1 RELIABILITY ASSESSMENT OF DISTRIBUTION NETWORS USING SEQUENTIAL MONTE CARLO SIMULATION Srete Nikolovski *, Predrag Maric *, Ivan Mravak ** *Faculty of Electrical Engineering, K. Trpimira 2B, 31 Osijek, Croatia **HEP -Croatian National Grid Company, Grada Vukovara 37, 1 Zagreb, Croatia Ivan.Mravak.@hep.hr INTRODUCTION This paper presents a Monte Carlo simulation approach to reliability evaluation of one distribution system. Stochastic model of distribution system components with Weibull distribution and Markov model of components are used. A set of system related reliability indices were calculated using sequential Monte Carlo simulation. The analysis was performed for a planned new 2 kv distribution network dedicated for supplying new highway road V-C. Monte-Carlo simulation was performed with full use of power restoration switches and full network load flow analysis. Load transfer was also considered to alleviate the overloading of distribution lines and transformers. SEQUENTIAL MONTE CARLO SIMULATION A sequential Monte Carlo simulation attempts to model system behavior precisely as it occurs in reality as a sequence of random events that build upon each other as the system progress through time. Some system contingences are modeled by probability distributions and can randomly occur at any point of time in the simulation. Other contingencies are conditional since their probability of occurrence depends upon prior events and the present state of the system. Sequential Monte Carlo simulation is implemented by dividing the simulation time period into small slices. Starting at first, each time slice is simulated in sequence to identify new contingences (such as faults) and respond to prior unresolved contingencies. Simulation accuracy increases as time slices become smaller, but the expense of increasing computation time. To model one year with a one-hour, time resolution requires 876 time slices. The probability of a contingency occurring during a time slice is equal to the probability of its having occurred at the end of time slice minus the probability of its having occurred at the beginning of the time slice. This is approximately equal to the value of the probability density function at the beginning of the time slice multiplied by the time slice duration. The equations are as follows: P(t) = F(t+ t) F(t) (1) P(t) t f(t) (2) P(t) = probability of occurrence in the time slice bounded by t and t F(t) = probability distribution function f(t) = probability density function t = duration of time slice Some probability distribution functions, like exponential distribution are stationary and do not vary in time. These events will have same likelihood of occurring in each time slice, equal to the rate of occurrence multiplied by the time slice duration. Other types of events are nonstationary and have probability functions that vary with time and must be individually computed for each time slice. Components models and parameters Sequential Monte Carlo simulation requires generation of artificial operating/restoration histories of the network components. In distribution system these components are overhead lines, cables, transformers, disconnect switches, fuses and breakers. Overhead lines, cables and transformers can be generally represented by two-state Markov model shown in Figure 2. State number 1 indicates that the component is in the operating up state and the state number 2 indicates that the component is in inoperable down state. 1 λ 2 A µ A Figure 1. A sequential Monte Carlo simulation divides the simulation into small slices. Figure 2. State space diagram of component
2 The time during the component remains in state number 1 is called the time to failure (TTF) or failure time (FT). The time during the component is in state number 2 is called the restoration time and can be either the time to repair (TTR) or the time to replace (TTR). The process of transiting from the up state to a down state is the failure process. Transition from up state to a down state can be caused by the failure of any components or by removal of components for maintenance. On Figure 3. is shown operating/restoration history of a component. Load point and system reliability indices The average values and the probability distributions of theese indices can be calculated from the load point operating /restoration histories. The three basic load point reliabilty indices are the average failure rate, the average repair rate, and the average annual unavailability or average outage time U. The average values of the three basic load point indicies for load point j can be calculated from the load point up-down operating history using the following formulae : N j λ j = (3) ΣTuj Figure 3. Component operating/repair history The parameters TTF, and TTR are random variables and may have different probability distributions. The probability distributions most often used to simulate these times are Exponential, Gamma, Weibull, Normal and Lognormal. In Figure 4. is shown Weibull distribution used in DIgSILENT software. Fuses and breakers are used to automatically isolate failed components or failed areas from healthy areas. They can exist in either operating or failed states which can be described in terms of their probabilities. From Weibull distribution for appropriate parameters exponential distribution can be done. N j µ j = (4) T T U j = (5) T + T uj Where T and uj T are the respective summations of all the up times T U and all the down times T d and N j is the number of failures during the total sampled years. In order to determine the probability distributions of the load point frequency, the period k of this index are calculated for each sample year. The number of years m(k) in which load point outage frequency equals k is counted. The probability distribution p(k) of the load point failure frequency can be calculated using m( k) p ( k) = M k =,1, 2... (6) where M is total sample years. Figure 4. Weibull distribution Determination of load point failures Component failures may affect one or more load points. The most difficult problem in the simulation is to find the load points affected by the failure of a component and to determine their operating/restoration histories, which are dependent on the network configuration, the system protection and the maintenance philosophy. In order to create a structured approach, the distribution system can be broken down into general segements. A complex radial distribution system can be divided into the combination of main feeder ( a feeder that is connected to a transformer station) and subfeeders. The probability distribution of load point unavailability can becalculated in a similar manner. To caclulate the probability distribution of outage duration, the failure number n(i), with outage duration between i-1 and i is counted. The probability distribution p(i) is : n( i) p ( i) = i =,1,2... (7) N where N is total failures in sampled years. The system indices can be calculated from the basic load point indices as system indices are basically weighted averages of the load point values. Well known and usually used system indices are : total number of customer int erruptions = total number of customers total = number of total number of customer int erruptions affected customers
3 sum of customer int erruptions durations = total number of customers sum of customer int erruptions durations = total number of customer int eruptions customer hours of available service = customer hours demanded = Expected energy not supplied. RELIABILITY ASSESSMENT OF DISTRIBUTION NETWORK FOR CORRIDOR V-C. Customers on new corridor V-C are supplied from 2 kv and 1 kv cable network connected to HEP Prijenos d.d. (Croatian power transmission network) at six 11/x kv transformer stations that are: B.,,, Osijek1, Djakovo and ci. Each 11/x kv transformer station supplies its own distribution network (i.e. determined number of customers) which may or may not be interconnected with the rest of the system. Each distribution network is a segment of system dedicated for supplying a new corridor V-C. If the fault occurs in a 11/x kv transformer station, the main idea of automated switching equipment is to automatically switch its 2 kv or 1 kv distribution network (segment of system) on the closest 11/x kv transformer station which works properly. Customers on the corridor V-C can be independently supplied from the rest of belonging system segment interconnecting with customers on corridor that are supplied from another system segment. Reliability assessment is performed for the main (base) system state (when all 11/x kv transformer stations work properly and their distribution sub networks are interconnected) and for N-1 states during outages of 11/x kv stations. Before Monte Carlo simulation starts, load flow analysis has to be performed. These simulations have been performed using DigSilent Power Factory 13 software. System reliability indices for the base system state are shown in table 1. TABLE 1. Reliability system indices for main system state Comment of results; it can be expected that each customer will be unsupplied 4.33 times per year and the total time of interruptions in a year will be 4.88 hours which means that average duration per interruption will be 1.12 hours. Customers that will suffer power interruptions will be average 8.17 times per year unsupplied. Total amount of electrical energy that would not be delivered to the loads is MWh which equals 1.82 MWh per customer. Load flow analysis for this system stage shows good results. There are no voltage limits violations and problems and there are no overloaded lines and transformers. Customers located on the future V-C corridor have possibility of redundant 2 kv power supplying (SCADA system gives possibility of automated inter-connection with customers on corridor that are supplied from another system segment), so their reliability indices are better than reliability indices of the rest of old distribution system. N-1 reliability assessment For N-1 system states, reliability indices will be calculated for all system states when one component is out in the case when the one of 11/x kv transformer stations is out of service. Selected 11/x kv transformer station is assumed to be permanently unavailable one year. Reliability assessment will be performed for two cases. The first case is when the automated interconnection of all loads (TS 1/.4 kv) on corridor V-C is performed, when one of 11/x kv transformer station is unavailable. The second case is when that interconnection will not be done. Reliability indices for both of cases are shown in further tables. TABLE 2. Reliability indices for n-1 system states in case when all customers on corridor V-C are interconnected n-1 TABLE 3. Reliability indices for n-1 system states in case when all customers on corridor V-C are not interconnected. n B Osijek Djakovo ci B Osijek Djakovo ci Reliability indices of distribution system when all customers on corridor V-C are interconnected are similar to reliability indices of main-base system case but reliability indices when all customers on corridor are not interconnected are approximately two times worse. That legitimate existing of automated interconnection of all customers using SCADA system on corridor V-C when one of 11/x kv transformer station is permanently unavailable.
4 Transformer stations 11/x kv and ci are on the opposite edges of analyzed distribution system and when those transformer stations are permanently unavailable reliability indices are much worse than reliability indices if some of other 11/x kv transformer stations are permanently unavailable. Comparison between reliability indices, here Energy Not Supplied, in the case when interconnection between all customers on V-C corridor exist and when this interconnection does not exist is shown in Figure 4. [MWh/a] Figure 4. Comparison between in the case when interconnection exist red diagram and when does not exist- blue diagram. N-2 reliability assessment Comparison between reliability indices, for N-2 system states and N-1 system states when all customers on corridor V- C are interconnected and when they are not is shown in Figure 5 and 6. [MWh/a] Figure 5. Comparison between for n-2 system states - red diagram and n-1 system states when interconnection exist blue diagram. [MWh/a] For N-2 system states, reliability indices will be calculated for all system states in the case of coincidence of any two components when all two combinations of 11/x kv transformer stations are out of service. For selected 11/x kv transformer stations are assumed to be one year permanently unavailable. Reliability assessment will be performed in case of automated interconnection of all customers on corridor V-C when two of 11/x kv transformer stations are unavailable. Results of this reliability assessment are partly shown in table 4 (15 cases of coincidence of two 11/x kv stations out of service). Figure 6. Comparison between for n-2 system states - red diagram and n-1 system states when interconnection does not exist blue diagram. Results of each sequential Monte Carlo simulation are different because each simulation generates different random events. When Monte Carlo simulation is used, software enables us to change start and stop time, number of runs, maximal errors and confidence interval, as it is presented on Figure 7. TABLE 4. Reliability indices for n-2 system states when all customers on corridor V-C are interconnected. n-2 & B & & & & Djakovo Djakovo & Figure 7. Dialog box for Monte Carlo simulation.
5 After a huge number of simulations, the mean value of reliability indices are approaching very close to the expected mean value, even if the simulated time period is changed. On Figure 8 is shown how indices (for n-2 system state) becomes very close to 5, after a huge number of simulations with different simulated time period. [4] DIgSILENT software Power Factory 13 Manuals, 24, Digsilent GmbH, Gomaringen, Germany [5] R. Bilinton, G. Lian, 1993 Station Reliability Evaluation Using Monte Carlo Approach IEEE Transactions on Power Delivery, Vol. 8, No. 3. BIOGRAPHIES Figure 8. after 2 simulations with different simulated time period. Different colors of graphs means different simulated time period. CONCLUSION In this paper Sequential Monte Carlo simulation is used for reliability analysis of 2 kv distribution network for new planned corridor V-C road power supply. All system components are modeled with Weibull distribution for two state Markov model of component. Two main switching states are considered in reliability indices calculation: The first case is when the automated interconnection of all loads (TS 1/.4 kv) on corridor V-C is performed and the second case is when that interconnection is not done. System reliability indices:,,, 1/Ca),,, are calculated for all system states in the case of N-1 or N-2 fault coincidence, when one or any two combinations of 11/x kv supply transformer stations are out of service. This type of analysis can help in the process of construction, building and maintaining this distribution network of corridor V-C road. REFERENCES [1] R. Billinton, P. Wang, 1999, "Teaching Distribution System Reliability Evaluation Using Monte Carlo Simulation", IEEE Transactions on Power Systems, Vol.14, No.2. [2] R. Billinton, P. Wang, 1998, "Distribution System Reliability Cost/Worth Analysis Using Analytical and Sequential Simulation Techiniques", IEEE Transactions on Power Systems, Vol.13, No.4. [3] R.E. Brown, 22, Electric Power Distribution Reliability, Marcel Decker, Inc, New York, USA Srete Nikolovski was born in Belgrade on 1. October, He obtained his B.Sc. degree in 1978 and Master of Science degree (M.Sc) in 1989, both in the field of Electrical Engineering, from the Faculty of Electrical Engineering, University of Belgrade. He received his PhD degree from the Faculty of Electrical Engineering and Computing, University of Zagreb, Croatia in He was appointed Assistant Professor in Currently he is Associate Professor on the Power System Engineering Department at the Faculty of Electrical Engineering, University of Osijek, Croatia. He is IEEE senior member. His main interest is in power system modeling, simulation and analysis, especially in reliability assessment of power system and power system protection. Predrag Mari was born on 11 December 1979 in Osijek,. He obtained diploma degree in 24 in field of Electrical Power Engineering from the faculty of Electrical Engineering, University of Osijek. His graduation thesis awarded two prizes: Hrvoje Po ar of Croatian Energy Association as specially noticed thesis in field of power engineering, and a prize from Croatian Power Company HEP for the best graduation thesis in the field of power engineering. Currently he works as research assistant in the Power System Engineering Department at the Faculty of Electrical Engineering, University of Osijek. His main interest is modeling, simulation and analysis of transient phenomena in power systems and power system protection Ivan Mravak was born on 23. February 1954 in Vukovar. He obtained diploma degree in 1979 from the Technical faculty in Novi Sad and Master of Science degree (MSc) in 1993, both in the field of Electrical Power Engineering. He worked in Kombinat Borovo factory until the1988, after he left and became the technical manager in HEP Elektra Distribution in Vukovar. From 1993 he became coordinator for building in HEP Direction for distribution. From 1997 he worked as manager of the sector for technical activities in HEP Distribution. In 24 he became a General Manager of HEP- Croatian National Grid Company. His main interest is in reliability analysis of distribution system, management of production, transmission and distribution of electric energy.
Distribution System Reliability Evaluation using Time Sequential Monte Carlo Simulation
Distribution System Reliability Evaluation using Time Sequential Monte Carlo Simulation 1 Supriya M D, 2 Chandra Shekhar Reddy Atla, 3 R Mohan, 4 T M Vasanth umara 1,3,4 Dept of E & E,AIT, Chikmagalur
More informationSIMULATION METHOD FOR RELIABILITY ASSESSMENT OF ELECTRICAL DISTRIBUTION SYSTEMS
SIMULATION METHOD FOR RELIABILITY ASSESSMENT OF ELECTRICAL DISTRIBUTION SYSTEMS Johan Setréus, Lina Bertling, Shima Mousavi Gargari KTH, School of Electrical Engineering, Stockholm, Sweden johan.setreus@ee.kth.se
More information4»IEEE POWER SYSTEMS .*ISK ASSESSMENT OF. Models, Methods, and Applications. Wiley. Ph.D., Fellow, IfE, CAE, EIC SECOND EDITION
.*ISK ASSESSMENT OF POWER SYSTEMS Models, Methods, and Applications SECOND EDITION Wenyuan Li, Ph.D., Fellow, IfE, CAE, EIC Chongqing University, China BC H> Canada, n IEEE PRESS SERIES ON POWER ENGINEERING
More informationThe Effect of Distributed Generation on Distribution System Reliability
University of Tennessee, Knoxville Trace: Tennessee Research and Creative Exchange Masters Theses Graduate School 12-2008 The Effect of Distributed Generation on Distribution System Reliability Nura Nubee
More informationReliability Assessment of a Power Grid with Customer Operated Chp Systems Using Monte Carlo Simulation
University of Massachusetts Amherst ScholarWorks@UMass Amherst Masters Theses 1911 - February 2014 2009 Reliability Assessment of a Power Grid with Customer Operated Chp Systems Using Monte Carlo Simulation
More informationOptimum Return Period of an Overhead Line Considering Reliability, Security and Availability with Respect to Extreme Icing Events
IWAIS XIV, China, May 0 Optimum Return Period of an Overhead Line Considering Reliability, Security and Availability with Respect to Extreme Icing Events Asim Haldar, Ph.D, P.Eng. ahaldar@nalcorenergy.com
More informationDUQUESNE LIGHT COMPANY TRANSMISSION PLANNING CRITERIA
DUQUESNE LIGHT COMPANY TRANSMISSION PLANNING CRITERIA Transmission Planning Criteria Updated: March Compiled: September 2007 Compiled from: s Comprehensive Transmission Reliability Plan, July 2005 s Strategic
More informationBasic Reliability Analysis of Electrical Power Systems
Basic Reliability Analysis of Electrical Power Systems Course No: E03-020 Credit: 3 PDH Velimir Lackovic, Char. Eng. Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony Point, NY 10980
More informationAnalysis of distribution system reliability and outage rates
Reclosers Technical Data TD280026EN Supersedes pril 2003 (R280-90-7) COOPER POWER SERIES nalysis of distribution system reliability and outage rates Recloser Technical Data TD280026EN nalysis of distribution
More informationInformation Document Protection System Information ID# R
Information Documents are for information purposes only and are intended to provide guidance. In the event of any discrepancy between the Information Document and the related authoritative document(s)
More informationPROBABILISTIC RELIABILITY ASSESSMENT OF TRANSMISSION SYSTEMS
PROBABILISTIC RELIABILITY ASSESSMENT OF TRANSMISSION SYSTEMS DAWOOD ALALI Thesis submitted to Cardiff University in candidature for the degree of Doctor of Philosophy. School of Engineering Cardiff University
More informationThe Advanced Distribution Management System. The indispensable tool of the Smart Grid era
The Advanced Distribution Management System The indispensable tool of the Smart Grid era Telvent utilities group August 2010 The Advanced Distribution Management System The indispensable tool of the Smart
More informationVisualization for Shipboard Power Systems
Visualization for Shipboard Power Systems Karen L. Butler-Purry N.D.R. Sarma Power Systems Automation Laboratory Department of Electrical Engineering Texas A&M University, TAMUS 3128 College Station, TX-77848-3128,
More informationChapter 4. Mathematical Modeling of Service Outages
Chapter 4 Mathematical Modeling of Service Outages 4.1 Introduction The end to end availability of mobile communication network is a function of the availability of all the intermediate elements. The physical
More informationCONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING, NETWORK SYSTEMS SECTION
CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING, NETWORK SYSTEMS SECTION SPECIFICATION EO-2113 REVISION 4 DECEMBER, 2012 TRANSFER OF LOAD FROM COMPANY'S
More informationInternational ejournals
ISSN 2249 5460 Available online at www.internationalejournals.com International ejournals International Journal of Mathematical Sciences, Technology and Humanities 21 (2011) 205 212 ENERGY CONTROL CENTER
More informationOptimal network topology and reliability indices to be used in the design of power distribution networks in oil and gas plants *
Optimal network topology and reliability indices to be used in the design of power distribution networks in oil and gas plants * R Naidoo and EJ Manning University of Pretoria, Pretoria, South Africa ABSTRACT:
More informationDistribution Network Planning for Mumbai
Newsletter Issue 98 January 2006 Distribution Network Planning for Mumbai Carsten Böse Project Manager Siemens AG, PTD SE PT carsten.boese@siemens.com Introduction The Indian utility Reliance Energy Ltd.
More informationPerformance Improvement in Distribution Network with DG
The 23 224 nd International 25 Power Engineering and Optimization Conference (PEOCO2008), Shah Alam, Selangor, MALAYSIA. 4-5 June 2008. Performance Improvement in Distribution Network with DG 1 Siti Rafidah
More informationIMPLEMENTATION OF DISTRIBUTION AUTOMATION SYSTEMS (DAS) IN THE ELECTRICA COMPANY ROMANIA
IMPLEMENTATION OF DISTRIBUTION AUTOMATION SYSTEMS (DAS) IN THE ELECTRICA COMPANY ROMANIA Gheorghe Ion MAZILU - ELECTRICA SA Mihaela CONU - ELECTRICA SA Romania Romania Serban COCULESCU - ANRE Adrian Ion
More informationMaking Decision of the Maintenance Priority of Power Distribution System using Time Varying Failure Rate and Interruption Cost
Journal Electrical Engineering & Technology, Vol. 4, No., pp. 43~48, 2009 43 Making Decision the Maintenance Priority Power Distribution System using Time Varying Failure and Interruption Cost Cheol-Min
More informationPOTOMAC ELECTRIC POWER COMPANY
POTOMAC ELECTRIC POWER COMPANY FERC Form 715 (Part 4) - Transmission Planning Study Guidelines Transmission Reliability Guidelines 1. General Overview The reliability guidelines used to plan the transmission
More informationReliability assessment in active distribution networks with detailed effects of PV systems
J. Mod. Power Syst. Clean Energy (014) (1):59 68 DOI 10.1007/s40565-014-0046- Reliability assessment in active distribution networks with detailed effects of PV systems Zulu ESAU, Dilan JAYAWEERA (&) Abstract
More informationService plans enhance the benefits of preventive maintenance programs
Service plans enhance the benefits of preventive maintenance programs White Paper Document 1910DB1612 by Charles Alvis Executive summary Companies are continually being tasked by management to increase
More informationWolverine Power Supply Cooperative, Inc. Senior Transmission System Operator
I. OBJECTIVE Wolverine Power Supply Cooperative, Inc. Senior Transmission System Operator A. The Senior Transmission System Operator is responsible for the reliable and safe operation of Wolverine s transmission
More informationThe Implementation of Smart Metering Systems for Electricity Consumption in Croatia
The Implementation of Smart Metering Systems for Electricity Consumption in Croatia Hrvoje Pandžić 1, Darjan Bošnjak 1, Igor Kuzle 1, Marin Bošković 2, Damir Ilić 1 1 Faculty of Electrical Engineering
More informationModeling and Operation Analysis of Meshed Distribution Systems with Distributed Generation
Modeling and Operation Analysis of Meshed Distribution Systems with Distributed Generation WEN-CHIH YANG Department of Electrical Engineering Technology and Science Institute of Northern Taiwan No.2, Syueyuan
More informationSurvey and Summary of Best Practices for Distribution Reliability Improvement. December 8, p.m. EST
Survey and Summary of Best Practices for Distribution Reliability Improvement December 8, 2016 2 3 p.m. EST Webinar Overview Moderator: Speaker: Michele Suddleson DEED Program Director American Public
More informationDA concept for higherquality. supplies. 24 ABB Review 4/1996
DA concept for higherquality power supplies Low power network losses and an uninterrupted supply of electricity are no longer enough to satisfy today s consumers, who take a highquality power supply for
More informationSingle and Multiple Outage Statistics in Turkish National Power Transmission System
Single and Multiple Outage Statistics in Turkish National Power Transmission System Aydogan Ozdemir, Mustafa Bagriyanik, Ilim Erden Department of Electrical Engineering Istanbul Technical University Istanbul,
More informationSeven-Year Electric Service Reliability Statistics Summary
Oregon Investor-owned Utilities Seven-Year Electric Service Reliability Statistics Summary 2010-2016 June 2017 Report available at http://www.puc.state.or.us (Click on Safety, then click on Reports ) Information
More informationExISTING SubSTATION INfORmATIONON
ExISTING SubSTATION INfORmATIONON drives equipment LIFe extension, modernization, and retrofitting david dolezilek and GeraLdo rocha, Schweitzer Engineering Laboratories, Inc. i. introduction Much of the
More informationOptimization of the NAS Battery Control System
Optimization of the NAS Battery Control System Background PG&E has purchased a 4MW, 28MWh sodium-sulfur (NAS) battery to be installed October, 2010 in San Jose at Hitachi headquarters. The site was chosen
More informationStandard TPL Transmission System Planning Performance Requirements
A. Introduction 1. Title: Transmission System Planning Performance Requirements 2. Number: TPL-001-4 3. Purpose: Establish Transmission system planning performance requirements within the planning horizon
More informationReliability Evaluation of Composite Electric Power System Based On Latin Hypercube Sampling
Reliability Evaluation of Composite Electric Power System Based On Latin Hypercube Sampling R. Ashok Bakkiyaraj, N. Kumarappan Abstract This paper investigates the suitability of Latin Hypercube sampling
More informationSimulation of timing failure and downtime of production line applying dynamic systems
11 3rd International Conference on Information and Financial Engineering IPEDR vol.12 (11) (11) IACSIT Press, Singapore Simulation of timing failure and downtime of production line applying dynamic systems
More informationProceeding of 9 th International Seminar on Industrial Engineering and Management ISSN : X
Proceeding of 9 th International Seminar on Industrial Engineering and Management ISSN : 1978-774X PROPOSED MAINTENANCE POLICY AND SPARE PART MANAGEMENT OF GOSS UNIVERSAL PRINTING MACHINE WITH RELIABILITY
More informationDistribution Information Exchange Code
Distribution Information Exchange Code Version 5.1 Approved September 2007 Comments to this document can be forwarded to: The RSA Grid Code Secretariat Attention: Mr. Bernard Magoro Eskom, Transmission
More informationOverview of Common Mode Outages In Power Systems
Overview of Common Mode Outages In Power Systems Paper Prepared by Task Force of RRPA Subcommittee Presented by Chanan Singh Texas A&M University Defintions A common mode outage refers to simultaneous
More informationWithlacoochee River Electric Cooperative, Inc. P.O. Box 278 Dade City, FL Billy E. Brown, Executive V.P.
Wednesday, February 25, 2015 PSC 25 6.0343 Municipal Electric Utility and Rural Electric Cooperative Reporting Requirements Withlacoochee River Electric Cooperative, Inc. P.O. Box 278 Dade City, FL 33526-0278
More informationNETWORK RELIABILITY MEASUREMENT, REPORTING, BENCHMARKING AND ALIGNMENT WITH INTERNATIONAL PRACTICES
NETWORK RELIABILITY MEASUREMENT, REPORTING, BENCHMARKING AND ALIGNMENT WITH INTERNATIONAL PRACTICES Baden Chatterton PrEng MSc(Eng) BSc(Eng) MSAIEE MIEEE MIEE Senior Engineer, Distribution Technology,
More informationTEMPORARY GRID RECONFIGURATIONS NET BENEFIT TEST METHODOLOGY
TEMPORARY GRID RECONFIGURATIONS NET BENEFIT TEST METHODOLOGY 1 1. Summary When one part of the grid is facing security of supply risk where local generation in one region of the grid is not enough for
More informationB Improvements on High Voltage Electrical Substations to face the new Brazilian Legislation. G. M. Bastos (*) R. C. Valente E.
21, rue d'artois, F-75008 Paris http://www.cigre.org B3-214 Session 2004 CIGRÉ Improvements on High Voltage Electrical Substations to face the new Brazilian Legislation G. M. Bastos (*) R. C. Valente E.
More informationTHIS PAPER addresses the effects caused by the addition of
1442 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 21, NO. 3, AUGUST 2006 Recloser Allocation for Improved Reliability of DG-Enhanced Distribution Networks Aleksandar Pregelj, Member, IEEE, Miroslav Begović,
More informationDynamic Simulation and Supply Chain Management
Dynamic Simulation and Supply Chain Management White Paper Abstract This paper briefly discusses how dynamic computer simulation can be applied within the field of supply chain management to diagnose problems
More informationSmart Distribution Applications and Technologies - Program 124
Smart Distribution Applications and Technologies - Program 124 Program Description Program Overview New technologies will be critical to future smart grid operation. These technologies will include advanced
More informationMulti-Agent Model for Power System Simulation
Multi-Agent Model for Power System Simulation A.A.A. ESMIN A.R. AOKI C.R. LOPES JR. G. LAMBERT-TORRES Institute of Electrical Engineering Federal School of Engineering at Itajubá Av. BPS, 1303 Itajubá/MG
More informationPOWER SYSTEM STABILITY GUIDELINES
PREPARED BY: DOCUMENT REF: Planning PSSG-02 VERSION: 1.0 DATE: 25 May 2012 FINAL Final Matt Zema CEO Date 25/ 5 /2012 Version Release History VERSION DATE AUTHOR PEER REVIEW APPROVED COMMENTS 1.0 25/5/12
More informationManagement System of Distribution Transformer Loading
Management System of Distribution Transformer Loading A. G. Leal, M.Sc J. A. Jardini, Ph.D. L. C. Magrini, Ph.D. S. U. Ahn, Ph.D. D. Battani Abstract - This paper presents an Integrated Management System
More informationCOMPUTATIONAL ANALYSIS OF A MULTI-SERVER BULK ARRIVAL WITH TWO MODES SERVER BREAKDOWN
Mathematical and Computational Applications, Vol. 1, No. 2, pp. 249-259, 25. Association for cientific Research COMPUTATIONAL ANALYI OF A MULTI-ERVER BULK ARRIVAL ITH TO MODE ERVER BREAKDON A. M. ultan,
More informationPerformance Reporting Criteria
Revision Date: February 2012 Revision No.: 2 Document No.: DOC-131102-ADV Status: Approved by CER Date: 01/03/2012 ESB Networks Ltd. Contents 1. Background... 3 2. Report Headings... 4 3. Criteria... 5
More informationNEW PROCEDURE FOR TRANSMISSION NETWORK PLANNING IN CROATIA
NEW PROCEDURE FOR TRANSMISSION NETWORK PLANNING IN CROATIA DAVOR BAJS, MATISLAV MAJSTROVIĆ, GORAN MAJSTROVIĆ Energy Institute HRVOJE POŽAR Savska 163, HR-10000 Zagreb Croatia Abstract Transmission network
More informationPROFITABLE OR NOT A METHOD TO STUDY NETWORK INVESTMENT IN THE NEW REGULATION ENVIRONMENT
PROFITABLE OR NOT A METHOD TO STUDY NETWORK INVESTMENT IN THE NEW REGULATION ENVIRONMENT Jukka Lassila *, Samuli Honkapuro, Kaisa Tahvanainen, and Jarmo Partanen Lappeenranta University of Technology Juha
More informationStandard Development Timeline
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).
More informationSouth Carolina Electric & Gas Company Transmission Function Employees Job Titles and Descriptions. Electric Transmission
Electric Transmission VP Electric Transmission SCEG The Electric Transmission Officer is responsible for System Control; Operations Planning; Transmission Planning; ERO compliance; Transmission Training;
More informationPower system generation reliability assessment based on multi-agents technique
International Journal of Smart Grid and Clean Energy Power system generation reliability assessment based on multi-agents technique Nadheer A. Shalash *, Abu Zaharin Bin Ahmad a Faculty of Electrical and
More informationCalifornia Dept. of Technology AT&T CALNET 3. Service Level Agreements (SLA) Legacy Telecommunications
California Dept. of Technology AT&T CALNET 3 Service Level Agreements (SLA) Subcategory 1.6.6 Legacy Telecommunications Page 1 Trouble Ticket Stop Clock Conditions The following conditions shall be allowed
More informationSolving a redundancy allocation problem with repairable identical components using simulation method and genetic algorithm
Solving a redundancy allocation problem with repairable identical components using simulation method and genetic algorithm Amir Vahid Fakhredaie Islamic Azad University, Dubai, UAE Ayoub Veisi; Mani Sharifi
More informationSIMULATOR BASED OPERATOR TRAINING ENSURING QUALITY OF POWER SYSTEM OPERATION
SIMULATOR BASED OPERATOR TRAINING ENSURING QUALITY OF POWER SYSTEM OPERATION U Spanel, M Kreutz, C Roggatz DUtrain GmbH, Germany ABSTRACT Liberalisation of the electricity supply industry causes new operation
More informationLong Term Planning Method Comparison Considering DG Interconnection
Long Term Planning Method Comparison Considering DG Interconnection Marie-Cécile Alvarez Co-authors : G2Elab: Raphaël Caire, Bertrand Raison, Nouredine Hadjsaid EDF R&D: Bogdan Enacheanu, Olivier Devaux
More informationUsing a virtual power plant to optimize the functionality of the resources distribution in the power system
Using a virtual power plant to optimize the functionality of the resources distribution in the power system Mostafa ESKANDARI 1, *, Jafar Trfy FRD 2, Jamal Gholami AHANGARAN 3 * Islamic Azad University
More informationDetermining Nitriding Parameters with Neural Networks
Journal of ASTM International, May 2005, Vol. 2, No. 5 Paper ID JAI12213 Available online at www.astm.org Tomislav Filetin, 1 Irena Žmak, 1 and Davor Novak 1 Determining Nitriding Parameters with Neural
More informationCalifornia Independent System Operator Corporation Fifth Replacement Tariff
Table of Contents Method to Assess Available Transfer Capability... 2 L.1 Description of Terms... 2 L.1.1 Available Transfer Capability (ATC)... 2 L.1.2 Total Transfer Capability (TTC)... 2 L.1.3 Existing
More informationAssessment of Reliability and Quality Measures in Power Systems
Assessment of Reliability and Quality Measures in Power Systems Badr M. Alshammari and Mohamed A. El-Kady Abstract The paper presents new results of a recent industry supported research and development
More information69/12KV SUBSTATION DESIGN
69/12KV SUBSTATION DESIGN ISU SENIOR DESIGN GROUP: MAY 15-01 Matt Backes Faran Malik Ryan Jerve Bhargav Gouni Kiran Rane Sohail Suryavanshi Team Leader Communication Leader Communication Leader Key Concept
More informationFacility Interconnection Requirements
Facility Interconnection Effective 1/1/2016 1. Purpose Facility Interconnection Facility Interconnection (FAC-001-2) To avoid adverse impacts on the reliability of the Bulk Electric System (BES), RPU documents
More informationSix-Year Electric Service Reliability Statistics Summary
Oregon Investor-owned Utilities Six-Year Electric Service Reliability Statistics Summary 2002-2007 July 2008 Report available at http://www.puc@state.or.us (Click on Safety ) Information Contact: Jerry
More informationPublic Utility District Number 1 of Snohomish County
Public Utility District Number 1 of Snohomish County Facility Connection Requirements September 29, 2011 1 Revision History: Number Date Description Original Sept. 29, 2011 Document Origination Compilation
More informationDistribution GIS & Grid Model Data Management
Distribution GIS & Grid Data Management Pat Brown EPRI OGC Energy & Utilities Summit June 28, 2017 Pat Brown works in EPRI s Information and Communication Technology program. She is currently engaged in
More informationNETWORK ASSET CONDITION ASSESSMENT AND REFURBISHMENT PLANNING
NETWORK ASSET CONDITION ASSESSMENT AND REFURBISHMENT PLANNING D J Vrey (Senior Eng, M.Ing, Pr.Eng, NETGroup South Africa) M E N du Preez (Managing Dir, M.Ing, Pr.Eng, NETGroup South Africa) H H van der
More information1.818J/2.65J/3.564J/10.391J/11.371J/22.811J/ESD166J SUSTAINABLE ENERGY. Prof. Michael W. Golay Nuclear Engineering Dept.
1.818J/2.65J/3.564J/10.391J/11.371J/22.811J/ESD166J SUSTAINABLE ENERGY Prof. Michael W. Golay Nuclear Engineering Dept. Energy Supply, Demand, and Storage Planning The Example of Electricity 1 PRESENTATION
More informationEffect of Wind Energy Unit Availability on Power System Adequacy
, Vol 9(28), DOI: 10.17485/ijst/2016/v9i28/97962, July 2016 ISSN (Print) : 0974-6846 ISSN (Online) : 0974-5645 Effect of Wind Energy Unit Availability on Power System Adequacy Athraa Ali Kadhem 1*, N.
More informationMaintenance Priority Index of Overhead Transmission Lines for Reliability Centered Approach
J Electr Eng Technol Vol. 9, No. 3: 742-?, 2014 http://dx.doi.org/10.5370/jeet.2014.9.3.742 ISSN(Print) 1975-0102 ISSN(Online) 2093-7423 Maintenance Priority Index of Overhead Transmission Lines for Reliability
More informationReliability Based Power Distribution Systems Planning: A Review
Reliability Based Power Distribution Systems Planning: A Review 1 M. Azhar Khan, 2 Dr. Shailja Shukla 1 Research Scholar, Electrical Department, Jabalpur (Govt.) Engineering, College, Jabalpur, India 2
More informationWIND TURBINES IN WEAK GRIDS CONSTRAINTS AND SOLUTIONS. J O G Tande and K Uhlen. SINTEF Energy Research, Norway SUMMARY
WIND TURBINES IN WEAK GRIDS CONSTRAINTS AND SOLUTIONS J O G Tande and K Uhlen SINTEF Energy Research, Norway SUMMARY Cost efficient utilisation of the wind energy resource requires wind farms to be located
More informationELECTRICITY SERVICES QUALITY STANDARDS DIRECTIVE No. 2/2005. DRAFT awaiting approval
ELECTRICITY SERVICES QUALITY STANDARDS DIRECTIVE No. 2/2005 PART ONE GENERAL DRAFT awaiting approval 1. Issuing Authority This Directive is issued by the Ministry of Infrastructure (hereafter referred
More informationPERFORMANCE EVALUATION OF DEPENDENT TWO-STAGE SERVICES
PERFORMANCE EVALUATION OF DEPENDENT TWO-STAGE SERVICES Werner Sandmann Department of Information Systems and Applied Computer Science University of Bamberg Feldkirchenstr. 21 D-96045, Bamberg, Germany
More informationEvaluating Wind Power Generating Capacity Adequacy Using MCMC Time Series Model
Evaluating Wind Power Generating Capacity Adequacy Using MCMC Time Series Model by Abdulaziz Almutairi A thesis presented to the University of Waterloo in fulfillment of the thesis requirement for the
More informationContribution of PV Power Plants to Flicker Severity in Power Distribution Grids
Contribution of PV Power Plants to Flicker Severity in Power Distribution Grids Denisa G. Rusinaru, Leonardo G. Manescu, Adelaida, M. Duinea and Cristian C. Bratu Abstract This paper presents some results
More informationManaging Power Outage with OpenWay
Managing Power Outage with OpenWay Dave Stensland Product Manager Katrina Hutchinson Sr. Product Manager 2010, Itron Inc. All rights reserved. 1 Executive Overview 3 Introduction to Outage Reliability
More informationPh.D. Defense: Resource Allocation Optimization in the Smart Grid and High-performance Computing Tim Hansen
Ph.D. Defense: Resource Allocation Optimization in the Smart Grid and High-performance Computing Tim Hansen Department of Electrical and Computer Engineering Colorado State University Fort Collins, Colorado,
More informationUNOFFICIAL TRANSLATION SUPPLY OF REACTIVE POWER AND MAINTENANCE OF REACTIVE POWER RESERVES
UNOFFICIAL TRANSLATION SUPPLY OF REACTIVE POWER AND MAINTENANCE OF REACTIVE POWER RESERVES Guideline 1 (11) Contents 1 INTRODUCTION... 2 2 PRINCIPLES OF THE SUPPLY OF REACTIVE POWER... 2 2.1 Supply point
More informationAvailability Modeling for the Application of Manufacturing Equipment
Availability Modeling for the Application of Manufacturing Equipment Aron Brall, Landis Gardner, a UNOVA Company, Waynesboro Key Words: Reliability Model, Availability Model, Manufacturing Reliability,
More informationAssessment of Electric Power Distribution Feeders Reliability: A Case Study of Feeders that Supply Ede Town
Assessment of Electric Power Distribution Feeders Reliability: A Case Study of Feeders that Supply Ede Town Johnson, Daniel Ogheneovo Department of Electrical and Electronic Engineering Federal Polytechnic,
More informationAssessment of Load Shed Service for Import (LSSi) Product
Assessment of Load Shed Service for Import (LSSi) Product Date: March 27, 2014 Prepared by: Prepared for: Mike Law Jenny Chen Senior Market Design Specialist Vice President, Market Services Table of Contents
More informationMethodology for Determining and Communicating System Operating Limits for the Planning Horizon (FAC-010 & -014) Revision Log
Revision Log Page 2 of 13 Revision or Change Number Effective Date Affected Page Numbers Description of Revision/Change 0000 03-26-2011 All Converted TPD document to SPP format 0001 03-26-2012 All Annual
More informationMethodology PLG-METH-0002-V1
Methodology Department: Document No: System Planning and Strategic Projects PLG-METH-0002-V1 Title: Transmission Planning Assessment Practices Issue Date: September 27, 2012 Previous Date: Nov. 18, 2011
More informationMedium Voltage UPS Solutions - When and Why? Frank Herbener, Piller Group GmbH, Germany
Medium Voltage UPS Solutions - When and Why? Frank Herbener, Piller Group GmbH, Frank.Herbener@Piller.com, Germany 1 Contents 1 Scope 3 2 Power Demand and Distribution in today s Mission Critical Applications
More informationOUTAGE COORDINATION PROCESS
OUTAGE COORDINATION PROCESS October 3, 2016 www.peakrc.com. Classification: Public Page 0 of 67 Effective Date: Apr 01, 2017 Contents 1. Conventions... 2 2. Introduction... 2 3. Purpose... 2 4. Applicability...
More informationThe Value of Customer Reliability to the Utility
The Value of Customer Reliability to the Utility Interviewing Lee Taylor, Consulting Engineer Presentation to IEEE Working Group on Distribution Reliability June 20, 2006 Montreal Canada Overview Service
More informationSmart Grid Demonstrations Cost and Benefit Analysis Methodology
Presentation Identifier (Title or Location), Month 00, 2008 Cost and Benefit Analysis Framework: Update EPRI Smart Grid Advisory Meeting October 14, 2009 Albuquerque, New Mexico Steve Bossart Director,
More informationIJSRD - International Journal for Scientific Research & Development Vol. 4, Issue 04, 2016 ISSN (online):
IJSRD - International Journal for Scientific Research & Development Vol. 4, Issue 04, 2016 ISSN (online): 2321-0613 Microgrid Protection using Adaptive Overcurrent Relays Narendra J. Mahala 1 Jignesh B.
More informationTSO Comparison Group
Comparison Group September 201 1 Introduction Our mission is to exchange information on our current and future operating practices for the purpose of benchmarking. An annual survey is undertaken to ascertain
More information1. For s, a, initialize Q ( s,
Proceedings of the 2006 Winter Simulation Conference L. F. Perrone, F. P. Wieland, J. Liu, B. G. Lawson, D. M. Nicol, and R. M. Fujimoto, eds. A REINFORCEMENT LEARNING ALGORITHM TO MINIMIZE THE MEAN TARDINESS
More informationEffects of Wide-Area Control on the Protection and Operation of Distribution Networks
Effects of Wide-Area Control on the Protection and Operation of Distribution Networks Will Allen Schweitzer Engineering Laboratories, Inc. Published in Wide-Area Protection and Control Systems: A Collection
More informationElectrical Networks Principles and Performance
Engineering Standard Electrical Networks Electrical Networks Principles and Performance Version: 1 Issued: January 2015 Owner: Chief Engineer Approved By: Paul O Halloran Chief Engineer PRINTOUT MAY NOT
More informationCOMPARISON OF BOTTLENECK DETECTION METHODS FOR AGV SYSTEMS. Christoph Roser Masaru Nakano Minoru Tanaka
Roser, Christoph, Masaru Nakano, and Minoru Tanaka. Comparison of Bottleneck Detection Methods for AGV Systems. In Winter Simulation Conference, edited by S. Chick, Paul J Sanchez, David Ferrin, and Douglas
More informationDeterministic-based power grid planning enhancement using system well-being analysis
J. Mod. Power Syst. Clean Energy https://doi.org/10.1007/s40565-018-0390-8 Deterministic-based power grid planning enhancement using system well-being analysis Wijarn WANGDEE 1 Abstract This paper presents
More informationPepco s Reliability Enhancement Model Using Predictive Reliability to Plan Investment in Electrical Infrastructure
1 Pepco s Reliability Enhancement Model Using Predictive Reliability to Plan Investment in Electrical Infrastructure General Meeting of the IEEE Power Engineering Society Panel Discussion Predictive Reliability
More information25 Distribution System A utomation
Distribution System A utomation Introduction 25.1 Factors influencing the application of automation to distribution networks 25.2 Primary distribution system automation 25.3 Secondary distribution networks
More information