WSUD On-site Detention in xprafts 2013

Size: px
Start display at page:

Download "WSUD On-site Detention in xprafts 2013"

Transcription

1 WSUD On-site Detention in xprafts 2013 Content 1. Introduction of ODS 2. General a. Impervious Area b. Pervious Area Capture c. Average Allotment Density d. Developed Area/Total Area 3. On-site Detention Unit a. Type of ODS system b. Extended Detention Storage c. Flood detention Storage d. Primary orifice outlet e. Secondary orifice outlet f. Site Storage Requirements (SSR) g. Site Reference Discharge (SRD) h. Permissible Site Discharge (PSD) i. Secondary Permissible Site Discharge j. High Early Discharge (HED) k. Base of Storage to Discharge Control Pit Invert (H1) l. Height of Extended Detention Storage (H2) m. Height to Spillway (H3) n. Volume of Initial Water / Total Water Volume of Storage at start o. Infiltration 4. Rainwater tank a. Available Air Space Volume (Dedicated Airspace) b. Available Water Space Volume c. Roof Capture d. Volume of Initial Water/Total Volume of Water Storage at start e. Height of Outlet to Spill f. Spill Width/Developed Area 1. Introduction of On-site Detention/Retention On-site Detention (OSD) involves the temporary storage and controlled release of stormwater generated within a site. Without adversely affecting the property, it relies on thoughtful design and passive engineering during site development to achieve significant reductions in downstream flooding. OSD is required to ensure that the change in stormwater runoff from a site due to development does not increase flooding problems downstream except severe events. OSD systems must be properly maintained to make sure that stormwater flows from the site are regulated for the life of the development. More details on OSD can be found in the handbook called On-site Stormwater Detention Handbook, the 4 th Edition, published by Upper Parramatta River Catchment Trust, 12/2005. OSD can be provided most efficiently and effectively when it is considered at early stage of the development process. The system is easy to maintain when owners have a clear idea of the location and function of each component in the system. Aims: Detention on development sites has been seen as the solution to problems of established areas where additional development or redevelopment is required. Generally, it is not possible, either physically or financially, to progressively enlarge drainage systems to accommodate increases in impervious areas, runoff rates and volumes occurred due to redevelopment. Detention and/or retention facilities are normally planned for inclusion in urban stormwater management systems for the following purposes: WSUD On-site Detention - xprafts 2013 Page 1

2 to remedy a situation where some part of the downstream drainage system is undersized, and cannot be enlarged conveniently or inexpensively; to reduce flows from a developing area, so that the flows from the fully urbanised catchment are no greater than those which would occur under present conditions, or for the catchment in its natural state; or to develop the most cost-effective drainage system possible, by reducing the sizes and cost of downstream pipes and channels, or as long as this reduces the overall net cost of the total drainage works At first the OSD policy was designed to prevent increased flooding during very large storms (e.g. 100 year ARI), and had no impact on smaller but more frequent storms (e.g. 1 year ARI). In environmental terms, these smaller storms may cause more damage to watercourses and disturbance to aquatic habitats. Furthermore, from a sustainability viewpoint, it would be desirable to have the stormwater runoff from developed sites more closely mimic pre-development conditions. Consequently, using a two-stage outlet to control site runoff in both the 1.5 year ARI storm and the 100 year ARI storm, and by implication all intervening storm magnitudes, was preferred. Several significant changes to the OSD policy were assessed including: an on-line OSD storage; dual outlets, i.e. primary and secondary outlets; an uncontrolled primary outlet, i.e. outlet without High Early Discharge (HED) and a discharge control pit for the secondary outlet only i.e. outlet with HED. Under the alternative OSD arrangement all site runoff is directed to the OSD storage. The water level in the OSD storage rises gradually. In this way, the discharge through the orifice also increases gradually as the depth of water (the head ) above the orifice increases. In small storms the discharge leaving the site through the primary outlet (low level orifice) will be much less than occurred previously due to the adoption of a reduced Permissible Site Discharge (PSD) for the primary outlet. In major storms a secondary outlet with a higher PSD would control outflows from the OSD storage. In combination these two outlets achieve overall aims of reducing peak flows in frequent storms as well as in major storms. OSD Solution: The Trust's catchment OSD policy, developed in conjunction with the four local councils in the catchment Baulkham Hills, Blacktown, Holroyd and Parramatta is the result of an extensive series of computer simulations using a detailed hydrologic model of the upper Parramatta River catchment. Since late 1991, all four councils have been applying the same OSD policy to their portion of the catchment. The catchment OSD policy aims to ensure that subsequent developments will not increase flooding or stormwater flows at any downstream locations, in all flood events up to and including 100 year ARI events. Rainfall/runoff modelling of the Upper Parramatta River catchment has been undertaken on a semi continuous basis for over 25 year. The xprafts rainfall/runoff program has been adopted for the hydrologic inputs to more advanced hydraulic analysis of the major tributaries throughout the catchment. Initially the catchment was divided into only a few sub-catchments to represent the inflows from the various tributaries. Subsequent modelling, carried out by the Trust, has progressively expanded this model to 778 sub-catchments with 18 public retarding basins, 13 private basins and 22 natural storages that act as de facto basins. xprafts has been used to analyse OSD solutions for all four editions of the handbook mentioned above. 2. On-site detention policy For a complete guidance and example of OSD systems users are referred to the handbook called On-site Stormwater Detention Handbook the 4 th Edition, published by Upper Parramatta River Catchment Trust in December WSUD On-site Detention - xprafts 2013 Page 2

3 2.1 Statement The catchment OSD policy aims two main points: to ensure that new developments and redevelopments do not increase peak stormwater flows in any downstream area during major storms up to and including 100 year ARI (1% AEP) event; to reduce post development peaks throughout the catchment in the 1.5 year ARI event to be as close to natural levels and to encourage the integration of OSD with other water quality measures. The OSD solution should create a sustainable solution for peak stormwater flow management, which complements any WSUD aspects of the development. 2.2 Objectives To limit flow peaks throughout the catchment, in a 100 year ARI event, to estimated peak flows under 1999 conditions, even if the further development is equivalent to full medium/high density redevelopment throughout the catchment, thereby preventing any increase in downstream peak flows by temporarily storing on-site the additional and quicker runoff generated; To prevent increases in downstream flooding and drainage problems that could: - increase flood losses - damage public assets - reduce property values - require additional expenditure on flood mitigation or drainage works. To reduce post development peaks, throughout the catchment, in the 1.5 year ARI event to as close to natural levels as practical; To encourage integration of OSD systems into the architectural design and layout of the development so that adequate storage areas are included in the initial stages of the site design; To encourage integration of the OSD facilities into a sustainable overall water management plan for the site; and To require construction supervision of OSD systems by the OSD designer to improve construction standards. 2.3 Policy Application OSD systems temporarily detain stormwater on a site, in order to limit the discharge leaving the property to a pre-determined rate ensuring that the development does not increase downstream flood discharges for storms up to the 100 year ARI event. OSD is applied as a condition of development consent by Council under the Environmental Planning and Assessment Act Any existing obligation to provide and maintain an OSD system will be found in the development consent applicable to the property or on the property title itself. In the case of a proposed development, the guidelines are given whether OSD will be necessary. OSD is not generally required on residential lots created by subdivision prior to 1991 when a common OSD policy was adopted by the four councils in the upper Parramatta River catchment. All lots created after 1991 have a requirement for OSD applied as a condition of development consent for the subdivision. The stormwater drainage system (including surface gradings, gutters, pipes, surface drains and overland flowpaths) for the property must: o be able to collectively convey all runoff to the OSD system in a 100-year ARI (1% AEP) event with a duration equal to the time of concentration of the site; and WSUD On-site Detention - xprafts 2013 Page 3

4 o ensure that the OSD storage is by-passed by all runoff from neighbouring properties and any part of the site not being directed to the OSD storage, for storms up to and including the 100-year ARI event. 3. xprafts General tab Impervious Area Sub-catchment Land Use and OSD Capture i. Land Use (in %) is classified into three groups: Roof, Road and Paved Areas. These three components percentage should be added up to 100%. ii. ODS Capture (%) is percentage of impervious areas that enter the OSD. Pervious Area Capture (%) Percentage of pervious areas that enter the OSD. Average Allotment Density (lots/ha) This is required mainly for the Rainwater Tank component of any OSD systems. Developed Area / Total Area Developed Area/Total Area is a ratio describing the area of controllable private land by OSD over the total sub-catchment area. For example the total sub-catchment has a large an urban area component, that requires the OSD, and also has 20% parkland and public road, that is not controlled by the OSD, then the ratio of Developed Area/Total Area would be 0.8. WSUD On-site Detention - xprafts 2013 Page 4

5 4. xprafts On-site Detention Unit Type of ODS system Two different types of On-Site Detention units are considered in xprafts as shown in the diagram in a typical side view below: (i) (ii) type either rectangular or circular, and type triangular which is more naturally ground based sloped ponds with the deepest part at the outlet. In addition the outlet orifices can be controlled by a High Early Discharge chamber (HED) or discharge proportionally to the driving head with direct outlets in the outlet wall. WSUD On-site Detention - xprafts 2013 Page 5

6 Extended Detention Storage The lower portion of the OSD storage, which detains stormwater in smaller, frequent storms up to the 1.5 year ARI event in order to reduce stormwater runoff closer to the rates under natural, pre-development conditions. This helps to minimise damage and disturbance to downstream watercourses and aquatic ecosystems. Flood Detention Storage The upper portion of the OSD storage that detains stormwater to prevent any increase in downstream flooding in moderate to major storms, e.g. 100 year ARI events. Water held in the Flood Detention storage drains away through both the primary and secondary orifice outlets. Site Storage Requirements (SSR) SSR T is total volume (in m 3 /ha or in m 3 as applied to a specific site) required for overall storage. The SSR for the OSD storage is partitioned into Extended Detention Storage (lower) and Flood Detention Storage (upper). The total SSR T for an OSD storage is 455 m 3 /ha in which the maximum SSR for the extended detention storage is 300 m 3 /ha. The SSR is only adjusted if a rainwater tank is included in the development/redevelopment and an airspace credit is claimed to partially offset the SSR. It is common for an Authority to nominate a minimum SSR requirement for an on-site detention unit within an individual allotment development. xprafts can, therefore, simulate an individual allotment with a node at the outlet point of every allotment or simulate the accumulative effects of a number of allotments within a single xprafts sub-catchment. The developed portion of the sub-catchment is the area enclosing all allotments that contain individual on-site units. For example if the sub-catchment contains parkland that will not include an on-site detention unit then the developed portion of the sub-catchment will be less than the total sub-catchment. Site Reference Discharge (SRD) The SRD for the primary (lower) orifice outlet (SRD L ) is 40 l/s/ha. The SRD for the secondary (upper) orifice outlet (SRD U ) in the DCP is 150 l/s/ha. This will need to be adjusted in accordance with the procedures when the entire site cannot be drained to the storage. Permissible Site Discharge (PSD) WSUD On-site Detention - xprafts 2013 Page 6

7 PSD is the maximum allowable discharge leaving the site in litres/sec/hectare (l/s/ha) or in litres/sec (l/s) when applied to a specific site. Refer also to Site Reference Discharge. Secondary Permissible Site Discharge This is the maximum permissible discharge (in l/s/ha) for an optional second discharge point from an On-Site Detention Unit at a higher elevation within the unit s outlet orifices. The reason for an optional second higher outlet point with different diameter is to allow the optimizing of units to meet downstream maximum peak flow requirements for two different flow frequencies. For example for a 5 year return period event only the lower outlet is required operating while both primary and secondary outlets operating is required for a 100 year flood flow. Note that by running simulations to limit the 5 year flow peak downstream to the pre-developed level it is possible to determine appropriate SSR and primary PSD. These runs will also provide the maximum water level in the detention unit. This level will then be used to set the height of the secondary outlet whereby its size can be adjusted to meet downstream maximum peak requirements in the 100 year return period event. It is also necessary to run a range of ARI storm durations to locate the one that produces the maximum water level in the detention unit. High Early Discharge (HED) HED is the method for ensuring that the discharge from a Discharge Control Pit (DCP) approaches the PSD soon after flow spills into the DCP. There are two options included in xprafts: HED on Primary and HED on Secondary Primary orifice outlet This is the lower orifice located at the base of the OSD storage. It controls the rate of release of runoff from the site in smaller, frequent storms when water only fills part of the (lower) Extended Detention portion of the OSD storage. Secondary orifice outlet Larger orifice located at the base of the Discharge Control Pit. Because it is much larger the secondary orifice controls the rate of release of runoff from the site in larger, rarer storms as water has filled the lower Extended Detention storage and starts to fill part of the upper Flood Detention storage. Base of Storage to Discharge Control Pit Invert (H1) It is a vertical measure (in meter) between the invert of Discharge Control Pit and the base of the OSD (see figure below). Height of Extended Detention Storage (EDS) (H2) This height is a vertical measure (in meter) between the invert of the OSD s lower outlet and the invert of Flood Detention Storage. Height to Spillway (H3) This height is a vertical measure (in meter) between the lower outlet invert and the spill level of the OSD spillway. This is a flag to indicate if a High Early Discharge (HED) pit is in operation. If it is then the maximum discharge rate is reached almost immediately after a relatively small volume inlet pit is filled prior to water discharging into the main OSD. If no HED is utilized the discharge rate for the outlet/s is progressively increased to the Permissible Site Discharge (PSD) at a stage equal to the Primary Height to Spill (LWHT). This will be equal to the invert of the secondary upper outlet if there is one. WSUD On-site Detention - xprafts 2013 Page 7

8 Infiltration Infiltration is the process by which water on the ground surface enters the soil. Infiltration rate is a measure of the rate at which the soil is able to absorb rainfall or irrigation in inches per hour or millimeters per hour. The rate at which the flow occurs is dependent on the properties of the material and the relative volume of voids (air spaces) it contains. The rate decreases as the soil becomes saturated. If the precipitation rate exceeds the infiltration rate, runoff will usually occur. Pond Infiltration xprafts provides for leakage from basins and reservoirs in addition to evaporation losses and conventional outflow. Three strata situations are presently covered, including (i) a Shallow Water Table, (ii) Deep Water Table and (iii) Clogged Surface Layer. The equations utilize the work of Bouwer (1978), Bear et al (1968) and Todd (1980) to define shallow water tables. The methods prescribed are similar to those utilized by Main Roads (Western Australia) PC SUMP(C) software. WSUD On-site Detention - xprafts 2013 Page 8

9 Basin Infiltration Rate Discharge through basin floor infiltration expressed (in m/hr): This value represents the hydraulic conductivity of the basin floor. Clogged layer Thickness of clogged layer (in meters): The infiltration rate (in m/hr) should now relate to this clogged layer. Water table Depth of water table below the invert of the basin (in meters): This option is only required if the 'Shallow water table' flag is turned ON. Shallow Water table Select this option to model a shallow water table at the given depth. If this flag is off then a deep water table is implied with no interaction with the infiltration flow. WSUD On-site Detention - xprafts 2013 Page 9

10 5. xprafts Rainwater Tank Prior to 2001 the rainwater tanks was not considered as part of an OSD facility due to the assumption that the tank would be full at the start of a major rainfall event. However, it has been argued that a rainwater tank would not always be full at the start of a storm if its water is used inside and outside the dwelling for non-potable purposes toilet flushing, laundry, hot water and garden watering. As part of the detailed analyses of the cumulative impacts on peak discharges undertaken in recent years the interaction of rainwater tanks and OSD tanks was investigated. Analyses were also undertaken of rainwater tanks including the airspace that varies in response to rainfall and water demands (internal and/or external). This led to a revision of the proportion of a rainwater tank which can be counted as part of the OSD storage. This credit reduces the SSR L and SSR T for an OSD system. The SSR is only adjusted if a rainwater tank is included in the development / redevelopment and an airspace credit is considered to partially offset the SSR. Available Air Space Volume This is the volume of allotment tank space between the orifice outlet and the spillway (in m 3 /lot). Available Water Space Volume WSUD On-site Detention - xprafts 2013 Page 10

11 This is the volume of allotment tank below the orifice outlet invert (in m 3 /lot). Note that rainwater tank data is only entered if the OSD designer is claiming an airspace credit against the required OSD storage volumes. Based on the analysis results reported by Cardno Willing (2004) the following reductions in the SSR values may be allowed subject to Council approval: 50% of the available air space can be credited against the required extended detention volume (SSR L ); 100% of the available air space can be credited against the required overall detention volume (SSR T ); subject to: a maximum Available Air Space Volume credit no greater than the ratio of the area of roof discharging to the rainwater tank to the lot area times the overall site storage volume that is required; the rainwater tank has an orifice outlet to ensure that the Available Air Space Volume is recovered after a storm event and the maintenance schedule specifically requires checking and cleaning of the outlet; the PSD for the rainwater tank orifice outlet is no greater than 40 l/s/ha; all outflows from the rainwater tank (outflows from the orifice outlet and overflows from the spillway) are discharged to the OSD storage. Roof Capture Percentage of Roof Capture draining to a rainwater tank, i.e. represents the percentage of allotment roof area directed into the rainwater tank. Volume of Initial Water/Total Volume of Water Storage at start Percentage of the initial water volume in Available Water Space Volume over the total rainwater tank at which top-up commences. Height of Outlet to Spill This is the height (in meter) between the invert of orifice outlet and the spillway. Spill Width/Developed Area This is the spillway width represented in terms of meter per area of sub-catchment (m/ha) times development ratio. WSUD On-site Detention - xprafts 2013 Page 11

Let Them Count An Argument for Inclusion of the Impact of. Household Rainwater Tanks When Designing an Urban Drainage. Network

Let Them Count An Argument for Inclusion of the Impact of. Household Rainwater Tanks When Designing an Urban Drainage. Network Let Them Count An Argument for Inclusion of the Impact of Household Rainwater Tanks When Designing an Urban Drainage Network L.Strauch* 1 *Presenting Author Household rainwater tanks are currently an optional

More information

PROJECT 23 STAGE 3: RETENTION AND DETENTION

PROJECT 23 STAGE 3: RETENTION AND DETENTION Supported By PROJECT 23 STAGE 3: RETENTION AND DETENTION Dr Brett C Phillips 2 Detention and Retention Work carried out by What is Detention and Retention Dr Brett C Phillips Dr Allan Goyen Dr Tina Fang

More information

Stormwater Management Practice Note NSC 07: Detention Tanks

Stormwater Management Practice Note NSC 07: Detention Tanks Stormwater Management Practice Note NSC 07: Detention Tanks This practice note has been developed to give general information on the minimum design requirements and maintenance of detention tanks for both

More information

Taking the pain out of the treatment train: continuous simulation modelling for integrated water management

Taking the pain out of the treatment train: continuous simulation modelling for integrated water management Engineers & Consultants Taking the pain out of the treatment train: continuous simulation modelling for integrated water management Stu Farrant & Reuben Ferguson, Morphum Environmental Limited Abstract

More information

RETENTION BASIN EXAMPLE

RETENTION BASIN EXAMPLE -7 Given: Total Tributary Area = 7.5 ac o Tributary Area within Existing R/W = 5.8 ac o Tributary Area, Impervious, Outside of R/W = 0.0 ac o Tributary Area, Pervious, Outside of R/W = 1.7 ac o Tributary

More information

Section 1 - Introduction

Section 1 - Introduction VERSION 1.0 Stormwater Solutions for Residential Sites Section 1 - Introduction Prepared for EcoWater Solutions A Department of Waitakere City Council 113 Central Park Drive Henderson WAITAKERE CITY November

More information

Insights from editing the ARR Urban Book. Peter J Coombes

Insights from editing the ARR Urban Book. Peter J Coombes Insights from editing the ARR Urban Book Peter J Coombes Motivation for revision of ARR Many practices and data in ARR 1987 are outdated More rainfall and streamflow data Improved understanding of climate

More information

The MASMA and Sustainable Drainage Systems

The MASMA and Sustainable Drainage Systems RLD 512 LANDSCAPE HYDROLOGY The MASMA and Sustainable Drainage Systems Dr Naser Ghani PhD, P.Eng, MIEM, MASCE, MACEM anaser@usm.my www.hbp.usm.my/naser ROOM 104 E49 MASMA The main focus of Urban Storm

More information

Masters Geelong Stormwater Management Plan

Masters Geelong Stormwater Management Plan ` Masters Geelong Job Number: CG111748 ABN 47 106 610 913 150 Oxford Street, Collingwood Victoria 3066 Australia Telephone: 03 8415 7777 Facsimile: 03 8415 7788 International: +61 3 8415 7777 victoria@cardno.com.au

More information

Planning Considerations for Stormwater Management in Alberta. R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013.

Planning Considerations for Stormwater Management in Alberta. R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013. Planning Considerations for Stormwater Management in Alberta R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013 Photo Optional Purpose The purpose of urban stormwater management is to provide solutions

More information

THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT

THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT THE GOVERNMENT OF MALAYSIA PRIME MINISTER S DEPARTMENT ECONOMIC PLANNING UNIT THE STUDY ON INTEGRATED URBAN DRAINAGE IMPROVEMENT FOR MELAKA AND SUNGAI PETANI IN MALAYSIA FINAL REPORT VOL. 5: TECHNICAL

More information

Stormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications

Stormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications Environmental Stormwater Attenuation Systems Sustainable Drainage Solutions for Domestic & Commercial Applications Sustainable, Reliable, Affordable Stormwater Attenuation Systems Sustainable Drainage

More information

Hydrology Study. Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated)

Hydrology Study. Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated) Hydrology Study Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated) Prepared for San Mateo Real Estate & Construction March 9, 21 Rev. 1 11-8-211 Rev.

More information

Stormwater design considerations

Stormwater design considerations Stormwater design considerations Manage the small and frequent rainfall events first Bill Till Supervising Engineer Urban Water Management Stormwater management information Decision Process for Stormwater

More information

Hydromodification Management Measures

Hydromodification Management Measures Chapter 7 Hydromodification Management Measures This Chapter summarizes the requirements for controlling erosive flows from development projects. 7.1 Why Require Hydromodification Management? Changes in

More information

Hydromodification Management Measures

Hydromodification Management Measures Chapter 7 Hydromodification Management Measures This Chapter summarizes the requirements for controlling erosive flows from development projects. 7.1 Why Require Hydromodification Management? Changes in

More information

The Process for Designing for Shallow Groundwater. and Small Rainfall Event Management in Urban. Developments

The Process for Designing for Shallow Groundwater. and Small Rainfall Event Management in Urban. Developments The Process for Designing for Shallow Groundwater and Small Rainfall Event Management in Urban Developments Bill Till* and Emma Monk *Presenting Author The Decision process for stormwater management in

More information

Appendix F. Flow Duration Basin Design Guidance

Appendix F. Flow Duration Basin Design Guidance Appendix F Flow Duration Basin Design Guidance Appendix F FINAL REPORT F:\SC46\SC46.31\HMP Mar 05\Appendices\Appendix F FLY_HMP.doc MARCH 2005 Appendix F Flow Duration Basin Design Guidance Prepared by

More information

Water sensitive urban design. Developing design objectives for urban development in South East Queensland

Water sensitive urban design. Developing design objectives for urban development in South East Queensland Water sensitive urban design Developing design objectives for urban development in South East Queensland Version 2-8 November 2007 Contents Contents......... ii Executive Summary............1 1 Introduction.........1

More information

3.11 Sand Filter Basin

3.11 Sand Filter Basin 3.11 Sand Filter Basin Type of BMP Priority Level Treatment Mechanisms Maximum Drainage Area Flow-Through Treatment Priority 3 Treatment Control BMP Filtration 25 acres Description The Sand Filter Basin

More information

Hydrologic Study Report for Single Lot Detention Basin Analysis

Hydrologic Study Report for Single Lot Detention Basin Analysis Hydrologic Study Report for Single Lot Detention Basin Analysis Prepared for: City of Vista, California August 18, 2006 Tory R. Walker, R.C.E. 45005 President W.O. 116-01 01/23/2007 Table of Contents Page

More information

Storm water Catchment Analysis

Storm water Catchment Analysis Storm water Catchment Analysis Analysis index 1. Storm water attenuation tank sizing method 2. Consent notices for storm water attenuation tanks 3. Summary of sub catchments 4. Hydrological Analysis for

More information

Summary of Detention Pond Calculation Canyon Estates American Canyon, California

Summary of Detention Pond Calculation Canyon Estates American Canyon, California July 15, 2015 Bellecci & Associates, Inc Summary of Detention Pond Calculation Canyon Estates American Canyon, California 1. Methodology: Method: Unit Hydrograph Software: Bentley Pond Pack Version 8i

More information

HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR

HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR HYDROLOGIC-HYDRAULIC STUDY ISABELLA OCEAN RESIDENCES ISLA VERDE, CAROLINA, PR 1 INTRODUCTION 1.1 Project Description and Location Isabella Ocean Residences is a residential development to be constructed

More information

Chapter 10 Infiltration Measures

Chapter 10 Infiltration Measures Chapter 10 Infiltration Measures Definition: A sub-surface water filtration system designed to allow water to infiltrate into surrounding soils. Purpose: To encourage stormwater to infiltrate into surrounding

More information

Preliminary Rainfall Runoff Management for Developments EA/Defra Report Procedure W5-074/A Summary Guidance for Developers and Engineers

Preliminary Rainfall Runoff Management for Developments EA/Defra Report Procedure W5-074/A Summary Guidance for Developers and Engineers Preliminary Rainfall Runoff Management for Developments EA/Defra Report Procedure W5-074/A Summary Guidance for Developers and Engineers 1. Objective of this guidance and Procedure W5-074/A is to assist

More information

Sizing Calculations and Design Considerations for LID Treatment Measures

Sizing Calculations and Design Considerations for LID Treatment Measures SCVURPPP C.3 Workshop December 18, 2012 Sizing Calculations and Design Considerations for LID Treatment Measures Jill Bicknell, P.E., EOA, Inc. Santa Clara Valley Urban Runoff Pollution Prevention Program

More information

The SuDS Manual Frequently asked questions

The SuDS Manual Frequently asked questions The SuDS Manual Frequently asked questions 1. Is source control still a requirement of the new SuDS Manual? Yes. Source control components are fundamental elements of a SuDS scheme. The benefits of source

More information

HANDBOOK ON DRAINAGE DESIGN GUIDELINES

HANDBOOK ON DRAINAGE DESIGN GUIDELINES HANDBOOK ON DRAINAGE DESIGN GUIDELINES December 2013 TABLE OF CONTENTS 1. Introduction... 1 2. Design Guidelines for On-site Stormwater Management... 2 2.1 Site Discharge Index... 2 2.2 General Principles...

More information

Example 1: Pond Design in a residential development (Water Quantity calculations for a Wet Pond and Wet Extended Detention Pond)

Example 1: Pond Design in a residential development (Water Quantity calculations for a Wet Pond and Wet Extended Detention Pond) Chapter 10 Design Examples Example 1: Pond Design in a residential development (Water Quantity calculations for a Wet Pond and Wet Extended Detention Pond) Example 2: Filter Design in a commercial development

More information

A framework for comprehensive stormwater management practices in eastern and southern Australia

A framework for comprehensive stormwater management practices in eastern and southern Australia A framework for comprehensive stormwater management practices in eastern and southern Australia John R Argue*, David Pezzaniti** and Guna Hewa *** *Adjunct Professor of Water Engineering ** Senior Research

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or any

More information

4.28 Underground Detention

4.28 Underground Detention 4.28 Underground Detention Detention Structural Stormwater Control Description: Detention storage located in underground tanks or vaults designed to provide water quantity control through detention and/or

More information

RAINWATER TANK OPTIONS FOR STORMWATER MANAGEMENT IN THE UPPER PARRAMATTA RIVER CATCHMENT

RAINWATER TANK OPTIONS FOR STORMWATER MANAGEMENT IN THE UPPER PARRAMATTA RIVER CATCHMENT RAINWATER TANK OPTIONS FOR STORMWATER MANAGEMENT IN THE UPPER PARRAMATTA RIVER CATCHMENT Peter J. Coombes 1, Andrew Frost 1, George Kuczera 1, Geoff O Loughlin 2 and Stephen Lees 3 1 Civil, Surveying and

More information

Rainwater Tanks for On-site Detention in Urban Developments in Western Sydney: An Overview

Rainwater Tanks for On-site Detention in Urban Developments in Western Sydney: An Overview Rainwater Tanks for On-site Detention in Urban Developments in Western Sydney: An Overview M van der Sterren 1, A Rahman 1, G Barker 2, G Ryan 2 and S Shrestha 1 1 School of Engineering, University of

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment

More information

San Francisco State University Site 1 Vegetated Infiltration Basin Monitoring Report: Rainy Seasons and

San Francisco State University Site 1 Vegetated Infiltration Basin Monitoring Report: Rainy Seasons and San Francisco State University Site 1 Vegetated Infiltration Basin Monitoring Report: Rainy Seasons 2011-12 and 2012-13 Project Overview San Francisco State University (SFSU) has implemented several green

More information

Integrated Catchment Modelling

Integrated Catchment Modelling Integrated Catchment Modelling Modelling the whole water cycle in one package Ann Pugh Integrated Water Planning Historically water, wastewater and stormwater modelling occurred in silos with little integration

More information

Drainage Servicing Report - Terms of Reference

Drainage Servicing Report - Terms of Reference Urban Form and Corporate Strategic Development City Planning 7th Floor, Edmonton Tower 10111 104 Avenue NW Edmonton, AB T5J 0J4 edmonton.ca July 2018 1 Introduction: Drainage Servicing Reports Drainage

More information

ROOF AND PROPERTY DRAINAGE

ROOF AND PROPERTY DRAINAGE CHAPTER 4 ROOF AND PROPERTY DRAINAGE 4.1 INTRODUCTION... 4-1 4.2 ROOF DRAINAGE SYSTEM... 4-1 4.3 ROOF DRAINAGE DESIGN PROCEDURE... 4-2 4.3.1 Catchment Area... 4-2 4.3.2 Design Average Recurrence Intervals...

More information

Paraprofessional Training Session 1

Paraprofessional Training Session 1 Paraprofessional Training Session 1 Part 2: Stormwater Basics November 26, 2012 Rutgers University, Cook Campus Christopher C. Obropta, Ph.D., P.E. Extension Specialist in Water Resources Associate Professor

More information

Learning objectives. Upon successful completion of this lecture, the participants will be able to describe:

Learning objectives. Upon successful completion of this lecture, the participants will be able to describe: Solomon Seyoum Learning objectives Upon successful completion of this lecture, the participants will be able to describe: The different approaches for estimating peak runoff for urban drainage network

More information

The Role of Pervious Paving in Meeting the Requirements of the Auckland Unitary Plan

The Role of Pervious Paving in Meeting the Requirements of the Auckland Unitary Plan The Role of Pervious Paving in Meeting the Requirements of the Auckland Unitary Plan Nick Vigar Waterways Planning Team Manager Auckland Council Healthy Waters Outline Stormwater management under the Air,

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or

More information

Rainwater Harvesting for Domestic Water Supply and Stormwater Mitigation

Rainwater Harvesting for Domestic Water Supply and Stormwater Mitigation Rainwater Harvesting for Domestic Water Supply and Stormwater Mitigation C Liaw 1, W Huang 2, Y Tsai 3, and, J Chen 4 1 President, Taiwan Rainwater Catchment Systems Association, Chliaw@ms41.hinet.net

More information

6.5 Extended Detention Basin

6.5 Extended Detention Basin 6.5 Extended Detention Basin Figure 6-22: Extended Detention Basin. Photograph courtesy of Bill Southard (DES Architects and Engineers) Best uses Detain low flows Can be expanded to detain peak flows Sedimentation

More information

Stormwater Management Report Bachman Terrace Residential Development

Stormwater Management Report Bachman Terrace Residential Development Stormwater Management Report Bachman Terrace Residential Development Project # 160401069 Prepared for: Tega Developments Prepared by: Stantec Consulting Ltd. April 14, 2014 Sign-off Sheet This document

More information

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff October 2003, Revised February 2005 Chapter 6.0, Runoff Page 1 6.1 Introduction 6.0 Runoff The timing, peak rates of discharge, and volume of stormwater runoff are the primary considerations in the design

More information

Nose Creek Watershed Partnership NOSE CREEK INTERNAL DRAINAGE AREAS STUDY FINAL REPORT MAY, 2013

Nose Creek Watershed Partnership NOSE CREEK INTERNAL DRAINAGE AREAS STUDY FINAL REPORT MAY, 2013 NOSE CREEK INTERNAL DRAINAGE AREAS STUDY FINAL REPORT MAY, 2013 NOSE CREEK WATERSHED PARTNERSHIP NOSE CREEK INTERNAL DRAINAGE AREAS STUDY Final Report (29123 001 00) May, 2013 Suite 260, East Atrium, 2635

More information

Water Balance Methodology

Water Balance Methodology Water Balance Methodology Integrating the Site with the Watershed and the Stream March 2012 An initiative under the umbrella of the Water Sustainability Action Plan for British Columbia Water Balance Methodology

More information

Stormwater Management Practice Notes. District Plan Change 22 (Decision Notice Version)

Stormwater Management Practice Notes. District Plan Change 22 (Decision Notice Version) Stormwater Management Practice Notes for District Plan Change 22 (Decision Notice Version) Stormwater Management Practice Notes List of Practice Notes Stormwater Management Practice Notes: NSC 01: Stormwater

More information

CENTRAL COAST POST-CONSTRUCTION REQUIREMENTS IMPLEMENTATION GUIDANCE SERIES 1

CENTRAL COAST POST-CONSTRUCTION REQUIREMENTS IMPLEMENTATION GUIDANCE SERIES 1 CENTRAL COAST POST-CONSTRUCTION REQUIREMENTS IMPLEMENTATION GUIDANCE SERIES 1 SERIES ISSUE #2: DECENTRALIZED STORMWATER MANAGEMENT TO COMPLY WITH RUNOFF RETENTION POST-CONSTRUCTION STORMWATER CONTROL REQUIREMENTS

More information

Sustainable Drainage Design Guidance

Sustainable Drainage Design Guidance Sustainable Drainage Design Guidance Contents Introduction 3 1. Legislative and Policy Background 4 2. What are Sustainable Drainage Systems? 5 3. Designing SuDS 7 4. Maintaining SuDS 9 5. Construction

More information

TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SPECIFICATIONS AND SCOPE 105.1

TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SPECIFICATIONS AND SCOPE 105.1 TABLE OF CONTENTS PART III - MINIMUM DESIGN STANDARDS Section 105 DRAINAGE SYSTEM DESIGN SECTION TITLE PAGE 105.1. SPECIFICATIONS AND SCOPE 105.1 105.2. METHODS OF ANALYSIS 105.1 105.2.1. Rational Method

More information

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management Husam Al-Najar Storm water management : Collection System Design principles The Objectives

More information

PART 3 STORM WATER TECHNICAL MANUAL

PART 3 STORM WATER TECHNICAL MANUAL PART 3 STORM WATER TECHNICAL MANUAL A. INTRODUCTION The Storm Water Technical Manual contains requirements for land development and construction activities, as well as design criteria and guidelines for

More information

CHAPTER 4 - EROSION & SEDIMENT CONTROL AND STORMWATER MANAGEMENT ORDINANCE OF DUBUQUE COUNTY, IOWA. Adopted March 29, 2010.

CHAPTER 4 - EROSION & SEDIMENT CONTROL AND STORMWATER MANAGEMENT ORDINANCE OF DUBUQUE COUNTY, IOWA. Adopted March 29, 2010. CHAPTER 4 - EROSION & SEDIMENT CONTROL AND STORMWATER MANAGEMENT ORDINANCE OF DUBUQUE COUNTY, IOWA Adopted March 29, 2010 Table of Contents Page Part 1 Introduction...3 4-1 Title..................3 4-2

More information

DIVISION 5 STORM DRAINAGE CRITERIA

DIVISION 5 STORM DRAINAGE CRITERIA DIVISION 5 STORM DRAINAGE CRITERIA Section 5.01 GENERAL The following storm drainage design criteria shall apply to all storm drainage designs in the City. Additional design criteria are specified in the

More information

Refer to Chapter 3.0 (Description of Development) for a detailed site and development description.

Refer to Chapter 3.0 (Description of Development) for a detailed site and development description. 7. WATER: HYDROGEOLOGY & HYDROLOGY 7.1 Introduction This chapter of the EIAR comprises of an assessment of the likely impact of the proposed development on the surrounding surface water and hydrogeological

More information

PRELIMINARY DRAINAGE STUDY

PRELIMINARY DRAINAGE STUDY PRELIMINARY DRAINAGE STUDY For 34 th & J Residences 3402 J St. San Diego, CA 92102 A.P.N 545-250-08 Prepared By: Kenneth J. Discenza, P.E. Site Design Associates, Inc. 1016 Broadway, Suite A El Cajon,

More information

WATER SENSITIVE URBAN DESIGN TECHNICAL DESIGN GUIDELINES FINAL

WATER SENSITIVE URBAN DESIGN TECHNICAL DESIGN GUIDELINES FINAL WATER SENSITIVE URBAN DESIGN TECHNICAL DESIGN GUIDELINES FINAL Prepared for the Northern Territory Department of Planning and Infrastructure GPO Box 2520 Darwin NT 0801 May 2009 This document has been

More information

CIE4491 Lecture. Quantifying stormwater flow Rational method

CIE4491 Lecture. Quantifying stormwater flow Rational method CIE4491 Lecture. Quantifying stormwater flow Rational method 27-5-2014 Marie-claire ten Veldhuis, Watermanagement Department Delft University of Technology Challenge the future Robust method stationary

More information

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall 6.0 Introduction This chapter summarizes methodology for determining rainfall and runoff information for the design of stormwater management facilities in the City. The methodology is based on the procedures

More information

Water Resources Management Plan

Water Resources Management Plan P L Y M O U T H M I N N E S O T A Appendix D: The developed a to analyze and minimize the impact of existing and future development on the City s natural resources. It is important to the City to have

More information

4.4.6 Underground Detention

4.4.6 Underground Detention 4.4.6 Underground Detention Limited Application Water Quality BMP Description: Detention storage located in underground pipe systems or vaults designed to provide water quantity control through detention

More information

Final Drainage Report

Final Drainage Report Thornton Electric Substation Project Final Drainage Report December 14, 2016 DRAFT Prepared for: Xcel Energy, 1800 Larimer Street, Suite 400, Denver, Colorado 80202 Prepared by: 350 Indiana Street, Suite

More information

Overview of Water Policy Challenges for Victoria. Dr Peter Coombes

Overview of Water Policy Challenges for Victoria. Dr Peter Coombes Overview of Water Policy Challenges for Victoria Dr Peter Coombes Insights from investigations into integrating urban drainage into water cycle management Working with Engineers Australia on this task

More information

Modelling and sizing evapotranspiration fields to manage urban. stormwater excess: reducing surface runoff volume

Modelling and sizing evapotranspiration fields to manage urban. stormwater excess: reducing surface runoff volume Modelling and sizing evapotranspiration fields to manage urban stormwater excess: reducing surface runoff volume Emma James* 1, Peter Breen 2, Sara Lloyd 3 and Courtney Henderson 4 *Presenting Author Surface

More information

Modelling a Combined Sewage and Stormwater Flood Detention Basin

Modelling a Combined Sewage and Stormwater Flood Detention Basin Modelling a Combined Sewage and Stormwater Flood Detention Basin A. Pugh B.E. (Hons), Member A.W.A. Sales and Support Manager, Wallingford Software Pty Ltd, Australia S. Ratcliffe B.Sc(Hons), Grad Dip

More information

Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts

Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts 1.0 INTRODUCTION The proposed hydromodification base strategy (Base Strategy)

More information

Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts

Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts Clean Water Services Design and Construction Standards Update: Base Strategy and Methodology to Address Hydromodification Impacts 1.0 INTRODUCTION The proposed hydromodification base strategy (Base Strategy)

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part 257.82 PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R. Part

More information

EXAMPLE Stormwater Management Plans w/ CSS BMP Sizing Calculator (v2.1)

EXAMPLE Stormwater Management Plans w/ CSS BMP Sizing Calculator (v2.1) 525 Golden Gate Avenue, 11th Floor San Francisco, CA 94102 EXAMPLE Stormwater Management Plans w/ CSS BMP Sizing Calculator (v2.1) The following example Stormwater Management Plans (SMPs) are provided

More information

Thinking about developing or building on land with ponding or drainage issues?

Thinking about developing or building on land with ponding or drainage issues? Thinking about developing or building on land with ponding or drainage issues? Much of the Kāpiti Coast is low-lying and subject to flooding, ponding or drainage issues. We need to pay careful attention

More information

A HYDROLOGY MODEL FOR MIMICKING PRE AND POST DEVELOPMENT RUNOFF VOLUMES

A HYDROLOGY MODEL FOR MIMICKING PRE AND POST DEVELOPMENT RUNOFF VOLUMES A HYDROLOGY MODEL FOR MIMICKING PRE AND POST DEVELOPMENT RUNOFF VOLUMES Mr. Randel Lemoine AUTHOR: Fort Benning, DPW Engineering Division, Meloy Dr. Bldg 6, RM 320-T, Fort Benning, Georgia, 315. REFERENCE:

More information

USING WSUD TO RESOLVE COMPETING OBJECTIVES: A CASE STUDY OF A SUSTAINABLE INDUSTRIAL DEVELOPMENT. Abstract

USING WSUD TO RESOLVE COMPETING OBJECTIVES: A CASE STUDY OF A SUSTAINABLE INDUSTRIAL DEVELOPMENT. Abstract USING WSUD TO RESOLVE COMPETING OBJECTIVES: A CASE STUDY OF A SUSTAINABLE INDUSTRIAL DEVELOPMENT R Wiese 1 M Brown 1,M Liebman 1 1 STORM_CONSULTING, rod@stormconsulting.com.au Abstract Located within the

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

Design of Stormwater Wetlands

Design of Stormwater Wetlands Hydraulic & Hydrologic Stormwater Engineering Design of Stormwater Wetlands Jon Hathaway, EI Extension Associate NCSU Bio. And Ag. Engineering 6 Step Process 1. Watershed Analysis (Runoff Volume and Peak

More information

Practices that capture and temporarily store the WQ v before allowing it to infiltrate into the soil.

Practices that capture and temporarily store the WQ v before allowing it to infiltrate into the soil. Chapter 5: Acceptable Stormwater Management Practices (SMPs) This section presents a list of practices that are acceptable for water quality treatment. The practices on this list are selected based on

More information

Detention Pond Design Considering Varying Design Storms. Receiving Water Effects of Water Pollutant Discharges

Detention Pond Design Considering Varying Design Storms. Receiving Water Effects of Water Pollutant Discharges Detention Pond Design Considering Varying Design Storms Land Development Results in Increased Peak Flow Rates and Runoff Volumes Developed area Robert Pitt Department of Civil, Construction and Environmental

More information

The discharge shall include stormwater generated during the construction phase of the subdivision.

The discharge shall include stormwater generated during the construction phase of the subdivision. Limits The discharge shall be only stormwater generated from: (a) Roofs, roads, hardstand areas, and pervious areas; and (b) Exposed areas during construction (optional); associated with the proposed [residential

More information

Dawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA (706) x 42228

Dawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA (706) x 42228 Dawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA 30534 (706) 344-3500 x 42228 DAWSON COUNTY STORM WATER REVIEW CHECKLIST Project Name: Property Address: Engineer: Fax #/Email: Date:

More information

BMP #: Infiltration Basin

BMP #: Infiltration Basin Structural BMP Criteria BMP #: Infiltration Basin An Infiltration Basin is a shallow impoundment that stores and infiltrates runoff over a level, subtle, uncompacted, (preferably undisturbed area) with

More information

a single source, fully warranted waterproofing and sustainable drainage solution

a single source, fully warranted waterproofing and sustainable drainage solution a single source, fully warranted waterproofing and sustainable drainage solution About Alumasc Alumasc Exterior Building Products Ltd (Alumasc) provides single-source products and systems for building

More information

Tutorial 1 - An Overview of xprafts

Tutorial 1 - An Overview of xprafts Tutorial 1 - An Overview of xprafts xp rafts is a comprehensive software program to simulate runoff hydrographs at defined points throughout a watershed based on a set of catchment characteristics and

More information

3.3 Acceptable Downstream Conditions

3.3 Acceptable Downstream Conditions iswm TM Criteria Manual - = Not typically used or able to meet design criterion. 1 = The application and performance of proprietary commercial devices and systems must be provided by the manufacturer and

More information

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS 1500.01 GENERAL REQUIREMENTS 1500.02 NATURE OF STORM WATER FACILITIES 1500.03 DRAINAGE EASEMENTS 1500.04 STORM WATER MANAGEMENT

More information

EXTENDED DETENTION BASIN EXAMPLE

EXTENDED DETENTION BASIN EXAMPLE EXTENDED DETENTION BASIN EXAMPLE 1117 6 July 2015 REFERENCE SECTION 1117 Given: TotalTributaryArea=7.5 o TributaryAreawithinExistingR/W=7.2 o TributaryArea,Impervious,OutsideofR/W=0.3 o TributaryArea,Pervious,OutsideofR/W=0.0

More information

INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR

INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR 257.82 EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R. Part 257 and Part

More information

Storm Water Management

Storm Water Management Storm Water Management Policy September 2014 2 Sustainable drainage feature designed to control and manage flows through a series of check dams 3 Document Name: Storm Water Management Controlled Copy No:

More information

E. STORMWATER MANAGEMENT

E. STORMWATER MANAGEMENT E. STORMWATER MANAGEMENT 1. Existing Conditions The Project Site is located within the Lower Hudson Watershed. According to the New York State Department of Environmental Conservation (NYSDEC), Lower Hudson

More information

2. DEFINITIONS. American Association of State Highway and Transportation Officials.

2. DEFINITIONS. American Association of State Highway and Transportation Officials. 2. DEFINITIONS 2.010 Definitions [See Amendment 2] In addition to words and terms that may be defined elsewhere in this manual, the following words and terms shall have the meanings defined below: AASHTO:

More information

Learning objectives. Upon successful completion of this lecture, the participants will be able to:

Learning objectives. Upon successful completion of this lecture, the participants will be able to: Solomon Seyoum Learning objectives Upon successful completion of this lecture, the participants will be able to: Describe and perform the required step for designing sewer system networks Outline Design

More information

Redevelopment Introduction

Redevelopment Introduction Redevelopment 11 11.1 Introduction Design standards for new development sites have been established in previous chapters of this document. Redevelopment sites, however, often present unique challenges

More information

OSD PANACEA OR PROBLEM?? Drew Bewsher, BE(Hons), MS(Civil), FIE Aust, CPEng Director, Bewsher Consulting Pty Ltd

OSD PANACEA OR PROBLEM?? Drew Bewsher, BE(Hons), MS(Civil), FIE Aust, CPEng Director, Bewsher Consulting Pty Ltd OSD PANACEA OR PROBLEM?? Drew Bewsher, BE(Hons), MS(Civil), FIE Aust, CPEng Director, Bewsher Consulting Pty Ltd Summary On-site stormwater detention (OSD) policies have been widely implemented by local

More information

Nuriootpa (Sturt Highway Service Centre) DPA The Barossa Council Appendices. Appendix C - Herriot Consulting Engineering Assessment

Nuriootpa (Sturt Highway Service Centre) DPA The Barossa Council Appendices. Appendix C - Herriot Consulting Engineering Assessment Nuriootpa (Sturt Highway Service Centre) DPA The Barossa Council Appendices Appendix C - Herriot Consulting Engineering Assessment 4th May 2018 C1803-002 Rocland Estate Lot 147 Sturt Highway, Nuriootpa

More information

Extended Detention Basin Design

Extended Detention Basin Design Extended Detention Basin Design 1 Extended Detention 2 Ohio Department of Transportation 1 Extended Detention Basin L&D Vol. 2 Section 1117.3 Provides quality and quantity treatment 3 Extended Detention

More information

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas.

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. July 2007 Update to Design Bulletin #16/2003: Added under Design Criteria Culverts of 600mm diameter are commonly used to

More information

Ballard Phase I/Retrofit Supplemental Monitoring Plan

Ballard Phase I/Retrofit Supplemental Monitoring Plan MEMORANDUM Ballard Phase I/Retrofit Supplemental Monitoring Plan PREPARED FOR: Seattle Public Utilities PREPARED BY: CH2M HILL DATE: August 17, 2012 Introduction This memo summarizes the plans for and

More information

100-yr Design Runoff (cfs) Basin ID 103b A a B B C Totals

100-yr Design Runoff (cfs) Basin ID 103b A a B B C Totals PROPOSED DEVELOPMENT The drainage for this site has been designed to be less than the maximum allowable runoff from each basin as stated in the Overall Rigden Farm drainage plan. Table 1 compares the actual

More information