Transbay Transit Center: An Opportunity to supply Architecturally Exposed Cast Steel Structural Nodes for San Francisco s New Transit Hub

Size: px
Start display at page:

Download "Transbay Transit Center: An Opportunity to supply Architecturally Exposed Cast Steel Structural Nodes for San Francisco s New Transit Hub"

Transcription

1 Transbay Transit Center: An Opportunity to supply Architecturally Exposed Cast Steel Structural Nodes for San Francisco s New Transit Hub

2 Transbay Transit Center Foundry Opportunity Project requires a total of 3.3-Million lbs of steel castings 296 steel castings from 71 unique geometries Castings weighing from 4,400 to 41,000 lbs Required delivery of components to commence Dec and end Dec Anticipated formal engagement of foundries by March 2013

3 Introductions Jeff Heath Sr. Project Manager, Webcor/Obayashi Gary Krutsch Project Manager, Turner Construction Michael Gray Vice President, Cast Connex Corporation

4 Contract Structure Transbay Joint Powers Authority (TJPA) Agency managing design and construction of the Transbay Transit Center (TTC) Construction Management Oversight (CMO) Turner Construction Design Team Pelli Clarke Pelli Architects, Adamson Associates International Architects, Thornton Tomasetti Structural Engineers Cast Steel Nodes Consultant Cast Connex Corporation Construction Manager/General Contractor (CM/GC) Webcor/Obayashi, Joint Venture Functions as General Contractor for construction of the TTC

5 Contract Structure

6 Contract Structure

7 1. New Intermodal Bus and Rail Station 2. Rail Extension for Caltrain & CHSR 3. New Neighborhood Transbay Transit Center Program

8

9

10

11

12

13

14

15

16

17 Current Program Schedule ( ) Shoring Wall Buttress Start Finish Apr-11 May-12 May-11 Mar Excavation Jan-12 Jan-14 Train Box Feb-13 Oct-14 Lower Concourse Feb-14 Mar-15 Above Grade Superstructure Jun-14 Feb-16 Rough Interiors Oct-14 Dec-16 Finish Interiors Oct-15 Aug-17 Exterior Enclosures Apr-15 Jan-17 Civil Sitework Apr-15 Oct-17 Rooftop Park Oct-15 Oct-17 Bus Ramps Dec-13 Apr-16 Systems Commissioning Apr-16 Oct-17

18 Foundry Contract Scope Foundry to be engaged by TG07.1 Trade Subcontractor by March 2012 Foundry scope of work to include: Foundry engineering, feeding and solidification analysis Production of casting tooling; maintenance and storage of tooling through the duration of the related structural steel fabrication and erection; tooling to remain the property of TJPA Casting production Supplemental post-casting surface finishing on selected exterior surfaces of some nodes

19 Casting Scope Packages Castings broken into Five (5) scope packages Ground Floor Level nodes Bus Deck Level nodes Roof Level nodes Light Column AESS Critical Light Column non-aess Critical A single foundry may be selected to produce nodes from more than one scope package BUT nodes from one package cannot be subdivided between foundry organizations This requirement is set as an additional measure to ensure consistency and to consolidate responsibility

20 Roof Level Bus Deck Level Ground Floor Level

21

22 Cast ConneX has been engaged by TJPA to prepare complete specifications, casting drawings, and 3-dimensional models of the cast nodes A Request for Information (RFI) has been issued via SFSA to gauge foundry interest in this project It is highly recommended that you respond to this RFI if you are interested in participating in this project

23 Ground Floor Nodes 17 Unique geometries; 35 castings 18,700 to 41,000 lbs each

24 Bus Deck Level Nodes 31 Unique geometries; 75 castings 9,100 to 22,600 lbs each

25 Bus Level Nodes 2 Unique geometries; 138 castings 4,400 or 5,400 lbs each

26 Light Column Nodes AESS Critical 17 Unique geometries; 35 castings 5,400 to 12,500 lbs each

27 Light Column Nodes Non-AESS Critical 5 Unique geometries; 16 castings 5,900 to 12,700 lbs each

28 General Specifications Ground, Bus, and Roof Level Nodes ASTM A216 Grade WCC Light Column ASTM A958 Grade SC8620 Class 80/50 Additional Requirements: Charpy Notch Toughness of 25 ft lb at 70- F Limitations on Carbon and CE Machining requirements Special surfacing requirements on some surfaces of some node types (Ground floor and Light Column)

29 TJPA DBE/SBE Programs The TJPA encourages the use of Disadvantaged and Small Business Enterprises on any contract with subcontracting opportunities Certifications accepted from: CA Dept. of General Services (SB, DVBE) CA Unified Certification Program (DBE) SF Human Rights Commission (L/M/WBE) Forms and instructions are included in RFP

30 California Unified Certification Program CUCP is the DBE certification program in California Certifications offered through Caltrans, BART, SFMTA, Samtrans, VTA, Central Contra Costa Transportation Authority Information and forms available at

31 California Department of General Services Office of Small and Disabled Veteran Business Enterprise Services Small Business (SB) or Disabled Veteran Business Enterprise (DVBE) certifications Apply online or download application at

32 San Francisco Human Rights Commission L/M/WBE certification PUC-LBE certification for businesses within the PUC Water System Service Area Go to click on Local Business Enterprise in lower right corner

33 More Information TJPA website TJPA > Doing Business With the TJPA view contract opportunities, register for notification, download programs and forms

34 Questions CONTACT INFORMATION Transbay Joint Powers Authority 201 Mission Street, Suite 2100 San Francisco, CA (415) Fax: (415)

Transbay Transit Center Program

Transbay Transit Center Program Transbay Transit Center Program Quality Management System Manual Revision 1 September 2013 Quality Management System Manual Revision 1 September 2013 Prepared for the Transbay Joint Powers Authority

More information

QA/QC Program Overview. November, 2015

QA/QC Program Overview. November, 2015 QA/QC Program Overview November, 2015 Quality Roles on the Project Construction Management Oversight (CMO-Turner) functions as the TJPA s eyes and ears. Construction Manager/General Contractor (CM/GC-

More information

Caltrain Planning Update

Caltrain Planning Update Caltrain Planning Update Board of Directors November 3, 2016 Agenda Item 14 Planning Initiatives Several key policy and strategic planning studies underway that will: Advance and support the Caltrain Strategic

More information

62 POTOMAC STREET WEST ROXBURY, MA 02132

62 POTOMAC STREET WEST ROXBURY, MA 02132 62 POTOMAC STREET SET P R O J E C T T E A M COVER 1. ALL WORK SHALL BE IN COMPLIANCE WITH ALL APPLICABLE LOCALS BUILDING CODES AND REGULATIONS. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR S REQUIRED FOR CONSTRUCTION

More information

TGO3 - Buttress, Shoring, Buttress - Issued for Bid

TGO3 - Buttress, Shoring, Buttress - Issued for Bid TGO3 - Buttress, Shoring, Buttress - Issued for Bid s are numbered in the order received. numbers missing in the sequence either have been answered or are still under review and will be published in future

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update January 1, 2015 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update March 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: March 1, 2014

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update October 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: October 1, 2014

More information

Management. Construction. Development. WE PROVIDE A complete roster of building services to streamline the construction process

Management. Construction. Development. WE PROVIDE A complete roster of building services to streamline the construction process WE ARE: We are a family-owned construction company providing construction services to general contractors and real estate owners throughout the San Francisco Bay Area. Founded in 2001, Argo Construction

More information

HOLDER CONSTRUCTION COMPANY Superintendents Weekly Activity Report #92 Douthit Hills Student Community, Clemson University Project Joe Jett

HOLDER CONSTRUCTION COMPANY Superintendents Weekly Activity Report #92 Douthit Hills Student Community, Clemson University Project Joe Jett SAFETY» Total Man Hours Worked This Week: 19935» Total Man Hours on Project: 689727» Crafts On Project This Week: 24» OSHA Recordable Rate: 0 November 13, 2016 Page 1 CURRENT CONSTRUCTION ACTIVITIES East

More information

Retrofit of an Existing Californian Hospital to Immediate Occupancy Standards One Year Later Again R. Jay Love, S.E.

Retrofit of an Existing Californian Hospital to Immediate Occupancy Standards One Year Later Again R. Jay Love, S.E. Retrofit of an Existing Californian Hospital to Immediate Occupancy Standards One Year Later Again R. Jay Love, S.E. Degenkolb Engineers MCEER 2006 Annual Meeting Diagnostic & Treatment Building Designed

More information

FDA CDRH Laboratory Silver Spring, Maryland. Executive Summary: Timothy Mueller Structural Option Walter Schneider

FDA CDRH Laboratory Silver Spring, Maryland. Executive Summary: Timothy Mueller Structural Option Walter Schneider Executive Summary: The FDA-CDRH Laboratory is currently being built on the Food and Drug Administration s White Oak Consolidation Campus. It is a four story building with a full below grade ground floor

More information

Project Information Session / Meet and Greet # 3

Project Information Session / Meet and Greet # 3 ATL WEST DECK COMPONENT Project Information Session / Meet and Greet # 3 Holder-Austin-Moody-Bryson, a Joint Venture October 10 th, 2017 Agenda 1. HAMB, a JV Company Overview 2. ATL West Deck Project Description

More information

Capital Rail Constructors: Quarterly Update to MWAA Board of Directors

Capital Rail Constructors: Quarterly Update to MWAA Board of Directors Dulles Corridor Metrorail Project Phase 2, Package A Capital Rail Constructors: Quarterly Update to MWAA Board of Directors Keith Couch Capital Rail Constructors January 2018 Agenda 1. Safety 2. Schedule

More information

PROJECT INFORMATION REPORT INFORMATION. Date: February 25, Owner s Rep: Alrich Lynch. 123 Project Address Drive, Savannah GA 31404

PROJECT INFORMATION REPORT INFORMATION. Date: February 25, Owner s Rep: Alrich Lynch. 123 Project Address Drive, Savannah GA 31404 LDG Consulting Providing Orientation, Direction, and Execution to the Design, Construction, and Real Estate Industries REPORT INFORMATION Date: February 25, 2015 Owner s Rep: Alrich Lynch Electronic Copy:

More information

DESIGN AND DEVELOPMENT COMPETITION

DESIGN AND DEVELOPMENT COMPETITION DESIGN AND DEVELOPMENT COMPETITION PROCESS REPORT DRAFT DECEMBER 12, 2005 STASTNYBRUN ARCHITECTS, INC. TABLE OF CONTENTS EXECUTIVE SUMMARY... 2 DESIGN & DEVELOPMENT COMPETITION OVERVIEW... 3 COMPETITION

More information

Johns Hopkins Graduate Student Housing. Thesis Proposal. 929 North Wolfe Street Baltimore, Maryland Brad Oliver Structural Advisor: Professor Memari

Johns Hopkins Graduate Student Housing. Thesis Proposal. 929 North Wolfe Street Baltimore, Maryland Brad Oliver Structural Advisor: Professor Memari Johns Hopkins Graduate Student Housing 929 North Wolfe Street Brad Oliver Structural Advisor: Professor Memari 12/09/2011 Table of Contents Executive Summary -... 3 Introduction... 4 Structural Systems...

More information

Objective. Who is involved. Before final decisions are made

Objective. Who is involved. Before final decisions are made New San Francisco-Oakland Bay Bridge Self Anchored Suspension Bridge By: Brian Maroney, PE, Dr. Engr. Deputy Toll Bridge Program Manager California Department of Transportation Objective Carry out an open

More information

BUYER MUST MAKE ARRANGEMENTS FOR LOADING AND TRANSPORTING THE CONTAINERS.

BUYER MUST MAKE ARRANGEMENTS FOR LOADING AND TRANSPORTING THE CONTAINERS. LOS ANGELES COUNTY METROPOLITAN REQUEST FOR BID TRANSPORTATION AUTHORITY PROCUREMENT DEPARTMENT BID NO. 021308-S ONE GATEWAY PLAZA LOS ANGELES, CALIFORNIA 90012-2932 TEL. (213) 922-1092 THIS IS NOT AN

More information

Administration Division Public Works Department Anchorage: Performance. Value. Results.

Administration Division Public Works Department Anchorage: Performance. Value. Results. Administration Division Anchorage: Performance. Value. Results. Mission Provide administrative, budgetary, fiscal, and personnel support to ensure departmental compliance with Municipal policies and procedures,

More information

Click to edit Master title style I N D U S T R Y D AY O C T O B E R 1,

Click to edit Master title style I N D U S T R Y D AY O C T O B E R 1, Click to edit Master title style I N D U S T R Y D AY O C T O B E R 1, 2 0 1 4 Welcome Nevada Governor Brian Sandoval Nevada DOT Director Rudy Malfabon, PE Goals Goals Obtain the best value for the costs

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 PROJECT: OWNER: Shell and Core Improvements-1235 Mission Scope 3: Roofs 1 & 3 DATE: December 29, 2017 1235 Mission

More information

The Call Center Balanced Scorecard

The Call Center Balanced Scorecard The Call Center Balanced Scorecard Your Overall Measure of Call Center Performance! MetricNet Best Practices Series Some Common Call Center KPIs Cost Cost per Contact Cost per Minute of Handle Time Quality

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 14 DIVISION: Capital Programs and Construction BRIEF DESCRIPTION: SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY Awarding San Francisco Municipal Transportation Agency

More information

Super Bowl 50 Service Plans, Safety Protocols and Communications

Super Bowl 50 Service Plans, Safety Protocols and Communications Super Bowl 50 Service Plans, Safety Protocols and Communications Bicycle Advisory Committee January 21, 2016 Agenda Item 7 Overview Pre-Super Bowl events throughout the Bay Area Special service Jan. 30

More information

Site Analysis. Site Conditions: Seismic Challenges Strong Winds Average Temperature 69. San Francisco

Site Analysis. Site Conditions: Seismic Challenges Strong Winds Average Temperature 69. San Francisco A Site Analysis Site Conditions: Seismic Challenges Strong Winds Average Temperature 69 San Francisco A Site Analysis A Engineering School of San Francisco Requirements 2015 Innovative Design Gold LEED

More information

Manufacturing Facilities Proposal

Manufacturing Facilities Proposal Manufacturing Facilities Proposal Construction proposal To assist business owners with expansion projects, Wisconsin Public Service has compiled information and renderings of common building types in business

More information

TECHNICAL ASSIGNMENT 2

TECHNICAL ASSIGNMENT 2 PENN STATE AE SENIOR THESIS 2011-2012 TECHNICAL ASSIGNMENT 2 Cost and Schedule Analysis TECHNICAL ASSIGNMENT 2 Cost and Schedule Analysis BRIANNE KYLE Construction Management Thesis Advisor: Dr. Chimay

More information

UCSF Mission Bay & Dogpatch Construction Community Meeting 11/7/2017

UCSF Mission Bay & Dogpatch Construction Community Meeting 11/7/2017 UCSF Mission Bay & Dogpatch Construction Community Meeting Agenda Welcome Project Communications Construction Context Project Updates Minnesota Housing Center for Vision Neuroscience Precision Cancer Medicine

More information

4. Construction Analysis Façade Sequencing

4. Construction Analysis Façade Sequencing 4. Construction Analysis Façade Sequencing Problem Statement As a developer catering to Class-A tenants, the owners of are placing a strong emphasis on the occupancy schedule for the office spaces. The

More information

JMU Capital Projects SWaM Outreach Event Presentations

JMU Capital Projects SWaM Outreach Event Presentations JMU Capital Projects SWaM Outreach Event Presentations Kjellstrom + Lee Contact: Jessica Marcus jmarcus@kjellstromandlee.com Project: College of Business Renovation/Expansion Please contact Kjellstrom

More information

2016 Port of San Francisco Building Code

2016 Port of San Francisco Building Code PORT CODE PROCEDURE NO. : DATE : December 5, 2012 SUBJECT : Permit Process; Inspection TITLE : Special Inspection and Structural Observation Procedures PURPOSE : The purpose of this Port Code Procedure

More information

Existing Project Conditions. General Conditions Estimate. Michael Vergari Construction Management Advisor: Dr. Riley

Existing Project Conditions. General Conditions Estimate. Michael Vergari Construction Management Advisor: Dr. Riley Existing Project Conditions General Conditions Estimate The Center for Health Research and Rural Advocacy is constructed under the supervision of the Geisinger Facilities Division. The project team develops

More information

The Service Desk Balanced Scorecard

The Service Desk Balanced Scorecard The Service Desk Balanced Scorecard Your Overall Measure of Service Desk Performance MetricNet Best Practices Series Your Speaker: Jeff Rumburg Co Founder and Managing Partner, MetricNet, LLC Winner of

More information

Building in Beijing. Steel provides the support for two new high-profile atriums in China s capital.

Building in Beijing. Steel provides the support for two new high-profile atriums in China s capital. international projects Building in Beijing By Mark Sarkisian, P.E., S.E., Neville Mathias, P.E., S.E., and Aaron Mazeika, P.E. Steel provides the support for two new high-profile atriums in China s capital.

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update October 1, 2013 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails

More information

Bonner Bridge Replacement Update:

Bonner Bridge Replacement Update: Bonner Bridge Replacement Update: Jerry D. Jennings, PE - NCDOT Division 1 Engineer Pablo A. Hernandez, - NCDOT Resident Engineer September 18, 2017 Bonner Bridge Replacement Timeline Refresher Bonner

More information

THE PLAZA AT PPL CENTER ALLENTOWN, PA

THE PLAZA AT PPL CENTER ALLENTOWN, PA Building Function and Primary Use The owner of the new Plaza at PPL Center is Liberty Property Trust, but the primary tenant is PPL, which will use the building as the headquarters for its new subsidiaries

More information

Landscape elements will be completed between now and Spring Break by UCO Contractor should have resolved parking lot lighting issues

Landscape elements will be completed between now and Spring Break by UCO Contractor should have resolved parking lot lighting issues February 24, 2017 CAPITAL PROJECT AND PLANNING UPDATE OLD NORTH Phase III and West Campus Entry: Three major components: Bid Set I and II (Interiors) Start Date: Aug. 2014 Completion: Feb. 2017 Size: 41,803

More information

Next PBDG Meeting: PBDG Holiday Gift Giving

Next PBDG Meeting: PBDG Holiday Gift Giving January 2018 UPDATE PROFESSIONAL BUSINESS DEVELOPMENT GROUP A Trade Association for Construction and Professional Services Prosperity Success Profitability Thriving We hope you all enjoyed your holidays

More information

Planned Procurement Opportunities Report. February 2018

Planned Procurement Opportunities Report. February 2018 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the

More information

SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

SPACE TYPE: OUTSIDE PARKING (STRUCTURE) SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table.

More information

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel

More information

Development of a Frame for Wide Openings in Residential Construction

Development of a Frame for Wide Openings in Residential Construction Development of a Frame for Wide Openings in Residential Construction Alan ROSS (formerly) CHH Futurebuild Private Bag 92-106 Auckland, New Zealand Co-authors: Ross Davison, Law Sue Davison Ltd Hank Bier,

More information

Date: Committee. To: From: Through: Subject: to Exceed. Summary. soil on the. original. $130,000 to. conditions. a total.

Date: Committee. To: From: Through: Subject: to Exceed. Summary. soil on the. original. $130,000 to. conditions. a total. Memorandum Date: To: From: Through: Subject: 01.08.15 Finance Committee: Commissioners Cohen Farrell, Tang and Avalos (Ex Officio) RE: Finance Committee January 13, 2015 (Chair), Wiener (Vice Chair), Christensen,

More information

Report For Class D Construction Cost Estimate

Report For Class D Construction Cost Estimate Report For Class D Construction Cost Estimate Douglas McNeill Director Jon Gilford Senior Cost Manager Turner & Townsend 170 Laurier Avenue West Suite 604 Ottawa Ontario K1P 5V5 t: +1 (613) 221 9560 e:

More information

TOC INDEX. Basis Levels in Cattle Markets. Alberta Agriculture Market Specialists. Introduction. What is Basis? How to Calculate Basis

TOC INDEX. Basis Levels in Cattle Markets. Alberta Agriculture Market Specialists. Introduction. What is Basis? How to Calculate Basis TOC INDEX Basis Levels in Cattle Markets Feeder Associations of Alberta Ltd. Alberta Agriculture Market Specialists Introduction Basis levels are an effective tool to use for monitoring feeder and fed

More information

Santa Clara Valley Transportation Authority Board of Directors. General Manager, Nuria I. Fernandez

Santa Clara Valley Transportation Authority Board of Directors. General Manager, Nuria I. Fernandez 8.1.C Date: Current Meeting: Board Meeting: December 6, 2017 December 7, 2017 December 7, 2017 BOARD MEMORANDUM TO: Santa Clara Valley Transportation Authority Board of Directors THROUGH: General Manager,

More information

Cargo Training International

Cargo Training International Cargo Training International Program of Courses for 2018 USA PDF Edition UNITED STATES AND INTERNATIONALLY APPROVED TRAINING PROGRAMS FOR INDUSTRY: CARGO TRAINING INTERNATIONAL LIMITED P O Box 580026,

More information

Planned Procurement Opportunities Report. December 2017

Planned Procurement Opportunities Report. December 2017 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the

More information

Construction Summary

Construction Summary Construction Summary Project Name Item of Work Base Building Add-ons Total Cost Code Site Development $ 18,150.00 $ - $ 18,150.00 Landscaping $ 500.00 $ - $ 500.00 Cast-in-place Concrete $ 7,806.00 $ -

More information

2019 Salt River Siphon Outage Customer Focus Meeting

2019 Salt River Siphon Outage Customer Focus Meeting 2019 Salt River Siphon Outage Customer Focus Meeting Darrin Francom, PE Engineering Services Department Manager Agenda 1. Overview of the Siphon 2. Review of Repair in 2001 3. Results of 2009 Inspection

More information

Thesis Cira Centre Philadelphia. Structural Redesign of Lateral Force Resisting System. Andrew Kauffman Structural Option

Thesis Cira Centre Philadelphia. Structural Redesign of Lateral Force Resisting System. Andrew Kauffman Structural Option Thesis 2005 Cira Centre Philadelphia Structural Redesign of Lateral Force Resisting System Andrew Kauffman Structural Option Presentation Outline Introduction Building Description Structural System Problem

More information

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE Magnetic Shielding

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE Magnetic Shielding SECTION 13096 RADIO FREQUENCY SHIELDING ENCLOSURE Magnetic Shielding Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13096-1 MAGNETIC SHIELDING PART 1 GENERAL 1.1 GENERAL

More information

Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates

Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates Dulles Corridor Metrorail Project Phase 1 & Phase 2 Updates June 30, 2017 Charles W. Stark Executive Project Director Phase 2 Station Tour 2 Phase 1 Phase 1 Cost Summary Quarter Expenditures (Feb, Mar,

More information

Funding was provided by the City of New York via the Hudson Yards Infrastructure Corporation and Hudson Yards Development Corporation.

Funding was provided by the City of New York via the Hudson Yards Infrastructure Corporation and Hudson Yards Development Corporation. FACT SHEET GENERAL INFORMATION The project extends the existing No.7 Line subway service via a 1.5 mile extension from Times Square to the new 34 Street Hudson Yards station located at West 34th Street

More information

MANHATTAN COLLEGE STUDENT COMMONS

MANHATTAN COLLEGE STUDENT COMMONS MANHATTAN COLLEGE STUDENT COMMONS BUDGET CHECK USING GILBANE S COSTADVISOR MODEL OCTOBER 29, 2010 Introduction: Gilbane developed this CostAdvisor Model of the proposed new Manhattan College Student Commons

More information

Building Permit Application Instructions INFORMATION REQUIRED FOR ISSUANCE OF A BUILDING PERMIT

Building Permit Application Instructions INFORMATION REQUIRED FOR ISSUANCE OF A BUILDING PERMIT Building Permit Application Instructions NOTICE: Keep these instructions for your records. Please read and understand these instructions completely prior to completing and submitting your building permit

More information

The Wing Sang Building at 51 East Pender

The Wing Sang Building at 51 East Pender Seismic Retrofit of Historic Wing Sang Building By Dudley R. Rusty Morgan and Lihe John Zhang The Wing Sang Building at 51 East Pender Street, Vancouver, BC, Canada, is the oldest standing building in

More information

Master RFI List: March 22, 2013 Version # 1, 2 & 3

Master RFI List: March 22, 2013 Version # 1, 2 & 3 Master RFI List: March 22, 2013 Version # 1, 2 & 3 1. Can the City confirm the completion and occupancy dates for the Main Street Garage (February 2003?) and Transit Center Garage facilities? Main Street

More information

The courthouse exterior. Courtesy of NLA/HLM Architects. United States. Courthouse Sacramento, Robert D. McCartney, S.E.

The courthouse exterior. Courtesy of NLA/HLM Architects. United States. Courthouse Sacramento, Robert D. McCartney, S.E. The courthouse exterior. Courtesy of NLA/HLM Architects. United States Courthouse Sacramento, Robert D. McCartney, S.E. CA Modern Steel Construction / November 2001 Public entrances to courtrooms occur

More information

SECTION CLIMBING WALLS

SECTION CLIMBING WALLS SECTION 13120-1 PART 1 - GENERAL 1.1 SUMMARY A. This section includes the following: 1. Custom Climbing Wall. B. Related Sections 1. Section Structural Steel 2. Section Rough Carpentry 3. Finishes 1.2

More information

Spring Hill Suites Marriott

Spring Hill Suites Marriott Spring Hill Suites Marriott Project Location: Amarillo, TX Prepared for: Girder Slab Technologies Contact: Daniel Fisher, Sr. January 15, 2008 Prepared by: Monica Stockmann Regional Engineer: Erika Winters-Downey

More information

Measure What You Manage. Michael Cowley, CPMM President CE Maintenance Solutions, LLC

Measure What You Manage. Michael Cowley, CPMM President CE Maintenance Solutions, LLC Measure What You Manage Michael Cowley, CPMM President CE Maintenance Solutions, LLC Define Maintenance Scorecards Discuss Required Prerequisites Explain 10 Common Maintenance Scorecards Review Your Return-on-Investment

More information

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project

More information

Supplemental Concrete Tilt Up Retrofit Plan Check Correction Sheet (2014 LABC)

Supplemental Concrete Tilt Up Retrofit Plan Check Correction Sheet (2014 LABC) Supplemental Concrete Tilt Up Retrofit Plan Check Correction Sheet (2014 LABC) Plan Check Submittal Date: Plan Check / PCIS App #: Job Address: Applicant: P.C. Engineer: (Print first / last name) Phone:

More information

Chicago Transit Authority. Construction Reorganization

Chicago Transit Authority. Construction Reorganization Chicago Transit Authority Construction Reorganization Construction Best Practices Deloitte has assisted with benchmarking and establishing construction best practices Preliminary recommendations include:

More information

Certification Areas Grade Levels Test Titles Fees Early Childhood Education & Elementary Education

Certification Areas Grade Levels Test Titles Fees Early Childhood Education & Elementary Education Missouri Educator Gateway Assessments Missouri Content Assessments Individual Certification Areas, Test Titles, and Costs for 2015-2016 (Including Highly Qualified Teacher (HQT) Requirements) Certification

More information

OMAHA BASEBALL STADIUM. May 21, 2009 Report No. 2

OMAHA BASEBALL STADIUM. May 21, 2009 Report No. 2 OMAHA BASEBALL STADIUM May 21, 2009 Report No. 2 METROPOLITAN ENTERTAINMENT & CONVENTION AUTHORITY MONTHLY CONSTRUCTION PROGRESS REPORT Metropolitan Entertainment & Convention Authority Omaha, Nebraska

More information

SPECIFYING AN O KEEFFE S LADDER

SPECIFYING AN O KEEFFE S LADDER SPECIFYING AN O KEEFFE S LADDER When including an O Keeffe s Aluminum Ladder in your specification, use the following steps to choose the right ladder for your project. Step 1 Select Your Model 531 532

More information

January 18, 2010 Report No. 7 MONTHLY CONSTRUCTION PROGRESS REPORT

January 18, 2010 Report No. 7 MONTHLY CONSTRUCTION PROGRESS REPORT January 18, 2010 Report No. 7 MONTHLY CONSTRUCTION PROGRESS REPORT METROPOLITAN ENTERTAINMENT & CONVENTION AUTHORITY MONTHLY CONSTRUCTION PROGRESS REPORT Metropolitan Entertainment & Convention Authority

More information

ST ANNE S CATHOLIC CHURCH EXISTING CONDITIONS REPORT 84 AUSTIN ROAD, SEAFORD

ST ANNE S CATHOLIC CHURCH EXISTING CONDITIONS REPORT 84 AUSTIN ROAD, SEAFORD EXISTING CONDITIONS REPORT 84 AUSTIN ROAD, SEAFORD JULY 2016 INTRODUCTION This report has been prepared to assist with the review of the existing conditions at the existing St Anne s Catholic Church at.

More information

Totaling approximately 617,000

Totaling approximately 617,000 Totaling approximately 617,000 sq. ft, the mixed-use Embassy Suites hotel development is among the largest of several newly built hotels in the business district adjoining New York s bustling Wall Street

More information

INOVA Office Building I. Adolfson & Peterson Construction. Keri Burson:

INOVA Office Building I. Adolfson & Peterson Construction. Keri Burson: INOVA Office Building I Adolfson & Peterson Construction Keri Burson: kburson@a-p.com; 303-363-7101 Category #9 Best Building Project General Contractor ($10 - $40 Million) Why this project should win

More information

SJI Updates Expanded Load Tables for Noncomposite Joists / Joist Girders and Development of New Composite Joist Series

SJI Updates Expanded Load Tables for Noncomposite Joists / Joist Girders and Development of New Composite Joist Series SJI Updates Expanded Load Tables for Noncomposite Joists / Joist Girders and Development of New Composite Joist Series SUMMARY David Samuelson Steel joists are growing in recognition as being a very economical

More information

The designer shall also submit additional information required by the University as described and underlined below.

The designer shall also submit additional information required by the University as described and underlined below. I. Structural Engineering Submissions The designer shall submit all information required by the State Construction Office (SCO) as described in the State Construction Manual Chapter 300 - Project Design

More information

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) Factory Name: Karardi, Shibpur, Narsingdi, Narsingdi Dhaka Bangladesh 10 May 2013 The Alliance for Bangladesh Worker Safety Page 1/15 10 May 2013 Introduction

More information

Brad Cordek. Lighting - Recessed compact fluorescent faculty, offices, classrooms.

Brad Cordek. Lighting - Recessed compact fluorescent faculty, offices, classrooms. Project Overview - Dates of Construction: Dec. 2004 May 2006 Project Size: Approx. 66,500 square feet Cost Information: GMP contract $21.8 million Project Delivery: Design-Bid-Build Building Description

More information

CITY OF CALABASAS RESIDENTIAL PLAN REQUIREMENTS 1 OF 5 8/2017 PLAN INFORMATION

CITY OF CALABASAS RESIDENTIAL PLAN REQUIREMENTS 1 OF 5 8/2017 PLAN INFORMATION 1 PLAN INFORMATION Residential plans must be legible and capable of digital scanning. All sheets shall be the same size and distinctly labeled with a sheet title and number. The minimum dimension of the

More information

Planned Procurement Opportunities Report. November 2017

Planned Procurement Opportunities Report. November 2017 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the

More information

Planned Procurement Opportunities Report. January 2018

Planned Procurement Opportunities Report. January 2018 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted on the

More information

HQ Building Renovation. Mark Focht, President Nancy Somerville, EVP Michael O Brien, CFO

HQ Building Renovation. Mark Focht, President Nancy Somerville, EVP Michael O Brien, CFO HQ Building Renovation Mark Focht, President Nancy Somerville, EVP Michael O Brien, CFO Agenda Roll Call Introduction Presentation of Design Concepts and Cost Estimate Financing Options and Recommendation

More information

Section 5 - Project Logistics

Section 5 - Project Logistics Section 5 - Project Logistics The project schedule for the Pearland Recreation Center and Natatorium begins with commencement of design on March 1, 2007 and ends with substantial completion on May 12,

More information

QUALITY CONTROL LABORATORIES, LLC th Street, Suite 102 Woodside, New York 11377

QUALITY CONTROL LABORATORIES, LLC th Street, Suite 102 Woodside, New York 11377 This is to signify that QUALITY CONTROL LABORATORIES, LLC. 25-26 50 th Street, Suite 102 Woodside, New York 11377 Special Inspection Agency SIA-203-NY has demonstrated compliance with the IAS Accreditation

More information

Kennedy Krieger Institute Outpatient Medical Center Baltimore, Maryland

Kennedy Krieger Institute Outpatient Medical Center Baltimore, Maryland Kennedy Krieger Institute Katie Sennett - CM Senior Thesis Advisor: Dr. Messner April 9, 2008 Kennedy Krieger Institute Project Team Construction Management Estimated Project Cost: $35,000,000 Size: 115,000

More information

Anaheim Regional Transportation Intermodal Center (ARTIC) 2014 AIA TAP / BIM Awards

Anaheim Regional Transportation Intermodal Center (ARTIC) 2014 AIA TAP / BIM Awards Anaheim Regional Transportation Intermodal Center (ARTIC) 2014 AIA TAP / BIM Awards Project Overview The Anaheim Regional Transportation Intermodal Center (ARTIC) combines the heritage and civic importance

More information

Management and Integration of Data and Modeling at Santa Clara County Congestion Management Agency

Management and Integration of Data and Modeling at Santa Clara County Congestion Management Agency Management and Integration of Data and Modeling at Santa Clara County Congestion Management Agency VTA Modeling and GIS Group Peter Chen ITE SF Bay Area Annual Modeling Workshop April 29, 2015 Outlines

More information

Reducing Peak Energy Demand: The Hidden Benefit of Cool Roofs

Reducing Peak Energy Demand: The Hidden Benefit of Cool Roofs Reducing Peak Energy Demand: The Hidden Benefit of Cool Roofs Dr. James L. Hoff, DBA, TEGNOS Research, Inc., Keith Gere and Robert Carnick, Duro-Last Inc. November 11, 2014 MW Peak Energy Demand 30,000

More information

PT Slab Deflections. What is acceptable? By Douglas Sarkkinen, PE,SE Senior Structural Engineer Otak, Inc PTI Annual Conference, Kansas City, MO

PT Slab Deflections. What is acceptable? By Douglas Sarkkinen, PE,SE Senior Structural Engineer Otak, Inc PTI Annual Conference, Kansas City, MO PT Slab Deflections What is acceptable? By Douglas Sarkkinen, PE,SE Senior Structural Engineer Otak, Inc. 2011 PTI Annual Conference, Kansas City, MO May 1, 2011 Types of Buildings Presentation Overview

More information

L+M Cancer Center IPD: Embracing a True Collaborative Team Approach

L+M Cancer Center IPD: Embracing a True Collaborative Team Approach L+M Cancer Center IPD: Embracing a True Collaborative Team Approach WHO WE ARE Who We Are Brenda Bullied Owner, Lawrence + Memorial Hospital Josh DiGloria Construction Manager, Suffolk Construction Pam

More information

Introduction. Andy Penev Construction Management CityCenterDC Parcel 1 Washington, D.C.

Introduction. Andy Penev Construction Management CityCenterDC Parcel 1 Washington, D.C. Introduction Andy Penev Construction Management Andy Penev Construction Management Size: 257,500 SF Location: Project Cost: $48 million Contract Type: (4) GMP Delivery Method: Design-Bid-Build Schedule:

More information

Addendum #02 New County Office Building Responses to RFP Questions

Addendum #02 New County Office Building Responses to RFP Questions Sam Lin Manager Project Development Unit 1402 Maple Street Redwood City, CA 94063 650-369-4766 September 22, 2017 slin@smcgov.org Addendum #02 New County Office Building Responses to RFP Questions To All

More information

Elevated Slab Sequence

Elevated Slab Sequence Elevated Slab Sequence The following group of photos shows the sequence for installa4on of a one- way elevated slab. (Slab & Beam with Reinforcing & Post- Tensioning) Columns Placed & Form Support (Scaffolding)

More information

DATE: August 22, All Proposers

DATE: August 22, All Proposers DATE: August 22, 2017 TO: All Proposers RE: Addendum No. 2 RFP for the Design of Lighting Upgrades for David L. Lawrence Convention Center Roadways and Sidewalks and North Shore Garage Interior and Exterior

More information

DSA Inspectors. Arcadia USD. Arcadia HS Campus Enrichment. Inspection Report Apr 2014

DSA Inspectors. Arcadia USD. Arcadia HS Campus Enrichment. Inspection Report Apr 2014 DSA Inspectors Arcadia USD Arcadia HS Campus Enrichment Inspection Report Apr 2014 Architect DSA Application No. A03-111889 33 Narcissa Drive, Rancho Palos Verdes, CA 90275 (626) 786-4331 Info@KnowlandInc.com

More information

HOLDER CONSTRUCTION COMPANY Superintendent s Weekly Activity Report #139 Douthit Hills Student Community, Clemson University Project Tony Greene

HOLDER CONSTRUCTION COMPANY Superintendent s Weekly Activity Report #139 Douthit Hills Student Community, Clemson University Project Tony Greene October 6, 2017 Page 1 CURRENT CONSTRUCTION ACTIVITIES EAST ZONE & SITE Completed Hardscapes East of Building C. Completed Building D Dumpster Pad. Completed Brick on Site Wall North of Building D. Completed

More information

Project Address: Name of Person Completing Form:

Project Address: Name of Person Completing Form: Statement of Inspections This form is provided as a way to list aspects of the project that require special inspection and testing in accordance with IBC Sections 107.1, 1704, and 1705 and define duties

More information

Section Safety Section Cleanup. None Required

Section Safety Section Cleanup. None Required January 2000 Page 1 of 6 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED SECTIONS PART 2 PRODUCTS The General Conditions of the Contract, General Requirements, and Supplemental

More information

Material Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey sqft.spf] Page 1 of 5

Material Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey sqft.spf] Page 1 of 5 Material Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey 01-2320 sqft.spf] Page 1 of 5 PREPARATION PRELIM PERMITS & FEES Building Permit 1 each 2200.00 _ 2200.00

More information