1 Achieving DBE Contractor Goals and More David Pinckney, FHWA HQ // Carlos Gonzalez, FHWA RC

2 Overview Introduction Case Studies Q & As Review / Wrap Up

3 Case Studies 1, 2, and 3 Contract Goal Setting

4 Contract Goals (26.51) A State DOT must meet the maximum portion of its overall goal by using RN participation. A State DOT must use RC measures to meet any portion of the overall goal not attained through RN participation. Contract Goals: State DOTs should have a system in place for setting DBE contract goals 4

5 Contract Goals (26.51) The State DOT may use contract goals only on DOTassisted contracts that have subcontracting possibilities. The State DOT is not required to set a contract goal on every DOT-assisted contract or set each contract goal at same percentage as the overall goal. The goal for a specific contract may be higher or lower than that percentage level of the overall goal, depending on: type of work; the location of the work, and availability of DBEs for the work of the particular 5 contract.

6 Case Studies 4 & 5 Good Faith Efforts

7 GFEs (26.53) GFEs only apply to contract goals Award contract to lowest responsive bidder: o Responsive if DBE goal met o Responsive if demonstrate GFEs Appendix A lists GFEs Matter of Responsiveness or Responsibility

8 GFE Evaluation Factors Did bidder make enough work items available to meet the goal? Did bidder break out work items? Did Bidder choose to self perform? Did bidder solicit available DBEs for work items Did bidder follow up with specific DBEs? Did 2 nd & 3 rd bidders get more DBE commitments? (new rule update) 8

9 Utilize Listed DBE Firms 2014 Final Rule Update: 26.53(f)(1) Each prime contract must include a provision: The contractor must utilize the specific DBEs listed to perform the work and supply the materials; The contractor will not receive any payment for work or materials that is not performed by the listed DBE (unless State provides written consent of changes). 9

10 Termination /Substitution Cannot remove DBE without your prior written consent. Written consent only for good cause, (i.e., DBE fails or refuses to execute contract, fails to perform, becomes bankrupt, others,) 10

11 Case Study 6 Prompt Payment

12 Prompt Payment and Return of Retainage (26.29) Prompt Payment Must have contract provision that requires primes to pay all subcontractors, material suppliers, truckers no later than 30 days after completion and acceptance Satisfactory Completion means portion of the work has been completed and accepted. Return of Retainage There are 3 options The State DOT must select one of them 12

13 Prompt Payment and Return of Retainage USDOT guidance (March 24, 2016) DBE Program must include Prompt Payment clause (Retainage clause where applicable); State DOT must ensure compliance; Dispute Resolution Process; DO NOT rely on complaints USDOT guidance (April 25, 2018) Prompt Payment Section Sample Template 13

14 Case Study 7 & 8 Commercially Useful Function

15 Commercially Useful Function (CUF) A DBE performs a CUF when it executes the contract and carries out its responsibilities by actually: 1. Performing 2. Managing 3. Supervising the work involved. With respect to materials & supplies, the DBE must be responsible for: 1. Negotiating price 2. Determining quality & quantity; 3. Ordering materials & installing (if applicable) 4. Paying for materials.

16 Case Study 10 State & Local Minority Programs

17 Minority/Women Owned Business Enterprise The Department does not allow recipients to establish Minority and Women-owned Business Enterprise (MWBE) participation goals on federally-funded contracts. The only participation goals allowed on a federal-aid contract are goals applied through the federal Disadvantaged Business Enterprise (DBE) program under the Department s DBE regulations at 49 CFR Part

18 Thank you for your participation! David Pinckney DBE Program Analyst Phone: (202) Carlos A. Gonzalez Civil Rights Specialist Phone: (404)

SRC CONSENSUS EVALUATION

SRC CONSENSUS EVALUATION SRC CONSENSUS EVALUATION PROPOSAL EVALUATION WORKSHEET PROPOSER: Keolis DATE: 9/2/13 CONSENSUS RATING: NARRATIVE SUMMARY: Keolis' DBE plan proposal generally meets the standards of the DBE requirements

More information

Massachusetts Department of Transportation Highway Division

Massachusetts Department of Transportation Highway Division Massachusetts Department of Transportation Highway Division DBE Goal Setting Step-by-Step Methodology FY2017 FY2019 The U.S. Department of Transportation (USDOT) regulations appearing at 49 Code of Federal

More information

DBE Program Training

DBE Program Training DBE Program Training Lance Yokota Civil Rights Program Manager Federal highway Administration California Division Henry Wells Process Review Engineer Caltrans Division of Local Assistance DBE Contract

More information

PROPOSAL EVALUATION WORKSHEET (INDIVIDUAL) EVALUATION FACTOR: DISADVANTAGED BUSINESS ENTERPRISE PLAN AND PROGRAM (RATED)

PROPOSAL EVALUATION WORKSHEET (INDIVIDUAL) EVALUATION FACTOR: DISADVANTAGED BUSINESS ENTERPRISE PLAN AND PROGRAM (RATED) PROPOSER: Keolis DATE: 8/19/13 OVERALL RATING: _AcceptabIe NARRATIVE SUMMARY: The Proposer committed to meeting the goals and meeting good faith efforts, but provided minimum components to their DBE Plan.

More information

PROPOSAL EVALUATION WORKSHEET (INDIVIDUAL) EVALUATION FACTOR: DISADVANTAGED BUSINESS ENTERPRISE PLAN AND PROGRAM (RATED) Selection Committee

PROPOSAL EVALUATION WORKSHEET (INDIVIDUAL) EVALUATION FACTOR: DISADVANTAGED BUSINESS ENTERPRISE PLAN AND PROGRAM (RATED) Selection Committee Selection Committee PROPOSER: Keolis DATE: 8/25/2013 OVERALL RATING: NARRATIVE SUMMARY: DBE Plan submitted in the Proposal meets both the federal and 's DBE program requirements. DBE Utilization is proposed

More information

Certifications. Certification decisions address the nature of a firm's ownership and structure.

Certifications. Certification decisions address the nature of a firm's ownership and structure. November 2017 Certifications Certification decisions address the nature of a firm's ownership and structure. DBE Program Regulations Code of Federal Regulations Title 49: Transportation Part 26 - Participation

More information

DISADVANTAGED BUSINESS ENTERPRISE (DBE) COMMERCIALLY USEFUL FUNCTION (CUF) COMPLIANCE OVERVIEW FOR PRIME PROVIDER PROJECT MANAGERS DECEMBER 12, 2018

DISADVANTAGED BUSINESS ENTERPRISE (DBE) COMMERCIALLY USEFUL FUNCTION (CUF) COMPLIANCE OVERVIEW FOR PRIME PROVIDER PROJECT MANAGERS DECEMBER 12, 2018 DISADVANTAGED BUSINESS ENTERPRISE (DBE) COMMERCIALLY USEFUL FUNCTION (CUF) COMPLIANCE OVERVIEW FOR PRIME PROVIDER PROJECT MANAGERS DECEMBER 12, 2018 Agenda Topic Welcome - Housekeeping DBE Program Authority

More information

PROPOSAL EVALUATION WORKSHEET (INDIVIDUAL) EVALUATION FACTOR: DISADVANTAGED BUSINESS ENTERPRISE PLAN AND PROGRAM (RATED)

PROPOSAL EVALUATION WORKSHEET (INDIVIDUAL) EVALUATION FACTOR: DISADVANTAGED BUSINESS ENTERPRISE PLAN AND PROGRAM (RATED) PROPOSER: MBCR EvaIuator#15 DATE: 8/20/13 OVERALL RATING: _tabie_ NARRATIVE SUMMARY: the Proposer provided a robust DBE plan and provided examples of what and how they would implement. Demonstrated by

More information

PROPOSAL EVALUATION WORKSHEET (CONSENSUS) EVALUATION FACTOR: DISADVANTAGED BUSINESS ENTERPRISE PLAN AND PROGRAM (RATED)

PROPOSAL EVALUATION WORKSHEET (CONSENSUS) EVALUATION FACTOR: DISADVANTAGED BUSINESS ENTERPRISE PLAN AND PROGRAM (RATED) PROPOSER: _MBCR_ DATE: 8/21/13 CONSENSUS RATING: GOOD NARRATIVE SUMMARY: Based upon the material contained in the MBCR proposal especially those stated and demonstrated actions that clearly support their

More information

DIVISION OF OPPORTUNITY, DIVERSITY, AND INCLUSION OFFICE OF SMALL AND DISADVANTAGED BUSINESS ENTERPRISES Commercially Useful Function (CUF) Procedures

DIVISION OF OPPORTUNITY, DIVERSITY, AND INCLUSION OFFICE OF SMALL AND DISADVANTAGED BUSINESS ENTERPRISES Commercially Useful Function (CUF) Procedures EXHIBIT F DIVISION OF OPPORTUNITY, DIVERSITY, AND INCLUSION OFFICE OF SMALL AND DISADVANTAGED BUSINESS ENTERPRISES Commercially Useful Function (CUF) Procedures TABLE OF CONTENTS 1.0 Monitoring 1.1 General

More information

VIRGINIA DBE GOAL SETTING METHODOLOGY DRAFT

VIRGINIA DBE GOAL SETTING METHODOLOGY DRAFT VIRGINIA DBE GOAL SETTING METHODOLOGY 2015-2017 DRAFT DBE regulations (49 CFR 26.45) require the establishment of an overall goal based on demonstrable evidence of the availability of ready, willing, and

More information

LAWTON FT. SILL REGIONAL AIRPORT

LAWTON FT. SILL REGIONAL AIRPORT FFY 2016-2018 DISADVANTAGED BUSINESS ENTERPRISE PROGRAM METHODOLOGY FOR THE LAWTON FT. SILL REGIONAL AIRPORT LAWTON, OKLAHOMA Attachment # 5 Lawton Ft Sill Regional Airport DBE Program Page 1 METHODOLOGY

More information

SCHEDULE OF CONTRACT PARTICIPATION AND SL/DBE COMMITMENT PRIME(S) & SUB-CONTRACTOR/CONSULTANT/VENDOR(S) INSTRUCTIONS

SCHEDULE OF CONTRACT PARTICIPATION AND SL/DBE COMMITMENT PRIME(S) & SUB-CONTRACTOR/CONSULTANT/VENDOR(S) INSTRUCTIONS INSTRUCTIONS Fill out fields NOAB Project Title, NOAB Project No., Project Type and Project SL/DBE Goal. Complete a table row for each firm that will participate in the contract, including the prime. Additional

More information

TAB I.5 M/WBE Participation

TAB I.5 M/WBE Participation TAB I.5 M/WBE Participation A. The Offeror shall provide a completed M/WBE Utilization Form indicating the percentage of the Base Award Price and Total Proposal Price to be supplied by qualified M/WBEs

More information

Minority/Women Business Enterprise (M/WBE) Compliance Guidelines and Forms

Minority/Women Business Enterprise (M/WBE) Compliance Guidelines and Forms Minority/Women Business Enterprise (M/WBE) Compliance Guidelines and Forms To be completed and signed by the Prime Vendor/Contractor Bid/RFP : Title: Company Name: Company Address: City: State: Zip: Contact

More information

DBE/ACDBE Monitoring & Enforcement

DBE/ACDBE Monitoring & Enforcement Counting DBE Participation & Assessing Commercially Useful Function (CUF) DBE/ACDBE Monitoring & Enforcement Presented by: Eliz Presented by: Wilbur Barham Deputy Director, National Policy & Compliance

More information

PENNDOT FHWA Inline Correction for FFY November 1, 2015

PENNDOT FHWA Inline Correction for FFY November 1, 2015 PENNDOT FHWA Inline Correction for FFY 2016 November 1, 2015 1 Inline Correction for FFY 2016 Market Category Technical Consultants Service Consultants Baseline Ratio Adjusted Baseline Ratio Weights of

More information

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director

Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 5/11/2015 Project 153037 Addendum No. 2 PID No. 98695 CUY SR 10

More information

Port of Seattle Commission. Policy Directive on Diversity in Contracting. As Adopted January 9, 2018

Port of Seattle Commission. Policy Directive on Diversity in Contracting. As Adopted January 9, 2018 Port of Seattle Commission Policy Directive on Diversity in Contracting As Adopted January 9, 2018 Document last updated April 6, 2018 SECTION 1. Purpose. The Port finds that minority and women businesses

More information

Professional Services for Signage Design and Planning Contract Number

Professional Services for Signage Design and Planning Contract Number Professional Services for Signage Design and Planning Contract Number 8500366 09.07.18 1 2 Travis Sanderfer, Program Solicitations Manager Design, Code and Construction Solicitation Schedule Deadline for

More information

UTSA HUB Program. Locate bids at: Agency #743

UTSA HUB Program. Locate bids at:  Agency #743 UTSA HUB Program Historically Underutilized Business Subcontracting Plans (HSP) Tip Sheet The Historically Underutilized Business (HUB) Program of UT at San Antonio was established to identify Historically

More information

REQUIRED CONTRACT PROVISION SPECIFIC EQUAL EMPLOYMENT OPPORTUNITY CONTRACTUAL REQUIREMENT

REQUIRED CONTRACT PROVISION SPECIFIC EQUAL EMPLOYMENT OPPORTUNITY CONTRACTUAL REQUIREMENT Sheet 1 of 7 REQUIRED CONTRACT PROVISION SPECIFIC EQUAL EMPLOYMENT OPPORTUNITY CONTRACTUAL REQUIREMENT 1. General: Equal employment opportunity requirements to NOT discriminate and to take affirmative

More information

NEW JERSEY DEPARTMENT OF TRANSPORTATION DISADVANTAGED BUSINESS ENTERPRISE GOAL SUBMISSION FEDERAL FISCAL YEARS 2017 THROUGH 2019

NEW JERSEY DEPARTMENT OF TRANSPORTATION DISADVANTAGED BUSINESS ENTERPRISE GOAL SUBMISSION FEDERAL FISCAL YEARS 2017 THROUGH 2019 NEW JERSEY DEPARTMENT OF TRANSPORTATION DISADVANTAGED BUSINESS ENTERPRISE GOAL SUBMISSION FEDERAL FISCAL YEARS 2017 THROUGH 2019 The New Jersey Department of Transportation (NJDOT) has established a Disadvantaged

More information

FHWA 1273 Compliance Reviews. Learning Outcomes. Contractor Compliance Program Authorities. 23 CFR Part 230 (Subparts A, C, and D)

FHWA 1273 Compliance Reviews. Learning Outcomes. Contractor Compliance Program Authorities. 23 CFR Part 230 (Subparts A, C, and D) FHWA 1273 Compliance Reviews Learning Outcomes At the end of this session, participants will be able to: Recognize the requirements of the FHWA 1273 contract provision on a federal-aid project; Identify

More information

CHAPTER 11. Program Implementation

CHAPTER 11. Program Implementation CHAPTER 11. Program Implementation Chapter 11 reviews information relevant to the Los Angeles County Metropolitan Transportation Authority s (Metro s) implementation of specific components of the Federal

More information

EQUAL OPPORTUNITY CONSTRUCTION CONTRACT COMPLIANCE

EQUAL OPPORTUNITY CONSTRUCTION CONTRACT COMPLIANCE Approved: Effective: July 20, 2011 Office: Equal Opportunity Topic No.: 275-020-002-g Department of Transportation EQUAL OPPORTUNITY CONSTRUCTION CONTRACT COMPLIANCE PURPOSE: The Federal Highway Administration

More information

DISADVANTAGED BUSINESS ENTERPRISES (DBE) AIRPORT CONCESSIONS DISADVANTAGED BUSINESS ENTERPRISES (ACDBE)

DISADVANTAGED BUSINESS ENTERPRISES (DBE) AIRPORT CONCESSIONS DISADVANTAGED BUSINESS ENTERPRISES (ACDBE) DISADVANTAGED BUSINESS ENTERPRISES (DBE) AIRPORT CONCESSIONS DISADVANTAGED BUSINESS ENTERPRISES (ACDBE) GOOD FAITH EFFORT (GFE) PARTICIPATION PROGRAM FOR SMALL AND MINORITY BUSINESS ENTERPRISES For Federally

More information

Description Number Procurement Standards Sect (b)

Description Number Procurement Standards Sect (b) Federal Regulations for Government Agencies 24 CFR Part 85 Procurement Standards This information is provided as an outline and is not intended to be a complete summary of the regulations. Please read

More information

Small Business Program Update

Small Business Program Update Businss Oversight Committee Information Item IV-A May 10, 2018 Small Business Program Update Page 6 of 20 Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

Resolution No Resolution No. 3737, Diversity in Contracting Policy Directive Page 1 of 8

Resolution No Resolution No. 3737, Diversity in Contracting Policy Directive Page 1 of 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 Resolution No. 3737 A RESOLUTION of the Port of Seattle Commission establishing a

More information

NETWORX PROGRAM INDIVIDUAL SMALL BUSINESS SUBCONTRACTING PLAN IDIQ TASK ORDER BASED

NETWORX PROGRAM INDIVIDUAL SMALL BUSINESS SUBCONTRACTING PLAN IDIQ TASK ORDER BASED NETWORX PROGRAM INDIVIDUAL SMALL BUSINESS SUBCONTRACTING PLAN IDIQ TASK ORDER BASED Company Name: Qwest Government Services, Inc. (QGSI) Address: 4250 N. Fairfax Drive Arlington, VA 22203 Date Submitted:

More information

DISADVANTAGED BUSINESS ENTERPRISE (DBE) PROGRAM PROPOSED THREE-YEAR OVERALL GOAL & METHODOLOGY FOR FEDERAL FISCAL YEARS 2017 THROUGH

DISADVANTAGED BUSINESS ENTERPRISE (DBE) PROGRAM PROPOSED THREE-YEAR OVERALL GOAL & METHODOLOGY FOR FEDERAL FISCAL YEARS 2017 THROUGH DISADVANTAGED BUSINESS ENTERPRISE (DBE) PROGRAM PROPOSED THREE-YEAR OVERALL GOAL & METHODOLOGY FOR FEDERAL FISCAL YEARS 2017 THROUGH 2019 12.2% Sound Transit last developed an overall DBE goal in 2013,

More information

REQUEST FOR PROPOSALS. Community Engagement Strategy and Regional Transportation Plan Development Assistance

REQUEST FOR PROPOSALS. Community Engagement Strategy and Regional Transportation Plan Development Assistance REQUEST FOR PROPOSALS Community Engagement Strategy and Regional Transportation Plan Development Assistance The Atlanta Regional Commission (ARC) is seeking proposals from firms or teams of firms experienced

More information

WYOMING DEPARTMENT OF TRANSPORTATION SUPPLEMENTARY SPECIFICATION FOR SPECIFIC EQUAL EMPLOYMENT OPPORTUNITY RESPONSIBILITIES AND TRAINING PROVISIONS

WYOMING DEPARTMENT OF TRANSPORTATION SUPPLEMENTARY SPECIFICATION FOR SPECIFIC EQUAL EMPLOYMENT OPPORTUNITY RESPONSIBILITIES AND TRAINING PROVISIONS Page 1 of 9 WYOMING DEPARTMENT OF TRANSPORTATION SUPPLEMENTARY SPECIFICATION FOR SPECIFIC EQUAL EMPLOYMENT OPPORTUNITY RESPONSIBILITIES AND TRAINING PROVISIONS I. DESCRIPTION The requirements set forth

More information

DRAFT. Goal Setting Methodology OVERALL GOAL

DRAFT. Goal Setting Methodology OVERALL GOAL DRAFT City of Montgomery The M Transit System DBE Program Goal Setting For Federal Transit Administration (FTA) Assisted Contracts Analysis and Methodology for Fiscal Year 2017 to Fiscal Year 2019 1 DRAFT

More information

Kaydon Corporation Small Business Individual Subcontracting Plan

Kaydon Corporation Small Business Individual Subcontracting Plan Kaydon Corporation Small Business Individual Subcontracting Plan 1. IDENTIFICATION DATA: Company Name: Kaydon Corporation-Bearings Division Address: 2860 McCracken St., Muskegon, MI 49441 Date Prepared:

More information

CENTRAL CORRIDOR LIGHT RAIL TRANSIT (GREEN LINE) DISADVANTAGED BUSINESS ENTERPRISE (DBE) REVIEW PROGRAM EVALUATION AND AUDIT

CENTRAL CORRIDOR LIGHT RAIL TRANSIT (GREEN LINE) DISADVANTAGED BUSINESS ENTERPRISE (DBE) REVIEW PROGRAM EVALUATION AND AUDIT CENTRAL CORRIDOR LIGHT RAIL TRANSIT (GREEN LINE) DISADVANTAGED BUSINESS ENTERPRISE (DBE) REVIEW PROGRAM EVALUATION AND AUDIT. November 2013 INTRODUCTION Background The $957 million Central Corridor Light

More information

POLICY AND PROCEDURES FOR THE DOD PILOT MENTOR-PROTEGE PROGRAM (Revised August 12, 2008)

POLICY AND PROCEDURES FOR THE DOD PILOT MENTOR-PROTEGE PROGRAM (Revised August 12, 2008) POLICY AND PROCEDURES FOR THE DOD PILOT MENTOR-PROTEGE PROGRAM (Revised August 12, 2008) I-100 Purpose. (a) This Appendix I to 48 CFR Chapter 2 implements the Pilot Mentor-Protege Program (hereafter referred

More information

SH 288 Toll Lanes Project. A JOINT VENTURE DRAGADOS USA Shikun & Binui America Pulice Construction, Inc.

SH 288 Toll Lanes Project. A JOINT VENTURE DRAGADOS USA Shikun & Binui America Pulice Construction, Inc. SH 288 Toll Lanes Project A JOINT VENTURE DRAGADOS USA Shikun & Binui America Pulice Construction, Inc. DBE Goal Joint Venture DBE Goal Ø12% (design & construction) v Flow-down 12% goal to non-dbe subcontractors

More information

DFARS Appendix I. Appendix I Policy and Procedures for the DoD Pilot Mentor- Protégé Program TABLE OF CONTENTS. I-100 Purpose. I-101 Definitions.

DFARS Appendix I. Appendix I Policy and Procedures for the DoD Pilot Mentor- Protégé Program TABLE OF CONTENTS. I-100 Purpose. I-101 Definitions. DFARS Appendix I Appendix I Policy and Procedures for the DoD Pilot Mentor- Protégé Program I-100 Purpose. I-101 Definitions. I-102 Participant eligibility. I-103 Program duration. I-104 Selection of protege

More information

INDOT Quality Based Selection Consultant Contract Process

INDOT Quality Based Selection Consultant Contract Process INDOT Quality Based Selection Consultant Contract Process QBS Regulations & Policies Title 40 USC, Chapter 10, Subchapter VI Brooks Act Title 49 USC, Subtitle A, Part 18, Subpart C, Section 18.36 Uniform

More information

Renewable Energy Power Purchasing

Renewable Energy Power Purchasing Attachment D City of Philadelphia Economic Opportunity Plan Renewable Energy Power Purchasing Introduction, Definitions and Diversity Practices A. Chapter 17-1600 of The Philadelphia Code requires the

More information

Quick Guide Contract Compliance Requirements

Quick Guide Contract Compliance Requirements Contract Compliance, within the Department of Procurement and Contracts, is responsible for monitoring the Minority/Women/Disadvantaged Business Enterprises (M/W/DBE) and Section 3 policies and the Davis-Bacon

More information

DISADVANTAGED BUSINESS ENTERPRISE (DBE) PROGRAM PROPOSED THREE-YEAR OVERALL GOAL & METHODOLOGY FOR FEDERAL FISCAL YEARS 2017 THROUGH 2019

DISADVANTAGED BUSINESS ENTERPRISE (DBE) PROGRAM PROPOSED THREE-YEAR OVERALL GOAL & METHODOLOGY FOR FEDERAL FISCAL YEARS 2017 THROUGH 2019 DISADVANTAGED BUSINESS ENTERPRISE (DBE) PROGRAM PROPOSED THREE-YEAR OVERALL GOAL & METHODOLOGY FOR FEDERAL FISCAL YEARS 2017 THROUGH 2019 16.1% Sound Transit last developed an overall Disadvantaged Business

More information

Step 1: Determination of Base Figure for Relative Availability of DBEs

Step 1: Determination of Base Figure for Relative Availability of DBEs MassDOT calculated the Transit Division goal utilizing a preliminary budget to identify federalaid service and supply contracts on USDOT-assisted projects to be performed. To determine the relative availability

More information

Great Minds. DBE / Workforce Retreat January 20, 2010

Great Minds. DBE / Workforce Retreat January 20, 2010 Great Minds DBE / Workforce Retreat January 20, 2010 Objectives Present and exchange information that is essential to establishing and implements a strategic plan for the Central Corridor Light Rail DBE

More information

Section 26.45: Overall DBE Three-Year Project Goal Methodology. Name of Recipient: The City of Driggs, ID owner of the Driggs-Reed Memorial Airport

Section 26.45: Overall DBE Three-Year Project Goal Methodology. Name of Recipient: The City of Driggs, ID owner of the Driggs-Reed Memorial Airport Section 26.45: Overall DBE Three-Year Project Goal Methodology Name of Recipient: The City of Driggs, ID owner of the Driggs-Reed Memorial Airport Goal Period: FY-2018-2020 DOT-assisted contract amount:

More information

South Dakota Department of Transportation Methodology for Determining Overall DBE Goal FFY Goal 6.57%

South Dakota Department of Transportation Methodology for Determining Overall DBE Goal FFY Goal 6.57% South Dakota Department of Transportation Methodology for Determining Overall DBE Goal FFY 2019-2021 Goal 6.57% Race neutral 5.42% Race conscious 1.15% Step 1. Determining the Base figure: 49 CFR 26.45(c)(2)

More information

AIRPORT CONCESSIONS DISADVANTAGED BUSINESS ENTERPRISE (ACDBE) PROGRAM

AIRPORT CONCESSIONS DISADVANTAGED BUSINESS ENTERPRISE (ACDBE) PROGRAM AIRPORT CONCESSIONS DISADVANTAGED BUSINESS ENTERPRISE (ACDBE) PROGRAM Car Rental GOAL SETTING METHODOLOGY FFY 2018-2019-2020 49 CFR Part 23 DATED: September 29, 2017 Goal effective October 1, 2017 to September

More information

ADDENDUM TO BID DOCUMENTS SCCD RFP: # Vacaville Classroom Building (Annex) Renovation. Date: 11/15/2017

ADDENDUM TO BID DOCUMENTS SCCD RFP: # Vacaville Classroom Building (Annex) Renovation. Date: 11/15/2017 Solano Community College District Vacaville Classroom Annex Renovation Documents #18-005 ADDENDUM TO BID DOCUMENTS ADDENDUM #01 SCCD RFP: #18 005 Project: Solano Community College District Vacaville Classroom

More information

Cleveland County CONTRACT PROPOSAL

Cleveland County CONTRACT PROPOSAL Cleveland County CONTRACT PROPOSAL TIP NUMBER: R-5849 COUNTY: CLEVELAND DESCRIPTION: ADDITION OF TURN LANES ON SR 1313 (WASHBURN SWITCH RD) AND NEW INDUSTRIAL ENTRANCES TO WASHBURN SWITCH BUSINESS PARK

More information

Disadvantaged Business Enterprise Program

Disadvantaged Business Enterprise Program Disadvantaged Business Enterprise Program Grantee ID: 5143 Revised: August 1, 2013 Capital Metropolitan Transportation Authority Aida Douglas, Manager Office of Diversity /DBE Officer Office of Diversity

More information

REQUEST FOR LETTERS OF INTEREST IN PROFESSIONAL ENGINEERING SERVICES PROJECT NO /05. Ref: General Engineering Services

REQUEST FOR LETTERS OF INTEREST IN PROFESSIONAL ENGINEERING SERVICES PROJECT NO /05. Ref: General Engineering Services REQUEST FOR LETTERS OF INTEREST IN PROFESSIONAL ENGINEERING SERVICES PROJECT NO. 99-16-04/05 Ref: General Engineering Services The Ohio Turnpike and Infrastructure Commission ( Commission ) issues this

More information

Civil Construction Pre-Bid and DBE Meet and Greet. November 13, 2017

Civil Construction Pre-Bid and DBE Meet and Greet. November 13, 2017 Civil Construction Pre-Bid and DBE Meet and Greet November 13, 2017 1 Today s Topics Welcome/Introductions Bid Requirements Review of DBE Participation Overview of Project Specifications DBE Meet and Greet

More information

The Suburban Bus Division of the Regional Transportation Authority (Pace) Overall Disadvantaged Business Enterprise Goal (DBE)

The Suburban Bus Division of the Regional Transportation Authority (Pace) Overall Disadvantaged Business Enterprise Goal (DBE) The Suburban Bus Division of the Regional Transportation Authority (Pace) Overall Disadvantaged Business Enterprise Goal (DBE) Setting Methodology Report Federal Fiscal Years (FFY) 2016-2018 Federal Transit

More information

Request for Bid Group 1 Relay Addendum No. 1 to RFB No. 196548.71.0401 February 20, 2018 The following information encompasses Addendum No. 1 for the above referenced RFB. Bidders shall fully consider

More information

CHAPTER 8. Further Exploration of MBE/WBE and DBE Utilization on FHWA- and State-funded Contracts

CHAPTER 8. Further Exploration of MBE/WBE and DBE Utilization on FHWA- and State-funded Contracts CHAPTER 8. Further Exploration of MBE/WBE and DBE Utilization on FHWA- and State-funded Contracts Building upon the analysis presented in Chapter 7, Keen Independent further examines the utilization of

More information

ADVERTISEMENT FOR BIDDERS

ADVERTISEMENT FOR BIDDERS Sealed Bids for the Owensville Wastewater Inflow/Infiltration Reduction Project for the Town of Owensville, Indiana (herein called the "OWNER") will be received by the Owner at the Owensville Town Hall,

More information

SMALL/MINORITY/WOMEN-OWNED AND DISADVANTAGED BUSINESS UTILIZATION

SMALL/MINORITY/WOMEN-OWNED AND DISADVANTAGED BUSINESS UTILIZATION SECTION 6 SMALL/MINORITY/WOMEN-OWNED AND DISADVANTAGED BUSINESS UTILIZATION On October 20, 1993 the Las Vegas Valley Water District Board of Directors adopted a resolution that directed the District to

More information

INVITATION FOR BID. December ,

INVITATION FOR BID. December , Mobile Area Water and Sewer System 4725A Moffett Road Mobile, Al 36618-2236 Buyer II Lisa Russell (251) 694-3153 Office lrussell@mawss.com TO Prospective Bidders INVITATION FOR BID NUMBER IFB 17-042 SEPARATE

More information

CHAPTER 5. Availability Analysis

CHAPTER 5. Availability Analysis CHAPTER 5. Availability Analysis BBC Research & Consulting (BBC) analyzed the availability of minority- and woman-owned businesses that are ready, willing, and able to perform on Los Angeles County Metropolitan

More information

Southeast Rail Extension Pre-Proposal Briefing. March 25, 2015

Southeast Rail Extension Pre-Proposal Briefing. March 25, 2015 Southeast Rail Extension Pre-Proposal Briefing March 25, 2015 Technical/Scope Andy Mutz RTD Southeast Project Manager 2 Southeast Rail Extension Extends Southeast Light Rail 2.3 miles from Lincoln Avenue

More information

SEATTLE S NEW WMBE INCLUSION PLAN

SEATTLE S NEW WMBE INCLUSION PLAN SEATTLE S NEW WMBE INCLUSION PLAN This past summer Seattle Mayor Mike McGinn announced a new WMBE program for Seattle public works contracts he called an Inclusion Plan to increase women and minority owned

More information

How to Do Business with The Orlando Utilities Commission

How to Do Business with The Orlando Utilities Commission How to Do Business with The Orlando Utilities Commission 5971 Pershing Ave Orlando, FL 32822 Phone: 407-434-4080 Fax: 407-434-4338 Website: www.ouc.com PREFACE Welcome Suppliers to Orlando Utilities Commission.

More information

SECTION III. Analysis of MBE/WBE Availability

SECTION III. Analysis of MBE/WBE Availability SECTION III. Analysis of MBE/WBE Availability BBC analyzed the relative availability of minority- and women-owned firms that are ready, willing and able to perform Metro contracts and subcontracts. Minority-

More information

Small Business Participation Goal and Subcontracting Goals

Small Business Participation Goal and Subcontracting Goals Small Business Participation Goal and Subcontracting Goals Presented by OSBP January 2017 Discussion Areas Purpose Differences Common Mistakes Additional Note to Large Businesses CPARS and Small Business

More information

MBE ATTACHMENT -1B WAIVER GUIDANCE

MBE ATTACHMENT -1B WAIVER GUIDANCE MBE ATTACHMENT -1B WAIVER GUIDANCE GUIDANCE FOR DOCUMENTING GOOD FAITH EFFORTS TO MEET MBE PARTICIPATION GOALS In order to show that it has made good faith efforts to meet the Minority Business Enterprise

More information

BREAKOUT SESSION GROUP 3 Track B Civil Rights Thursday, September 26, :30am 12:00pm

BREAKOUT SESSION GROUP 3 Track B Civil Rights Thursday, September 26, :30am 12:00pm BREAKOUT SESSION GROUP 3 Track B Civil Rights Thursday, September 26, 2013 10:30am 12:00pm September 26, 2013 Tammy Mancinelli Phyllis Brice Danielle Morris Compliance Coordinator Lynchburg CR Manager

More information

REQUIRED DOCUMENT PACKAGE Gerald Desmond Bridge Replacement Project Contract Number: HD: 7961

REQUIRED DOCUMENT PACKAGE Gerald Desmond Bridge Replacement Project Contract Number: HD: 7961 This REQUIRED DOCUMENT PACKAGE has been prepared to facilitate compliance on the Gerald Desmond Bridge Replacement Project. It is not a replacement or substitute for contract documents. As a compliance

More information

FINANCIAL OPERATION Regulation 3165

FINANCIAL OPERATION Regulation 3165 FINANCIAL OPERATION Regulation 3165 Procurement Stards Federal Contracts Procurement Stards Federal Contracts Conflict of Interest The District maintains a written code of stards of conduct which governs

More information

Request for Price Proposal Transit Vehicle Decals Production & Installation

Request for Price Proposal Transit Vehicle Decals Production & Installation Request for Price Proposal Transit Vehicle Decals Production & Installation The Piedmont Authority for Regional Transportation (PART) is a North Carolina Transportation Authority created under NC General

More information

Ohio Department of Transportation DBE/EDGE Consultant Contracting Procedures Implementation of Contract Specific Development Goal Procedures

Ohio Department of Transportation DBE/EDGE Consultant Contracting Procedures Implementation of Contract Specific Development Goal Procedures Rev. August 28, 2017 Ohio Department of Transportation DBE/EDGE Consultant Contracting Procedures Implementation of Contract Specific Development Goal Procedures In order to foster DBE and EDGE participation

More information

FEDERAL TRANSIT ADMINISTRATION DBE METHODOLOGY AND GOAL. Developed by the

FEDERAL TRANSIT ADMINISTRATION DBE METHODOLOGY AND GOAL. Developed by the 2018-2020 FEDERAL TRANSIT ADMINISTRATION DBE METHODOLOGY AND GOAL Developed by the August 1, 2017 TABLE OF CONTENTS Overview of the Goal-Setting Process... 1 The Regulatory Mandate... 1 Summary of the

More information

49 CFR Part 23 2/9/2016 TRI CITIES AIRPORT (PSC) ACDBE GOAL CALCULATION FOR

49 CFR Part 23 2/9/2016 TRI CITIES AIRPORT (PSC) ACDBE GOAL CALCULATION FOR TRI CITIES AIRPORT (PSC) ACDBE GOAL CALCULATION FOR 2017-2019 1 Section 23.45: Overall Goal Calculation for Concessions Other Than Car Rentals Amount of Goal (submit if average annual gross receipts exceed

More information

Office Of Small And Disadvantaged Business Utilization Small Business Subcontracting Plan

Office Of Small And Disadvantaged Business Utilization Small Business Subcontracting Plan Office Of Small And Disadvantaged Business Utilization Small Business Subcontracting Plan The following outline meets the minimum requirements of section 8(d) of the Small Business Act, as amended, and

More information

Audio Sessions. Session 4 PROCUREMENT. Construction Contract Administration Education Program

Audio Sessions. Session 4 PROCUREMENT. Construction Contract Administration Education Program Audio Sessions Session 4 PROCUREMENT Construction Contract Administration Education Program Certified Construction Contract Administrator (CCCA) Preparatory Course 2011 The Construction Specifications

More information

The Greater Toronto Electrical Contractors Association endorses the following CCDC/CCA Documents

The Greater Toronto Electrical Contractors Association endorses the following CCDC/CCA Documents The Greater Toronto Electrical Contractors Association endorses the following CCDC/CCA Documents CCDC Standard Construction Documents CCDC 2-1994 Stipulated Price Contract Standard prime contract between

More information

Mentor-Protégé Program

Mentor-Protégé Program Mentor-Protégé Program 1. PURPOSE The Chicago Transit Authority (CTA) is committed to the growth and development of the Disadvantaged Business Enterprise (DBE) Community and its ability to compete in the

More information

There is no checklist you can go through and at the end say you ve definitely made a good faith effort. The point of good faith efforts is to

There is no checklist you can go through and at the end say you ve definitely made a good faith effort. The point of good faith efforts is to 1 There is no checklist you can go through and at the end say you ve definitely made a good faith effort. The point of good faith efforts is to demonstrate you did everything reasonable to utilize sufficient,

More information

Job Order Contracting (JOC) ITB JE Overview August 2016

Job Order Contracting (JOC) ITB JE Overview August 2016 Job Order Contracting (JOC) ITB 16-14204-JE Overview August 2016 Job Order Contracting (JOC) What is JOC? Using general and specialty trade contractors to perform a series of projects on an as-needed basis.

More information

DISADVANTAGED BUSINESS ENTERPRISE PROGRAM (49 CFR PART 26) FOR FREDERICKSBURG REGIONAL TRANSIT POLICY STATEMENT

DISADVANTAGED BUSINESS ENTERPRISE PROGRAM (49 CFR PART 26) FOR FREDERICKSBURG REGIONAL TRANSIT POLICY STATEMENT DISADVANTAGED BUSINESS ENTERPRISE PROGRAM (49 CFR PART 26) FOR FREDERICKSBURG REGIONAL TRANSIT POLICY STATEMENT Section 26.1, 26.23 Objectives/Policy Statement FREDericksburg Regional Transit (FRED), a

More information

HARRISBURG SCHOOL DISTRICT

HARRISBURG SCHOOL DISTRICT No. 631 SECTION: FINANCES HARRISBURG SCHOOL DISTRICT TITLE: MINORITY/WOMEN/ DISADVANTAGED BUSINESS ENTERPRISES PARTICIPATION ADOPTED: DECEMBER 21, 2015 REVISED: 631. MINORITY/WOMEN/DISADVANTAGED BUSINESS

More information

March, 2017 (Revised )

March, 2017 (Revised ) JSCB Resolution No 40-2017-Appendix A (Final as Amended by Board) March, 2017 (Revised 3-23-17) Phase II - Development and Diversification Plan for Workforce & Business 1 P age 2780141.4 Introduction The

More information

PROCUREMENT STANDARDS. Program Regulations found in: 7 CFR Parts 210, 215, 220, 225, and 226 and 2 CFR

PROCUREMENT STANDARDS. Program Regulations found in: 7 CFR Parts 210, 215, 220, 225, and 226 and 2 CFR Program Regulations found in: 7 CFR Parts 210, 215, 220, 225, and 226 and 2 CFR 200.318-.326 Procurement standards Program Regulations Government-wide Regulations Procurement Monitoring What to look for?

More information

TRANSIT AUTHORITY OF RIVER CITY (TARC) I.D

TRANSIT AUTHORITY OF RIVER CITY (TARC) I.D In March of 2010, the US Department of Transportation (USDOT) and the Federal Transit Administration (FTA) jointly issued a directive to FTA recipients, including the Transit Authority of River City (TARC),

More information

Neighborhood Community and Revitalization Program (NCR) Procurement, Contract, and Construction Standards

Neighborhood Community and Revitalization Program (NCR) Procurement, Contract, and Construction Standards Subrecipient Administrative Training (SAT) Meeting NJEDA Office, Trenton, NJ December 18, 2014 Neighborhood Community and Revitalization Program (NCR) Procurement, Contract, and Construction Standards

More information

INSTRUCTIONS TO BIDDERS -- FEDERAL PROJECTS DBE REQUIREMENTS

INSTRUCTIONS TO BIDDERS -- FEDERAL PROJECTS DBE REQUIREMENTS April 2, 2011 INSTRUCTIONS TO BIDDERS -- FEDERAL PROJECTS DBE REQUIREMENTS This project is partially funded with federal-aid highway funds, and is subject to the requirements for participation of Disadvantaged

More information

Federal Transit Administration (FTA) Overall DBE Goal-Setting Methodology

Federal Transit Administration (FTA) Overall DBE Goal-Setting Methodology Federal Transit Administration (FTA) Overall DBE Goal-Setting Methodology for FFY 2017-2019 Goal Period Submitted in fulfillment of: Title 49 Code of Federal Regulations Part 26 This analysis is prepared

More information

Sample Social Clauses to Encourage Community Benefits from Waste

Sample Social Clauses to Encourage Community Benefits from Waste Sample Social Clauses to Encourage Community Benefits from Waste What are social clauses and community benefits? 1 The UK Sustainable Development Strategy has set the challenge of making the UK an EU leader

More information

PROJECT PROCUREMENT MANAGEMENT. 1 Powered by POeT Solvers Limited

PROJECT PROCUREMENT MANAGEMENT. 1  Powered by POeT Solvers Limited PROJECT PROCUREMENT MANAGEMENT 1 www.pmtutor.org Powered by POeT Solvers Limited CONDUCT PROCUREMENT PROCESSES BY PROCESS GROUP Planning Executing Monitoring and controlling Closing 12.1 12.2 12.3 12.4

More information

SPECIAL ATTACHMENT NO. 2

SPECIAL ATTACHMENT NO. 2 CONTRACT DOCUMENTS MILWAUKEE METROPOLITAN SEWERAGE DISTRICT S/W/MBE Policies for Construction and Administrative Policy 2-78.01 Page: 1 of 30 PURPOSE: This Administrative Policy provides direction for

More information

CITY OF SEATTLE: SOCIAL EQUITY IN PROCUREMENT

CITY OF SEATTLE: SOCIAL EQUITY IN PROCUREMENT CITY OF SEATTLE: SOCIAL EQUITY IN PROCUREMENT Office of Mayor Ed Murray Javier Valdez, Special Assistant on WMBE Programs City Purchasing & Contracting Services Kelsey Beck, Senior Policy Advisor BACKDROP

More information

Bidders Name: DOCUMENT 330 BID FORM

Bidders Name: DOCUMENT 330 BID FORM Bidders Name: DOCUMENT 330 BID FORM TO: The City of Topeka, Kansas Contracts & Procurement Division 215 S.E. 7th St., Room 60 Topeka, Kansas 66603 Project No. and Description: 1. The undersigned Bidder

More information

PUBLIC CONTRACT CODE SECTION

PUBLIC CONTRACT CODE SECTION PUBLIC CONTRACT CODE SECTION 22160 22169 22160. (a) The Legislature finds and declares that the design build method of project delivery, using a best value procurement methodology, has been authorized

More information

Federal Transit Administration (FTA) Overall Disadvantage Business Enterprise (DBE) Goal-Setting Methodology

Federal Transit Administration (FTA) Overall Disadvantage Business Enterprise (DBE) Goal-Setting Methodology 42210 6 TH STREET WEST LANCASTER, CA 93534 Federal Transit Administration (FTA) Overall Disadvantage Business Enterprise (DBE) Goal-Setting Methodology For the Fiscal Federal Years (FFY) 2016-2018 Goal

More information

San Diego Housing Commission POLICY

San Diego Housing Commission POLICY Number: PO204.000 Effective Date: 2/24/88 Page 1 of 9 1. Error! Bookmark not defined. The San Diego Housing Commission will conduct its MBE/WBE Program in accordance with the Program established by the

More information

BELLOWS FALLS HISTORICAL SOCIETY, INC. Post Office Box 466 Bellows Falls, VT I fax

BELLOWS FALLS HISTORICAL SOCIETY, INC. Post Office Box 466 Bellows Falls, VT I fax BELLOWS FALLS HISTORICAL SOCIETY, INC. Post Office Box 466 Bellows Falls, VT 05101 802-376-6789 I fax 802-463-9415 Request for Qualifications Design and Build Services for Nature Observation Platforms

More information

Civil Construction Pre-Bid and DBE Meet and Greet. March 3, 2017

Civil Construction Pre-Bid and DBE Meet and Greet. March 3, 2017 Civil Construction Pre-Bid and DBE Meet and Greet March 3, 2017 1 Today s Topics Welcome/Introductions Bid Requirements Review of DBE Participation Overview of Project Specifications DBE Meet and Greet

More information

CONTRACT / CONSTRUCTION REQUIREMENTS FOR PUBLIC SCHOOLS PROJECTS. August 2005

CONTRACT / CONSTRUCTION REQUIREMENTS FOR PUBLIC SCHOOLS PROJECTS. August 2005 CONTRACT / CONSTRUCTION REQUIREMENTS FOR PUBLIC SCHOOLS PROJECTS August 2005 Projects Requiring Licensed Architect / Engineer: *Project Cost Threshold New Construction or Additions $135,000 + Major Repairs

More information