1 EVALUATION MATRIX Proponent s Name: Project Title: REQUEST FOR PROPOSALS FOR WOOD AND ORGANIC WASTE REDUCTION Evaluation Date: Evaluator: Criteria Step 1: YES NO Mandatories Proposal received prior to closing Provision of Staff Resumes Provision of Equipment List Provision of Sub-Contractors List Provision of References Sufficient number of proposal copies Acknowledgement of Addenda Step 2: TECHNICAL QUALIFICATIONS (40%) PROPOSAL (30%) Step 3: COST Max Qualifications of firm 5 Experience of firm 5 Past performance 10 Resources 20 Methodology 20 Scheduling 5 Innovation 5 Max PRICE (30%) TOTAL (100%) for Price = (lowest cost proposal divided by proposal being evaluated) x (30% weight) 30 EVALUATION MATRIX 1. Requests for Proposals (RFPs) will be reviewed by the Evaluation Team. 2. Each Evaluation Team member will complete the following RFP Evaluation Form for each proposal. 3. Upon completion, the Evaluation Team shall determine, by consensus, the score for each proposal and shall forward these scores to the Individual Corporate Board for consideration and award.
2 EVALUATION CRITERIA QUALIFICATIONS: (40%) (i) Qualifications of Company and Team Members Is the company and team members specialized and qualified in the nature of the work? (ii) Experience of Company and Team Members Has the Company conducted similar works during the last three (3) years? Do the proposed team members have experience with similar contracts? (iii) Past Performance Is the Company s record of past performance sound? Do reference checks reveal weaknesses? Was abnormal level of monitoring required? Does the Company consistently complete tasks on time and within specifications? (iv) Resources Does the Company have ample resources (e.g. staff, equipment, etc.) to apply to this contract? Has the Company provided financial statements including an auditor s report or a review report of a public accounting firm providing evidence that the Proponents financial strength and stability can support the anticipated project financing and long-term contractual commitments? PROPOSAL: (30%) (i) Methodology Do the proposal s, scope, work plan, equipment and prediction of results comply with the project requirements? Are the methodology and work plan clear and in sufficient detail to cover all necessary aspects? Does the proposal reflect the required understanding of the project? Is each task clearly outlined and in logical sequence? (ii) Scheduling Does the proposal indicate that the achievement of service objectives will be met according to an acceptable schedule? Is the Scheduling adequate to sustain acceptable stockpile volumes and product quality? Are alternatives or problems accounted for? (iii) Innovation Do proposed innovations reflect a unique grasp of conditions and a realistic appraisal of the tasks required to produce the desired results? PRICE: (30%) (i) Calculation (lowest cost proposal divided by proposal being evaluated) x (30% weight) 2
3 PROPOSAL FORM TECHNICAL PROPOSAL GENERAL As per Proposal Instructions, Proponents shall provide a typewritten itemized response to all the requested information for the work on which a Proposal and price are being submitted. The requested information is based on the requirements for service set out in the proposal document. When responding to the proposal, proponents are requested to review the Evaluation Matrix and Evaluation Criteria and ensure that all requested information is supplied and thoroughly detailed and addresses all listed requirements. SPECIFIC Supplemental to the basic Evaluation Criteria please provide specific answers to the questions listed below: 1) Are there contaminant tolerances and if so, what are they? 2) Please provide your process capability for minimum and maximum dimensions (length and width) for chip sizing. (Detail in Table B) 3) As per PI 3.12 do you have an alternate Performance Security proposal? 4) As per PI 4.8 do you have an alternate Price Adjustment proposal? 5) Please describe the dust suppression system. 6) Please describe the metals removal system and a percent per m 3 residual ferrous metal remaining as per OS 4.5. Please include variations in metals removal percent based on chip size. 7) Please describe the method of on-site transportation and of loading for off-site transport and indicate if there is: - an additional cost to load materials for off-site transport; - a cost for loading materials off-site for a period after the chipping event. 8) Please provide details regarding the provision of adequate water at each site for fire and dust suppression. 9) Please provide specifications for machinery and describe grinding process. 3
4 COST PROPOSAL Table A) Please indicate the price per m3. Proposal #1 is the cost per m3 for award of a single Corporation If cost is variable dependent upon number or combinations of sites acquired, please note variations (if any) by indicating costs in each proposal column for example: a) if proponent is successful on all sites indicate cost per site in all rows of Column #2. b) if proponent can offer a cost reduction if awarded 2 or more Corporations indicate price in another Column, the unit cost in Proposal #1 will be the maximum cost per corporation. Table B) Please indicate the chip dimensions available and the additional cost if any to the basic price per m3. The Corporation may evaluate the cost proposal based upon chip size and suitability to end use e.g. Biosolids Compost (BC), Yard Waste Compost (YC) Animal Bedding (AB) and Co-generation (CG). Table A) Landfill Site(s) Estimated Annual Volume m3 Proposal #1 INDIVIDUAL Proposal #2 Proposal #3 Proposal #4 Proposal #5 RDOS *68,500 Summerland *18,500 Osoyoos *12,000 Princeton *12,000 Table B) NOTE: The above quantities are estimates only. The quantities reported above are only for evaluating proposals on a uniform basis, the Corporations in no way guarantee quantities of material actually received at the landfills Chip Size W x L Cost Adjustment Recommended Use 4
5 Table C) Equipment Description Equipment Force Account Rates Model / Year Hourly Rate 5
Request For Proposals Information Technology Services IT Health Check
Request For Proposals Information Technology Services IT Health Check 1.0 INTRODUCTION The City of Fort St. John is one of the fastest growing cities in Canada and is located in the Peace River Region
More informationREQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE ROOF AND HVAC REPLACEMENT PROJECT PW1320
REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE 2015 2016 ROOF AND HVAC REPLACEMENT PROJECT PW1320 Issued by: City of Stockton Public Works Department 22 E. Weber Avenue, Room 301 Stockton, CA 95202
More informationAttachment D: Cost Proposal, RFP Section 3.4
ATTACHMENT D: COST PROPOSAL, RFP SECTION 3.4 Instructions: Use this template to comply with Section 3.4, Cost Proposal. Because the requirements of this RFP are part of a portfolio of projects designed
More informationADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION
ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION Subject to conditions prescribed by the University of California, San Diego, responses to the University's prequalification documents for a Design Build
More informationArchitectural Services
Architectural Services 2016 Capital Improvement Program Request for Proposal Number: 18-20 Title of the Projects: Renovations to Weaver Middle School Procurement Department Bibb County School District
More informationMaterials Recycling. Waste Wood Grinding Request for Proposal
Materials Recycling Waste Wood Grinding Request for Proposal Joe Angevine 1-26-2018 This request for proposals (RFP) serves four main purposes: 1. Establishing a background of the collection activities
More informationReport on Contract Management Practices Review. Ministry of Finance. Internal Audit & Advisory Services Ministry of Finance
Report on Contract Management Practices Review Ministry of Finance Internal Audit & Advisory Services Ministry of Finance Table of Contents Section Page No. Introduction... 1 Purpose... 2 Scope & Objectives...
More informationRequest for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO.
Request for Proposals (RFP) Information Technology Independent Verification and Validation ADDENDUM NO. 2 Questions and Answers RFP Amendments September 2015 Contained herein are the responses to the questions
More informationSH99 Grand Parkway Segments H, I1, and I2 Proposer RFQ Q&A Matrix No. 3 September 22, 2014
Proposer RFQ Q&A Matrix 3 Section and Page Document * Any document changes (other than RID updates) described in TxDOT's responses will be made in an Addendum to the RFQ unless otherwise indicated. RID
More informationSECTION QUALITY REQUIREMENTS
SECTION 01 40 00 QUALITY REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: Quality control and control of installation. Tolerances. References. Labeling. Mock-up requirements. Testing and inspection
More informationREQUEST FOR PROPOSAL. HRIS Human Resources Information Software Fort Morgan, Colorado
REQUEST FOR PROPOSAL HRIS Human Resources Information Software Fort Morgan, Colorado October 7, 2014 Michael Boyer Director, Human Resources and Risk Management CITY OF FORT MORGAN P.O. BOX 100 FORT MORGAN,
More informationWashington, D.C. London New Delhi Chicago San Francisco Scottsdale West Chester Sydney The Corporate Executive Board: What the Best Companies Do Toolbox.com is a wholly owned subsidiary of the Corporate
More informationPRELIMINARY SCOPE OF SERVICES
PRELIMINARY SCOPE OF SERVICES (Owner) (Project) The, through its, is (owner) (governing body if applicable - i.e. Board of Directors) in the process of selecting professional services for. This project
More informationAssociate Transportation Planner
Page 1 of 6 COUNTY OF SANTA CLARA INVITES APPLICATIONS FOR THE POSITION OF: Associate Transportation Planner An Equal Opportunity Employer SALARY $47.11 - $57.27 Hourly $3,768.64 - $4,581.20 Biweekly $8,165.39
More informationREQUEST FOR EXPRESSIONS OF INTEREST 5006 EOI DETERRENT PROGRAM FOR SNOW GEESE CONTROL
5006 EOI REQUEST FOR EXPRESSIONS OF INTEREST 5006 EOI DETERRENT PROGRAM FOR SNOW GEESE CONTROL Responses to this Request for Expressions of Interest will be received at the Information Counter, Main Floor,
More informationOhio Public Employees Retirement System. Request for Proposal
Ohio Public Employees Retirement System For: Consulting Services for Development of the Business Intelligence & Analytics Office Date: 9/11/2017 Project Name: Business Intelligence & Analytics Program
More informationREQUEST FOR PROPOSALS. RFP Strategic Planning Consultant. ISSUE DATE: July 31, 2015
REQUEST FOR PROPOSALS RFP 2015-16 02 Strategic Planning Consultant ISSUE DATE: July 31, 2015 CLOSING DATE AND TIME: 4:00 PM local time, Wednesday, August 26, 2015 CHILDRENS AID SOCIETY OF THE UNITED COUNTIES
More informationTompkins County Solid Waste Management Plan Executive Summary
Tompkins County Solid Waste Management Plan Executive Summary Tompkins County has prepared a comprehensive, twenty-year Solid Waste Management Plan to comply with the requirements of the Solid Waste Management
More informationConstruction Management/Construction Inspection Services
DELAWARE RIVER JOINT TOLL BRIDGE COMMISSION ADMINISTRATION BUILDING 110 WOOD & GROVE STREETS MORRISVILLE, PA 19067 ADDENDUM NO. 1 This Addendum No. 1 gives additional information in connection with the
More informationRequest for Proposal For: 2018 American Bar Association Temporary Services
Table of Contents Bid Timetable [2] 1.0 General Bid Information [3] 2.0 Proposal Requirements [5] 3.0 Criteria for Selection [7] 4.0 Specifications and Work Statement [7] Appendix A: Bidder Response Sheet
More informationREQUEST FOR PROPOSAL. Construction Management Services Not at Risk
REQUEST FOR PROPOSAL Construction Management Services Not at Risk The St. Charles County Ambulance District proposes to retain a qualified firm/team for the Construction Management Services Not at Risk
More informationW I N D A N D S O L A R R F Q / R F P P R O C E S S
W I N D A N D S O L A R R F Q / R F P P R O C E S S S a s k a t c h e w a n R e n e w a b l e s I P P and Supplier I n f o r m a t i o n S e s s i o n S a s k a t o o n, S a s k a t c h e w a n N o v e
More informationREQUEST FOR PROPOSALS FOR AN INTEGRATED PROJECT DELIVERY METHOD UTILIZING DESIGN/BUILD GUARANTEED MAXIMUM PRICE (GMP) SERVICES
REQUEST FOR PROPOSALS FOR AN INTEGRATED PROJECT DELIVERY METHOD UTILIZING DESIGN/BUILD GUARANTEED MAXIMUM PRICE (GMP) SERVICES Pueblo Urban Renewal Authority (PURA) Pueblo Convention Center Expansion &
More informationConsultant to support monitoring and evaluation planning for Capacity Development Partnership Fund (CDPF) Phase III
Terms of Reference Consultant to support monitoring and evaluation planning for Capacity Development Partnership Fund (CDPF) Phase III UNICEF Cambodia 1. Background The Capacity Development Partnership
More information1. Questions regarding the scoring methodologies developed by the IEP Rating Category teams.
IEP Response to Respondent Questions Related to IEP Transmission Provider Internal Report for RFP000001 The Industry Expert Panel provides these responses to the questions submitted to SPP by Respondents.
More informationInsert Client Name Request for Proposal for Security Risk Assessment Services Consulting
Courtesy of the International Association of Professional Security Consultants Distribute your RFP at no cost at https://iapsc.org/rfp/ Insert Client Name Request for Proposal for Security Risk Assessment
More informationHRM. Human Resource Management Rapid Assessment Tool. A Guide for Strengthening HRM Systems. for Health Organizations. 2nd edition
HRM Human Resource Management Rapid Assessment Tool for Health Organizations A Guide for Strengthening HRM Systems 2nd edition Copyright 2005, 2009 Management Sciences for Health, Inc. All rights reserved.
More informationADDENDUM TO THE RFP TENDER DOCUMENT
ADDENDUM TO THE RFP TENDER DOCUMENT ADDENDUM : TWO DATE : 25 TH JANUARY 2018 REF NO : RFP:201718/002 SUBJECT : RFP FOR PROVIDING CONCURRENT AUDIT SERVICES AT INDIAN INSTITUTE OF MANAGEMENT BANGALORE This
More informationBID THRESHOLD AND QUOTES
April 27 th & 28 th, 2016 As Presented By: Matthew Cavallo, Township Manager for the Township of Verona & Gerald T Reiner Jr., Purchasing Agent for the County of Bergen BID THRESHOLD AND QUOTES Jurisdiction
More informationSeattle Public Schools Office of Internal Audit. Internal Audit Report Construction Management Practices
Seattle Public Schools Office of Internal Audit Issue Date: December 5, 2017 Introduction and Background In accordance with the fiscal year 2018 capital audit plan, we have completed an audit of the district
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES OCTOBER 09, 2014 EAST BAY REGIONAL PARK DISTRICT Atlas Road Extension Improvements POINT PINOLE REGIONAL SHORELINE PROPOSALS DUE: 2:00PM, NOVEMBER
More informationCONSTRUCTION INDUSTRY COUNCIL Technical Seminar on Construction Procurement Selection of Consultants 27 November 2015
CONSTRUCTION INDUSTRY COUNCIL Technical Seminar on Construction Procurement Selection of Consultants 27 November 2015 Background A Task Force established by CIC Comprising Government, Clients, Consultants,
More informationFebruary Procurement Overview
February 2017 Procurement Overview The Strategic Procurement objective TCHC Strategic Procurement team is committed to open, fair and transparent procurement practices to achieve best value for money in
More informationSt. Lucie Public Schools
April 26, 2016 TO: FROM: RE: All Prospective Proposers Kim Albritton Coordinator of Business Services RFP 16-18 Speech-Language Therapy & Audiology Services ADDENDUM 1 TO RFP 16-18 SPEECH-LANGUAGE THERAPY
More informationCenterwide System Level Procedure
1 of 5 REVISION HISTORY Rev Description of Change Author Effective Date 0 Initial Release L. Jensen 5/6/98 1 Clarifications based on 7/98 DNV Audit and 6/98 Internal Audit (see DCR 98-015). Major rewrite.
More informationCAMP BUYING: PROVIDING EXCELLENCE
CAMP IPPS 2016 CAMP BUYING: PROVIDING EXCELLENCE Zip Line Your Way to High Dollar Purchases! Presented by Mary Chiu and Tony Esquer PC West: Earl Warren College Room 2:30 3:15 SO, WHY ARE YOU HERE TODAY?
More informationINTRODUCTION OF NEW EMPLOYMENT APPLICATION SYSTEM
INTRODUCTION OF NEW EMPLOYMENT APPLICATION SYSTEM Thank you for choosing South Central Regional Medical Center as a potential place of employment. We are pleased to announce our implementation of our new
More informationJob Order Contracting (JOC) ITB JE Overview August 2016
Job Order Contracting (JOC) ITB 16-14204-JE Overview August 2016 Job Order Contracting (JOC) What is JOC? Using general and specialty trade contractors to perform a series of projects on an as-needed basis.
More information1) Please share the last years expenditure under this contract. Answers: LIPA expects to spend approximately $1.2 million a year.
RFP for Information Technology Services- Questions Due: 8/11, 3pm, Answers due 8/16 Questions/Answers 1) Please share the last years expenditure under this contract. Answers: LIPA expects to spend approximately
More informationAsbestos Removal at Forest Blvd., Hugo, MN
Request for Bids for Asbestos Removal at 14383 Forest Blvd., Hugo, MN This Request for Bids ( RFB ) is for the services of a qualified and licensed contractor to provide removal of Asbestos contaminated
More informationTECHNICAL EVALUATION
ANNEX C TECHNICAL EVALUATION 1 Technical Bid Format The technical bid must address clearly and in sufficient depth the points that are subject to the evaluation criteria against which the bid will be evaluated
More informationKirk W Buffington, CPFIM, CPPO, C.P.M.,
Kirk W Buffington, CPFIM, CPPO, C.P.M., An Overview We will be talking about: The elements of the RFP process Factors determining the selection of the procurement method The elements of risk and how they
More informationNuclear Quality Standard Association General information about Quality Management System in the nuclear industry
Nuclear Quality Standard Association General information about Quality Management System in the nuclear industry This document is the property of NQSA Its copying, use or communication is subject to prior
More informationREQUEST FOR QUALIFICATIONS
NOTE: The City of New Brunswick Parking Authority will consider proposals only from firms or organizations that have demonstrated the capability and willingness to provide high quality services in the
More informationARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES
ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT CONSULTANT SELECTION PROCEDURES FOR ENGINEERING AND DESIGN RELATED SERVICES Section I Application (These procedures do not apply to Design-Build Contracts.)
More informationLOWER MANHATTAN DEVELOPMENT CORPORATION
LOWER MANHATTAN DEVELOPMENT CORPORATION REQUEST FOR QUALIFICATIONS for PHOTOCOPYING AND RELATED SERVICES The Lower Manhattan Development Corporation, a subsidiary of the New York State Urban Development
More informationAssociation of Consulting Engineering Companies British Columbia User Guide to Implementing Qualifications Based Selection
Association of Consulting Engineering Companies British Columbia User Guide to Implementing Qualifications Based Selection Best Practices for Selecting your Design Professional June 2016 USER GUIDE TO
More informationAppendix G - OPM's Job Analysis Methodology
Appendix G - OPM's Job Analysis Methodology Introduction There are a number of valid approaches to job analysis. The method described below provides one model. You are free to choose any method, provided
More informationTown of York, Maine Request for Qualifications
Town of York, Maine Request for Qualifications Historic Restoration Contractor The Town of York is accepting Statement of Qualifications from General contractors experienced in historic restoration, for
More informationHOWEVER, IT S NOT THAT SIMPLE.
10 Contract Management November 2015 An explanation of why the source selection process takes as long as it does, along with some tips for both government and industry to speed up the process. BY MARGE
More informationProject Executive Compensation Project - 2
Project 432702 Executive Compensation Project - 2 1. General Information Citizens Energy Group Citizens Energy Group (Citizens) operates as a Public Charitable Trust engaged in a variety of businesses
More informationREQUEST FOR PROPOSALS SOLID WASTE COLLECTION AND LANDFILL MANAGEMENT STUDY CRISP COUNTY GEORGIA
REQUEST FOR PROPOSALS SOLID WASTE COLLECTION AND LANDFILL MANAGEMENT STUDY CRISP COUNTY GEORGIA I. PROJECT DESCRIPTION: The Crisp County Board of Commissioners is seeking proposals from qualified consulting
More informationNational Technical Advisor to Support the Development of the Action Plan to Implement the Child Protection Policy in Schools
United Nations Children s Fund (UNICEF) Phnom Penh, Cambodia Individual Consultant National Technical Advisor to Support the Development of the Action Plan to Implement the Child Protection Policy in Schools
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS UTILITY BILLING SOFTWARE DUE DATE: NO LATER THAN 5:00 PM EASTERN TIME, MARCH 11, 2016 QUESTIONS: JESSICA MARTIN-LANE JESSICA@MARTIN-MCGILL.COM NOTE: THE COUNTY OF HARNETT RESERVES
More informationTech Services Requirements
Technology Services Requirements Tech Services Requirements Robert J. (Rob) Rennie, PhD I NFORMATION T ECHNOLOGY FLORIDA STATE COLLEGE AT JACKSONVILLE Technology Department January 2013 Page 1 Table of
More informationINTERREG IVA Programme. Guidance Note on Procurement and Tendering G4/IIVA
INTERREG IVA Programme Introduction Guidance Note on Procurement and Tendering G4/IIVA This guidance note sets out the procurement processes and thresholds in relation to projects funded in the INTERREG
More informationCITY OF THREE RIVERS, MICHIGAN Specifications for Bids. Tree and/or Stump Removal Performance Bids
CITY OF THREE RIVERS, MICHIGAN Specifications for Bids Tree and/or Stump Removal Performance Bids The City of Three Rivers is committed to the concept of performance bids. All vendors are encouraged to
More informationREQUEST FOR QUALIFICATIONS FOR Design-Build Services for the University of Washington Seismic Improvements
Page 1 of 16 University of Washington REQUEST FOR QUALIFICATIONS FOR Design-Build Services for the University of Washington Seismic Improvements Project No. 205729 Submittal Deadline Date: No later than
More informationB. Related Sections: 1. Division 07 Section "Joint Sealants" for sealing of expansion, contraction, control, and isolation joints in tile surfaces.
SECTION 093000 - CERAMIC TILE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationCritical 0 Major 0 Minor 0. Certification Body name and address
Audit Report Global Standard for Agents and Brokers Issue 1: January 2014 1.Audit Summary Company name BRC Site Code BRC Site code 2.Scope Operation Services Scope of audit Product categories Select Operation
More informationHow To Do Business with the Ontario Government. Supply Chain Management, Ontario Shared Services Ministry of Government Services January 2010
How To Do Business with the Ontario Government Supply Chain Management, Ontario Shared Services Ministry of Government Services January 2010 1 Agenda To maximize your chances of being successful in obtaining
More informationPOSTAL STATION B ENVELOPE REHABILITATION & BASE BUILDING UPGRADE CONSTRUCTION MANAGER FAIRNESS MONITOR FINAL REPORT
POSTAL STATION B ENVELOPE REHABILITATION & BASE BUILDING UPGRADE CONSTRUCTION MANAGER FAIRNESS MONITOR FINAL REPORT Submission Date: September 23, 2015 Submitted To: Director, Fairness Monitoring Departmental
More informationREQUEST FOR QUALIFICATIONS. Design/Build Project Number CP Power Plant - Boiler 10 Gas Burner Replacement
REQUEST FOR QUALIFICATIONS Project Number CP160801 Power Plant - Boiler 10 Gas Burner Replacement University of Missouri Campus Facilities Planning, Design and Construction Columbia, Missouri February
More informationContracting for Architectural and Engineering (A/E) Services Webinar. August 30, AM to 11:30 AM
Contracting for Architectural and Engineering (A/E) Services Webinar August 30, 2011 10 AM to 11:30 AM 1 Where We're Going Today Webinar Operation - Fred Ward 5 minutes (+/-) Topic Introduction - John
More informationREQUEST FOR QUOTATIONS (RFQ)
REQUEST FOR QUOTATIONS (RFQ) Transition Initiatives for Stabilization Plus (TIS+) Provision of Support for Engineering Technical Supervision and Capacity Building for Baardhere Orientation Center (JSS021)
More informationREQUEST FOR PROPOSAL
REQUEST FOR PROPOSAL 07-X-37657 For: PRINTING EQUIPMENT: Offset, Digital Duplicators, Thermal Sign Printing Equipment including Vinyl Plotters, Prepress and Bindery Equipment. Maintenance and Supplies
More informationPLATTE RIVER RECOVERY IMPLEMENTATION PROGRAM REQUEST FOR CONTRACTOR PREQUALIFICATION
PRRIP ED OFFICE FINAL 3/3/2010 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 PLATTE RIVER RECOVERY IMPLEMENTATION PROGRAM REQUEST
More informationRequest for Proposal (RFP)
Request for Proposal (RFP) BOK INFORMATION TECHNOLOGY RISK ASSESSMENT Date of Issue Closing Date Place Enquiries Table of Contents 1. Project Introduction... 3 1.1 About The Bank of Khyber... 3 1.2 Critical
More informationApplication for Focus on Energy s Biogas Feasibility Study Grants for Anaerobic Pretreatment and Anaerobic Digester Facilities
Application for Focus on Energy s Biogas Feasibility Study Grants for Anaerobic Pretreatment and Anaerobic Digester Facilities Focus on Energy, a statewide service, works with eligible Wisconsin residents
More informationGroup Accountant (Children s Services)
Grade: 54,000 Group Accountant (Children s Services) Section: Division: Department: Reports to: As Required Finance Chief Executive Group Manager (Services) Purpose of the Job You are employed to provide
More informationBSA/AML Self-Assessment Tool. Overview and Instructions
BSA/AML Self-Assessment Tool Overview and Instructions February 2018 1129 20 th Street, N.W. Ninth Floor Washington, DC 20036 www.csbs.org 202-296-2840 FAX 202-296-1928 2 Introduction and Overview The
More informationLatest Technologies for Processing Organics
Latest Technologies for Processing Organics Northeast Recycling Council Fall Organics Recycling Conference October 29, 2013 Presented by: Wayne Davis VP Community & Government Affairs Harvest Power, Inc.
More informationSolid Waste Disposal & Maintenance Manager
ANNE ARUNDEL COUNTY http://www.aacounty.org/personnel/index.cfm invites applications for the position of: ANNOUNCEMENT: 04286 Solid Waste Disposal & Maintenance Manager An Equal Opportunity Employer SALARY:
More informationcertificate in management practice financial skills
NQF Level 4 certificate in management practice financial skills Building a cost conscious culture amongst non-financial managers about the programme The training need The need to embed cost effectiveness
More informationMid-America Intergovernmental Audit Forum. Selecting an External Auditor. Guide for Making a Sound Decision
Mid-America Intergovernmental Audit Forum Selecting an External Auditor Guide for Making a Sound Decision May 2007 Foreword The benefits of having a high-quality audit of a government's financial statements
More information1.0 BASIS OF ESTIMATE (BOE) HOW TO
1.0 BASIS OF ESTIMATE (BOE) HOW TO 1.1 Definition A Basis of Estimate (BOE) is a document that identifies the logic, data, methodology and calculations used to estimate the resources required to perform
More informationCompetitive Procurement Evaluation Process Audit
1200, Scotia Place, Tower 1 10060 Jasper Avenue Edmonton, Alberta T5J 3R8 edmonton.ca/auditor Competitive Procurement Evaluation Process Audit August 28, 2017 City of Edmonton 16417 Procurement Evaluation
More informationSTATEMENT OF SPECIAL INSPECTION FORM
STATEMENT OF SPECIAL INSPECTION FORM Project Title: Plan Check #: Project Address: This Statement of Special Inspections is submitted in fulfillment of the requirements of the 2013 California Building
More informationPUBLIC HEALTH AGENCY OF CANADA MANITOBA/SASKATCHEWAN REGIONAL OFFICE REQUEST FOR PROPOSAL (RFP)
PUBLIC HEALTH AGENCY OF CANADA MANITOBA/SASKATCHEWAN REGIONAL OFFICE REQUEST FOR PROPOSAL (RFP) CLOSING DATE: November 13, 2007 CLOSING TIME: 4pm Time Zone: Central Standard Time RFP Reference Number:
More informationRequest for Proposal Simulation-Based Learning Competition
International Council on Hotel, Restaurant, and Institutional Education February 1, 2018 Request for Proposal Simulation-Based Learning Competition RFP#2018-SIM-101 Your firm is invited to submit a proposal
More informationSECTION EPOXY TERRAZZO
SECTION 09402 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to
More informationEMPLOYMENT APPLICATION
DATE: EMPLOYMENT APPLICATION CITY OF SPRING GROVE 118 1 ST AVENUE NW PO BOX 218 SPRING GROVE, MINNESOTA 55974 (507) 498-5221 Title of job applied for: (Type or print) Last Name First Name MI Home Phone
More informationApplication for Employment St. Charles Public Library
Application for Employment St. Charles Public Library Received: We consider applicants for all positions without regard to race, color, religion, creed, gender, national origin, age, disability, marital
More informationSocial Procurement Policy
Purpose and Policy Statement Social Procurement Policy To embed supply chain diversity and workforce development initiatives within the City's Procurement Processes to drive inclusive economic growth.
More informationManual. EUREKA Project Assessment Methodology [PAM]
Manual EUREKA Project Assessment Methodology [PAM] June 23 PAM Manual Table of Contents Section 1: Introduction to the PAM Manual Section 2: PAM Assessment Form Section 3: PAM Criteria and Definitions
More information1. Poor attitude toward any of the other students, instructors, or judges. 2. Failure to use personal protective equipment (PPE).
Welding Contest Rules and Score Sheet 2016 4G Rules: 1. Be Safe & Have Fun 2. Can tack in any position but groove welding must be in accordance with your WPS. 3. Can use wire brush, chipping hammer, and
More informationREQUEST FOR PROPOSAL Audit and Tax Services ISSUED April 24, 2015 RFP No
REQUEST FOR PROPOSAL Audit and Tax Services ISSUED April 24, 2015 RFP No. 15-1474 Tampa Bay Workforce Alliance, Inc. is accepting proposals from qualified CPA firms to provide audit and tax services. Parties
More informationSPECIFICATIONS FOR DOUBLE CHIP SEAL
SPECIFICATIONS FOR DOUBLE CHIP SEAL 1.0 DEFINITIONS The term Director [Superintendent, etc.] shall mean the Director of Public Works of the awarding authority. The term Designee shall mean an employee
More informationYou Passed Your Bond Now What? a Part 3: Multi-Prime and Design-Build Project Delivery Methods and Project Labor Agreements
You Passed Your Bond Now What? a Part 3: Multi-Prime and Design-Build Project Delivery Methods and Project Labor Agreements January 25, 2017 Presented By: Deidree Sakai Cameron Ward SAN FRANCISCO LONG
More informationTsawwassen First Nation Procurement Policy. February, 2010
Tsawwassen First Nation Procurement Policy February, 2010 TFN Procurement Policy Page 0 of 10 Table of Contents 1. Authority... 2 2. Purpose and Scope... 2 3. Principles... 2 4. Purchasing authority and
More informationCRISP Azure Migration Consulting Services. All responses due no later than Friday, July 21 st, at 5pm EST
Request for Quote CRISP Azure Migration Consulting Services Friday, July 7th, 2017 All responses due no later than Friday, July 21 st, at 5pm EST 1 Request for Quote RFQ TO ALL RESPONDERS CRISP Azure Migration
More informationPREPARED BY ORGANIZATION DATE
Process for Authorizing Use of Consultants NRAO Doc. #: Richard Sakshaug, Joyce Johnson May 18, 2015 Version: New Process for Authorizing Use of Consultants PREPARED BY ORGANIZATION DATE Richard Sakshaug,
More informationAUTOMATIC METER READING SYSTEM DETAILED SPECIFICATION
From: TO THE CITY COUNCIL CITY OF CARLYLE, ILLINOIS EQUIPMENT FOR AUTOMATIC METER READING SYSTEM AND HOSTING SERVICES for the MUNICIPAL ELECTRIC and WATER UTILITY. The undersigned, having familiarized
More informationLodging Career Investigation
Ohio FCCLA Lodging Skill Event Lodging Career Investigation DESCRIPTION OF EVENT: Teams comprised of 1-3 participants will develop a career investigation project in the Lodging and Travel Services pathway.
More informationApplication Guidelines. Request for Proposals (RFP) for Independent Contractor Opportunity for:
Application Guidelines Request for Proposals (RFP) for Independent Contractor Opportunity for: Professional Services: Workplace Communication Workshops Facilitator Healthcare Connections Terms: Year 1
More informationDates/Times: p.m. Pacific Time.
Notice - Request for Qualifications (RFQ) For Corrosion Engineering and Investigations For The "E" Street Reservoir Cover Repainting For The City of Port Angeles 06-12-12 The City of Port Angeles, Washington,
More informationELECTORAL COMMISSION. Staff Appraisal Form for Officers
ELECTORAL COMMISSION Staff Appraisal Form for Officers ANNUAL/HALF YEARLY PERFORMANCE REPORT FOR THE PERIOD FROM TO 1.0 PURPOSE The Electoral Commission strives to ensure that there are regular, free and
More information2 No GOVERNMENT GAZETTE, 11 OCTOBER 2017
Vol. 628 11 October Oktober 2017 No. 41175 2 No. 41175 GOVERNMENT GAZETTE, 11 OCTOBER 2017 STAATSKOERANT, 11 OKTOBER 2017 No.41175 3 Contents Gazette Page No. No. No. GOVERNMENT NOTICES GOEWERMENTSKENNISGEWINGS
More informationSTANDARD SPECIFICATION SECTIONS. November 2016 Physical Resources Design, Engineering and Construction
STANDARD SPECIFICATION SECTIONS Design, Engineering and Construction SPECIFICATIONS for Replacement of Heating System Building 045 Project Number XXXXXX June 25, 2004 Consultant Name and Address, etc.
More informationProcurement Guidelines
Reference 21 CM@Risk Procurement Guidelines Draft June 5, 2014 Purpose: These guidelines are intended to provide (1) assistance to those who may be responsible for implementation, processing and/or management
More information