1 Guideline Preparation of Rezoning or LEP Amendment Requests Table of Contents 1 Introduction Requirements Other Issues for Consideration in the Request... 5 Controlled Document Information... 6 Lake Macquarie City Council Page 1 of 7
2 1 Introduction Guideline Lake Macquarie Local Environmental Plan (LMLEP) 2014 provides the statutory framework for land use planning in the majority of the Lake Macquarie Local Government Area (LGA). The assessment of Rezoning/LEP amendments is completed by Integrated Planning (IP) Staff, and occurs within the framework provided by legislation, the NSW Department of Planning and Environment s (DoPE) strategic planning directions, and Council s adopted land use strategies and policies. Staff require certain information to be able to consider the strategic merits of a request. Initial consultation with council staff will provide the applicant with an idea of the issues that need to be addressed in the LEP amendment request. It is advisable for the formal LEP amendment request to be prepared by a qualified town planning consultant. If the Rezoning/LEP amendment request is considered to have merit, staff prepare what is known as a Planning Proposal for consideration by Council. The Planning Proposal outlines the proposed changes to the LEP and provides strategic justification for these changes, including supporting documentation, such as maps, property descriptions, photos and the like. If Council resolves to proceed with the Planning Proposal, it is then forwarded to the NSW DoPE s LEP Review Panel for a gateway determination. Council staff refer to the NSW Department of Planning and Environment s A Guide to Preparing Planning Proposals, when preparing a Planning Proposal. A copy of the Guide is available on the NSW DoPE s website at: ashx 1.1 Requirements Information submitted in support of a Rezoning/LEP amendment request needs to address the following: Part 1 Objective of the Rezoning/LEP Amendment Request This is a concise statement setting out the intended outcomes of the Rezoning/LEP amendment request. Part 2 Explanation of the requested changes Part 2 explains how the LEP will be amended, for example the zone applying to the land is changed, or additional uses are identified as being permitted on a particular site. Part 3 Justification for the requested changes Part 3 provides the justification for the objectives, outcomes and provisions of the requested LEP Amendment, and the process intended to implement them. It sets out the case for changing the zones and/or LEP controls. The level of justification will reflect the level of impact the LEP amendment will potentially have. The justification will need to address the questions listed in Sections A to D below: Lake Macquarie City Council Page 2 of 7
3 Section A - Need for the Rezoning /LEP Amendment 1. Is the request a result of any strategic study or report? In this section, note any strategic study or report that supports the request. If the request resulted from a study or report, detail the key findings with a brief explanation. 2. Is the request the best means of achieving the objectives or intended outcomes, or is there a better way? Outline any other mechanisms available to address the need for the amendment and why these are not preferred. Section B Relationship to Strategic Planning Framework 3. Is the request consistent with the objectives and actions contained within the applicable regional or sub-regional strategy (including exhibited draft strategies)? Outline how the request complies with the Hunter Regional Plan 2036 (HRP), the draft Greater Newcastle Metropolitan Strategy and/or other relevant State government strategies (such as Western Corridor Planning Strategy). Rezoning requests not identified in the HRP or draft Greater Newcastle Metro Strategy as a future development area, need to address why they should be considered now. 4. Is the request consistent with Council s Community Strategic plan, or other local strategic plan? This section should detail how the request addresses Council s 10 Year Community Plan, Lifestyle 2030 Strategy (LS2030), and LMLEP LS2030 Strategic Directions Provide sufficient detail to demonstrate that the request will be responsive to the environment; contribute to a well-serviced and equitable community; contribute to a well-designed and liveable community; contribute to the progress and prosperity of Lake Macquarie, and contribute to an efficient and accessible movement system. LS2030 Core Values Sufficient details are to be provided demonstrating the request is consistent with the core values of sustainability, equity, efficiency, and liveability. This requires demonstration that the request will: integrate environmental, economic, social and cultural elements so as to ensure Lake Macquarie s resources are respected, preserved, enjoyed and utilised in a sustainable manner both for current and future generations, contribute to the distribution and improvement of access to employment, housing, urban services, community facilities, environmental quality and recreation, and provides for a range of lifestyle opportunities to suit all members of the community. contribute to a land use structure that provides a comprehensive approach to the design of movement networks, open space and water management systems within a wide range of living, employment and leisure opportunities, capable of adapting over time as the community changes. contribute to the development of a well-designed, attractive, and functional land use structure that will result in a diverse, accessible, compatible, and vibrant community that supports security, safety, identity, historic continuity, and cultural diversity. LS2030 Strategic Plan Maps and Intent Statements The Strategic Plan Maps identify the preferred pattern of development for the City and form a graphic description of how LS2030 s Aims and Directions will be achieved. The request is to demonstrate it is consistent with the intent of each of the Strategic Plan Maps. Lake Macquarie City Council Page 3 of 7
4 LMLEP 2014 Demonstrate through sufficient detail that the request is consistent with the Objectives of LMLEP 2014 and to achieve development of land that is in accordance with the principles of ecologically sustainable development by promoting balanced development of the land, and implementing LS Is the request consistent with applicable State Environmental Planning Policies (SEPPs)? This should include an assessment of potentially applicable SEPPs and details that demonstrate the request is consistent with relevant SEPPs. 6. Is the request consistent with applicable Ministerial Directions (s.9.1 directions)? This should include an assessment of relevant s9.1 Ministerial Directions and sufficient detail to demonstrate that the request is consistent with the relevant s9.1 Ministerial Directions. If there are any inconsistencies, why these are justified. Section C Environmental, Social and Economic Impact 7. Is there any likelihood that critical habitat or threatened species, populations or ecological communities, or their habitats, will be adversely affected as a result of the request? It may not be known at this stage whether threatened species or habitats will be impacted. The report should note whether there are potential impacts on species and habitats. Further investigation would occur should Council and the DoPE s Gateway Determination resolve to proceed with the amendment. This further investigation will identify whether the request would adversely affect such species and habitats. 8. Are there any other likely environmental effects as a result of the request and how are they proposed to be managed? A summary of the potential impacts of the request on the environment is to be provided. This should include positive and negative impacts. Where negative impacts are likely, proposed methods of amelioration need to be specified. A concise overview of the potential effects of the request on the character of the local environment needs to be presented. This must take into account factors such as alterations to traffic, visual changes, changes in topography, alteration to natural drainage etc. This section will be updated once further studies and technical investigations occur, should Council and the Gateway Determination resolve to proceed with the amendment. 9. How has the request adequately addressed any social and economic effects? A summary of the potential impacts of the request on the social and economic environment is required. This should include impacts on adjoining and nearby land uses, demographic changes and potential employment projections and social impacts. The request must demonstrate that any potential negative impacts can be appropriately ameliorated. This section will be updated to incorporate the outcome of further studies and technical investigations, should Council and the Gateway Determination resolve to proceed with the amendment. Section D State and Commonwealth Interests 10. Is there adequate public infrastructure for the request? Sufficient details are to be provided to demonstrate that infrastructure and facilities are available to service the outcomes of the request. Alternatively, it should be demonstrated that capacity is available for their provision and that initial inquiries indicate availability in a timely manner. Infrastructure to be considered include water, sewerage, roads, railway, buses and electricity. Facilities to be considered include open space and recreation, community facilities, education and health care. Should the request potentially place additional demand on public infrastructure, this section will be developed further following consultation with the public authorities (providing Council and the Gateway Determination resolve to proceed with the proposal). Lake Macquarie City Council Page 4 of 7
5 1.2 Other Issues for Consideration in the Request If Council resolves to proceed with a Planning Proposal, it will be forwarded to the NSW DoPE for a Gateway Determination. If the Gateway Determination identifies that the proposal should proceed, the determination will set out details on required studies, government agency consultation and community consultation. Council is also responsible for undertaking any studies or technical investigations required to adequately assess the planning proposal. These studies will be prepared at the proponent s expense. A Planning Proposal may be amended prior to finalisation, to incorporate recommendations from technical studies, the views of relevant State and Commonwealth authorities, and community consultation. NB. This Guide should be read in conjunction with Council s Rezoning/LEP Amendment Request Information Sheet. These documents reflect the requirements of the Environmental Planning and Assessment Act 1979 and the Council procedures on the rezoning process. Lake Macquarie City Council Page 5 of 7
6 Authorisation Details Controlled Document Information This document is a controlled document. Before using this document, check it is the latest version by referring to the TRIM controlled document folder identified below or Council s intranet. Unless otherwise shown, printed or downloaded versions of this document are uncontrolled. Folder No: F2006/ TRIM Record No: D Audience: Department: Officer: Review Timeframe: Max < 4 years External Integrated Planning Senior Strategic Landuse Planner 2 years Next Scheduled Review Date: 7 March 2020 Authorisation: Manager Integrated Planning - Sharon Pope - 7 March 2018 Related Document Information, Standards & References Related Legislation: Related Policies (Council & Internal): (Legislation) State Environmental Planning Policies (SEPPs Environmental Planning and Assessment Act 1979 s9.1 Ministerial Directions (Policy Name & TRIM Document No.) Related Procedures, Guidelines, Forms, WHS Modules/PCD s, Risk Assessments, Work Method Statements: Standards COP s & Other References Information Sheet for Rezoning Requests Amending Local Environmental Plan - Procedure (Standard, COP or Other References) NSW Department of Planning and Environment s A Guide to Preparing Planning Proposals Hunter Regional Plan 2036 Western Corridors Planning Strategy Lake Macquarie City Council 10 Year Community Plan Lifestyle 2030 Strategy (LS2030) Definitions Term / Abbreviation DCP Definition Development Control Plan DoPE Department of Planning and Environment HRP Hunter Regional Plan 2036 LEP LGA Local Environmental Plan Local Government Area LS2030 Lifestyle 2030 Lake Macquarie City Council Page 6 of 7
7 Consultation (update for each version created) Key Departments, Teams, Positions, Meetings: Department of Department of Planning; Integrated Planning Manager Version History Version No Date Changed Modified By Details and Comments 1 February November 2016 G. Alderson Controlled Document created A. Troke Reference to Lower Hunter Regional Strategy deleted and reference to Hunter Regional Plan added. Link to Department of Planning and Environment s Guidelines for Preparing Planning Proposals updated to new Guideline. 3 March 2018 L Sasse; S Pope Updated Environmental Planning and Assessment Act 1979 references to new numbering in several sections throughout document. Section A Point 3: Replaced Lower Hunter Regional Plan (LHRP) with Hunter Regional Plan; included draft Greater Newcastle Metropolitan Strategy Section 1.2 Note Box Replaced Council Policy with Council procedure. Lake Macquarie City Council Page 7 of 7
Planning Proposal - Amendment to Lake Macquarie Local Environmental Plan 2014 Biodiversity Offsets PP_2016_LAKEM_001_00
Planning Proposal - Amendment to Lake Macquarie Local Environmental Plan 2014 Biodiversity Offsets PP_2016_LAKEM_001_00 Local Government Area: ame of Draft LEP: Lake Macquarie City Planning Proposal Biodiversity
More informationPIA Submission Pre-Gateway Review
19 October 2015 Executive Director Regions Department of Planning & Environment GPO Box 39 Sydney NSW 2001 Via email pregatewayreview@planning.nsw.gov.au Dear Sir/ Madam PIA Submission Pre-Gateway Review
More informationChapter 4 Planning and statutory requirements. Chapter 4 Planning and statutory requirements
Chapter 4 Planning and statutory requirements Chapter 4 Planning and statutory requirements Contents Page number 4. Planning and statutory requirements 4-1 4.1 Approval under the EPBC Act 4-1 4.1.1 Controlled
More informationJuly State Planning Policy. Department of Infrastructure, Local Government and Planning
July 2017 State Planning Policy Department of Infrastructure, Local Government and Planning The State of Queensland, July 2017. Published by the Department of Infrastructure, Local Government and Planning,
More informationPIA NSW SUBMISSION SYDNEY METRO NETWORK STAGE 1 (CBD METRO) ENVIRONMENTAL ASSESSMENT
PO Box 484 North Sydney NSW 2059 PIA NSW SUBMISSION SYDNEY METRO NETWORK STAGE 1 (CBD METRO) ENVIRONMENTAL ASSESSMENT T: 02 8904 1011 F: 02 8904 1133 E: nswmanager@planning.org.au About PIA The Planning
More informationBiodiversity Certification: what it is, how it works
Biodiversity Certification: what it is, how it works Nari Sahukar Senior Policy & Law Reform Solicitor, EDO NSW Leumeah, 16 November 2017 About EDO NSW: Community legal centre Independent from Government
More informationCentral NSW Regional Contaminated Land Policy Template
Central NSW Regional Contaminated Land Policy Template Contamination Central: Supporting safe, stable and sustainable redevelopment of land in Central West NSW. Funded by the New South P a g e 1 {Instruction
More informationNSW DEPARTMENT OF EDUCATION AND COMMUNITIES
NSW DEPARTMENT OF EDUCATION AND COMMUNITIES Position Description POSITION DETAILS Position Title: Reports to: Manager, Asset Management Unit (Various locations) Manager, Delivery Date: April 2010 PRIMARY
More informationNSW Planning Law Changes. Nari Sahukar, Senior Policy & Law Reform Solicitor Rachel Walmsley, Policy & Law Reform Director
NSW Planning Law Changes Nari Sahukar, Senior Policy & Law Reform Solicitor Rachel Walmsley, Policy & Law Reform Director 2 March 2017 About EDO NSW Independent, not-for-profit Community Legal Centre Helping
More informationDRAFT SUBMISSION REGARDING
DRAFT SUBMISSION REGARDING Biodiversity Certification Draft Assessment Methodology DATE July 2010 Opening: The Local Government Association of NSW and Shires Association of NSW (the Associations) are the
More informationLooking After Our Environment
Item: 12.06 Subject: DRAFT BIODIVERSITY CERTIFICATION ASSESSMENT AND APPLICATION - PORT MACQUARIE AIRPORT AND SURROUNDING LAND Presented by: Development and Environment Services, Matt Rogers Alignment
More informationSection 32 Evaluation Report Business Mixed Use Zone (formerly the Business Zone) Contents
Section 32 Evaluation Report Business Mixed Use Zone (formerly the Business Zone) Contents Section 32 Evaluation Report: Business Mixed Use Zone (formerly the Business Zone)... 2 1. Strategic Context...
More informationLand Management and Biodiversity Conservation Reforms
Land Management and Biodiversity Conservation Reforms Tom Celebrezze Director Biodiversity, Sustainable Development and Coastal Policy NSW Office of Environment and Heritage 6 December 2017 Simplifying
More informationenvironmental defender s office new south wales
environmental defender s office new south wales Submission on the Discussion Paper for the Metropolitan Strategy Review Sydney Towards 2036 30 April 2010 The EDO Mission Statement: To empower the community
More information1. The impacts of development and settlement intensification on biodiversity and Aboriginal cultural heritage;
Your reference Our reference: DOC13/40624 Contact: Liz Mazzer (02) 68835325 Date 8 th August 2013 General Manager Lithgow City Council PO Box 19 Lithgow NSW 2790 Attention: Ms Sherilyn Hanrahan, Strategic
More informationINDEPENDENT PUBLIC INQUIRY SYDNEY S LONG TERM PUBLIC TRANSPORT PLAN
INDEPENDENT PUBLIC INQUIRY PO Box 484 North Sydney NSW 2059 SYDNEY S LONG TERM PUBLIC TRANSPORT PLAN T: 02 8904 1011 F: 02 8904 1133 E: nswmanager@planning.org.au About PIA The Planning Institute of Australia
More informationNSW Planning Renewable Energy Development. July 2017
NSW Planning Renewable Energy Development July 2017 Contents 1. Overview of the renewable energy industry 2. Legislative framework for development 3. Development assessment framework 4. New guidelines
More informationRegister of Contaminated Land Consent Conditions
Regional Contaminated Land Capacity Building Program Register of Contaminated Land Consent Conditions AUGUST 2017 Regional Contaminated Land Capacity Building Program This publication was produced by the
More informationTHE REGION S PLAN POLICY FRAMEWORK. August 2015
THE REGION S PLAN POLICY FRAMEWORK August 2015 2 What is The Policy Framework? Cover photo credit: Sinan Sinharoy for Atlanta BeltLine, Inc. Atlanta is one of the world s most dynamic metropolitan areas,
More informationReport for Agenda Item: 2
QLDC Council 28 September 2017 Department: Planning & Development Report for Agenda Item: 2 Stage 2 Proposed District Plan Notification Purpose The purpose of this paper is to present those parts of Stage
More information(iii) Senior Management Course, lasting not less than 4 weeks from a recognized Institution;
VACANT POSTS V/No. 01/2018 PRINCIPAL HOUSING OFFICER, JOB GROUP N, TEN (10) POSTS Salary Scale: Kshs.51,660 69,990 p.m. (a) Duties and Responsibilities Duties and responsibilities at this level involve
More informationLeasing of Railway Land
Discipline: Engineering (Track & Civil) Category: Standard Leasing of Railway Land ETD-17-01 Applicability New South Wales CRIA (NSW CRN) Primary Source ARTC NSW Standard EGS 08 Document Status Version
More informationThe State of Planning in NSW With reference to social and environmental impacts and public participation RECOMMENDATIONS FOR REFORM
The State of Planning in NSW With reference to social and environmental impacts and public participation RECOMMENDATIONS FOR REFORM The State of Planning in NSW With reference to social and environmental
More informationEnvironmental Impact Assessment in Western Australia
Environmental Impact Assessment in Western Australia Fact Sheet Updated February 2011 An introduction to Environmental Impact Assessment in Western Australia Environmental impact assessment under the Environmental
More informationIntroduction. Comprehensive Plan
Comprehensive Plan 2010-2030 1 The City of Elwood Comprehensive Plan establishes a development strategy and policies to guide the future growth and development of the community for the next two decades.
More informationSection 9 Implementation
Section 9 Implementation 9 Section 9: Implementation 9.1 Overview The primary role of Your Bright Future is to provide a community sustainability based framework to direct the future growth and development
More informationIII. King County Guiding Principles
III. King County Guiding Principles 2016 Comprehensive Plan December 5, 2016 The Comprehensive Plan is based on the principles of creating sustainable neighborhoods, preserving open space, farmland, and
More informationBUSHFIRE ATTACK LEVEL
BUSHFIRE ATTACK LEVEL FOR FUTURE DWELLINGS AT STAGE 46A NORTHLAKES ESTATE Prepared by: Firebird ecosultants Pty Ltd ABN 16 105 985 993 PO Box 354 Newcastle NSW 2300 Mob: 0414 465 990 Ph: 02 4910 3939 Fax:
More informationGreater Newcastle Transport Plan
Greater Newcastle Transport Plan Engineers Australia submission 16 February 2018 11 National Circuit, Barton ACT 2600 Tel: 02 6270 6555 Email: publicaffairs@engineersaustralia.org.au www.engineersaustralia.org.au
More informationDraft Cairns Region Planning Scheme
Draft Cairns Region Planning Scheme 12 December 2014 Submission from the Outdoor Media Association 01 ABOUT THE OUTDOOR MEDIA ASSOCIATION The Outdoor Media Association (OMA) is the peak national industry
More informationPosition Description
Position Description Position: Location: Department: Reports to: Status: Senior Project Manager Gold Coast Planning and Projects General Manager Planning and Projects Full Time Purpose of the role: The
More informationProtection of Ramsar Wetlands under the EPBC Act
Protection of Ramsar Wetlands under the EPBC Act 1. INTRODUCTION The Commonwealth Environmental Protection and Biodiversity Conservation Act 1999 (the EPBC Act ) commenced on 16 July 2000 and brought about
More informationManaging Land Contamination Planning Guidelines SEPP 55 Remediation of Land
Managing Land Contamination Planning Guidelines SEPP 55 Remediation of Land 1998 Department of Urban Affairs and Planning Environment Protection Authority Crown copyright 1998 Printed August 1998; reprinted
More informationCLASSIFICATION REVIEW GUIDELINE FOR STAFF AND SUPERVISORS. Table of Contents
CLASSIFICATION REVIEW GUIDELINE FOR STAFF AND SUPERVISORS Table of Contents 1.0 Context 2 2.0 General Principles 2 3.0 Timeline and Action 3 4.0 Self Guided Formats 4 4.1 Training 4 5.0 Alignment with
More informationProtection of World Heritage Properties under the EPBC Act
Protection of World Heritage Properties under the EPBC Act 1. INTRODUCTION The Commonwealth Environmental Protection and Biodiversity Conservation Act 1999 (the EPBC Act ) commenced on 16 July 2000 and
More informationSGS EB Negotiations STATUS OF NEGOTIATIONS As at 20/05/16
SGS EB Negotiations STATUS OF NEGOTIATIONS As at 20/05/16 Details of Union Claim ISSUES AGREED ISSUES NOT AGREED ISSUES STILL SUBJECT TO NEGOTIATION 1 No loss or diminishment of existing rights, entitlements
More informationRiver Murray to Broken Hill Pipeline
ouble River Murray to Broken Hill Pipeline Final Report Number DC16095 October 2017 Prepared for WaterNSW Document Control Version Authors Reviewer Approved for Issue Name Date Final Lara Hess Kristen
More informationBiodiversity Certification: What are the potential outcomes? Dr Steven Ward
Biodiversity Certification: What are the potential outcomes? Dr Steven Ward International Around the world: 39 existing offset programs 25 programs under development Estimate: >86,000 ha conserved per
More informationUrban Development Institute of Australia Western Australian Division Incorporated
Our ref: 27.17 31 March 2006 Tracy McQue City of Swan PO Box 196, MIDLAND WA 6936 Dear Ms McQue CITY OF SWAN DRAFT URBAN GROWTH POLICIES Thank you for the opportunity to provide industry comment on the
More informationSTRATEGIC ENVIRONMENTAL ASSESSMENT SCREENING REPORT. for PROPOSED VARIATION NO 3 OF THE MEATH COUNTY DEVELOPMENT PLAN
STRATEGIC ENVIRONMENTAL ASSESSMENT SCREENING REPORT for PROPOSED VARIATION NO 3 OF THE MEATH COUNTY DEVELOPMENT PLAN 2013-2019 for MEATH COUNTY COUNCIL December 2015 Brady Shipman Martin Canal House Canal
More informationRevised functions for Resource Management Act 1991 decision-makers
RESOURCE LEGISLATION AMENDMENTS 2017 FACT SHEET 2 Revised functions for Resource Management Act 1991 decision-makers This is part of a series of 16 fact sheets that give an overview of recent resource
More informationCJA TELECOMMUNICATIONS (PTY) LTD EMPLOYMENT EQUITY SUCCESSION PLAN. For the period
CJA TELECOMMUNICATIONS (PTY) LTD EMPLOYMENT EQUITY SUCCESSION PLAN For the period 1 FEBRUARY 2015 31 JANUARY 2018 1 Introduction CJA Telecommunications (Pty) Ltd has actively pursued a transformation process
More informationDivision: Planning and Regulation Job Grade: JG4A
Position Title: Position Number: 3032 Division: Planning and Regulation Job Grade: JG4A Unit: Building and Environmental Health Award base: 35 Hours Unit Leader: Manager Building and Environmental Health
More informationTSI OPERATION AND TRAFFIC MANAGEMENT FINAL REPORT ON THE MERGING OF CONVENTIONAL RAIL AND HIGH SPEED TSIS
INTEROPERABILITY UNIT RATION AND TRAFFIC MANAGEMENT FINAL REPORT ON THE MERGING OF CONVENTIONAL RAIL AND HIGH SPEED TSIS Reference: ERA/CON/2011-02/INT Document type: Final report Version : 0.8 Date :
More informationThe Lakes District and Schooner Cove Integrated Stormwater Management Plan Kerr Wood Leidal, Draft Report, July 2012 (revised October 2013)
To: Jeremy Holm, Regional District of Nanaimo cc: Geoff Garbutt, Regional District of Nanaimo From: Dan Huang / Ehren Lee 1.0 INTRODUCTION Urban Systems has been asked to assist the Regional District of
More informationWork Health and Safety
Policy Health and Safety Endorsed: 23 August 2016 Brief description The GPC Health and Safety Policy and its supporting standards and procedures provide a framework to protect the health and safety of
More informationAGILE WORKPLACE SAFETY GUIDELINES
UOW SAFE@WORK AGILE WORKPLACE SAFETY GUIDELINES HRD-WHS-GUI-648.1 Agile Workplace Safety Guidelines Page 1 of 6 Contents Agile Workplace Guidelines 1 Introduction...3 2 Purpose...3 3 Scope...3 4 Responsibilities...3
More informationSEARs project justification and conclusion
31 Project justification and conclusion This chapter presents a justification for the project and a conclusion to the environmental impact statement (EIS). The justification is based on the strategic need
More informationManager Asset Management
Position Description Manager Asset Management Position Title: Occupant: Reports To: Grade: Division: Department: Manager Asset Management TBC Director Community Development Manager Community Development
More informationGUIDELINE. environmental management of mining. GUIDELINE 11 - Terms of Reference and Preparation of an Environmental Impact. Statement.
GUIDELINE environmental management of mining GUIDELINE 11 - Terms of Reference and Preparation of an Environmental Impact Statement Content: 1 Introduction 2 Background 3 Objectives page 1 page 1 page
More informationPosition Description Development Officer Infrastructure Planning
POSITION NO: 100829 DATE APPROVED: 04.06.2017 DEPARTMENT: DIVISION: Infrastructure Development Infrastructure & Recreation CLASSIFICATION: Band 6 POSITION OBJECTIVES Assist the, Development Team (Team
More informationPolicy Work Health and Safety (WHS) RCPA Introduction WHS legislation
Policy Subject: Work Health and Safety (WHS) Approval Date: July 2011, December 2014 Review Date: July 2018 Review By: Board of Directors Number: 1/2011 The Royal College of Pathologists of Australasia
More informationGuidelines for Global Action on Peatlands (GAP)
"Wetlands: water, life, and culture" 8th Meeting of the Conference of the Contracting Parties to the Convention on Wetlands (Ramsar, Iran, 1971) Valencia, Spain, 18-26 November 2002 Guidelines for Global
More informationCODE OF PRACTICE Appointment to Positions in the Civil Service and Public Service
CODE OF PRACTICE Appointment to Positions in the Civil Service and Public Service PUBLISHED IN 2017 BY THE COMMISSION FOR PUBLIC SERVICE APPOINTMENTS, 18 LOWER LEESON STREET, DUBLIN 2, D02 HE97 TEL: (01)
More informationAgency Reorganization Request Program Manual
State Personnel System Agency Reorganization Request Program Manual Division of Human Resource Management June 26, 2017 Department of Management Services HRM #2017-006 TABLE OF CONTENTS INTRODUCTION...
More informationCODE OF PRACTICE Emergency Short-Term Appointments to Positions in the Health Service Executive
CODE OF PRACTICE Emergency Short-Term Appointments to Positions in the Health Service Executive PUBLISHED IN 2017 BY THE COMMISSION FOR PUBLIC SERVICE APPOINTMENTS, 18 LOWER LEESON STREET, DUBLIN 2, D02
More informationQuotation Procedure TRIM: D12/85125P
Quotation Procedure TRIM: D12/85125P INTRODUCTION This procedure supports the University's Procurement Policy and outlines the process for the procurement of all goods and services for the University of
More informationEXECUTIVE OFFICE OF THE GOVERNOR
EXECUTIVE OFFICE OF THE GOVERNOR STATE REPORT OF FINDINGS AND RECOMMENDATIONS FOR THE TREASURE COAST REGIONAL PLANNING COUNCIL'S STRATEGIC REGIONAL POLICY PLAN OCTOBER 23, 1995 INTRODUCTION The State Report
More informationTrack Possession Guidelines
Division / Business Unit: Function: Document Type: Delivery and Maintenance Possession Management Guideline Track Possession Guidelines Applicability Hunter Valley Publication Requirement Internal / External
More information28 JULY 2015 PLANNING COMMITTEE. 5i 14/1315 Reg d: Expires: Ward: OW. of Weeks on Cttee Day:
5i 14/1315 Reg d: 25.11.2014 Expires: 29.04.15 Ward: OW Nei. Con. Exp: 14.01.15 BVPI Target Minor (13) Number of Weeks on Cttee Day: 21/8 On Target? No LOCATION: PROPOSAL: TYPE: London House, 134 High
More informationSubsidence Monitoring Program
Subsidence Monitoring Program West Wallsend Colliery Page 1 of 27 Contents West Wallsend Colliery 1.Introduction... 3 1.1 Background... 3 1.2 Purpose and Scope... 3 1.3 Relationship with Other Documents...
More informationBalranald Mineral Sands Project
Balranald Mineral Sands Project NSW Environmental Impact Statement Prepared for Iluka Resources Limited May 2015 Volume 2 Appendix A - Secretary's Environmental Impact Assessment Requirements Appendix
More informationState Significant Development and State Significant Infrastructure
Planning, Development & Heritage State Significant Development and State Significant Infrastructure Last updated: July 2015 These Fact Sheets are a guide only and are no substitute for legal advice. To
More informationFor Discussion Purposes Only EDMONTON METROPOLITAN REGION BOARD REGULATION. Part 1 Edmonton Metropolitan Region Board
LEGEND - Outlines the sections of the Municipal Government Act that apply to growth management boards. Provides an explanation of the regulation s contents. * N E W R E G U L AT I O N For Discussion Purposes
More informationGUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08
CS ENERGY PROCEDURE FOR GUIDELINES FOR CONTRACTOR ENVIRONMENTAL MANAGEMENT PLANS CS-ENV-08 Responsible Officer: Manager Environment Approved: Executive General Manager Asset Strategy DOCUMENT HISTORY Date
More informationThe Submission fails to satisfy the requirement to sufficiently cost the provision of infrastructure for the proposed development.
Sutherland Shire Council s Response to: Heathcote Ridge - Site of State Significance Submission to NSW Department of Planning & Infrastructure Dec 2011 Appendix A This submission includes the consideration
More informationHillsborough County Future Land Use 160
RURAL-AGRICULTURE LAND USE CLASSIFICATION Agricultural/Mining -1/20 (AM-1/20) RESIDENTIAL GROSS DENSITY TYPICAL USES MAXIMUM FLOOR AREA RATIO OR Up to 1 dwelling unit per 20 gross acres. Alternative methods
More informationDevelopers Manual. Version 1.23
Version 1.23 REVISIONS The following clauses in this manual were revised on the dates shown. Revision Number Issue Date Reason for Change 1.0 4 August 1999 Initial Issue 1.1 6 April 2000 Amendments to
More informationRURAL LIVING AREAS Rural Living Areas Rural Lifestyle and Rural Residential 8.1 Issues, Objectives and Policies
. Rural Living Areas Rural Lifestyle and Rural Residential.1 Issues, Objectives and Policies.1.1 Resource Management Issues Discussion of additional relevant issues is found in the following Parts of the
More informationQLDC Council 8 November Report for Agenda Item: 1
5 QLDC Council 8 November 2017 Department: Planning & Development Report for Agenda Item: 1 Stage 2 Proposed District Plan Notification - Transport Purpose 1 The purpose of this report is to present parts
More informationThe rezoning application and proposed transportation facility warrants consideration.
Date: November 11, 2014 To: Re: Chair and Members Planning & Development Committee PDE File Number: REZ1400020 275 Conception Bay South Bypass Road, Ward 5 Application to Rezone Land to Industrial General
More informationDevelopment on Peatland Guidance Waste. Objective
Development on Peatland Guidance Waste Objective This document is written as internal guidance for SEPA staff engaged in the consideration of planning applications involving developments on peat or in
More informationTimber harvesting in native State forests
OCTOBER 2008 PRIMEFACT 693 Timber harvesting in native State forests Forest Management There are approximately 2 million hectares of native State forests in NSW. In managing these areas, Forests NSW aims
More informationRecruitment and Appointment Policy Responsible Officer. Executive Director, Human Resources Approved by
Recruitment and Appointment Procedure Related Policy Recruitment and Appointment Policy Responsible Officer Executive Director, Human Resources Approved by Executive Director, Human Resources Approved
More informationVILLAGE OF FRANKFORT REQUEST FOR PROPOSAL FOR PROFESSIONAL PLANNING SERVICES TO PREPARE A COMPREHENSIVE PLAN
VILLAGE OF FRANKFORT REQUEST FOR PROPOSAL FOR PROFESSIONAL PLANNING SERVICES TO PREPARE A COMPREHENSIVE PLAN I. Purpose of Proposal The requests proposals from planning and design consultants to complete
More informationCaval Ridge Mine Change Request 8 Accommodation Village Condition Changes
Caval Ridge Mine Change Request 8 Accommodation Village Condition Changes 31 May 2013 Contents Executive Summary... 3 1 Introduction... 5 1.1 Project Background... 6 1.1.1 Bowen Basin Coal Growth Project...
More informationB. Stakeholder Guide: Infrastructure and utility providers
B. Stakeholder Guide: Infrastructure and utility providers Why is the Government proposing new legislation? As our population grows, the Government wants to accelerate the building of new communities and
More informationChin Koerner Executive Director US Regulatory and Development Policy
Chin Koerner Executive Director US Regulatory and Development Policy Novartis Pharmaceuticals Corporation 1700 Rockville Pike Suite 510 Rockville, MD 20852 Tel 301.468.5607 Fax 301.468.5614 Email: Chin.Koerner@novartis.com
More informationLAND USE PLANNING LAW REFORM (PATIENT ZERO TO PATIENT HERO)
LAND USE PLANNING LAW REFORM (PATIENT ZERO TO PATIENT HERO) Day 2 : Session 4 Western Cape Property Developers Forum Annual Conference Presenters: Helena Jacobs & Theo Rebel 13 May 2016 What will be covered?
More informationL 337/36 Official Journal of the European Union
L 337/36 Official Journal of the European Union 22.12.2005 PROTOCOL on the implementation of the Alpine Convention of 1991 in the field of energy Energy Protocol Preamble THE FEDERAL REPUBLIC OF GERMANY,
More informationProvince - Department of Municipal and Provincial Affairs Nunatsiavut Government. Activities Responsibility Timing
SUBJECT: Consultation on land use laws Activity Sheet: 10-1 OBLIGATION: PARTIES: Consult on land use policy or development regulation in Labrador Inuit Settlement Area (LISA) outside Labrador Inuit Lands
More informationSTATEMENT OF EVIDENCE OF MARK BULPITT CHRISP
IN THE MATTER of the Resource Management Act 1991 AND IN THE MATTER of submissions by Contact Energy Ltd in relation to Proposed Plan Changes 29 and 33 to the Taupo District Plan STATEMENT OF EVIDENCE
More informationdraft Environment Strategy
draft Environment Strategy Our Commitment Our vision is to be the lifestream of Sydney for generations to come. We want to be world-class, delivering essential services that our customers love, in our
More informationCity Infrastructure and Traffic Operations. Titles of Positions which report to Public Domain Team Leader are:
POSITION DESCRIPTION 1. POSITION DETAILS Position Title: Division: Unit: Management Level: Team Leader Public Domain City Operations City Infrastructure and Traffic Operations Supervisor/Team Leader 2.
More informationDraft Biodiversity Conservation Regulation 2017
Draft Biodiversity Conservation Regulation 2017 Regulatory Impact Statement Prepared for NSW Office of Environment and Heritage April 2017 THE CENTRE FOR INTERNATIONAL ECONOMICS The Centre for International
More informationISO AUDIT PREPARATION KIT 2016
ISO AUDIT PREPARATION KIT 2016 IQY Technical College Table of Contents ISO... 3 ISO 9001:2008 Fact Sheet... 6 Further Information... 6 Preparing for the ISO 9001:2008 Audit - 2016... 7 ISO 9001:2008 Definitions...
More informationGUIDELINES FOR APPOINTMENTS TO POSITIONS NOT UNDER THE REMIT OF THE PUBLIC SERVICE MANAGEMENT (RECRUITMENT AND APPOINTMENTS) ACT 2004
GUIDELINES FOR APPOINTMENTS TO POSITIONS NOT UNDER THE REMIT OF THE PUBLIC SERVICE MANAGEMENT (RECRUITMENT AND APPOINTMENTS) ACT 2004 July 2017 1 FOREWORD The Public Appointments Service (PAS) mainly operates
More informationWest Virginia University Compensation Strategy Non-classified Employees August, 2015
West Virginia University Compensation Strategy Non-classified Employees August, 2015 Background: Mission - West Virginia University s primary mission is to provide high-quality programs of instruction
More informationSYDNEY: MOVING FORWARD
SYDNEY: MOVING FORWARD UDIA NSW Response to the Draft Metropolitan Strategy for Sydney JUNE 2013 Copyright UDIA NSW 2013 1 EXECUTIVE SUMMARY The importance of preparing a strategic plan for Sydney that
More informationYour Bright Future: Municipal Development Plan
Your Bright Future: Municipal Development Plan 2010-2020 Executive Summary OVERVIEW Municipalities face many challenges and opportunities. Central to a municipality s ability to provide a high standard
More informationSydney Port Botany Terminal 3 Project Out of Hours Works Protocol
1/11 Terms and Definitions The following terms, abbreviations and definitions are used in this plan: Terms Explanation SPBT3 Sydney Port Botany Terminal 3 CEMP EM EPA ERAP OEH PAH OOHWP EIS MCoA Distribution
More informationCONTRACTOR WHS HAZARD STANDARD TRAFFIC MANAGEMENT EXTERNAL USE ONLY
CONTRACTOR WHS HAZARD STANDARD TRAFFIC MANAGEMENT EXTERNAL USE ONLY Principles in the Optus Contractor WHS management process CONTRACTOR MANAGEMENT STAGES PRINCIPLES THIS STANDARD REQUISITION Requisition
More informationA submission by Meridian Energy Limited on. Proposed amendments to the National Policy Statement for Freshwater Management 2011 A discussion document
A submission by Meridian Energy Limited on Proposed amendments to the National Policy Statement for Freshwater Management 2011 A discussion document 4 February 2013 Summary The most significant water management
More informationAction Plan for a New Local Governance System in New Brunswick
Action Plan for a New Local Governance System in New Brunswick December 2011 A message from the Premier As part of our 2010 election platform, Putting New Brunswick First, our Government committed to forging
More informationSCHOOL BOARD ACTION REPORT
SCHOOL BOARD ACTION REPORT DATE: October 2, 2017 FROM: Directors Leslie Harris, Sue Peters and Scott Pinkham For Introduction: October 4, 2017 For Action: October 4, 2017 1. TITLE Resolution 2017/18-6
More informationInput from Engineers Ireland Into the Department of Transport s Statement of Strategy
Input from Engineers Ireland Into the Department of Transport s Statement of Strategy 2008 2010 Table of Contents Page Executive Summary 3 Department of Transport Mandate and Mission (2005-2007) 4 The
More informationPHILIPPINES: SOCIAL INCLUSION AND ALTERNATIVE LIVELIHOOD FOR THE INFORMAL WASTE SECTOR
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PHILIPPINES: SOCIAL INCLUSION AND ALTERNATIVE LIVELIHOOD FOR THE INFORMAL WASTE SECTOR
More informationLESEDI ENVIRONMENTAL MANAGEMENT FRAMEWORK (EMF) PUBLIC MEETING 25 JANUARY 2006
LESEDI ENVIRONMENTAL MANAGEMENT FRAMEWORK (EMF) PUBLIC MEETING 25 JANUARY 2006 AGENDA Opening and Welcome Introduction of Consultants Profile of Izwelisha Consortium Explanation of the EMF process Environmental
More informationChristie Downs Urban Regeneration Project Control Group Terms of Reference (Strategic Planning Stage)
Christie Downs Urban Regeneration Project Control Group Terms of Reference (Strategic Planning Stage) April 2009 1. Background Urban regeneration at Christie Downs is consistent with both State and local
More informationRural Living Environment
1 RLE.1 Rural Living Environment RLE.1.1 Description & Expectations The Rural Living Environment (RLE) covers rural areas within the District that are either already characterised by lifestyle activities
More information