1 Environmental Monitoring Report # Semiannual Report January-June 2016 INO: West Kalimantan Power Grid Strengthening Project Prepared by Joint Venture of Tractebel Engineering Ltd and Powergrid International Limited (Thailand) for the PT PLN and the Asian Development Bank.

2 CURRENCY EQUIVALENTS (as of 30 June 2016) Currency unit Indonesian rupiah (Rp) Rp1.00 = $ $1.00 = Rp13,131 (i) NOTE In this report, "$" refers to US dollars. This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

3 Environmental Monitoring Report Semi Annual / Semestral Report January June 2016 Indonesia: Project Implementation Strengthening of West Kalimantan Power Grid Prepared by PT PLN (Persero) for the Republic of Indonesia and the Asian Development Bank Page a of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

4 ABBREVIATIONS ADB - Asian Development Bank AFD Agence Française de Développment AMDAL - analisis mengenai dampak lingkungan (environmental assessment under Indonesian Government requirements) BAPEDAL - Environmental Impact Management Agency (Government of Indonesia) BAPPEDA - Badan Perencanaan Pembangunan Daerah (Regional Planning Agency) EMP - environmental management plan GI - gardu induk (substation) HVTL - high voltage transmission line HIV/ AIDS - human immunodeficiency virus/ acquired immunodeficiency syndrome IEE - initial environmental examination (ADB terminology) No - Number OPGW - optical ground wire or optical fiber composite overhead ground wire OSH - occupational safety and health PIC - project implementation consultant PLN - PT Perusahaan Listrik Negara (Persero) (State Electricity Company) PT - perusahaan terbatas (company limited) RKL - rencana pengelolaan lingkungan or environmental management plan SMCF - steel mortar composite foundations ROW - right of way SUTT - saluran udara tegangan tinggi or high voltage transmission line SUTET - saluran udara tegangan ekstra tinggi or extra high voltage transmission line TE - Tractebel Engineering T. - tower UKL - UPL - upaya pengelolaan lingkungan and upaya pemantauan lingkungan or environmental management and monitoring effort UPK - PT PLN (Persero) Unit Pelaksana Kerja 5 is the old name of PLN UPP of Kalbagbar 3 UPP : PT PLN (Persero) Unit Pelaksana Proyek KALBAGBAR 3 (Kalimantan Bagian Barat 3) or PLN Project Implementation Unit of West Kalimantan 3. UIP - PT PLN (Persero) Unit Induk Pembangunan (UIP) X is the old name of PLN UIP Kalimantan Bagian Barat (PLN Principal Project of West Kalimantan) ha - hectare km - kilometer kv - kilovolt m - meter MVA - mega volt ampere WEIGHTS AND MEASURES Page i of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

5 NOTE This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Page ii of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

6 Table of Contents 1. INTRODUCTION Summary of Construction Progress of Package 1: 275 kv Bengkayang Jagoibabang Transmission Line Summary of Construction Progress of Package 2: 275/150 kv Bengkayang Substation Summary of Construction Progress of Package 3: 150 kv Bengkayang Ngabang Tayan Transmission Lines Summary of Construction Progress of Package 4: 150/20 kv Ngabang Substation and Tayan Substation Extension SUMMARY OF ENVIRONMENTAL PROGRESS Summary Environmental Progress of Package 1: 275 kv Bengkayang Jagoibabang Transmission Line Summary Environmental Progress of Package 2: 275/150 kv Bengkayang Substation Summary Environmental Progress of Package 3: 150 kv Bengkayang - Ngabang Tayan Transmission Lines Summary Environmental Progress of Package 4: 150/20 kv Ngabang and Tayan substations ENVIRONMENTAL MITIGATIONS AND LAND ACQUISITION IMPLEMENTED Environmental Mitigations Land Acquisition SUMMARY OF ENVIRONMENTAL COMPLIANCE MONITORING Summary of Inspection Activities Mitigation Compliance Mitigation Effectiveness KEY ENVIRONMENTAL ISSUES Environmental key Issues Identified Action to be taken CONCLUSION Overall Progress of Implementation of Environmental Management Measures Problems Identified and Actions Recommended Revised EMP APPENDICES A-1. SITE INSPECTION / MONITORING REPORTS Page iii of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

7 A-1.1. Summary of Construction Progress, Environmental performance A Summary of Construction Progress, Environmental performance of 275 kv Bengkayang Jagoibabang Transmission Line A Summary of Environmental Performance of 275/150 kv Bengkayang substation A Summary of Construction Progress, Environmental performance of 150 kv Bengkayang Ngabang Tayan Transmission Line A Summary of Environmental Performance of 150 kv Ngabang and Tayan Substations 38 A-1.2. Mitigation Compliance Inspection Monitoring () A Site Environmental Compliance Inspection and Monitoring of Package A Site Environmental Compliance Inspection and Monitoring of Package A Site Environmental Compliance Inspection and Monitoring of Package A Site Environmental Compliance Inspection and Monitoring of Package A-2. PHOTOGRAPHS A-2.1. Package 1: 275 kv Bengkayang Jagoibabang Transmission lines A-2.2. Package 2: Bengkayang Substation A-2.3. Package 3: 150 kv Bengkayang- Ngabang-Tayan transmission line: A-2.4. Package 4: 150/20 kv Ngabang and Tayan substations A-3. CONTRACTUAL ENVIRONMENTAL REQUIREMENTS OF EACH PACKAGE A-3.1. PACKAGE 1: 275 KV BENGKAYANG JAGOIBABANG TRANSMISSION LINE () A-3.2. PACKAGE 2: 275/150 KV BENGKAYANG SUBSTATION () A-3.3. PACKAGE 3: 150 KV BENGKAYANG NGABANG TAYAN TRANSMISSION LINE () A-3.4. PACKAGE 4: 150/20 KV SUBSTATION AT NGABANG AND TAYAN () A-4. LIST OF SUBMITTED ENVIRONMENTAL REPORTS A-5. STATUS OF THE TOWER CHANGES AND ENVIRONMENTAL REVIEW List of Maps Map 1. Project location on the Map of Indonesia. 2 Map 2. The map of West Kalimantan Power Grid Strengthening Project List of Tables Table 1. Summary of land acquisition/compensation status of 275 kv Bengkayang Jagoibabang Transmission Line Table 2. Summary of land acquisition/compensation status of 150 kv Bengkayang Ngabang Tayan Transmission Line and Substations Page iv of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

8 1. INTRODUCTION In accordance with ADB s Project Administration Manual of July 2013 for the West Kalimantan Power Grid Strengthening Project, Article IX, B. Monitoring, item 86. Safeguards monitoring (Environment), (vi) reports on the implementation of the environmental mitigating measures and the environmental management and monitoring plans specified in the IEE and EMP are submitted to ADB on an semi-annual basis. This report also corresponds with the IEE, Appendix F Sample Mitigation Compliance Inspection Monitoring Form, and Appendix G Sample Project Environmental Progress and Monitoring Report. PT PLN (Persero) has assigned the Joint Venture of Tractebel Engineering Ltd. and Power Grid International Limited (Thailand), Contract No PJ/041/DIR/2013 of 30th July, 2013, to carry out the monitoring of the project works. The project comprises of design, supply, installation, testing, and commissioning of the works as follows: a) Package 1: 275 kv Transmission Line between Bengkayang substation and the border with Sarawak, East Malaysia (80.26 km). b) Package 2: 275/150 kv Substation at Bengkayang. c) Package 3: 150 kv Transmission Line from Bengkayang substation to the new Ngabang substation (93.34 km), and from there to the existing Tayan substation (46.64 km). d) Package 4: 150/20 kv Substation at Ngabang and Tayan Substation extension. The location of the project is presented on Map 1 and the West Kalimantan Power Grid Strengthening Project is presented on Map 2. The monitoring of the environmental works is carried out for all four packages of the works as mentioned above. Compared to the original schedule mentioned in IEE, there are some route changes due to the relocation of the planned sites for 275/150/20 kv Bengkayang substation and 150/20 kv Ngabang substation. The status report concerning the route changes is presented in Appendix According to the original plan the 275 kv Bengkayang Jagoibabang Transmission Line (Sarawak border) comprised of 199 towers (Tower No 1 in Bengkayang to Tower No. 199 in Jagoibabang). Six towers from No. 1 to 6 had been eliminated, and 4 towers had been added. Moreover, there are an additional 4 intermediate/insertion towers required thus in total there are 201 towers. 2. According to the original plan, 150 kv Bengkayang - Ngabang and 150 kv Tayan - Ngabang transmission line routes comprise of 393 towers (260 towers and 133 towers respectively). There are several modifications to the total number of towers for the Bengkayang Ngabang and Tayan - Ngabang transmission lines to increase to 408 towers (280 towers and 128 towers respectively) as follows: a) Bengkayang Ngabang route The shifting of 275/150 kv Bengkayang Substation to north-eastern direction resulted in the elimination of 3 towers and addition of 7 new towers. Due to site relocation of 150/20 kv Ngabang Substation to south of Ngabang and thus closer to Tayan direction, a number of towers will be relocated and added: Relocation: 7 towers (T.253 up to T.259) Addition: o 3 additional towers (T.260 up to T.262) to connect with the former Ngabang - Tayan route at tower T.128 Page 1 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

9 o o 13 additional towers as relocated towers from former Ngabang - Tayan route of towers T. 128 up to T additional towers to connect with tower T.116 of former Tayan Ngabang route with the (New) Ngabang substation. There are two towers (T.157 and T.159) to be eliminated due to span condition and one additionally inserted tower (T.24A). b) Ngabang Tayan route The Tayan - Ngabang route has been modified as follows: 5 eliminated towers of former Ngabang - Tayan route at towers T.129 up to T.133, because the Bengkayang Ngabang route will be connected with T eliminated towers which formerly belonged to the Ngabang - Tayan route from towers T. 128 up to T.116 but are now part of the Bengkayang - Ngabang route. Two additional towers (T.114B and T.114C) are required to connect with the remaining planned towers from Tayan direction. The original tower T.115 will be shifted from previous planned location (the number will become T.114A). 9 towers are required to connect to Tayan substation which had been shifted about 2.5 km southward during the planning of 150 kv Tayan-Siantan (Pontianak) transmission line. This route has not been mentioned in the original tower schedule of 150 kv Tayan- Ngabang transmission line. Two additional towers as insert tower at T.04A and T.73A Thereby the Bengkayang Ngabang Tayan transmission lines will comprise of about 408 towers, i.e. 280 towers for the Bengkayang Ngabang section and at least 128 towers for the Tayan - Ngabang section. Detailed information concerning environmental review on relocation of the substations and towers is elaborated in detail in Appendix 5. Map 1. Project location on the Map of Indonesia Page 2 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

10 Map 2. The map of West Kalimantan Power Grid Strengthening Project The summary of project works implementation progress up to the end of June 2016 was as follows: 1.1. Summary of Construction Progress of Package 1: 275 kv Bengkayang Jagoibabang Transmission Line. There are 201 planned towers to be constructed for the km transmission line. The following is the progress of the works up to end of June No Type of works Progress of works 1 Tower foundations a Soil works Up to the end of December 2015: Excavation of all 201 tower sites had been completed. This semester: All soil works were completed during previous semester. b Concrete works Up to the end of December 2015: Construction of all 201 tower sites had been completed. This semester: All concrete works were completed during previous semester. 2 Tower erection Up to the end of December 2015: All 201 towers had been erected. This semester: All erection works were completed during previous semester. 3 Stringing Up to the end of December 2015: The stringing works were completed for the first circuit of all 200 spans, i.e. T.A up to T199 where it is connected with the Sarawak transmission line up to Mambong substation. While the stringing of the remaining four sections (99 spans) of second circuit were in progress. Page 3 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

11 No Type of works Progress of works This semester: During this semester, the stringing of the remaining 99 spans of the second circuit (i.e. T.16 up to T.66; T.134 up to T.181) and the lowest conductor of circuit 2 of section T T.134 were completed in March Summary of Construction Progress of Package 2: 275/150 kv Bengkayang Substation The area of 275/150 kv Bengkayang Substation is being developed adjacent to another PLN project (150 kv substation to Singkawang and 150/20 kv to Bengkayang) which was started earlier but its progress of works was very slow. On temporary basis, the 150 kv transmission line Bengkayang Singkawang utilises the bay of 150 kv Bengkayang - Ngabang transmission line to deliver/evacuate the power to Singkawang. The progress of construction of the 275/150 kv Bengkayang Substation is as follows: No Type of works Progress of works 1 Civil works a Cut and fill B Concrete works 2 Electro-Mechanical works Up to the end of December 2015: Cut and fill works have been completed, leaving insignificant excavation soil to be flattened in adjacent with the south and north retaining wall Up to the end of June 2016: No activity. Up to the end of December 2015: All of the concrete works have been completed. Up to the end of June 2016: Minor activities throughout this period. The village road which is used as access road to Bengkayang substation was covered with compacted gravel and the open drainage channel was completed on one side of the road. The asphalting works for substation access road was completed. The oil pit is still not completed. a Mechanical (Metal) works Up to the end of December 2015: The inner fence in the surrounding area of 150 kv and 275 kv switchyards have been completed. The outer fence of the substation remained to be constructed. Up to the end of June 2016: The installation of the outer fence of the substation was about 90% completed. b Electrical works Up to the end of December 2015: All equipment of 150 kv and 275 kv switchyard area have been installed. Commissioning and testing for individual equipment and system have completed. Except for reactor, the energizing of all 275 and 150 kv switchyard equipment was conducted on 30th December Up to the end of June 2016: Energizing of circuit 1 of 275 kv Mambong-Bengkayang Transmission Line was done on 20 January 2016 and power was evacuated to Singkawang 150 kv substation. The second circuit of the transmission line and associated substation equipment was energised on 19 May Summary of Construction Progress of Package 3: 150 kv Bengkayang Ngabang Tayan Transmission Lines Page 4 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

12 Package 3 comprises of the two sections Bengkayang Ngabang and Ngabang Tayan transmission lines. Due to addition, relocation, inserting and elimination of towers as described in the introduction above, in total about 408 towers are required which comprise as follows: Original plan of Bengkayang-Ngabang transmission lines with 260 towers had to be adjusted to 280 towers. Original plan of Ngabang-Tayan transmission lines with 133 towers was reduced to 128 towers. During this semester, the contractor for package 3 had completed the foundations for 21 tower sites and 93 towers have been erected, bringing the total completed works up to the end of June 2016 to 351 finished tower foundations and 343 erected towers respectively. The summary of the progress for each section is as follows: No Type of works Progress of works I Bengkayang Ngabang Transmission Line route 1 Tower foundations a Soil works b Concrete works Up to the end of December 2015: Excavation for 235 tower sites of which all of them had been completed. This semester: Excavation was conducted on 8 tower sites of which all of were completed bringing the total to 243 sites completed up to the end of June Up to the end of December 2015: Foundations construction for 235 tower sites activities of which all of them had been completed. This semester: Construction conducted on 8 tower sites of which all were completed bringing the total to 243 sites completed up to the end of June Tower erection Up to the end of December 2015: Erection activities for 192 towers of which all of them had been erected. This semester: Erection conducted on 48 tower sites of which all were erected bringing the total to 240 tower sites completed at the end of June Stringing Not started yet II Ngabang Tayan Transmission Line route 1 Tower foundations a Soil works b Concrete works Up to the end of December 2015: Excavation was conducted on 72 tower sites of which 61 tower sites were completed bringing the total to 95 tower sites completed. This semester: Excavation was conducted on 14 tower sites of which 13 tower sites were completed bringing the total to 108 tower sites completed up to the end of June Up to the end of December 2015: Construction of foundations conducted on 72 tower sites of which 61 tower sites were completed bringing the total to 95 tower sites completed. This semester: Construction conducted on 14 tower sites of which 13 tower sites were completed bringing the total to 108 tower sites completed up to the end of June Tower erection Up to the end of December 2015: Erection activities conducted on 28 tower sites of which 26 tower sites were Page 5 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

13 No Type of works Progress of works completed bringing the total to 58 tower sites had been erected. This semester: Erection conducted on 46 tower sites of which 45 tower sites were completed bringing the total to 103 tower sites completed at the end of June Stringing Not started yet 1.4. Summary of Construction Progress of Package 4: 150/20 kv Ngabang Substation and Tayan Substation Extension The construction progress of package 4 is as follows: No Type of works Progress of works I 150/20 kv Ngabang Substation 1 Civil works a Cut and fill b Main civil and infrastructure works 2 Electro-Mechanical works a Mechanical (Metal) works b Electrical works II 150/20 kv Tayan Substation 1 Civil works The land preparation for the substation area had been completed in April Up to the end of December 2015: Construction of cable duct has been finished. The finishing work of control building and guard booth was on progress. Retaining walls at right side and at rear border were on progress Up to the end of June 2016: There were several civil works being conducted i.e. concreting of oil pit, septic tank and water tank concrete column and finishing of control building respectively. The works for the retaining walls at right side and rear border area were almost completed. Up to the end of December 2015: No other works other as reported previously. Up to the end of June 2016: No mechanical works during this period. Up to the end of December 2015: Oil filling of 150/20 kv transformer was completed. Installing control panel in the control building was completed, the testing and commissioning remained to be done. Up to the end of June 2016: No electrical works were conducted during this quarter. Individual testing and commissioning is planned for mid-july a Cut and fill b Main civil and infrastructure works The land preparation for the substation area was completed at the end of Up to the end of December 2015: Except related with inner fence, no civil works activity during this semester Up to the end of June 2016: Installation of the inner fence was completed, the gravel in the surrounding equipment was deployed. Civil masonry concerning drainage and finishing of concrete grouting of equipment pads was completed. Access road to substation was completed. Page 6 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

14 No Type of works Progress of works 2 Electro-Mechanical works a Mechanical (Metal) works b Electrical works Up to the end of December 2015: No mechanical work activity during this semester, Inner fence has been installed. Up to the end of June Mechanical works were completed. Up to the end of December 2015: All 150 kv circuit breakers, current- and voltage transformers, disconnecting switches and lightning arresters had been installed. Cable installation and conductor stringing were in progress. Up to the end of June 2016: Electrical works completed except for switchyard and access road lighting. 2. SUMMARY OF ENVIRONMENTAL PROGRESS The environmental works implementation progress at the end of June 2016 is as follows: 2.1. Summary Environmental Progress of Package 1: 275 kv Bengkayang Jagoibabang Transmission Line The foundation construction activities may generate impact on the surrounding environment by Vegetation clearing; Soil erosion; Drainage; Water quality; Air quality; Construction waste; Domestic waste; Roads and infrastructure; Community health and safety and Employment opportunities. The tower erection activities may generate impact on the surrounding environment by Domestic waste; Roads and infrastructure; Community health and safety and Employment opportunities. The stringing activities may generate impact on the surrounding environment by Vegetation clearing; Domestic waste; Roads and infrastructure; Community health and safety and Employment opportunities. Up to the end of December 2015, all foundation construction activities and tower erection works were completed for the 201 tower locations. The stringing of conductors and OPGW was completed for all 200 spans of first circuit and connected with the Sarawak transmission line up to Mambong substation. The stringing of the remaining four sections of the second circuit (99 spans) were in progress. During the period under review (January - June 2016), the stringing of the remaining 99 spans of the second circuit were completed i.e. T.16 up to T.66; T.134 up to T.181, and the lowest conductor of circuit 2 of section T T.134 thus completing the stringing works for both circuits of all 200 spans. Energizing of circuit 1 of 275 kv Mambong-Bengkayang Transmission Line was done on 20 January 2016 and power was evacuated to Singkawang 150 kv substation. The second circuit was energised on 19 May The environmental monitoring review of Package 1 at end of June 2016 is as follows: No Environment Impact / Concern Mitigation Implementation progress 1 Land Compensation All 201 sites have been compensated. 2 Vegetation clearing Good progress for all towers span location. - Note For tower sites, vegetation clearing were conducted prior to civil works being initiated. Page 7 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

15 No Environment Impact / Concern Mitigation Implementation progress 3 Soil erosion Fair to good. Most towers location have been naturally covered with grass and shrub Note For stringing the vegetation clearing were conducted along the ROW for trees exceeding 3 m in height. Towers located in the slope area to be protected with simple civil works i.e. levelling the site to reduce runoff and smoothing the slope. But for 7 tower sites special slope protection is required to stop soil erosion and avoid landslides. 4 Drainage Fair No need of special drainage. 5 Water quality Fair Simple measures. Insignificant due to micro scale and scattered areas. 6 Air quality Fair to good Few machinery causing air pollution were used. Insignificant due to micro scale and scattered areas. 7 Construction waste Fair Removal of remaining construction waste such as plastic, hemp sack remained to be done in some locations. 8 Domestic waste Fair Removal of domestic waste remained to be done in some locations. Mostly small plastic of food wraps. 9 Roads and infrastructure 10 Community health and safety 11 Employment opportunities Good Fair to good Fair to good No impact. Most concern on feeding materials for tower foundation and tower erection. See: Occupational Safety and Health report. Local people were hired for transporting the material from roadside to tower locations in most locations and also as subcontractor at selected tower sites Summary Environmental Progress of Package 2: 275/150 kv Bengkayang Substation The construction activity of Bengkayang substation is conducted in an area of about 6.6 ha which is separated from the local community activities. The interaction point of the project with the local communities is the access road of 400 m length which is being shared between project access and the local communities to go to their homes, school, and farming area. The concern from the environmental point of view is the mobilization of material and equipment which causes damage to the road. Up to the end of December 2015 cut and fill works were completed, leaving insignificant areas of excavation soil to be flattened. All concrete works were completed. Retaining walls for all areas were completed. The inner fence was installed, the outer fence remained to be done. All equipment of 150 kv and 275 kv switchyard area have been installed. Commissioning and testing for individual equipment and system were completed. On 30 Page 8 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

16 December 2015 the substation was energised via the 150 kv Singkawang Bengkayang transmission line to test the equipment in the control room and switchyard area. In this semester (January - June 2016): Circuit 1 of 275 kv Mambong-Bengkayang Transmission Line was energised on 20 January 2016 and power was evacuated to Singkawang 150 kv substation. The second circuit of the 275 kv transmission line and associated substation equipment was energised on 19 May Part of West Kalimantan (Bengkayang, Singkawang, Sambas etc.) enjoy the electric energy transferred by this substation, the transmission lines and the connection to existing distribution lines in Bengkayang District. Several supporting and maintenance activities in the Bengkayang substation have been completed and some were still on going. The village road used as access road to substation was covered with compacted gravel and the open drainage channel was completed on one side of the road. The asphalting works for substation access road was completed. The oil pit is still not completed. The installation of the outer fence of the substation was about 90% completed. The environmental works implementation progress of Package 2 is as follows: No Environment Impact/ Concern 1 Land Compensation Completed Mitigation Implementation progress Note 2 Soil erosion Good Construction of retaining wall for all areas have been completed. Pavement for parking area have been finished. Switchyard areas have been covered with gravel.. 3 Drainage Good Using the main drainage. 4 Water quality Good 5 Air quality Fair Few machinery causing air pollution were used. 6 Construction waste Fair to good 7 Domestic waste Fair to good 8 Roads and infrastructure 9 Community health and safety 10 Employment opportunities Fair Fair Fair to good 400 m access road shared with local people; the road which previously was damaged by transport of material, equipment and machinery has been improved with compacted gravel. No special concern observed. See: Occupational Safety and Health report. Local contractor as subcontractors and local people as labour were hired Summary Environmental Progress of Package 3: 150 kv Bengkayang - Ngabang Tayan Transmission Lines The foundation construction activities could generate impact on Vegetation clearing; Soil erosion; Drainage; Water quality; Air quality; Construction waste; Domestic waste; Roads Page 9 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

17 and infrastructure; Community health and safety and Employment opportunities. The tower erection activities could generate impact on Domestic waste; Roads and infrastructure; Community health and safety and Employment opportunities. Up to the end of December 2015, 330 foundations had been completed and 250 towers had been erected. During this semester (January - June 2016), there were activities for construction of foundations at 23 locations with completed foundations for 21 towers resulting in 351 completed foundations up to end of June 2016, and at two tower location works were in progress. There were tower erection activities at 94 locations with erected towers for 93 locations resulting in 343 erected towers. The environmental monitoring review of Package 3 is as follows: No Environment Impact / Concern Mitigation Implementation progress Note I Bengkayang Ngabang Transmission Line route 1 Land Compensation End of June 2016: 259 locations of 280 planned locations have been compensated. 2 Vegetation clearing Good progress for tower location but not yet started for the ROW. See social report for details. Two eliminated tower sites are included among the 259 compensated locations. So if they are calculated then it becomes 257 of 280 planned locations. For tower sites, vegetation clearing were conducted prior to foundation works being initiated. 3 Soil erosion Fair Towers located in the slope area to be protected with simple civil works i.e. levelling the site to reduce runoff and smoothing the slope. 4 Drainage Fair No need for special drainage. 5 Water quality Fair Simple measures. Insignificant due to micro scale and scattered areas. 6 Air quality Fair to good Few machinery causing air pollution were used. Insignificant due to micro scale and scattered areas. 7 Construction waste Fair Removal of remaining construction remains such as plastic, hemp sack to be done in some locations. 8 Domestic waste Fair Removal of domestic waste remained to be done in some locations. Mostly plastic of food wraps. 9 Roads and infrastructure impact 10 Community health and safety 11 Employment opportunities Good Fair to good Fair to good No impact. Most concern on feeding materials for tower foundation and tower erection. See: Occupational Safety and Health report. Local people were hired for transporting the material from roadside to tower locations in most locations and also as subcontractor at selected tower sites. Page 10 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

18 No Environment Impact / Concern Mitigation Implementation progress II Ngabang Tayan Transmission Line route 1 Land Compensation End of June 2016: 119 locations of 128 planned locations have been compensated. 2 Vegetation clearing Good progress for tower locations but not yet started for the ROW. Note See social report for details. For tower sites, vegetation clearing were being conducted prior to foundation works being initiated. 3 Soil erosion Fair Towers located in the slope area to be protected with simple civil works i.e. levelling the site to reduce runoff and smoothing the slope. 4 Drainage Fair No need for special drainage. 5 Water quality Fair Simple measures. Insignificant due to micro scale and scattered areas. 6 Air quality Fair to good Few machinery causing air pollution were used. Insignificant due to micro scale and scattered areas. 7 Construction waste Fair Removal of remaining construction waste such as Plastic, hemp sack remained to be done in some locations. 8 Domestic waste Fair Removal of domestic waste remained to be done in some locations. Mostly small plastic of food wraps. 9 Roads and infrastructure impact 10 Community health and safety 11 Employment opportunities Good Fair to good Fair to good No impact. Most concern on feeding materials for tower foundation and tower erection. See: Occupational Safety and Health report. Local people were hired for transporting the material from roadside to tower locations in most locations and also as subcontractor at selected tower sites Summary Environmental Progress of Package 4: 150/20 kv Ngabang and Tayan substations The construction activity of Ngabang substation is conducted in an area of about 1 ha, located away from communities, adjacent to the provincial road connecting Pontianak to several regencies. The Tayan substation is located 300 m from the provincial road and connected with village road for its access. The Tayan substation part under this project is an extension to the adjacent existing substation which is under construction but its development during reporting period was almost stagnant. Up to the end of December 2015: At Ngabang substation: Oil filling of 150/20 kv transformer was completed. Construction of the control building, guard booth and retaining Page 11 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

19 walls at right side and at rear border were in progress. At Tayan substation: Installing inner fence was completed. For both substations cables have been pulled into the control building, connection to the control panels were completed. The area of both switchyard have not covered with gravel During this semester: At Ngabang substation there were several civil works being conducted i.e. concreting of oil pit, septic tank and water tank concrete column, retaining walls and finishing of control building respectively. The testing and commissioning of the electrical works remained to be done. At Tayan substation the installation of the inner fence was completed, the gravel in the area of the two bays has been deployed. Civil masonry concerning drainage and finishing of concrete grouting of equipment pads was completed. Access road to the substation was completed. Electrical and mechanical works were completed except for switchyard and access road lighting. The environmental works implementation progress of Package 4 is as follows: No Environment Impact / Concern Mitigation Implementation progress Note I Ngabang Substation 1 Land Compensation Completed 2 Soil erosion Fair At Ngabang substation retaining wall had been constructed in the surrounding boundary areas 3 Drainage Fair 4 Water quality Fair 5 Air quality Fair Few machinery causing air pollution were used. 6 Construction waste Fair to good 7 Domestic waste Fair to good 8 Roads and infrastructure impact 9 Community health and safety 10 Employment opportunities Fair Fair Fair to good Part of the run-off water with eroded soil sediment flows over the main road. See: Occupational Safety and Health report. Local contractor as subcontractors and local people as labour were hired. II Tayan Substation 1 Land Compensation Completed 2 Soil erosion Fair to good Retaining wall had been constructed. 3 Drainage Fair Part of drainage system will share with the existing one (completed). 4 Water quality Fair 5 Air quality Fair Few machinery causing air pollution were used. 6 Construction waste Fair to good 7 Domestic waste Fair to good 8 Roads and infrastructure impact Good No impact up to now. Page 12 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

20 No Environment Impact / Concern 9 Community health and safety 10 Employment opportunities Mitigation Implementation progress Fair Fair to good Note See: Occupational Safety and Health report. Local contractor as subcontractors and local people as labour were hired. 3. ENVIRONMENTAL MITIGATIONS AND LAND ACQUISITION IMPLEMENTED 3.1. Environmental Mitigations a) Air Quality: Air quality deterioration could be caused by exhaust gas of construction vehicles (truck, car, motor cycle), operation of concrete mixer, drilling/pilling machineries and heavy vehicles for land preparation (mostly utilized for substation areas; for tower sites it is very rare). Concrete mixer: For concrete pouring of each tower pad, contractor applied small unit of concrete mixer for intermittent use for about 2-3 hours a day (in average 8 machinedays) to complete concrete pouring for the foundations of each tower. Mostly, it generated insignificant impact on air quality due to short duration and most towers are located away from dwelling areas. Drilling and excavation: Contractor applied high intensive manual labour for excavation of tower pads so no air pollution for this activity. Drilling holes for concrete piles was conducted for the tower site with low bearing capacity of soil. In wet soil drilling machine was used, while in the dry soil manual drilling was used. In the tower site with good soil condition no drilling to be conducted. The air pollution impact due to drilling was considered moderate. Erection of towers: Contractor applied manual winch/pulley for elevating the assembled steel member of tower erection development. No machinery used, so there is no air pollution. Transportation of material. From warehouse to roadside near the sites, contractor applied trucks in good condition. Air quality deterioration caused by the fugitive dust can be neglected because there were no significant fugitive dust. From roadside to tower sites, contractor mostly used labour and motor cycles or used small trucks wherever possible. Air pollution was very small and dispersed. Land preparation of the substations. The land preparation was conducted at Bengkayang and Ngabang substations but not for Tayan substation (the site had been ready). The original area was undulating land, so it needed soil works to level the site. The higher soil level was excavated to fill the lower level using bulldozer and backhoe. No quarry from outside was needed for the embankment, all soil for embankment comes from the same area, in consequence no truck was going in and out to public road or other places concerning this activity, thus there was no fugitive dust in the surrounding area during the land preparation. b) Water Quality Water quality deterioration could be caused by soil works, concrete works, oil spill (oily water). Soil works may generate sedimentation and turbid water in water body. In tower pad area, where the excavation encountered the soil acid in nature, it also may produce acid water. Concrete works usually produce alkaline water and turbid water due to the cement Page 13 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

21 deposit. Oil spill could occur due to negligence, misconduct and accident, further it may cause oil pollution on soil and later oily water in water body. Drillings and excavations. In area of tower pad where the soil is classified as soft soil it shall be drilled to develop holes for concrete piles. Where the soil was considered good enough, no drilling was applied. Excavation was conducted in all tower pads with varied dimension, depending on topography and type of tower. The drillings and excavations generated muddy soil and brown water with high soil sediment. When it rains, and no barrier exists, the bare soil and soil sediment may wash away. In general, the contractor did not apply the protection measures to trap the sedimentation. Fortunately, most towers are located in areas where natural sediment screening is provided by grass, bushes and litter of foliage. In general this activity generated insignificant soil erosion. At the time being, there was no suspected acid sulphate soil, so no acidity soil and water pollution happened. Land preparation. The land preparation of Bengkayang, Ngabang and Tayan substations cover an area of about 6.6 ha, 1 ha and 1 ha respectively. The areas are undulating and needed soil works to level the sites. The higher soil level was excavated to fill the lower level using bulldozer. Bare land may cause soil erosion and sedimentation, but fortunately there is no creek nor river in the adjacent area so sediment settled in the substation areas. To protect soil from land slide and erosion, a retaining wall covering the entire boundary area was constructed at Bengkayang substation.. At Ngabang the retaining wall in the surrounding boundary areas have been constructed. The drainage water siphon has been repaired so no flooding anymore in the adjacent area. An open drainage ditch was constructed between main road and substation so that there is no flooding of the road anymore. The same applies to the adjacent area behind the control building. At Tayan substation the required retaining wall was completed. Concrete works. Most impact of concrete works usually happens during the cleaning/washing of the concrete mixer machine and other apparatus. It produces alkaline water and turbid water due to the cement deposit. In many instances, contractor dumped the waste water on ground within tower area. Due to small volume of each event, the waste water could be easily absorbed by the soil in the tower s area. There was insignificant impact caused by this activity. Oil uses. Other than transportation of material for the construction works of each tower, the contractor used diesel oil for powering the concrete mixer only. It is contained in tight jerry cans, and no oil spill was observed during the works. c) Noise Quality The common noisy equipment used was concrete mixer. Contractor applied concrete mixer for intermittent use and only for 2-3 hours a day (in average 8 machine-days) to complete concrete pouring for the foundations of each tower. There are very limited tower sites which used very loud machinery such as pile machine, rock breaker, i.e. four towers of the 275 kv Bengkayang transmission line for which Steel Mortar Composite Foundations (SMCF) system was used (approx. 4-6 days for each tower foundation) which produced very loud noise, and at 150 kv Bengkayang - Ngabang transmission line at towers 172 and 174 for which rock breaker was used for excavation. The tower sites were located away from the inhabitant area and the works were conducted during daytime so the noise impact was insignificant. d) Pollution Prevention Page 14 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

22 Air Pollution See the review of item a) Water Pollution and Soil Pollution See the review of item b) Land Pollution To protect the land from pollution caused by the construction and domestic waste, in most cases, the contractors have been removing the bigger pieces of the construction and domestic waste but neglected the smaller pieces, frequently found scattered at many tower sites. The construction waste of paper cement containers, broken hemp sacks, plastic wraps and chunks of wood is found in development areas of most towers. As the majority of towers are inaccessible by car, most material is transported by motorcycle or carried by people. Sand and gravel were contained in hemp sacks and transported either by motorcycle or by human from roadside to tower sites. Cement of 50 kg each was transported in fabricated paper containers. The domestic waste associated with the construction works was also encountered at most tower construction locations and its adjacent areas. Those wastes were produced by the construction workers who throw the garbage (plastic bottles, plastic wrap) carelessly to the surrounding environment. The form work for casting concrete is made of wood and at some places as metal formwork, and is repeatedly used for concrete works at other tower locations. e) Biodiversity and Natural Resources The awareness of contractor/subcontractor/workers not to disturb the surrounding forest trees was low during construction of foundations and towers of transmission lines. Subcontractor/workers frequently cut the small to medium sized trees in surrounding forest for fixing the form work for concrete works and other uses. f) Physical Cultural Resources Until now, the finding of physical cultural resources was not reported or observed during surveillance monitoring. g) Employment opportunities The construction of foundations and erection of towers needs labours for carrying materials from roadside to tower site. The contractor recruited local people to conduct this work. It provided mutual benefit for the local people and the contractors. Especially in Seluas and Jagoibabang area the contractor for the 275 kv Bengkayang - Jagoibabang transmission line assigned local people as subcontractors for constructing the tower foundations. h) Capacity Building Workshop on capacity building had been conducted for environment, health & safety, and social issues in Bengkayang on 16 th October 2014 which was attended by Contractors of four packages of design, supply, installation, testing, and commissioning of the works as the follows: o PT. Bukaka Teknik Utama on Package 1. o CG Consortium on Package 2. Page 15 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

23 o Consortium of KEC International Ltd. and Mitsubishi Corporation on Package 3. o PT. Siemens Indonesia on Package 4. PT PLN (Persero) as the project owner: o PT. PLN (Persero) Unit Induk Pembangunan (UIP) X as the Principal project management unit in Kalimantan. o PT. PLN (Persero) Unit Pelaksana Kerja (UPK) 5 as the project implementation management unit of the Implementation Strengthening of West Kalimantan Power Grid. Tractebel Engineering (TE) and Power Grid International Limited in association with PT. Catur Bina Persada as the arranger of the workshop Land Acquisition a) 275 kv Bengkayang Jagoibabang Transmission Line Of the 201 tower sites 198 sites along the 275 kv Bengkayang - Jagoibabang transmission line have been compensated, including 4 locations as re-route towers and 4 locations as insert towers. Table 1. Summary of land acquisition/compensation status of 275 kv Bengkayang Jagoibabang Transmission Line NO ROUTES AND LOCATION TOTAL COMPENSATION STATUS 1 Bengkayang Substation (275 kv and 150 kv) 1 Compensated 2 Towers on private land: A, B, C, D, and Compensated 3 Towers on Forestry land: Compensated 4 Towers on private land: including Inserted towers 76A, 99A, 110A, 158A 147 Compensated 5 Towers on Forestry land: Compensated Total on Forestry land 39 Total on Private land 162 Total number of Towers 201 Total of Compensated Land for towers 201 Total of not yet compensated land 0 b) 150 kv Bengkayang Ngabang - Tayan Transmission Line There will be 408 tower sites for the 150 kv Bengkayang Ngabang - Tayan Transmission Line which comprises of 280 tower sites for the Bengkayang - Ngabang alignment and 128 tower sites for the Ngabang -Tayan alignment. There are 88 towers which will traverse the forestry land, out of them 65 towers of Bengkayang - Ngabang alignment (Towers 1A to 7A, 4 to 32; 82 to 103; and 144 to 151) and 23 towers of Tayan - Ngabang alignment (Towers 35 to 43; 53 to 54 and 57 to 68). In total 378 tower locations have been compensated, they comprise of 259 tower sites located along the Bengkayang - Ngabang route and 119 tower sites located along Ngabang - Tayan alignment. Both the new Ngabang and Tayan substation sites have been compensated. Page 16 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

24 Table 2. Summary of land acquisition/compensation status of 150 kv Bengkayang Ngabang Tayan Transmission Line and Substations COMPENSATION NO ROUTES AND LOCATION TOTAL STATUS I 150 KV BENGKAYANG NGABANG TRANSMISSION LINE AND NGABANG SUBSTATION 1 Ngabang Substation (New Location) 1 Compensated 2 Towers on private land: 33 to 81, 91, 104 to 126; 128 to 143; 152 to 168, 170 to 221, 224 to 244, 251 to 254 and 264 to 273 (ex Ngabang-Tayan of 118 to 127) 193 Compensated. 191 if 2 eliminated towers not calculated 3 Other towers on private land 23 Not yet compensated 4 Towers on Forestry land: 1A to 32, 82 to 103 and 144 to 151 II Total number of towers for 150 kv Bengkayang Ngabang Transmission Line 66 Compensated 150 KV TAYAN NGABANG TRANSMISSON LINE AND TAYAN SUBSTATION 1 Tayan substation extension 1 Compensated 2 Towers on private land: 1G to 1D, 1B, 1A, 1 to 34, 44 to 52, 55-56, 69 to 94 and 96 to Compensated 3 Other towers on private land 9 Not yet compensated 4 Towers on Forestry land: 35 to 43, 53,54 and 57 to Compensated Total number of towers for 150 kv Tayan Ngabang Transmission Line kv BENGKAYANG-NGABANG-TAYAN Total on Forestry land 89 Total on Private land 321 Total number of Towers 408 Total of Compensated Land for Towers 378 Supposed to be 376 if 2 eliminated towers to be deducted Total of not yet compensated land to be deducted with 376 Note: Due to new Ngabang substation located closer to Tayan direction, Tower No 117 up to 133 of Tayan-Ngabang Transmission Line has been numbered as continuation of Bengkayang-Ngabang Transmission Line Page 17 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

25 4. SUMMARY OF ENVIRONMENTAL COMPLIANCE MONITORING 4.1. Summary of Inspection Activities a) Vegetation clearing. At many tower site locations and the substations the contractor conducted vegetation clearing confined to the tower and substation sites, except for the locations where there was no pathway, it has been practiced to clear the vegetation for access. Clearing vegetation of tress higher than 3 m, within right of way (ROW) have been conducted for of the entire 275 kv Bengkayang-Jagoibabang transmission line. In several places the branches and leaves of the cut trees were left scattered along the ROW. During the rainy season it was fine, but might be caught by fires during dry season. b) Soil erosion. In tower sites located in steep slope with high potential for erosion, the contractor shall provide soil erosion protection. The contractor may propose additional cost for this matter as stated in the contract document (1).After foundation construction finished, contractor conducted backfilling the holes of the tower s legs and levelized the soil in the tower area and smoothed the steep slope. This treatment will reduce the soil erosion. It can be tolerated not to apply soil erosion protection in non-critical sites such as a flat area or the site and its surrounding could naturally absorb the sedimentation. At tower sites located in steep slope with high potential for land slide or erosion some towers shall be provided with the retaining wall for land slide or soil erosion protection e.g. T.43, 91, 115, 116, 191 and 201 of 275 kv Bengkayang-Jagoibabang transmission line. The retaining wall in the entire boundary area of Bengkayang substation was completed. At Ngabang substation the retaining wall was completed at the front side and the left hand side, while the construction works on the right hand side and the rear retaining wall were in progress. c) Drainage. During the tower construction works, the construction of drainage was not practised at most tower sites, except in certain area where it is considered required e.g. very steep slope, near the flowing water area, etc. At Bengkayang substation the drainage was almost completed, leaving only small portion in the entrance area. The drainage siphon at left side of Ngabang substation has been normalized, the rain water can drain easily by undercrossing the road. d) Acid sulphate soils. No such soil was observed. No action required to be done. e) Water quality impacts. For tower foundation works, the use of water was for drilling and concrete works, and these activities generated waste water. Most of the waste water from such activities is relatively small, and although it is directly dumped to the soil it usually could be absorbed by the soil at the tower sites. The Contractor did not provide a suitable barrier to prevent such waste water to escape from the tower site. Although it rarely happened, it could be observed that such water of drilling works spilled to surrounding tower area, but only few meters from the tower site and the volume was small and it could be absorbed by the surrounding soil and create insignificant impact caused by this high soil sediment waste water. f) Air quality impacts. Contractor applied high intensive labour to conduct various works, i.e. transportation, drilling, elevating steel parts that in nature will not cause air quality impacts. g) Construction waste management. Contractor cleaned most of the construction waste, although some remaining chunk of woods, broken hemp sacks and cement paper containers remained to be removed. 1 Contract document Volume 1, Section 6: Employer s Requirements, Sub Section 6.2.3: Technical Specification item 3.12 Payments for Towers and Foundations. In this contract is stated that Additional work which may be required to secure foundations against the effects of soil erosion will be paid for at the rates to be agreed Page 18 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

26 h) Domestic waste management. The waste originated mainly from the construction workers and other waste originated from local people who were hired to transport the materials from roadsides to the tower sites. In several places the domestic waste was scattered within the tower sites, temporary shelter areas and along the temporary access pathway. i) Roads and infrastructure impacts. No impact was observed in such facilities. j) Encroachment into protected forests, hunting, wood collection. No encroachment was observed. The works have started in the state forest land, but most land are bush or grass. No firewood collection from the forest was observed. No hunting activity by the workers was observed. k) Community health and safety i. Prevention of HIV/AIDS. The contractor did not provide the awareness or providing the measures in preventing the community and their workers safety concerning the sexually transmitted diseases. ii. iii. iv. Safety line and notice. The contractor generally did not provide this kind of OSH requirement in the unloading zone of materials at road sites and working areas for preventing the community entering the non-safety zone. The mobilization of materials. The transport of metal parts for the towers is of concern from the OSH point of view. Loading and unloading works in the warehouse and at the roadside carried out with the front loader machine is considered not safe enough for conducting this kind of works and may endanger the community passing by. The stringing of conductors. During stringing activities for the 275 kv Bengkayang - Jagoibabang transmission line the contractor installed scaffolding at the sites of the public utilities such as road, electrical distribution lines etc. for public safety wherever the transmission line is crossing them. l) Employment opportunities. Contractor employed local people at most tower sites for transporting the construction materials from roadside to the tower site. The local subcontractors were also employed for foundation construction of 275 kv Bengkayang - Jagoibabang transmission line and for some works of substation project activities. Local people also enjoyed indirect employment benefit from providing services such as lodging, meals, etc. for the construction employees and workers. m) Physical cultural resources. Until now no physical cultural resources were found and observed Mitigation Compliance a) Vegetation clearing. In most locations the contractor complied with the mitigation requirement except the clearing of trees along the right of way on some places, where the dry branches and foliage were left behind, scattered in some part of the right of way. The dry material will be susceptible to spread fires. b) Soil erosion. Contractor has not fully complied with the requirement. Contractor is supposed to apply soil erosion protection at the tower site which has high erosion rate such as steep slope location. At each tower location after foundation construction was finished, the contractor conducted backfilling the holes of the tower legs and levelized the soil in the tower area and smoothed the steep slope. This treatment reduced the soil erosion although it was not optimal. The vegetation cover is supposed to be planted to reduce soil erosion. Based on monitoring at many tower sites it took 3 to 6 months for the exposed soil in the tower construction area to naturally recover and revegetate by Page 19 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

27 itself. c) Drainage. Most tower sites do not need the construction of a drainage system. Drainage system is needed in certain areas e.g. very steep slope, near the flowing water area. Generally contractors comply with the requirement, except for the holes of some tower legs (excavated holes or unfinished backfilling) which were inundated by rain water. d) Acid sulphate soils. Up to now this type of soil was not found. e) Water quality impacts. Most towers are surrounded by the landscape (grasses, and falling foliage) which screen the suspended solid contained in waste water generated from drilling and concrete works in the tower construction area. Although the contractor did not provide special treatment, according to observations the water quality impact seemed to comply with the requirement. f) Air quality impacts. Contractor complied with the requirement. g) Construction waste management. Contractor partly complied with the requirement but in many cases it must be improved,since the construction waste still could be found at many tower locations. h) Domestic waste management. Contractor did not fully comply with the requirement. Garbage originated from construction workers scattered in several tower locations. Almost all of the subcontractor s workers ignored this requirement. Some workers were observed to burn domestic garbage, even it was small volume but it contributed the pollution of the ambient air in the surrounding area. i) Roads and infrastructure impacts. Contractor complied with the requirements. j) Encroachment into protected forests, hunting, wood collection. Contractor complied with the requirements. k) Community health and safety. Contractor did not fully comply with the requirement, e.g. warning signs were not installed. l) Employment opportunities. Contractor complied with the requirement. The local people were hired to transport the materials from roadside to the tower locations. m) Physical cultural resources. Until present no physical cultural resources were found or observed Mitigation Effectiveness The mitigation effectiveness is low due to the following reasons: a) Lack of understanding and lack of awareness of environmental mitigation that is required to be accomplished by the contractors and their subcontractors. The environmental and safety personnel who are supposed to enforce the environmental requirement came from the contractors head office and were only appointed for short duration at the site, no fulltime officers were appointed in the site office to implement the Environmental Management Plan (EMP) 2. 2 The EMP is mentioned in the IEE (Initial Environment Examination) of 275 kv Regional Interconnection Transmission Line Mambong (Sarawak) to Bengkayang and 150 kv Transmission Lines Bengkayang to Tayan (West Kalimantan) published in 2011, in RKL (Rencana Pengelolaan Lingkungan) or Environmental Management Plan, Kegiatan Pembangunan SUTET 275 kv GI Bengkayang Perbatasan Sarawak published in 2010 and in UKL-UPL (Upaya Pengelolaan dan Pemantauan Lingkungan) of 150 kv Bengkayang-Ngabang-Tayan transmission lines Page 20 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

28 The previous EMP was considered to be too stringent for several environmental mitigation measures to be implemented in scattered places and relatively very small areas. In June 2015 it had been adjusted by revising the EMP without jeopardizing the purpose of environmental impact mitigation. 5. KEY ENVIRONMENTAL ISSUES 5.1. Environmental key Issues Identified The compliance of the EMP requirement is low due to lack of awareness concerning the environmental management among the contractors, subcontractors and their workers. The root cause is that there is no personnel in charge for the site works to enforce the EMP requirements Action to be taken The four main contractors (i) PT Bukaka Teknik Utama of Package 1: 275 kv Bengkayang - Jagoibabang Transmission Lines, (ii) CG Consortium for Package 2: 275/150 kv Bengkayang substation, (iii) Consortium of KEC International Limited and Mitsubishi Corporation of Package 3: 150 kv Bengkayang Ngabang - Tayan Transmission Lines, and (iv) Siemens for Package 4: 150/20 kv Ngabang and Tayan substation, shall commit to the EMP and OSH requirements and appoint officer(s) to enforce them. Among other, they shall include: to continuously provide awareness to the main contractors personnel, subcontractors and labours concerning Environmental Management Plan requirement. to provide instruction to the labours to apply proper procedure concerning Environmental Management Plan. 6. CONCLUSION 6.1. Overall Progress of Implementation of Environmental Management Measures The contractors implementation of environmental management measures varied between good and poor as follows: In general the impact mitigation is good and fair for the following issues: Air quality impact, employment opportunities, and roads and infrastructure impacts. The issues of cleaning the construction waste is considered fair, the contractor has removed most of the construction waste but some waste remains to be removed from the sites. The issues of erosion is considered fair, the contractor has levelized most disposal and excavation soil and constructed retaining walls to protect from landslide and erosion. The implementation of environmental management measures of the following issues are considered poor: Management of protecting soil and water pollution in the oil storage and working areas by providing leakage prevention. Management of waste, especially disposed materials wrap Management of cut trees (removal of dry branches and foliage) along the right of way Page 21 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

29 There are two issues which were not yet implemented, so no evaluation was conducted. These issues are in conditional matters, for which the environmental management measures shall be implemented when they are encountered during implementation: Acid sulphate soils Physical cultural resources 6.2. Problems Identified and Actions Recommended a. The four main contractors to deploy their Environmental and OSH personnel to be in charge of daily works. b. The four main contractors to assign the fulltime Environmental and OSH officer(s) to enforce the EMP and OSH requirement and always provide the awareness on EMP and OSH requirement to labours and providing instruction for the subcontractors and their labours to apply proper procedures Revised EMP The PIC has revised the EMP to adapt it to the conditions prevailing at the construction sites and it has been submitted to PLN on 30 June Page 22 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

30 REFERENCES 1. Asian Development Bank Initial Environment Examination: 275 kv Regional Interconnection HVTL Mambong (Sarawak) to Bengkayang and 150 kv HVTLs Bengkayang to Tayan (West Kalimantan). Prepared by SOFRECO. July TA 6441-REG. Efficiency Improvement and Connectivity Strengthening in Archipelagic Southeast Asia Project. Final Report, Part G. 2. Bukaka Teknik Utama, Approved Foundation Schedule for Bengkayang Jagoibabang Transmission lines for Tower 50 up to PLN Kalimantan Principal Project of Generation and Transmission Lines Environmental Management Plan and Environmental Monitoring Plan (UKL-UPL) of High Voltage Transmission Line of Bengkayang-Ngabang West Kalimantan. PT PLN (Persero) Proyek Induk Pembangkit dan Jaringan Kalimantan. Printed document of translated document. 4. PLN Kalimantan Principal Project of Generation and Transmission Lines Environmental Management Plan and Environmental Monitoring Plan (UKL-UPL) of High Voltage Transmission Line of Ngabang-Tayan West Kalimantan. PT PLN (Persero) Proyek Induk Pembangkit dan Jaringan Kalimantan. Printed document of translated document. 5. PLN Kalimantan Principal Project of Generation and Transmission Lines Environmental Assessment, Environmental Management Plan and Environmental Monitoring Plan of Extra High Voltage Transmission Line of Bengkayang-Sarawak borderline and Bengkayang substation. West Kalimantan. PT PLN (Persero) Proyek Induk Pembangkit dan Jaringan Kalimantan. Soft file of translated document. 6. PLN, Contract document No 001.PJ/611/DIR/2013 dated April 12th, 2013 between PT Perusahaan Umum Listrik Negara (Persero) and PT Bukaka Teknik Utama. Strengthening West Kalimantan Power Grid Project Loan ADB + AFD. Package 1: Design, Supply, Installation, Testing, and Commissioning of 275 kv Overhead Transmission Lines Bengkayang Substation Jagoibabang Volume I IV. 7. PLN, Contract Document No PJ/611/DIR/2013, Dated April 30th, 2013, between PT. Perusahaan Listrik Negara (PERSERO) and CG Consortium for Strengthening West Kalimantan Power Grid Project LOAN ADB + AFD Package 2 : Design, Supply, Installation, Testing, and Commissioning of 275/150 kv Bengkayang Substation. Volume 1 III. 8. PLN, Contract document No 0009.PJ/611/DIR/2013 dated April 30th, 2013 between PT Perusahaan Umum Listrik Negara (Persero) and Consortium of KEC International Limited and Mitsubishi Corporation. Strengthening West Kalimantan Power Grid Project Loan ADB + AFD. Package 3: Design, Supply, Installation, Testing, and Commissioning of 150 kv Overhead Transmission Lines Bengkayang Ngabang-Tayan. Volume I IV. 9. PLN, Contract Agreement No PJ/041/DIR/2013, Dated: August 1st, 2013 Between: PT. PLN (Persero) and PT. Siemens Indonesia for Strengthening West Kalimantan Power Grid Project Loan ADB + AFD. Package 4: Design, Supply, Installation, Testing, and Commissioning of 150/20 kv Substation at Ngabang and Tayan. Book PLN, Contract document No 0107.PJ/611/DIR/2013 dated July 30th, 2013 between PT Perusahaan Umum Listrik Negara (Persero) and Joint Venture of Tractebel Engineering Ltd and Powergrid International Limited (Thailand), Sub-Consultant PT Caturbina Guna Persada for Consulting Services for Project Implementation Strengthening West Kalimantan Power Grid (Loan No 3015-INO) 11. PLN UPK V, Bengkayang. Various data such as: a) Maps of re-routes tower of 150 kv Bengkayang Ngabang Tayan Transmission lines and Ngabang substations. b) Maps of re-routes tower of 275 kv Bengkayang Jagoibabang Transmission line (Sarawak Border) c) Land Compensation which has been conducted for Bengkayang Jagoibabang Transmission lines and Bengkayang Ngabang-Tayan Transmission lines. Page 23 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

31 APPENDICES APPENDIX: A-1. SITE INSPECTION / MONITORING REPORTS A-1.1. Summary of Environmental Performance. A A A A Summary of Environmental Performance of 275 kv Bengkayang- Jagoibabang transmission line. Summary of Environmental Performance of 275/150 kv Bengkayang substation. Summary of Environmental Performance of 150 kv Bengkayang-Ngabang- Tayan transmission lines. Summary of Environmental Performance of 150 kv Ngabang and Tayan Substations. A-1.2. Mitigation Compliance Inspection Monitoring A Site Environmental Compliance Inspection and Monitoring of Package 1 A Site Environmental Compliance Inspection and Monitoring of Package 2 A Site Environmental Compliance Inspection and Monitoring of Package 3 A Site Environmental Compliance Inspection and Monitoring of Package 4 Page 24 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

32 Appendix: A-1.1. Summary of Construction Progress, Environmental performance A Summary of Construction Progress, Environmental performance of 275 kv Bengkayang Jagoibabang Transmission Line New Tower' Number Old Tower number Compens Payment Tower site ROW Soil works Construction Concreting Erection Insulator install Stringing Environmental Mitigation Public Safety & Health 1 A B C D Air quality Water quality Soil protection Trash & Debris Biodiversity Loc. Employment Foundation Erection Stringing Page 25 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

33 New Tower' Number Old Tower number Compens Payment Tower site ROW Soil works Construction Concreting Erection Insulator install Stringing Environmental Mitigation Public Safety & Health A A Air quality Water quality Soil protection Trash & Debris Biodiversity Loc. Employment Foundation Erection Stringing Page 26 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

34 New Tower' Number Old Tower number Compens Payment Tower site ROW Soil works Construction Concreting Erection Insulator install Stringing Environmental Mitigation Public Safety & Health A Air quality Water quality Soil protection Trash & Debris Biodiversity Loc. Employment Foundation Erection Stringing Page 27 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

35 New Tower' Number Old Tower number Compens Payment Tower site ROW Soil works Construction Concreting Erection Insulator install Stringing Environmental Mitigation Public Safety & Health A Air quality Water quality Soil protection Trash & Debris Biodiversity Loc. Employment Foundation Erection Stringing SCORE NOTE For Compensation & Construction: Blank = Not started yet Highlight = On going; 1 = done For Environmental Mitigation & OSH: 5=Very Good; 4=Good; 3=Fair; 2=Poor; 1=Very poor. Page 28 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

36 Appendix A Summary of Environmental Performance of 275/150 kv Bengkayang substation. No Project works category Air quality Water quality Environmental Mitigation Soil protection Trash & Debris Biodiversity Loc. Employment Public Safety Health 1 Land clearing Land preparation Foundation and subsoil structure works Metal works Installation Testing and commissioning Score For Environmental Mitigation & OSH: 5=Very Good; 4=Good; 3=Fair; 2=Poor; 1=Very poor. Appendix: A Summary of Construction Progress, Environmental performance of 150 kv Bengkayang Ngabang Tayan Transmission Line A. Bengkayang Ngabang Section No (Sequential) No. Tower Compens. Payment Tower site ROW Soil works Construction Environmental Mitigation Public H&S Concreting Erection Insulator install. Stringing Air quality Water quality Soil protection Trash & Debris Biodiversity Loc. Employment 1 1A A A A A A A Foundation Erection Stringing Notes Page 29 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

37 No (Sequential) No. Tower Compens. Payment Tower site ROW Soil works Construction Environmental Mitigation Public H&S Concreting Erection Insulator install. Stringing Air quality Water quality Soil protection Trash & Debris Biodiversity Loc. Employment A Foundation Erection Stringing Notes Page 30 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

38 No (Sequential) No. Tower Compens. Payment Tower site ROW Soil works Construction Environmental Mitigation Public H&S Concreting Erection Insulator install. Stringing Air quality Water quality Soil protection Trash & Debris Biodiversity Loc. Employment Foundation Erection Stringing Notes Page 31 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

39 No (Sequential) No. Tower Compens. Payment Tower site ROW Soil works Construction Environmental Mitigation Public H&S Concreting Erection Insulator install. Stringing Air quality Water quality Soil protection Trash & Debris Biodiversity Loc. Employment VOID TOWER VOID TOWER Foundation Erection Stringing Notes Page 32 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

40 No (Sequential) No. Tower Compens. Payment Tower site ROW Soil works Construction Environmental Mitigation Public H&S Concreting Erection Insulator install. Stringing Air quality Water quality Soil protection Trash & Debris Biodiversity Loc. Employment Foundation Erection Stringing Notes Page 33 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

41 No (Sequential) No. Tower Compens. Payment Tower site ROW Soil works Construction Environmental Mitigation Public H&S Concreting Erection Insulator install. Stringing Air quality Water quality Soil protection Trash & Debris Biodiversity Loc. Employment Foundation Erection Stringing Notes A B ex Tayan-Ngabang towers SCORE NOTE For Compensation & Construction: Blank = Not started yet Highlight = On going; 1 = done For Environmental Mitigation & OSH: 5=Very Good; 4=Good; 3=Fair; 2=Poor; 1=Very poor. Page 34 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

42 B. Ngabang -Tayan section Compens. Payment Construction Environmental Mitigation Public H&S No (Sequential) No. Tower Tower site 1 1G/ F/ E/ D/ D/0 1 6!C/1 7 1C/0 8 1B/ A/ ROW Soil works Concreting Erection Insulator install. Stringing Air quality Water quality Soil protection Trash & Debris Biodiversity Local Employment A Foundation Erection Stringing Page 35 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

43 Compens. Payment Construction Environmental Mitigation Public H&S No (Sequential) No. Tower Tower site ROW Soil works Concreting Erection Insulator install. Stringing Air quality Water quality Soil protection Trash & Debris Biodiversity Local Employment A Foundation Erection Stringing Page 36 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

44 Compens. Payment Construction Environmental Mitigation Public H&S No (Sequential) No. Tower Tower site ROW Soil works Concreting Erection Insulator install. Stringing Air quality Water quality Soil protection Trash & Debris Biodiversity Local Employment A B C Foundation Erection Stringing SCORE NOTE: For Compensation & Construction: Blank = Not started yet Highlight = On going: 1 = done For Environmental Mitigation & OSH: 5=Very Good; 4=Good; 3=Fair; 2=Poor; 1=Very poor. Page 37 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

45 Appendix A Summary of Environmental Performance of 150 kv Ngabang and Tayan Substations A. 150/20 kv NGABANG SUBSTATION No Project works category Air quality Water quality Environmental Mitigation Soil protection Trash & Debris Biodiversity Local Employment 1 Land clearing Land preparation Foundation and subsoil Public S & H structure works 4 Metal works Installation Testing and commissioning Score For Environmental Mitigation & OSH: 5=Very Good; 4=Good; 3=Fair; 2=Poor; 1=Very poor. B. 150 kv TAYAN SUBSTATION EXTENSION No Project works category Air quality Water quality Environmental Mitigation Soil protection Trash & Debris Biodiversity Loc. Employment Public safety & Health 1 Land clearing Land preparation Foundation and subsoil structure works 4 Metal works Installation Testing and commissioning Score For Environmental Mitigation & OSH: 5=Very Good; 4=Good; 3=Fair; 2=Poor; 1=Very poor. Page 38 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

46 Appendix A-1.2. Mitigation Compliance Inspection Monitoring (3) Appendix A Site Environmental Compliance Inspection and Monitoring of Package 1 Project : West Kalimantan Power Grid Strengthening Project (RRP INO 41074) Sub-Project : 275 kv Bengkayang-Jagoibabang Transmission Line Location Monitoring Period : Districts of Lumar, Ledo, Sanggau Ledo, Seluas, Jagoibabang. Implementing Agency Monitoring Agency Enforcement Agency : PLN UPP KALBAGBAR-3, PLN UIP KALBAGBAR : PLN UIP KALBAGBAR : Ministry of Environment; Bapedalda West Kalimantan : 1 st January - 30 th June 2016 Contractor(s) : Bukaka Teknik Utama Date : End of June 2016 Implementation Phase : Construction (1). Contractor(s) Contractor(s) Environmental Awareness Contractor(s) aware of mitigation requirements? Yes / No Yes Actions Required Contractor Response / Comment Bukaka to provide continued awareness of EMP to the subcontractors and the labourers Contractor(s) have a copy of EMP? Yes Bukaka to provide Simple Works Instruction Procedure to the labourers 3 Refer to APPENDIX F. Initial Environmental Examination, July West Kalimantan Power Grid Strengthening Project (RRP INO 41074). Page 39 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

47 (2). Mitigation Compliance Inspection No Impact / Mitigation Measure (From EMP) Mitigations Mitigations Implemented Effective? (Yes, No) (1 to 5)* Impact Observed / Location 1 Vegetation clearing Yes and No 4 TA T199 2 Soil erosion Yes and No 4 TA T199 3 Drainage Yes and No 4 TA T199 4 Acid sulphate soils - - TA T199 5 Water quality impacts Yes and No 4 TA T199 6 Air quality impacts Yes 4 TA T199 7 Construction waste management Yes and No 4 TA T199 Action Required All vegetation clearing has been completed Most areas have naturally recovered, but the towers: T.43, 91, 115, 116, 191 and 201 still needs soil protection e.g. retaining wall All backfilling in each leg has been finished There is no acid sulphate soils observed All construction works has been finished All construction works has been finished Contractor Response / Comment Endorsed by: Implementing Agency Monitoring Agency 8 Domestic waste management Yes and No 4 TA T Roads and infrastructure impacts Encroachment into protected forests, hunting, wood collection Yes 4 TA T TA T199 There is no protected forest area 11 Community health and safety Yes and No 4 TA T Employment opportunities Yes 4 TA T Physical cultural resources - - TA T199 There is no PCR observed/ affected *) Mitigation Effectiveness Rating Criteria: (5). Very Good (all required mitigations implemented); (4) Good ( the majority of required mitigations implemented); (3). Fair (some mitigations implemented); (2). Poor (few mitigations implemented); (1). Very Poor (very few mitigations implemented) Page 40 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

48 (3). Environmental Incidents During Reporting Period (if relevant) Environmental Incidents (accidents, spills, complaint) Date / Location Reported by Description/ Location Action Taken Further Action Required Endorsed by: Implementing Agency Monitoring Agency (4).Summary of Actions Required and Follow-up (if relevant) Action Required Timeframe (e.g. within one week) Responsible Parties Follow-up (to be completed if inspection/monitoring indicates actions are required) Required Action Taken: Effectiveness: Further Action Required?: Prepared by: Date: Inspection Completed by: Attachments: (e.g. notes, photographs) Date: Signature:. Page 41 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

49 Appendix A Site Environmental Compliance Inspection and Monitoring of Package 2. Project : West Kalimantan Power Grid Strengthening Project (RRP INO 41074) Sub-Project : 275/150 kv Bengkayang Substation Implementing Agency Monitoring Agency Location : Magmagan, Bengkayang Enforcement Agency : PLN UPP KALBAGBAR-3, PLN UIP KALBAGBAR : PLN UIP KALBAGBAR : Ministry of Environment; Bapedalda West Kalimantan Monitoring Period : 1 st January - 30 th June 2016 Contractor(s) : CG Consortium Date : End of June 2016 Implementation Phase : Construction (1). Contractor(s) Contractor(s) Environmental Awareness Contractor(s) aware of mitigation requirements? Contractor(s) have a copy of EMP? Yes / No Yes Yes Actions Required Contractor Response / Comment CG Consortium to provide continued awareness of EMP to the subcontractors and the labourers CG Consortium to provide Simple Works Instruction Procedure to the labourers Page 42 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

50 No (2). Mitigation Compliance Inspection Impact / Mitigation Measure (From EMP) Mitigations Mitigations Implemented Effective? (Yes, No) (1 to 5)* 1 Vegetation clearing Yes Yes 2 Soil erosion Yes/No 3 Impact Observed / Location Action Required Complete the removing excavated soil and develop retaining wall surrounding the site 3 Drainage Yes/No 3 Construct permanent drainage. 4 Acid sulphate soils - - None 5 Water quality impacts Yes and No 3 Bengkayang Substation Prevent the water pollution (concrete waste water and oily water) 6 Air quality impacts Yes 4 Maintenance the machinery used 7 Construction waste management Yes and No 4 Cleaning whole construction waste 8 Domestic waste management Yes and No 3 Cleaning whole domestic waste 9 Roads and infrastructure impacts Yes 3 10 Encroachment into protected forests, hunting, wood collection 11 Community health and safety Yes and No 3 12 Employment opportunities Yes and No 3 Repair the access road when damage. - - No forest affected. Not applied. 13 Physical cultural resources - - None Awareness for workers and supervisors Always encourage the usage of local labourers Contractor Response / Comment Endorsed by: Implementing Agency Monitoring Agency *) Mitigation Effectiveness Rating Criteria : (5). Very Good (all required mitigations implemented); (4) Good ( the majority of required mitigations implemented); (3). Fair (some mitigations implemented) ; (2). Poor (few mitigations implemented) ; (1). Very Poor (very few mitigations implemented) Page 43 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

51 (3). Environmental Incidents during Reporting Period (if relevant) Environmental Incidents (accidents, spills, complaint) Date / Location Reported by Description/ Location Action Taken Further Action Required Endorsed by: Implementing Agency Monitoring Agency (4). Summary of Actions Required and Follow-up (if relevant) Action Required Timeframe (e.g. within one week) Responsible Parties Follow-up (to be completed if inspection/monitoring indicates actions are required) Required Action Taken: Effectiveness: Further Action Required?: Prepared by: Date: Inspection Completed by: Attachments: (e.g. notes, photographs) Date: Signature:. Page 44 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

52 Appendix A Site Environmental Compliance Inspection and Monitoring of Package 3. Project : West Kalimantan Power Grid Strengthening Project (RRP INO 41074) Implementing Agency : PLN UPP KALBAGBAR-3, PLN UIP KALBAGBAR Sub-Project : 150 kv Bengkayang-Ngabang- Tayan Transmission Line Monitoring Agency : PLN UIP KALBAGBAR Location : Bengkayang, Landak and Sanggau Regencies Enforcement Agency : Bapedalda of West Kalimantan Bapedalda of Bengkayang Bapedalda of Landak Bapedalda of Sanggau Monitoring Period : 1 st January - 30 th June 2016 Contractor(s) : Consortium of KEC International Limited and Mitsubishi Corporation Date : End of June 2016 Implementation Phase : Preparation for Construction (1). Contractor(s) Contractor(s) Environmental Awareness Contractor(s) aware of mitigation requirements? Yes / No Yes Actions Required Contractor Response / Comment KEC & Mitsubishi Consortium to provide continued awareness of EMP to the subcontractors and the labourers - Contractor(s) have a copy of EMP? Yes KEC & Mitsubishi Consortium to provide Simple Works Instruction Procedure to the labourers - Page 45 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

53 (2). Mitigation Compliance Inspection No Impact / Mitigation Measure (From EMP) Mitigations Implemented (Yes, No) Mitigations Effective? (1 to 5)* Impact Observed / Location Action Required Contractor Response / Comment Implementing Agency Endorsed by: Monitoring Agency 1 Vegetation Clearing Yes 4 2 Soil Erosion Yes/No 3 3 Drainage Yes/No 3 4 Acid Sulphate Soils Water Quality Impacts Yes and No 3 6 Air Quality Impacts Yes 4 7 Construction Waste Management Yes and No 3 8 Domestic Waste Management Yes and No Roads and Infrastructure Impacts Encroachment into Protected Forests, Hunting, Wood Collection Yes Community Health and Safety Yes and No 3 Bengkayang- Ngabang T.1A T.262 Tayan- Ngabang T.01 T.115 Levelize the tower site and smooth the steep slope To conduct backfilling for each leg as soon as it is finished There is no acid sulphate soils observed Prevent the water pollution (concrete waste water and oily water) Maintenance the machinery used Cleaning whole construction waste Cleaning whole domestic waste There is no protected forest area Awareness for workers and supervisors 12 Employment Opportunities Yes and No 3 13 Physical Cultural Resources - - There is no PCR observed/ affected *) Mitigation Effectiveness Rating Criteria (5). Very Good (all required mitigations implemented); (4) Good ( the majority of required mitigations implemented); (3). Fair (some mitigations implemented); (2). Poor (few mitigations implemented); (1). Very Poor (very few mitigations implemented) Page 46 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

54 (3). Environmental Incidents during Reporting Period (if relevant) Environmental Incidents (accidents, spills, complaint) None Date / Location Reported by Description/ Location Action Taken Further Action Required Endorsed by: Implementing Agency Monitoring Agency (4).Summary of Actions Required and Follow-up (if relevant) Action Required Timeframe (e.g. within one week) Responsible Parties Follow-up (to be completed if inspection/monitoring indicates actions are required) Required Action Taken: Effectiveness: Further Action Required?: Prepared by: Date: Inspection Completed by: Attachments: (e.g. notes, photographs) Date: Signature:. Page 47 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

55 Appendix A Site Environmental Compliance Inspection and Monitoring of Package 4. Project : West Kalimantan Power Grid Strengthening Project (RRP INO 41074) Sub-Project : 150/20 kv Ngabang & Tayan Substation Implementing Agency Monitoring Agency Location : Ngabang and Tayan Enforcement Agency Monitoring Period : PLN UPP KALBAGBAR-3, PLN UIP KALBAGBAR : PLN UIP KALBAGBAR : Bapedalda of West Kalimantan Bapedalda of Landak Bapedalda of Sanggau : 1 st January - 30 th June 2016 Contractor(s) : PT. Siemens Indonesia Date : End of June 2016 Implementation Phase : Construction (1). Contractor(s) Contractor(s) Environmental Awareness Contractor(s) aware of mitigation requirements? Contractor(s) have a copy of EMP? Yes / No Yes Yes Actions Required Contractor Response / Comment PT. Siemens Indonesia to provide continued awareness of EMP to the subcontractors and the labourers PT. Siemens Indonesia to provide Simple Works Instruction Procedure to the labourers Page 48 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

56 No (2). Mitigation Compliance Inspection Impact / Mitigation Measure (From EMP) Mitigations Mitigations Implemented Effective? (Yes, No) (1 to 5)* 1 Vegetation clearing Yes Yes 2 Soil erosion Yes/No 3 3 Drainage Yes 3 Impact Observed / Location 4 Acid sulphate soils - - None 5 Water quality impacts Yes and No 3 6 Air quality impacts Yes 4 7 Construction waste management Ngabang & Tayan Substations Action Required Retaining wall at the rear border and right hand side (viewed from main road) of the Ngabang substation need to be constructed soonest to protect land slide and erosion. Drainage adjacent to the road side area at Ngabang Substation needs to be immediately developed Prevent the water pollution (concrete waste water and oily water) Maintenance of the machinery used Yes and No 4 Cleaning whole construction waste 8 Domestic waste management Yes and No 3 Cleaning whole domestic waste 9 10 Roads and infrastructure impacts Encroachment into protected forests, hunting, wood collection Yes 4 11 Community health and safety Yes and No 3 12 Employment opportunities Yes and No 3 13 Physical cultural resources No forest affected. Not applied. Awareness for workers and supervisors Always encourage the usage of local labour None Contractor Response / Comment Endorsed by: Implementing Agency Monitoring Agency *) Mitigation Effectiveness Rating Criteria : (5). Very Good (all required mitigations implemented); (4) Good ( the majority of required mitigations implemented); (3). Fair (some mitigations implemented) ; (2). Poor (few mitigations implemented) ; (1). Very Poor (very few mitigations implemented) Page 49 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

57 (3). Environmental Incidents During Reporting Period (if relevant) Environmental Incidents (accidents, spills, complaint) Date / Location Reported by Description/ Location Action Taken Further Action Required Endorsed by: Implementing Agency Monitoring Agency (4). Summary of Actions Required and Follow-up (if relevant) Action Required Timeframe (e.g. within one week) Responsible Parties Follow-up (to be completed if inspection/monitoring indicates actions are required) Required Action Taken: Effectiveness: Further Action Required?: Prepared by: Date: Inspection Completed by: Attachments: (e.g. notes, photographs) Date: Signature:. Page 50 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

58 APPENDIX: A-2. PHOTOGRAPHS A-2.1. Package 1: 275 kv Bengkayang Jagoibabang Transmission Line Note: Left: Sagging activity at T 36 Right: Span between T 154 to T 155 No of Picture: 1 and 2 Route: 275 kv Bengkayang - Jagoibabang Tower: Left: T.36, Right: T.154 Location: Left: Lamoda village, Lumar. Right: Seluas village, Seluas. Status: Sagging. Picture taken: Left & Right 30 th January 2016 Note: Left: Stringing section of T 118 to T 134 for the bottom phase. Right: Tension Machine located near T 119 for conductor stringing at section T 118 to T 134 No of Picture: 3 and 4 Route: 275 kv Bengkayang - Jagoibabang Tower: T.118 and T,134 Location: Left: Sango village, Sanggau Ledo, Right: Mayak village Seluas Status: 2 nd circuit Conductor stringing Picture taken: Left & Right: 27 th February Note: Left: Installing new Number plate and Warning plate at T.189. Right: ROW span of tower T 188 T 189 No of Picture: 5 and 6 Route: 275 kv Bengkayang - Jagoibabang Tower: T.189 Location: Jagoi village, Jagoibabang Status: Installing the tower number and warning plate. Picture taken: Left & Right: 19 th March Page 51 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

59 Note: Left and right: Construction of retaining wall completed No of Picture: 7 and 8 Route: 275 kv Bengkayang - Jagoibabang Tower: T.50 (working number 52) Location: Lamoda Village, Lumar Picture taken: Left & Right: 13 March No of Picture: 9 and 10 Route: 275 kv Bengkayang - Jagoibabang Tower: T.13 and 36 Location: Tiga Berkat and Belimbing village, Lumar Picture taken: Left & Right 20 April Note: Left: Construction site already overgrown with bushes and grass. Right: Packing materials still to be removed A-2.2. Package 2: Bengkayang Substation No of Picture: 11 and 12 Area: 275/150/20 kv Bengkayang Substation Location: 275 kv substation area Status: Maintenance phase Picture taken: Left: 18 th March Right: 30 th March, 2016, Note: Left: Safety Warning at 275 kv substation area Right: Inner road and drainage in the substation area Page 52 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

60 Note: Left: Outer fence at Northern boundary. Right: Outer fence at South-east boundary No of Picture: 13 and 14 Area: 275/150/20 kv Bengkayang Substation Location: North and South-East- Boundary area Status: Maintenance phase Picture taken: Left: 18 th March 2016, Right: 30 th March 2016 No of Picture: 15 and 16 Area: 275/150/20 kv Bengkayang Substation Location: Left & Right: Village/Access Road. Status: Improving Village/ Access Road. Picture taken: Left 30 th March Right: 22 th June 2016 Note: Left: Gravel has been put to cover up the village/access road. Right: 20 kv distribution lines from Bengkayang substation to supply Bengkayang and surrounding areas have been installed along the existing village/access road. A-2.3. Package 3: 150 kv Bengkayang- Ngabang-Tayan transmission line: 1) 150 kv Bengkayang Ngabang transmission line Note: Left: Concreting tower foundation pad Leg D at T106 Right: Concreting tower foundation pad, Leg A at T 89 No of Picture: 17 and 18 Route: 150 kv Bengkayang - Ngabang No of Tower: T 106 and T.89 Location: Left: Tembawang village, Landak Right: Kampet, Landak Status: Tower foundation construction Picture taken: Left: 22 nd March Right: 24th March 2016 Page 53 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

61 Note: Left: Stone masonry as slope protection at T.181 Right: Soil excavation of tower foundation leg D at T.46 No of Picture: 19 and 20 Route: 150 kv Bengkayang - Ngabang No of Tower: T.181 and T.46 Location: Left: Antan Rayan village, Landak. Right: Sebente, Bengkayang Status: Tower foundation construction Picture taken: Left: 24 th February Right: 26 th March 2016 Note: Left & Right: Tower foundation T.2A, leg D to be protected with slope protection No of Picture: 21 and 22 Route: 150 kv Bengkayang - Ngabang No of Tower: T.1A; T.19-T21 Location: Magmagan village. Status: Tower s foundation construction Picture taken: Left & Right: 25 th February ) 150 kv Ngabang Tayan Transmission Line No of Picture: 23 and 24 Route: 150 kv Ngabang - Tayan No of Tower: T.90 Location: Jelimpo village Picture taken: Left: 29 th February Right: 10 th March 2016 Note: Left: Pile cap concreting of leg D at T.90 Right: Pile cap concreting of leg C at T.90 Page 54 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

62 No of Picture: 25 and 26 Route: 150 kv Ngabang - Tayan No of Tower: T.63 and T.98 Location: Padekaye village, Balai and Jelimpo village Status: Tower erection Note: Left: Transport of steel members for tower construction Right: Tower erection Picture taken: Left: 17 May Right: 24 May 2016 No of Picture: 27 and 28 Route: 150 kv Ngabang - Tayan No of Tower: T.5 Note: Left & Right: Soil excavation of pile cap leg B at T.5 Location: Cempedak village, Tayan Sub district Picture taken: Left: 24 th February Right. 25 th February 2016 No of Picture: 29 and 30 Route: 150 kv Ngabang - Tayan No of Tower: T.60 and T.90 Location: Padekaye village, Balai and Jelimpo village Status: Foundation construction and provisional retaining wall Note: Left: Pouring of concrete for pad of Leg B of tower 60 Right: Provisional retaining wall to avoid soil erosion at tower 90 Picture taken: Left: 6 June 2016 Right: 17 May 2016 Page 55 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

63 No of Picture: 31 and 32 Route: 150 kv Ngabang - Tayan No of Tower: T.47 and T.55 Note: Left: Tower Erection of T.47. Right: Tower Erection of T.55 Location: Padekaye village, Balai Sub district Picture taken: Left: 24 th March Right: 24 th February A-2.4. Package 4: 150/20 kv Ngabang and Tayan substations 1) 150/20 kv Ngabang substation No of Picture: 33 and 34 Area: 150/20 kv Ngabang substation Location: Left: Transformer area. Right: Oil pit Status: Equipment accessories civil works. Picture taken: Left: 24 March 2016, Right: 29 March 2016 Note: Left: Transformer 150/20 kv and its oil pit area. Right: Construction of Oil pit concrete cover was finished No of Picture: 35 and 36 Area: 150/20 kv Ngabang substation Location: Left: Right border line. Right: Rear border Status: Under construction Picture taken: Left: 29 th March 2016, Right: 22 th March 2016 Note: Left: Water Tank Concrete Column. Right: Septic tank Page 56 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

64 No of Picture: 37 and 38 Area: 150/20 kv Ngabang substation Location: Right border Status: Under construction Pictures taken: 15 June 2016 Note: Left: Drainage channel under construction. Right: Construction of stone masonary at back side of retaining wall No of Picture: 39 and 40 Area: 150/20 kv Ngabang substation Location: Control building Status: Under construction Picture taken: Left & Right: 29 th March 2016 Note: Left: Control building of Ngabang Substation. Right: Equipment Panels inside the control building 2) 150/20 kv Tayan substation No of Picture: 16 Area: 150/20 kv Tayan substation Location: East front yard Status: Inner fence construction Note: Left: Construction of inner fence & drainage. Right: Inner fence & drainage has been completed Picture taken: Left: 25 th February Right: 10 th March 2016 Page 57 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

65 Note: Left: Gravel and Open Drainage finished Right: Finishing work on access concrete road No of Picture: 17 Area: 150/20 kv Tayan substation Location: Left: Switchyard area. Right: Switchyard area of existing project. Status: Accesories facility civil work construction Picture taken: Left & Right: 23 rd March 2016 No of Picture: 23 and 24 Area: 150/20 kv Tayan substation Location: Status: Finishing works Pictures taken: 20 April 2016 Note: Left: Retaining wall at Tayan substation Right: Gravel put at Tayan 150 kv switchyard Page 58 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

66 A-3. CONTRACTUAL ENVIRONMENTAL REQUIREMENTS OF EACH PACKAGE A-3.1. PACKAGE 1: 275 KV BENGKAYANG JAGOIBABANG TRANSMISSION LINE (4) Section VII Special Section 8 - Special Conditions of Contract Conditions Special Conditions of Contract (SCC) shall supplement the General Conditions of Contract (GCC). Whenever there is a conflict, the provisions herein shall prevail over those in the GCC. The clause number of the SCC is the corresponding clause number of the GCC (Page 8-1). Clause 46. Protection of the Environment (Page 8-6) The Contractor shall comply with all applicable national, provincial, and local environmental laws and regulations. The Contractor shall: a. establish an operational system for managing environmental impacts, b. carry out all of the monitoring and mitigation measure set forth in the Initial Environmental Examination (lee) or Environmental Management Plan (EMP), and c. allocate the budget required to ensure such measures are carried out. The Contractor shall submit semi-annual reports on the carrying out of such measure to the Employer. More particularly, the Contractor shall comply with: (i) the measures and requirements set forth in the initial environmental examination and the environmental management plan attached hereto as Appendix 9; and (ii) any corrective or preventive actions set out in safeguards monitoring reports that the Employer will prepare from time to time to monitor implementation of the initial environmental examination and the environmental management plan. The Contractor shall allocate a budget for compliance with these measures, requirements and actions Addendum No. 1 of Bidding Document Package 1: 275 kv Bengkayang - Jagoibabang Transmission Line (September 2012) Section 8: Special Conditions of Contract (Page R1) Clause 35. Unforeseen Conditions Clause 35.3 (added at end of 35.3) o In addition to notice of any Unforeseeable physical conditions, the Contractor shall provide the Project Manager with a written notice of any unanticipated environmental or resettlement risks or impacts that arise during construction, implementation or operation of the Plant or Permanent Works, which were not considered in the initial environmental examination, the environmental management plan or the resettlement plan attached hereto as Appendix 9 through Appendix 10 (not attached in this report) 4 Contract document No 001.PJ/611/DIR/2013 dated April 12 th, 2013 between PT Perusahaan Umum Listrik Negara (Persero) and PT Bukaka Teknik Utama. Strengthening West Kalimantan Power Grid Project Loan ADB + AFD. Package 1: Design, Supply, Installation, Testing, and Commissioning of 275 kv Overhead Transmission Lines Bengkayang Substation Jagoibabang Volume I IV. Page 59 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

67 A-3.2. PACKAGE 2: 275/150 KV BENGKAYANG SUBSTATION (5) VOLUME I of III, BOOK 2 of 2, April GENERAL TECHNICAL REQUIREMENT: 2.4 Environmental Considerations The contractor shall comply with the following acts and regulations a follows: - Act of Republic of Indonesia no. 23/1997, regarding Environmental Management - Act of Republic of Indonesia no. 24/1992, regarding Spatial Use Management - Degree of the Minister for Environmental of Republic of Indonesia No. KEP- 28/MENLH/11/1996, regarding Noise Level Standards - The following are other environmental considerations for which the Contractor shall take due considerations. Local Employment The contractor shall make every endeavour to maximize the employment of people from the local villages of the site. Earthworks The Contractor shall ensure that stripped topsoil is stored for later use for landscaping and re-vegetation. The Contractor shall ensure that adequate and appropriate temporary silt ponds, site drainage and silt traps are constructed during earth works, especially in the rainy season to minimize the impact of silt/mud run off into local streams. The Contractor shall minimize the extent of vegetation stripping during earth works. At the completion of the main earth works the Contractor shall spread topsoil in open areas inside the site and re-vegetate such areas as appropriate. Construction Traffic The road to the site is narrow and passes through a village. There are a number of residents houses and a school near the road. Therefore, in order to minimize construction traffic impact and ensure the safety of local people - in particular children - the Contractor shall schedule as best as practical the construction traffic through the villages so as to minimize impacts. Construction traffic shall be during the day except for large transportation items. The contractor shall install traffic signs around the villages and impose and strictly enforce a 20 km/h speed limit for construction traffic in the vicinity of the site and village. All construction vehicles shall be maintained as to minimize their noise and exhaust pollution levels. The road in the vicinity of the site and the local village which is used for construction traffic shall be regularly water sprinkled by water truck to minimize the level of dust in the air around local villages. Site Noise Control All works shall be carried out without unreasonable noise. Welding generator and stringing motors used at site shall be silenced either by using only full silenced models fitted with effective exhaust silencers and properly lined and sealed acoustic covers or by 5 Contract Document No PJ/611/DIR/2013, Dated April 30th, 2013, between PT. Perusahaan Listrik Negara (PERSERO) and CG Consortium for Strengthening West Kalimantan Power Grid Project LOAN ADB + AFD Package 2 : Design, Supply, Installation, Testing, and Commissioning of 275/150 kv Bengkayang Substation Page 60 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

68 the use of effective acoustic screen to enclose the noise source. Such equipment shall be maintained in good and efficient working order. Public Morality The Contractor shall be responsible for keeping discipline in the site and in this regard the Contractor shall pay attention to the public morality of his staff and labourers both on and off the site. In the interests of good community relations, the Contractor and his personnel shall be circumspect in their dealing with people residing in the neighbourhood of the works and take steps to minimize any disturbance to them. The Contractor shall arbitrate any dispute arising between his personnel and persons in the neighbourhood of the works. Interference with Existing Water Courses The Contractor shall not interfere with damage, contaminate and/or pollute any existing significant streams or rivers. The Contactor shall take all precautions not to affect the original condition. Direct discharge of construction waste water or contaminated water into the stream or river is not permitted. The Contractor shall provide adequate setting basins for construction works. VOLUME I of III, BOOK 1 of 2, Aprill 2013 SECTION 8. SPECIAL CONDITIONS OF CONTRACT (SCC) 46. Environmental Protection (page 8-6) The Contractor shall comply with all applicable national, provincial, and local environmental laws and regulations. The Contactor shall: (a) establish an operational system for managing environmental impacts, (b) carry out all the monitoring and mitigation measure set forth in the Initial Environmental Examination (IEE) or Environmental Management Plan (EMP), and (c) allocate the budget required to ensure such measures are carried out. The Contractor shall submit semi-annual reports on the carrying out of such measures to the Employer. More particularly, the Contractor shall comply with (i) the measures and requirements set forth in the initial environmental examination and the environmental management plan attached hereto as Appendix 9; and (ii) any corrective or preventive actions set out in the safeguards monitoring reports that the Employer will prepare from time to time to monitor implementation of the initial environmental examination and environmental management plan. The Contractor shall allocate a budget for compliance with these measures, requirements and actions ADDENDUM NO Unforeseen Conditions 35.3 (added to end of 35.3) In addition to notice of any unforeseeable physical conditions, the Contractor shall provide the Project Manager with a written notice of any unanticipated environmental or resettlement risks or impact that arise during construction, implementation or operation of the Plant or Permanent Works, which were not considered in the initial environmental Page 61 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

69 examination, the environmental management plan or the resettlement plan attached hereto as Appendix 9 through Appendix 10 (not added to this report). A-3.3. PACKAGE 3: 150 KV BENGKAYANG NGABANG TAYAN TRANSMISSION LINE (6) Section VI Addendum No. 1 of Bidding Document (September 2012) Section 8 - Special Conditions of Contract (Page 8-5-R1) Section VII: Special Conditions Section 8 - Special Conditions of Contract Special Conditions of Contract (SCC) shall supplement the General Conditions of Contract (GCC). Whenever there is a conflict, the provisions herein shall prevail over those in the GCC. The clause number of the SCC is the corresponding clause number of the GCC (Page 8-1). Section 8 - Special Conditions of Contract (Page 8-5) Clause 35. Unforeseen Conditions Clause (added at end of 35.3) In addition to notice to any unforeseen physical conditions, the Contractor shall provide the Engineer with a written notice of any unanticipated environmental or resettlement risks or impacts that arise during construction, implementation or operation of the Plant or Permanent Works, which were not considered in the initial environmental examination, the environmental management plan or the resettlement plan attached hereto as Appendix [B] through Appendix [D]. Clause 46. Protection of the Environment (Page 8-5 and 8-6) The Contractor shall comply with all applicable national, provincial, and local environmental laws and regulations. The Contractor shall: a. establish an operational system for managing environmental impacts, b. carry out all of the monitoring and mitigation measure set forth in the Initial Environmental Examination (lee) or Environmental Management Plan (EMP), and c. allocate the budget required to ensure such measures are carried out. The Contractor shall submit semi-annual reports on the carrying out of such measure to the Employer. More particularly, the Contractor shall comply with: (i) the measures and requirements set forth in the initial environmental examination and the environmental management plan attached hereto as Appendix [B and D]; and (ii) any corrective or preventive actions set out in safeguards monitoring reports that the Employer will prepare from time to time to monitor implementation of the initial environmental examination and the environmental management plan. The Contractor shall allocate a budget for compliance with these measures, requirements and actions 6 Contract document No 0009.PJ/611/DIR/2013 dated April 30 th, 2013 between PT Perusahaan Umum Listrik Negara (Persero) and Consortium of KEC International Limited and Mitsubishi Corporation. Strengthening West Kalimantan Power Grid Project Loan ADB + AFD. Package 3: Design, Supply, Installation, Testing, and Commissioning of 150 kv Overhead Transmission Lines Bengkayang Ngabang-Tayan. Volume I III. Page 62 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

70 A-3.4. PACKAGE 4: 150/20 KV SUBSTATION AT NGABANG AND TAYAN (7) BOOK I (1 of 8) Section 8. Special Conditions of Contract (SCC) and Addendum No. 1 September, Environmental Protection The Contractor shall comply with all applicable national, provincial, and local environmental laws and regulations. The Contactor shall: (a) establish and operational system for managing environmental impacts, (b) carry out all the monitoring and mitigation measure set forth in the Initial Environmental Examination (IEE) or Environmental Management Plan (EMP), and (c) allocate the budget required to ensure such measures are carried out. The Contractor shall submit semi-annual reports on the carrying out of such measure to the Employer. More particularly, the Contractor shall comply with: (i) the measures and requirements set forth in the initial environmental examination and the environmental management plan attached hereto as Appendix 9; and (ii) any corrective or preventive actions set out in the safeguards monitoring reports that the Employer will prepare from the time to time to monitor implementation of the initial environmental examination and environmental management plan. The Contractor shall allocate a budget for compliance with these measures, requirements and actions. 7 Contract Agreement No PJ/041/DIR/2013, Dated : August 1st, 2013 Between: PT. PLN (Persero) and PT. Siemens Indonesia FOR Strengthening West Kalimantan Power Grid Project Loan ADB + AFD. Package 4 : Design, Supply, Installation, Testing, and Commissioning of 150/20 kv Substation at Ngabang and Tayan Page 63 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

71 APPENDIX: A-4. LIST OF SUBMITTED ENVIRONMENTAL REPORTS a) Inception Report (One) b) Quarterly Report (Eight) c) Semi annual Report (Four) d) Monthly Reports (Twenty nine) Inception Report Monthly Reports Quarterly Report Semi Annual Reports Page 64 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

72 APPENDIX: A-5. STATUS OF THE TOWER CHANGES AND ENVIRONMENTAL REVIEW Comparing with the original schedule mentioned in IEE, there are some route changes due to relocation of the planned sites for 275/150kV Bengkayang substation and 150/20 kv Ngabang substation. The routes location are highlighted in the Map A-1 and the addition or elimination of towers as consequence of the site changes of both substations are discussed in the following paragraphs: Map A-1 Situation map of re-routing of 275 kv Bengkayang Jagoibabang and 150 kv Bengkayang Ngabang Tayan Transmission Lines e) Tower reroutes and changes of tower locations of 275 kv Bengkayang Jagoibabang Transmission Line According to the original planning, this route comprised of 199 towers (Tower No 1 in Bengkayang to Tower No 199 in Jagoibabang). For the sake of synchronizing with the route of the 150 kv Singkawang-Bengkayang transmission line, the planned 275/150kV Bengkayang substation which was originally located at the left hand side of road into direction to Jagoibabang, had been shifted to north-eastern direction at right hand side of the road, located adjacent to the 150/20 kv Bengkayang substation which is under construction and where the 150 kv Singkawang - Bengkayang Transmission Line will be terminated. Now this line comprises of 201 towers as described below: a.1) Six towers from No.1 to 6 had been eliminated, and replaced through four towers of No. A, B, C, D which had been erected to connect the 275 kv Bengkayang Substation (see Map A-1) with tower No. 7 (Coordinate X= , Y= ). For the sake of mitigating of insufficient ground clearance of Page 65 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

73 conductors, an additional four intermediate/insertion towers of No. 76A, 99A, 110A, and 158A had been constructed. So in total, there are 201 towers, or two additional towers on the 275 kv Bengkayang-Jagoibabang route. Table A.1.1 Tower Changes of 275 kv Bengkayang Jagoibabang Transmission Line TOWER NUMBERS A B C D A A A A Tower inserted The 275/150kV Bengkayang substation has been shifted to North-Eastern direction at right hand side of the road, located adjacent to 150/20 kv Bengkayang substation to connect with Singkawang. The towers connecting to it were relocated (4 sites) and eliminated 2 sites. Map A-2 Tower re-routing of 275 kv Bengkayang Jagoibabang and 150 kv Bengkayang - Ngabang Transmission Lines Environmental review: The route to the new substation location at Bengkayang had less impact on forest land due to shorter distance of the Right of Way (ROW) but slightly more impact on rubber and palm oil plantation, and it also added one more crossing of the main National Road of Bengkayang - Jagoibabang and medium voltage lines. No major impact and no special environmental management measures were encountered. During the construction of towers and stringing activities the environmental standard protection measures had been applied and thereby eliminated the expected associated impact. Regarding land use of the alignment which was rubber and palm oil plantation, in general, the prediction of potential impacts to be experienced by affected households due to the permanent land acquisition for the tower bases were minor. The towers in West Kalimantan have been constructed higher than those of Page 66 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

74 International standard, so the farmers may cultivate along the ROW area with the annual or perennial crops with its canopy up to 3 m in height. The impact on traffic due to main road crossing could be neglected because no traffic congestion had been encountered caused by stringing activities. Scaffolding as temporary protection made of bamboo at both sides of the road eliminated the traffic disturbance. a.2) The new 275/150 kv Bengkayang substation is being developed adjacent to the new 150/20 kv substation of Bengkayang where it will connect with the 150 kv Bengkayang - Singkawang Transmission Line, but its construction was stagnant for a long period due to financial matters. The landuse of the substation area was rubber plantation. The planned area was undulating and so it needed soil works to level the site. The higher soil level had been excavated to fill the lower level. No quarry from outside was needed for the embankment, all soil for embankment came from the same area. Environmental review: Impact on erosion and polluting the water body was minimal because there was no significant creek or river in that area. No embankment for land preparation using soil/material from other location outside, thus no hauling truck going in/out carrying soil that might cause an impact on air quality such as fugitive dust and exhaust gas. No wild animal affected, since the area was rubber plantation and bushes. Close to the substation area at approximately 100 m, there is an elementary school, but without impact on children since there is no access for them to go to the site. The substation area is fenced to protect anybody from entering the site without permission. f) Tower re-routes of 150 kv Bengkayang - Ngabang Transmission Line According to the original plan, this route would comprise of 260 towers (Tower No 1 in Bengkayang to Tower 260 in Ngabang). The total number of towers became 280 after several modifications to the number of the towers: Due to 275/150/20 kv Bengkayang Substation shifted north-eastern, it had been decided to eliminate three towers (number 1 to 3) and add of seven new towers (1A, 2A, 3A, 4A, 5A, 6A, and 7A). Tower 1A (X=332798, Y=100065); Tower 7A (X=333493, Y=98504) (see Map A-2). According to recalculation of the design regarding the conductor ground clearance, it had been decided to eliminate three towers (Tower No. 126, 157 and 158), but in addition one insert tower (Tower No. 24A) will be required. Recent consideration of land acquisition and span clearance, that Tower No 126 and 127 will still be constructed. Seven towers to be shifted due to relocation of 150/20 kv Ngabang Substation (see Map A-3.1). Eight towers will be added to connect T.1 to Tayan substation Page 67 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

75 Table A.1.2. TOWER CHANGES OF 150 KV BENGKAYANG NGABANG TRANSMISSION LINE TOWER NUMBERS 1A 2A 3A 4A 5A 6A 7A A Note: Tower Changes Due to landuse problem on previously proposed Ngabang Substation, the towers connecting to it have been planned to be relocated. (The new route survey and design had been completed). As the new Ngabang substation is now closer to Tayan direction, tower No. 117 up to 133 of Tayan - Ngabang Transmission Line has been added to Bengkayang - Ngabang Transmission Line. Accordingly, the total number of towers of Bengkayang - Ngabang Transmission Line will become 280. b.1) Re-routes and addition of 7 new towers (1A, 2A, 3A, 4A, 5A, 6A, and 7A). Environmental review: Of the seven additional tower sites of 150 kv Bengkayang Ngabang Transmission Line, there are four towers which will be constructed in parallel route to the completed 150 kv Bengkayang - Singkawang Transmission Line. The later route is on the western side and the Bengkayang - Ngabang Transmission Line route is on the eastern side. The landuse of the new alignment is palm oil, rubber plant and bushes. There is no protected wild animal in the area, so the impact on flora and fauna is considered insignificant. The new route is far from the river and other water bodies, impact on sedimentation and water quality caused by new alignment can be neglected. b.2) Re-routes due to relocation of originally proposed Ngabang substation. Nine new towers will be constructed due to the relocation of the originally planned Ngabang substation site, of which seven towers will belong to the previous Bengkayang - Ngabang alignment and two towers belong to the previous Ngabang - Tayan alignment. The footprint of the proposed tower sites has been surveyed and the tower types have been designed. Page 68 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

76 Map A-3.1 Tower re-routes of 150 kv Bengkayang - Ngabang Transmission Line at originally proposed Ngabang substation Note: The green mark (T.259) was planned for Ngabang substation, but now it is used as dwelling area, so it had been decided to relocate the substation to the South-East of Ngabang (see Map No. A-3.2) Tower of Tayan Ngabang shifted to become Bengkayang-Ngabang Ngabang SS Tayan Ngabang route shifted to Bengkayang- Relocated Bengkayang Ngabang Ngabang route Connected route to 116B 116A Due to (New) Ngabang substation shifted southward, towers (yellow mark) are to be relocated. Environmental review: The new alignment of the 150 kv transmission line passes through gentle area with landuse of rubber plantation and mixed garden. The area is far from the water body, so erosion and sedimentation will be insignificant. There is no protected wild animal, so the impact on flora and fauna is considered insignificant. Tower T.252 toward tower T.259 as the end tower of 150 kv Bengkayang - Ngabang route were shifted by approximately 700 m southern of original route to connect with the Ngabang Tayan Transmission Line. It will overpass the regency road and the green area along the creek in between the fast growing residential area. No significant impact is anticipated along this relocated route. g) Tower re-routing of 150 kv Ngabang Tayan Transmission Line The planned number of towers of the original plan for 150 kv Tayan Ngabang Transmission Line was 133, counting starts from Tayan substation. The total tower will become 128 due to relocation of Ngabang and Tayan substations. c.1) Towers changes to connect 150 kv Ngabang substation. The new 150/20 kv Ngabang Substation is under construction near to the previous tower No T.116 of the 150 kv Tayan - Ngabang Transmission Line (x= ; y= ). This tower was located adjacent to and on the right hand side of the main road of Pontianak Tayan - Ngabang in the village of Tebedak, Ngabang Subdistrict, Landak Regency (see Map A-3.2). Page 69 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

77 Map A-3.2 Tower re-routes of 150 kv Bengkayang - Ngabang Transmission Line Environmental review: The area of the New Ngabang substation is approximately 1 ha. The topography was undulating and the level of the area about 1 to 4 m higher than the main road. There is no major settlement close to the area. To level the site, soil works had been conducted in March - April No quarry was needed for embankment and no excess soil to be moved in/out from the site, so there was no major impact on traffic caused by the land preparation. Impact on water quality during the land preparation was insignificant, since the river is about 1.5 km away. The landuse of the proposed new substation was mixed vegetation that consisted of bamboo, rubber trees and other wood trees. No protected fauna was found in that area. The Tayan - Ngabang transmission line was relocated from T.114 up to T115. In the alignment of those towers are oil palm plantations for which no significant environmental impact is expected. c.2) Tower additions to connect with 150 kv Tayan substation In the original tower schedule, the first tower (T.01) of Tayan is not adjacent to the existing Tayan substation, because the originally planned Tayan substation was relocated about 2.5 km southward due to land acquisition and other consideration of the Siantan-Tayan transmission line route. The Tayan- Ngabang transmission line needs nine additional towers (1A, 1B, 1C, 1C1 1D, 1D1, 1E, 1F and 1G). Environmental review: The direct route will cross the national road that connects Pontianak with several regencies in eastern part of West Kalimantan and in the future to southern part of West Kalimantan after the Kapuas (1.5 km) bridge will be completed. The crossing point of the transmission lines with that important road will be in the area which is very close to the cross junction road connecting Tayan Sosok. That area is a new high value commercial area where several buildings (some of them with two storey floors) have been built along this road, leaving relatively narrow corridors in between that could be used as the route for the transmission line. Page 70 of 71 Fifth Semi Annual Report on Environmental Issues (30/6/2016)

INO: West Kalimantan Power Grid Strengthening Project

INO: West Kalimantan Power Grid Strengthening Project Environment Monitoring Report # Quarterly Report March 2016 INO: West Kalimantan Power Grid Strengthening Project Prepared by Joint Venture Of Tractebel Engineering Ltd and Powergrid International Limited

More information

INO: West Kalimantan Power Grid Strengthening Project

INO: West Kalimantan Power Grid Strengthening Project Environmental Monitoring Report # Semiannual Report July-December 2016 INO: West Kalimantan Power Grid Strengthening Project Prepared by Joint Venture of Tractebel Engineering Ltd and Powergrid International

More information

INO: West Kalimantan Power Grid Strengthening Project

INO: West Kalimantan Power Grid Strengthening Project Environmental Monitoring Report Semi-Annual Report January-June 2014 INO: West Kalimantan Power Grid Strengthening Project Prepared by the joint venture of Tractebel Engineering Ltd. and Power Grid International

More information

WEST KALIMANTAN POWER GRID STRENGTHENING PROJECT Reducing Indonesia s Oil Dependency While Fostering Regional Cooperation

WEST KALIMANTAN POWER GRID STRENGTHENING PROJECT Reducing Indonesia s Oil Dependency While Fostering Regional Cooperation WEST KALIMANTAN POWER GRID STRENGTHENING PROJECT Reducing Indonesia s Oil Dependency While Fostering Regional Cooperation Construction of the Bengkayang Substation Sohail Hasnie Oil fuels all power generation

More information

6. Project Description

6. Project Description 6. Project Description As previously noted, the Project will supply electricity from the 500 kv system to the 230 kv system in order to replace the loss of the Pickering NGS (see Section 1.1 for the need

More information

Big Thunder Wind Park

Big Thunder Wind Park Construction Plan Report DRAFT Prepared by: M.K. Ince and Associates Ltd. May 18, 2010 TABLE OF CONTENTS BIG THUNDER WIND PARK... 1 1 PROJECT OVERVIEW... 1 1.1 PROJECT SCHEDULE... 2 2 CONSTRUCTION ACTIVITIES...

More information

Sri: Sustainable Power Sector Support Project

Sri: Sustainable Power Sector Support Project Environmental Monitoring Report June 2015 Sri: Sustainable Power Sector Support Project Prepared by Ceylon Electricity Board for the Asian Development Bank. This environmental monitoring report is a document

More information

Water Pollution Control for Work in Sensitive Areas

Water Pollution Control for Work in Sensitive Areas Water Pollution Control for Work in Sensitive Areas 10-1. WATER POLLUTION CONTROL The Contractor is advised that failure to fully comply with the provisions of this Section, and all requirements listed

More information

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 311000 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

ROADS: OPERATION AND MAINTENANCE

ROADS: OPERATION AND MAINTENANCE ROADS: OPERATION AND MAINTENANCE GEMS Environmental Compliance- ESDM Training Series Kabul July / August 2016 8/1/2016 1 ROADS AND DEVELOPMENT Improved access = benefits across economic sectors Service

More information

Prepared by State Joint Stock Company UzbekEnergo for the Republic of Uzbekistan and the Asian Development Bank.

Prepared by State Joint Stock Company UzbekEnergo for the Republic of Uzbekistan and the Asian Development Bank. Environmental Monitoring Report Semestral Report for July - December 2016 UZB: Samarkand Solar Power Project Prepared by State Joint Stock Company UzbekEnergo for the Republic of Uzbekistan and the Asian

More information

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are: 4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:

More information

PREQUALIFICATION APPLICATION INSTRUCTIONS

PREQUALIFICATION APPLICATION INSTRUCTIONS PREQUALIFICATION APPLICATION INSTRUCTIONS Please read the following instructions carefully as incomplete applications will not be processed. COMPLETE AND RETURN ALL SECTIONS OF THE APPLICATION PACKAGE.

More information

Papua New Guinea: Pilot Border Trade and Investment Development Program

Papua New Guinea: Pilot Border Trade and Investment Development Program Environmental Monitoring Report Semiannual Report January June 2016 Papua New Guinea: Pilot Border Trade and Investment Development Program Prepared by Border Development Authority for the Government of

More information

CAMLICA ELEKTRIK URETIM A.S. CAMLICA III RESERVOIR AND HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN (EMP)

CAMLICA ELEKTRIK URETIM A.S. CAMLICA III RESERVOIR AND HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN (EMP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized CAMLICA ELEKTRIK URETIM A.S. CAMLICA III RESERVOIR AND HYDROELECTRIC POWER PLANT (HEPP)

More information

YUCE HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN

YUCE HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized YUCE HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT

More information

PREQUALIFICATION APPLICATION INSTRUCTIONS

PREQUALIFICATION APPLICATION INSTRUCTIONS PREQUALIFICATION APPLICATION INSTRUCTIONS Please read the following instructions carefully as incomplete applications will not be processed. COMPLETE AND RETURN ALL SECTIONS OF THE APPLICATION PACKAGE.

More information

1993 Specifications CSJ'S & SPECIAL SPECIFICATION ITEM Tree Preservation and Treatment

1993 Specifications CSJ'S & SPECIAL SPECIFICATION ITEM Tree Preservation and Treatment 1993 Specifications CSJ'S 0912-71-554 & 0912-71-555 SPECIAL SPECIFICATION ITEM 1016 Tree Preservation and Treatment 1. Description. This section specifies the requirements for protecting trees and related

More information

Livezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani

Livezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Livezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani DESCRIPTION OF

More information

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES Construction Best Management Practices Handbook www.montereysea.org BEST MANAGEMENT PRACTICES 26 www.montereysea.org Construction Best Management Practices Handbook VEHICLE TRACKING AND DUST CONTROL IN

More information

10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION

10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION 10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION 10.1 Objective The main objective is to confirm the implementation of mitigation measures recommended in

More information

CONSTRUCTION PHASE ENVIRONMENTAL ISSUE MITIGATION REQUIREMENTS 1. Access road selection and construction

CONSTRUCTION PHASE ENVIRONMENTAL ISSUE MITIGATION REQUIREMENTS 1. Access road selection and construction 2.7 Generic Mitigation Measures 2.7.1 Avifauna CONSTRUCTION PHASE ENVIRONMENTAL ISSUE MITIGATION REQUIREMENTS 1. Access road selection and construction Vehicles and machinery can impact on natural vegetation

More information

Environmental Impact Assessment. GEO: East West Highway (Khevi Ubisa Section) Improvement Project

Environmental Impact Assessment. GEO: East West Highway (Khevi Ubisa Section) Improvement Project May 2018 Third Draft GEO: East West Highway (Khevi Ubisa Section) Improvement Project Section F2 of the Khevi Ubisa Shorapani Argveta Road (E60 Highway) Part 6 Appendices A D Prepared by JV IRD Engineering

More information

Leaside to Main Infrastructure Refurbishment Project Strengthening the transmission system in your neighbourhood

Leaside to Main Infrastructure Refurbishment Project Strengthening the transmission system in your neighbourhood Leaside to Main Infrastructure Refurbishment Project Strengthening the transmission system in your neighbourhood Purpose of this Public Information Centre Provide you with an update on Hydro One s infrastructure

More information

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING January 2007(Revision 1) Page 1 of 8 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 CLASSIFICATION OF THE WORK 1.05 QUALITY ASSURANCE PART 2 PRODUCTS 2.01

More information

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5B

Oweninny Wind Farm. Oweninny Environmental Impact Statement Appendix 5B Oweninny Wind Farm Oweninny Environmental Impact Statement Appendix 5B Access Tracks, Hardstanding Areas, Electrical Compounds, Borrow Pit And Cable Laying Construction Method Statement Copyright ESB International

More information

Prequalification of Electrical Contractors

Prequalification of Electrical Contractors Prequalification of Electrical Contractors \\ 2018 Application Instructions & Forms Prequalified Electrical Contractors Application Checklist To apply for prequalification of utility type work for Tacoma

More information

Environmental Due Diligence Report. People s Republic of China: Guangxi Baise Vocational Education Development Project

Environmental Due Diligence Report. People s Republic of China: Guangxi Baise Vocational Education Development Project Environmental Due Diligence Report # 1 Report February 2017 People s Republic of China: Guangxi Baise Vocational Education Development Project Prepared by Guangxi Baise Vocational Education Development

More information

E. CONSTRUCTION PROCEDURES

E. CONSTRUCTION PROCEDURES E. CONSTRUCTION PROCEDURES The Project facilities would be constructed in accordance with established electric utility practices, best management practices, final engineering plans, CL&P s specifications

More information

SIEA LUNGGA POWER STATION RETAINING WALL

SIEA LUNGGA POWER STATION RETAINING WALL SIEA LUNGGA POWER STATION RETAINING WALL 1. Glossary In this scope of work the following abbreviations and definitions apply. Term AS 3000 AS 3600 AS 3700 Boundary Lines AS 4678 Brick Works Contract Contractor

More information

Public Disclosure Authorized EXECUTIVE SUMMARY

Public Disclosure Authorized EXECUTIVE SUMMARY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized EXECUTIVE SUMMARY Introduction Georgia is an important transport corridor connecting

More information

Management of Design and Construction for Civil Works under EPC contract in one Oversea Wind Farm Project

Management of Design and Construction for Civil Works under EPC contract in one Oversea Wind Farm Project ORIGINAL ARTICLE Management of Design and Construction for Civil Works under EPC contract in one Oversea Wind Farm Project Wu Zheng Power China Chengdu Engineering Corporation LTD, Chengdu 610072 Abstract:

More information

Program Safeguard Systems Assessment. Indonesia: Sustainable Energy Access in Eastern Indonesia Electricity Grid Development Program

Program Safeguard Systems Assessment. Indonesia: Sustainable Energy Access in Eastern Indonesia Electricity Grid Development Program Sustainable Energy Access in Eastern Indonesia Electricity Grid Development Program (RRP INO 50016) Program Safeguard Systems Assessment August 2017 Indonesia: Sustainable Energy Access in Eastern Indonesia

More information

Environmental Safeguard Monitoring Report

Environmental Safeguard Monitoring Report Environmental Safeguard Monitoring Report Project No.45148 Period Covering January to December 2014 March 2015 Sri Lanka: Greater Colombo Water and Wastewater Management Improvement Investment Program

More information

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 616 APRIL 2018 CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT TABLE OF CONTENTS 616.01 SCOPE 616.02 REFERENCES 616.03 DEFINITIONS

More information

Cox's Construction Ltd. P.O.Box 157 Lawn A0E-2E0 Tel: (709) Fax: (709)

Cox's Construction Ltd. P.O.Box 157 Lawn A0E-2E0 Tel: (709) Fax: (709) Cox's Construction Ltd. P.O.Box 157 Lawn A0E-2E0 Tel: (709) 873-2301 Fax: (709) 873 2567 Cells: (709) 873-7731/873-7730/ 697-0861 September 23, 2016 Government of Newfoundland and Labrador Department of

More information

IN THE KYRGYZ REPUBLIC

IN THE KYRGYZ REPUBLIC Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized NATIONAL ROAD REHABILITATION (OSH-ISFANA) PROJECT (NRRP)- WORLD BANK PPA Q 6240 CONSULTANCY

More information

Concrete Waste Management

Concrete Waste Management Objectives EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Objective

More information

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department 2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote

More information

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving. SECTION 312000 - EARTH MOVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating and filling for rough grading the Site. 2. Preparing subgrades for walks, curbs, pavements, and turf and grasses.

More information

Paving and Grinding Operations

Paving and Grinding Operations Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category

More information

Program Safeguard Systems Assessment (Draft) INO: Sustainable Energy Access in Eastern Indonesia Electricity Grid Development Program

Program Safeguard Systems Assessment (Draft) INO: Sustainable Energy Access in Eastern Indonesia Electricity Grid Development Program Sustainable Energy Access in Eastern Indonesia Electricity Grid Development Program (RRP INO 50016) Program Safeguard Systems Assessment (Draft) August 2016 INO: Sustainable Energy Access in Eastern Indonesia

More information

LABOR AND MATERIAL PROPOSAL

LABOR AND MATERIAL PROPOSAL LABOR AND MATERIAL PROPOSAL CLIENT: CITY OF KINSTON, NC PROJECT: POD NO. 2 PROJECT NO.: 15-8103-8015 CONTRACTOR: DATE: GROUP DESCRIPTION QTY UNIT 3.1 Structures 1 Lot UNIT PRICING CONTRACTOR- LABOR FURNISHED

More information

No. 6 December, Wisconsin s Forestry Best Management Practices for Water Quality Forest Roads

No. 6 December, Wisconsin s Forestry Best Management Practices for Water Quality Forest Roads No. 6 December, 1995 Wisconsin s Forestry Best Management Practices for Water Quality Forest Roads Steve Holaday, Wisconsin Dept. of Natural Resources, and Jeff Martin, Dept. of Forestry, UW-Madison BMPs

More information

SACHSE EROSION CONTROL GUIDELINES

SACHSE EROSION CONTROL GUIDELINES SACHSE EROSION CONTROL GUIDELINES Section I. Definitions The following words, terms, and phrases, when used in this guideline, shall have the meanings ascribed to them in this Section, except where the

More information

Environmental and Social Monitoring Report. THA: Provincial Solar Power Project Phase 2B Bang Pa-hun, Phranakorn Sri Ayutthaya

Environmental and Social Monitoring Report. THA: Provincial Solar Power Project Phase 2B Bang Pa-hun, Phranakorn Sri Ayutthaya Environmental and Social Monitoring Report Annual Report Project Number: 45923-014 April 2014 to June 2015 THA: Provincial Solar Power Project Phase 2B Bang Pa-hun, Phranakorn Sri Ayutthaya This environmental

More information

RFP Questions and Answers 1 (Pre-Bid Meeting)

RFP Questions and Answers 1 (Pre-Bid Meeting) RFP 40860 Questions and Answers 1 (Pre-Bid Meeting) Amendment to Page 8 of 99 of the Proposal for RFQ 40860 to change from 120 days stated to 270 days for completion of project. Clarifications of drawings:

More information

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT

CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 616 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR FOOTINGS AND PADS FOR ELECTRICAL EQUIPMENT TABLE OF CONTENTS 616.01 SCOPE 616.02 REFERENCES 616.03

More information

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building...

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building... Contents 11. Construction processes and materials... 11-2 11.1 Power House... 11-2 11.2 Maintenance Building... 11-2 11.3 Fuel Treatment Building... 11-3 11.4 Roads & Paths... 11-3 11.5 Fencing... 11-3

More information

PART 1 GENERAL REQUIREMENTS

PART 1 GENERAL REQUIREMENTS PART 1 GENERAL REQUIREMENTS Contract Closeout Plan 110 Arrow diagram for project close-out...3 Erosion Control 121 Straw bale barrier... 5 122 Silt fence... 7 123 Diversion dike... 9 124 Inlet protection...

More information

Site C Clean Energy Project. Monthly Environmental Monitoring Summary Report - February 2017

Site C Clean Energy Project. Monthly Environmental Monitoring Summary Report - February 2017 Site C Clean Energy Project Monthly Environmental Monitoring Summary Report - February 2017 Prepared by BC Hydro Submitted May 8, 2017 Page 1 of 17 Table of Contents Introduction... 4 Project Progress...

More information

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 602 MARCH 1993 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF ELECTRICAL CHAMBER 602.01 SCOPE 602.02 REFERENCES 602.05 MATERIALS TABLE OF CONTENTS

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.PROV 602 NOVEMBER 2017 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF ELECTRICAL CHAMBERS TABLE OF CONTENTS 602.01 SCOPE 602.02 REFERENCES 602.03 DEFINITIONS

More information

Installation Guidelines

Installation Guidelines 815 NE 172 nd Avenue Vancouver, WA 98684 877-694-0141 Installation Guidelines Installation steps include job planning, layout, excavating and preparing the soil subgrade, applying geotextiles (optional),

More information

Constructability Guidelines

Constructability Guidelines Constructability Guidelines The Constructability Guidelines offer a list of items that should be considered by Constructability function personnel during the Concept Development Phase through the Final

More information

PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES

PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)

More information

REG: Trans Borneo Power Grid: Sarawak to West Kalimantan Transmission Link (Malaysia Section)

REG: Trans Borneo Power Grid: Sarawak to West Kalimantan Transmission Link (Malaysia Section) Trans Borneo Power Grid: Sarawak to West Kalimantan Transmission Link (RRP INO 44921) Initial Environmental Examination July 2011 REG: Trans Borneo Power Grid: Sarawak to West Kalimantan Transmission Link

More information

CONSTRUCTION SPECIFICATION FOR TUNNELLING

CONSTRUCTION SPECIFICATION FOR TUNNELLING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 415 FEBRUARY 1990 CONSTRUCTION SPECIFICATION FOR TUNNELLING 415.01 SCOPE 415.02 REFERENCES 415.03 DEFINITIONS TABLE OF CONTENTS 415.04 SUBMISSION AND

More information

Dry structural excavation is usually done with front-end loaders, bulldozers or backhoes.

Dry structural excavation is usually done with front-end loaders, bulldozers or backhoes. 1.1 Excavation - General Excavation is the removal of all material (including ice, water, etc.) required for the construction of foundations or substructures as indicated on the drawings or as determined

More information

Q. CONSTRUCTION IMPACTS

Q. CONSTRUCTION IMPACTS Q. CONSTRUCTION IMPACTS 1. Construction Plan As noted on Exhibit 3Q-1, Overall Phasing Plan and SWPPP Notes, construction of the Proposed Project is anticipated to include five phases. The entire construction

More information

TS 803 DUCTS DUCT INSTALLATION, PROTECTION AND MARKING WITHIN A TRENCH OPEN TRENCH DUCT INSTALLATION PROFILE

TS 803 DUCTS DUCT INSTALLATION, PROTECTION AND MARKING WITHIN A TRENCH OPEN TRENCH DUCT INSTALLATION PROFILE TORONTO TRANSPORTATION March 2012 TS 803 DUCTS TABLE OF CONTENTS 1. DRAWINGS TTD 803.001 TTD 803.010 DUCT INSTALLATION, PROTECTION AND MARKING WITHIN A TRENCH OPEN TRENCH DUCT INSTALLATION PROFILE 2. CONSTRUCTION

More information

Factor Potential Effects Mitigation Measures

Factor Potential Effects Mitigation Measures Natural Environment No impacts of provincial significance to the natural environment are anticipated for the rapid transit project. Other impacts and how they will be mitigated are outlined in the table

More information

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw 6410 2006 The Erosion and Sediment Control plan should seek (i) to protect the soil surface from erosion where possible and (ii) capture

More information

DOORNVALLEI EXT 5 & 6

DOORNVALLEI EXT 5 & 6 DOORNVALLEI EXT 5 & 6 Proposed township establishment on portion 107 the farm Doornkloof 391 JR Sewer Pipe Crossings - Sesmylspruit Construction Method Statement April 2016 Revision 3 PREPARED FOR: PREPARED

More information

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1

2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1 2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1 There are three ways to accomplish urban soil erosion and sedimentation control: Allow erosion to take place and then control sediment

More information

Indonesia: Perusahaan Listrik Negara (PLN) Agency-Level Use of Country Safeguard Systems. LD 1: Equivalence Assessment of Environmental Safeguards

Indonesia: Perusahaan Listrik Negara (PLN) Agency-Level Use of Country Safeguard Systems. LD 1: Equivalence Assessment of Environmental Safeguards DRAFT FOR DISCUSSION ONLY August, 2018 Indonesia: Perusahaan Listrik Negara (PLN) Agency-Level Use of Country Systems LD 1: Equivalence Assessment of Environmental s This assessment is a work in progress,

More information

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.

ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0. ENVIRONMENTAL MANAGEMENT PLAN FOR DALPATPUR STONE QUARRY AT VILLAGE DALPUTPUR TEHSIL KHURAI AND DISTRICT SAGAR [MP], AREA (0.920ha) 1.1 Introduction The subject quarry is proposed for metal stone on 0.920

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Site Grading C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Site Grading C O N T E N T S SPECIFICATIONS - DETAILED PROVISIONS Section 02210 - Site Grading C O N T E N T S PART 1 - GENERAL... 1 1.01 REQUIREMENT... 1 1.02 STRUCTURE PROTECTION... 2 1.03 JOB CONDITIONS... 3 PART 2 - PRODUCTS...

More information

Summary of Preparatory Study

Summary of Preparatory Study Summary of Preparatory Study 1. Title of the Cooperation Project, Relevant Project Report Preparatory Survey on the Project for the Establishment of Rural Water Supply System in Kambia Town in the Republic

More information

PROGRAM RESULTS ASSESSMENT

PROGRAM RESULTS ASSESSMENT Sustainable Energy Access in Eastern Indonesia Electricity Grid Development Program (RRP INO 50016) A. Program Results Framework PROGRAM RESULTS ASSESSMENT 1. Country results framework. The Government

More information

Indonesia - Lahendong II Geothermal Power Project (P096677) Environmental and Social Due Diligence

Indonesia - Lahendong II Geothermal Power Project (P096677) Environmental and Social Due Diligence Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Indonesia - Lahendong II Geothermal Power Project (P096677) and Social Due Diligence

More information

Qty (1) 1 Lot. 1 Lot. 1 Lot

Qty (1) 1 Lot. 1 Lot. 1 Lot Schedule No. 4c. Environmental, Social, Health And Safety () Cost Schedule Item Description Unit Price Total Price 1001 Air quality & dust Qty (1) a. The Contractor to protect stockpiles of friable material

More information

E3072 v2. GEF Large City Congestion and Carbon Reduction Project. Environment Management Plan. Public Disclosure Authorized

E3072 v2. GEF Large City Congestion and Carbon Reduction Project. Environment Management Plan. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized E3072 v2 GEF Large City Congestion and Carbon Reduction Project Environment Management

More information

Section 7: Specifications

Section 7: Specifications Section 7: Specifications 29 31 Building Boundary of Clear Area See Note # 1 8' Shrubs 8' Concrete Pad Equipment 8' TRAVELED WAY M Meter Pedestal 8' Curb Protective Vehicle Posts (Bollards) If Required

More information

12 Oct Virama Karya presentation on South Coast Highway. Therefore require a new route expressway

12 Oct Virama Karya presentation on South Coast Highway. Therefore require a new route expressway in association with Design 151.66 Km (Existing Road Apr. 180 km) 2 OBJECTIVE: The Government of Timor Lestewishes to Engage Consultant to carry out the Preliminary, Detailed Engineering Design and Environment

More information

Aztec Substation. Demolition Specifications. May 13, 2016

Aztec Substation. Demolition Specifications. May 13, 2016 Aztec Substation Demolition Specifications May 13, 2016 GENERAL REQUIREMENTS I. Applicability of Requirements Requirements listed within shall apply to the earthworks involved with the demolition of the

More information

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Sheet 1 of 8 KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION Note: This Special Provision is generally written in the imperative mood. The subject, the

More information

Murphy s Services Inc.

Murphy s Services Inc. Murphy s Services Inc. P.O. Box 3208 Paradise, NL A1L 3W3 Ph: (709)687-3297 or (709)690-2114 Fax: (709)782-2888 ENVIROMENTAL ASSESSMENT REGISTRATION DOCUMENT Proposed Gravel Quarry Foxtrap, CBS Newfoundland

More information

Welcome to our Information Centre

Welcome to our Information Centre Welcome to our Information Centre Overbrook to Riverview Transmission Line Upgrade September 21 and 22, 2016 Purpose of the Information Centre Meet our project team and learn more about: The proposed project

More information

SECTION GENERAL EXCAVATION

SECTION GENERAL EXCAVATION 02210-1 of 11 SECTION 02210 GENERAL EXCAVATION 02210.01 GENERAL A. Description 1. General excavation shall include but not necessarily be limited to, excavation and grading for general site work, roadways,

More information

TECHNICAL SPECIFICATIONS OF LAYING OF UNDER GROUND POWER CABLE FOR TRANSMISSION LINE

TECHNICAL SPECIFICATIONS OF LAYING OF UNDER GROUND POWER CABLE FOR TRANSMISSION LINE GUJARAT ENERGY TRANSMISSION CORPORATION LTD. Sardar Patel Vidyut Bhavan, Race Course, Vadodara: 390 007 TECHNICAL SPECIFICATIONS OF LAYING OF UNDER GROUND POWER CABLE FOR TRANSMISSION LINE GETCO/E/TS LUC058/R1

More information

Storm Drain Inlet Protection for Construction Sites (1060)

Storm Drain Inlet Protection for Construction Sites (1060) Storm Drain Inlet Protection for Construction Sites (1060) Wisconsin Department of Natural Resources Conservation Practice Standard I. Definition A temporary device installed in or around a storm drain

More information

SITE C FIELD WORK FOR 2019

SITE C FIELD WORK FOR 2019 January 2019 SITE C FIELD WORK FOR 2019 During the construction of Site C, BC Hydro will conduct environmental and engineering field work along the Peace River between the Williston Reservoir and the Alberta

More information

Underground Service Requirements and Instructions

Underground Service Requirements and Instructions This packet includes all FKEC underground service requirements, instructions, procedures and drawings. If you are considering underground power service please review this document in its entirety (3 page

More information

Best Management Practices (BMPs) for Construction Sites & Home Remodeling Projects

Best Management Practices (BMPs) for Construction Sites & Home Remodeling Projects Best Management Practices (BMPs) for Construction Sites & Home Remodeling Projects Stormwater Program Department of Public Works City of Rancho Santa Margarita 22112 El Paseo Rancho Santa Margarita, CA

More information

Construction of Bison Containment Game Fence Grasslands National Park - Parks Canada Agency

Construction of Bison Containment Game Fence Grasslands National Park - Parks Canada Agency Construction of Bison Containment Game Fence Grasslands National Park - Parks Canada Agency General Specifications: 1.0 General These specifications address the construction of fences to be built along

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The People s Republic of Bangladesh Project: The Kanchpur, Meghna and Gumti 2nd Bridges Construction and Existing Bridges Rehabilitation

More information

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING PART 1 GENERAL SECTION 02221 TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING 1.01 SECTION INCLUDES A. Excavation, dewatering and backfilling with compaction of trenches for pipes, conduits, channels

More information

Construction Entrance / Construction Road Stabilization Alturnamats & Versamats Dewatering Dandy Dewatering Bag / Dirt Bag...

Construction Entrance / Construction Road Stabilization Alturnamats & Versamats Dewatering Dandy Dewatering Bag / Dirt Bag... CONTENTS Construction Entrance / Construction Road Stabilization... 1 Alturnamats & Versamats... 1 Dewatering... 8 Dandy Dewatering Bag / Dirt Bag... 8 Diversion Dike... 10 Diversion Dike of Compacted

More information

SPECIAL STUDY AREA PLAN (SSAP) 1: FIRTH OF FORTH SPA

SPECIAL STUDY AREA PLAN (SSAP) 1: FIRTH OF FORTH SPA SPECIAL STUDY AREA PLAN (SSAP) 1: FIRTH OF FORTH SPA 1 INTRODUCTION The Firth of Forth is classified as a Special Protection Area (SPA) because it qualifies under Article 4.1 of the Birds Directive by

More information

Environmental Control Plan

Environmental Control Plan Environmental Control Plan Environmental Control Plan In accordance with Watts & Hughes Construction Waikato Bay of Plenty Limited. corporate strategies the Company has an Environment Control Plan which

More information

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements.

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements. SECTION 31 20 00 PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating soil and other material for surface improvements. B. Excavating soil and other material for drainage basins. C. Placing fill. D. Compaction

More information

November 2000 Transmission & Distribution World

November 2000 Transmission & Distribution World November 2000 Transmission & Distribution World www.tdworld.com The Art and Science of Substation Design GIS, underground construction and custom landscaping innovations enable utility to integrate a substation

More information

Lloydminster to Spruce Lake 138kV Transmission Line Projects

Lloydminster to Spruce Lake 138kV Transmission Line Projects Lloydminster to Spruce Lake 138kV Transmission Line Projects Preferred Corridor Presentation June 2017 SaskPower continues to invest in the province s electricity system to ensure we have the infrastructure

More information

SECTION B. Prevention of sedimentation of waterways, open drainage ways, and storm and sanitary sewers due to construction activities.

SECTION B. Prevention of sedimentation of waterways, open drainage ways, and storm and sanitary sewers due to construction activities. SECTION 01 5713 TEMPORARY EROSION AND SEDIMENT CONTROL PART 1 GENERAL 1.01 SECTION INCLUDES A. Prevention of erosion due to construction activities. B. Prevention of sedimentation of waterways, open drainage

More information

City of Doral 8401 NW 53 rd Ter. Doral, FL 33166

City of Doral 8401 NW 53 rd Ter. Doral, FL 33166 City of Doral 8401 NW 53 rd Ter. Doral, FL 33166 Project Address: (305) 593-6700 Permit Number: National Pollution Discharge Elimination System (NPDES) Construction Site Erosion and Sedimentation Control

More information

RÍO AMOYÁ - LA ESPERANZA Hydroelectric Power Plant

RÍO AMOYÁ - LA ESPERANZA Hydroelectric Power Plant RÍO AMOYÁ - LA ESPERANZA Hydroelectric Power Plant The power plant is located in southern Tolima, in the municipality of Chaparral, approximately 150 km from Ibague. It has an installed capacity of 80

More information

Concrete Waste Management

Concrete Waste Management Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category

More information

SECTION 2831 ITEM F-162 CHAIN-LINK FENCES

SECTION 2831 ITEM F-162 CHAIN-LINK FENCES SECTION 2831 ITEM F-162 CHAIN-LINK FENCES PART 1 - GENERAL 1.1 DESCRIPTION. This item shall consist of furnishing and erecting a chain-link fence in accordance with these specifications and the details

More information

Figure Inlet protection (Source: Minnesota DOT)

Figure Inlet protection (Source: Minnesota DOT) 3.9 INLET PROTECTION Figure 3.14. Inlet protection (Source: Minnesota DOT) Overview Description: A manufactured protective device or barrier used to trap sediment at a storm drain surface or curb inlet.

More information