More information4 ADMINISTRATIVE FRAMEWORK 4.1 INTRODUCTION
4 ADMINISTRATIVE FRAMEWORK 4.1 INTRODUCTION This section provides an overview of legislation, guidelines and information documents that have informed the scope and content of this report and the approach
More informationBACKGROUND INFORMATION DOCUMENT:
BACKGROUND INFORMATION DOCUMENT: APPLICATION FOR A MINING RIGHT MMAKAU COAL (PTY) LTD SCHURVEKOP 227 IS, BETHAL, MPUMALANGA 1. INTRODUCTION Mmakau Coal (Pty) Ltd intends to submit an application for a
More informationEskom Holdings SOC Ltd
Environmental Scoping Report for the Underground Coal Gasification Project and Associated Infrastructure in support of co-firing of gas at the Majuba Power Station, Amersfoort, Mpumalanga Final Eskom Holdings
More information3 EIA PROCESS AND METHODOLOGY
3 EIA PROCESS AND METHODOLOGY 3.1 Introduction The Environmental Impact Assessment (EIA) and Waste Licence Application process for the proposed Majuba Continuous Ashing project is comprised of two main
More informationENVIRONMENTAL IMPACT ASSESSMENT: PROPOSED REVERSE OSMOSIS PLANT AT HENDRINA POWER STATION, MPUMALANGA EXECUTIVE SUMMARY: FINAL BASIC ASSESSMENT REPORT
1 ENVIRONMENTAL IMPACT ASSESSMENT: PROPOSED REVERSE OSMOSIS PLANT AT HENDRINA POWER STATION, MPUMALANGA DEA REF. NO. 12/12/20/2273 AUGUST 2011 EXECUTIVE SUMMARY: FINAL BASIC ASSESSMENT REPORT Eskom Holdings
More informationBACKGROUND INFORMATION DOCUMENT
BACKGROUND INFORMATION DOCUMENT PROPOSED CONSTRUCTION OF 400/132KV MARANG B SUBSTATION AND ±2KM, 400kv POWER LINE LOOPING IN AND OUT FROM THE BIGHORN-MARANG OR MEDUPI MARANG 400KV POWERLINES WITHIN RUSTENBURG
More informationENVIRONMENTAL IMPACT ASSESSMENT PROCESS AND WASTE MANAGEMENT LICENSE APPLICATION PROPOSED EXTENSION OF ASH DAMS AT HENDRINA POWER STATION, MPUMALANGA
ENVIRONMENTAL IMPACT ASSESSMENT PROCESS AND WASTE MANAGEMENT LICENSE APPLICATION PROPOSED EXTENSION OF ASH DAMS AT HENDRINA POWER STATION, MPUMALANGA DEA Reference Number: 12/12/20/2175 BACKGROUND INFORMATION
More informationFigure 1.1: Location of Majuba Power Station within the Pixley Ka Seme Local Municipality
1 INTRODUCTION Majuba Power Station is located near Amersfoort in the Mpumalanga Province and falls within the Pixley Ka Seme Local Municipality (Figure 1.1) which falls within the Gert Sibande District
More informationPROPOSED VOLSPRUIT MINE, MOKOPANE DISTRICT, LIMPOPO PROVINCE. Background Information Document (BID) ESCIENCE ASSOCIATES (PTY) LTD.
ENVIRONMENTAL IMPACT ASSESSMENT (EIA), MINING RIGHT APPLICATION AND OTHER ANCILLARY LICENSING PROCESSES: PROPOSED PLATINUM GROUP METALS MINE & ASSOCIATED INFRASTRUCTURE PROPOSED VOLSPRUIT MINE, MOKOPANE
More informationterms of sections 24(2), 24(5), 24D and 44, read with section 47A(1)(b) of the
325 National Environmental Management Act (107/1998): Amendment of the Environmental Impact Assessment Regulations Listing Notice 2 of 2014 40772 194 No. 40772 GOVERNMENT GAZETTE, 7 APRIL 2017 DEPARTMENT
More informationINTRODUCTION PROJECT DESCRIPTION
JOE GQABI DISTRICT MUNICIPALITY DROUGHT RELIEF PROGRAMME PROPOSED LADY GREY BULK WATER SUPPLY PROJECTS, LADY GREY, SENQU MUNICIPALITY, EASTERN CAPE EIA BACKGROUND INFORMATION DOCUMENT INTRODUCTION Joe
More informationBACK GROUND INFORMATION DOCUMENT
PROJECT: Basic Environmental Assessment for the Construction of a lodge and additional staff accommodation, Lion Sands, Sabi Sand Game Reserve BACK GROUND INFORMATION DOCUMENT CONSULTANT: EMROSS Consulting
More informationESKOM HOLDINGS SOC LIMITED: WATER USE LICENCE APPLICATION AT THE MEDUPI AND MATIMBA POWER STATIONS, LEPHALALE LOCAL MUNICIPALITY, LIMPOPO PROVINCE
11 May 2018 1791642 Interested and Affected Parties ESKOM HOLDINGS SOC LIMITED: WATER USE LICENCE APPLICATION AT THE MEDUPI AND MATIMBA POWER STATIONS, LEPHALALE LOCAL MUNICIPALITY, LIMPOPO PROVINCE Dear
More informationPostal Private Bag X6546, GEORGE, 6530 Physical Fourth Floor York Park Building, York Street, GEORGE, Website
SCIENTIFIC SERVICES Postal Private Bag X6546, GEORGE, 6530 Physical Fourth Floor York Park Building, York Street, GEORGE, 6530 Website Enquiries www.capenature.co.za Clyde Lamberts Telephone +27 44 802
More information1 INTRODUCTION. Figure 1.1: Steve Tshwete Local Municipality
1 INTRODUCTION Hendrina Power Station is located at Pullenshope (near Hendrina) in the Mpumalanga Province and falls within the Steve Tshwete Local Municipality (Figure 1.1) which falls within the Nkangala
More informationBACKGROUND INFORMATION DOCUMENT AND INVITATION TO COMMENT
BACKGROUND INFORMATION DOCUMENT AND INVITATION TO COMMENT WASTE MANAGEMENT LICENCE APPLICATION FOR THE MANAGEMENT OF ALL WASTE STREAMS FOR THE OPEN PIT AND UNDERGROUND OPERATIONS AT VENETIA MINE, LIMPOPO
More informationBACKGROUND INFORMATION DOCUMENT
APPLICATION FOR RECTIFICATION APPLICATION FOR RECTIFICATION IN TERMS OF SECTION 24G OF NEMA FOR THE UNLAWFUL COMMENCEMENT AND / OR CONTINUATION OF LISTED ACTIVITIES ON THE FARM EKANGALA 610JR, GAUTENG.
More informationENVIRONMENTAL IMPACT ASSESSMENT: PROPOSED EXTENSION OF ASH DAM FACILITY, KRIEL POWER STATION, MPUMALANGA DECEMBER 2010
1 ENVIRONMENTAL IMPACT ASSESSMENT: PROPOSED EXTENSION OF ASH DAM FACILITY, KRIEL POWER STATION, MPUMALANGA DECEMBER 2010 SUMMARY DOCUMENT: DRAFT SCOPING REPORT Eskom proposes to expand the existing ash
More informationAnnesley Andalusite Mine: Section 24G Rectification Process. Consultation with community members 15 June 2017
Annesley Andalusite Mine: Section 24G Rectification Process Consultation with community members 15 June 2017 AGENDA Welcome and introduction Meeting protocol Purpose of the meeting Project background Project
More information13 July
13 July 2018 1792943 GRINDROD TERMINALS (PTY) LIMITED: APPLICATION FOR WATER USE LICENCE AT THE NAVITRADE SITE, UMHLATHUZE LOCAL MUNICIPALITY, KWAZULU NATAL PROVINCE Notice issued in terms of sections
More informationINTRODUCTION SECTION 24G PROCESS
PROJECT: Section 24G application to authorise the continued storage and processing of building waste on a portion of the Remaining Extent of Portion 16 of the Farm Lombardy 36-IR, Cnr London Road and N3,
More informationDEA Reference Number: To be announced
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR THE PROPOSED DEVELOPMENT AND INCLUSION OF THE METAL CONCENTRATORS (METCON) REFINERY FACILITY IN THE JEWELLERY MANUFACTURING PRECINT (JMP) WITHIN THE OR TAMBO INTERNATIONAL
More informationENVIRONMENTAL IMPACT ASSESSMENT (BASIC ASSESSMENT) PROCESS: PROPOSED REVERSE OSMOSIS PLANT, IRON ORE HANDLING FACILITY, PORT OF SALDANHA
ENVIRONMENTAL IMPACT ASSESSMENT (BASIC ASSESSMENT) PROCESS: PROPOSED REVERSE OSMOSIS PLANT, IRON ORE HANDLING FACILITY, PORT OF SALDANHA BACKGROUND INFORMATION DOCUMENT SRK Project 364470/42G June 2007
More informationENVIRONMENTAL IMPACT ASSESSMENT EIA PHASE
ENVIRONMENTAL IMPACT ASSESSMENT EIA PHASE PROPOSED ESTABLISHMENT OF THE PUMPED STORAGE SCHEME AND ASSOCIATED INFRASTRUCTURE IN THE STEELPOORT AREA, LIMPOPO AND MPUMALANGA PROVINCES FINAL MINUTES OF THE
More informationFULL SCOPING AND ENVIRONMENTAL IMPACT ASSESSMENT PROCESS
FULL SCOPING AND ENVIRONMENTAL IMPACT ASSESSMENT PROCESS Agricultural Expansion on Portion 2 of Farm 92, Tregaron, known as Sylvania, Sundays River Valley Municipality BACKGROUND INFORMATION DOCUMENT,
More informationBACK GROUND INFORMATION DOCUMENT
PROJECT: Basic Environmental Assessment for the Replacement of a Causeway Crossing of the Klaserie River, Klaserie Game Reserve BACK GROUND INFORMATION DOCUMENT CONSULTANT: P.O. Box 507 White River 1240
More informationENVIRONMENTAL IMPACT ASSESSMENT: PROPOSED PHOTOVOLTAIC ENERGY PLANT ON FARM KLIPGATS PAN NEAR COPPERTON, NORTHERN CAPE
ENVIRONMENTAL IMPACT ASSESSMENT: PROPOSED PHOTOVOLTAIC ENERGY PLANT ON FARM KLIPGATS PAN NEAR COPPERTON, NORTHERN CAPE 1 MAY 2012 DEA REF. NO. 12/12/20/2501 NEAS REF. NO. DEAT/EIA/0000611/2011 EXECUTIVE
More informationVLAKVARKFONTEIN COAL MINE
VLAKVARKFONTEIN COAL MINE PURPOSE OF THIS DOCUMENT: This Background Information Document (BID) provides you, as an Interested and Affected Party (I&AP), an overview of the proposed project. The BID invites
More informationCHAPTER 4: APPROACH TO EIA, LEGISLATION AND PUBLIC CONSULTATION 4-1
CHAPTER 4: APPROACH TO EIA, LEGISLATION AND PUBLIC CONSULTATION 4-1 4.1. OVERVIEW OF APPROACH TO PREPARING THE FINAL EIA REPORT AND EMPR 4-2 4.2. LEGISLATION, EIA GUIDELINES AND INTERNATIONAL CONVENTIONS
More informationDEPARTMENT OF ENVIRONMENTAL AFFAIRS. No November 2013 NATIONAL ENVIRONMENTAL MANAGEMENT: WASTE ACT, 2008 (ACT NO.
STAATSKOERANT, 29 NOVEMBER 2013 No. 37083 3 GOVERNMENT NOTICE DEPARTMENT OF ENVIRONMENTAL AFFAIRS No. 921 29 November 2013 NATIONAL ENVIRONMENTAL MANAGEMENT: WASTE ACT, 2008 (ACT NO. 59 OF 2008) LIST OF
More informationKusile Power Station Ash Disposal Facility
Zitholele Consulting Reg. No. 2000/000392/07 PO Box 6002 Halfway House 1685 South Africa Thandanani Park, Matuka Close Halfway Gardens, Midrand Tel + (27) 11 207 2060 Fax + (27) 86 674 6121 E-mail : mail@zitholele.co.za
More informationAPPENDIX H DETAILS OF EAP & EXPERTISE
APPENDIX H DETAILS OF EAP & EXPERTISE Curriculum Vitae Prashika Reddy Environmental Scientist Transport and Planning T: +271236758973 F: +27123478378 Email: prashika.reddy@rhdhv.com Prashika started her
More informationDRAFT FOR PUBLIC REVIEW
ENVIRONMENTAL SCOPING REPORT FOR THE PROPOSED COMBINED CYCLE GAS TURBINE (CCGT) POWER PLANT IN THE AMERSFOORT AREA, MPUMALANGA PROVINCE (DEAT REF 12/12/20/1074) DRAFT FOR PUBLIC REVIEW PROJECT OF ESKOM
More informationProposed Expansion of the existing Natal Solvent Recovery facility on ERF 7590, Pinetown (10 Clubhouse Place, Westmead) REF: 12/9/11/L44704/4
Proposed Expansion of the existing Natal Solvent Recovery facility on ERF 7590, Pinetown (10 Clubhouse Place, Westmead) REF: 12/9/11/L44704/4 NOTICE OF APPLICATION FOR WASTE MANAGEMENT LICENCE, SUBJECT
More informationProposed Establishment of the N.N. Metals (Pty) Ltd Waltloo Metal Reclamation Facility
Proposed Establishment of the N.N. Metals (Pty) Ltd Waltloo Metal Reclamation Facility BACKGROUND INFORMATION DOCUMENT (BID) Prepared for: Prepared by: Project Ref No: N.N. Metals (Pty) Ltd Bokamoso Landscape
More informationBACKGROUND INFORMATION DOCUMENT FOR THE ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED ELECTRICITY GENERATION PLANT HERNIC FERROCHROME
BACKGROUND INFORMATION DOCUMENT FOR THE ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED ELECTRICITY GENERATION PLANT AT HERNIC FERROCHROME ENVIRONMENTAL SCIENCE ASSOCIATES POSTAL ADDRESS: PO Box 2950 Saxonwold
More informationPUBLIC PARTICIPATION REPORT
ESKOM HOLDINGS SOC (PTY) LTD PUBLIC PARTICIPATION REPORT PROPOSED CONSTRUCTION OF ESKOM TYALARA-QUNU 132 KV POWER LINE AND ASSOCIATED INFRASTRUCTURE September 2013 J31096 Head Office 14 Eglin Road, Sunninghill
More informationAnnexure E.3. Comment Response Report. Proposed Expansion of Ash Disposal Facility at the Kriel PowerStation, Mpumalanga: Scoping Report
Proposed Expansion of Ash Disposal Facility at the Kriel PowerStation, Mpumalanga: Scoping Report Annexure E.3 Comment Response Report Project 113084 / 11081File Kriel Ash Disposal Facility Scoping_2017
More informationNEM:WA (81) Transitional provisions in respect of permits issued in terms of Environment Conservation Act
Addendum IV: Legal considerations for the construction and operation of a constructed wetland NEM:WA (81) Transitional provisions in respect of permits issued in terms of Environment Conservation Act (1)
More informationIMPORTANT NOTICE. Kindly note that:
1 APPLICATION FORM FOR ENVIRONMENTAL AUTHORISATIONS IN TERMS OF THE NATIONAL ENVIRONMENTAL MANAGEMENT ACT, 1998 AND THE NATIONAL ENVIRONMENTAL MANAGEMENT WASTE ACT, 2008 IN RESPECT OF LISTED ACTIVITIES
More informationPROPOSED MOKOLO CROCODILE (WEST) WATER AUGMENTATION PROJECT PHASE 2
BACKGROUND INFORMATION DOCUMENT May 2016 PROPOSED MOKOLO CROCODILE (WEST) WATER AUGMENTATION PROJECT PHASE 2 Water Transfer Infrastructure & Bulk Power Supply Proponent Implementing Agent Engineering Team
More informationA. OWENS 1 and J. BURKE 2
A CONSOLIDATED APPROACH TO IMPLEMENTING BEST PRACTICE GUIDELINES, WATER USE LICENCE CONDITIONS AND INTEGRATED WATER AND WASTE MANAGEMENT PLANS IN THE MINING ENVIRONMENT OPPORTUNITIES AND CHALLENGES ABSTRACT
More information1 INTRODUCTION 1.1 PROJECT APPLICANT
1 INTRODUCTION 1.1 PROJECT APPLICANT Transnet State Owned Company (SOC) Limited (Transnet) is a wholly state owned company in South Africa, which strives to enable competitiveness, growth and development
More informationBRYPAAL SOLAR POWER (PV) PROJECT AND ASSOCIATED INFRASTRUCTURE
JUNE 2017 ENVIRONMENTAL IMPACT ASSESSMENT PROCESS CONSTRUCTION OF THE PROPOSED BRYPAAL SOLAR POWER (PV) PROJECT AND ASSOCIATED INFRASTRUCTURE NORTHERN CAPE BACKGROUND INFORMATION DOCUMENT A commercial
More informationFreshwater Consulting cc Unit 23, Imhoff Farm Kommetjie Road Kommetjie 7975
Freshwater Consulting cc Unit 23, Imhoff Farm Kommetjie Road Kommetjie 7975 Cell: 072 377 7006 E-mail: dean.ollis@gmail.com 22 June 2018 Chantel Muller Sillito Environmental Consulting By email: chantel@environmentalconsultants.co.za
More informationPROJECT BACKGROUND INFORMATION DOCUMENT
PROJECT BACKGROUND INFORMATION DOCUMENT ENVIRONMENTAL IMPACT ASSESSMENT STUDY FOR THE MASAMA COAL PROJECT BY MINERGY COAL IN THE KWENENG AND KGATLENG DISTRICTS Introduction and Project Background Minergy
More informationPROPOSED LIBODE & NGQELENI BULK WATER SUPPLY CONVEYANCE CORRIDORS OR TAMBO DISTRICT MUNICIPALITY, EASTERN CAPE
PROPOSED LIBODE & NGQELENI BULK WATER SUPPLY CONVEYANCE CORRIDORS OR TAMBO DISTRICT MUNICIPALITY, EASTERN CAPE Background Information Document DEDEA Ref No s: EC 155/ORT/LN1&LN2/M/13 34 EC 157/ORT/LN1&LN3/M/13
More informationMangaung Gariep Water Augmentation Project (MGWAP)
Mangaung Gariep Water Augmentation Project (MGWAP) Mangaung Gariep Water Augmentation Project (MGWAP) 1 Introduction It is estimated that the Mangaung Metropolitan Municipality (MMM) has a population of
More informationEnviroLeg cc NATIONAL WATER Reg p 1
EnviroLeg cc NATIONAL WATER Reg p 1 GN. 704 GG20119 4 June 1999 NATIONAL WATER ACT, 1998 (ACT NO. 36 OF 1998) REGULATIONS ON USE OF WATER FOR MINING AND RELATED ACTIVITIES AIMED AT THE PROTECTION OF WATER
More informationPROPOSED CONSTRUCTION OF A SEWAGE TREATMENT PLANT AT CAPE POINT, TABLE MOUNTAIN NATIONAL PARK
PROPOSED CONSTRUCTION OF A SEWAGE TREATMENT PLANT AT CAPE POINT, TABLE MOUNTAIN NATIONAL PARK SCOPING REPORT EXECUTIVE SUMMARY 1 INTRODUCTION SANParks proposes, as a key element of a wider infrastructure
More informationBACKGROUND INFORMATION DOCUMENT
Kingfisher Farms (Pty) Ltd SAND MINING APPLICATION Manor Grange Farm, Hibberdene (KwaZulu-Natal) BACKGROUND INFORMATION DOCUMENT BACKGROUND INFORMATION An application has been submitted to the Department
More informationRE: STAKEHOLDER INFORMATION DOCUMENT 1: RIETKOL MINING OPERATIONS
6 October 2016 Dear Stakeholder, RE: STAKEHOLDER INFORMATION DOCUMENT 1: RIETKOL MINING OPERATIONS As indicated in our previous notification dated 12 February 2016, Consol Glass (Pty) Limited ( Consol
More informationGP 30/5/1/3/2/10242 MP
! Before Dawn Property Developers (Pty) Ltd GP 30/5/1/3/2/10242 MP Background Information Document For the proposed mining permit On the farm Malony s Eye 169 IQ. Report Ref: 2017/BDPD0001 Prepared by:
More informationERM conducted the public participation process (PPP) as part of the EIA and EMPr Amendment for MP 30/5/1/2/2/133MR to include:
6 PUBLIC PARTICIPATION PROCESS ERM conducted the public participation process (PPP) as part of the EIA and EMPr Amendment for MP 30/5/1/2/2/133MR to include: a new Central Discard Dump at the Maquasa East
More informationDESCRIPTION OF PROPOSED
1 224 Kies Avenue, Reservoir Hills, Durban, 4091 Tel: +27(0)31 262 3171 Fax: +27(0)31 262 2279 Mobile: 082-875 3710 Email: enaq@vodamail.co.za - Environmental, Civil, Water & Earth Consultants PROPOSED
More informationTECHNOBURN (Pty) Ltd DRAFT SCOPING REPORT
TECHNOBURN (Pty) Ltd DRAFT SCOPING REPORT WASTE LICENCE APPLICATION, AIR EMISSIONS LICENSE APPLICATION AND SECTION 24G RECTIFICATION APPLICATION FOR A USED OIL RECYCLING FACILITY ON ERF 104904, MYMONA
More information2. TECHNICAL DESCRIPTION OF THE PROJECT
2. TECHNICAL DESCRIPTION OF THE PROJECT 2.1. What is a Combined Cycle Gas Turbine (CCGT) Plant? A CCGT power plant uses a cycle configuration of gas turbines, heat recovery steam generators (HRSGs) and
More informationTo license or not to license? Listed or Unlisted? Presented by: Stuart Gower-Jackson
To license or not to license? Listed or Unlisted? Presented by: Stuart Gower-Jackson Order of proceedings 1. Classification of activities and an easy explanation on how to determine which activities qualify
More informationTECHNOBURN (Pty) Ltd FINAL SCOPING REPORT
TECHNOBURN (Pty) Ltd FINAL SCOPING REPORT WASTE LICENCE APPLICATION, AIR EMISSIONS LICENSE APPLICATION AND SECTION 24G RECTIFICATION APPLICATION FOR A USED OIL RECYCLING FACILITY ON ERF 104904, NUMBER
More information(For official use only)
Basic assessment report in terms of the Environmental Impact Assessment Regulations, 2010, promulgated in terms of the National Environmental Management Act, 1998(Act No. 107 of 1998), as amended. File
More informationBACKGROUND INFORMATION DOCUMENT & INVITATION TO COMMENT JULY 2015
Introduction EOH Coastal & Environmental Services has been appointed by K2014173145 (South Africa) (Pty) Ltd (Reg No. 2014/173145/07), to undertake the Public Participation Process and associated Basic
More informationPUBLIC PARTICIPATION REPORT
PUBLIC PARTICIPATION REPORT Development of new Landfill site at Koedoespoort in Pretoria Submitted to: DEPARTMENT OF ENVIRONMENTAL AFFAIRS REPUBLIC OF SOUTH AFRICA Prepared by: AUGUST 2015 http://www.mawenje.com
More informationProposed Wolseley Wind Energy Facility: Motivation for Amendment of Environmental Authorisation
SAGIT Energy Ventures (Pty) Ltd The Oval, Newlands P.O. Box 44721, Claremont Western Cape, South Africa Proposed Wolseley Wind Energy Facility: Motivation for Amendment of Environmental Authorisation Submitted
More informationCurriculum Vitae Malcolm Roods
Curriculum Vitae Malcolm Roods Market Segment Leader Transport, T: +27117986000 F: +27117986005 Email: malcolm.roods@rhdhv.com Malcolm Roods is a Principal with RHDHV specializing in Environmental Impact
More informationNotice: Application for Postponement of Minimum Emission Standards for Eskom's Tutu...
Notice: Application for Postponement of Minimum Emission Standards for Eskom's Tutu... https://webmail2.dotnetwork2.co.za/owa/?ae=item&t=ipm.note&id=rgaaaad29b4cq... Page 1 of 2 17/01/2018 Notice: Application
More informationProposed Wolseley Wind Energy Facility: Motivation for Amendment of Environmental Authorisation
SAGIT Energy Ventures (Pty) Ltd The Oval, Newlands P.O. Box 44721, Claremont Western Cape, South Africa Proposed Wolseley Wind Energy Facility: Motivation for Amendment of Environmental Authorisation Submitted
More informationLead and Solder Sales cc Section 22A Environmental Impact Report October 2018
EXECUTIVE SUMMARY 1. INTRODUCTION Lead and Solder Sales cc (LASS), situated within Saxon Industrial Park in Bellville South, City of Cape Town (CoCT) (see Figure 1 below), produces a range of products,
More informationAnglo American Platinum; Mogalakwena Mine: Explosive Depot Expansion
Anglo American Platinum; Mogalakwena Mine: Explosive Depot Expansion Consultation with the council of Induna Chaba and Mapela T/A 19 January 2016, 14:30 AGENDA Welcome and introduction. Meeting protocol.
More informationConstruction of a 600 MW independent power plant and associated infrastructure. BACKGROUND INFORMATION DOCUMENT July 2011
Construction of a 600 MW independent power plant and associated infrastructure for KiPower (Pty) Ltd near Delmas in Mpumalanga (DEA Ref No: 12/12/20/2333; NEAS Ref No: DEA/EIA/0000364/2011) BACKGROUND
More informationBACKGROUND INFORMATION DOCUMENT: EXPANSION OF SINGITA SWENI LODGE
PROJECT: The expansion of Singita Sweni Lodge, N Wanetsi Private Concession, Kruger National Park BACKGROUND INFORMATION DOCUMENT: EXPANSION OF SINGITA SWENI LODGE CONSULTANT: EMROSS Consulting (Pty) Ltd.
More informationNOTICE OF INTENT. 2. This notification should be submitted not less than 14 days prior to initiating the basic assessment process.
Notice of intent to submit an application in terms of regulation 22 (b) of Government Notice No. R 385 in terms of Chapter 5 of the National Environmental Management Act, 1998 (Act 107 of 1998). July 2006
More informationCOMBINED LICENCE FOR THE CONSTRUCTION OF A PETROLEUM STORAGE FACILITY, LOADING FACILITIES AND PETROLEUM PIPELINES
Licence Number: PPL.sf.F1/175/2014 COMBINED LICENCE FOR THE CONSTRUCTION OF A PETROLEUM STORAGE FACILITY, LOADING FACILITIES AND PETROLEUM PIPELINES This licence is issued by the National Energy Regulator,
More informationENVIRONMENTAL IMPACT ASSESSMENT ENVIRONMENTAL IMPACT ASSESSMENT PHASE
ENVIRONMENTAL IMPACT ASSESSMENT ENVIRONMENTAL IMPACT ASSESSMENT PHASE PROPOSED ESTABLISHMENT OF THE PUMPED STORAGE SCHEME AND ASSOCIATED INFRASTRUCTURE IN STEELPOORT AREA, LIMPOPO AND MPUMALANGA PROVINCES
More informationSAS May
SAS 215107 May 2015 84 SAS 215107 May 2015 ANNEXURE B SPECIALIST CVS 85 SAS 215107 May 2015 SCIENTIFIC AQUATIC SERVICES (SAS) SPECIALIST CONSULTANT INFORMATION CURRICULUM VITAE OF MICHELLE PRETORIUS PERSONAL
More informationResource Consent Application - Removal/Remediation of Flare/Blowdown Pit at Kapuni Well site KA2 for Shell Todd Oil Services Ltd
27 March 2012 Project No. 42780930 South Taranaki District Council Private Bag 902 Hawera, 4640 Attention: Blair Sutherland Dear Blair Subject: Resource Consent Application - Removal/Remediation of Flare/Blowdown
More informationAnnex B2.3. Background Information Document
Annex B2.3 Background Information Document Background Goldfields South Deep Mine, in partnership with Enel Green Power, proposes to design, construct, and operate 2x20MW Solar PV plants on Mine owned property
More informationBackground Information Document
Background Information Document Independent Power Producer Programme: EIA for a Floating Power Plant and EIA for LNG Import Facilities, Port of Saldanha: ERM Ref Number: 0320754 Purpose of this Background
More informationLICENCE FOR THE CONSTRUCTION OF A PETROLEUM STORAGE FACILITY AND AN AUXILIARY PIPELINE
Licence Number: PPL.sf.F1/175/2014 LICENCE FOR THE CONSTRUCTION OF A PETROLEUM STORAGE FACILITY AND AN AUXILIARY PIPELINE This licence is issued by the National Energy Regulator, hereinafter referred to
More informationPROJECT PROPOSAL AGENDA ENVIRONMENTAL IMPACT ASSESSMENT PROJECT MOTIVATION FERROCHROME & FERROMANGANESE AT ASSMANG CHROME, MACHADADORP
ENVIRONMENTAL IMPACT ASSESSMENT PROPOSED ALTERNATE PRODUCTION OF FERROCHROME & FERROMANGANESE AT ASSMANG CHROME, MACHADADORP Stakeholder Briefing Meeting 14 March 2008 environmental science associates
More informationEXECUTIVE SUMMARY 1. INTRODUCTION
I 1. INTRODUCTION EXECUTIVE SUMMARY Mulilo Renewable Energy (Pty) Ltd (later referred to as Mulilo) has identified two alternative sites for the establishment of a 10MW photovoltaic (PV) power generation
More informationIAIAsa August 2014 Betty Mdala Department of Environmental Affairs
D R A F T S TA N D A R D F O R T H E S T O R A G E O R S T O R A G E A N D H A N D L I N G O F D A N G E R O U S G O O D S A N D I D E N T I F I C AT I O N O F A C T I V I T I E S W H I C H M AY C O M
More informationThe PPP has been designed to achieve the following objectives: To ensure that stakeholders are well informed about the proposed development;
7 PUBLIC PARTICIPATION PROCESS 7.1 INTRODUCTION Consultation with Interested and Affected Parties (I&APs) forms an integral component of an ESIA process. It enables inter alia directly affected and neighbouring
More informationEkoInfo CC Environmental & Wildlife Management Consultancy
18 February 2016 Dear Sir/Madam INVITATION TO REGISTER, PARTICIPATE AND COMMENT Eskom Air Quality Offsets Plan Public Participation RE: INVITATION TO REGISTER, PARTICIPATE AND COMMENT ON THE ESKOM AIR
More information