1 Date & Time: Project: Meeting Location: Meeting Purpose: (Thursday) from 1:30 pm 3:30 pm East Central Florida Corridor Evaluation Study FDOT District Five Urban Office Lake Harris Conference Room 133 S. Semoran Blvd. Orlando, FL East Central Future Corridors Evaluation Study Project Advisory Group (PAG) Kick-Off Meeting ATTENDEES Alissa Torres, Orange County Antony Biblo, DEO Bob Kamm, Space Coast TPO Brenda Young, FDOT District Five Brian Stanger, FDOT District Five Brian ten Siethoff, Cambridge Systematics Dana Reiding, FDOT Central Office David Cooke, FDOT District Five David Williams, VHB Erin Sterk, Brevard County Glenn Pressimone, CFX Harry Barley, MetroPlan Orlando Hugh Harling, ECFCRPC MEETING AGENDA I. Introductions & Project Overview - John Zielinski (1:30 1:35) II. FDOT Partnership (1:35 2:00) Central Office Dana Reiding Statewide Future Corridors Initiative Statewide agency coordination District Five Project management and administration Technical analysis and evaluation Continued regional coordination James Stansbury, DEO Jamil Gutierrez, FDOT District Five Jeff Bowen, Hanson John Zielinski, FDOT District Five Jon Weiss, Orange County Joseph Berenis, CFX Lori Sellers, Hanson Mansoor Khuwaja, Hanson Shane Friedman, Osceola County Shelley Lauten, trisect Virginia Whittington, MetroPlan Orlando Xavier Pagan, FDOT Central Office III. PAG Involvement - Jeff Bowen (2:00 2:15) Stakeholder Liaison Technical Input Support / Implementation Recommendations PAG Communication Plan IV. Project Approach Discussion (2:15 2:45) Task Force Recommendations Review Project Work Plan V. Stakeholder Updates (2:45 3:15) VI. Next Steps - John Zielinski (3:15 3:30)
2 MEETING SUMMARY East Central Florida Corridor Evaluation Study I. INTRODUCTIONS & PROJECT OVERVIEW - John Zielinski John Zielinski opened the meeting and provided a brief overview of the Future Corridors planning process. John described the current phase of several statewide and regional visioning studies that have led up to the East Central Florida Corridor Evaluation Study (ECFCES). John provided an overview of the history of the statewide Future Corridors Initiative and the East Central Florida Corridor Task Force (ECFCTF) that preceded the ECFCES; The concept of the Future Corridors Initiative and the Future Corridors planning process was discussed. o John noted that four out of the total five total statewide Future Corridors cross in Central Florida, the unique characteristics of Florida s Super Region, and highlighted the importance of the work of the ECFCES. John noted the limitations of traditional forecasting in long range planning and opportunities to design Corridors of the Future in the ECFCES. o With the ECFCES planning horizon year of 2060, and trends like the expanding global economy; technological advances such as vehicle and manufacturing automation; and governance and regulatory policy changes, the ECFCES will be examining and developing new methodologies in planning. o John noted the ECFCES will be utilizing a post-processing tool to facilitate scenario planning and explore multiple future scenarios in the planning process. This tool, called TransFuture, will supplement traditional planning with a probabilistic analysis framework Jon Weiss noted that traditional modeling process assumes today s technologies and trends will continue into the future unchanged. He noted that all assumption and methodologies should be disclosed through the process, but that he s glad to see different methodologies being considered. Bob Kamm also noted he will be interested in how the modeling for a project with this many variables and uncertainties will be accomplished, especially between the current modeling horizon of 2040, and the ECFCES planning horizon of Alissa Barber-Torres also noted that it is good that the ECFCES is evaluating the impact of changes in transportation demand from Millennials. Alissa also noted that Orange County is looking at a 2030 horizon for long range plan and future land use which challenges us all to find a sound technical way to approach long term transportation planning Hugh Harling asked the group to consider ways to integrate water management with transportation planning, including runoff from transportation corridors. He provided an example being examined in Volusia County to store excess water underground vs. installing drainage and retention structures designed for irregular, intense storm events. John provided further background for the ECFCES describing the ECFCTF How Shall We Grow? regional visioning effort. o The ECFCES falls within the Evaluation phase of the Future Corridors planning process: Concept phase: concept studies were completed for two (2) of the future corridors, Tampa to Jacksonville and Central Florida to Tampa Bay. Concept study defined areas for further study, and identifies long range needs for these corridors The Central Florida Tampa Bay Concept Study was completed in The concept study recommended that FDOT conduct the ECFCES to address the regional connectivity gap between 2
3 the Orlando International Airport and southern Brevard County to refine the future corridor planning process for future use. The Task Force was created by Executive Order , November 1, 2013 with the purpose of evaluating and developing consensus recommendations on future transportation corridors serving established and emerging economic activity centers in portions of Brevard, Orange, and Osceola Counties. The Final Report was provided to the Governor in December o The ECFCTF developed 21 recommended guiding principles based on the 4C s - Conservation, Countryside, Centers, and Corridors - developed in How Shall We Grow?, and a proposed action plan that recommends: Existing corridors for further study: SR 528 Super Corridor; SR 50/SR 405 Corridor; SR 520 Corridor; US 192 Corridor; SR 417 / Narcoossee Rd Corridor; and Four new corridors providing connections between Brevard, Orange, and Osceola counties. The 4C s will be guiding principles in the ECFCES The ECFCTF recommendations also include developing a regional transit system plan to set priorities for long-term transit investments in Central Florida II. FDOT PARTNERSHIP Dana Reiding and John provided an overview of the partnerships involved in ECFCES. Central Office will oversee the statewide Future Corridors Initiative and ensure statewide future corridors policy implementation consistency and provide statewide agency/stakeholder coordination District Five will provide ECFCES project management and administration, continued regional coordination, and lead the technical analysis and evaluation of proposed projects The Central Florida MPO Alliance will lead the Regional Transit Study; results will be incorporated into ECFCES III. PAG INVOLVEMENT Jeff Bowen Jeff led a discussion of the PAG s role and involvement in the ECFCES. The PAG is a critical component to the ECFCES. Jeff provided an overview of the key roles and functions the PAG provides to the ECFCES. Jeff noted the three (3) primary roles / responsibilities of the PAG include: o Stakeholder Liaison PAG members will communicate with their respective stakeholders and agency officials regarding the project process and findings o Technical Input Provide jurisdictional, policy, technical, and administrative guidance throughout the Study review; provide information and direction for key project milestones 3
4 o Support Implementation of Recommendations Assist in identifying and establishing an evaluation approach and criteria that will help prioritize investments in transportation infrastructure and services Assist in developing information that will rank / prioritize corridor alternative(s) being adopted by the maintaining agency Support implementation through comprehensive and land use policy adoption Dana stressed that the metropolitan planning organizations, regional planning council, cities, counties, and system owner/operators like the Central Florida Expressway Authority, have a primary role in implementation Jon Weiss recommended making a clear distinction between the role of the PAG in the ECFCES process (stakeholder liaison, technical advisor) from outreach to elected officials. IV. PROJECT APPROACH DISCUSSION Jeff Bowen Jeff noted the scope of the ECFCES was developed in consideration with the guiding principles and proposed action plan put forward by the ECFCTF. Jeff presented the ECFCES Work Plan outlining the anticipated schedule of the ECFCES. Project tasks include: Existing Conditions Analysis; Evaluation Approach and Criteria Development; The Regional Transit System Plan, to be conducted by the Central Florida MPO Alliance with support from the Hanson Team; Future Conditions Analysis; Purpose and Need Development; Alternatives Analysis; Funding / Financing Identification; Support Local and Regional Plan Amendments; Develop Local and Regional Agency Agreements; Development of Methods / Tools to Facilitate Implementation; and Project Documentation The ECFCES has a tentative completion date by February Jeff described the tentative meeting calendar: o PAG meetings every two to three months, either in person or through teleconferencing, generally in conjunction with deliverables o PAG project update meetings occurring during longer gaps between deliverables. Jeff defined and led group discussion of the ECFCES study goals, which are: o Coordinate and develop best alignments for new corridors o Prepare projects for project development o Local plan amendments o Facilitate right-of-way (R/W) preservation and agreements o Develop Purpose and Need statements to facilitate proposed corridor improvements moving straight into Project Development Joe Berenis noted that a clearly defined need and purpose must be established to set aside R/W o Establish a process for evaluating corridors, to be used in the statewide Future Corridor Initiative 4
5 Harry Barley noted that the ECFCTF process appeared straightforward, but noted the ECFCES process will have many more variables and agencies involved; many agencies involved in implementation and adoption of the Task Force recommendations. Xavier Pagan noted that any project that may move into a Federalized process has to be very careful about how R/W preservation is approached and described in pre-nepa planning documents Hugh Harling recommended focusing on existing corridors first; future new corridor alignments would be developed later when there is a need for it as growth happens. Corridor reservation will be part of Osceola County agreement with developer of North Ranch; asked if similar agreements needed with other major landowners along these corridors. Harry asked if the ECFCTF sunsetted or if they have an ongoing role. John responded that the Task Force did sunset, but we will keep them apprised of our progress in this evaluation effort. Jeff noted that there has been time between when the ECFCTF published their report to the Governor, but the FDOT has maintained coordination with several key stakeholders to the ECFCES process: Central Florida Expressway Authority Deseret Ranch East Central Florida Regional Planning Council Florida s Turnpike Enterprise Osceola Expressway Authority Discussion was held regarding project communication with the PAG, public, and agency and elected officials. It was noted that the ECFCES process will not include a traditional public involvement process as that will be addressed at later stages of project development. V. STAKEHOLDER UPDATES Jeff Bowen Alissa noted that Orange County Transportation Planning is proposing to their Board to update an East Orange County Transportation Needs Study in coordination with planned and proposed development in East Orange County. The first Needs Study was conducted about 15 years ago. Joe noted that the CFX Board adopted 2040 Master Plan. o As part of agreement to acquire R/W along SR 528, Joe stated that CFX agreed to do a study of a north-south expressway through the North Ranch. o This study area could be a derivative of corridors H and I, dependent upon the sale of property to land developer, Tavistock, and direction from Deseret Ranch. He noted that preliminary traffic projections conducted by Tavistock do not indicate sufficient demand to support a limited access facility through their property (as would be constructed and operated by CFX). o CFX anticipates initiating a mobility evaluation study within the next six (6) months which will include the new corridor derivative and multimodal analyses. o USF conducting study for CFX of transit policies regarding multimodal transportation investments and operation and maintenance. Bob Kamm noted that many of the corridors recommended for analysis by the ECFCTF are part of existing planning and implementation efforts; the challenge may be to tie it all up. Alissa noted that MetroPlan Orlando recently funded an update to the Orange County portion of the regional Freight, Goods, and Services Plan. John mentioned an update to the Osceola portion is also planned. 5
6 VI. NEXT STEPS Define Forecasting Methodology (2040 and 2060) Finalize Scope for Evaluation Approach and Criteria Development Develop corridor specific Purpose and Need statements Finalize Stakeholder Engagement Plan Develop Post-Process Forecasting Tool Upcoming PAG Meeting August 2016 (tentative) VII. ADJOURN HANDOUT MATERIALS Agenda East Central Florida Corridor Task Force Summary Report East Central Florida Corridor Task Force Recommendations and Action Plan Central Florida Projects Map East Central Florida Corridor Evaluation Study PAG Kickoff Meeting Presentation Work Plan / Schedule PAG Membership PAG Meeting Schedule (Tentative) 6
SR 417 Extension. June 2003 INTRODUCTION AND HISTORY PROJECT SCOPE AND PURPOSE STUDY OBJECTIVE STUDY PHASES
Planning Feasibility Study June 2003 INTRODUCTION AND HISTORY The SR 417 Extension Study was a yearlong effort undertaken by Florida s Turnpike Enterprise to investigate the feasibility of a new toll road
More informationCanaveral Port Authority: Rail Extension Update
Rail Extension Update Canaveral Port Authority: Rail Extension Update Thursday, April 30, 2015 5:30 to 6:30 p.m. Port Canaveral Maritime Center John Walsh CEO, Canaveral Port Authority Jim Dubea Speakers
More informationFlorida Department of TRANSPORTATION Florida Transportation Plan (FTP) and Strategic Intermodal System (SIS) Strategic Plan Updates
Florida Department of TRANSPORTATION Florida Transportation Plan (FTP) and Strategic Intermodal System (SIS) Strategic Plan Updates Jim Wood Director, Office of Policy Planning Overview The FTP and the
More informationFlorida Freight Supplychain Intermodal Model
Florida Freight Supplychain Intermodal Model Innovations in Travel Modeling 2014 April 29, 2014 Introduction Support freight plan development Office of Freight Logistics and Passenger Operations Evaluate
More informationFlorida Transportation Modeling. Table 1 Top Five Priorities by Market Segment RANK PUBLIC SECTOR PRIVATE SECTOR
Florida Transportation Modeling Newsletter October 2009 MTF Membership Develops Model Improvement Priorities By: FDOT Systems Planning Office The Model Task Force tri-chairs and committee chairs met in
More informationExhibit A - Scope of Service Office of Freight, Logistics and Passenger Operations Consultant
I. Purpose Exhibit A - Scope of Service Office of Freight, Logistics and Passenger Operations Consultant The Department requires the assistance of a Consultant for a wide range of planning, policy, financial,
More informationFlorida s Automated Vehicle Initiative
Florida s Automated Vehicle Initiative Outline Overview of Autonomous Vehicles and Connected Vehicles Florida s Automated Vehicles Initiative Activities Automated Vehicles Connected Vehicles Technology
More informationStatewide Acceleration Transformation (SWAT)
Presented to: AASHTO SCOE/SCOD Presented by: Marjorie Kirby Paul Hiers, P.E. Statewide Acceleration Transformation (SWAT) July 2017 PD&E Study Comply with the National Environmental Policy Act (NEPA) and
More informationAGENDA ITEM #13: MAP-21/FAST ACT SAFETY PERFORMANCE MEASURES AND TARGETS Keith Nichols, HRTPO
AGENDA ITEM #13: MAP-21/FAST ACT SAFETY PERFORMANCE MEASURES AND TARGETS Keith Nichols, HRTPO Recent federal surface transportation legislation established that States and Metropolitan Planning Organizations
More informationRegional Transportation Studies Regional Council
Pima Association of Governments 1 E. Broadway, Tucson, Arizona Santa Rita Conference Room Regional Transportation Studies Regional Council September 28, 2017 I-11 Tier 1 Environmental Impact Statement
More informationSoutheast Florida Freight and Goods Movement Update Treasure Coast Regional Planning Council September 16, 2011
Southeast Florida Freight and Goods Movement Update Treasure Coast Regional Planning Council September 16, 2011 For Questions on this Presentation, Please Contact: Jeff Weidner, Mobility Manager Florida
More informationSR 9/I-95 Interchange at 45th Street PD&E Study Palm Beach County, Florida FPID No.: FAP No.: ETDM No.
Palm Beach County, Florida Palm Beach Metropolitan Planning Organization April 217 Project Study Area LIMITS: SR 9/I-95: from S of 45th Street to N of 45th Street 45th Street: From Village Boulevard to
More informationPhase 1 Status Report to the General Assembly PREFACE
PREFACE The Commonwealth Transportation Board (CTB) was directed by the 2002 General Assembly through passage of House Bill (HB) 771 to develop a statewide multimodal longrange transportation plan with
More informationPublished by the Palm Beach Metropolitan Planning Organization (MPO) in coordination with Leftwich Consulting Engineers, Inc.
AMENDMENT #3 + Published by the Palm Beach Metropolitan Planning Organization (MPO) in coordination with Leftwich Consulting Engineers, Inc. Adopted October 16, 2014 by the Board of Directors Palm Beach
More informationREQUEST FOR PROPOSAL Audit and Tax Services ISSUED April 24, 2015 RFP No
REQUEST FOR PROPOSAL Audit and Tax Services ISSUED April 24, 2015 RFP No. 15-1474 Tampa Bay Workforce Alliance, Inc. is accepting proposals from qualified CPA firms to provide audit and tax services. Parties
More informationFlorida Department of Transportation Daniels Parkway Fort Myers, FL 33913
RICK SCOTT GOVERNOR Florida Department of Transportation 10041 Daniels Parkway Fort Myers, FL 33913 ANANTH PRASAD, P.E. SECRETARY Mr. Ray Eubanks Plan Processing Administrator Department of Economic Opportunity
More informationWorking with Transportation Concurrency Exception Areas
Working with Transportation Concurrency Exception Areas September 2006 Presented by the Florida Department of Transportation Working with Transportation Concurrency Exception Areas Volume 1, September
More informationNorth Carolina Statewide Freight Plan
Greater Charlotte Regional Freight Peer Exchange North Carolina Statewide Freight Plan Derry Schmidt & Terry Arellano NCDOT Planning Branch NC : Two Phase Process Phase 1 Interim MAP-21 compliant freight
More informationInland Port Cargo Complex
Inland Port Cargo Complex Regional Approach for Ports A statewide improvement Connects five plus seaports Promotes connectivity utilizing existing transportation network Improves rail efficiencies Relocates
More informationChapter 6: Regional Transportation
Chapter 6: Regional Transportation Continued growth and development throughout the region magnifies the significance of connections to surrounding counties as economic and social interactions continue
More informationTruck GPS Data for Freight Planning
Truck GPS Data for Freight Planning presented to Florida Model Task Force, Orlando presented by Frank Tabatabaee Abdul Pinjari Jeff Short (ATRI) Florida DOT University of South Florida (USF) American Transportation
More informationFlorida s Automated Vehicle Initiative
Florida s Automated Vehicle Initiative Outline Advancement of the automobile Overview of autonomous vehicles and connected vehicles Benefits of planning for automated vehicles Federal and Florida initiatives
More informationEXHIBIT A. TRANSIT AND MULTIMODAL DEVELOPMENT SUPPORT CONTINUING SERVICES SCOPE OF SERVICES FM No
EXHIBIT A TRANSIT AND MULTIMODAL DEVELOPMENT SUPPORT CONTINUING SERVICES SCOPE OF SERVICES FM No. 429768-4-12-01 This Exhibit forms an integral part of the Agreement between the DEPARTMENT and, the CONSULTANT,
More informationORLANDO INTERNATIONAL AIRPORT (OIA) CONNECTOR REFRESH ALTERNATIVES ANALYSIS FINAL REPORT
ORLANDO INTERNATIONAL AIRPORT (OIA) CONNECTOR REFRESH ALTERNATIVES ANALYSIS FINAL REPORT Prepared For: Florida Department of Transportation, District Five Prepared By: HDR Engineering, Inc. February 2016
More informationHB2 Implementation Policy Guide
report HB2 Implementation Policy Guide prepared for Commonwealth Transportation Board date March 18, 2015 Table of Contents 1.0 Introduction... 9 1.1 HB2 Legislation Requirements... 10 House Bill 1887...
More informationPractitioners Network for Large Landscape Conservation Organizational Charter
Practitioners Network for Large Landscape Conservation Organizational Charter Last updated: December 7, 2015 1. Scope and Objectives The Practitioners Network ( Network ) is an alliance of individuals
More informationCRTPA Regional Mobility Plan Attachment 1 Agenda Item 4E Page 1 of 11
CRTPA Regional Mobility Plan Attachment 1 Page 1 of 11 INTRODUCTION Everyone wants to have the ability to move around the city, county, region, country and world in the way that they see fit, when they
More informationTEXAS MEXICO TRANSPORTATION BORDER MASTER PLAN UPDATE
TEXAS MEXICO TRANSPORTATION BORDER MASTER PLAN UPDATE Border Trade Advisory Committee Footer Text Date Background Information: May 31, 2017 Previous border master plans (2013 / 2014) Primarily focused
More informationCHAPTER 1: INTRODUCTION/ GOALS AND OBJECTIVES
CHAPTER 1: INTRODUCTION/ GOALS AND OBJECTIVES 1.1: INTRODUCTION ABOUT THE FREDERICKSBURG AREA METROPOLITAN PLANNING ORGANIZATION (FAMPO) Established in 1992, the Fredericksburg Area Metropolitan Planning
More informationDirector of Transportation Planning
Director of Transportation Planning The Lehigh Valley Planning Commission (LVPC) is seeking a candidate for Director of Transportation Planning to lead a team developing and managing the implementation
More informationStrategic Plan Charlottesville-Albemarle MPO May 25, 2016
Strategic Plan Charlottesville-Albemarle MPO May 25, 2016 Introduction In Fiscal Year 2016, the Charlottesville-Albemarle Metropolitan Planning Organization (CA-MPO) adopted its first Strategic Plan, setting
More informationSECTION 6: MITIGATION STRATEGY
SECTION 6: MITIGATION STRATEGY This section describes the process by which the Lehigh Valley Steering Committee and municipal planning partnership performed the update to the county and local mitigation
More informationI-10 Master Plan Escambia and Santa Rosa Counties TPO Meetings. Tier II June 11 th & 13 th, 2012
I-10 Master Plan Escambia and Santa Rosa Counties TPO Meetings Tier II June 11 th & 13 th, 2012 Agenda Introduction & Background Study Area Purpose & Need Project Status Tier Methodology & Tier I Evaluation
More informationHB2 Implementation Policy Guide
report HB2 Implementation Policy Guide prepared for Commonwealth Transportation Board date August 1, 2015 Table of Contents 1.0 Introduction... 1 1.1 HB2 Legislation Requirements... 1 1.2 Roles and Responsibilities...
More informationRapid City Area Metropolitan Planning Organization OPERATIONS PLAN
Rapid City Area Metropolitan Planning Organization OPERATIONS PLAN Prepared for the Rapid City Area Metropolitan Planning Organization Endorsed by the Executive Policy Committee of the Rapid City Area
More informationSPACE COAST TRANSPORTATION PLANNING ORGANIZATION
SPACE COAST TRANSPORTATION PLANNING ORGANIZATION DRAFT AUGUST 2015 This page intentionally left blank SPACE COAST TRANSPORTATION PLANNING ORGANIZATION DRAFT AUGUST 2015 prepared by: This page intentionally
More informationMDX Contract #: RFP MDX Work Program #: ETDM #: 11501
SR 874/Don Shula Expressway Ramp Connector Project Development & Environment (PD&E) Study PUBLIC HEARING December 8, 2011 MDX Contract #: RFP-09-04 MDX Work Program #: 87410.011 ETDM #: 11501 1 This Public
More informationCHAPTER 2 WHAT ARE WE TRYING TO ACHIEVE?
CHAPTER 2 WHAT ARE WE TRYING TO ACHIEVE? VISION After significant public outreach and coordination with numerous agencies, organizations, and individuals, Phase 1 established a vision for transportation
More informationTRANSPORTATION 101 Today and Tomorrow. Moving People and Goods
TRANSPORTATION 101 Today and Tomorrow Moving People and Goods What is the Transportation Commission? An independent, seven-member body of citizens appointed by the Governor for six-year terms and representing
More informationCENTRAL FLORIDA WATER INITIATIVE
CENTRAL FLORIDA WATER INITIATIVE... A collaborative regional water supply endeavor to protect, conserve and restore our water resources The CFWI document is a constantly evolving document. It is intended
More informationScope of Work. Project Approach and Understanding. Task 1: Study Initiation and Administration
Scope of Work Route 116/Hinesburg Growth Center Corridor Study Town of Hinesburg and CCRPC Project Approach and Understanding Route 116 through Hinesburg had seen substantial changes in the past 15 years,
More informationWith the challenges facing Washington s transportation
CHAPTER 5 REACHING THE VISION HOW WILL WE GUIDE OURSELVES MOVING FORWARD? With the challenges facing Washington s transportation system, the project team and partners identified four focus areas that consistently
More informationSouth Florida East Coast Corridor (SFECC) Study
South Florida East Coast Corridor (SFECC) Study P r o j e c t U p d a t e J u l y 2 7, 2 0 11 FM Number: 417031-3-22-01 Re-introduce Passenger Rail Service on FEC Corridor (85 miles) Improve Freight Capacity
More informationSR 29 Project Development & Environment Study. Presentation to SR 29 Stakeholders Advisory Committee. January 23, 2014
SR 29 Project Development & Environment Study Presentation to SR 29 Stakeholders Advisory Committee January 23, 2014 Purpose and Need Enhancing Economic Competitiveness Improving Emergency Evacuation Capabilities
More informationStrategic Intermodal System
Strategic Intermodal System Strategic Plan Status Report Florida Transportation Commission December 9 2003 1 Today s Presentation Update on SITAC Activities Strategic Plan Development Progress Public Workshop
More informationPangborn Memorial Airport I One Pangborn Drive I East Wenatchee, WA 98802
TO: Planning Advisory Committee (PAC) Members RE: Pangborn Airport Master Plan PAC Kickoff Meeting #1 DATE: August 22, 2016 On behalf of the Pangborn Memorial Airport, I would like to invite you to serve
More informationScope of Services Traffic Signal Retiming Contract FM NO Florida Department of Transportation District Four
Scope of Services Traffic Signal Retiming Contract FM NO. 230017-8-32-01 Florida Department of Transportation District Four A-1 Contents 1. Background... 3 2. Summary of Services... 3 3. Consultant Requirements...
More informationFlorida Transportation Modeling
Florida Transportation Modeling Newsletter September/October 2010 MTF Meeting Scheduled for November 30 to December 2, 2010 The Florida Model Task Force (MTF) recognizes that travel demand models were
More information10:00 AM Welcome, Introductions & Project Overview 10:15 AM ITS Architecture Overview
Stakeholder Meeting February 10, 2016 Agenda 10:00 AM Welcome, Introductions & Project Overview 10:15 AM ITS Architecture Overview National ITS Architecture Terms and Concepts Regional ITS Architecture
More informationSPECIAL BOARD OF DIRECTORS MEETING. 1:00 p.m.
4677 Overland Avenue San Diego, California 92123 SPECIAL BOARD OF DIRECTORS MEETING Board Room February 13, 2014 1:00 p.m. 1. Call to order. 2. Roll call Determination of a quorum. A. Report on proxies
More informationDAKOTA COUNTY SOIL AND WATER CONSERVATION DISTRICT COMPREHENSIVE PLAN
DAKOTA COUNTY SOIL AND WATER CONSERVATION DISTRICT COMPREHENSIVE PLAN 2011-2015 4100 220 th Street West, Suite 102 Farmington, MN 55024 651-480-7777 www.dakotacountyswcd.org I. INTRODUCTION A. Purpose
More informationAmericans with Disabilities Act (ADA) Program Review, Training, and Support Services
Americans with Disabilities Act (ADA) Program Review, Training, and Support Services Presented to: 14th Annual New Jersey Department of Transportation Research Showcase Presented by: Christopher Titze,
More informationCOMMITMENT FINANCIALLY FEASIBLE PROJECTS. move people create jobs strengthen communities
COMMITMENT 2040 FINANCIALLY FEASIBLE PROJECTS FEBRUARY 2014 move people create jobs strengthen communities Steering Committee Trade Centre South 100 West Cypress Creek Road, Suite 850 Ft. Lauderdale, FL
More informationThe Northwest Seaport Alliance Transition Plan DRAFT AS OF 5/5/15
The Northwest Seaport Alliance Transition Plan DRAFT AS OF 5/5/15 1.0 Introduction This document fulfills requirements for a Transition Plan as defined in the Framework ILA. It defines the steps and timeframes
More informationGuidelines for TxDOT Regional Toll Road Authority. Cooperation AND. Coordination
T e x a s D e p a r t m e n t o f T r a n s p o r t a t i o n Guidelines for TxDOT Regional Toll Road Authority Cooperation AND Coordination Acknowledgments This project was conducted in cooperation with
More informationOsceola County Long Range Transit Plan. Prepared for. Prepared by
TABLE OF CONTENTS title PAGE Prepared for Prepared by TABLE OF CONTENTS 4.2.5. US 441/Orange Blossom Trail/US 17-92... 23 4.2.6. Lake Toho Parkway (Proposed)... 23 4.2.7. Southport Connector/SR 417 Extension
More informationThe Office of Financial Regulation Statement of Agency Organization and Operation
The Office of Financial Regulation Statement of Agency Organization and Operation This statement of agency organization and operation has been prepared in accordance with the requirements of section 28-101.001,
More informationPinellas County Metropolitan Planning Organization 2035 Long Range Transportation Plan Environmental Resource Evaluation Methodology
Pinellas County Metropolitan Planning Organization 2035 Long Range Transportation Plan Environmental Resource Evaluation Methodology The Pinellas County Metropolitan Planning Organization s 2035 Long Range
More informationGOOD NEIGHBOR POLICY
Regional Open Space MIDPENINSULA REGIONAL OPEN SPACE DISTRICT GOOD NEIGHBOR POLICY Adopted by the Board of Directors October 26, 1988 Amended August 14, 1996 Amended September 26, 2007 Introduction The
More informationIntroduction to the Proposed Statewide Transportation Improvement Program (STIP) Transportation Planning and Programming
Introduction to the Proposed 2015-2018 Statewide Transportation Improvement Program (STIP) Transportation Planning and Programming Public Hearing August 19 th, 2014 TABLE OF CONTENTS Introduction... 1
More informationCITYOFIRVINE CALIFORNIA
CITYOFIRVINE CALIFORNIA INVITATION TO AN EXCITING CAREER OPPORTUNITY TRANSPORTATION MANAGER THE POSITION The City of Irvine is seeking an innovative and highly accomplished professional to serve as the
More informationSTATEWIDE ANALYSIS MODEL (SAM-V3) June 5, 2014 Janie Temple
STATEWIDE ANALYSIS MODEL (SAM-V3) June 5, 2014 Janie Temple Introduction Brief SAM History Intro to SAM-V3 functionality Past and Current SAM projects Future additions to SAM Suggestions from model users
More informationUniversity of Florida IFAS Extension Briefing Paper Strategic Plan for Extension in Metropolitan Regions
University of Florida IFAS Briefing Paper 7 14 2015 Strategic Plan for in Metropolitan Regions "The Mission of UF/IFAS is to develop knowledge in human, natural, and agricultural resources and to make
More informationNATMEC June 30, 2014 Anita Vandervalk, PE, PMP
NATMEC June 30, 2014 Anita Vandervalk, PE, PMP Agenda 1. Florida s MPM Program 2. Research Efforts and Progress 3. Source Book 4. Transitioning to Real Time Data 5. Next Steps Importance of Mobility Providing
More informationAdvanced Transportation and Congestion Management Technologies Deployment Initiative Notice of Funding Opportunity Number 693JJ317NF0001
Connecting the East Orlando Communities i Project Name Connecting the East Orlando Communities Eligible Entity Applying to Receive Federal Florida Department of Transportation Funding Total Project Cost
More informationCHAPTER II BOARD COMMITTEES A. ADVISORY COMMITTEE TO REVIEW VICE PRESIDENT CANDIDATES
CHAPTER II BOARD COMMITTEES A. ADVISORY COMMITTEE TO REVIEW VICE PRESIDENT CANDIDATES 1. Objective The purpose of the committee is to review potential candidates for international vice president and to
More informationWater Management Representatives
Bay Area Water Supply and Conservation Agency A multicounty agency authorized to plan for and acquire supplemental water supplies, encourage water conservation and use of recycled water on a regional basis.
More informationLEGISLATIVE AGENDA. North Myrtle Beach Chamber of Commerce Local Legislative Agenda PUBLIC POLICY COUNCIL GOAL:
North Myrtle Beach Chamber of Commerce Local Legislative Agenda 2014-2015 LEGISLATIVE AGENDA PUBLIC POLICY COUNCIL GOAL: Our commitment is to be recognized as the business voice in the legislative process,
More informationEXHIBIT A SCOPE OF SERVICES FOR FINANCIAL PROJECT ID: DISTRICT TWO
EXHIBIT A SCOPE OF SERVICES FOR FINANCIAL PROJECT ID: 430959-1-22-01 DISTRICT TWO Stage I Scope A-1 August 2, 2017 SCOPE OF SERVICES DISTRICTWIDE ENVIRONMENTAL SERVICES FLORIDA DEPARTMENT OF TRANSPORTATION
More informationDRAFT WORK PLAN. For the Southeast Florida Transit Oriented Development Working Group. DRAFT February 5, 2015 Prepared for TOD Working Group Review
Draft 2015 Work Plan DRAFT WORK PLAN For the Southeast Florida Transit Oriented Development Working Group Achieving transit oriented development (TOD) in South Florida is a complex process and requires
More informationMarch 6, 2015 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA Addendum No. 1/RFP Y15-1023-CH DISASTER DEBRIS MONITORING SERVICES Proposal Opening Date: March 17, 2015 This addendum is hereby incorporated
More informationAttachment 2: Draft Business Plan Scope of Work
Attachment 2: Draft Business Plan Scope of Work Background: The following pages present a high level draft scope of work for the Caltrain Business Plan along with a description of outreach plans, project
More informationWalnut Creek Watershed Management Authority. Project Kick Off March 18, 2015
Walnut Creek Watershed Management Authority Project Kick Off March 18, 2015 Agenda Schedule & Meeting Purpose Meeting Purpose TMDL Raccoon River TMDL Impaired by Nitrate and E.coli Includes Walnut Creek
More informationTRANSPORTATION ASSOCIATION OF CANADA STRATEGIC PLAN
TRANSPORTATION ASSOCIATION OF CANADA STRATEGIC PLAN WHO WE ARE The Transportation Association of Canada (TAC) is a not-for-profit, national technical association that focusses on road and highway infrastructure
More informationAre We Prepared for the Energy Movements? JEANNIE BECKETT THE BECKETT GROUP ENERGY EXPORT PERMITTING IN THE NW JUNE SEA-TAC CONFERENCE CENTER
Are We Prepared for the Energy Movements? JEANNIE BECKETT THE BECKETT GROUP ENERGY EXPORT PERMITTING IN THE NW JUNE 16 2014 SEA-TAC CONFERENCE CENTER Topics Capacity existing infrastructure Further rail/port
More informationThe Emergence of. Florida s Seaports and Inland Ports. Florida League of Cities - International Relations Committee November 17, 2011
The Emergence of Florida s Seaports and Inland Ports Florida League of Cities - International Relations Committee November 17, 2011 History of the Global Supply Chain 2 Supply Chain, Circa 1950 Regional
More informationAll Aboard Florida Project Status Update TREASURE COAST REGIONAL PLANNING COUNCIL
All Aboard Florida Project Status Update TREASURE COAST REGIONAL PLANNING COUNCIL APRIL 2014 Southeast Florida Rail Network & Proposed All Aboard Florida Route To Jacksonville Tampa Orlando Everglades
More informationProgrammatic Environmental Impact Statement (EIS) for Lower Green River Corridor Plan Request for Proposals:
Programmatic Environmental Impact Statement (EIS) for Lower Green River Corridor Plan Request for Proposals: The King County Flood District (District) is seeking proposals from firms to prepare a programmatic
More informationBOARD STANDING COMMITTEE CHARTER
BOARD STANDING COMMITTEE CHARTER Version #: 1 Date: Aug 23, 2017 Description: SOC 2018 Charter COMMITTEE NAME: Strategy Oversight Committee (SOC) CHARTER EFFECTIVE DATE AND DURATION: 01 January 2018 to
More informationCaltrain Business Plan Draft Business Strategy and Scope. Board of Directors December 7, 2017 Agenda Item 9
Caltrain Business Plan Draft Business Strategy and Scope Board of Directors December 7, 2017 Agenda Item 9 Overview Background and Process Draft Business Strategy Draft Phase 2 Scope - Technical Tasks
More informationThe Indian Nations Council of Governments (INCOG) 2035 Plan: Roadways Element
Roadways The Indian Nations Council of Governments (INCOG) The Indian Nations Council of Governments is the designated regional planning organization for the Tulsa Transportation Management Area (TMA).
More informationO & D Data. Results. Traffic Increase. Heavier Payloads. Total and Average Value of Freight Payload for Selected Highways
Presentation To SFTA Steering Committee O&D Data Results: FREIGHT VALUE! Eric Jessup Assistant Professor, State University Michael Clark Research Associate, State University O & D Data. Results Traffic
More informationPlanning Today to Shape Tomorrow: Charting a Course for Page 2. Listen and Collaborate: Reaching Out to the Public...Page 6
TABLE OF CONTENTS Blueprint 2040...Page 1 Planning Today to Shape Tomorrow: Charting a Course for 2040...Page 2 Listen and Collaborate: Reaching Out to the Public...Page 6 Grow with the Flow: Moving Traffic
More informationTransportation Workshop. FORA Staff 9/8/17
Transportation Workshop FORA Staff 9/8/17 Overview History/Background Policy Context CEQA Mitigations Projects Status 2018 TAMC Regional Impact Fee Study Future Considerations 2 Fort Ord Transportation
More informationTCATS October 12-Michigan Works 5:30-7pm. NATS October 19-Niles District Library 6-7:30pm
Goal Development Workshop TCATS October 12- Works 5:30-7pm NATS October 19-Niles District Library 6-7:30pm SAFETEA-LU Goals 2035 TwinCATS Goals 2030 TwinCATS Goals 1. Support the economic vitality of the
More informationVISION. 4. Vision. 31 Page
VISION 4. Vision The 2035 LRTP, branded as Transformation, is the Broward MPO s plan for change. Economic vitality for the region, a better environment, and enhanced quality of life are envisioned. This
More informationLampasas River Watershed Partnership. Ground Rules
Lampasas River Watershed Partnership Ground Rules The signatories to these Ground Rules agree as follows: The following are the Ground Rules for the Lampasas River Watershed Partnership agreed to and signed
More informationLocal Planning for Economic Development: Florida's Growth Management Act in Practice
Local Planning for Economic Development: Florida's Growth Management Act in Practice Betty Waldron, University of Florida The terms "growth" and "development" are increasingly being viewed as distinct,
More informationMichael Weatherby, P.G., MWH, Tampa, FL
Michael Weatherby, P.G., MWH, Tampa, FL T. Barton Weiss, P.G., Hillsborough County, Tampa, FL James Duncan, P.E., Hillsborough County, Tampa, FL Philip Waller, P.E., MWH, Tampa, FL Groundwater Protection
More informationODOT Asset Management Plan 0
ODOT Asset Management Plan 0 Table of Contents Executive Summary... 1 ODOT s Experience with Asset Management... 1 A New Way of Doing Business... 2 ODOT s Investment Plans... 3 Moving Forward... 5 1.0
More informationPurpose of the Countywide Transportation Plan SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY
> 12 Purpose of the Countywide Transportation Plan SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY 13 SAN FRANCISCO S MULTIMODAL transportation network is crucial to San Francisco s status as a major regional
More informationTexas Freight Advisory Committee
Texas Freight Advisory Committee Kick Off Meeting Texas Department of Transportation 125 East 11 th Street, Austin, Texas Attendees: Committee Member Organization Attendance Harris County Present Judge
More informationCFWI STORMWATER SUBTEAM PROJECTS REPORT. Steering Committee Meeting
CFWI STORMWATER SUBTEAM PROJECTS REPORT Steering Committee Meeting October 24, 2014 Stephen R. Miller, PE Subteam Leader Other Stormwater, Dispersed, Storage, etc. County CFWI SubRegions Project Name Implementing
More informationSurveying Florida MPO Readiness to Incorporate Innovative Technologies into Long Range Transportation Plans
Surveying Florida MPO Readiness to Incorporate Innovative Technologies into Long Range Transportation Plans Draft Final Report Prepared for THE FLORIDA DEPARTMENT OF TRANSPORTATION RESEARCH OFFICE FDOT
More informationINTERGOVERNMENTAL COORDINATION ELEMENT GOALS, OBJECTIVES, AND POLICIES
INTERGOVERNMENTAL COORDINATION ELEMENT GOALS, OBJECTIVES, AND POLICIES Goal 8 To provide accessible, effective and frequent intergovernmental opportunities to achieve consistency among all government agencies
More informationMONITORING IMPLEMENTATION AND PERFORMANCE
12 MONITORING IMPLEMENTATION AND PERFORMANCE The FAST Act continues the legislation authorized under MAP-21, which created a data-driven, performance-based multimodal program to address the many challenges
More informationDelaware Valley Goods. July 15, 2009
South Jersey Freight Transportation and Economic Development Assessment Delaware Valley Goods Movement Task Force July 15, 2009 The New Jersey Comprehensive Statewide Freight Plan Highlighted Goods Movement
More informationPIMA COUNTY REGIONAL ACCESS MANAGEMENT PLAN (RAMP) LOCAL AND NON-LOCAL ACCESS MANAGEMENT PROGRAMS DELIVERABLE 1B
PIMA COUNTY REGIONAL ACCESS MANAGEMENT PLAN (RAMP) LOCAL AND NON-LOCAL ACCESS MANAGEMENT PROGRAMS DELIVERABLE 1B April 2008 Prepared by: Curtis Lueck & Associates 5460 West Four Barrel Court Tucson, AZ
More informationExhibit A Scope of Services Technology and Data Support Consultant for Emerging Transportation Systems
I. Purpose Exhibit A Scope of Services Technology and Data Support Consultant for Emerging Transportation Systems The Florida Department of Transportation (DOT) has been at the forefront of other State
More informationPresentation to DATA on VTrans 2040 / HB2. October 21, 2015
Presentation to DATA on VTrans 2040 / HB2 October 21, 2015 Life Cycle of a Candidate Project How it s planned. How it s scored. How it s funded. 2 How it s planned. VTrans2040 VTRANS 2040 serves two functions,
More information