Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460)
|
|
- Jonathan Caldwell
- 6 years ago
- Views:
Transcription
1 Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460) Operation Name: Bahia Integrated State Highway Management Project Project Stage: Implementation Seq.No: 11 Status: ARCHIVED Archive Date: 26-Jul-2011 (P095460) Country: Brazil Approval FY: 2007 Product Line: IBRD/IDA Region: LATIN AMERICA AND CARIBBEAN Lending Instrument: Sector Investment and Maintenance Loan Implementing Agency(ies): DERBA-Departamento de Infra-estrutura de Transportes da Bahia Key Dates Board Approval Date 14-Nov-2006 Original Closing Date 30-Sep-2013 Planned Mid Term Review Date Last Archived ISR Date 26-Jul-2011 Effectiveness Date 06-Dec-2007 Revised Closing Date 30-Sep-2013 Actual Mid Term Review Date Project Development Objectives Project Development Objective (from Project Appraisal Document) The Project's ultimate development objective is to increase effective use of the state road infrastructure, with an aim at stimulating higher economic growth. Has the Project Development Objective been changed since Board Approval of the Project? Yes No Component(s) losure Authorized Public Disclosure Authorized Component Name Component Cost Highway Rehabilitation and Maintenance Institutional Strengthening Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Satisfactory Satisfactory Overall Risk Rating Low Low Implementation Status Overview Project implementation is satisfactory with 93% of all the resources from the loan already disbursed -- approx km rehabilitated to date -- and most of the Project Institutional Strengthening activities either in bidding or in execution phases. Locations No Location data has been entered Page 1 of 5
2 Results Project Development Objective Indicators % reduction in average land transport freight rates on selected itineraries (cum.) Text Value 0% reduction 6% reduction The study that will monitor this indicator is in procurement phase. Procurement has moved forward as the bidding documents are being finalized. % increase in use of road transport infrastructure on selected itineraries (as Text Value 0% increase 12% increase measured in veh.-km. increase relatively to 2005 levels ) (cum.) The study that will monitor this indicator is in procurement phase. Procurement as moved forward as DERBA is currently analyzing the bids for the surveys. Intermediate Results Indicators % increase of State paved network extension Text Value 0% increase 12.4% 18% increase under result-based contracts (cum.) Corresponds to the km of the BA state highway network under CREMA. Target value based on 1200 km included in PREMAR is rather 13% % of network traffic traveling on paved roads in Text Value 50% 73% 80% good conditions (cum.) Integrated road planning and management system operational Text Value System not operational System upgrading on-going. System operational Page 2 of 5
3 # of regional offices (residencias) operating Text Value DERBA's information systems on-line (cum.) All DERBA regional offices access central information systems. # of staff weeks of training for DERBA staff Text Value (cum.) No significant progress, as other institutional strengthening activities were prioritized. # of technical audits realized annually by the Text Value each year starting in year 2 Quality Group 12 audits carried out in 2011 State multimodal strategy defined Text Value No strategy Strategy defined Data warehouse system for PELTBAHIA operational Plan under implementation to optimize logistics impacts on the development of Salvador Metropolitan Region Geo-referenced social and economic database in operation AGERBA's normative body, and analysis/ supervision capacity consolidated Date 02-Jan Dec Dec-2011 Bidding process for the PELTBAHIA study on-going Text Value No data warehouse Data warehouse operational Bidding process to procure data warehouse on-going Text Value No plan Study on-going. Plan developed Date 02-Jan Dec Dec-2011 Text Value No database Database in operation Bidding process for the database setup study ongoing Text Value No capacity consolidation Capacity consolidated Page 3 of 5
4 This activity will not be undertaken. # of feasibility studies for PPP (cum.) Text Value No feasibility study 3 4 # of staff weeks of training for AGERBA staff (cum.) Concession BA93, PPP road terminal Feira de Santana, PPP Ferry-boat Text Value The MBA course for AGERBA staff will not be organized. Data on Financial Performance (as of 25-Oct-2011) Financial Agreement(s) Key Dates Project Loan No. Status Approval Date Signing Date Effectiveness Date Closing Date P IBRD Effective 14-Nov Sep Dec Sep-2013 Disbursements (in Millions) Project Loan No. Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P IBRD Effective USD Disbursement Graph Page 4 of 5
5 Key Decisions Regarding Implementation / Restructuring History Level two Approved on 14-Sep-2010 Related Projects There are no related projects. Page 5 of 5
Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Bahia Integrated State Highway Management Project (P095460) Operation Name: Bahia Integrated
More informationImplementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Operation
More informationImplementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Operation
More informationImplementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Pelotas - Rio Grande do Sul Integrated Municipal Development Program (APL) (P094199) Operation
More informationImplementation Status & Results Chile Ministry of Public Works Institutional Strengthening TAL (P102931)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Chile Ministry of Public Works Institutional Strengthening TAL (P102931) Operation Name: Ministry
More informationImplementation Status & Results Brazil Rio de Janeiro Mass Transit Project II (P111996)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Rio de Janeiro Mass Transit Project II (P111996) Operation Name: Rio de Janeiro Mass Transit
More informationPublic Disclosure Copy. Public Disclosure Copy. The World Bank
Public Disclosure Authorized Public Disclosure Authorized losure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Rio de Janeiro Sustainable Integrated Ecosystem
More informationImplementation Status & Results India Andhra Pradesh Road Sector Project (P096021)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021) Operation Name: Andhra Pradesh Road Sector Project
More informationImplementation Status & Results India Andhra Pradesh Road Sector Project (P096021)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India Andhra Pradesh Road Sector Project (P096021) Operation Name: Andhra Pradesh Road Sector Project
More informationImplementation Status & Results Brazil Rio Grande do Norte Integrated Water Resources Management (P089929)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Rio Grande do Norte Integrated Water Resources
More informationImplementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Western Indonesia National Roads Improvement Project (P090990) Operation Name: Western
More informationImplementation Status & Results Africa WAPP APL 2 - OMVS Felou Hydroelectric Project (P094916)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Africa WAPP APL 2 - OMVS Felou Hydroelectric Project (P094916) Operation Name: WAPP APL 2 - OMVS
More informationImplementation Status & Results Cameroon Agricultural Competitiveness Project (P112635)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Cameroon Agricultural Competitiveness Project (P112635) o C Operation
More informationImplementation Status & Results Indonesia ID-Domestic Gas Market Development Project (P077175)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia ID-Domestic Gas Market Development Project
More informationImplementation Status & Results Brazil Sustainable Cerrado Initiative (P091827)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Sustainable Cerrado Initiative (P091827) Operation Name: Sustainable Cerrado Initiative (P091827)
More informationImplementation Status & Results Indonesia Barefoot Engineers III (P131387)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Barefoot Engineers III (P131387) Operation
More informationImplementation Status & Results Iraq IQ-TF EMERG. WATER, SANITATION & URBAN (P087910)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Iraq IQ-TF EMERG. WATER, SANITATION & URBAN (P087910) Operation Name: IQ-TF EMERG. WATER, SANITATION
More informationImplementation Status & Results Brazil Energy Sector Technical Assistance Project (P076977)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Energy Sector Technical Assistance Project (P076977) Operation Name: Energy Sector Technical
More informationImplementation Status & Results Nicaragua Second Agricultural Technology Project (P087046)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Nicaragua Second Agricultural Technology Project (P087046) Operation Name: Second Agricultural Technology
More informationThe World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report
Public Disclosure Authorized Public Disclosure Copy AFRICA Malawi Agriculture Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 13 ARCHIVED on 04-Nov-2015 ISR21002 Implementing Agencies:
More informationImplementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112) Operation Name: QUALITY PROTECT (GEF) (P085112)
More informationImplementation Status & Results India Rajasthan Rural Livelihoods Project (RRLP) (P102329)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India Rajasthan Rural Livelihoods Project (RRLP) (P102329) Operation Name: Rajasthan Rural Livelihoods
More informationImplementation Status & Results Brazil National Biodiversity Mainstreaming and Institutional Consolidation Project (P094715)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil National Biodiversity Mainstreaming and Institutional Consolidation Project (P094715) Operation
More informationImplementation Status & Results Brazil National Biodiversity Mainstreaming and Institutional Consolidation Project (P094715)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil National Biodiversity Mainstreaming and Institutional Consolidation Project (P094715) Operation
More informationImplementation Status & Results Indonesia Geothermal Power Generation Development (P099757)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Geothermal Power Generation Development
More informationImplementation Status & Results Vietnam Second Transmission and Distribution Project (P084871)
losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Vietnam Second Transmission and Distribution Project
More informationImplementation Status & Results Benin Benin Emergency Urban Env. Project (P113145)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Benin Benin Emergency Urban Env. Project (P113145) Operation Name: Benin Emergency Urban Env. Project
More informationImplementation Status & Results Nicaragua Second Agricultural Technology Project (P087046)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Nicaragua Second Agricultural Technology Project (P087046) Operation Name: Second Agricultural Technology
More informationImplementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Bosnia and Herzegovina QUALITY PROTECT (GEF) (P085112) Operation Name: QUALITY PROTECT (GEF) (P085112)
More informationThe World Bank AO-Market Oriented Smallholder Agriculture Project (P093699)
Public Disclosure Authorized AFRICA Angola Agriculture Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 14 ARCHIVED on 06-Nov-2015 ISR21246 Implementing Agencies: Ministry of Agriculture
More informationImplementation Status & Results Brazil National Biodiversity Mainstreaming and Institutional Consolidation Project (P094715)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil National Biodiversity Mainstreaming and Institutional Consolidation Project (P094715) Operation
More informationThe World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report
Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Transport Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 13 ARCHIVED on 17-Jun-2015 ISR19767 Implementing Agencies: Hanoi Urban
More informationThe World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report
Public Disclosure Authorized Public Disclosure Copy AFRICA Malawi Agriculture Global Practice IBRD/IDA Specific Investment Loan FY 2008 Seq No: 14 ARCHIVED on 30-Jun-2016 ISR23059 Implementing Agencies:
More informationImplementation Status & Results Brazil BR GEF Rio Grande do Sul Biodiversity (P086341)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil BR GEF Rio Grande do Sul Biodiversity (P86341) o C Operation
More informationPublic Disclosure Copy. Implementation Status & Results Report Indonesia: Scholarships Prog. for Strengthening Reforming Institutions (P118150)
Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Governance Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 9 ARCHIVED on 05-Jan-2016 ISR22346 Implementing Agencies: BAPPENAS,
More informationThe World Bank. Key Dates. Project Development Objectives. Component(s) Public Disclosure Copy Overall Ratings
Implementation Status & Results Benin Benin Emergency Urban Env. Project (P113145) Operation Name: Benin Emergency Urban Env. Project (P113145) Project Stage: Implementation Seq.No: 3 Status: ARCHIVED
More informationPublic Disclosure Copy. Implementation Status & Results Report Indonesia: Scholarships Prog. for Strengthening Reforming Institutions (P118150)
Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Public Sector Governance Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 8 ARCHIVED on 22-May-2015 ISR18498 Implementing Agencies:
More informationThe World Bank Pernambuco Rural Economic Inclusion (P120139)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF PERNAMBUCO RURAL ECONOMIC INCLUSION APPROVED ON MARCH 6, 2012 TO STATE
More informationName Previous Rating Current Rating
Public Disclosure Authorized Public Disclosure Copy MIDDLE EAST AND NORTH AFRICA Egypt, Arab Republic of Environment & Natural Resources Global Practice Global Environment Project Investment Project Financing
More informationThe World Bank KI: Telecommunications and ICT Development Project (P126324)
Public Disclosure Authorized EAST ASIA AND PACIFIC Kiribati Transport & ICT Global Practice IBRD/IDA Technical Assistance Loan FY 2013 Seq No: 7 ARCHIVED on 15-Jun-2016 ISR23726 Implementing Agencies:
More informationINDONESIA: IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY (KIAT GURU)
Public Disclosure Authorized INDONESIA: IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY (KIAT GURU) (P159191) EAST ASIA AND PACIFIC Indonesia Social, Urban, Rural and Resilience Global Practice Global
More informationThe World Bank Sustainable Land Management Project (P133133)
Public Disclosure Authorized AFRICA Ethiopia Environment & Natural Resources Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 9 ARCHIVED on 04-Dec-2017 ISR28418 Implementing Agencies:
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower(s)
More informationBusiness & Co-financing Opportunities in the Transport Sector
Business & Co-financing Opportunities in the Transport Sector Outline 1. Overview of IDB Transport 2. IDB support: Initiatives in transport 3. Business opportunities Overview of IDB Transport Vice-president
More informationThe World Bank Ethiopia: Supporting Open Data Initiative (P156400)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF ETHIOPIA: SUPPORTING OPEN DATA INITIATIVE APPROVED ON OCTOBER 15, 2015
More informationImplementation Status & Results Report Coastal Watersheds Conservation in the Context of Climate Change Project (P131709)
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Mexico Environment & Natural Resources Global Practice Global Environment Project Investment Project Financing FY 2014 Seq No: 9 ARCHIVED on 30-Oct-2017
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF
Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY Report No: RES22361 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
More informationFOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING THE FOREST PROTECTION AND REFORESTATION PROJECT
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A PROPOSED PROJECT
More informationSECTOR ASSESSMENT (SUMMARY): TRANSPORT (RAIL TRANSPORT [NONURBAN])
Railway Rolling Stock Project (RRP BAN 49094) SECTOR ASSESSMENT (SUMMARY): TRANSPORT (RAIL TRANSPORT [NONURBAN]) Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Bangladesh s transport
More informationBNDES support to Infrastructure
BNDES support to Infrastructure 32th German-Brazilian Economy Meeting Hamburg, Germany September 1st, 2014 Claudia Cristina de Campos Manager of the Logistics Department - Infrastructure Division AGENDA
More informationL/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Dec ,000, Original Commitment 50,000,
Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020344 Public Disclosure Authorized Project ID P106702 Country Brazil Project Name BR Integr. Solid
More informationFOR OFFICIAL USE ONLY
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A Report No:
More informationPUBLIC DISCLOSURE AUTHORISED
PUBLIC DISCLOSURE AUTHORISED CARIBBEAN DEVELOPMENT BANK EXECUTIVE SUMMARY WITH MANAGEMENT RESPONSE PROJECT COMPLETION VALIDATION REPORT EXPANSION OF THE GRANTLEY ADAMS INTERNATIONAL AIRPORT - BARBADOS
More informationSUPPLY CHAIN EXCELLENCE IN WIDEX. June 2016
SUPPLY CHAIN EXCELLENCE IN WIDEX June 2016 AGENDA 1. Presentation of Widex 2. The first year Creating a solid base 3. The second year Stabilizing the performance 4. The next steps Unleashing the competitive
More informationSUMMARY OF PROJECT PERFORMANCE
Additional Financing of Ha Noi Metro Rail System Project (Line 3: Nhon Ha Noi Station Section) (RRP VIE 40080) A. Background SUMMARY OF PROJECT PERFORMANCE 1. The Ha Noi Metro Rail System Project (Line
More informationMinnesota District Freight Plans - Work Plan
Minnesota District Freight Plans - Work Plan Overview of Tasks and Deliverables The work will be completed in six tasks. Each of these tasks is described in detail in the following section. The District
More informationRESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING INDIA - CAPACITY BUILDING FOR INDUSTRIAL POLLUTION MANAGEMENT APPROVED ON JUNE 3, 2010
Public Disclosure Authorized The World Bank REPORT NO.: RES29424 Public Disclosure Authorized Public Disclosure Authorized RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF INDIA - CAPACITY BUILDING
More informationIMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD and IBRD-80330) ON A LOAN IN THE AMOUNT OF EURO MILLION (US$ MILLION EQUIVALENT)
Public Disclosure Authorized Document of The World Bank Report No: ICR00003698 Public Disclosure Authorized Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-47840 and IBRD-80330)
More informationL/C/TF Number(s) Closing Date (Original) Total Financing (USD) IBRD Sep ,000, Original Commitment 550,000,
Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020046 Public Disclosure Authorized Operation ID P132768 Country Brazil Operation Name BR-Pernambuco
More informationIMPLEMENTATION COMPLETION AND RESULTS REPORT (TF-95978) ON A GRANT FROM THE GLOBAL ENVIRONMENT FACILITY TRUST FUND IN THE AMOUNT OF US$8.
Public Disclosure Authorized Document of The World Bank Report No.: ICR00003829 IMPLEMENTATION COMPLETION AND RESULTS REPORT Public Disclosure Authorized Public Disclosure Authorized (TF-95978) ON A GRANT
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower(s) Implementing Agency Environmental Category Date PID Prepared/ Updated
More informationRuta del Sol. Ruta del Sol: Lessons learned PPP Days 2012
Ruta del Sol: Lessons learned PPP Days 2012 1 Project Context Colombia's main corridor: 1,071 km Connects interior with the Caribbean 78 km Greenfield 993 km Rehabilitation, geometry improvement expansion,
More informationFinancial Results Meeting: The 1st 3 Months of FY Ending March (April 1, 2016 June 30, 2016) August 9, 2016
Financial Results Meeting: The 1st 3 Months of FY Ending March 2017 (April 1, 2016 June 30, 2016) August 9, 2016 Unification of Accounting Period Unify accounting period (financial reporting period) of
More informationTelecommunication Expansion Project (II)
Ghana Telecommunication Expansion Project (II) Report Date: October, 2002 Field Survey: July, 2001 1. Project Profile and Japan s ODA Loan Project Site Switchboard System (Accra Station) 1.1 Background
More informationCountry Practice Area(Lead) Additional Financing Brazil Water P125829
Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020959 Public Disclosure Authorized Public Disclosure Authorized Project ID P006553 Project Name BR
More informationPPP capability. global vision local knowledge
PPP capability global vision local knowledge summary The following pages give an illustration of Roughton's background, technical expertise and the sectors in which we serve our clients. It also gives
More informationSpot-market Rate Indexes: Truckload Transportation. Dr. Christopher Caplice
Spot-market Rate Indexes: Truckload Transportation Author: Advisor: Sponsor: Andrew Bignell Dr. Christopher Caplice Coyote Logistics An index is a statistical measure of changes over time in a representative
More informationLEGAL AND INSTITUTIONAL FRAMEWORK FOR PUBLIC PRIVATE PARTNERSHIP IN VIETNAM
LEGAL AND INSTITUTIONAL FRAMEWORK FOR PUBLIC PRIVATE PARTNERSHIP IN VIETNAM Dinh Trong Thang, Ph.D Central Institute for Economic Management Da Nang, November 2015 Introduction - Vietnam has a strong demand
More informationSTATUS ON DRY PORTS DEVELOPMENT IN LAO PDR
MINISTRY OF PUBLIC WORKS AND TRANSPORT. LAO PDR 1 st Meeting of Working Group on Dry Ports of International Importance Bangkok, 25 26 November 2015 STATUS ON DRY PORTS DEVELOPMENT IN LAO PDR Phanthaphap
More informationLao PDR: Southeast Asia Disaster Risk Management Project Procurement Plan (As of November 15, 2017)
Public Disclosure Authorized I. General Lao PDR: Southeast Asia Disaster Risk Project Plan (As of November 15, 2017) Public Disclosure Authorized Public Disclosure Authorized II. 1. Project information:
More informationDominican Republic Mid-Term Report. Pedro García Brito Climate Change Director Focal Point for REDD+
Dominican Republic Mid-Term Report Pedro García Brito Climate Change Director Focal Point for REDD+ Dominican Republic and Climate Change The Dominican Republic s Constitution: declares as a national priority
More informationThe World Bank Burkina Faso - Bagre Growth Pole Project (P119662)
Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF BURKINA FASO - BAGRE GROWTH POLE PROJECT APPROVED ON JUNE 21, 2011 TO
More informationSunrise Project South I-205 Corridor Improvement Project
Sunrise Project South I-205 Corridor Improvement Project January 24, 2007 Sunrise and I-205 Project Summary Conclusions Sunrise Scoping Study Key Results South I-205 Scoping Study Key Results South I-205
More informationInsert Cover Image using Slide Master View Do not distort. Container Logistics (CFS & ICD) Market India
Insert Cover Image using Slide Master View Do not distort Container Logistics (CFS & ICD) Market India February 2015 Executive Summary Market Container cargo traffic is expected to grow substantially at
More informationCOURSE LISTING. Courses Listed. Training for Applications with Integration in SAP Business One. 27 November 2017 (07:09 GMT) Advanced
Training for Applications with Integration in SAP Business One Courses Listed Advanced TB1000 - SAP Business One - Logistics TB1100 - SAP Business One - Accounting TB1200 - SAP Business One - Implementation
More informationCARIBBEAN DEVELOPMENT BANK LOAN AND PROJECT SUMMARY POWER PROJECT - SURINAME (ELECTRICITY SYSTEM UPGRADE AND EXPANSION)
PUBLIC DISCLOSURE AUTHORISED CARIBBEAN DEVELOPMENT BANK LOAN AND PROJECT SUMMARY POWER PROJECT - SURINAME (ELECTRICITY SYSTEM UPGRADE AND EXPANSION) This Document is being made publicly available in accordance
More informationIDA16 Results Measurement System
IDA16 Results Measurement System A I IDA16 Results Measurement System International Development Association THE WORLD BANK S FUND FOR THE POOREST B I IDA16 Results Measurement System What is the Results
More informationMonitoring validated processes by using SPC
Monitoring validated processes by using SPC Content Monitoring validated process effectively Using SPC / Control charts to monitor processes Separating Signal from Noise System Approach Risk Analysis Protocol/Report
More informationFinancial Results of PGNiG SA Q August 13th 2008
Financial Results of PGNiG SA 28 August 13th 28 Financial Highlights PGNiG Group (PLN m) 27 28 change Sales revenue 3,392 3,929 16% EBIT 412 294 (29%) EBITDA 785 665 (15%) Net profit 326 28 (14%) Net margin
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA14823 Project Name
More informationKENYA REVENUE AUTHORITY (KRA)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized East African Transport & Trade Facilitation Project : Kenya Procurement Plan Goods and
More informationDOCUMENT OF THE WORLD BANK RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING
Public Disclosure Authorized The World Bank East-West Roads Project (Almaty-Korgos Section): Western Europe - Western China International Transit Corridor (CAREC - 1b) (P128050) DOCUMENT OF THE WORLD BANK
More informationInfoShop. Integrated Safeguards Data Sheet (Initial) Date ISDS Prepared/Updated: 10/21/2002. Section I - Basic Information
Public Disclosure Authorized THE WORLD BANK GROUP InfoShop Integrated Safeguards Data Sheet (Initial) 25030 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date Prepared/Updated:
More informationPUBLIC-PRIVATE PARTNERSHIPS Brazil Bahia
PUBLIC-PRIVATE PARTNERSHIPS Brazil Bahia Session 1: Mobilising the Member States PPP Units behind the UN SDGs Genève November 2017 Agenda National Scenario PPP s context RedePPP - PPP s Intergovernmental
More informationLearnings from Bihar, India An evolutionary process and the impact of a market development program to create a functioning sanitation market
Learnings from Bihar, India An evolutionary process and the impact of a market development program to create a functioning sanitation market Shankar Narayanan PSI India UNC Water & Health Conference 2015
More informationJakarta Water Supply Development Project (Immediate Project of 2nd Stage,
Indonesia Jakarta Water Supply Development Project (Immediate Project of 2nd Stage, First Phase) 1. Project Profile and Japan s ODA Loan Report Date: October, 2002 Field Survey: September, 2001 Location
More informationMinipe and Nagadeepa Irrigation Rehabilitation Project
Sri Lanka Minipe and Nagadeepa Irrigation Rehabilitation Project 1. Project Profile and Japan s ODA Loan Report Date: March 2001 Field Survey: September 2000 The Philippines Manila Cebu Project Site Map
More informationMetro Manila Flood Control Project (II)
Philippines 1. Project Profile and Japan s ODA Loan Metro Manila Flood Control Project (II) Report Date: March 2001 Field Survey: September 2000 Project site The Philippines Manila Cebu Site Map: Manila
More informationCOMPANY PROFILE 2016
COMPANY PROFILE 2016 takasolutions upgrades buildings to reduce the energy, water and costs at no expense to the owner while sharing the savings. TARGET CLIENTS THE CONCEPT Clients and buildings that are
More informationWATER AND SANITATION DEVELOPMENT PROJECT (WSDP) SUMMARY PROCUREMENT PLAN (first eighteen months)
Public Disclosure Authorized WATER AND SANITATION DEVELOPMENT PROJECT (WSDP) SUMMARY PROCUREMENT PLAN (first eighteen months) Public Disclosure Authorized I. General The following procurement plan has
More informationMINISTRY OF AGRICULTURE, IRRIGATION AND WATER DEVELOPMENT MALAWI SHIRE RIVER BASIN MANAGEMENT PROJECT - P117617
Public Disclosure Authorized MINISTRY OF AGRICULTURE, IRRIGATION AND WATER DEVELOPMENT MALAWI SHIRE RIVER BASIN MANAGEMENT PROJECT - P117617 1 st STEP ANNUAL PROCUREMENT PLAN BASED ON THE FEBRUARY 2017
More informationAFRICAN DEVELOPMENT FUND
AFRICAN DEVELOPMENT FUND PROJECT: JOMO KENYATTA INTERNATIONAL AIRPORT EMERGENCY INTERIM TERMINAL CONSTRUCTION PROJECT COUNTRY: KENYA OITC/EARC DEPARTMENTS October 2013 1. INTRODUCTION 1.1 Management hereby
More informationINTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID:
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 05-Mar-2014
More informationL/C/TF Number(s) Closing Date (Original) Total Project Cost (USD) IBRD Nov ,493,000.00
Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0021025 Public Disclosure Authorized Public Disclosure Authorized Project ID P106703 Country Brazil Project
More informationIMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-73590) ON A LOAN IN THE AMOUNT OF US$259.6 MILLION TO THE ARAB REPUBLIC OF EGYPT FOR A
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-73590)
More informationNHS Highland Internal Audit Report Managing Sickness Absence August 2011
Internal Audit Report Managing Sickness Absence August 2011 Internal Audit Report Managing Sickness Absence August 2011 1 Executive Summary...1 2 Background...2 3 Scope...2 4 Summary of Findings...2 5
More informationElectric Forward Market Report
Mar-01 Mar-02 Jun-02 Sep-02 Dec-02 Mar-03 Jun-03 Sep-03 Dec-03 Mar-04 Jun-04 Sep-04 Dec-04 Mar-05 May-05 Aug-05 Nov-05 Feb-06 Jun-06 Sep-06 Dec-06 Mar-07 Jun-07 Sep-07 Dec-07 Apr-08 Jun-08 Sep-08 Dec-08
More informationRail freight and development
Rail freight and development Transport Forum & Learning Week Paul Amos: Transport Advisor World Bank Washington, March 2007 0 Contents World Bank and railways: overview Financing sources for public railways
More information14 th Americas School of Mines
Mining Investment Analyses-Risks and Opportunities Antenor Silva Agenda Logistic Energy Market Fiscal & Financial Environment & Community Logistic Main Risks Of The Logistic System in Brazil Part 1 Highway
More information1.4 Borrower/Executing Agency The Government of the Republic of the Philippines / The Department of Public Works and Highways (DPWH).
Philippines Second Mandaue Mactan Bridge Construction Project Report Date September, 2002 Field Survey June, 2001 1. Project Profile and Japan s ODA Loan Project Location Map Second Mandaue-Mactan Bridge
More information