1 Apply DynusT Model for Incident Management along Loop 101 Corridor Lili(Leo) Luo, P.E. ITS/Safety Engineer Sarath Joshua, P.E. ITS/Safety Program Manager
2 What do Transportation Models do? Help us answer the What if questions. One example: What if we adjust the splits given the existing Turning Movement Volumes? Would that reduce delay? With one catch: The underlying method/algorithm of the model is sound or at least its limitations are well understood.
3 Example: SYNCHRO One of the most widely used signal timing models Implementation of HCM method and other analytical methods Did not account for intersection spill back or turn bay blockage, etc. Limitations may be addressed through timing fine tuning process --Still considered a very useful tool for signal timing analysis
4 Role of Models We should not discard all Models because they are not sufficiently realistic Need to recognize that, at best, models are a close representation of reality Models are very useful because they can help answer complex what if questions
5 What is DTA? A more realistic representation of how each individual decide which path he/she is going to take from origin to destination. An aggregation of this path choice decision from all of the individuals forms the volumes on our street network.
6 MAG DynusT Model Network 11,200 Sq Miles # of links: # of nodes: # of signalized intersections: 2933 # of zones: Million Trips
7 MAG DynusT Model Network (cont.) Covers all the major arterials and the entire freeway system within the current planning boundary Simulates traffic across the entire network for 24hr for a typical work day Capable in converting into VISSIM model for more detail hot spot analysis and visualization
8 Model Calibration--Count AM Simulation Count V. Actual Count PM Simulation Count V. Actual Count
9 Model Validation Bottleneck AM Dynust Output AM MAG Bottleneck Study PM Dynust Output PM MAG Bottleneck Study
10 Model Validation Travel Time 7:30AM-8:00AM US60 to L202 L202 to US60 SH51 to L202 I-10 to SH51 I-17 to I-10 TT Survey Simulation Travel Time Along Loop 101NB by Segments
11 Application on Loop 101 Verify the pre-designed diversion plan Focus resources on major diversion routes Promote coordination Improve Incident Response, improve safety and reduce congestion
12 The Original Plan PINNACLE PEAK SECTOR 3 BELL PIMA FWY / LOOP 101 LOCAL INCIDENT DETOUR PLAN GREENWAY THUNDERBIRD CACTUS SHEA SECTOR 2 STRATEGIC SECTOR # DOUBLETREE McCORMICK VIA DE VENTURA INDIAN BEND McDONALD CHAPARRAL INDIAN SCHOOL SECTOR 1 SAMPLE INCIDENT LOCATION POSSIBLE DETOUR ROUTES LOCAL DYNAMIC MESSAGE SIGN THOMAS McDOWELL McKELLIPS Note: Scottsdale does not control any of the freeway interchange signals south of Indian Bend. In order to have better remote control of traffic exiting the freeway during an incident we would need communications to those signals.
13 2013 Western ITE Conference Freeway Statistics Upstream Flow
14 2013 Western ITE Conference Freeway Statistics Upstream Travel Time
15 Freeway Statistics 6 Miles Upstream
16 Arterial Statistics Suggested Diversion Routes 2013 Western ITE Conference
17 Arterial Statistics Hayden NB Traffic Flow
18 Arterial statistics Volume Time Volume Street Hayden Direction NB Location Between Princess Drive and Loop 101 Link# FromNode ToNode : : : : : : : : :
19 Arterial Statistics Turning Movement Counts Intersection Dir Movement 6:30 6:45 7:00 7:15 7:30 7:45 8:00 8:15 8:30 8:45 9:00 Pima&McDo well SB right SB left EB left EB through WB right WB through
20 Recommendations PINNACLE PEAK SECTOR 3 BELL GREENWAY THUNDERBIRD CACTUS SHEA SECTOR 2 DOUBLETREE McCORMICK VIA DE VENTURA INDIAN BEND McDONALD CHAPARRAL INDIAN SCHOOL THOMAS McDOWELL McKELLIPS SECTOR 1
21 What else the DTA models can do? Regional or area-wide traffic operations strategies have system wide impacts One-way Couplets V. Two-way Streets Reversible Lanes V. Fixed-use Lanes Traffic Incident Management Strategies Major Construction Traffic Control Emergency Evacuation Integrated Corridor Management
The Secrets to HCM Consistency Using Simulation Models
The Secrets to HCM Consistency Using Simulation Models Ronald T. Milam, AICP David Stanek, PE Chris Breiland Fehr & Peers 2990 Lava Ridge Court, Suite 200 Roseville, CA 95661 r.milam@fehrandpeers.com (916)
More informationWoodburn Interchange Project Transportation Technical Report
Final Report Woodburn Interchange Project Transportation Technical Report Prepared for Oregon Department of Transportation April 212 Prepared by DKS Associates Contents Methodologies... 4 Volume Development...
More informationThe New Highway Capacity Manual 6 th Edition It s Not Your Father s HCM
The New Highway Capacity Manual 6 th Edition It s Not Your Father s HCM Tom Creasey, PE, PhD Principal, Stantec Consulting Services Inc. Chair, TRB Highway Capacity and Quality of Service Committee Presented
More informationVolume to Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning. Hiron Fernando, BSCE. A Thesis CIVIL ENGINEERING
Volume to Capacity Estimation of Signalized Road Networks for Metropolitan Transportation Planning by Hiron Fernando, BSCE A Thesis In CIVIL ENGINEERING Submitted to the Graduate Faculty of Texas Tech
More informationDEVELOPMENT, ANALYSIS, AND DESIGN OF A NEW PARKWAY AT GRADE INTERSECTION (PAGI)
2013 ITE Western District Annual Meeting COCEPT DEVELOPMET, AALYSIS, AD DESIG OF A EW PARKWAY AT GRADE ITERSECTIO (PAGI) Lead Author: James M. Witkowski, PhD Supporting Author: Darrell Truitt, PE The Pima
More informationOPTIMIZING RAMP METERING STRATEGIES
OPTIMIZING RAMP METERING STRATEGIES Presented by Kouros Mohammadian, Ph.D. Saurav Chakrabarti. ITS Midwest Annual Meeting Chicago, Illinois February 7, 2006 Background Ramp control is the application of
More informationConstruction Alternative Screening with Regional Travel Demand Model
Construction Alternative Screening with Regional Travel Demand Model By: Marty Milkovits (Corresponding Author) Cambridge Systematics, Inc. 100 CambridgePark Drive, Suite 400 Cambridge, MA 02140 Phone:
More informationMULTIMODAL TRANSPORTATION IMPACT STUDY GUIDELINES
MULTIMODAL TRANSPORTATION IMPACT STUDY GUIDELINES 1 st Edition City of San Luis Obispo 2035 Circulation Element 1 Table of Contents Introduction... 2 Process... 2 When Impact Studies Are Required... 3
More informationGreenhouse Gas Emission Reduction Strategies
Greenhouse Gas Emission Reduction Strategies 2011 ITE Quad Conference April 18 19, 2011, Embassy Suites; Lynnwood, WA Victor L. Sl Salemann, PE Senior Associate David Evans and Associates Bellevue, WA
More informationFREEWAY PERFORMANCE MEASUREMENT SYSTEM (PeMS): AN OPERATIONAL ANALYSIS TOOL
FREEWAY PERFORMANCE MEASUREMENT SYSTEM (PeMS): AN OPERATIONAL ANALYSIS TOOL Tom Choe Office of Freeway Operations California Department of Transportation District 7 120 S Spring Street Los Angeles, CA
More informationAdvanced Transportation Management System (ATMS)
Advanced Transportation Management System (ATMS) Presentation to the ITS Technology Workshop for Municipalities February 15, 2017 ATMS Project Background Increasing traffic volumes Roadway network is near
More informationThe Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges
The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges I. ABSTRACT Keith A. Riniker, PE, PTOE This paper presents the Folded Interchange design and compares
More informationREQUIREMENTS FOR THE CALIBRATION OF TRAFFIC SIMULATION MODELS
REQUIREMENTS FOR THE CALIBRATION OF TRAFFIC SIMULATION MODELS Bruce R. Hellinga Department of Civil Engineering University of Waterloo Waterloo, ON N2L 3G1 ABSTRACT The recent emphasis on utilising advanced
More informationNATMEC June 30, 2014 Anita Vandervalk, PE, PMP
NATMEC June 30, 2014 Anita Vandervalk, PE, PMP Agenda 1. Florida s MPM Program 2. Research Efforts and Progress 3. Source Book 4. Transitioning to Real Time Data 5. Next Steps Importance of Mobility Providing
More informationAnalytical Tools and Decision Support Systems SANDAG I-15 ICM. ITS PA January 30 th, 2014
Analytical Tools and Decision Support Systems SANDAG I-15 ICM ITS PA January 30 th, 2014 Project Partners/Stakeholders National ICM Evaluator National AMS Contractor 2 San Diego I-15 Corridor 21 mile corridor
More informationTRAFFIC & TRANSPORTATION COMMISSION AGENDA REPORT
TRAFFIC & TRANSPORTATION COMMISSION AGENDA REPORT AGENDA ITEM #4 T/T MTG: 092616 DATE: SEPTEMBER 26, 2016 TO: TRAFFIC & TRANSPORTATION COMMISSION FROM: BENJAMIN CHAN, P.E, T.E., DEPUTY PUBLIC WORKS DIRECTOR
More informationINSIDE THIS ISSUE. mctrans.ce.ufl.edu VOLUME 64 \\ OCTOBER Streets Heat Map Freeways Animation HSM Supplement
mctrans.ce.ufl.edu INSIDE THIS ISSUE McTrans Center University of Florida Civil & Coastal Engineering PO Box 116585 Gainesville, FL 32611-6585 Streets Heat Map Freeways Animation HSM Supplement Phone:
More informationMaximize Transportation System Capacity
US 75 Integrated Corridor Management System Using Technology and Partnership to Using Technology and Partnership to Maximize Transportation System Capacity What is ICM? The integrated management of freeway,
More informationAPPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies
APPENDIX B Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies Revised December 7, 2010 via Resolution # 100991 Reformatted March 18, 2011 TABLE OF CONTENTS
More informationTruck GPS Data for Freight Planning
Truck GPS Data for Freight Planning presented to Florida Model Task Force, Orlando presented by Frank Tabatabaee Abdul Pinjari Jeff Short (ATRI) Florida DOT University of South Florida (USF) American Transportation
More informationExecutive Summary. Overview
Executive Summary Overview The Genesee-Finger Lakes Diversion Route Initiative identifies the most suitable diversion routes for Principal Arterial roads in the nine-county Genesee-Finger Lakes Region.
More informationTABLE OF CONTENTS PAGE NUMBER. Executive Summary Why Variable Pricing? What Was Studied? User Surveys Air Quality Analysis User And Equity Analysis
TABLE OF CONTENTS PAGE NUMBER Executive Summary Why Variable Pricing? What Was Studied? User Surveys Air Quality Analysis User And Equity Analysis Findings Scenario 1 Base Case Scenario 2 Detoll Scenario
More informationJim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project
Memorandum Date: January 15, 2014 To: CC: From: Subject: Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project Paul Danielson, P.E. Project Manager, Southwest Light Rail
More informationAdding value through market research
Jones Lang LaSalle Research Adding value through market research Phoenix / Office Statistics / Q4 2013 Rural Rd McClintock Rd Scottsdale Rd Hayden Rd Tatum Blvd 64th St 64th St 56th St Scottsdale Rd Ellsworth
More informationDevelopment of TSP warrants. to-day variability in traffic demand
Development of TSP warrants considering vehicular emissions and day-to to-day variability in traffic demand Zeeshan Abdy Supervisor: Bruce R. Hellinga Dec 2006 Introduction Signalized intersections Traffic
More informationVISUM State-of-the-Art Travel Demand Modeling VISUM
State-of-the-Art Travel Demand Modeling VISUM What is VISUM? VISUM is a comprehensive, flexible software system for transportation planning, travel demand modeling and network data management. VISUM is
More informationAMPO Annual Conference Session: Performance (Part 1) October 18, 2017 Savannah, GA
AMPO Annual Conference Session: Performance (Part 1) October 18, 2017 Savannah, GA Introduction: North Jersey Transportation Planning Authority NJTPA Congestion Management Process Study Goals Analysis
More informationManagement. VA SITE Annual Meeting June 27, 2013 Jay Styles Performance and Strategic t Planning Manager, Business Transformation Office
VDOT and MAP-21 Performance Management VA SITE Annual Meeting June 27, 2013 Jay Styles Performance and Strategic t Planning Manager, Business Transformation Office Overview Map-21- How is VDOT Preparing?
More informationScope of Services Traffic Signal Retiming Contract FM NO Florida Department of Transportation District Four
Scope of Services Traffic Signal Retiming Contract FM NO. 230017-8-32-01 Florida Department of Transportation District Four A-1 Contents 1. Background... 3 2. Summary of Services... 3 3. Consultant Requirements...
More informationCITY OF CLOVIS Traffic Impact Study Guidelines
CITY OF CLOVIS Traffic Impact Study Guidelines CLOVIS, A WAY OF LIFE Approved August 25, 2014 City Council Resolution 2014-79 Prepared by City of Clovis Engineering Division Steve White, City Engineer
More informationTHE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence.
THE PROJECT A freeway segment ranked 6th worst in the Nation, with levels of congestion, pollution and accidents that are simply unacceptable and which have Statewide and National implications. Executive
More informationA Unique Application of Railroad Preemption with Queue Mitigation at a Roundabout Interchange
A Unique Application of Railroad Preemption with Queue Mitigation at a Roundabout Interchange Jeromy Grenard, PE, PTOE American Structurepoint Hardik Shah, PE, PTOE American Structurepoint Roundabouts
More informationNavigation system: Route guidance
NAVIGATION SYSTEM: ROUTE GUIDANCE SECTION 3 Navigation system: Route guidance Route guidance screen 92 Typical voice guidance prompts 95 Distance and time to destination 97 Setting and deleting destinations
More informationreport Smart Growth - Refined Transport Modelling
report Smart Growth - Refined Transport Modelling report Smart Growth - Refined Transport Modelling Prepared for Smart Growth By Beca Carter Hollings & Ferner Ltd November 2002 8111359/210 Rev A L1:90421
More informationOrigin-Destination Trips and Skims Matrices
Origin-Destination Trips and Skims Matrices presented by César A. Segovia, AICP Senior Transportation Planner AECOM September 17, 2015 Today s Webinar Content Matrix Estimation Data sources Florida Application
More informationEVALUATION OF INCIDENT MANAGEMENT BENEFITS USING TRAFFIC SIMULATION
EVALUATION OF INCIDENT MANAGEMENT BENEFITS USING TRAFFIC SIMULATION Hussein Dia and Nick Cottman Department of Civil Engineering The University of Queensland Brisbane, Australia 4072 E-mail: H.Dia@uq.edu.au
More informationAPPENDIX H: TRAVEL DEMAND MODEL VALIDATION AND ANALYSIS
APPENDIX H: TRAVEL DEMAND MODEL VALIDATION AND ANALYSIS Travel demand models (TDM) simulate current travel conditions and forecast future travel patterns and conditions based on planned system improvements
More informationSR 99 Incident Response After- Action Plan
SR 99 Incident Response After- Action Plan Background On June 10, 2014 at 1:52 PM, a pickup truck and a passenger car collided on southbound SR 99 (E Marginal Way S), just south of S Spokane St. The SDOT
More informationBuffalo Niagara Integrated Corridor Management Project. ENTERPRISE Webinar Keir Opie, Cambridge Systematics September 26, 2016
Buffalo Niagara Integrated Corridor Management Project ENTERPRISE Webinar Keir Opie, Cambridge Systematics September 26, 2016 1 Buffalo-Niagara ICM Corridors I-190 ICM Corridor Cross Border Corridor 2
More informationQuantifying the performance of a traffic data collection system: Scout Connect match rate evaluation
Technology Showcase Miovision Scout Quantifying the performance of a traffic data collection system: Scout Connect match rate evaluation Contents Executive summary 2 Elements of the study 2 Objectives
More informationSAN DIEGO SITE: I-15 ICM DEMONSTRATION PROJECT. TRB Joint Operations Committees Midyear Meeting Integrated Corridor Management July 18-21, 2011
SAN DIEGO SITE: I-15 ICM DEMONSTRATION PROJECT TRB Joint Operations Committees Midyear Meeting Integrated Corridor Management July 18-21, 2011 San Diego 2 Investments To Meet Growth Manage Lanes System
More informationFlorida International University; University of Central Florida. Mohammed Hadi, Ph.D., PE (Dr. Haitham Al-Deek from UCF is Co-PI)
Project Information Form Project Title University Principal Investigator PI Contact Information Performance Measurements of Transportation Systems based on Fine- Grained Data Collected by AVI and AVL Systems
More informationThe Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives.
4 Goals & Objectives INTRODUCTION The 2015-2040 MTP preserves and promotes the quality of life and economic prosperity of the MAB by providing a transportation system consistent with the regional goals.
More informationADAPTIVE SIGNAL CONTROL TECHNOLOGY
ADAPTIVE SIGNAL CONTROL TECHNOLOGY Design Operations Maintenance Current Practice Improving The Practice Planning for Operations RTSOPs Resources Documentation Basic Service Concept Traffic Signal Timing
More informationI-10 CONNECT. Public Meeting #1
I-10 CONNECT Public Meeting #1 The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT
More informationNational Governors Association
National Governors Association Roundtable Presentation April 2, 2001 Dr. Christine Johnson Director, ITS Joint Program Office Program Manager, FHWA Operations 1 Congestion is a critical problem Transportation
More informationINSIDE THIS ISSUE. mctrans.ce.ufl.edu VOLUME 65 \\ JANUARY Capacity Analysis Webinars. Bus Bike-Rack App HCS Release 7.5
mctrans.ce.ufl.edu INSIDE THIS ISSUE Bus Bike-Rack App HCS Release 7.5 Capacity Analysis Webinars McTrans Center University of Florida Civil & Coastal Engineering PO Box 116585 Gainesville, FL 32611-6585
More informationU.S. 101 / San Mateo County Smart Corridor Project
Department of Transportation District 4 - Traffic Operations October 1, 2013 U.S. 101 / San Mateo County Smart Corridor Project www.dot.ca.gov California Department of Transportation (Caltrans) Overview
More informationMITSIMLab: Enhancements and Applications for Urban Networks
Topic Area: C4 Paper Number: 3453 Authors: Moshe Ben-Akiva Margaret Cortes Angus Davol Haris Koutsopoulos Tomer Toledo Title: MITSIMLab: Enhancements and Applications for Urban Networks Abstract: Urban
More informationTwin Cities Regional Truck Corridors Study. MnDOT Metro Freight Studies Roundup
Twin Cities Regional Truck Corridors Study MnDOT Metro Freight Studies Roundup February 3, 2017 Study Background Transportation Policy Plan Goal: The regional transportation system supports the economic
More informationVariable Speed Warnings on DMS
Variable Speed Warnings on DMS Evolving Tools for Better Safety and Service Jeanne Olubogun, P.E. District Traffic Engineer - St. Louis Region Jeanne.Olubogun@modot.mo.gov 314-275-1536 2014 Traffic and
More informationDeveloping Dwelling Unit Equivalent (DUE) Rates Using an Activity Based Travel Demand Model
Developing Dwelling Unit Equivalent (DUE) Rates Using an Activity Based Travel Demand Model Institute of Transportation Engineers ITE Western District Annual Meeting Phoenix, Arizona July 14-17, 2013 By:
More informationAdaptive Signal Control Technology Research in Illinois. Kyle Armstrong, Ray Benekohal, Xueying Liu
Adaptive Signal Control Technology Research in Illinois Kyle Armstrong, Ray Benekohal, Xueying Liu Overview ASCT ASCT Research Study Phases Before Study SynchroGreen Implementation After Study Future Tasks
More informationCentral Phoenix Transportation Framework Study
Central Phoenix Transportation Framework Study Study Area 2013, All Rights Reserved. 1 Agenda Introductions Work Products Feedback on previous products Draft products for Planning Partner review SR-30
More informationI-70 East ROD 1: Phase 1 (Central 70 Project) Air Quality Conformity Technical Report
I-70 East ROD 1: Air Quality Conformity Technical Report January 2017 I-70 East ROD 1: Air Quality Conformity Technical Report TABLE OF CONTENTS Chapter Page 1 PURPOSE OF THIS REPORT... 1 2 PROJECT DESCRIPTION...
More informationRisk Analysis of Freeway Lane Closure During Peak Period
Risk Analysis of Freeway Lane Closure During Peak Period Jake Kononov and Zane Znamenacek This paper examines risks associated with peak period lane closure during construction or maintenance work on urban
More informationHCM 6th Edition Planning and Preliminary Engineering Applications Guide (PPEAG) to the HCM Bringing Back-of-the-Envelope Back.
HCM 6th Edition Planning and Preliminary Engineering Applications Guide (PPEAG) to the HCM Bringing Back-of-the-Envelope Back April, 2017 Potential Use of the HCM in Planning The HCM is commonly used to
More informationPast, Present, and Future
The Highway Capacity Manual: Past, Present, and Future HCM Chronology 1 st Ed.: 1950 BPR/HRB/GPO (147 Pgs) 1957 Highway Research Board Bulletin 167 2 nd Ed: 1965 TRB Special Report 87 (411 pgs) 1980 TRB
More informationAN INTEGRATED TRANSPORTATION PLANNING AND OPERATIONS MODEL FOR MEMPHIS, TENNESSEE
AN INTEGRATED TRANSPORTATION PLANNING AND OPERATIONS MODEL FOR MEMPHIS, TENNESSEE Jeffery Karafa, Mihalis M. Golias, Martin Lipinski Department of Civil Engineering & Intermodal Freight Transportation
More informationAPPENDIX A TIER 1 ANALYSIS
SPN H.004100 FEASIBILITY STUDY APPENDIX A TIER 1 ANALYSIS 040-012-042AH Appendices Lead Sheets PROVIDENCE STATE PROJECT. H.004100 The following worksheets analyze various project alternatives at various
More informationTRAFFIC ANALYSES TO SUPPORT NEPA STUDIES
VIRGINIA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL DIVISION NEPA PROGRAM LOCATION STUDIES TRAFFIC ANALYSES TO SUPPORT NEPA STUDIES CONSULTANT RESOURCE GUIDANCE DOCUMENT Issued on: November 18, 2016 Last
More informationRoadway Traffic Assignment (Last Edit August 26, 2005)
Roadway Traffic Assignment (Last Edit August 26, 2005) This chapter focuses on the Roadway Traffic Assignment module of the Dallas-Fort Worth Regional Travel Model (DFWRTM). Based on the input vehicle
More informationFLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT
FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT District 2 1109 South Marion Avenue Lake City, FL 32025-5874 INTERSTATE 10 (SR 8) / SR
More informationSIEMENS CONCERT: City of Seattle
SIEMENS CONCERT: City of Seattle Use of ATMS to Enhance and Extend Signal Operations Abstract: Today s signal systems are part of a complex environment that includes varied and disparate data sources and
More informationVS-PLUS Introduction. Even this knotty problem can be solved. Dr. Thomas Riedel. April 2001 page 1
VS-PLUS Introduction Even this knotty problem can be solved Dr. Thomas Riedel April 2001 page 1 Presentation Contents Company introduction The traffic engineering workflow The workflow support tools Basic
More informationPLAN 2040 Regional Transportation Plan Update. Final Recommendations. Transportation and Air Quality Committee March 13, 2014
PLAN 2040 Regional Transportation Plan Update Final Recommendations Transportation and Air Quality Committee March 13, 2014 TIP/RTP Update Milestones Official public comment period closed February 21 Final
More informationASSESSING THE IMPACT OF SECURITY MEASURES AT GATES OF SEAPORTS ON TRAFFIC OPERATION
ASSESSING THE IMPACT OF SECURITY MEASURES AT GATES OF SEAPORTS ON TRAFFIC OPERATION Dr. Arun Chatterjee Professor Emeritus Dept of Civil & Environmental Engineering The University of Tennessee Knoxville,
More informationDynamic Lane Merge Systems
Dynamic Lane Merge Systems Acknowledgements Maryland State Highway Administration University of Maryland, College Park Michigan Department of Transportation Wayne State University Lane Merging Issues Merging
More informationShannon Noonan, City of Cambridge Don Drackley, IBI Group Scott Johnson, IBI Group PTSL
100 175 Galaxy Boulevard Toronto ON M9W 0C9 Canada tel 416 679 1930 fax 416 675 4620 ibigroup.com Memorandum To/Attention From cc Shannon Noonan, City of Cambridge Don Drackley, IBI Group Scott Johnson,
More informationWIN-WIN DYNAMIC CONGESTION PRICING FOR CONGESTED URBAN AREAS
1 WIN-WIN DYNAMIC CONGESTION PRICING FOR CONGESTED URBAN AREAS Aya Aboudina, Ph.D. Student University of Toronto Baher Abdulhai, Ph.D., P.Eng. University of Toronto June 12 th, 2012 ITS Canada - ACGM 2012
More informationUS 75 Integrated Corridor Management System Using Technology and Partnership to Maximize Transportation System Capacity
US 75 Integrated Corridor Management System Using Technology and Partnership to Maximize Transportation System Capacity Ahmad Sadegh, Ph.D. Schneider Electric US 75 Corridor Networks Freeway with continuous
More informationITEM 8 Action May 17, 2017
ITEM 8 Action May 17, 2017 Approval of Maryland Department of Transportation (MDOT) Additional Project Submission for the Out-Of-Cycle Air Quality Conformity Analysis for the Amendment to the 2016 CLRP
More informationTRAFFIC DIVERSION RESULTING FROM RAMP METERING
TRAFFIC DIVERSION RESULTING FROM RAMP METERING by Jingcheng Wu A Thesis Submitted in Partial Fulfillment of the Requirements for the Degree of Master of Science in Engineering at The University of Wisconsin
More informationTransportation and Works Department The Regional Municipality of York Yonge Street Newmarket, Ontario L3Y 6Z1
TRANSPORTATION IMPACT STUDY (TIS) GUIDELINES FOR DEVELOPMENT APPLICATIONS Transportation and Works Department The Regional Municipality of York 17250 Yonge Street Newmarket, Ontario L3Y 6Z1 August, 2007
More informationData processing. In this project, researchers Henry Liu of the Department of Civil Engineering and
Data mining of transit vehicle location, passenger count, and fare collection databases for intelligent transportation applications Supporting efficient transit service by maximizing the use of available
More informationFY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)
FY 2018-2027 WIDE TRANSPORTATION IMPROVEMENT PROGRAM NY Susquehanna and Western Rail Line Bicycle/Pedestrian Path DBNUM: NS9803 / UPC: 058018 The 4.8 mile New York, Susquehanna, and Western Railway (NYS&W)
More informationOverall project. The $288 million Phase 2 DesignBuild project starts construction. this spring, with completion by December 31, 2016
Overall project Johnson County Gateway Interchange Project Improvements 87th Street The $288 million Phase 2 DesignBuild project starts construction this spring, with completion by December 31, 2016 Phase
More informationAPPENDIX A: SHORT-TERM PROJECT DEPLOYMENTS
APPENDIX A: SHORT-TERM PROJECT DEPLOYMENTS Page 1 of 15 ST-01: I-95 ITS DEPLOYMENT (DE STATE LINE TO AIRPORT) PROJECT DESCRIPTION AND SCOPE: Project will address gaps in ITS device coverage on I-95 from
More informationMaine Turnpike Needs Assessment
Maine Turnpike Needs Assessment Safety and Capacity Study Prepared for: Maine Turnpike Authority Prepared by: May 2016 ii P age TABLE OF CONTENTS EXECUTIVE SUMMARY... 1 1.1 Purpose and Scope... 1 1.2 Turnpike
More informationModeling the impacts of new border crossing corridor in Windsor, Ontario (Congestion, Accessibility and Emissions)
Modeling the impacts of new border crossing corridor in Windsor, Ontario (Congestion, Accessibility and Emissions) Presenter: Shakil Khan Co-authors: Hanna Maoh and William Anderson, Cross-Border Institute,
More informationRegional Traffic Simulation for Emergency Preparedness
Regional Traffic Simulation for Emergency Preparedness By Virginia P. Sisiopiku, Ph.D. Steven L. Jones, Jr., Ph.D. Andrew J. Sullivan, P.E. Sameer S. Patharkar Xiaohong Tang, M.S. Department of Civil and
More informationTRANSIT OPERATIONS UNDER EMERGENCY CONDITIONS AMAR S. CHAUKAR VIRGINIA P. SISIOPIKU, COMMITTEE CHAIR ROBERT W. PETERS WILBUR A. HITCHCOCK A THESIS
TRANSIT OPERATIONS UNDER EMERGENCY CONDITIONS by AMAR S. CHAUKAR VIRGINIA P. SISIOPIKU, COMMITTEE CHAIR ROBERT W. PETERS WILBUR A. HITCHCOCK A THESIS Submitted to the graduate faculty of The University
More informationREGIONAL SOLICITATION ROADWAY APPLICATIONS: POTENTIAL CHANGES. TAB September 20, 2017
REGIONAL SOLICITATION ROADWAY APPLICATIONS: POTENTIAL CHANGES TAB September 20, 2017 2 2016 Application Categories Bridge Incorporate Highway Truck Corridor Study Tiers instead of Freight Project Elements
More informationEmergency Incident Management, Benefits and Operational Issues
Emergency Incident Management, Benefits and Operational Issues -- Performance and Benefits Evaluation of CHART Ying Liu, Peiwei Lin, Nan Zou, Gang-len Chang Department of Civil Engineering University of
More informationUse of TMC Data for Performance Measurement and Improving Operations. National Rural ITS Conference August 25, 2014 Ming Shiun Lee URS Corporation
Use of TMC Data for Performance Measurement and Improving Operations National Rural ITS Conference August 25, 2014 Ming Shiun Lee URS Corporation 1 Presentation Outline Motivations Performance Measures
More informationIntegrated Corridor Management --An Overview --
Integrated Corridor Management --An Overview -- Neil Spiller FHWA Office of Operations Program Manager: ICM KBPS video 1 Integrated.. combining or coordinating separate agencies so as to provide a harmonious,
More informationCHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES
CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES 4.0 INTRODUCTION The ability to accommodate high volumes of intersecting traffic safely and efficiently through the arrangement of one or more interconnecting
More informationCE 452 Traffic Impact Assessment
CE 452 Traffic Impact Assessment 1 Why Required? New developments Produce/ attract new traffic Production: Residences Attraction: Shops, Offices, Schools, Hospitals etc. etc. Changes in traffic pattern
More informationHORIZON 2030: Plan Projects November 2005
Horizon PROJECTS 2030 Projects 10-1 10-2 The Horizon 2030 Project Information section is comprised of individual project information in alphabetical order by project name. The information provided for
More informationI-66 Corridor Improvements Outside the Capital Beltway in Northern Virginia, USA
15th International Conference on Managed Lanes I-66 Corridor Improvements Outside the Capital Beltway in Northern Virginia, USA Case Study for Funding of Transit Service and Transportation Demand Management
More informationStrategic Transportation Plan. Presented to: ECO-Rapid Transit Board of Directors Presented by: Gill V. Hicks, Cambridge Systematics, Inc.
Strategic Transportation Plan Presented to: ECO-Rapid Transit Board of Directors Presented by: Gill V. Hicks, Cambridge Systematics, Inc. June 11, 2014 1 Local Solutions for all Gateway Cities Communities
More informationDallas ICM & 511 System. 87 th Annual Transportation Short Course
Dallas ICM & 511 System 87 th Annual Transportation Short Course October 16, 2013 Agenda Introduction ICM Overview 511 Overview Next Steps / Schedule Q&A What is ICM? The integrated management of freeway,
More informationReal-Time Variable Message Signs Based Route Guidance Consistent With Driver Behavior
Real-Time Variable Message Signs Based Route Guidance Consistent With Driver Behavior Srinivas Peeta 1 and Shyam Gedela 2 1 Srinivas Peeta School of Civil Engineering Purdue University West Lafayette,
More informationEvaluation Summary for the San Diego Testbed. Final Report August 2017 FHWA-JPO
Analysis, Modeling, and Simulation (AMS) Testbed Development and Evaluation to Support Dynamic Mobility Applications (DMA) and Active Transportation and Demand Management (ATDM) Programs Evaluation Summary
More informationDistribution of traffic over buffer space by using controlled intersections
Distribution of traffic over buffer space by using controlled intersections Master of Science Thesis Mark Buitenhuis Distribution of traffic over buffer space by using controlled intersections Master
More informationOperations in the 21st Century DOT Meeting Customers Needs and Expectations
Operations in the 21st Century DOT Meeting Customers Needs and Expectations 1 Purpose of this Meeting: Share Thoughts & Discuss Challenges brought about by the changing transportation environment and public
More informationTRANSPORTATION IMPACT ANALYSIS GUIDELINES
TRANSPORTATION IMPACT ANALYSIS GUIDELINES SANTA CLARA COUNTY TRANSPORTATION AUTHORITY CONGESTION MANAGEMENT PROGRAM ADOPTED MARCH 2009 TABLE OF CONTENTS PART I - STATUTE AND AUTHORITY...1 CHAPTER 1. CMP
More informationUS & USRC Track Capacity Study Train Capacity Analysis Present to Maximum Capacity and Beyond
Transportation Metrolinx US & USRC Track Capacity Study Prepared by: AECOM 5080 Commerce Boulevard 905 238 0007 tel Mississauga, ON, Canada L4W 4P2 905 238 0038 fax www.aecom.com AECOM Project Number:
More informationWELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017
WELCOME IL 47 Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 MEETING PURPOSE MEETING AGENDA 1. Welcome/Introduction 2. Review Previous Public Involvement 3. Process/Schedule
More informationTRAFFIC MODELLING PLATFORMS IN TEMA-TT
Workshop Modelling Futures Lisboa 14 Julho de 2014 1 TRAFFIC MODELLING PLATFORMS IN TEMA-TT Jorge Bandeira & Margarida C. Coelho University of Aveiro, R&D Group on TRANSPORTATION TECHNOLOGY, Centre for
More information