Movement & Place Strategic into Tactical and Operational. Sameem Moslih Director Journey Services
|
|
- Silvester Cole
- 6 years ago
- Views:
Transcription
1 Movement & Place Strategic into Tactical and Operational Sameem Moslih Director Journey Services
2 What is movement & place? A road/street is a movement conduit.
3 Movement & Place What is Place? What is movement & place? A road/street is also a place, a destination in its own right
4 Movement & Place Design Objectives What is movement & place? Movement: minimise commute time Place: extend dwell time
5 Movement & Place framework Top-down Transport Integration Act Network Development Strategy Plan Melbourne Movement Place Road Safety Environment Bottom-up Transport bodies Community
6 Transport System Objectives Objectives Themes Social and economic inclusion Economic prosperity Efficiency, coordination and reliability Movement Integration of transport and land use Safety and health and wellbeing Environmental sustainability Place Road Safety Environment Reference: Transport Integration Act 2010
7 Why is it important? integrates movement, place, safety and environment Movement Road Safety Place Environment builds on SmartRoads provides a common language
8 Uses of a Network Operations Plan Movement & Place modules NETWORK CLASSIFICATION PERFORMANCE ASSESSMENT P1 P2 P3 P4 P5 PLACE M1 M2 STRATEGIC LEVEL M3 M4 M5 MOVEMENT DESIGN GUIDES OPTIONS ASSESSMENT PROJECT LEVEL
9 Defining classifications Place Users Environment
10 Place classification Strategic significance Local PLACE P1 P2 P3 P4 P5 Level Description Example P1 State level CBD P2 Regional level Box Hill, Ballarat CBD P3 Municipal level Bridge Rd, Benalla CBD P4 Neighbourhood level Balwyn Shops, Maldon P5 Limited Use / Limited Access Monash Fwy, Foxhow Rd
11 Movement classification MOVEMENT Strategic significance M1 M2 M3 Description M4 M1 Mass movement of people & goods at high speeds on routes with a State or National level movement function or primary access to a State level place. Local M5 M2 M3 Significant movement of people & goods at moderate speed on routes connecting across multiple municipalities or primary access to Regional level places. Moderate movement of people & goods on routes connecting municipalities or primary access to Municipal level places. M4 Movement of people & goods at lower speed within a municipality M5 Local movement at low speeds
12 M&P classifications Local street M5/P
13 Movement & Place classification
14 User classification - Bus Bus network hierarchy classification Level B1 B2 B3 B4 Description Mass movement of people providing high frequency access to a high level places. e.g. Segments with 12+ Scheduled services per hour at peak times in each direction. Significant movement of people at moderate frequency e.g. Segments with 6-11 Scheduled services per hour at peak times in each direction. Movement of people at lower frequency that provides primarily provides access to lower order places. e.g. Segments with 4-5 scheduled services in peak times in each direction. Movement of people at low / irregular frequency that provides access to lower order places. e.g Segments with 3 scheduled services in peak times in each direction.
15 Link classification Movement: Place: General traffic: Tram: Walking: M3 P3 GT4 T2 W1
16 How to use classifications Strategic Narrative Structure Planning Planning Referrals Public Enquiries Traffic Signal Operation Event Management Disruption Management
17 Quantifying performance Quality score = Indicator rating x M&P Weighting
18 Performance indicators Themes Indicators Movement Place Road Safety Travel time Level of Traffic Stress Pedestrian delay Access Amenity Walkability Risk Environment Emissions Noise
19 Quantifying indicator ratings Quality Rating Shortfall A 0 B 1 C 2 D 3 E 4
20 Indicator weightings
21 Indicator weightings Weighting Priority Weighting Very high 10 High 2-4 Medium 1 Low 0.5 Very low 0
22 Indicator weightings
23 Example of quantifying performance Road segment: Classification: High Street, Kew M3, P5, T1
24 Tram Travel Speed Quality Rating C D C Road segment: Classification: D High Street, Kew M3, P5, T1 E D C B A
25 Tram Travel Speed Quality Score Score = Indicator rating x Weighting Quality Rating A B C D E Shortfall = 3 x 4.0 = 12 Road segment: Classification: High Street, Kew M3, P5, T1
26 Case study Melbourne CBD
27 SmartRoads Preferred Traffic Routes
28 SmartRoads Preferred Traffic Routes
29 SmartRoads Preferred Traffic Routes
30 SmartRoads Preferred Traffic Routes
31 Movement & Place
32
33 Making Better Use of Data 33
34 Model Overview 1. Queries began about seven years ago (Build was from 2015) 2. Build a network based on how the intersections operate Derived from VISUM application by Transport for London Assignment with ICA in VISUM Bespoke not Generic Link Capacities 3. Be able to answer questions quickly Same day/next day/ next week responses 4. Easy to use: Simple Graphic User Interface (no scripting) Develop the capability across the organisation 5. Not a focus on demand forecasting (or longer term planning) Domino: Connecting the network of pieces Nov 17 34
35 Domino: Connecting the network of pieces Nov 17
36 Short Term Turnarounds: St Kilda Rd Alternate corridors being explored
37 Future: Systems and Tools: Real time lane by lane traffic volumes and speeds Personalised information to our customers Origin destination data Real time predictive model Mobility as a Service Model Staff Capabilities: Traffic Engineering/Network Control expertise Data analytics, insights User Centred Design Experts with empathy Domino: Connecting the network of pieces Nov 17
38 Domino: Connecting the network of pieces Nov 17 THANK YOU
Network Operation Planning - A new approach to managing congestion
Network Operation Planning - A new approach to managing congestion Andrew Wall VicRoads, Melbourne, VIC, Australia 1 Introduction Congestion is an unavoidable aspect of most urban cities. However, there
More informationAUCKLAND TRANSPORT / NZ TRANSPORT AGENCY NETWORK OPERATING FRAMEWORK TRIAL
Network Operating Plan Trial R Douglas-Jones, R Lloyd & P Glucina Page 0 AUCKLAND TRANSPORT / NZ TRANSPORT AGENCY NETWORK OPERATING FRAMEWORK TRIAL Author & Presenter: Rob Douglas-Jones MEng (Hons) Traffic
More informationIntegrated Transport Model of Thuringia
Florian M. Heinitz, Diana Pataki Nagy Integrated Transport Model of Thuringia Guest Lecture, KTI Budapest, 6 May 2010 Outline Introduction Supply Side Modelling Demand Side Modelling Application Projects
More informationAnalytical Tools and Decision Support Systems SANDAG I-15 ICM. ITS PA January 30 th, 2014
Analytical Tools and Decision Support Systems SANDAG I-15 ICM ITS PA January 30 th, 2014 Project Partners/Stakeholders National ICM Evaluator National AMS Contractor 2 San Diego I-15 Corridor 21 mile corridor
More informationThe Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives.
4 Goals & Objectives INTRODUCTION The 2015-2040 MTP preserves and promotes the quality of life and economic prosperity of the MAB by providing a transportation system consistent with the regional goals.
More informationMaster Plan. Summary
R e g i o n a l Tr a n s p ortat i o n Master Plan Summary Executive Summary With an increasing population and changing demographics, Waterloo Region must ensure that growth is both sustainable and affordable.
More informationGreenhouse Gas Emission Reduction Strategies
Greenhouse Gas Emission Reduction Strategies 2011 ITE Quad Conference April 18 19, 2011, Embassy Suites; Lynnwood, WA Victor L. Sl Salemann, PE Senior Associate David Evans and Associates Bellevue, WA
More informationCO N S T R U C T I O N CO O R D I N AT I O N
CO O R D I N AT I O N BOOM The City of Toronto is undergoing an unprecedented construction boom Toronto is recognized as a great place to live, work, and do business. The city has rapidly grown to become
More informationFUTURE BUS RAPID TRANSIT PLANS
ATTACHMENT 1 Preferred Configuration Saskatoon Bus Rapid Transit - Preferred Configuration FUTURE BUS RAPID TRANSIT PLANS Plan For Growth Transportation Plan BRT Plan October 2017 saskatoon.ca/engage 1
More informationScope of Work. Project Approach and Understanding. Task 1: Study Initiation and Administration
Scope of Work Route 116/Hinesburg Growth Center Corridor Study Town of Hinesburg and CCRPC Project Approach and Understanding Route 116 through Hinesburg had seen substantial changes in the past 15 years,
More informationAuckland Transport Alignment Project. Arterial Roads Report
Auckland Transport Alignment Project Arterial Roads Report Contents 1. Executive Summary... 4 2. Background... 5 3. Arterial Road Productivity... 7 3.1. Defining Productivity... 7 3.2. Operational Performance
More informationPassenger service for the Dudding Hill line: brief for feasibility study
Appendix 1: Specification for a Study Passenger service for the Dudding Hill line: brief for feasibility study Introduction The West London Alliance is currently investigating ways of accommodating the
More informationSection 11: Transportation Strategies Toolbox
Section 11: Transportation Strategies Toolbox A transportation strategies toolbox was developed to provide a systematic approach to identify potential strategies that address corridor transportation needs.
More information3. STATION SPACING AND SITING GUIDELINES
3. STATION SPACING AND SITING GUIDELINES The station spacing and siting guidelines are summarized in Table 3-1. Table 3-1 also includes benchmark information for local transit service and express bus as
More informationTRANSPORTATION MOBILITY PLAN GUIDELINES
TRANSPORTATION MOBILITY PLAN GUIDELINES for Development Applications November 2016 Executive Summary The Regional Municipality of York (the Region) is located in the heart of the Greater Toronto Area (GTA)
More informationBuilding the Regional Transit Strategy
oregonmetro.gov/rtp 2018 Regional Transportation Plan Building the Regional Transit Strategy TriMet Board of Directors August 9, 2017 Regional Transportation Plan Sets the course for moving the region
More informationCHAPTER 2 - TRAVEL DEMAND MODEL DEVELOPMENT
CHAPTER 2 - TRAVEL DEMAND MODEL DEVELOPMENT 2.1 EXISTING TRAVEL DEMAND MODEL In order to accurately project future year traffic volumes within this regional study area, it was first necessary to construct
More informationTravelSmart: Planning for Sustainable Urban Transportation
Case Studies in Sustainable Transportation KAMLOOPS, BRITISH COLUMBIA CASE STUDY 3 TravelSmart: Planning for Sustainable Urban Transportation Organization City of Kamloops Transportation Department, Community
More informationIntegrating Frequent Transit Service & Corridor-based Transit Supportive Environments in the Metro Vancouver Region. July 2009
South Coast British Columbia Transportation Authority Integrating Frequent Transit Service & Corridor-based Transit Supportive Environments in the Metro Vancouver Region July 2009 By: Lyle Walker, Transportation
More informationTRAFFIC ADVISORY LEAFLET
TRAFFIC ADVISORY LEAFLET ITS 9/03 Community Transport This leaflet is one of a series of documents from the ITS Assist Project. ITS Assist is a Department for Transport (DfT) initiative that aims to encourage
More informationData processing. In this project, researchers Henry Liu of the Department of Civil Engineering and
Data mining of transit vehicle location, passenger count, and fare collection databases for intelligent transportation applications Supporting efficient transit service by maximizing the use of available
More informationGUIDING PRINCIPLES MEMORANDUM
M E T R O P O L I TAN TRA NS P O RTATI O N PLAN GUIDING PRINCIPLES MEMORANDUM El Paso Metropolitan Planning Organization INTRODUCTION The guiding principles for development of the El Paso MPO s Destino
More informationActive Risk Management - Charles River Basin
Protecting, Promoting and Enhancing our Commonwealth: Assisting MassDOT to deliver projects on Time and on Budget Active Risk Management - Charles River Basin September 18, 2013 & Massachusetts Accelerated
More informationJULY This guide is to be used for the Sustainable Transport Credits in the Transport Category.
JULY 2015 This guide is to be used for the Sustainable Transport Credits in the Transport Category. For information on this document, please contact: Green Building Council of Australia (02) 8239 6218
More informationVEHICLES MILES TRAVELED (VMT) TRAFFIC IMPACT METRIC
VEHICLES MILES TRAVELED (VMT) TRAFFIC IMPACT METRIC A project-specific quantified analysis of the MGA Campus has been undertaken to compare BAU to the project including the project s VMT reduction program
More informationVISUM State-of-the-Art Travel Demand Modeling VISUM
State-of-the-Art Travel Demand Modeling VISUM What is VISUM? VISUM is a comprehensive, flexible software system for transportation planning, travel demand modeling and network data management. VISUM is
More informationState Transit Authority. Corporate Plan June 2016 (Issue 5) State Transit Authority. Corporate Plan June 2016 (Issue 5) 1
Corporate Plan 2012-2017 June 2016 (Issue 5) Corporate Plan 2012-2017 June 2016 (Issue 5) 1 Contents Chief Executive s Message...3 Our Business...4 Our Challenges...4 Our Ambition...5 Our Initiatives...5
More informationSUTRA : Sustainable Urban Transportation for the City of Tomorrow
Preliminary Report SUTRA : Sustainable Urban Transportation for the City of Tomorrow WP 03: Multi-modal Transportation Modelling D03.3 User Manual and Example Test Data Sets First Draft Karlsruhe, January
More information1 Introduction 4. 2 Our vision 5. 3 Critical transport challenges 6. 4 Keeping it customer-focussed 10
GREATER MANCHESTER TRANSPORT STRATEGY 2040 EXECUTIVE SUMMARY 2040 A sustainable urban mobility plan for the future February 2017 2 GREATER MANCHESTER TRANSPORT STRATEGY 2040 EXECUTIVE SUMMARY Contents
More informationHCM 6th Edition Planning and Preliminary Engineering Applications Guide (PPEAG) to the HCM Bringing Back-of-the-Envelope Back.
HCM 6th Edition Planning and Preliminary Engineering Applications Guide (PPEAG) to the HCM Bringing Back-of-the-Envelope Back April, 2017 Potential Use of the HCM in Planning The HCM is commonly used to
More informationSustainable design and construction
Sustainable design and construction efficiency Waste Water Materials Ecology & biodiversity Health & wellbeing Extensive green roof for habitat diversity Accessible private outdoor space - balconies, wintergardens
More informationTravel Demand Modeling At NCTCOG
Travel Demand Modeling At NCTCOG Arash Mirzaei North Central Texas Council Of Governments For University of Texas at Arlington ITE Student Chapter March 9, 2005 Agenda Background DFW Regional Model Structure
More informationNottinghamshire County Council Environment. Nottinghamshire County Council
Nottinghamshire County Council Environment Nottinghamshire County Council LTP 2 Guidance, Links to Development Control and Timetable Kevin Sharman LTP Team Manager Aims Overview of LTP 2 guidance New requirements
More informationSIEMENS CONCERT: City of Seattle
SIEMENS CONCERT: City of Seattle Use of ATMS to Enhance and Extend Signal Operations Abstract: Today s signal systems are part of a complex environment that includes varied and disparate data sources and
More informationCITY OF VALLEJO PUBLIC WORKS DEPARTMENT TRAFFIC IMPACT Analysis/Study GUIDELINES
The City Engineer, under the authority of the Public Works Director and recommendations from the Traffic Engineer, will make the final decision on the need for a traffic study. The purpose of the traffic
More informationInput from Engineers Ireland Into the Department of Transport s Statement of Strategy
Input from Engineers Ireland Into the Department of Transport s Statement of Strategy 2008 2010 Table of Contents Page Executive Summary 3 Department of Transport Mandate and Mission (2005-2007) 4 The
More informationTONBRIDGE & MALLING BOROUGH COUNCIL. PLANNING and TRANSPORTATION ADVISORY BOARD. 15 November 2016
Part 1- Public TONBRIDGE & MALLING BOROUGH COUNCIL PLANNING and TRANSPORTATION ADVISORY BOARD 15 November 2016 Report of the Director of Planning, Housing & Environmental Health Matters for Recommendation
More informationOverview of City of Dallas and DART Interlocal Agreements
Overview of City of Dallas and DART Interlocal Agreements Council Transportation and Environment Committee Prepared by Transportation Programs Public Works and Transportation March 24, 2008 Purpose of
More informationHORIZON 2030: Plan Projects November 2005
Horizon PROJECTS 2030 Projects 10-1 10-2 The Horizon 2030 Project Information section is comprised of individual project information in alphabetical order by project name. The information provided for
More informationDraft Newell Highway Corridor Strategy SUBMISSION June 2014
Draft Newell Highway Corridor Strategy SUBMISSION June 2014 1 This Regional Organisation of Councils speaks for over 236,000 people covering an area of more than 70,000sq kms comprising Bathurst Regional,
More informationSUBJECT: Draft New Official Plan: Public Consultation and Engagement Summary
Page 1 of Report PB-47-17 SUBJECT: Draft New Official Plan: Public Consultation and Engagement Summary TO: FROM: Planning and Development Committee Planning and Building Department Report Number: PB-47-17
More informationContent of the module
Content of the module Methodology approach Planning process Definition of working area Population and territorial context Supply Infrastructure Transport service Demand On board / at the stations or bus
More informationChapter 4: Transportation and Land Use
Chapter 4: Transportation and Land Use Transportation and land use together make possible the wide range of destination opportunities in the region. Transportation provides the connections, and, in turn,
More informationMETROPOLITAN RAILWAY NETWORK TRACK OCCUPATION PROTOCOL
Approval Name Position Signature/Date Document Author Adam Graves Network Program Planning Manager Document Endorsers Approving Manager Scott Short Karen Wilson Robb van Toledo Manager, Network Scheduling
More informationSUSTAINABLE TRANSPORT: CHALLENGES AND OPPORTUNITIES
Paper for presentation at the Conference on Public Transport and Urban Citizenship: Making Dublin the Capital of Ireland 21 st September 2007 SUSTAINABLE TRANSPORT: CHALLENGES AND OPPORTUNITIES David Banister
More informationCraig McGeoch Integration of Mega Projects into the Existing Road Network the Critical Role of Traffic Modelling
CRAIG MCGEOCH Principal Manager Road Network Analysis Roads and Maritime Services craig.mcgeoch@rms.nsw.gov.au INTEGRATION OF MEGA PROJECTS INTO THE EXISTING NETWORK THE CRITICAL ROLE OF TRAFFIC MODELLING
More informationARAD THE CHARACTER CITY WB LEARNING EXCHANGE 7/6/2010
ARAD THE CHARACTER CITY WB LEARNING EXCHANGE 1 Basic facts Geographical location: Surface: Population: GDP: Climate: Altitude: Western part of Romania, at the border with Hungary, on the banks of the Mures
More informationLUNDY S LANE COMMUNITY IMPROVEMENT PLAN STUDY
PUBLIC INFORMATION MEETING # October, 0 LUNDY S LANE COMMUNITY IMPROVEMENT PLAN STUDY AGENDA :00 to :0pm: Open House :0 to :pm: Presentation : to :00pm: Individual paced workshop with the Study Team PUBLIC
More informationCollaborative, sustainable & holistic: Integrated transport and land-use planning in Hume
Collaborative, sustainable & holistic: Integrated transport and land-use planning in Hume Janet Rice Senior Strategic Transport Planner Hume City Council GAMUT Outer Metropolitan Transport Forum 21 July
More information2040 Transportation Policy Plan Conversion to Performance Based Planning Basis. 25 th Annual CTS Transportation Research Conference May 21, 2014
2040 Transportation Policy Plan Conversion to Performance Based Planning Basis 25 th Annual CTS Transportation Research Conference May 21, 2014 1 About the plan Long-range transportation plan for the Twin
More informationLARKSPUR SMART STATION AREA PLAN. Public Workshop December 3, 2013
LARKSPUR SMART STATION AREA PLAN Public Workshop December 3, 2013 0 PURPOSE OF Provide information about the regional planning context for the Larkspur Station Area, including Plan Bay Area, SMART, and
More informationRapid Transit in Winnipeg. Winnipeg TOD Summit November 17, 2014
Rapid Transit in Winnipeg Winnipeg TOD Summit November 17, 2014 Presentation Overview Rapid Transit (RT) in Winnipeg What is RT? What are our RT plans? Near term Longer term Comments re: TOD OurWinnipeg
More information4.12 Public and Emergency Services
4.12 Public and Emergency Services Public services include schools, community centers, cemeteries, and social service providers. Emergency services include fire and police stations and services, hospitals,
More informationApply DynusT Model for Incident Management along Loop 101 Corridor
Apply DynusT Model for Incident Management along Loop 101 Corridor Lili(Leo) Luo, P.E. ITS/Safety Engineer Sarath Joshua, P.E. ITS/Safety Program Manager What do Transportation Models do? Help us answer
More informationTransit Demand Analysis
Transit Demand Analysis Purpose To determine impact on ridership and revenues of any change in service policy. Need to know how demand estimates will be used. May not require an elaborate analysis in many
More informationTRAFFIC ADVISORY LEAFLET
TRAFFIC ADVISORY LEAFLET ITS 7/03 Public Transport Information This leaflet is one of a series of documents from the ITS Assist Project. ITS Assist is a Department for Transport (DfT) initiative that aims
More informationIncorporating TMS into Planning. Jianming Ma, Ph.D., P.E.
Incorporating TMS into Planning Jianming Ma, Ph.D., P.E. Table of Contents 1 What is TMS 3-4 2 Transportation Environment is Changing 5-6 3 Benefits from TMS 7-8 4 Traditional Approach to Managing Transportation
More informationManagement. VA SITE Annual Meeting June 27, 2013 Jay Styles Performance and Strategic t Planning Manager, Business Transformation Office
VDOT and MAP-21 Performance Management VA SITE Annual Meeting June 27, 2013 Jay Styles Performance and Strategic t Planning Manager, Business Transformation Office Overview Map-21- How is VDOT Preparing?
More informationTransAction Plan October 2017
Transportation Action Plan for Northern Virginia TransAction Plan October 2017 TransAction is the multimodal transportation master plan for Northern Virginia. It is a long range plan addressing regional
More informationRegion of Waterloo Stage 1 Light Rail Transit Project. Definitions, Acronyms, Cited References Article 1 Definitions.
Region of Waterloo Stage 1 Light Rail Transit Project Definitions, Acronyms, Cited References Article 1 Definitions Table of Contents 1.0 Definitions... 1-1 ARTICLE 1 DEFINITIONS 1.0. Definitions. In the
More informationStandard Performance Attributes for Transportation Projects
Standard s for Transportation Projects Mainline Operations Local Operations Maintainability Construction Impacts Environmental Impacts Project Schedule An assessment of traffic operations and safety on
More informationThe proposed Economy Indicators are:
Indicators The following indicators were derived from the Research Roundtable Workshop discussions and previous indicator research undertaken by the Design Centre for Sustainability and its partner research
More information1 RICHMOND HILL CENTRE / LANGSTAFF URBAN GROWTH CENTRE - TRANSPORTATION STUDY
Report No. 4 of the Transportation Services Committee Regional Council Meeting of April 22, 2010 1 RICHMOND HILL CENTRE / LANGSTAFF URBAN GROWTH CENTRE - TRANSPORTATION STUDY The Transportation Services
More informationProject Evaluation Criteria
Project Evaluation Criteria Goals and Objectives were developed to guide Envision 35 Long Range Transportation Plan (LRTP) Update. These guiding principles were based on the requirements included in the
More informationChallenges for CBD Freight in Sydney s Transformation. Michael Stokoe 11 October 2016
Challenges for CBD Freight in Sydney s Transformation Michael Stokoe 11 October 2016 CBD Coordination Office Functions include: Communications Operational planning: traffic management and contingency planning
More informationCongestion Management Process 2013 Update
OVERVIEW OF THE DALLAS-FORT WORTH CONGESTION MANAGEMENT PROCESS Traffic Congestion In The Dallas-Fort Worth Region With the Dallas-Fort Worth (DFW) urban area as its center, the North Central Texas region
More informationAMPO Annual Conference Session: Performance (Part 1) October 18, 2017 Savannah, GA
AMPO Annual Conference Session: Performance (Part 1) October 18, 2017 Savannah, GA Introduction: North Jersey Transportation Planning Authority NJTPA Congestion Management Process Study Goals Analysis
More informationDowntown Las Vegas Multi-modal Transportation Project Las Vegas, Nevada. Appendix A: Benefit-Cost Analysis
Downtown Las Vegas Multi-modal Transportation Project Las Vegas, Nevada Appendix A: -Cost Analysis EXECUTIVE SUMMARY Appendix A: Cost Analysis Table 1: s and Description by Evaluation Criteria Long-Term
More informationINDEPENDENT PUBLIC INQUIRY SYDNEY S LONG TERM PUBLIC TRANSPORT PLAN
INDEPENDENT PUBLIC INQUIRY PO Box 484 North Sydney NSW 2059 SYDNEY S LONG TERM PUBLIC TRANSPORT PLAN T: 02 8904 1011 F: 02 8904 1133 E: nswmanager@planning.org.au About PIA The Planning Institute of Australia
More informationAppendix A: Benefit Cost Analysis
EXECUTIVE SUMMARY Appendix A: Cost Analysis Table 1: s and Description by Evaluation Criteria Long-Term Outcomes Categories Types of Societal s Livability Community Development (net of capitalized travel
More informationPlanning for Growth and Change. Elective Course March 7 th 2015
Planning for Growth and Change Elective Course March 7 th 2015 Planning for Growth & Change Darren Todd - City Wide Policy & Integration Liliana Vargas - Transportation Planning Presentation Objectives
More informationAPPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies
APPENDIX B Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies Revised December 7, 2010 via Resolution # 100991 Reformatted March 18, 2011 TABLE OF CONTENTS
More information407 TRANSITWAY. Planning & Preliminary Design
FROM EAST OF HIGHWAY 400 TO KENNEDY ROAD GWP #252-96-00 Public Information Centre #2 June 24 th and 29 th, 2010 Purpose of Public Information Centre #2 The first Public Information Centre (PIC #1) was
More informationNORTH EAST LINK INFRASTRUCTURE AUSTRALIA REFORM AND INVESTMENT FRAMEWORK TEMPLATES FOR USE BY PROPONENTS
NORTH EAST LINK INFRASTRUCTURE AUSTRALIA REFORM AND INVESTMENT FRAMEWORK TEMPLATES FOR USE BY PROPONENTS (To be read in conjunction with Infrastructure Australia s Better Infrastructure Decision-Making)
More informationTHAT Council adopt the Congestion Management Strategy as outlined in this report
RR3 ADMINISTRATIVE REPORT Report Date: May 2, 2017 Contact: Winston Chou Contact No.: 604.873.7913 RTS No.: 011564 VanRIMS No.: 08200020 Meeting Date: May 16, 2017 TO: FROM: SUBJECT: Vancouver City Council
More information20. Alternative Ranking Using Criterium Decision Plus (Multi-attribute Utility Analysis)
The selection of the preferred alternative, using a structured decision process, begins with creation of the decision hierarchy. The hierarchy is the clear organization of the goal, listing of categories
More informationModeling Traffic Flow under Emergency Evacuation Situations: Current Practice and Future Direction
Modeling Traffic Flow under Emergency Evacuation Situations: Current Practice and Future Direction Kevin D. Moriarty Research Assistant Transportation Engineering November 16, 2006 Overview Introduction
More informationPSRC s 2018 Regional FTA Competition Project Evaluation Criteria
PSRC s 2018 Regional FTA Competition Project Evaluation Criteria Guidance for PSRC s 2018 Regional FTA Competition was adopted as part of the 2018 Policy Framework for PSRC s Federal Funds. The policy
More informationUIC / UITP Performance Conference. 22 February 2012
UIC / UITP Performance Conference 22 February 2012 Summary Yarra Trams at a glance Our challenges PRIDE our performance philosophy Some analytical examples Network change reviews Our key findings Yarra
More informationPTV Vision. Suite. SMALL AA-Size. LARGE C-Size. X-LARGE D-Size. BASE A-Size. MEDIUM B-Size PTV VISION PRICE LIST 2008
TRAFFIC MOBILITY LOGISTICS 1/2008 Page 1 PTV Vision Suite PTV VISION PRICE LIST 2008 FOR THE AMERICAS* (U.S. DOLLARS) The PTV Vision Suite is an integrated suite of transportation analysis tools. The prices
More informationTECHNICAL ADVISORY COMMITTEE. January 29, 2013
TECHNICAL ADVISORY COMMITTEE January 29, 2013 1 Introductions and Review Common TAC and PAG comments TAC-specific input Refined Draft Scoring Factors/Transit Development Strategy review Revised Transit
More informationUPDATE OF THE SIGNAL TIMING MANUAL
Project No. 3-103 COPY NO. X UPDATE OF THE SIGNAL TIMING MANUAL PRELIMINARY DRAFT FINAL REPORT Prepared for National Cooperative Highway Research Program Transportation Research Board of The National Academies
More informationUS & USRC Track Capacity Study Train Capacity Analysis Present to Maximum Capacity and Beyond
Transportation Metrolinx US & USRC Track Capacity Study Prepared by: AECOM 5080 Commerce Boulevard 905 238 0007 tel Mississauga, ON, Canada L4W 4P2 905 238 0038 fax www.aecom.com AECOM Project Number:
More informationCAPITAL AREA TRANSIT PLANNING SERVICE STANDARDS AND PROCESS
CAPITAL AREA TRANSIT PLANNING SERVICE STANDARDS AND PROCESS Customer Experience Department January 2013 1 INTRODUCTION Transit Service Standards are public rules and guidelines used to make decisions about
More informationOUTCOMES. Journey Reliability Policy Workshop Keeping Melbourne Moving. Thursday 23 November 2017 Aurecon Centre, Melbourne
OUTCOMES Journey Reliability Policy Workshop Keeping Melbourne Moving Thursday 23 November 2017 Aurecon Centre, Melbourne Welcome and Introduction Steve Cooley Roads Australia Journey Reliability Chapter
More informationNorth Central Bedfordshire Growth Options Study Appendix 5 part 2
Central Bedfordshire Council www.centralbedfordshire.gov.uk rth Central Bedfordshire Growth Options Study Appendix 5 part 2 July 2017-1 - Location ID: N14 Name: Potton West Location area: 93.2 hectares
More informationIntelligent Transportation Systems Master Plan
Space Coast Transportation Planning Organization Intelligent Transportation Systems Master Plan April 15, 2014 Version 1.0 Prepared for: Space Coast Transportation Planning Organization 2725 Judge Fran
More information2030 Transportation Policy Plan SUMMARY PRESENTATION. Land Use Advisory Committee November 15, 2012
2030 Transportation Policy Plan SUMMARY PRESENTATION Land Use Advisory Committee November 15, 2012 Today s Topics Transportation Policy Plan (TPP) Requirements and Background Current TPP Policies, Issues
More informationFacts that provide correct decision-making input
Road data brochure Ask us at Road Data. We know. Facts that provide correct decision-making input Road Data operations at the Swedish Road Administration (SRA) exist all over the country. Just as our name
More informationSmarter Cities: Citizen Inclusion Citizen Collaboration & Social Media Analytics & Maturity Model Findings for Ljubljana
Smarter Cities: Citizen Inclusion Citizen Collaboration & Social Media Analytics & Maturity Model Findings for Ljubljana Michele Leonardi, COO IBM Slovenia Big Data is the Next Great Natural Resource IBM
More informationTransAction Plan Draft for Public Comment Spring/Summer 2017
Transportation Action Plan for Northern Virginia TransAction Plan Draft for Public Comment Spring/Summer 2017 Comments are invited on this TransAction Plan, and associated TransAction Plan Project List.
More informationIPSWICH NORTHERN ROUTES STUDY. Stage 1 Progress
IPSWICH NORTHERN ROUTES STUDY Stage 1 Progress 17 th January 2017 STUDY CONTEXT 2 The study is being funded in partnership with the Suffolk district and borough councils. Work forms part of the Suffolk
More informationSR 99 Incident Response After- Action Plan
SR 99 Incident Response After- Action Plan Background On June 10, 2014 at 1:52 PM, a pickup truck and a passenger car collided on southbound SR 99 (E Marginal Way S), just south of S Spokane St. The SDOT
More informationCity of Brantford Chapter 3 TABLE OF CONTENTS
Chapter 3 The Land Use & Transportation Connection TABLE OF CONTENTS 3.1 THE LAND USE & TRANSPORTATION LINK... 1 3.2 POPULATION & EMPLOYMENT GROWTH FORECASTS... 3 3.2.1 Proposed Places to Grow Plan Forecasts
More informationGUIDELINES FOR SELECTING TRAVEL FORECASTING METHODS AND TECHNIQUES
GUIDELINES FOR SELECTING TRAVEL FORECASTING METHODS AND TECHNIQUES Maren Outwater and Jeff Doyle, RSG, 55 Railroad Row, White River Junction, VT 05001 maren.outwater@rsginc.com, jeff.doyle@rsginc.com ABSTRACT
More informationDowntown Estes Loop Project Frequently Asked Questions
May 15 th, 2015 Project Status 1) Has Alternative 1 already been selected? Is it a done deal? Response: The NEPA process will proceed with environmental analysis of both the No Action and Alternative 1.
More informationPINELLAS COUNTY MOBILITY PLAN SUMMARY REPORT
PINELLAS COUNTY MOBILITY PLAN SUMMARY REPORT In September, 2013, the Pinellas County Mobility Plan Report was approved by the Metropolitan Planning Organization (MPO). This action endorsed a countywide
More informationDEVELOPMENT OF A WEB-BASED TOOL TO SUPPORT THE DEVELOPMENT OF CITY-LEVEL URBAN TRANSPORT ROADMAPS TO 2030
0 0 0 DEVELOPMENT OF A WEB-BASED TOOL TO SUPPORT THE DEVELOPMENT OF CITY-LEVEL URBAN TRANSPORT ROADMAPS TO 00 Sujith Kollamthodi, Corresponding Author Ricardo-AEA Limited Harwell Business Centre, Didcot,
More informationLos Angeles Westside Purple Line Extension Project Challenges and Lessons Learned
Los Angeles Westside Purple Line Extension Project Challenges and Lessons Learned Ashok Kothari, P.E. WSP USA, Sr. Vice President Los Angeles, California Michael McKenna, P.E. LACMTA Executive Officer,
More informationTransit Oriented Development Study
Federal Way Link Extension Transit Oriented Development Study Table of Contents Executive Summary ES 1 Chapter 1: Introduction.. 1-1 Chapter 2: Methodology. 2-1 Chapter 3: Project Overview 3-1 Chapter
More information