CQE Sample Test #4. A. I and only. B. I and only. C. and only. D., and. 4. The equation below represents the

Size: px
Start display at page:

Download "CQE Sample Test #4. A. I and only. B. I and only. C. and only. D., and. 4. The equation below represents the"

Transcription

1 CQE Sample Test #4 1. Inspection operations typically A. Help in assuring satisfactory quality. B. Reduce the usability of the product or service involved. C. Require precise equipment in most instances. D. Occur between all manufacturing operations. 2. A process calls for the mean value of a dimension to be 2.02". Which of the following should be used as the null hypothesis to test whether or not the process is achieving this mean? A. The mean of the population is 2.02" B. The mean of the sample is 2.02" C. The mean of the population is not 2.02" D. The mean of the sample is not 2.02" 3. When evaluation data for goodness of fit to suspected distributions, which of the following statements are true?. Most distributions have the same degrees of freedom.. The χ test can be used for hypothesis testing.. In all cases, the data is divided into cells. A. I and only. B. I and only. C. and only. D., and. 4. The equation below represents the π μ σ A. Lognormal probability density function. B. Normal probability density function. C. Exponential probability density function. D. None of the above.

2 5. If Events A and B are independent, then. P(B/A)=P(A). P(A/B)=P(B). P(B/A)=P(B) A. only B. only C. only D. and only 6. If we drew a large number of samples from a controlled process, we would not be surprised to discover. Some differences among the values of the sample means. A distribution of sample means around some central value. That many sample means differ from the process average A. only B. only C. and only D., and 7. The recently introduced quality term "kaizen" refers to which of the following? A. The application of reengineering to process improvement. B. Small, gradual but continual improvement steps. C. The natural spread of SPC applications to administrative areas. D. The numerous Japanese adaptations of the work of W. Edwards Deming. 8. The follow-up on the need for corrective action, identified in an audit report, is MOST clearly the responsibility of which of the following? A. The client's upper management. B. The auditee's upper management. C. The lead auditor. D. The operating area in which finding was made. 9. When items are removed from service or testing without failure, they are said to be A. Censored. B. Missing. C. Invalid. D. Inconsistent.

3 10. No one likes complaints, but they are good for us. Why? A. There is no good in it. B. A second chance to improve. C. They did the inspection for us. D. Ignore the complaint. 11. Which of the following will BEST assure quality in most organizations? A. Have competent people with quality attitudes. B. Automate the process where possible. C. Use only high quality suppliers. D. Hire an energetic quality assurance manager. 12. The advantages of an effective quality cost measurement system EXCLUDE which of the following?. An alignment of company and quality goals.. The solving of many quality problems.. The elimination of most management corrective actions.. An effective vehicle for resource allocation. A. and only B. and only C., and only D. and only 13. Which of the following statements can be safely made about Pareto diagrams? A. They have little application outside of the quality area. B. They reflect an observation of fact. C. They are bound by a universal set of laws. D. They have no validity for discrete data.

4 14. Which of the following quality improvement tools utilize the accumulation of ideas or data into categories?. Control charts.. Plan/do/check/act.. Pareto diagrams.. Fishbone diagrams.. Flow charts. A. and only B. and only C. and only D.,, and only 15. During the problem definition phase of continuous improvement, which of the following tools would be considered particularly effective?. PDCA.. Pareto diagrams.. Fishbone diagrams.. Process capability. A. and only B., and only C. and only D.,, and 16. Quality control has been labeled as the science and art of identifying and controlling variability. One measure of variability as used in this context is A. The arithmetic mean. B. The variance. C. The mode. D. The geometric mean. 17. When comparing an assessment audit with an appraisal audit, one would conclude that A. The appraisal audit measures system effectiveness. B. The appraisal audit is generally an internal audit. C. The assessment audit is usually external. D. The assessment audit is larger in scope.

5 18. ISO/TS 16949(2002) requirements for corrective and preventive action include which of the following?. Corrective action procedures to investigate and eliminate the cause of the nonconformity.. The use of a disciplined problem solving methodology to address the resolution of any nonconformance.. The use of mistake proofing methodology as part of their corrective and preventive action. A. only B. and only C. and only D., and 19. As a problem solving technique, which of the following would be the BEST application for an lshikawa diagram? A. Problem identification and corrective action. B. To support the Plan, Do, Check, Act cycle. C. Determination of potential root problem causes. D. Determination of short-term corrective action. 20. The sequence for the Deming Improvement cycle is A. Design, manufacture, inspect, ship. B. Plan, document, implement, audit. C. Plan, do, study, act. D. Vision, creation, evaluation, optimization. 21. What is a checksheet that is used to collectlocational data commonly called? A. A measles chart. B. A recording checksheet. C. A location checksheet. D. A position chart. 22. The difference between setting alpha equal to 0.05 and alpha equal to 0.01 in hypothesis testing is A. With alpha equal to 0.05, one is more willing to risk a type error. B. With alpha equal to 0.05, one is more willing to risk a type error. C. Alpha equal to 0.05 is a more "conservative" test of the null hypothesis(ho). D. With alpha equal to 0.05, one is less willing to risk a type error.

6 23. A random variable. May be either discrete or continuous.. Is called "random" because it depends on the normal distribution.. Is called "variable" because it refers to the variance. A. only B. only C. and only D. and only 24. Which of the following are good sources of information on customer satisfaction?. Internal customers.. Suppliers.. Upper management.. Customers. A. only B., and only C., and only D.,, and 25. Which of the modern quality management tools could use 3" 5" cards or post-it-notes as part of the brainstorming or idea generation stage?. Tree diagrams.. Affinity diagrams.. Matrix diagrams.. Interrelationship diagrams.. Activity network diagrams. A., and only B., and only C., and only D.,, and only 26. Records of old blank audit checklists are handy for A. Recording comments that wouldn't fit on the audit checklist. B. Reference when compiling a new checklist. C. The auditee to preview potential audit areas. D. Including in a company's quality manual.

7 27. There are numerous approaches to problem solving. Arrange the following steps into the most logical sequence from start to finish. 1. Analyze the problem. 2. Confirm the results. 3. Define the problem. 4. Identify the problem. 5. Investigate the problem. 6. Solve the problem. A. 3, 4, 1, 5, 2, 6 B. 1, 4, 3, 5, 2, 6 C. 4, 3, 1, 5, 6, 2 D. 4, 3, 5, 1, 6, The quality tool widely used to analyze the relationship between two variables is A. Scatter diagram. B. Pareto diagram. C. Run charts. D. Cause and effect diagram. 29. Rivets from several different forging presses are dumped into a large central total bin. Once each hour an inspector goes to the bin and selects five rivets at random and plots an X bar - R chart. Which of the following statements would one suspect to be true of the resulting X bar - R chart?. The R bar on the chart will be relatively high.. There are very few special or assignable causes noted on the X bar chart.. Only subtle shifts in the over all process average will be observed.. The average chart will become a better indicator of process performance than range chart. A. only B. and only C., and only D.,, and 30. The word of material control is laden with three letter acronyms. Arrange the following acronyms in proper time sequence (from first to last) as they would occur in the case of a nonconformity.. MRR. MRB. CAR. CAB A.,,, B.,,, C.,,, D.,,,

8 31. In order to obtain the most verifiable objective evidence during an audit, which of the following auditor requests is the best approach? A. How often do you receive or transmit product information? B. To what extent is product information important to your job duties? C. Please show me examples of product information and describe how they affect your job duties. D. Is product information important in the performance of your quality related job duties? 32. Which of the following statements is NOT correct in regards to regression analysis? A. The coefficient of determination ranges from 0 to 1 B. The correlation coefficient ranges from -1 to 1 C. The higher the coefficient of determination, the better the fit. D. Least squares is required to determine the best fit straight line. 33. The BEST reason for instituting a quality cost system is A. To satisfy ISO 9001 system requirements. B. To achieve a proper balance of prevention, appraisal and failure costs. C. To identity opportunities for improvement. D. To benchmark your competitors. 34. A negative report about a potential supplier can result from which one of the following?. Poor past performance.. No quality control plan.. Lack of suitable equipment.. No evidence of equipment calibration. A. and only B., and only C., and only D.,, and 35. Duplicate readings, using two separate instruments, were obtained on ten samples. What is the tabular value of the statistic used to determine the significance of the mean difference at the 0.05 level of probability? A B C D. 2.09

9 36. Which two of the following would be positive steps for an organization intent on continuous improvement?. Determining the total organizational impact of changes.. Decreasing skill based training expenditure.. Discontinuing detailed record keeping of improvement projects.. Calculating the costs of proposed improvement projects. A. and only B. and only C. and only D. and only 37. Normally, complaint data for both a product or service organization should provide A. An indication of the organizational areas creating the most problems. B. The degree or extent of customers dissatisfaction. C. The appropriate corrective action to take. D. The total quality costs for the organization. 38. Given the incomplete ANOVA table below, compute the F statistic. A B C D. 1.14

10 39. The figure below is referred to as A. An acceptance curve. B. A percent defective curve. C. A conformance curve. D. An OC curve. 40. Which of the following CANNOT be a null hypothesis? A. The population means are equal. B. P'=0.5. C. The sample means are equal. D. The difference in the population means is Of the seven major MBNQA critique areas, which of the following receive the heaviest weighting? A. Business results. B. Human resource management. C. Strategic planning. D. Process management. 42. Which of the following would NOT be a true statement regarding the use of pneumatic gages?. A high level of skill is required for use.. The equipment is both fast and accurate.. The equipment is versatile and can make a variety of measurements.. Only variable measurements can be made. A., only B. only C. and only D., and only

11 43. What is the principal function of the quality department? A. A service department for all other departments. B. To coordinate the quality effort. C. Inspection and process control. D. Organizational focus. 44. Which of the following is the BEST method to developing materials for a training program on the gaps in performance? A. Secure a workshop trainer. B. Review a record of activities. C. Set up a one shot case study. D. Allocate employees for training. 45. A lot of 50 pieces contains 5 defectives. A sample of two is drawn without replacement. The probability that both will be defective is approximately A B C D All of the following are a possible cause for corrective action EXCEPT A. A customer complaint. B. An internal quality audit. C. A competitive pricing structure. D. A management review. 47. Which of the following individuals or groups is (are) NOT involved in a preliminary review of nonconforming incoming purchased material? A. Members of MRB. B. Quality assurance supervisor. C. Purchasing department representative. D. Inspection personnel. 48. Which of the following would NOT be considered a valid microwave testing application? A. Measurement of the moisture content of a variety of materials. B. Monitoring of the chemical composition of certain liquids. C. Defect detection in metallic parts with relatively simple shapes. D. Thickness gaging of numerous non-metallic materials.

12 49. Which of the following is a preventive action? A. Expanding or rewriting a procedure after it has been found to be ineffective. B. Correcting tolerances after they were found to be wrong. C. Retraining workers on how to do a task after mistakes were found. D. Writing an inspection procedure for a new product. 50. Which of te following items would be LEAST likely to be included in a company's quality manual? A. A nonconforming product element. B. The results of customer surveys - good or bad. C. An internal quality audit policy. D. A description of statistical techniques employed. 51. The term collinear refers to A. Two linear variables. B. A linear interaction. C. Variables being a linear combination of one another. D. Linear correlation. 52. A particular structure is to be used in a critical application. Based on the expected load profile, the structure is required to have a mean strength of 10,000 psi. To ensure reliability against fracture, rupture, or collapse, the structure was designed with a mean strength of 15,000 psi. Based on the design information, the margin of safety is A B C D In product liability, the proper legal term(s) for statements regarding the reliability of a product are known as A. Advertisements. B. Warranties. C. Contracts or obligations. D. Representations.

13 54. Which of the seven new quality management tools can be useful in organizing facts about an unfamiliar subject?. The affinity diagram.. The process decision program chart(pdpc).. The matrix diagram.. The prioritization matrix. A. only B. and only C., and only D.,, and 55. Given that resistors are produced in lots 1000, and that the average number of defective resistors per lot is 12.7, what are the upper and lower limits for the control chart appropriate for this process? A. LCL=2.0 UCL=23.4 B. LCL=3.8 UCL=20.2 C. LCL=0.031 UCL=0.131 D. LCL=1.5 UCL= The major purposes of an internal quality audit program includes which of the following?. Help prevent unfit products from being manufactured.. Determine if established procedures are being followed.. Provide objective feedback to management.. Identity problems needing attention. A. and only B., and only C., and only D.,, and 57. Which of the following would be considered essential elements of a total improvement plan?. Providing the necessary training and education for company employees.. Providing bonuses for major departmental heads based upon their performance.. Encouraging a culture transformation within the organization.. Providing a regular quality cost report to major departments. A. and only B., and only C. and only D., and and

14 58. The diameter of a population of ball bearings is normally distributed with a mean of 75 and a standard deviation of 8. What is probability of the average diameter of 10 randomly selected ball bearings being greater that 77? A B C D A good quality information system should. Allow top management to easily view important information.. Collect as much data as possible electronically rather than manually.. Be accessible to all members of the organization. A. and only B. and only C. and only D., and 60. The ideal results of a quality training effort would NOT include which of the following? A. Increased cost-of-quality results. B. Improved working methods and morale. C. Increased productivity and job satisfaction. D. Reduced defects and employee turnover. 61. A system was designed with 3 capacitors. When the system is first activated all capacitors are operating. The system continues to operated as long as at least 1 capacitor is operating. This is an example of A. Redundancy. B. A series system. C. An active parallel system D. A standby parallel system. 62. Which of the following is the MOST reliable source of audit evidence? A. Physical observation of activities by at least two independent sources. B. Physical examination of documentation and observation of corresponding activities. C. A combination of written and oral responses from auditee personnel to checklist questions. D. Examination of the key documents that are identified in the standard or contract being audited.

15 63. Which of the following is the underlying subgrouping scheme for control charting? A. Selected to include a heterogeneous cross section of product produced. B. Selected to coincide with customer orders and invoices. C. Selected to consist of products produced in tight time sequence. D. Selected to match final inspection lots. 64. What is the lower control limit for proportion defective if the average daily production is 5000 units and the average fraction defective is 0.02? A B C. 0 D The distinguishing feature of the optical comparator is that adjustments for measurement are observed on A. A dial indicator. B. A reticle coordinator. C. A screen. D. A rotating stage. 66. Which of the following quality tools would be LEAST important in the problem definition phase? A. Fishbone diagrams. B. Control charts. C. Process flow diagrams. D. Pareto diagrams. 67. Given a coefficient of determination of 0.85, which of the following is TRUE?. There is positive correlation in the data.. 85% of the variability is explained by the regression model.. The sum of squares of X is greater than the sum of squares of Y. A. only B. only C. and only D. and only

16 68. The working documents that facilitate the execution of an audit often include which of the following?. The credentials of the audit team.. Checklists and reporting forms.. Standard requirements for corrective action.. Quality system procedures and work instructions. A. and only B. and only C. and only D. and only 69. In a full factorial experimental design, factors A and B are both tested at 4 levels. How many experiments are conducted? A. 8 B. 9 C. 12 D The cause(s) for declining productivity rates in the United States is (are). Management's refusal to invest more in research and development.. Lack of quality in marketed products.. Poor communication channels. A. only B. and only C. and only D., and 71. Calculate the standard deviation of the following complete set of data 11, 7, 12, 10, 8 A. 4.3 B. 2.2 C. 1.9 D What step in the Six Sigma DMAIC problem solving approach is missing from the PDSA and PDCA cycles? A. C B. I C. M D. D

17 73. Recognizing the nature of process variability, the process capability target is usually A. Looser than product specifications. B. The same as product specifications. C. Tighter than product specifications. D. Not related to product specifications. 74. The purpose of an audit interview can be to. Understand and evaluate the facts.. Attempt the identification of system deficiencies.. Ensure that both auditee and auditor understand the quality requirements. A. and only B. and only C. and only D., and 75. The figure below is commonly referred to as a A. Venn diagram. B. Pareto chart. C. OC chart D. Space diagram. 76. The figure below indicates A. A strong interaction. B. No interaction. C. A weak interaction. D. A positive interaction.

18 77. The probability of survival (Ps) for a product is expressed as a decimal fraction or percent which indicates A. The expected number of devices in a quantity of devices that will not be degraded by the specified special tests. B. The expected number of devices in a quantity of devices that would not be found defective by sampling plan inspection. C. The expected number of devices in a quantity of devices that will not fail due to other than cause reasons. D. The expected number of devices in a quantity of devices that will survive for a required period of time. 78. When specifying the "10:1 calibration principle", one is referring to A. The ratio of the frequency of calibration of the secondary standard to that of the primary standard B. The ratio of the frequency of calibration of the instrument to that of the primary standard C. The ratio of the main scale to vernier scale calibration D. The ratio of calibration standard accuracy to calibrated instrument accuracy. 79. Which of the following action steps is most recommended to change a satisfied product customer into a delighted customer? (A delighted customer won't buy anything but your product.) A. Exceed the customer's reliability requirements. B. Have an exceptionally quick warranty claim system. C. Provide an initial cost substantially below your competition. D. Consistently exceed the quoted delivery schedule. 80. When comparing internal and external customers, one finds that. The requirements of both must be clearly defined.. Feedback is essential in both areas.. An external customer may have more flexibility to seek a different supplier.. There are no significant differences. A. and only B. and only C., and only D.,, and

19 81. If the specification limits are wider than the control limits, then A. The process is capable. B. The process capability index is greater than 1.0. C. The specification limits replace the control limits on the chart. D. None of the above. 82. Please arrange the following quality management techniques in sequential order, from least complex to most complex. The complexity involves both the ease of use and the amount of subject familiarity necessary for effectiveness. 1. Affinity diagram. 2. Tree diagram. 3. Matrix diagram. 4. Prioritization matrix. A. 1, 2, 3, 4 B. 2, 1, 4, 3 C. 3, 1, 2, 4 D. 1, 3, 2, How many standard deviation units, symmetrical about the mean, will span an area around the mean of 40% of the total area under the normal curve? A. ±0.84 B. ±0.52 C. ±1.28 D. ± The existence of a quality control manual at your key supplier means A. That a quality system has been developed. B. That a quality system has been implemented. C. That the firm is quality conscious. D. That the firm is a certified supplier. 85. When using a sine bar to measure an angle, the height of the gage block setting is determined by multiplying the sine of the angle by A. The width of the gage blocks. B. The height of the gage blocks. C. The length of the adjacent side. D. The length of the sine bar.

20 86. On the production floor, parts being produced measure The specification requires the parts to be Which of the following techniques would NOT be particularly useful in trying to improve and control the process? A. Pre-control B. Short run charts C. X-bar And R charts D. ANSI/ASQ Z The sequential design steps for Taguchi's robust design are. Concept design.. Parameter design.. Tolerance design. A.,, B.,, C.,, D.,, 88. The factor D4 in X bar and R control charts is used to A. Determine the upper control limit of a range chart. B. Establish the control limits for the average chart. C. Correct the bias in estimating the population. D. Determine the lower control limit of a range chart. 89. The most frequent error made by top management, when dealing with system variation, is A. Treating common causes as special causes. B. Considering all causes to be local causes. C. Recognizing that common causes require quick action. D. Treating special causes as common causes. 90. Which of the following functions are normally considered work elements of quality control engineering?. Preproduction planning.. Process capability studies.. Classification of characteristics.. Quality cost analysis. A. and only B. and only C., and only D.,, and

21 91. Which of the following are likely to be positive actions in obtaining a supplier's commitment to quality improvement?. Involving the supplier early in the product development stage.. Partially reimbursing the supplier, when the product is rejected.. Establishing a firm schedule of required product quantities and dates.. Providing meaningful and timely quality performance feedback. A. and only B., and only C., and only D.,, and 92. Which of the following data types would provide the most useful information in eliminating the causes of paint blemishes on automobiles being produced on an assembly line? A. Attribute. B. Ordinal. C. Locational. D. Variables. 93. Which of the following distributions is used in situations that have only two possible outcomes?. Binomial.. Hypergeometric.. Geometric. A. and only B. and only C. and only D., and 94. A box contains 5 red marbles and 2 blue marbles. Given a red marble has been drawn, what is the probability of drawing at least 2 red marbles in the next 3 draws? A B C D The coefficients in the equation below can be determined using A. SPC. B. Least squares regression. C. Sum of squares estimation. D. All of the above.

22 96. Precision can BEST be defined as A. The ability to target a process to a specified normal value. B. The average reading determined after repeated measurements by different operators. C. The difference between the average of repeated measurements on the same item. D. The agreement or closeness of measurements on the same item. 97. Calculate the standard deviation of the following set of five sample observations 1.5, 1.2, 1.1, 1.0, 0 A B C D A process that is normally distributed will have which of the following characteristics? A. It is predictable. B. It is bimodal. C. It is skewed. D. It is truncated. 99. Which of the following is NOT true in regards to blocking?. A block is a dummy factor which doesn't interact with real factors.. A blocking factor has 2 levels.. A block is a subdivision of the experiment.. Blocks are used to compensate when production processes restrict randomization of runs. A. only B. only C. only D. and only 100. Which of the following is BEST suited for modelling the reliability of a complex piece of equipment? A. Fault-tree. B. FMEA. C. MIL-STD-217. D. Vector Space Analysis.

23 101. What is the meaning of the G D & T symbol below? A. Maximum material condition. B. Regardless of feature size. C. Least material condition. D. Projected tolerance zone An audit consisting of an examination, inspection or testing of a product which has been previously inspected is called which of the following? A. System audit. B. Internal audit. C. Process audit. D. Product audit What is usual sequence (from top to bottom) for action terms in a continuous improvement driven company? 1. Tactics. 2. Mission. 3. Strategies. 4. Projects. A. 3, 2, 1, 4 B. 2, 4, 3, 1 C. 2, 3, 4, 1 D. 3, 2, 4, The probability of event A occurring and event B occurring is equal to the probability of event A occurring multiplied by the probability of event B occurring if. Events A and B are mutually exclusive.. Events A and B are independent.. The covariance of events A and B is zero. A. only B. and only C. only D. and only

24 105. Correlation coefficients are generated from which of the following graphs? A. Measles charts. B. Scatter diagrams. C. Pareto diagrams. D. Control charts Which of the following would be the BEST application of a Pareto chart?. To determine when to make proactive adjustments to a process.. To differentiate between major and minor problem areas.. To gather data and to design experimental controlled changes.. To evaluate the results of other problem solving techniques upon the product or service. A. and only B. and only C. and only D.,, and 107. Given a coefficient of determination of 0.9, what is the correlation coefficient? A. 0.9 or -0.9 B or C or D What type of production process does this histogram in the figure below show? A. In control, process capability = 1. B. Process capability needs to be improved. C. A distribution after 100% inspection. D. An in control process with special causes of variation.

25 109. Communication with vendors on quality problems A. Should be initiated by the vendor's quality control department. B. Should be initiated by the vendee's purchasing department. C. Should be initiated by the vendee's engineering department. D. Can be resolved only through personal visits between vendor and vendee The first and most important step, in establishing a good product design is A. Determining customer requirements. B. Determining manufacturing process capabilities. C. Evaluating vendor quality systems. D. Ensuring quality participation in design review A sampling plan that may use up to 4 samples to make a decision to accept or reject is A. Single sampling B. Double sampling C. Multiple sampling D. Quadruple sampling 112. The best definition of the PDSA technique is which of the following? A. A method of involving teams in the problem solving cycle. B. An organized mind-mapping technique. C. A continuous improvement loop. D. A creative planning analysis method 113. The administration and control of all inspection stamps normally rests with which of the following? A. The production planning department. B. The quality department. C. The material Review Board. D. The customer requesting the part identification A graphical display of the total percentage of results below a certain measurement value is called a A. Histogram. B. Probability density function. C. Cumulative distribution function. D. Expected value.

26 115. What type of data contains infinite data points that may be displayed on a continuous measurement scale? A. Continuous distribution. B. Statistics. C. Parameters. D. Discrete distribution The equation below is A. The covariance of X and Y. B. The correlation coefficient of x and Y. C. The coefficient of determination of X and Y. D. The variance of the product of X and Y What is the reliability of the system below? A B C D Which of the following could be used to accelerate failures in electronic devices?. Increased voltage.. Vibration.. Temperature cycling. A. and only B. and only C. and only D., and

27 119. Which of the following are TRUE statements regarding the use of visual inspection?. Reference standards can be used.. It provides consistency between inspectors.. It is relatively expensive.. It can be quickly performed. A. and only B., and only C. and only D.,, and 120. An X bar control chart is based on a sample size of 4. An operator mistakenly plots the value of a single point on the control chart. This point: A. Will not cause any misjudgements if the process is in control. B. Will always be plotted near the center line of the control chart. C. Will cause the associated R chart to show an out of control condition. D. Increases the probability of the process being labeled out of control Which of the following quality leaders is associated with the definition of quality as "fitness for use"? A. Joseph M. Juran. B. Philip B. Crosby. C. W. Edwards Deming. D. Armand V. Feigenbaum A Latin square design is noted for its straight forward an analysis of interaction effects. This statement is A. True in every case. B. True sometimes, depending on the size of the square. C. False in every case. D. False except for Graeco-Latin squares Usually three-view orthographic drawings are used to fully dimension objects. Which of the design forms needs only two views to achieve full dimension? A. Symmetrical. B. Chamfered. C. Perpendicular. D. Cylindrical.

28 124. One use for a student test is to determine whether or not differences exists in A. Variability. B. Confidence intervals. C. Correlation coefficients. D. Averages The probability of accepting a lot of unacceptable quality is known as A. Alpha risk. B. 1-beta risk. C. Producer's risk. D. Beta risk Why are Pareto diagrams used? A. To show the process capability. B. To prioritize problems. C. To show the flow of information or material. D. To facilitate a brainstorming session When introducing a new product to the manufacturing phase of the product's life, the most important justification for a process capability study-after a pilot run for stability, but during a controlled pre-production operation, is A. It will prove design feasibility. B. It will establish machine capability. C. It will provide manufacturing engineering with the basis for a preventive maintenance schedule. D. It will determine the degree of conformance of the system to meet design specifications and economic yield requirements Sensitivity in experimentation is A. Getting the true result. B. Extreme care in data analysis. C. Using the best measuring device. D. Ability to distinguish significant differences in the response variable.

29 129. After constructing a process flow chart, an improvement team can often generate improvement ideas by asking which of the following questions?. What are the significant few and the trivial many?. Are proven components and configurations used?. Is there any unnecessary complexity?. Does duplication or redundancy exist? A. and only B. and only C., and only D. and only 130. Historical data is used to create a Pareto diagram. The following occurrences were noted for one month Minor corrosion 38 Inclusions 23 Bolts missing 19 Cracking 14 Other 14 From this data one can conclude A. Corrosion costs more than other categories. B. Inclusions cause more defects than cracking. C. The "other" category is insignificant. D. The operator causes more problems than the design The reliability of a component is 0.8. How many of these components are required in parallel if the system reliability requirement is 0.99? A. 2 B. 3 C. 4 D One of the major hazards in the material review board procedure is the tendency of the board to emphasize only the disposition function and to neglect which of the following functions? A. Statistical analysis. B. Corrective action. C. Material evaluation D. Tolerance review.

30 133. Which of the following is NOT considered to be one of the new quality management tools? A. Scatter diagrams. B. PDPC charts. C. Tree diagrams. D. Matrix diagrams Which of the following is NOT true? A. The range of the correlation coefficient is from -1 to 1. B. The range of the coefficient of determination is from 0 to 1. C. A negative correlation coefficient indicates negative correlation. D. The lower the correlation coefficient the lower the correlation Using the available angle blocks of 1', 3', 5', 20', 30', 1, 3, 5, 20, 30, which of the following statements is correct regarding the angles that can be created? A. Angles of approximately 1/3 of the possibilities up to 60. B. Odd value angles below 20 and even values of 20 up to 50. C. All angles from 1/ to 59 59' in 1' increments. D. All angles from 0' to 59 59' in 1' increments When trying to find all possible causes of a problem, which of the following tools would be useful?. Systematic troubleshooting and brainstorming.. Fishbone diagrams and histograms.. Checklists and scatter diagrams.. Control charts and graphs. A. and only B., and only C., and only D.,, and 137. Which of the following statements is NOT true in regards to X bar control charts? A. The width of the limits are usually set at plus or minus 3 standard deviations of the sampling distribution. B. The width of the limits are inversely proportional to the sample size C. If the process is in control, 2700 points per million will fall outside the control limits. D. If the process is in control, 1/2 the point will fall below the center line.

31 138. Which of the following is a valid null hypothesis? A. p > 1/8 B. mu < 98 C. The mean of population A is not equal to the mean of population B. D. mu = EVOP should be used A. When there is a manufacturing problem. B. When a process is not in statistical control. C. When an experimenter first begins working on a new product. D. When a process is producing satisfactory material A set of measurements is arranged in order of magnitude with a frequency associated with each measurement. This action describes : A. A grouped frequency distribution. B. A cumulative frequency distribution. C. An ungrouped frequency distribution. D. A histogram Kaizen is a Japanese approach directed toward A. Mistake proofing an operation. B. Doing things better to achieve an increasingly higher standard. C. Developing employee participation in the business decisions. D. Becoming more competitive in the world market What association does the expression "house of quality" normally make? A. Our entire organization is quality minded. B. Full quality functional deployment. C. The organization listens to the voice of the customer. D. Prompt service and product quality.

32 143. Which of the following statements BEST reflects the difference between breakthrough as compared to typical improvement? A. Researching the competitive and noncompetive intelligence. B. Attempting to surpass the performance of the best benchmarked source. C. Determining the leader in the areas felt to be deficient. D. Identifying all major critical success functions A transistor is rated for use at 220 volts. Using this transistor in a device that delivers 180 volts is an example of A. Applying a safely factor. B. Allowing for part variability. C. Following the 1.2 electrical ratio rule. D. Derating When one performs "one experiment with five repetitions," what are the six experiments called? A. Randomization. B. Replications. C. Planned grouping. D. Sequential Often costs of quality reports reflect 4-5% of sales when the true amount is 15-20%. Which of the following cost categories is generally neglected? A. Direct quality department expenses. B. Indirect internal and external failure costs. C. Preventative quality costs. D. Combined appraisal and preventative expenses Which of the following terms apply to variable control charts?. Cumulative lines.. Process averages.. Control limits.. Process standard deviation.. Correlation coefficients. A. and only B. and only C. and only D., and only

33 148. An X bar chart has shown control for a long time. The points for the last 50 samples are all very near the center line on the chart. In fact, they are all within one sigma of the center line. This probably indicates that A. A desirable situation has occurred. B. An undesirable situation has occurred. C. The process standard deviation has decreased during the time the last 50 samples were taken. D. The control chart limits are incorrectly computed In planning process controls A. Deciding whether the process runs or not is determined by whether the resulting product conforms. B. The basic approach follows the servomechanism cycle so common in engineering. C. Collection of information goes hand-in-hand with decision making. D. Meeting process specification tolerances is the same as meeting product tolerances Objective evidence during the conduct of an audit can be collected via which of the following methods?. Interviews with personnel.. Reviews of old audit reports.. Examination of current documents.. Observation of actual conditions. A. and only B., and only C., and only D.,, and 151. What is the key ranking difference between the Deming philosophy and the Malcolm Baldrige award criteria? A. Deming prescribes "all or nothing" propositions but MBNQA ranks categories with different weights. B. The MBNQA ranks "business results" and "customer focus", but Deming does not consider these items. C. The MBNQA has seven categories compared to Deming's 14 points. D. There is no recognized rating system for the MBNQA.

34 152. A supplier of cotton yarn claims that his product has an average breaking strength of 90 pounds. To test his claim, you select a random sample of 16 pieces of yarn. If the standard deviation of his process is unknown and one uses the normal curve theory instead of "t" distribution theory to test the null hypothesis, one would. Increase the risk of a Type error.. Decrease the risk of a Type error.. Increase the risk of a Type error. A. only. B. only. C. and only. D. and only Which of the following quality tools is also a bar or column chart? A. Control chart. B. Ishikawa diagram. C. Pareto diagram. D. Scatter diagram In most cases, an improvement team facilitator will NOT normally : A. Be familiar with problem solving techniques. B. Provide feedback to the group. C. Function as the group leader. D. Summarize key ideas generated by the group When confirming the results of an improvement, which of the following tools would be LEAST beneficial? A. Pareto diagram. B. Brainstorming. C. Histograms. D. Control charts Approved auditing interviewing includes which of the following techniques?. Open-ended questions.. Paraphrasing.. Probing. A., B., C., D.,,

35 157. A process is in control with = 50, = 4.0 and = 6 The three-sigma limits of the process are approximately. A B C D If X and Y are independent random variables and if X has variance 3 and Y has variance 2, then the variance of 4X - 3Y is A. 18. B. 66. C. 6. D If a distribution is skewed to the left. The mode is between the median and the mean.. The mean is between the mode and the median.. The mode is greater than the median. A. B. C. D., 160. The authority for a quality audit program typically rests with which of the following? A. The auditing organization. B. The auditee. C. A company's top management. D. The quality department.

36 Solution #4 1 A 16 B 31 C 46 C 61 C 76 B 91 C 106 C 121 A 136 D 151 A 2 A 17 A 32 D 47 A 62 B 77 D 92 C 107 C 122 C 137 B 152 A 3 C 18 D 33 C 48 D 63 C 78 D 93 D 108 C 123 D 138 D 153 C 4 D 19 C 34 D 49 D 64 B 79 A 94 D 109 B 124 D 139 D 154 C 5 C 20 C 35 A 50 B 65 C 80 C 95 B 110 A 125 D 140 C 155 B 6 D 21 A 36 C 51 C 66 B 81 D 96 D 111 C 126 B 141 B 156 D 7 B 22 A 37 B 52 B 67 B 82 A 97 C 112 C 127 D 142 B 157 A 8 B 23 A 38 C 53 B 68 D 83 B 98 A 113 B 128 D 143 B 158 B 9 A 24 C 39 D 54 B 69 D 84 A 99 B 114 C 129 B 144 D 159 C 10 B 25 D 40 C 55 A 70 D 85 D 100 A 115 A 130 B 145 B 160 C 11 A 26 B 41 A 56 D 71 C 86 D 101 B 116 B 131 B 146 B 12 A 27 D 42 C 57 C 72 A 87 A 102 D 117 D 132 B 147 B 13 B 28 A 43 B 58 C 73 C 88 A 103 C 118 D 133 A 148 C 14 C 29 B 44 B 59 D 74 D 89 A 104 D 119 A 134 D 149 B 15 C 30 A 45 C 60 A 75 A 90 D 105 B 120 D 135 C 150 C

Quality Management (PQM01) Chapter 04 - Quality Control

Quality Management (PQM01) Chapter 04 - Quality Control Quality Management (PQM01) Chapter 04 - Quality Control Slide 1 Slide 2 Involves monitoring specific project results to determine if they comply with relevant quality standards, and identifying ways to

More information

Quality Management Chapter 14

Quality Management Chapter 14 Quality Management Chapter 14 1 Objectives What is Quality? Total Quality Management TQM in Service Cost of Quality Quality Improvements Quality Awards and Certifications 2 What is Quality? The Meaning

More information

Operations Management

Operations Management 9-1 Management of Quality Operations Management William J. Stevenson 8 th edition 9-2 Management of Quality CHAPTER 9 Management of Quality McGraw-Hill/Irwin Operations Management, Eighth Edition, by William

More information

Online Student Guide Types of Control Charts

Online Student Guide Types of Control Charts Online Student Guide Types of Control Charts OpusWorks 2016, All Rights Reserved 1 Table of Contents LEARNING OBJECTIVES... 4 INTRODUCTION... 4 DETECTION VS. PREVENTION... 5 CONTROL CHART UTILIZATION...

More information

Ch.3 Quality Issues.

Ch.3 Quality Issues. Module 2 : Supply Environment. Ch.3 Quality Issues. Edited by Dr. Seung Hyun Lee (Ph.D., CPM) IEMS Research Center, E-mail : lkangsan@iems.co.kr Resolving Quality Problems. Documentation of Corrective

More information

Six Sigma Black Belt Study Guides

Six Sigma Black Belt Study Guides Six Sigma Black Belt Study Guides 1 www.pmtutor.org Powered by POeT Solvers Limited. Overview of Six Sigma DMAIC Define Define the project targets and customer (internal and external) deliverables. Measure

More information

1. Introduction to CQE

1. Introduction to CQE About C.Q.E. 1. Introduction to CQE Certified Quality Engineer (CQE) Since 1968 The Certified Quality Engineer is a professional who understands the principles of product and service quality evaluation

More information

Continuous Improvement Toolkit. Pareto Analysis. Continuous Improvement Toolkit.

Continuous Improvement Toolkit. Pareto Analysis. Continuous Improvement Toolkit. Continuous Improvement Toolkit Pareto Analysis The Continuous Improvement Map Managing Risk FMEA Understanding Performance Check Sheets Data Collection PDPC RAID Log* Risk Assessment* Fault Tree Analysis

More information

Continuous Improvement Toolkit. Traffic Light Assessment. Continuous Improvement Toolkit.

Continuous Improvement Toolkit. Traffic Light Assessment. Continuous Improvement Toolkit. Continuous Improvement Toolkit Traffic Light Assessment The Continuous Improvement Map Managing Risk FMEA Understanding Performance Check Sheets Data Collection PDPC RAID Log* Risk Assessment* Fault Tree

More information

Continuous Improvement Toolkit. Risk Analysis. Continuous Improvement Toolkit.

Continuous Improvement Toolkit. Risk Analysis. Continuous Improvement Toolkit. Continuous Improvement Toolkit Risk Analysis The Continuous Improvement Map Managing Risk FMEA Understanding Performance Check Sheets Data Collection PDPC RAID Log* Risk Analysis* Fault Tree Analysis Traffic

More information

Introduction to Quality Management. BPF 2123 Quality Management System

Introduction to Quality Management. BPF 2123 Quality Management System Introduction to Quality Management BPF 2123 Quality Management System 1 Chapter Outline Introduction Changes in the Business Culture Defining Quality Dimensions of Quality Gurus of Quality / TQM Historical

More information

Continuous Improvement Toolkit. QFD (Quality Function Deployment) Continuous Improvement Toolkit.

Continuous Improvement Toolkit. QFD (Quality Function Deployment) Continuous Improvement Toolkit. Continuous Improvement Toolkit QFD (Quality Function Deployment) The Continuous Improvement Map Managing Risk FMEA Understanding Performance Check Sheets Data Collection PDPC RAID Log* Risk Assessment*

More information

Statistics Quality: Control - Statistical Process Control and Using Control Charts

Statistics Quality: Control - Statistical Process Control and Using Control Charts Statistics Quality: Control - Statistical Process Control and Using Control Charts Processes Processing an application for admission to a university and deciding whether or not to admit the student. Reviewing

More information

Chapter 9 1. List and briefly explain the dimensions of product and service quality

Chapter 9 1. List and briefly explain the dimensions of product and service quality Chapter 9 1. List and briefly explain the dimensions of product and service quality Product Quality the dimensions of product quality include: 1. performance main characteristics or function of the product

More information

Continuous Improvement Toolkit. RACI Matrix

Continuous Improvement Toolkit. RACI Matrix Continuous Improvement Toolkit RACI Matrix R A C I The Continuous Improvement Map Managing Risk FMEA Understanding Performance** Check Sheets Data Collection PDPC RAID Log* Risk Analysis* Benchmarking***

More information

Continuous Improvement Toolkit

Continuous Improvement Toolkit Continuous Improvement Toolkit Process Redesign Managing Risk PDPC Pros and Cons Importance-Urgency Mapping RACI Matrix Stakeholders Analysis FMEA RAID Logs Break-even Analysis Cost -Benefit Analysis PEST

More information

Continuous Improvement Toolkit. Relationship Mapping. Continuous Improvement Toolkit.

Continuous Improvement Toolkit. Relationship Mapping. Continuous Improvement Toolkit. Continuous Improvement Toolkit Relationship Mapping The Continuous Improvement Map Managing Risk FMEA Understanding Performance Check Sheets Data Collection PDPC RAID Log* Risk Assessment* Fault Tree Analysis

More information

Film Capacitors. Quality. Date: May 2009

Film Capacitors. Quality. Date: May 2009 Film Capacitors Quality Date: May 2009 EPCOS AG 2009. Reproduction, publication and dissemination of this publication, enclosures hereto and the information contained therein without EPCOS' prior express

More information

CERTIFIED RELIABILITY ENGINEER (CRE) BODY OF KNOWLEDGE MAP 2018

CERTIFIED RELIABILITY ENGINEER (CRE) BODY OF KNOWLEDGE MAP 2018 CERTIFIED RELIABILITY ENGINEER (CRE) BODY OF KNOWLEDGE MAP 2018 The Certified Reliability Engineer (CRE) Body of Knowledge () has been updated to ensure that the most current state of reliability practice

More information

Quality management in construction projects

Quality management in construction projects Quality management in construction projects MSc, PMP, CQE ASQ. Introduction The quality as a concept has a deep root in the history, anyway the quality profession greatly evolved after World War II when

More information

Continuous Improvement Toolkit. Flow Process Chart. Continuous Improvement Toolkit.

Continuous Improvement Toolkit. Flow Process Chart. Continuous Improvement Toolkit. Continuous Improvement Toolkit Flow Process Chart The Continuous Improvement Map Managing Risk FMEA Understanding Performance Check Sheets Data Collection PDPC RAID Log* Risk Assessment* Fault Tree Analysis

More information

Application of statistical tools and techniques in Quality Management

Application of statistical tools and techniques in Quality Management Application of statistical tools and techniques in Quality Management Asst. Professor Dr Predrag Djordjevic University of Belgrade, Technical Faculty in Bor, Serbia QUALITY IN SOCIETY The concept was known

More information

FMEA Failure Mode Effects Analysis. ASQ/APICS Joint Meeting May 10, 2017

FMEA Failure Mode Effects Analysis. ASQ/APICS Joint Meeting May 10, 2017 FMEA Failure Mode Effects Analysis ASQ/APICS Joint Meeting May 10, 2017 FMEA (Failure Mode and Effects Analysis) Failure Mode and Effects Analysis Agenda What is it? Motivation FMEA Methods Examples What

More information

Continuous Improvement Toolkit. Value Analysis

Continuous Improvement Toolkit. Value Analysis Continuous Improvement Toolkit Value Analysis VA NVA The Continuous Improvement Map Managing Risk FMEA Understanding Performance** Check Sheets Data Collection PDPC RAID Log* Risk Analysis* Benchmarking***

More information

Quality Control Charts

Quality Control Charts Quality Control Charts General Purpose In all production processes, we need to monitor the extent to which our products meet specifications. In the most general terms, there are two "enemies" of product

More information

American Society for Quality (ASQ) CERTIFIED HACCP AUDITOR (CHA) BODY OF KNOWLEDGE

American Society for Quality (ASQ) CERTIFIED HACCP AUDITOR (CHA) BODY OF KNOWLEDGE American Society for Quality (ASQ) CERTIFIED HACCP AUDITOR (CHA) BODY OF KNOWLEDGE The topics in this Body of Knowledge include the cognitive level at which the questions will be written and is designed

More information

Body of Knowledge. 2. Gauge handling, preservation, and storage Identify and apply various methods of cleaning, handling, and storing gauges.

Body of Knowledge. 2. Gauge handling, preservation, and storage Identify and apply various methods of cleaning, handling, and storing gauges. Body of Knowledge The topics in this body of knowledge include additional detail in the form of subtext explanations and the cognitive level at which the questions will be written. This information will

More information

Certified Quality Auditor (CQA) BOK Map

Certified Quality Auditor (CQA) BOK Map Certified Quality Auditor (CQA) Map 2012 2004 The Certified Quality Auditor Body of Knowledge () has been updated to ensure that the most current state of practice is being tested in the CQA examination.

More information

Continuous Improvement Toolkit. Stakeholder Analysis. Continuous Improvement Toolkit.

Continuous Improvement Toolkit. Stakeholder Analysis. Continuous Improvement Toolkit. Continuous Improvement Toolkit Stakeholder Analysis The Continuous Improvement Map Managing Risk FMEA Understanding Performance Check Sheets Data Collection PDPC RAID Log* Risk Assessment* Fault Tree Analysis

More information

FAIRFIELD GLOBAL SUPPLIER QUALITY PROGRAM

FAIRFIELD GLOBAL SUPPLIER QUALITY PROGRAM FAIRFIELD GLOBAL SUPPLIER QUALITY PROGRAM 1 QA.101 rev. 3-2012 PURPOSE OF THIS STANDARD Fairfield is committed to continuous product quality improvement. Our management team is convinced that only with

More information

Certified Manager of Quality/Organizational Excellence (CMQ/OE) Body of Knowledge (BOK) 2014

Certified Manager of Quality/Organizational Excellence (CMQ/OE) Body of Knowledge (BOK) 2014 Certified Manager of Quality/Organizational Excellence (CMQ/OE) Body of Knowledge (BOK) 2014 The topics in this new BOK include descriptive details (subtext) that will be used by the Exam Development Committee

More information

Notes for Production and Operations Management- I

Notes for Production and Operations Management- I Notes for Production and Operations Management- I Factors affecting Process Design Decisions Nature of product/service demand Degree of vertical integration Production Flexibility Degree of automation

More information

Overview of Statistics used in QbD Throughout the Product Lifecycle

Overview of Statistics used in QbD Throughout the Product Lifecycle Overview of Statistics used in QbD Throughout the Product Lifecycle August 2014 The Windshire Group, LLC Comprehensive CMC Consulting Presentation format and purpose Method name What it is used for and/or

More information

Certified Quality Auditor

Certified Quality Auditor Certified Quality Auditor Quality excellence to enhance your career and boost your organization s bottom line asq.org/certification Certification from ASQ is considered a mark of quality excellence in

More information

Fundamentals of Quality

Fundamentals of Quality Fundamentals of Quality Quality (business) Quality in business, engineering and manufacturing has a pragmatic interpretation as the non-inferiority or superiority of something; it is also defined as fitness

More information

Developing and implementing statistical process control tools in a Jordanian company. R.H. Fouad* and Salman D. Al-Shobaki

Developing and implementing statistical process control tools in a Jordanian company. R.H. Fouad* and Salman D. Al-Shobaki Int. J. Manufacturing Technology and Management, Vol. 17, No. 4, 2009 337 Developing and implementing statistical process control tools in a Jordanian company R.H. Fouad* and Salman D. Al-Shobaki Department

More information

SUPPLIER QUALITY ASSESSMENT

SUPPLIER QUALITY ASSESSMENT Supplier Organization Name: Supplier Number: Street Address: Date of This Audit: City, State, Zip Code: Date of Last Audit: Country: of Employees: Main Phone Number: of Buildings/Size: Fax Number: Principal

More information

Module 1 Introduction. IIT, Bombay

Module 1 Introduction. IIT, Bombay Module 1 Introduction Lecture 1 Need Identification and Problem Definition Instructional objectives The primary objective of this lecture module is to outline how to identify the need and define the problem

More information

Lean Gold Certification Blueprint

Lean Gold Certification Blueprint The Lean Certification Blueprint provides additional useful information beyond the Body of Knowledge. The Body of Knowledge specifies the competencies, topics, and subtopics required by different types

More information

CERTIFIED QUALITY AUDITOR

CERTIFIED QUALITY AUDITOR CQA CERTIFIED QUALITY AUDITOR Quality excellence to enhance your career and boost your organization s bottom line asq.org/cert Certification from ASQ is considered a mark of quality excellence in many

More information

INDUSTRIAL ENGINEERING

INDUSTRIAL ENGINEERING 1 P a g e AND OPERATION RESEARCH 1 BREAK EVEN ANALYSIS Introduction 5 Costs involved in production 5 Assumptions 5 Break- Even Point 6 Plotting Break even chart 7 Margin of safety 9 Effect of parameters

More information

CERTIFIED SUPPLIER QUALITY PROFESSIONAL

CERTIFIED SUPPLIER QUALITY PROFESSIONAL CSQP CERTIFIED SUPPLIER QUALITY PROFESSIONAL Quality excellence to enhance your career and boost your organization s bottom line asq.org/cert Certification from ASQ is considered a mark of quality excellence

More information

Contents. Part I Business-Integrated Quality Systems. Part II Integrated Planning. Preface... xi

Contents. Part I Business-Integrated Quality Systems. Part II Integrated Planning. Preface... xi Contents Preface... xi Part I Business-Integrated Quality Systems 1 Organizational Structures... 3 General Theory of Organization Structure... 5 The Functional/Hierarchical Structure... 6 Matrix Organizations...

More information

many quality problems remain invisible to consumers

many quality problems remain invisible to consumers Quality Management 1. Define Quality and TQM. 2. What are the ISO standards and why are they important? 3. What is Six Sigma? 4. Explain how benchmarking is used? 5. What are quality robust products and

More information

2017 Archaeology Audit Program Procedure Manual. April 2017

2017 Archaeology Audit Program Procedure Manual. April 2017 2017 Archaeology Audit Program Procedure Manual April 2017 Table of Contents Contents Table of Contents... 2 1.0 Introduction and Scope... 3 2.0 Audit Objectives... 3 3.0 Audit Procedures... 4 3.1 Audit

More information

Six Sigma Dictionary

Six Sigma Dictionary Six Sigma Dictionary # 4M / 5M / 6M Framework for root cause brainstorming. Categorizes root causes by: Man, Methods, Machines, Material, (5M) Mother Nature and (6M) Measurement System Impact 8D Process

More information

AS9003A QUALITY MANUAL

AS9003A QUALITY MANUAL Your Logo AS9003A QUALITY MANUAL Origination Date: (month/year) Document Identifier: Date: Document Status: Document Link: AS9003A Quality Manual Latest Revision Date Draft, Redline, Released, Obsolete

More information

A CHECKLIST FOR QUALITY. Seven Questions to Gauge Quality in Metal Stamping Suppliers

A CHECKLIST FOR QUALITY. Seven Questions to Gauge Quality in Metal Stamping Suppliers A CHECKLIST FOR QUALITY Seven Questions to Gauge Quality in Metal Stamping Suppliers The Value of Quality Quality. It s the #1 concern for OEM engineering and purchasing managers when evaluating and measuring

More information

Implementation of Quality Control Tools and Techniques in Manufacturing Industry for Process Improvement

Implementation of Quality Control Tools and Techniques in Manufacturing Industry for Process Improvement Implementation of Quality Control Tools and Techniques in Manufacturing Industry for Process Improvement Heena Sharma 1, Dr. N.M Suri 2 1Total Quality Engineering Management (TQEM), PEC University Of Technology,

More information

Seven Basic Quality Tools. SE 450 Software Processes & Product Metrics 1

Seven Basic Quality Tools. SE 450 Software Processes & Product Metrics 1 Seven Basic Quality Tools SE 450 Software Processes & Product Metrics 1 The Seven Basic Tools Checklists (Checksheets) Pareto Diagrams Histograms Run Charts Scatter Diagrams (Scatter Plots) Control Charts

More information

Definitions contained in the above mentioned Specifications and Industry Standards are applicable herein.

Definitions contained in the above mentioned Specifications and Industry Standards are applicable herein. 1. SCOPE Quality Specification TEC-1019 12 Jul 11 Rev C All Paragraphs Revised Global Quality Management System Supplement for the Aerospace Industry Model, AS 9100 (C) 1.1. Content This specification

More information

Project Quality Management

Project Quality Management 1 Project Quality Management Unit 8 Eng.elsaka09@gmail.com Project Quality Management Includes the processes and activities of the performing organization that determine quality policies, objectives, and

More information

UNIT 2 QUALITY PHILOSOPHY

UNIT 2 QUALITY PHILOSOPHY UNIT 2 QUALITY PHILOSOPHY 1 Quality What is quality? It is a relative word It lies in the eyes of the perceiver According to ISO 9000:2000, it is defined as the degree to which a set of inherent characteristics

More information

MULTIMEDIA COLLEGE JALAN GURNEY KIRI KUALA LUMPUR

MULTIMEDIA COLLEGE JALAN GURNEY KIRI KUALA LUMPUR STUDENT IDENTIFICATION NO MULTIMEDIA COLLEGE JALAN GURNEY KIRI 54100 KUALA LUMPUR FIFTH SEMESTER FINAL EXAMINATION, 2014/2015 SESSION MGT2063 TOTAL QUALITY MANAGEMENT DMGW-E-F-1/13, DMGQ-E-F-1/13, DMGA-E-F-1/13,

More information

Computer Science and Software Engineering University of Wisconsin - Platteville 3. Statistical Process Control

Computer Science and Software Engineering University of Wisconsin - Platteville 3. Statistical Process Control Computer Science and Software Engineering University of Wisconsin - Platteville 3. Statistical Process Control Yan Shi SE 3730 / CS 5730 Lecture Notes Outline About Deming and Statistical Process Control

More information

COPYRIGHTED MATERIAL RELIABILITY ENGINEERING AND PRODUCT LIFE CYCLE 1.1 RELIABILITY ENGINEERING

COPYRIGHTED MATERIAL RELIABILITY ENGINEERING AND PRODUCT LIFE CYCLE 1.1 RELIABILITY ENGINEERING 1 RELIABILITY ENGINEERING AND PRODUCT LIFE CYCLE 1.1 RELIABILITY ENGINEERING Reliability has a broad meaning in our daily life. In technical terms, reliability is defined as the probability that a product

More information

CORPORATE QUALITY MANUAL

CORPORATE QUALITY MANUAL Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of the ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance

More information

9001:2015. Quality Manual 9001:2015. Engineering Value through Quality and Innovation.

9001:2015. Quality Manual 9001:2015. Engineering Value through Quality and Innovation. Quality Manual 9001:2015 9001:2015 Suburban Manufacturing, Inc. encourages comments from customers, suppliers, employees and friends in order to improve our business and its performance. Information contained

More information

CRE Sample Test #2. e - μ μ k k = 0, 1, 2, 3,... P( x = k) = 1. Which answer is the expected value of the Poisson distribution shown below?

CRE Sample Test #2. e - μ μ k k = 0, 1, 2, 3,... P( x = k) = 1. Which answer is the expected value of the Poisson distribution shown below? CRE Sample Test #2. 1. Which answer is the expected value of the Poisson distribution shown below? P( x = k) = e - μ μ k k! k = 0, 1, 2, 3,... A. μ B. μe - μ C. e - μ D. μ 2 2. FMECA is : A. A professional

More information

LEAN CERTIFICATION BODY OF KNOWLEDGE RUBRIC VERSION 3.0

LEAN CERTIFICATION BODY OF KNOWLEDGE RUBRIC VERSION 3.0 MODULE 1 LEAN CERTIFICATION BODY OF KNOWLEDGE RUBRIC VERSION 3.0 1. Cultural Enablers 15% 20% 25% 1.1. Principles of Cultural Enablers 3% 4% 5% 1.1.1. Respect for the individual 1.1.2. Humility 1.2. Processes

More information

Ten Requirements for Effective Process Control

Ten Requirements for Effective Process Control Published in ASQ Quality Progress and won the Paper of the Year Award in 2002. Ten Requirements for Effective Process Control Thomas A. Little Ph.D. Thomas A. Little Consulting 12401 N Wildflower Lane

More information

Good afternoon members of the jury and members of the audience.

Good afternoon members of the jury and members of the audience. 1 1 Good afternoon members of the jury and members of the audience. I am Ernesto Marano, champion of our project, which is called Surfing is not so complex. 2 Telefónica Group is the market leader in telecommunications

More information

QUALITY MANUAL DISTRIBUTION. Your Logo Here. Page 1 1 of 57. Rev.: A

QUALITY MANUAL DISTRIBUTION. Your Logo Here. Page 1 1 of 57. Rev.: A Page 1 1 of 57 President Design Engineering Production Production Engineering Materials Control Purchasing Service Marketing Sales Contracts Human Resources Quality Assurance Quality Control Production

More information

Control Charts for Customer Satisfaction Surveys

Control Charts for Customer Satisfaction Surveys Control Charts for Customer Satisfaction Surveys Robert Kushler Department of Mathematics and Statistics, Oakland University Gary Radka RDA Group ABSTRACT Periodic customer satisfaction surveys are used

More information

Chapter 1 Statistical Quality Control, 7th Edition by Douglas C. Montgomery. Copyright (c) 2013 John Wiley & Sons, Inc.

Chapter 1 Statistical Quality Control, 7th Edition by Douglas C. Montgomery. Copyright (c) 2013 John Wiley & Sons, Inc. 1 Learning Objectives 2 1.1 Definitions Meaning of Quality and Quality Improvement 1.1.1 The Eight Dimensions of Quality 1. Performance 2. Reliability 3. Durability 4. Serviceability 5. Aesthetics 6. Features

More information

Materion AMTS Supplier Quality Manual

Materion AMTS Supplier Quality Manual Advanced Materials Technologies and Services Inc. Materion AMTS Supplier Quality Manual Supplier Name: Supplier Address: Suppliers shall review the attached Supplier Quality Manual and acknowledge receipt

More information

To provide a framework and tools for planning, doing, checking and acting upon audits

To provide a framework and tools for planning, doing, checking and acting upon audits Document Name: Prepared by: Quality & Risk Unit Description Audit Process The purpose of this policy is to develop and sustain a culture of best practice in audit through the use of a common framework

More information

Quality Management. Six Sigma Quality An introduction. All Rights Reserved, Indian Institute of Management Bangalore

Quality Management. Six Sigma Quality An introduction. All Rights Reserved, Indian Institute of Management Bangalore Quality Management Six Sigma Quality An introduction Six Sigma Quality An introduction Generally six sigma quality points to very high quality levels that defects are a rarity in operations It also points

More information

Software Quality Metrics. Analyzing & Measuring Customer Satisfaction (Chapter 14)

Software Quality Metrics. Analyzing & Measuring Customer Satisfaction (Chapter 14) Software Quality Metrics Analyzing & Measuring Customer Satisfaction (Chapter 14) By Zareen Abbas Reg# 169/MSSE/F07 Usman Thakur Reg# 181/MSSE/F07 1 Overview-Quality Product quality and customer satisfaction

More information

Measurement Systems Analysis

Measurement Systems Analysis Measurement Systems Analysis Components and Acceptance Criteria Rev: 11/06/2012 Purpose To understand key concepts of measurement systems analysis To understand potential sources of measurement error and

More information

Revision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C

Revision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C 1 of 29 Quality Manual Multilayer Prototypes Compliant to ISO 9001-2008 / AS9100 Rev C This Quality Manual sets forth the quality system policies and Defines compliance with the ISO 9001-2008 SAE AS 9100

More information

Quality Management System Guidance. ISO 9001:2015 Clause-by-clause Interpretation

Quality Management System Guidance. ISO 9001:2015 Clause-by-clause Interpretation Quality Management System Guidance ISO 9001:2015 Clause-by-clause Interpretation Table of Contents 1 INTRODUCTION... 4 1.1 IMPLEMENTATION & DEVELOPMENT... 5 1.2 MANAGING THE CHANGE... 5 1.3 TOP MANAGEMENT

More information

This document has been printed from the network and will not be updated. The user is responsible for verification of current revision.

This document has been printed from the network and will not be updated. The user is responsible for verification of current revision. Page 2 of 18 1.0 PURPOSE This document provides guidelines for compliance to UTC s UPPAP, for members of the NORDAM supply chain. is a standalone document to be used in place of UTC s ASQR 9.2. The UPPAP

More information

Continuous Improvement Toolkit

Continuous Improvement Toolkit Continuous Improvement Toolkit Lean Measures Managing Risk PDPC Pros and Cons Importance-Urgency Mapping RACI Matrix Stakeholders Analysis FMEA RAID Logs Break-even Analysis Cost -Benefit Analysis PEST

More information

EXPERIMENTAL INVESTIGATIONS ON FRICTION WELDING PROCESS FOR DISSIMILAR MATERIALS USING DESIGN OF EXPERIMENTS

EXPERIMENTAL INVESTIGATIONS ON FRICTION WELDING PROCESS FOR DISSIMILAR MATERIALS USING DESIGN OF EXPERIMENTS 137 Chapter 6 EXPERIMENTAL INVESTIGATIONS ON FRICTION WELDING PROCESS FOR DISSIMILAR MATERIALS USING DESIGN OF EXPERIMENTS 6.1 INTRODUCTION In the present section of research, three important aspects are

More information

Quality Manual QM-9001 Revision 25 May 2013

Quality Manual QM-9001 Revision 25 May 2013 Lion Precision 563 Shoreview Park Road Shoreview, MN 55126 Phone: (651) 484-6544 Fax: (651) 484-6824 info@lionprecision.com Quality Manual QM-9001 Revision 25 May 2013 Approved by: Don Martin, President

More information

CERTIFIED QUALITY IMPROVEMENT ASSOCIATE

CERTIFIED QUALITY IMPROVEMENT ASSOCIATE CQIA CERTIFIED QUALITY IMPROVEMENT ASSOCIATE Quality excellence to enhance your career and boost your organization s bottom line asq.org/cert Certification from ASQ is considered a mark of quality excellence

More information

ISO 9001 QUALITY MANUAL

ISO 9001 QUALITY MANUAL ISO 9001 QUALITY MANUAL Origination Date: 10/01/14 Document Identifier: AIF quality control manual Date: 10/01/14 Project: Customer review Document Status: Released Document Link: www.aeroindfast.com Abstract:

More information

ISO 9001:2015 Checklist with 9001:2008 Comparisons Observations/comments

ISO 9001:2015 Checklist with 9001:2008 Comparisons Observations/comments (comments in italic are t in the standard) Key: Yellow text indicates potential new requirements that may need to be included in an organization s quality management system. Blue text indicates 2008 version

More information

Address for Correspondence

Address for Correspondence Research Paper OPTIMIZATION OF CRITICAL TO QUALITY PARAMETERS OF VERTICAL SPINDLE SURFACE GRINDER 1 Maheshkumar A. Sutar, 2 Anil R. Acharya Address for Correspondence 1 Student, 2 Professor, Government

More information

SPECIAL CONTROL CHARTS

SPECIAL CONTROL CHARTS INDUSTIAL ENGINEEING APPLICATIONS AND PACTICES: USES ENCYCLOPEDIA SPECIAL CONTOL CHATS A. Sermet Anagun, PhD STATEMENT OF THE POBLEM Statistical Process Control (SPC) is a powerful collection of problem-solving

More information

Total Quality Management

Total Quality Management Total Quality Management The way of managing organization to achieve excellence Total everything Quality degree of excellence Management art, act or way of organizing, controlling, planning, directing

More information

Best Practices for Enterprise Agile Transformation

Best Practices for Enterprise Agile Transformation Best Practices for Enterprise Agile Transformation A White Paper for the Software Development Project Community Date: May 2017 Select Computing, Inc. 9841 Broken Land Parkway Suite 209 Columbia, MD 21046

More information

1. What is a key difference between an Affinity Diagram and other tools?

1. What is a key difference between an Affinity Diagram and other tools? 1) AFFINITY DIAGRAM 1. What is a key difference between an Affinity Diagram and other tools? Affinity Diagram builds the hierarchy 'bottom-up', starting from the basic elements and working up, as opposed

More information

UNIT I - INTRODUCTION

UNIT I - INTRODUCTION UNIT I - INTRODUCTION Definition of Quality, Dimensions of Quality, Quality Planning, Quality costs Analysis Techniques for Quality Costs, Basic concepts of Total Quality Management, Historical Review,

More information

Cage Code First Edition. A guide to AQS continuous improvement expectations

Cage Code First Edition. A guide to AQS continuous improvement expectations Cage Code 81205 First Edition AQS Guidelines A guide to AQS continuous improvement expectations The custodian for this document is: Boeing Commercial Airplane Group, Supply Management and Procurement Division,

More information

Total Quality Management (TQM): A Strategy for Competitive Advantage

Total Quality Management (TQM): A Strategy for Competitive Advantage Available online at : http://euroasiapub.org Vol. 6, Issue 9, September - 2016, pp. 51~55 Thomson Reuters ID: L-5236-2015 Total Quality Management (TQM): A Strategy for Competitive Advantage Dr Mahesh.

More information

Reliability Tools. Why use the tool? Where to use the tool? What does the tool achieve? When to use the tool?

Reliability Tools. Why use the tool? Where to use the tool? What does the tool achieve? When to use the tool? Reliability Tools What does the tool achieve? When to use the tool? Why use the tool? Where to use the tool? Paul Barringer, P.E. Barringer & Associates, Inc. P.O. Box 3985 Humble, TX 77347 Phone: 281-852-6810

More information

THE ROLE OF COSO FRAMEWORK IN ACHIEVING STRATEGIC OBJECTIVES IN IRANIAN COMPANIES

THE ROLE OF COSO FRAMEWORK IN ACHIEVING STRATEGIC OBJECTIVES IN IRANIAN COMPANIES I J A B E R, Vol. The, Role No. of 0 COSO (06): Framework 7055-707in Achieving Strategic Objectives in Iranian Companies 7055 THE ROLE OF COSO FRAMEWORK IN ACHIEVING STRATEGIC OBJECTIVES IN IRANIAN COMPANIES

More information

9100 revision Changes presentation clause-by-clause. IAQG 9100 Team November 2016

9100 revision Changes presentation clause-by-clause. IAQG 9100 Team November 2016 Changes presentation clause-by-clause IAQG 9100 Team November 2016 INTRODUCTION In September 2016, a revision of the 9100 standard has been published by the IAQG (International Aerospace Quality Group)

More information

Pegasus Manufacturing SUPPLIER QUALITY REQUIREMENTS MANUAL

Pegasus Manufacturing SUPPLIER QUALITY REQUIREMENTS MANUAL Pegasus Manufacturing SUPPLIER QUALITY REQUIREMENTS MANUAL January 15, 2013 Rev. 2 March 20, 2008 SUPPLIER QUALITY REQUIREMENTS MANUAL CONTENTS SECTION PAGE # INTRODUCTION ii 01 SUPPLIER SELECTION AND

More information

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017 Company: Prepared By: Date: Changes from previous version highlighted in yellow. Paragraph Element Objective Evidence 2.1 Objective of Quality Assurance Program 2.2 Applicability and Scope 2.3 QA Program

More information

EVANS CAPACITOR COMPANY

EVANS CAPACITOR COMPANY DISTRIBUTION LIST: Location Book # Quality Manager 0001 President 0002 CEO 0003 Engineering Manager 0004 Production Manager 0005 Office Manager 0006 Page 1 of 33 REV A 11/18/03 TABLE OF CONTENTS Page Distribution

More information

2009 Software Business Analyst: Seven Best Practices

2009 Software Business Analyst: Seven Best Practices 2009 Software Business Analyst: Seven Best Practices Barbara Merwin Patterson Group Monday April 20, 2009 1 Seven Best Practices for Software Business Analysts Quality as Job 1 Understand Your Business

More information

Acceptance Sampling Using Statgraphics Centurion. Presented by Dr. Neil W. Polhemus

Acceptance Sampling Using Statgraphics Centurion. Presented by Dr. Neil W. Polhemus Acceptance Sampling Using Statgraphics Centurion Presented by Dr. Neil W. Polhemus Acceptance Sampling Given a lot or batch containing N items, a decision to accept or reject the lot is made based on statistical

More information

Risk Management as Methodology of Continual Quality Improvement in Enterprise

Risk Management as Methodology of Continual Quality Improvement in Enterprise Risk Management as Methodology of Continual Quality Improvement in Enterprise MÁRIA HUDÁKOVÁ MÁRIA LUSKOVÁ Faculty of Special Engineering University of Zilina Ul.1.maja 32, 010 26 Zilina, SLOVAKIA maria.hudakova@fsi.uniza.sk,

More information

Engenharia e Tecnologia Espaciais ETE Engenharia e Gerenciamento de Sistemas Espaciais

Engenharia e Tecnologia Espaciais ETE Engenharia e Gerenciamento de Sistemas Espaciais Engenharia e Tecnologia Espaciais ETE Engenharia e Gerenciamento de Sistemas Espaciais SITEMA DE GESTÃO DA QUALIDADE SEIS SIGMA 14.12.2009 SUMÁRIO Introdução ao Sistema de Gestão da Qualidade SEIS SIGMA

More information

College Thrissur, Thrissur, India

College Thrissur, Thrissur, India International Journal of Engineering Research and Development e-issn: 2278-067X, p-issn: 2278-800X, www.ijerd.com Volume 8, Issue 3 (August 2013), PP. 07-13 Empirical Research on TQM Practices of Organizations

More information

Supplier Requirements Manual

Supplier Requirements Manual Supplier Requirements Manual 1.0 Control Responsibility TABLE OF CONTENTS 1.1 Proprietary Information Sharing 1.2 Purpose & Approval 1.2.1 Scope 1.3 Quality Systems Management & Evaluation 1.3.1 QMS 1.3.2

More information

CP:

CP: Adeng Pustikaningsih, M.Si. Dosen Jurusan Pendidikan Akuntansi Fakultas Ekonomi Universitas Negeri Yogyakarta CP: 08 222 180 1695 Email : adengpustikaningsih@uny.ac.id Operations Management Managing Quality

More information