1 Environmental Statement: Non-Technical Summary Report prepared by: Ecus Ltd. Brook Holt 3 Blackburn Road Sheffield S61 2DW February 2013
2 Page left intentionally blank
3 INTRODUCTION This Non Technical Summary (NTS) forms part of the Environmental Statement (ES) to accompany a Planning Application by Beck Haynes Associates on behalf of Motorpoint Ltd and Waystone 32 Limited for the construction of a new and used vehicle supermarket facility to include sales showrooms, outdoor display canopy, display parking and ancillary workshop accommodation on Plot 19 of Summit Park, Glasshoughton Business Park in West Yorkshire (National Grid reference (NGR: SE ) (Figure 1). Figure 1: Site Location The application area consists of an approximately ha vacant development plot. The location of the site is shown in Figure 1. The existing site forms part of the land known as Summit Park (originally part of the former Glasshoughton Colliery) with extant outline planning permission for B1, B2 and B8 industrial, office and distribution uses. These applications have been recently resubmitted and approved for renewal to extend the time limits (original applications 06/01285/FUL and 06/01286/FUL renewed through applications 12/01352/RPP and 12/01353/RPP). Planning permission for such redevelopment uses has existed since 1999 following closure of the colliery. The site is bounded by the M62 to the south and the Leeds-Goole railway to the east and north, Glasshoughton Community Stadium development is adjacent to the north. The area is on the edge of Castleford, West Yorkshire with the town centre located approximately 2 km to the north of the site.
4 THE DEVELOPER This Planning Application has been prepared and submitted by Beck Haynes Associates on behalf of Motorpoint Ltd and Waystone 32 Limited (The Applicant). Waystone have been successfully developing the former Glasshoughton Colliery site here for the past 20 years for a variety of employment, retail and leisure uses in close collaboration with Wakefield Metropolitan District Council (WMDC). THE ENVIRONMENTAL STATEMENT The ES has been prepared by Ecus Ltd and technical specialists to accompany the Planning Application in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations It includes consideration of potential effects to the environment that may occur throughout the life of the project including during the construction, operational and decommissioning phases. The potential for cumulative effects to occur in conjunction with other major schemes in the vicinity has been included within the assessment of impacts. SITE SELECTION AND LAYOUT DESIGN Consideration of design alternatives has been undertaken as an intrinsic part of the scheme development and the proposed scheme has been through several design iterations, to achieve the final layout whilst minimising the environmental impacts. The design process also proceeded in response to consultation with WMDC. assessments were used to inform the design of the design in an iterative way. THE PROPOSED SCHEME Early The proposed scheme comprises a Planning Application covering approximately ha of land comprising plot 19 of Summit Park including the access road and a net developable area if 2.9 ha. The proposed layout is shown in Figure 2. Figure 2: Proposed Development Layout
5 The proposed scheme comprises a planning application covering approximately ha of land for the construction of a new car showroom, sales forecourt and workshop facility. The site is split into sales areas accessible by the general public and ancillary areas which are accessible by authorised staff and appointed delivery personnel. There will be 2216 m 2 floor space and a gross external buildings footprint of 5450 m 2. The building height varies up to a maximum of approximately 7.1 m to the workshop building and 6.5 m to the showroom entrance as defined on the application drawings. Building materials will comprise prefabricated insulated metal cladding systems and steel frame. The construction procurement will be undertaken through a competent main contractor arrangement. The construction period is anticipated to be in the region of 6 months on site. Construction methods will be prefabricated wherever practically possible to enable the construction programme and site works to operate to a minimum in terms of timescale and disturbance. Mitigation control of dust and mud will be undertaken by the contractor in accordance with prepared method statements. CONSULTATION AND SCOPING Various pre-application consultations have taken place in relation to this development, the outcomes of which are summarised below. Initially a meeting took place at WMDC offices on 15 th May 2012 to discuss the feasibility of constructing a car supermarket and ancillary facilities on this site. The meeting raised no objections in principle, subject to an application for a full planning permission due to the Suis Generis nature of this use. A written request by BHA for an Environmental Impact Assessment Screening was submitted to WMDC planning department on 21st June 2012 with a response received on 5th July 2012 requesting an Environmental Statement to include the following reports: Flood Risk Assessment Land and Groundwater Contamination Report Air Quality Assessment Ecology/Biodiversity Report Bancroft Consulting Ltd, the applicant s traffic consultants, have agreed in principle the content of the traffic impact assessment and the green travel plan with the highways department. The Transport Assessment and Travel Plan have been submitted separately within the application. Consultations have taken place between Ecus Ltd and WMDC Environmental Health Department and the Planning Department to agree the requirements and of the Environmental Statement, particularly in relation to the content of the flood risk assessment and air quality assessment. PLANNING POLICY The Development Plan for Wakefield currently comprises the Local Development Framework and the Regional Spatial Strategy for Yorkshire and the Humber. However the RSS will be revoked on 22 nd February Therefore it is not expected that it will be a material consideration for this planning application. Local Development Framework The Wakefield Local Development Framework comprises the following documents:
6 Core Strategy (Adopted 15 April 2009); Development Policies (Adopted 15 April 2009); Central Wakefield Area Action Plan (Adopted 17 June 2009); Waste document (Adopted 9 December 2009); Site Specific Policies (Adopted 12 September 2012) Unitary Development Plan First Alteration Saved Policies and Proposals in relation to retail, town centres, leisure and open space (September 2007). Policies Map Policies and allocations within the Development Plan that are of relevance to the proposed development are discussed below. Further detail is provided within the Planning Statement. The Core Strategy and Development Policies documents of the Local Development Framework were adopted in 2009 and largely replace previous policy from the Wakefield Metropolitan Borough District Council Unitary Development Plan. Core Policies of particular relevance include CS1, 4, 8, 10 and 13 which relate to the encouragement of development in appropriate locations with high accessibility. They also support sustainable transport and appropriate design, safety and environmental quality throughout development. Development policies of relevance to this proposal relate are summarised as follows: Policy D 3 Protecting Employment Land. Policy D 4 Sites Designated for Biological or Geological Conservation. Policy D 5 Ecological Protection of Watercourses and Water Bodies. Policy D 6 Wildlife Habitat Network. Policy D 9 Design of New Development. Policy D 12 Landscape Design. Policy D 14 Access and Highway Safety. Policy D 15 Safety and Security Through Design. Policy D 20 Pollution Control. Policy D 22 Contaminated Land. Policy D 24 Flood Risk. Policy D 25 Drainage. Policy D 28 Sustainable Construction and Efficient Use of Resources. The Site Specific Policies Local Plan document of the Local Development Framework, adopted on the 12th September 2012, identifies the site of the former Glasshoughton Colliery and Coking facility as Special Policy Area 5 (SPA5) on the Policies Map. The citation highlights the importance of the issues of contaminated land, air quality, traffic and transport in relation to proposed further development of the site. The key policy objective for the site is identified as to provide employment and skills development opportunities for local residents. The Council will seek to secure these opportunities as far as possible. Policy SSP1 Presumption in Favour of Sustainable Development states that when considering development proposals the Council will take a positive approach that reflects the presumption in favour of sustainable development contained in the National Planning Policy Framework and Planning applications that accord with the policies in this Local Plan
7 (and, where relevant, with polices in neighbourhood plans) will be approved without delay, unless material considerations indicate otherwise. Wakefield Metropolitan District Council adopted the First Alteration of the Unitary Development Plan (UDP) in January The policies contained within the UDP are now largely replaced by the Wakefield Local Development Framework (LDF) documents, described below. However, a number of policies in the UDP are saved until such time that they are replaced by policies contained within the LDF documents. Saved policies exist for retail and leisure policy areas and, where appropriate, are related to specific areas of the district. A single saved policy is relevant to the proposed development, Policy S1 Out-of-Centre Retail Development. The National Planning Policy Framework In March 2012 the Government published the National Planning Policy Framework (NPPF). This document replaces all previous Planning Policy Guidance/Statements and confirms that Development Plan documents will need to revised to take into account policies in the NPPF. The NPPF introduces a presumption in favour of sustainable development. The presumption in favour of sustainable development should be seen as a golden thread running through both plan making and decision taking. It is stated that the Government is committed to securing economic growth in order to create jobs and prosperity. The Government is committed to ensuring that the planning system does everything it can to support sustainable economic growth. There are no known emerging policy documents or other material circumstances, relevant to the development, which suggests that the proposed scheme is inappropriate. ECOLOGY AND NATURE CONSERVATION An assessment of the ecological impacts of the proposed development has been carried out by Ecus Ltd following the guidelines set out by the Institute of Ecology and Environmental Management. The assessment process has identified and evaluated a number of key ecological features within, and adjacent to, the application area. This included survey of habitats and species within the application area. Consultation was undertaken with statutory nature conservation organisations and other wildlife interest groups and this, along with the field survey, helped to ensure that all habitats and species that may be affected by the development were fully considered. The site is not designated for nature conservation. The site is dominated by bare ground with small areas of ephemeral vegetation becoming established. The site does not support buildings, trees or any other vegetation. No signs of species protected under nature conservation law were recorded on site at the time of survey, and no records of any other species protected under nature conservation law are known from within 2.5 km of the application area. Due to the general lack of vegetation present the site is not considered to be of importance to nature conservation outwith the immediate zone of influence. The proposed scheme will include landscaping which should where possible use native species of local provenance. Consideration could be given to including of bird nesting boxes on new buildings for the benefit of nature conservation. AIR QUALITY The air quality impacts associated with the proposed development at Plot 19 of Summit Park have been assessed by Air Quality Consultants Ltd. Existing conditions within the study area show poor air quality, with concentrations of nitrogen dioxide exceeding the annual
8 mean objective along the M62 motorway. An Air Quality Management Area has been declared for this area, which includes the Motorpoint site. Whilst there will be increased traffic emissions arising from the additional traffic on local roads from the development, the increase in traffic flows on nearby roads has been found to be sufficiently small that a quantitative air quality assessment is not required. The air quality impacts associated with road traffic emissions from the proposed development are therefore deemed to be negligible. The construction works have the potential to create dust. During construction it may therefore be necessary to apply a package of mitigation measures to minimise dust emissions. Even with these measures in place, there remains a slight risk that the Teva factory car park might be affected by occasional dust-soiling impacts. Any effects will be temporary and relatively short lived, and will only arise during dry weather with the wind blowing towards a receptor, at a time when dust is being generated and mitigation measures are not being fully effective. The overall impacts during construction are judged to be negligible. LAND AND WATER CONTAMINATION The Land and Water Contamination assessment was undertaken by Ecus Ltd. The site is currently disused and the development of the site will introduce new receptors to any soil contamination on the site during the construction and operational phases of the work. Identified new receptors introduced to the site will be as follows: ground workers during the construction phase, employees on the site during the operational phase, customers and visitors to the site during the operational phase, and concrete substructures including foundations, drainage, etc. Fill materials placed on the site may contain elevated contaminant concentrations and therefore there is potential for ground workers to be exposed to soil contamination during the construction phase of the development without appropriate mitigation. The potential acute impacts on the health of ground workers during the construction phase can be mitigated by adopting best-practice hygiene, welfare, training, monitoring, dust control and waste management procedures. Assessment of the risk to site end users from exposure to contaminated soils concluded that the risk to site end users from exposure to these soil contaminants is low. In addition the proposals involve installing asphalt car parking and buildings over the large majority of the site area. This will result in a significant reduction in the potential for exposure of future site users to any soil contamination by breaking the potential contaminant pathways. The fill materials mean that there will be a requirement for underground concrete structures to have protective measures against aggressive chemical reactions. These potential impacts can be mitigated by adopting suitable concrete mixes and additional protective measures applicable to the relevant ground conditions and application of concrete substructure. The proposed development will require being surfaced with impermeable asphalt or buildings reducing the rate of infiltration of precipitation. All precipitation falling on the site will be collected and diverted to an engineered drainage system reducing the potential for contaminated fill material being deposited within the ponds. FLOOD RISK ASSESSMENT Flood Risk Assessment was undertaken by Ecus Ltd as the proposed scheme was over 1 ha in area. The proposed area of development is relatively flat-lying, with the east of the site lying at 42 m Above Ordnance Datum (AOD), and the west lying at 39 m AOD, this fall occurring over a distance of approximately 150 m, giving a gradient of 1 in 50. The western and southern boundaries of the site are formed by a steep slope, approximately 14 m to 16 m high.
9 The site lies wholly within the Environment Agency s Flood Zone 1. However, flooding can occur from more minor watercourses than those modelled by the EA. Minor watercourses are present adjacent to the site s southern and western boundaries. Information provided by the EA does not show any records for historical flooding at the site. However, not all flood events may have been historically recorded. The assessment showed that the site is at minimal risk of major flooding from fluvial, reservoir, canal or tidal sources, overland flow/surface water or ground water sources. In addition, it has been demonstrated that the development will not have an adverse affect on flood water storage/displacement at the site, and will not increase surface water run-off at the site. The site area to be developed will require the provision of infrastructure in order to drain surface water from the site into the pre-existing site-wide drainage system. A detailed drainage design for the site will therefore be required, with the design to be agreed with the Local Authority and local water company. CONCLUSIONS This Non Technical Summary has outlined the findings of the Environmental Impact Assessment for proposed development at Plot 19, Motorpoint, Glasshoughton Stadium Business Park. Full details of the assessments undertaken are set out in the Environmental Statement and accompanying technical appendices. Further information on the scheme design, planning policy and community interest package are contained within the Planning Application documents. No significant residual environmental impacts are anticipated to result from any aspect of the development as proposed. The development will provide creation of high quality jobs that can be filled predominantly from the existing local catchment of the Park. In the absence of the regeneration it is likely that the contribution that the Park makes to the local economy will decline in future and it is harder to attract high quality businesses to the Park in an increasingly competitive marketplace. The full Environmental Statement and its technical appendices have been distributed to WMBC and key consultees. It is available for public inspection on the WMBC website and at their offices during the statutory consultation period.
Land to the South of Old Mill Road, Sandbach Environmental Impact Assessment Environmental Statement: Non-Technical Summary
Environmental Impact Assessment Report prepared by: Ecus Ltd. Brook Holt 3 Blackburn Road Sheffield S61 2DW 0114 266 9292 September 2013 Page Left Intentionally Blank 2 INTRODUCTION This Non Technical
More informationPROPOSED MIXED USE DEVELOPMENT
J Routledge & Sons PROPOSED MIXED USE DEVELOPMENT Land at Tanhouse Lane, Widnes Environmental Statement: Non-Technical Summary Planning Application: 05/00057/OUTEIA Tanhouse Lane Environmental Statement
More information5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT. The scope of the EIA falls under three broad categories:
5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT 5.1 INTRODUCTION The scope of the EIA falls under three broad categories: technical scope; spatial scope; and temporal scope. The scoping process for the
More informationLongbridge Town Centre Planning Application
Longbridge Town Centre Planning Application Non-Technical Summary of the Environmental Statement January 2011 Introduction An application for Planning Permission has been submitted to Birmingham City Council
More informationPreface. Gaia Power Ltd 71A High Street Yarm TS15 9BG. Tel: Web:
Preface This document comprises the Environmental Statement and its Non- Technical Summary, which have been prepared in support of an application for planning consent for the construction of a biomass
More informationNorthacre Renewable Energy
Northacre Renewable Energy Revision of the layout and design of the Advanced Thermal Treatment Facility permitted under consent 14/12003/WCM at Stephenson Road, Northacre Trading Estate, Westbury, BA13
More informationNorthacre Renewable Energy
Northacre Renewable Energy Revision of the layout and design of the Advanced Thermal Treatment Facility permitted under consent 14/12003/WCM at Stephenson Road, Northacre Trading Estate, Westbury, BA13
More informationSizewell B Dry Fuel Store. Environmental Statement Non-Technical Summary
Sizewell B Dry Fuel Store Environmental Statement Non-Technical Summary NON TECHNICAL SUMMARY 1 INTRODUCTION This Non Technical Summary (NTS) is submitted as part of the application to extend the existing
More informationClifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until Non Technical Summary
Clifton Marsh Landfill Variation of planning permission 05/09/0376 & 06/09/0395 for the continuation of landfilling until 2035 Non Technical Summary SLR Consulting Limited Project Ref: 403.00079.00474
More informationViridor Waste Management. Proposed Development of an In-Vessel Composting Facility. Land at Exide Batteries, Salford Road, Bolton
Viridor Waste Management Proposed Development of an In-Vessel Composting Facility Land at Exide Batteries, Salford Road, Bolton Non-Technical Summary January 2009 Introduction Viridor Waste Management
More informationREFERENCE: F/03767/12 Received: 05 October 2012 Accepted: 05 October 2012 WARD(S): West Finchley Expiry: 30 November 2012.
LOCATION: 20 Ballards Lane, London, N3 2BJ REFERENCE: F/03767/12 Received: 05 October 2012 Accepted: 05 October 2012 WARD(S): West Finchley Expiry: 30 November 2012 Final Revisions: APPLICANT: PROPOSAL:
More informationHarewood Whin Waste Transfer Station Environmental Statement
Harewood Whin Waste Transfer Station Environmental Statement This document is the Environmental Statement for the proposed Waste Transfer Station at the site of the Harewood Whin Resource Recovery Facility,
More information6 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 6.1 INTRODUCTION
6 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 6.1 INTRODUCTION Cumulative and indirect effects result from the combined impacts of multiple projects / plans. Their consideration is important as the impacts
More informationNON TECHNICAL SUMMARY OF THE ENVIRONMENTAL STATEMENT
NON TECHNICAL SUMMARY OF THE ENVIRONMENTAL STATEMENT PLANNING APPLICATION TO REMOVE CONDITION 2 OF PLANNING PERMISSION REFERENCE TDC/94/065 TO EXTEND THE OPERATIONAL LIFE OF THE NON-HAZARDOUS AND HAZARDOUS
More informationNon-Technical Summary
Non-Technical Summary i. Introduction and background Introduction The Environment Agency (generally referred to in this non-technical summary as we or us ) has prepared an Environmental Statement (ES)
More informationTees Valley Renewable Energy Facility
Renewable Energy Facility The Environmental Statement: Volume 3 Non-Technical Summary Air Products PLC Hersham Place Technology Park Molesey Road Hersham Surrey KT12 4RZ Tel 020 3170 8465 tell me more
More informationCONCLUSIONS 14 CONTENTS
CONTENTS Introduction... 14-1 Traffic... 14-1 Air Quality... 14-1 Noise and Vibration... 14-2 Geology and Hydrology... 14-2 Landscape and Visual... 14-3 Ecology... 14-4 Cultural Heritage... 14-4 Population
More informationPortbury Dock Renewable Energy Plant. Cumulative Impact Assessment Non-Technical Summary September 2009
Portbury Dock Renewable Energy Plant Cumulative Impact Assessment Non-Technical Summary September 2009 INTRODUCTION On 28 th August 2009 E.ON Climate & Renewables UK Developments Limited (EC&R) submitted
More informationRefer to Chapter 3.0 (Description of Development) for a detailed site and development description.
7. WATER: HYDROGEOLOGY & HYDROLOGY 7.1 Introduction This chapter of the EIAR comprises of an assessment of the likely impact of the proposed development on the surrounding surface water and hydrogeological
More informationCrossrail. Environmental Statement. Volume 9c. Appendices. Westbourne Park Bus Garage Extension. Volume 2 Appendices
Crossrail Environmental Statement Volume 9c Appendices Westbourne Park Bus Garage Extension Environmental Statement Volume 2 Appendices 9c If you would like information about Crossrail in your language,
More informationRavenhead Quarry. Environment Act Application for Determination of Conditions (ROMP) Environmental Statement Non Technical Summary
Ravenhead Quarry I Environment Act 1995 Application for Determination of Conditions (ROMP) Environmental Statement Non Technical Summary November 2013 Prepared for: Ibstock Bricks (1996) Limited UNITED
More informationReport by the Executive Director of Community and Environmental Services
Planning (Regulatory) Committee 1 April 2016 Item No. Applications Referred to Committee for Determination: North Norfolk District: C/1/2015/1025: Hempton: Change of use to a mixed use development to allow
More informationA684 Bedale, Aiskew and Leeming Bar Bypass Environmental Statement. Non Technical Summary. Business and Environmental Services
A684 Bedale, Aiskew and Leeming Bar Bypass Environmental Statement Non Technical Summary Business and Environmental Services A responsive County Council providing excellent and efficient local services
More informationToddleburn Wind Farm. Environmental Statement Non-technical Summary. I & H Brown Toddleburn Ltd
Toddleburn Wind Farm Environmental Statement Non-technical Summary I & H Brown Toddleburn Ltd July 2004 Introduction I & H Brown Toddleburn Ltd proposes to develop a wind farm near Oxton, in the Scottish
More informationResidential Development Comprising 14 2 and 3 Bedroom Houses Witton Road Hebburn SOUTH TYNESIDE
Residential Development Comprising 14 2 and 3 Bedroom Houses Witton Road Hebburn SOUTH TYNESIDE Design and Access Statement November 2016 Contents Contents 1.00 The Existing Site 1.01 Context 1.02 Site
More informationViridor Energy from Waste Facility. Environmental Statement Non-Technical Summary
Viridor Energy from Waste Facility Environmental Statement Non-Technical Summary September 2012 Viridor Energy from Waste Facility Environmental Statement Non-Technical Summary Introduction Viridor has
More informationCottonmount Landfill Stable Non Reactive (SNR) Asbestos Cell. Volume 2 NON TECHNICAL SUMMARY. December 2012 SLR Ref:
Cottonmount Landfill Stable Non Reactive (SNR) Asbestos Cell Volume 2 NON TECHNICAL SUMMARY December 2012 SLR Ref: 419.00034.00473 INTRODUCTION 1. This Non Technical Summary (NTS) has been produced by
More information06/01851/MIN CONSTRUCTION OF A NOISE ATTENUATION BUND AT Hermitage Farm, Newport Road, Moulsoe FOR NGW and EF Richards
06/01851/MIN CONSTRUCTION OF A NOISE ATTENUATION BUND AT Hermitage Farm, Newport Road, Moulsoe FOR NGW and EF Richards THE APPLICATION Planning permission is sought for the construction of a noise attenuation
More informationDELEGATED REPORT. Reason To ensure that any impermeable areas created during the filming process does not have a permanent impact on the site runoff.
DELEGATED REPORT APPLICATION NO. 16/03324/PRIOR LOCATION Hartland Park Bramshot Lane Fleet Hampshire PROPOSAL Notification for Prior Approval for the Temporary Use of Building or Land for the Purpose of
More informationArun District Council. Interim Planning Policy Guidance on Draft for consultation
Arun District Council Interim Planning Policy Guidance on enterprise@bognorregis Draft for consultation July 2012 Arun District Council Interim Planning Policy Guidance on enterprise@bognorregis DRAFT
More informationWelcome to this exhibition by DS Smith Paper Ltd regarding the Kemsley Paper Mill (K4) CHP Plant project.
DS Smith Paper Ltd Welcome to this exhibition by DS Smith Paper Ltd regarding the Kemsley Paper Mill (K4) CHP Plant project. We will be applying to the Secretary of State for permission to build a new
More informationPrimary access to the site is proposed from two locations along the B3420 Andover Road, and a secondary access from Well House Lane.
17. SERVICES 17.1 Introduction 17.1.1 WSP Development Limited has been appointed by CALA Homes to investigate and appraise the availability of services to serve a proposed mix-use development of approximately
More informationAPPLICATION FOR CHANGE OR CANCELLATION OF RESOURCE CONSENT CONDTION
APPLICATION FOR CHANGE OR CANCELLATION OF RESOURCE CONSENT CONDTION (Section 127 of the Resource Management Act 1991) Use this form to apply to the Waitaki District Council for a change/variation or cancellation
More informationTullynahaw Wind Energy Project County Roscommon ENVIRONMENTAL IMPACT STATEMENT
HIBERNIAN WIND POWER LIMITED Tullynahaw Wind Energy Project County Roscommon ENVIRONMENTAL IMPACT STATEMENT NON-TECHNICAL SUMMARY September 2003 Report P04E311A-R2 Stephen Court, 18/21 St. Stephen's Green,
More informationWorplesdon Parish Council
Worplesdon Parish Council Guildford Borough Council Draft Local Plan Consultation Presentation 26 June 2014 By Gaynor White Clerk to Worplesdon Parish Council National Planning Policy Framework NPPF -
More information16.3 An Agricultural Land Classification Report is included in ES Volume 2.
CHAPTER 16: GROUND CONDITIONS AND LAND CONTAMINATION Introduction 16.1 This section of the ES presents the results of an assessment of the impacts of the proposed development on matters associated with
More informationFLOOD RESPONSE PLAN PROPOSED WASTE MANAGEMENT FACILITY AT UNIT C, MAERDY INDUSTRIAL ESTATE, RHYMNEY, TREDEGAR, NP22 5PY. On behalf of Mekatek Ltd
FLOOD RESPONSE PLAN PROPOSED WASTE MANAGEMENT FACILITY AT UNIT C, MAERDY INDUSTRIAL ESTATE, RHYMNEY, TREDEGAR, NP22 5PY On behalf of Mekatek Ltd Our Ref: 0097.b Date: December 2016 Prepared by: JDE Unit
More informationThe movement of construction vehicles is predicted to: give rise to some measurable increases in the early morning and evening;
5 TRAFFIC AND TRANSPORT 5.1 SUMMARY OF RESIDUAL IMPACTS The movement of construction vehicles is predicted to: give rise to some measurable increases in the early morning and evening; be outside of the
More informationArcow Quarry, North Yorkshire
Arcow Quarry, North Yorkshire Non Technical Summary Planning applications for a railhead and associated development REVISION SCHEDULE Rev Date Details Prepared by Reviewed by Approved by 0 December 2013
More informationUnit 800, Catesby Park, Off Eckersall Road, Kings Norton, Birmingham, B38 8SE
Committee Date: 12/06/2014 Application Number: 2014/02336/PA Accepted: 14/04/2014 Application Type: Full Planning Target Date: 14/07/2014 Ward: Kings Norton Unit 800, Catesby Park, Off Eckersall Road,
More informationWelcome. Welcome and thank you for taking the time to come to this information session for our proposed Denzell Downs wind farm.
Welcome Welcome and thank you for taking the time to come to this information session for our proposed Denzell Downs wind farm. Update: In 2011 Cornwall Council s Planning Committee granted permission
More informationArafura Resouces Ltd. Nolans Environmental Impact Statement. volume one. Risk assessment. Chapter 5
Arafura Resouces Ltd Nolans volume one 05 Risk assessment Chapter 5 5. Risk assessment 5.1 Introduction This chapter provides a description of the whole-of-project risk assessment undertaken for the identification,
More informationPonds Farm, Environmental Statement Non-Technical Summary
Ponds Farm, Cogent Land LLP QUALITY MANAGEMENT Issue/revision Issue 1 Revision 1 Final Date 03/05/2012 04/05/2012 09/05/2012 Prepared by Matthew Shepherd Caroline Burn Caroline Burn Signature Checked by
More informationSgurrEnergy Ltd Linfairn Wind Farm Environmental Statement: Chapter 4
4 THE EIA PROCESS 4.1 OVERVIEW The purpose of an EIA is to provide a systematic analysis of the impacts of a project in relation to the existing (baseline) environment. The findings of an EIA are presented
More informationGlaxoSmithKline Wind Project Environmental Statement Non-Technical Summary
GlaxoSmithKline Wind Project Environmental Statement Non-Technical Summary 22871-G8.indd greec01 Dec 2009 December 2009 Based upon the Ordnance Survey Map with the permission of the Controller of Her Majesty
More informationApplication Recommended for Approval Lanehead and Briercliffe Ward
Application Recommended for Approval Lanehead and Briercliffe Ward APP/2018/0060 Full Planning Application Variation of condition 2 of planning permission APP/2016/0528 to enable insertion of internal
More informationAnnex F Scoping Checklist
Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve
More informationENVIRONMENTAL APPRAISAL NON-TECHNICAL SUMMARY
ENVIRONMENTAL APPRAISAL NON-TECHNICAL SUMMARY Figure 1: Site Location 1. Introduction The Ministry of Defence (MoD) hereafter referred to as the Applicant is seeking detailed planning permission for a
More informationProposed Residential Development at Land to the South of Pepper Lane. Environmental Statement: Non-Technical Summary
Proposed Residential Development at Land to the South of Pepper Lane Environmental Statement: Non-Technical Summary Peter Brett Associates September 217 61 Oxford Street, Manchester, M1 6EQ T: +44 ()161
More informationSustainability Statement. Gainsford Road. For Pocket Living. XCO2 energy. April 2016
For Pocket Living April 2016 XCO2 energy w: www.xco2energy.com :: e: mail@xco2energy.com t: +44 (0) 20 7700 1000 :: f: +44 (0) 20 7183 6620 17-18 Hayward s Place :: Clerkenwell :: London :: EC1R 0EQ Contents
More informationan Inspector appointed by the Secretary of State for Communities and Local Government
Appeal Decision Site visit made on 15 December 2017 by S M Holden BSc MSc CEng MICE TPP FCIHT MRTPI an Inspector appointed by the Secretary of State for Communities and Local Government Decision date:
More informationVIRIDOR WASTE MANAGEMENT LTD
VIRIDOR WASTE MANAGEMENT LTD Proposed re-phasing of landfilling operations; amended restoration levels and aftercare scheme; and provision of a new waste reception building with associated site infrastructure
More informationA Rail Freight Interchange for Spalding
A Rail Freight Interchange for Spalding Consultation by South Holland District Council on a proposed development site option for a Rail Freight Interchange facility March 2010 About the proposals Introduction
More informationSurface Water Guidance for Developers
Surface Water Guidance for Developers Contents Overview of Sustainable Drainage Systems (SuDS)... 2 Information Required in a Flood Risk Assessment or Drainage Strategy... 3 Outline Planning Applications...
More informationTown & Country Planning Act 1990
Town & Country Planning Act 1990 Your Ref: 17/0411/OUT Proposed Development at Gwern y Domen by PMG Ltd and Persimmon Homes Ltd I of am against the proposed development for a number of reasons which are
More informationFlood Risk and Drainage Assessment.
Flood Risk and Drainage Assessment. Change of Use off land to Leisure Complex At, Caersws, Powys, SY17 5SB October 2018 Statement prepared for: Mr T Bebb By Woodsyde Developments Ltd Woodsyde Developments
More informationPort of Hull Local Development Order
Port of Hull Local Development Order Integrated Environmental Assessment Non Technical Summary March 2012 Final Prepared for: Hull City Council UNITED KINGDOM & IRELAND REVISION SCHEDULE Rev Date Details
More information28 JULY 2015 PLANNING COMMITTEE. 5i 14/1315 Reg d: Expires: Ward: OW. of Weeks on Cttee Day:
5i 14/1315 Reg d: 25.11.2014 Expires: 29.04.15 Ward: OW Nei. Con. Exp: 14.01.15 BVPI Target Minor (13) Number of Weeks on Cttee Day: 21/8 On Target? No LOCATION: PROPOSAL: TYPE: London House, 134 High
More information5. Environmental issues and methodology
5. Environmental issues and methodology 5 Environmental issues and methodology Introduction 5.1 The methodology used to carry out the environmental impact assessment (EIA) is set out in this chapter. This
More informationIn-combination and Cumulative Effects Assessment
P O R T I S H E A D B R A N C H L I N E P R E L I M I N A R Y ENV I R O N M E N T A L I N F O R M A T I O N R E P O R T V O L U M E 2 C H A P T E R 18 In-combination and Cumulative Effects Assessment Table
More information17th OCTOBER 2017 PLANNING COMMITTEE. 5e 17/0877 Reg d: Expires: Ward: c. Number of Weeks on Cttee Day:
5e 17/0877 Reg d: 08.03.2016 Expires: 26.09.17 Ward: c Nei. Con. Exp: 01.09.17 BVPI Target Number of Weeks on Cttee Day: 11/8 On Target? Yes LOCATION: PROPOSAL: TYPE: Buckinghams, Albert House, Albert
More informationInvolving People in Planning
Involving People in Planning The Authority s Statement of Community Involvement August 2014 1. Introduction As a National Park Authority we are strongly committed to public involvement in all of our work.
More informationABERARDER WIND FARM. Environmental Statement Volume I Non-Technical Summary
ABERARDER WIND FARM Environmental Statement 2014 Volume I CONTENTS Preface... 2 Introduction... 4 Site Location... 5 Development Plan Policy... 7 Environmental Sensitivity... 9 Site Construction & Decommissioning...
More informationGarvagh Glebe Wind Energy Project County Leitrim
HIBERNIAN WIND POWER LIMITED & COILLTE Garvagh Glebe Wind Energy Project County Leitrim ENVIRONMENTAL IMPACT STATEMENT NON-TECHNICAL SUMMARY March 2003 Report P04J004 R3 Stephen Court, 18/21 St. Stephen's
More information2 ENVIRONMENTAL IMPACT ASSESSMENT
2 ENVIRONMENTAL IMPACT ASSESSMENT Introduction 2.1 Environmental Impact Assessment (EIA) is required for certain categories of projects and involves a process of drawing together, in a systematic way,
More informationdetermine the effect of the Proposed Development together with the other planned changes within defined areas of influence;
14 SUMMARY OF CUMULATIVE AND INDIRECT EFFECTS 14.1 INTRODUCTION Cumulative and indirect effects result from the combined impacts of multiple projects / plans. Their consideration is important as the impacts
More informationSheringham Shoal Offshore Wind Farm Onshore Substation Reapplication Environmental Statement Addendum Non-Technical Summary
Sheringham Shoal Offshore Wind Farm Onshore Substation Reapplication Environmental Statement Addendum Non-Technical Summary Scira Offshore Energy Limited 9 April 2009 9R8482 SHERINGHAM SHOAL OFFSHORE WIND
More informationWHO ARE GAELECTRIC? RENEWABLE ENERGY TARGETS WHY SOLAR ENERGY?
WHO ARE GAELECTRIC? Founded in 2004 with a vision to empower the next generation of energy users with power from nature, we provide energy from renewable sources to reduce dependence on fossil fuels and
More informationIEMA ES Review Criteria
IEMA ES Review Criteria Structure of the Criteria The criteria are split into three sections and a review report is structured accordingly: Section 1 addresses all of the information contained within an
More informationEnvironmental Impact Assessment Non-Technical Summary. June 2015
Environmental Impact Assessment Non-Technical Summary June 2015 Contents 1. Introduction 3 2. Site and Surrounding Area, Proposed Development and Policy 6 3. Summary of Topics 9 4. Further Information
More informationD2: SELECTION OF THE LOCATION OF CONSTRUCTION COMPOUNDS
HIGH SPEED TWO INFORMATION PAPER D2: SELECTION OF THE LOCATION OF CONSTRUCTION COMPOUNDS This paper outlines the range of construction compounds and the criteria used to select them for Phase One of HS2.
More informationMarlow Flood Alleviation Scheme Environmental Statement Non-Technical Summary. Final. WNGLDC Environment Agency Title
Marlow Flood Alleviation Scheme Environmental Statement Non-Technical Summary Final WNGLDC Environment Agency Title We are The Environment Agency. It's our job to look after your environment and make it
More informationHigh Speed Rail (London- West Midlands)
High Speed Rail (London- West Midlands) Draft Environmental Minimum Requirements Annex 4: Draft Environmental Memorandum November 2013 ESA 4.2 High Speed Rail (London- West Midlands) Draft Environmental
More informationBUT001: Land to the east of Benington Road, Butterwick Sustainability Objective
BUT001: Land to the east of Benington Road, Butterwick Sustainability Objective 1. Provide a miture of sustainably designed new housing to provide everybody in South East Lincolnshire with the opportunity
More informationStrategic Environmental Assessment/ Sustainability Appraisal Non-Technical Summary. Draft for Public Consultation
South East Lincolnshire Local Plan 2011-2036 Strategic Environmental Assessment/ Sustainability Appraisal Non-Technical Summary Draft for Public Consultation January 2016 Contents 1. INTRODUCTION 3 2.
More informationEnvironmental Statement Non Technical Summary. Anthony s Way Frindsbury June creative minds safe hands
Environmental Statement Non Technical Summary Anthony s Way Frindsbury June 2010 www.wyg.com creative minds safe hands Contents Section A Introduction Part 1 Background Part 2 Environmental Assessment
More informationThis summary and the Report subsequently inform the recommended mitigation contained in Section 28 and will inform the Project conditions.
18. Air The Project Air quality team prepared an Air Quality Assessment Report for the Project, which is included in Volume 3 (Part 1). The Report provides an assessment of air quality effects associated
More informationInitial Construction Costs For Various Pavement and Drainage Options
Interpave Initial Construction Costs For Various Pavement and Drainage Options Final Prepared For Interpave Scott Wilson Ltd Interpave Pavement Design CONTENTS 1. Overview 2. Summary of Pavement Types
More informationFerrybridge Multifuel 2 (FM2) Power Station
Welcome Multifuel Energy Ltd is proposing to build a second multifuel power station at Ferrybridge (FM2). This formal consultation is an opportunity for you to provide feedback and comment on the Proposed
More informationI433. Pukekohe Hill Precinct
I433. Pukekohe Hill Precinct I433.1. Precinct Description The Pukekohe Hill Precinct covers approximately 196 hectares of land and is located at the southern urban edge of Pukekohe. Land use, development
More informationPeter Wallace 20 th July 2012 Principal Planner Dover District Council Council Offices White Cliffs Business Park Whitfield Dover, CT16 3PJ
Peter Wallace 20 th July 2012 Principal Planner Dover District Council Council Offices White Cliffs Business Park Whitfield Dover, CT16 3PJ Dear Mr Wallace, Planning Application DOV/12/00440 - Site at
More informationNapier Gateway Environmental Statement Non-technical Summary
Napier Gateway Environmental Statement Non-technical Summary ENVIRONMENT J2 Global Corporation Ltd Napier NON-TECHNICAL SUMMARY www.bwbconsulting.com ENVIRONMENT J2 Global Corporation Ltd Napier NON-TECHNICAL
More informationH3. Residential Single House Zone
H3. Residential Single House Zone H3.1. Zone description The purpose of the Residential Single House Zone is to maintain and enhance the amenity values of established residential neighbourhoods in number
More informationM25 Junctions 27 to 30 Widening
Safe roads, Reliable journeys, Informed travellers EXPLANATION OF THE M25 WIDENING SCHEMES The Highways Agency is to widen approximately 102 kilometres (63 miles) of the M25 by adding a lane in each direction
More informationDetailed Methodology for More Detailed Assessment for Housing Sites. Establishing what capacity re-assessment is required
B1.5.3 Detailed Methodology for More Detailed Assessment for Housing Sites Paragraphs 4.31 to 4.33 and 4.78 of the SSM advises that further indicative capacity work will be undertaken on each site identified
More informationNON TECHNICAL SUMMARY
INTRODUCTION 1. This document comprises a Non Technical Summary (NTS) and has been prepared by (SLR) on behalf of SITA UK (the applicant). 2. The NTS is part of a package of documents being submitted to
More informationWinchester District Local Plan Part 2 Development Management and Site Allocations Publication (Pre-Submission) Plan 2015
1 1 Introduction & Background 1.1 The Winchester District Local Plan Part 2 (Development Management and Site Allocations) (LPP2) forms part of the District Development Framework (see below), which will
More information4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT
4 APPROACH TO THE ENVIRONMENTAL IMPACT ASSESSMENT 4.1 INTRODUCTION This section describes the broad principles of the methodology adopted for the EIA of the Proposed Development. EIA is a procedure required
More informationRising Sun. Scaffold Hill. Flood Risk Assessment
Rising Sun Scaffold Hill Flood Risk Assessment August 2010 Contents 1.0 Introduction... 4 2.0 Site Description... 5 3.0 Legislative Framework... 6 4.0 Flood Risk... 10 5.0 Surface Water Drainage... 11
More informationDevelopers Guide for Surface Water Management.
Developers Guide for Surface Water Management www.southwark.gov.uk Contents 1. Introduction... 2 2. Requirements for Flood Risk Assessments and Drainage Strategies... 3 2.1 Planning Applications... 3 2.2
More information8 Geology, Hydrology & Hydrogeology
Inverneill Wind Farm Scoping Report Page 42 8 Geology, Hydrology & Hydrogeology 8.1 Introduction The EIA will consider the potential issues arising from the construction, operation and decommissioning
More informationSurface Water Management Masterplan. Summary and Actions. September 2016
Surface Water Management Masterplan Summary and Actions September 2016 Contents Section Page 1. MGSDP Area and Partners 1 2. MGSDP Objectives, Vision and Guiding Principles 3 3. Surface Water Management
More informationLOCATION: Mowbray House, Edgware Way, Edgware, Middx, HA8 8DJ REFERENCE: H/01384/12 Received: 06 April 2012 Accepted: 10 July 2012 WARD(S):
LOCATION: Mowbray House, 58-70 Edgware Way, Edgware, Middx, HA8 8DJ REFERENCE: H/01384/12 Received: 06 April 2012 Accepted: 10 July 2012 WARD(S): Edgware Expiry: 04 September 2012 Final Revisions: APPLICANT:
More informationNobel Way, The Hub, off Witton Road, Perry Barr, Birmingham, B6 7EU
Committee Date: 11/06/2015 Application Number: 2015/02541/PA Accepted: 22/04/2015 Application Type: Reserved Matters Target Date: 22/07/2015 Development Ward: Perry Barr Nobel Way, The Hub, off Witton
More informationLOSTOCK SUSTAINABLE ENERGY PLANT VARIATION OF CONSENT UNDER SECTION 36C OF THE ELECTRICITY ACT 1989
DOCUMENT 8b LOSTOCK SUSTAINABLE ENERGY PLANT VARIATION OF CONSENT UNDER SECTION 36C OF THE ELECTRICITY ACT 1989 DIRECTION UNDER SECTION 90(2ZA) OF THE TOWN AND COUNTRY PLANNING ACT 1990 TO VARY THE CONDITIONS
More informationNew U.S. Embassy, Nine Elms Lane ENVIRONMENTAL STATEMENT: NON-TECHNICAL SUMMARY
1. Introduction The Government of the United States of America (specifically the Unites States Department of State - hereafter referred to as the Applicant ) is seeking to build a new Embassy in London
More informationNorthacre Renewable Energy
Northacre Renewable Energy Proposed development at Stephenson Road, Northacre Trading Estate, Westbury, BA13 4WD Non-technical summary December 2014 Introduction Northacre Renewable Energy Ltd (a company
More informationNORTH LONDON WASTE AUTHORITY
NORTH LONDON WASTE AUTHORITY REPORT TITLE: DEVELOPMENT CONSENT ORDER APPLICATION REPORT OF: Managing Director FOR SUBMISSION TO: NORTH LONDON WASTE AUTHORITY DATE: 25 SEPTEMBER 2015 SUMMARY OF REPORT:
More informationDesign and Access Statement in support of the Planning Application for the Victoria Public House, 56 Middlesbrough Road, South Bank, Middlesbrough,
Design and Access Statement in support of the Planning Application for the Victoria Public House, 56 Middlesbrough Road, South Bank, Middlesbrough, TS6 6LZ, to obtain permission for a Change of Use to
More informationNON TECHNICAL SUMMARY
NON TECHNICAL SUMMARY CONTENTS Introduction... 1 The Proposed Development... 1 Planning Policy and Need... 2 Landscape and Visual Impact... 3 Noise... 4 Ecology... 4 Hydrogeology... 5 Land Quality... 6
More information