Size: px
Start display at page:

Download "MDOT ~ Public-Private Partnerships (P3 s) Metro Region Freeway Lighting P3"

Transcription

1 MDOT ~ Public-Private Partnerships (P3 s) Metro Region Freeway Lighting P3

2 P3 Definition FHWA defines Public-Private Partnerships (P3 s) as contractual agreements formed between a public agency and a private sector entity that allow for greater private sector participation in the delivery and financing of transportation project.

3 P3 Advantages Ability to shift specific risks to the private sector Ability to use private funds to advance projects Schedule and Price certainty over the term Ability to refocus our resources and efforts Innovation

4 P3 Project Screening Initial Screening Items and Project Evaluation Potential that private partner could provide value Market Interest Financial Feasibility Project Scope Risk Allocation

5 P3 Procurements Steps Request for Letters of Interest (RFLOI) Request for Qualifications (RFQ) Shortlist (typically 3-5 teams) Site Visits and One-on-One Meetings Request For Proposals (RFP) ITP, Project Agreement, Schedules, etc One-on-One Meetings Commercial Close Financial Close

6 P3 Unique Procurement Multiple Specialty Areas Financial KPMG provides these services for us through the Governor s Office Legal It is recommended that legal counsel be procured to help develop the contract language. Engineering Depending on the project, a multitude of specialty areas will need to review contract language Contract Services Plan to have conversations with contract services, both professional services and construction contracts. FHWA FHWA will need to be involved throughout the process (finance, legal and engineering) Insurance Plan to discuss required insurances and minimum requirements at length

7 Freeway Lighting P3 - Schedule Request for Letters of Interest posted July 25, 2013 MDOT received 12 responses on August 12, 2013 Request for Qualifications developed posted March 6, 2014 Received 9 proposals MDOT short-listed 4 firms announced short-list May 16, 2014 Short-listed firms DTE Energy, Freeway Lighting Partners, Citelum, Energy Systems Group

8 Freeway Lighting P3 - Schedule Developed Request For Proposals (RFP) Multiple meetings held with the bidders Final Version of the RFP posted February 27, 2015 Technical Submittals and Bids due on March 27, 2015 Announcement of Preferred Proposer May 26, 2015 Commercial and Financial Close August 24, 2015

9 Freeway Lighting P3 Key Terms Project Company will Design, Build, Finance, Operate & Maintain 14,870 freeway lights Consisting of all freeway lights within limited access Right of Way 15 year term Energy Savings Payment Project Company will be incentivized to provide energy efficient equipment Lane Rentals are included in the Contract Non-Compliance points assessed if not in compliance with Contract Example 10 days to correct a non-operating light Example 7 days to correct a group of non-operating lights First point is $450 per occurrence If not remedied, increased to $1,000

10 So Why a P3 Contract Structure? Significant upfront capital costs required to improve the existing system Energy costs can be significantly reduced if re-lamped to something more efficient Estimated $21M in Construction Costs to convert lamps to LED Use of energy savings can help reduce the overall payment Allows shift of MDOT staff functions to focus on other electrical infrastructure Shift the Risk New technologies are always being developed Allows use of emerging tech more quickly Shifts risk of failure onto the project company Allows the possibility of energy savings to offset some of the contract cost Theft Prevention

11 Freeway Lighting P3 Risk Sharing Theft Project Company first $150,000 50/50 share up to $250,000 Department any costs over $250,000 Damage to Infrastructure Vehicle damage Department responsible for costs associated with damage caused by errant vehicles Department will then pursue reclamation from insurance company

12 Freeway Lighting P3 Cost & Payment Structure Project Company will Design, Build, Finance, Operate & Maintain Payment Structure Milestone 1 - $6,000,000, paid once lights are operating at 90% Milestone 2 - $6,000,000, paid upon Substantial Completion 100% operational After Substantial Completion Operate & Maintain Quarterly Service Payments (est =$2.1 w/o power) Plan to use a mix of Federal and State funds $21.86 Total Cost of P3 contract = $145M (includes energy) Lights operating between 70-80% (current scenario) Expected costs = $140M Based on average costs expended over the last 8 years Lights operating at 100%, using High Pressure Sodium lights Estimated costs = $183M $46.03 $77.26 Capital Improvement Costs O&M Costs Power Costs

13 Freeway Lighting P3 Technical Requirements Technical Requirements Schedule 16 Development of the Project Management Plan (PMP) Design Requirements Non-Tunnels AASHTO Roadway Lighting Design Guide / IES RP-8 Tunnels AASHTO Roadway Lighting Design Guide (Chp 5) / IES RP-22 Non-Lighting Elements need to adhere to MDOT Standards, AASHTO, etc Must develop a Maintenance Management Information System (MMIS) Traffic Management Plan

14 Freeway Lighting P3 Non-Compliance Points These are all defined within Schedule 3 Payment Mechanism $450 per occurrence If the root cause of the problem is substantially the same Deduction is increased to $1000, indexed Mitigation Period timeframe is dependent on the type of failure Remedy Period timeframe is dependent on the type of failure

15 Freeway Lighting P3 Handback Criteria Handback Criteria for specific elements Exhibit C of Schedule 16 A complete condition survey and inspection must be completed within 1 year of handback Required to supply a 60 day supply of parts and materials quantity based upon a 60 day typical period for repairs as documented in the MMIS Handback requirements are variable dependent on the component Luminaires (including ballast/driver) 5 years Posts/Standards before term require inspections, during term 10 years & inspection High Mast before term require inspections, during term 15 years & inspection

16 Lessons Learned from the 1 st P3 Document and Version Control Need for the full team to be on-board at the development of the RFQ Identify and include as much information that we have readily available RFQ should provide detail on the planned structure of the P3 agreement as well as the expected closing process Risk workshops and updates to the financial model and engineering estimates should be done often and reflect the current risk profile of the contract Updated term sheets should be readily available to inform management when asked

17 Next Steps and Potential P3 project The Governor s Office is working on specific P3 legislation two bills introduced HB 4940 SB 627 Requests for Letters of Interest developed for Pump Stations Responses received November 24 th 16 responses received Evaluation of responses, risk assessment and estimates are being developed to present to Leadership.

18 P3 Resources FHWA has a very informative website: MDOT s Innovative Contracting website: Other State DOT s and agencies have good information Virginia and California Google is great

19 Questions? Charlie Stein, PE Innovative Contracting Unit

MDOT Freeway Lighting Public Private Partnership

MDOT Freeway Lighting Public Private Partnership MDOT Freeway Lighting Public Private Partnership Design-Build Build-Finance Finance-Operate Operate-Maintain (DBFOM) Project Project Overview Administering - Design and Construction Administering - Operations

More information

PACKAGING P3 PROCUREMENTS FOR COMPLEX PROJECTS THE LAX EXPERIENCE

PACKAGING P3 PROCUREMENTS FOR COMPLEX PROJECTS THE LAX EXPERIENCE PACKAGING P3 PROCUREMENTS FOR COMPLEX PROJECTS THE LAX EXPERIENCE BRIAN C. OSTLER Deputy City Attorney City of Los Angeles ROGER JOHNSON Airport Program Executive Jacobs BRANDON J. DAVIS Partner Nossaman

More information

ITE MICHIGAN TECHNICAL SESSION LIVING THE P3 DESIGN DREAM DESIGN BUILD ON STEROIDS PRESENTER: TOM WESTON, PE

ITE MICHIGAN TECHNICAL SESSION LIVING THE P3 DESIGN DREAM DESIGN BUILD ON STEROIDS PRESENTER: TOM WESTON, PE ITE MICHIGAN TECHNICAL SESSION LIVING THE P3 DESIGN DREAM DESIGN BUILD ON STEROIDS PRESENTER: TOM WESTON, PE DECEMBER 3, 2009 1 OVERVIEW MDOT DESIGN BUILD EXPERIENCE P3 OVERVIEW P3 ADVANTAGES P3 PROJECT

More information

SH 183 Managed Lanes Project RFQ Q & A MATRIX #2. (June 4, 2013)

SH 183 Managed Lanes Project RFQ Q & A MATRIX #2. (June 4, 2013) SH 183 Managed Lanes Project RFQ Q & A MATRIX #2 (June 4, 2013) No. Current language states: Project experience provided by a parent or sister company of the Lead Engineering Firm, Lead Contractor or Lead

More information

ATTACHMENT 3. Background:

ATTACHMENT 3. Background: Colorado Tolling Enterprise (CTE) or High Performance Transportation Enterprise Additional Information Requirements for Amendment Submittals for the DRCOG Fiscally Constrained RTP Adopted by DRCOG Board

More information

Commonwealth Transportation Board I-66 Corridor Briefing Outside the Beltway Route 15 to I-495

Commonwealth Transportation Board I-66 Corridor Briefing Outside the Beltway Route 15 to I-495 Commonwealth Transportation Board I-66 Corridor Briefing Outside the Beltway Route 15 to I-495 January 13, 2015 1 Project Status Update Transit P3 Procurement I-66 Corridor Briefing Overview Major Project

More information

-1- Intermodal Parking Facilities And Enhancements Design-Build Project

-1- Intermodal Parking Facilities And Enhancements Design-Build Project -1- Intermodal Parking Facilities And Enhancements Design-Build Project Presentation Foothill Extension Phase 2A Pasadena to Azusa Three Design-Build Projects Intermodal Parking Facilities and Enhancements

More information

2016 National Tribal Transportation Conference

2016 National Tribal Transportation Conference Alaska Tribal Technical Assistance Program Center 2016 National Tribal Transportation Conference Construction Management Darrel Williams Introductions Introduction to Construction Administration Construction

More information

Progressive Design Build

Progressive Design Build Progressive Design Build July 19, 2018 Ash Dhingra P.E.,S.E TRADITIONAL PROCUREMENT Design-Bid-Build (DBB) Design to 100%, procurement (bid), and construction proceed sequentially Construction contract

More information

Triple Bottom Line Achievements Through Energy Savings and Energy Performance Contracts

Triple Bottom Line Achievements Through Energy Savings and Energy Performance Contracts 7/28/2017 Triple Bottom Line Achievements Through Energy Savings and Energy Performance Contracts July 22nd, 2017 Gary Nower Wilfrid Laurier University Edward Ng EY Carl Mckay - Willms & Shier WILFRID

More information

Lease-Leaseback Project Delivery Method

Lease-Leaseback Project Delivery Method Lease-Leaseback Project Delivery Method ASBA Technical Meeting & Tradeshow Winter 2013 Presented by: Mark Baginski Principal Verde Design, Inc. James Moore V.P. of Pre-Construction Services Robert A. Bothman,

More information

RFP: The Center for Environmental Excellence Task on Stormwater. Introduction

RFP: The Center for Environmental Excellence Task on Stormwater. Introduction RFP: The Center for Environmental Excellence Task on Stormwater Introduction In 2001, American Association of State Highway and Transportation Officials (AASHTO) established the Center for Environmental

More information

Triple Bottom Line Achievements Through Energy Savings and Energy Performance Contracts

Triple Bottom Line Achievements Through Energy Savings and Energy Performance Contracts Triple Bottom Line Achievements Through Energy Savings and Energy Performance Contracts 11 June 2017 Gary Nower Wilfrid Laurier University Edward Ng EY Carl Mckay - Willms & Shier Background Background

More information

TRANSPARENCY IN STRATEGIC PROJECTS DIVISION

TRANSPARENCY IN STRATEGIC PROJECTS DIVISION TRANSPARENCY IN STRATEGIC PROJECTS DIVISION Scott Spradlin, P.E. Strategic Projects Division, TxDOT Footer Text October 13, 2015 Date INNOVATIVE PROJECT DELIVERY INNOVATIVE PROJECT DELIVERY AUTHORITY AND

More information

International Experience with PPP Programs: Success, Failure and Key Lessons. 22 February 2012

International Experience with PPP Programs: Success, Failure and Key Lessons. 22 February 2012 International Experience with PPP Programs: Success, Failure and Key Lessons Delivering Public-Private Private Partnerships in PNG 22 February 2012 Why PPPs? Value for Money Synergies between design, construction,

More information

INSEAD PPPs as Policy Instruments. Abraham Akkawi November 29, 2010

INSEAD PPPs as Policy Instruments. Abraham Akkawi November 29, 2010 INSEAD PPPs as Policy Instruments Abraham Akkawi November 29, 2010 Content PPP Defined PPP Advantages PPP Types Public Sectors Readiness Sample PPP example in the MENA region Case Study: Mafraq-Gweifat

More information

Ivan Damnjanovic and Stu Anderson

Ivan Damnjanovic and Stu Anderson Selection and Evaluation of Alternative Contracting Methods to Accelerate Project Completion (NCHRP 20-5) Ivan Damnjanovic and Stu Anderson Texas A&M University Texas Transportation Institute August 2008

More information

Presented By: Jeffrey T. Folden, P.E. Chief, Innovative Contracting Division

Presented By: Jeffrey T. Folden, P.E. Chief, Innovative Contracting Division Presented By: Jeffrey T. Folden, P.E. Chief, Innovative Contracting Division Project Delivery Methods Design-Bid-Build (DBB) Indefinite Delivery/Indefinite Quantity (ID/IQ) Construction Management at Risk

More information

Adaptive Signal Control Technologies (ASCT) Systems Engineering Process. Presented by: Adam Moser, P.E. Property of Gresham, Smith and Partners

Adaptive Signal Control Technologies (ASCT) Systems Engineering Process. Presented by: Adam Moser, P.E. Property of Gresham, Smith and Partners Adaptive Signal Control Technologies (ASCT) Systems Engineering Process Presented by: Adam Moser, P.E. Property of Gresham, Smith and Partners ITS Systems Engineering Analysis Putting the Stakeholders

More information

Adaptive Signal Control Technology (ASCT) for Rural Applications Lessons Learned from the Bell Rd ASCT Pilot Project

Adaptive Signal Control Technology (ASCT) for Rural Applications Lessons Learned from the Bell Rd ASCT Pilot Project Adaptive Signal Control Technology (ASCT) for Rural Applications Lessons Learned from the Bell Rd ASCT Pilot Project NRITS & ITS AZ Annual Conference October 2018 Presented by: April Wire, P.E., PTOE ITS

More information

Project Prioritization and Major Projects in Hampton Roads. Aubrey Layne

Project Prioritization and Major Projects in Hampton Roads. Aubrey Layne Project Prioritization and Major Projects in Hampton Roads Aubrey Layne Secretary of Transportation June 2, 2016 Context for Reform Legislature enacted significant transportation revenue package in 2013

More information

Klamath River Renewal Project Dam Removal RFQ Informational Meeting August 29, 2018 Klamath Falls, OR

Klamath River Renewal Project Dam Removal RFQ Informational Meeting August 29, 2018 Klamath Falls, OR Klamath River Renewal Project Dam Removal RFQ Informational Meeting August 29, 2018 Klamath Falls, OR Agenda Time 1:00pm 2:00pm 3:00pm Item Presentation on Design-Build RFQ 1. Room Safety 2. Project Background

More information

Public-Private Private Partnerships for Highway Infrastructure Scan Trip

Public-Private Private Partnerships for Highway Infrastructure Scan Trip Public-Private Private Partnerships for Highway Infrastructure Scan Trip June 2008 International Technology Scanning Program Sponsors: FHWA, AASHTO, NCHRP Outline Scan Trip Overview Host Nation PPP Program

More information

Liquefied Natural Gas to Power IPP Procurement Programme

Liquefied Natural Gas to Power IPP Procurement Programme Liquefied Natural Gas to Power IPP Procurement Programme Request for Qualification 5 October 2016 Outline of Presentation Procurement approach Purpose of the RFQ Framework of the RFQ Project Participants

More information

TRIBOROUGH BRIDGE AND TUNNEL AUTHORITY

TRIBOROUGH BRIDGE AND TUNNEL AUTHORITY TRIBOROUGH BRIDGE AND TUNNEL AUTHORITY FLOOD MITIGATION AT THE HUGH L CAREY TUNNEL AND THE QUEENS MIDTOWN TUNNEL DESIGN-BUILD CONTRACT TUN-MIT-01 R EQUEST FOR E XPRESSIONS OF I NTEREST (EOI) I NFORMATIONAL

More information

Request for Letters of Intent. Using Third Parties to Deliver Infrastructure-to-Vehicle (I2V) September 4, Issued by

Request for Letters of Intent. Using Third Parties to Deliver Infrastructure-to-Vehicle (I2V) September 4, Issued by Request for Letters of Intent Using Third Parties to Deliver Infrastructure-to-Vehicle (I2V) September 4, 2018 Issued by University of Virginia Center for Transportation Studies Charlottesville, Virginia

More information

Liquefied Natural Gas to Power IPP Procurement Programme

Liquefied Natural Gas to Power IPP Procurement Programme Liquefied Natural Gas to Power IPP Procurement Programme Request for Qualification 5 October 2016 Outline of Presentation Procurement approach Purpose of the RFQ Framework of the RFQ Consortium Membership

More information

Air Quality Peer Exchange Support Services. From the: American Association of State Highway and Transportation Officials

Air Quality Peer Exchange Support Services. From the: American Association of State Highway and Transportation Officials REQUEST FOR PROPOSAL FOR Air Quality Peer Exchange Support Services From the: American Association of State Highway and Transportation Officials October 11, 2013 A. INTRODUCTION: The American Association

More information

Pennsylvania Public Private Transportation Partnership Board

Pennsylvania Public Private Transportation Partnership Board Pennsylvania Public Private Transportation Partnership Board Friday, September 27, 2013 511PA /Traveler Information System Request for Information (RFI) issued jointly by PennDOT & Pennsylvania Turnpike

More information

2018 STATE LEGISLATIVE PROGRAM

2018 STATE LEGISLATIVE PROGRAM 2018 STATE LEGISLATIVE PROGRAM The California Transit Association s 2018 State Legislative Program is an integral part of making our vision a reality, and is part and parcel of our mission to further the

More information

INFORMATION MEETING SEPTEMBER 13, 2011 ARUBA

INFORMATION MEETING SEPTEMBER 13, 2011 ARUBA INFORMATION MEETING SEPTEMBER 13, 2011 ARUBA www.p3aruba.com Agenda 08:30 Welcome 08:40 Scope of the project 08:50 Tender procedure 09:20 DBFM Contract 09:30 Coffee Break 10:00 Q&A Session 11:30 Closing

More information

Procurement Documents for Progressive Design-Build Projects

Procurement Documents for Progressive Design-Build Projects Procurement Documents for Progressive Design-Build Projects March 22, 2013 John Awezec, P.E., DBIA HDR Engineering, Inc. John Doller, P.E. Carollo Engineers, Inc. Peter Hughes Executive Director WDBC Model

More information

Metro MotmpoiO.o r...,... lwthority

Metro MotmpoiO.o r...,... lwthority l.o< Aog""' Co""'Y Metro MotmpoiO.o r...,... lwthority One Gateway Plaza Los Angeles, CA 90012-2 952 2 1J.922.2000 Tel metro. net 72 EXECUTIVE MANAGEMENT COMMITTEE JANUARY 15,2015 SUBJECT: ACTION: REVENUE-GENERATING

More information

Transit P3s: Lessons Learned and Resources for Public Sector Sponsors. Jodie Misiak

Transit P3s: Lessons Learned and Resources for Public Sector Sponsors. Jodie Misiak Transit P3s: Lessons Learned and Resources for Public Sector Sponsors Jodie Misiak 1 A New Formula for Infrastructure Investment The BUILD AMERICA BUREAU 2 Build America Bureau Objectives v Consolidate

More information

FY 2016 Annual Audit Report

FY 2016 Annual Audit Report FY 2016 Annual Audit Report TABLE OF CONTENTS I. Compliance with Texas Government Code, Section 2102.015: Posting the Internal Audit Plan, Internal Audit Annual Report, and Other Audit Information on Internet

More information

ADDENDUM NO. 1 Questions and Answers

ADDENDUM NO. 1 Questions and Answers ADDENDUM NO. 1 Questions and Answers Addendum to the Indianapolis Bond Bank RFQ-LJF-2017-004 Request for Qualifications Design and Design Criteria Consulting Services for the Indianapolis-Marion County

More information

Review of Construction Costs and Time Schedules for Virginia Highway Projects

Review of Construction Costs and Time Schedules for Virginia Highway Projects Joint Legislative Audit and Review Commission of the Virginia General Assembly Review of Construction Costs and Time Schedules for Virginia Highway Projects JLARC Staff Briefing December 19, 2000 Introduction

More information

Development District Association of Appalachia (DDAA)

Development District Association of Appalachia (DDAA) Development District Association of Appalachia (DDAA) Request for Qualifications for Management & Administration Services Due Date: November 15, 2017 General Information: Document Type: Request for Qualifications

More information

Managing NEC3 on the M25 DBFO Contract

Managing NEC3 on the M25 DBFO Contract Managing NEC3 on the M25 DBFO Contract Chris Richardson - Director, Asset Contracts & Procurement Tuesday 26 June 2012 Introduction The M25 DBFO Contract is the largest DBFO road contract awarded by the

More information

NCDOT s Performance Based Contracting Experience in Charlotte. Jennifer Brandenburg, PE State Road Maintenance Engineer July 21, 2009

NCDOT s Performance Based Contracting Experience in Charlotte. Jennifer Brandenburg, PE State Road Maintenance Engineer July 21, 2009 NCDOT s Performance Based Contracting Experience in Charlotte Jennifer Brandenburg, PE State Road Maintenance Engineer July 21, 2009 Overview Performance Base Contracting in NC Project Scope Contract Development

More information

Project Delivery Selection Matrix If the Project Delivery Approach Fits, Use It

Project Delivery Selection Matrix If the Project Delivery Approach Fits, Use It Project Delivery Selection Matrix If the Project Delivery Approach Fits, Use It Jim Mallorey, P.E. Metro Wastewater Reclamation District Chris Harper - University of Colorado Boulder January 23, 2014 1

More information

Market Failures Exploring Remedies for Externalities

Market Failures Exploring Remedies for Externalities U4;N3 Market Failures Exploring Remedies for Externalities A market failure is the inability of the market to produce a desirable product or to produce a desirable product in the "right" amount. Market

More information

REQUEST FOR PROPOSALS For Engineering Design Services Street Reconstruction at Various Locations CITY OF SAN MATEO, CALIFORNIA

REQUEST FOR PROPOSALS For Engineering Design Services Street Reconstruction at Various Locations CITY OF SAN MATEO, CALIFORNIA REQUEST FOR PROPOSALS For Engineering Design Services Street Reconstruction at Various Locations CITY OF SAN MATEO, CALIFORNIA The City of San Mateo hereby requests proposals for engineering design services

More information

Building the Roads Ahead Terry Brechtel, Executive Director

Building the Roads Ahead Terry Brechtel, Executive Director Building the Roads Ahead Terry Brechtel, Executive Director Alamo RMA Legislative Priorities 1. Primacy: Assure that local control will be maintained over toll projects and that toll revenues will remain

More information

Should we Expect ITS Programs to Generate Revenue?

Should we Expect ITS Programs to Generate Revenue? Should we Expect ITS Programs to Generate Revenue? ITS California Annual Meeting Carol Kuester Director, Electronic Payments September 23, 2015 Transportation Funding Needs are Tremendous 2 Neglected Improvements

More information

North Central Texas Council of Governments 157

North Central Texas Council of Governments 157 13. Transportation System Safety The goal of the Transportation System Safety Program Area is to improve transportation safety throughout the region by supporting planning efforts to develop safety policies,

More information

LOU LAMBERT, DEPUTY DIRECTOR BUREAU OF TRANSPORTATION PLANNING

LOU LAMBERT, DEPUTY DIRECTOR BUREAU OF TRANSPORTATION PLANNING LOU LAMBERT, DEPUTY DIRECTOR BUREAU OF TRANSPORTATION PLANNING FIVE MAJOR AREAS Evolving Process of Strategic Analysis New Paradigm in Transportation Current Activities in Asset Management Michigan Business

More information

Maryland Department of Transportation Maryland Transit Administration

Maryland Department of Transportation Maryland Transit Administration Special Review Maryland Department of Transportation Maryland Transit Administration Allegations Related to Possible Violations of State Laws, Regulations, and Policies Involving an MTA Management Employee

More information

Federal Highway Administration Cooperative Automated Vehicle (CAV) Update

Federal Highway Administration Cooperative Automated Vehicle (CAV) Update Federal Highway Administration Cooperative Automated Vehicle (CAV) Update AASHTO Committee on Traffic Engineering Kevin Sylvester Office of Transportation Operations Office of Operations Federal Highway

More information

An Ounce of Prevention: Performance-Based Maintenance Contracting

An Ounce of Prevention: Performance-Based Maintenance Contracting An Ounce of Prevention: Performance-Based Maintenance Contracting By Christopher L. Warren, P.E. and Howard Butch Eley You wouldn't buy a new car and drive it 100,000 miles without ever changing the oil.

More information

ENGINEERING SERVICES Phase III Construction Engineering Services for the Benedictine Parkway Improvement Project

ENGINEERING SERVICES Phase III Construction Engineering Services for the Benedictine Parkway Improvement Project VILLAGE OF LISLE REQUEST FOR QUALIFICATIONS ( RFQ ) #1267 ENGINEERING SERVICES Phase III Construction Engineering Services for the Benedictine Parkway Improvement Project DUE BY: FEBRUARY 5, 2018 @ 11:00

More information

Contracting Methods and Risk Management

Contracting Methods and Risk Management Contracting Methods and Risk Management In Tunneling and Underground Construction Michael S Schultz Senior Vice President CDM Smith Boston, Massachusetts September 12, 2016 Topics What is a Contract and

More information

Chapter 9 IMPLEMENTATION AND FUTURE DEVELOPMENTS CHAPTER 9 IMPLEMENTATION AND FUTURE DEVELOPMENTS PAGE 111

Chapter 9 IMPLEMENTATION AND FUTURE DEVELOPMENTS CHAPTER 9 IMPLEMENTATION AND FUTURE DEVELOPMENTS PAGE 111 Chapter 9 IMPLEMENTATION AND FUTURE DEVELOPMENTS CHAPTER 9 IMPLEMENTATION AND FUTURE DEVELOPMENTS PAGE 111 This page intentionally left blank. PAGE 112 MINNESOTA GO MNDOT TRANSPORTATION ASSET MANAGEMENT

More information

Construction Division Update Upcoming Work. Greg Henion, P.E. Deputy State Construction Engineer

Construction Division Update Upcoming Work. Greg Henion, P.E. Deputy State Construction Engineer Construction Division Update Upcoming Work Greg Henion, P.E. Deputy State Construction Engineer Pre-Qualification 2 Why prequalification? Contractor s ability to perform the work: Quality Safety Experience

More information

Training workshop PPP in health sector

Training workshop PPP in health sector EU Health Facility, Vietnam Training workshop in health sector Session 8 Tran Duy Hung Senior and Finance Expert Da Nang, 1-3 December, 2016 1 Content Healthcare considerations project phases 2 Healthcare

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS CONSTRUCTION MANAGEMENT SERVICES OCTOBER 09, 2014 EAST BAY REGIONAL PARK DISTRICT Atlas Road Extension Improvements POINT PINOLE REGIONAL SHORELINE PROPOSALS DUE: 2:00PM, NOVEMBER

More information

Minnesota Department of Transportation. Request for Interest. Personal Rapid Transit (PRT) Viability and Benefits

Minnesota Department of Transportation. Request for Interest. Personal Rapid Transit (PRT) Viability and Benefits Minnesota Department of Transportation Request for Interest Personal Rapid Transit (PRT) Viability and Benefits 1. Introduction The Minnesota Department of Transportation (Mn/DOT) seeks input from local

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1114 LUMINAIRES, SOLID-STATE (LED) APPROVED LIST QUALIFICATION PROCEDURE.

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1114 LUMINAIRES, SOLID-STATE (LED) APPROVED LIST QUALIFICATION PROCEDURE. STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1114 LUMINAIRES, SOLID-STATE (LED) APPROVED LIST QUALIFICATION PROCEDURE July 18, 2014 1114.01 Description 1114.02 Approval 1114.03 Removal from the

More information

Transportation Asset Management Webinar Series

Transportation Asset Management Webinar Series Transportation Asset Management Webinar Series Webinar 34 Integrating PM2 Targets with the TAMP Sponsored by FHWA and AASHTO Webinar 34 October 10, 2018 FHWA-AASHTO Asset Management Webinar Series This

More information

Jim Reed Group Director Environment, Energy and Transportation Presented to Fiscal Analysts Seminar, Seattle, October 2014

Jim Reed Group Director Environment, Energy and Transportation Presented to Fiscal Analysts Seminar, Seattle, October 2014 Evaluating PPPs for Transportation: An Analytical Approach for State Legislators Jim Reed Group Director Environment, Energy and Transportation Presented to Fiscal Analysts Seminar, Seattle, October 2014

More information

Request for Proposal BGE Small Business. Energy Solutions Program. - Responses to Questions from the Bidders. October 12, 2018

Request for Proposal BGE Small Business. Energy Solutions Program. - Responses to Questions from the Bidders. October 12, 2018 Request for Proposal BGE Small Business Energy Solutions Program - s to s from the Bidders October 12, 2018 BGE Small Business Energy Solutions Program - s to s from the Bidders Do you have to be a small

More information

Organization. Project Management Institute, Olympia Chapter Date Nov. 20, 2012

Organization. Project Management Institute, Olympia Chapter Date Nov. 20, 2012 Organization Project Management Institute, Olympia Chapter Date Nov. 20, 2012 Program Overview The Alaskan Way Viaduct Replacement Program includes projects led by the Washington State Department of Transportation,

More information

Route 7 Truck Climbing Lane. RFQ Information Meeting

Route 7 Truck Climbing Lane. RFQ Information Meeting Route 7 Truck Climbing Lane From West Market Street to Route 9 RFQ Information Meeting November 9, 2012 Mark Gibney, PE District Project Manager Ian Millikan, PE APD Project Manager and POC Introduction

More information

Presented By: Debbie Hunt Florida Department of Transportation District Seven Director of Transportation Development October 16, 2013

Presented By: Debbie Hunt Florida Department of Transportation District Seven Director of Transportation Development October 16, 2013 PROJECT MANAGEMENT IN A DOT ENVIRONMENT Presented By: Debbie Hunt Florida Department of Transportation District Seven Director of Transportation Development October 16, 2013 Mission Safe Transportation

More information

RTC Mobility Plan Workshop. North Central Texas Council of Governments July 9, 2015

RTC Mobility Plan Workshop. North Central Texas Council of Governments July 9, 2015 RTC Mobility Plan Workshop North Central Texas Council of Governments July 9, 2015 Agenda 1. Introduction to the Metropolitan Transportation Plan (MTP) 2. New Planning Parameters 3. Emerging Planning and

More information

Evaluating the Potential Economic Efficiency of Project Delivery Options

Evaluating the Potential Economic Efficiency of Project Delivery Options 1 1 1 1 1 1 1 1 0 1 0 1 Paper No. 1-000 Evaluating the Potential Economic Efficiency of Project Delivery Options Patrick DeCorla-Souza 1 Public-Private Partnerships Program Manager Build America Bureau

More information

Integrated Cost Engineering System for Bridge Construction, Repair and Upgrade Projects

Integrated Cost Engineering System for Bridge Construction, Repair and Upgrade Projects Integrated Cost Engineering System for Bridge Construction, Repair and Upgrade Projects Presented at the October 2000 Transportation Estimators Association Conference, Santa Fe, NM Richard Rast, Talisman

More information

Iowa Department of Transportation Intelligent Work Zone Deployments

Iowa Department of Transportation Intelligent Work Zone Deployments Iowa Department of Transportation Intelligent Work Zone Deployments SMARTER WORK ZONES TECHNOLOGY APPLICATIONS CASE STUDY The Every Day Counts Initiative (EDC-3) aims to accelerate the deployment of identified,

More information

State of Michigan Civil Service Commission Capitol Commons Center, P.O. Box Lansing, MI POSITION DESCRIPTION

State of Michigan Civil Service Commission Capitol Commons Center, P.O. Box Lansing, MI POSITION DESCRIPTION CS-214 Rev 11/2013 State of Michigan Civil Service Commission Capitol Commons Center, P.O. Box 30002 Lansing, MI 48909 POSITION DESCRIPTION Position Code 1. TRNSTCHAB97R This position description serves

More information

I-95 Southbound CD Lanes Rappahannock River Crossing Stafford County/ City of Fredericksburg, Virginia. RFQ Information Meeting - November 9, 2016

I-95 Southbound CD Lanes Rappahannock River Crossing Stafford County/ City of Fredericksburg, Virginia. RFQ Information Meeting - November 9, 2016 I-95 Southbound CD Lanes Rappahannock River Crossing Stafford County/ City of Fredericksburg, Virginia RFQ Information Meeting - November 9, 2016 Krishna Potturi, PE Project Manager Suril Shah APD Project

More information

Public Private Partnerships (P3) Management Framework

Public Private Partnerships (P3) Management Framework MAY 2011 Page 2 of 64 Contents SECTION 1 - INTRODUCTION... 7 Purpose... 7 Public Private Partnerships... 7 P3 Model... 7 GNWT Experiences with P3s... 8 Capital Plan... 8 Assessment and Approval Procedures

More information

RFP Restructuring Advisory Committee: Water and Sewer Question and Answer. Question Cut-Off 2/13/17

RFP Restructuring Advisory Committee: Water and Sewer Question and Answer. Question Cut-Off 2/13/17 RFP 2017-0007 Restructuring Advisory Committee: Water and Sewer Question and Answer Question Cut-Off 2/13/17 1. What is the estimated value of the sewer system? Determining an appropriate valuation of

More information

TERMS OF REFERENCE RFP NO.: SALGA/32/2016

TERMS OF REFERENCE RFP NO.: SALGA/32/2016 TERMS OF REFERENCE RFP NO.: SALGA/32/2016 SOUTH AFRICAN LOCAL GOVERNMENT ASSOCIATION (SALGA) HEREBY REQUEST FOR PROPOSALS FOR THE PROGRAMME DESIGN: EMPLOYEE WELLNESS PROGRAMME (EWP) CLOSING DATE: 13 MAY

More information

REGULATORY FRAMEWORK ON PUBLIC PROCUREMENT RULES FOR BUILDING AND MANAGING INFRASTRUCTURES

REGULATORY FRAMEWORK ON PUBLIC PROCUREMENT RULES FOR BUILDING AND MANAGING INFRASTRUCTURES REGULATORY FRAMEWORK ON PUBLIC PROCUREMENT RULES FOR BUILDING AND MANAGING INFRASTRUCTURES THE PROCUREMENT CONTEXT REGULATORY FRAMEWORK 1. Public procurement 1.a. Public contracts and concessions 1.b.

More information

03 July 2006 PRACTITIONER S HANDBOOK AASHTO MANAGING THE NEPA PROCESS FOR TOLL LANES AND TOLL ROADS. AASHTO Center for Environmental Excellence

03 July 2006 PRACTITIONER S HANDBOOK AASHTO MANAGING THE NEPA PROCESS FOR TOLL LANES AND TOLL ROADS. AASHTO Center for Environmental Excellence AASHTO PRACTITIONER S HANDBOOK 03 July 2006 MANAGING THE NEPA PROCESS FOR TOLL LANES AND TOLL ROADS Conducting National Environmental Policy Act (NEPA) studies projects involving toll lanes and toll roads

More information

REQUEST FOR PROPOSAL (RFP) AS NEEDED ENGINEERING DESIGN SERVICES FOR 2019, 2020 & 2021

REQUEST FOR PROPOSAL (RFP) AS NEEDED ENGINEERING DESIGN SERVICES FOR 2019, 2020 & 2021 REQUEST FOR PROPOSAL (RFP) AS NEEDED ENGINEERING DESIGN SERVICES FOR 2019, 2020 & 2021 The Washtenaw County Road Commission (WCRC) invites qualified firms to submit Proposals for As Needed Engineering

More information

Board Safety Task Force

Board Safety Task Force Board Safety Task Force First meeting occurred in June 2005 Purpose What we hoped to accomplish Why Contractor Safety was selected as one of the key components 1 Utility Contractor Safety Our work is changing..

More information

Role of Procurement / Purchasing Within the Authority

Role of Procurement / Purchasing Within the Authority Role of Procurement / Purchasing Within the Authority What is Purchasing s Role / Why Is Purchasing Important? The Authorized entity within the Water Authority that procures the goods / services required.

More information

Long Beach City Auditor s Office

Long Beach City Auditor s Office Long Beach City Auditor s Office Contract Administration Audit Limited Scope Review Report 7 of 10 Utiliworks Consulting, LLC July 1, 2016 Laura L. Doud City Auditor Audit Team: Deborah K. Ellis Assistant

More information

GDOT s Design-Build Program Past, Present and Future

GDOT s Design-Build Program Past, Present and Future GDOT s Design-Build Program Past, Present and Future John D. Hancock, P.E. Assistant State Innovative Program Delivery Engineer September 16, 2013 Agenda Program Overview GA Code 32-2-81 (SB 70) Look Ahead

More information

Conflict of Interest Language

Conflict of Interest Language Project Development - Design Services The Consultant and subconsultants shall disclose in the Transmittal Letters that accompany the Statement of Qualifications (SOQ), all contracts or projects for which

More information

Any discussions or marketing activities related to this specific project.

Any discussions or marketing activities related to this specific project. 08/28/17 Posting Date UNI/FRA-NW 33 Smart Mobility Corridor Project Implementation of the Advanced Transportation and Congestion Management Technologies Deployment Program Grant Project Management Consultant

More information

Building Schools for the Future: Procurement Review

Building Schools for the Future: Procurement Review Building Schools for the Future: Procurement Review ICT in BSF 18 March 2008 Tim Byles Chief Executive Partnerships for Schools Background Strong programme momentum Focus to date on pre-engagement and

More information

Overview & Pavement Update. Thomas Van November 2013

Overview & Pavement Update. Thomas Van November 2013 Overview & Pavement Update Thomas Van November 2013 What is SHRP2? Tools to save lives, save money, save time. Products developed from objective, credible research Solutions that respond to challenges

More information

395 Express Lanes Project Design-Build Procurement Industry Outreach. March 23, 2016

395 Express Lanes Project Design-Build Procurement Industry Outreach. March 23, 2016 395 Express Lanes Project Design-Build Procurement Industry Outreach March 23, 2016 INTRODUCTIONS Karl Rohrer, Head of Delivery, Transurban Susan Shaw, Regional Transportation Program Director, VDOT Sean

More information

Alternate Project Delivery Experience at UOSA and PWCSA

Alternate Project Delivery Experience at UOSA and PWCSA Alternate Project Delivery Experience at UOSA and PWCSA Bob Angelotti, Director of Technical Services at UOSA Samer Beidas, Director of Engineering and Planning at PWCSA Presented at the VWEA 2015 Education

More information

ADDENDUM #2 RFQ Red Line BRT Design Services. All vendors are to accept the information contained herein as the official response of IPTC.

ADDENDUM #2 RFQ Red Line BRT Design Services. All vendors are to accept the information contained herein as the official response of IPTC. Page 1 of 8 ADDENDUM #2 RFQ 15-01-194 Red Line BRT Design Services. February 17, 2015 To: All Vendors of Record RE: Addendum #2 All vendors are to accept the information contained herein as the official

More information

Hydrogen Infrastructure Partnership Program

Hydrogen Infrastructure Partnership Program Program Opportunity Notice for the Implementation of Hydrogen Refueling Stations In the South Coast Air District PON2018-02 April 6, 2018 Section I: Introduction For the past 27 years, the Mobile Source

More information

Contract Administration Section

Contract Administration Section Contract Administration Section 1 Challenges 25,000+ bridges statewide PENNDOT S BRIDGE PROGRAM Currently at 3,200 structurally deficient bridges Approximately 300 bridges become structurally deficient

More information

Ap p e n d i x E. Stat e De s i g n-bu i l d En a b l i n g Stat u t e s f o r Tr a n s p o rtat i o n Pr o j e c t s

Ap p e n d i x E. Stat e De s i g n-bu i l d En a b l i n g Stat u t e s f o r Tr a n s p o rtat i o n Pr o j e c t s Ap p e n d i x E. Stat e De s i g n-bu i l d En a b l i n g Stat u t e s f o r Tr a n s p o rtat i o n Pr o j e c t s a s o f Oc t o b e r 2010 244 1 Alabama Ala. Code 23-2- 140 to 163 Under legislation

More information

NATIONAL GUIDING PRINCIPLES FOR A BUSINESS IMPROVEMENT DISTRICT

NATIONAL GUIDING PRINCIPLES FOR A BUSINESS IMPROVEMENT DISTRICT NATIONAL GUIDING FOR A BUSINESS IMPROVEMENT DISTRICT REVISED APRIL 2018 NATIONAL GUIDING FOR A BID The purpose of this document is to guide developing and established locations on the principles that contribute

More information

Hampton Roads Bridge Tunnel Expansion: Overview of Tunnel Construction Methods

Hampton Roads Bridge Tunnel Expansion: Overview of Tunnel Construction Methods Hampton Roads Bridge Tunnel Expansion: Overview of Tunnel Construction Methods February 21, 2018 James S. Utterback HRBT Project Director Virginia Department of Transportation Ten Hampton Roads Tunnels

More information

Arizona DOT Transportation Systems Management and Operations (TSM&O)

Arizona DOT Transportation Systems Management and Operations (TSM&O) Arizona DOT Transportation Systems Management and Operations (TSM&O) Jim Windsor, PE TSM&O Deputy State Engineer Timothy Tait, Ed.D Communications Director Arizona Department of Transportation April 11,

More information

What?! A Standard LRV RFP? Richard J. Wieczorek

What?! A Standard LRV RFP? Richard J. Wieczorek What?! A Standard LRV RFP? Richard J. Wieczorek S. F. Bay Area Rapid Transit District Department Manager Procurement Oakland, California Agenda History The Document Moving Forward History July 31, 2006

More information

Bonnie Rouse. David LeMieux. State Buildings Program Manager Montana State Energy Office (406)

Bonnie Rouse. David LeMieux. State Buildings Program Manager Montana State Energy Office (406) Montana Association of School Business Officials Sept. 15-16, 2016 Facilities Planning & Financing Bonnie Rouse State Buildings Program Manager Montana State Energy Office brouse@mt.gov (406) 444-6439

More information

BRIEFING TO THE PORTFOLIO COMMITEE ON CORRECTIONAL SERVICES OUTSOURCING SERVICES 09 SEPTEMBER 2009

BRIEFING TO THE PORTFOLIO COMMITEE ON CORRECTIONAL SERVICES OUTSOURCING SERVICES 09 SEPTEMBER 2009 BRIEFING TO THE PORTFOLIO COMMITEE ON CORRECTIONAL SERVICES ON OUTSOURCING SERVICES 09 SEPTEMBER 2009 REPUTATION PROMISE / MISSION The Auditor-General has a constitutional mandate and, as the Supreme Audit

More information

AASHO Road Test and first SHRP are examples of special-purpose research programs. First SHRP research was about ; implementation activities

AASHO Road Test and first SHRP are examples of special-purpose research programs. First SHRP research was about ; implementation activities 1 AASHO Road Test and first SHRP are examples of special-purpose research programs. First SHRP research was about 1987-1993; implementation activities seem to have begun around 1992 with funds from subsequent

More information

Any discussions or marketing activities related to this specific project.

Any discussions or marketing activities related to this specific project. 04-11-19 Posting Date South Sandusky Street Widening and Relocation PID No. Not Assigned City of Mount Vernon Response Due Date: 04-24-19 Communications Restrictions Please note the following policy concerning

More information

Glenbard Wastewater Authority Combined Heat and Power (CHP) Project Case Study

Glenbard Wastewater Authority Combined Heat and Power (CHP) Project Case Study Glenbard Wastewater Authority Combined Heat and Power (CHP) Project Case Study Christopher Buckley & Eider Alvarez October 27, 2015 Presenters: From B&W Wastewater Department - Chicago Office: Chris Buckley,

More information

Precast Concrete Pavement (R05)

Precast Concrete Pavement (R05) Precast Concrete Pavement (R05) 1 Agenda SHRP2 Overview What is SHRP2? Focus Areas Implementation Assistance Technical Product Description Product Implementation Implementation Timeline Questions Source: