Implementing an Asset and Pavement Management System in Alexandria, VA. Craig Schorling, GISP Business Development Manager, Transmap Corporation
|
|
- Cecily Candice Johns
- 5 years ago
- Views:
Transcription
1 Implementing an Asset and Pavement Management System in Alexandria, VA Craig Schorling, GISP Business Development Manager, Transmap Corporation
2
3 Alexandria Statistics Located on the Western bank of the Potomac River Is the 7 th largest & highest income city in VA Has a population of 140,024 Part of Metro Washington DC area
4 Transmap/Timmons Partnership Transmap provided pavement/asset location information and condition assessment Azteca Cityworks is being implemented by Timmons Group to maintain these results from MicroPAVER The result of this project is a part of Alexandria s Comprehensive Transportation Master Plan
5 Overview ESRI MicroPAVER Alexandria Cityworks Transmap
6 Alexandria Street Network Alexandria has 275 miles of paved streets Cost to replace the road network would exceed 300 million dollars Current resurfacing budget is 2.5 million yearly.
7 Mobile Mapping Core High resolution cameras (1600x1200) Robust positioning (highest accuracy GPS/INS commercially available 1 to 2 foot) LiDAR (automated asset detection)
8 What are ON-SIGHT images? Real World GIS Van Location Layer Centerline Layer Smith St Main St Roadway Images in GIS
9 STEREO Images Explained 13 Foot Spacing
10 Raw Data to PCI First step is creating samples on the LRS
11
12 Pavement Distresses Alligator Cracking Pot Holes Block Cracking Rutting Linear Cracking Edge Cracking Patching/Utility Cut
13 Feature extraction software coupled with our ON-SIGHT HD images are used for pavement distress inspection Our experienced team visits each sample area and visually determines distress type, severity, and quantity to match APWA/ASTM industry standards.
14 Distress with Severity Medium Alligator Cracking Low Alligator Cracking Proper sealing lowers the severity of the distress
15 Distress with Severity Medium Block Cracking Low Block Cracking
16 MicroPAVER Pavement Condition Index (PCI) scores are calculated using MicroPAVER MicroPAVER bases the PCI calculation on Distress Type, Severity, and Quantity
17 Reasons for Pavement Management As pavements get older, condition and value decrease Typical maintenance treatments can be 5 to 40 times less expensive than total reconstruction Pavement life can be extended up to 10 years with maintenance treatments
18 Typical Degradation Curve
19 PCI Ratings Over Time
20 Linear Features Curbs Fences Guardrails Medians Number of Lanes One-Way Streets Road Width Sidewalks School Speed Zones Speed Limit Zones Pavement Striping
21 Linear Measurements Number of Lanes/Roadwidth
22 Point Features ADA Ramps Bridges Bus Features Control Cabinets Crosswalks Drainage Structures Driveway Aprons Hydrants Street Trees Water Valves Intersections Loop Detectors Manholes Parking Meters Pavement Markings Roadway Lighting Traffic/Pedestrian Signals Traffic Calming Devices Traffic Signs Signal Poles
23 Pilot Point Features Type: R2-1 Condition: Good Post Type: Wooden Pole Sign Face Direction: W Flashers: No
24 Alexandria Proposed System Work Order / Service Request Personnel Management Azteca Cityworks TM Asset Inventory Control Equipment Management Material / Small Equipment Alexandria MicroPAVER Pavement Management System
25 Capital Expenditures Assets that are maintained are capital assets Data created from this project will be used city-wide for many years
26 "Our pavement condition and inventory project will provide the city with an objective and systematic method for creating future paving plans." -L.A. McCracken Information Technology Coordinator Department of Transportation City of Alexandria, VA
27 Return on Investment Alexandria has over $300 million invested in pavement alone Using Transmap data, Alexandria is more efficient in allocating its budget With PCI Values ranging from Excellent to Failed, pavement improvement projects can be tailored to the more critical areas first
28 City of Alexandria Pavement Condition Index Ratings Public works has embraced the red, yellow, and green representation of pavement quality, as it helps identify the hot spots in Alexandria.
29 Alexandria PCI Values, 2008 Based on a total of 275 miles of roadway 66 miles of Fair to Failed roads
30 Planning Candidate Reports When will streets be repaired depending on the level of funding
31 Alexandria Phases Phase I Starting in 2008 with Total Pavement Collection Phases II Collected City wide Point and Linear data Phase III (????) Condition assessment of pavement will be updated to establish pavement curves
32 Transmap Best Practices Phase III will use the same network definition and sample model Inspection of the exact pavement samples previously recorded Results in more robust pavement condition analysis - previously sampled areas can be directly compared to newly sampled areas
33 Be Prepared to accurately account for your assets Document your needs Have all the facts Be compliant (GASB 34) How do my assets deteriorate over time? (pavement, signs) How can my crews be more efficient? Get shovels in the ground (people to work) Future Funding Shovel Ready!
34 Questions?
Designing and Implementing a GIS- Centric Pavement Management System for the City of Alexandria, VA
Designing and Implementing a GIS- Centric Pavement Management System for the City of Alexandria, VA Transmap Corporation 614-481-6799 (office) Howard Luxhoj, P.E. President and CEO hluxhoj@transmap.com
More informationTown of Middleborough Department of Public Works
Town of Middleborough Department of Public Works August 25, 2014 The practice of planning for pavement maintenance and rehabilitation with the goal of maximizing the value and life of a pavement network
More informationImplementing a Pavement Management System PASER Based City of Omaha, NE
Implementing a Pavement Management System PASER Based City of Omaha, NE Introductions JESS HASTINGS, PE Project Manager 10 Years of Experience TIM O BRYAN, PE Senior Project Manager 30 Years of Experience
More informationRIDOT S Statewide Roadway and Asset Data Collection Project
RIDOT S Statewide Roadway and Asset Data Collection Project ESRI User Conference 2017 Rafiq Basaria, DTS; Daniel Behnke DTS, Shane White, RIDOT Accent image here Primary Image here What is MIRE? Recommended
More information2006 GIS-T T Symposium Columbus Ohio
2006 GIS-T T Symposium Columbus Ohio Paving the Way to a Robust GIS Managing countywide transportation asset data in St. Johns County, Florida County Objectives Complete and accurate inventory of transportation
More informationComparing Tools for Managing Infrastructure. VUEWorks. September 15, 2016
Comparing Tools for Managing Infrastructure VUEWorks September 15, 2016 Foundations (10 Minutes) 2 1 3 VUEWorks Performance-Based Asset Management - Forecast capital budget needs - Create & manage
More informationBATAVIA S STATE OF STREETS STREET MAINTENANCE PROGRAM REPORT
BATAVIA S STATE OF STREETS STREET MAINTENANCE PROGRAM REPORT September 2015 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Street Area (SY) Street
More informationDepartment of Street Services
Department of Street Services FY 07-08 Proposed Budget Briefing to the City Council September 5, 2007 Purpose An overview of the Department of Street Services Scope of operation and maintenance activities
More informationPowerful Integration of GIS, Asset Mgt, Work Order Mgt, CRM, Pavement Mgt, and Related Technology - You Can Have it all Without Selling Your Soul!
Powerful Integration of GIS, Asset Mgt, Work Order Mgt, CRM, Pavement Mgt, and Related Technology - You Can Have it all Without Selling Your Soul! Ramzi Bannura, GISP, MBA GeoSpatial Programs Manager DPW
More informationPreventive Maintenance Project & Treatment Selection
Preventive Maintenance Project & Treatment Selection 19 th Annual TERRA Pavement Conference February 12, 2015, St. Paul, MN Mark Watson, MnDOT Maintenance Outline Introduction Network Level Project Level
More informationOverview of Maintenance and Construction Programs. Mike Holder, PE, Chief Engineer Jennifer Brandenburg, PE, State Asset Management Engineer
Overview of Maintenance and Construction Programs Mike Holder, PE, Chief Engineer Jennifer Brandenburg, PE, State Asset Management Engineer March 3, 2015 Overview Maintenance and Construction State v.
More informationInnovations in establishing priorities for roadway maintenance & capital projects April 16, Presented by: Chris McConn
Innovations in establishing priorities for roadway maintenance & capital projects April 16, 2012 Presented by: Chris McConn Identifying a need Our client is one of the top 5 largest cities in the country
More informationTacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)
Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington 98409-7207 (253) 798-7250 Fax (253) 798-4233 www.piercecountywa.org/roadstandards March 2012 Comment Form Date: To: From:
More informationPublic Works Department Five Year Capital Improvement Plan FY PROPOSED
Public Works Department Five Year Capital Improvement Plan FY 2019-2023 PROPOSED Capital Improvement Plan Summary STREET DIVISION PROJECTS 141 Asphalt Sidewalk Replacement Program Funding Source Adopted
More informationTABLE OF DRAWINGS. Pierce County Public Works & Utilities
Section A Concrete and Asphalt Concrete Pavement and Roadway Sections PC.A1.1 Arterial with Cement Concrete Traffic Curb and Gutter and Sidewalk, Closed Drainage 05/10/2018 PC.A1.2 Arterial with Cement
More informationTABLE OF DRAWINGS. Pierce County Public Works & Utilities
Section A Concrete and Asphalt Concrete Pavement and Roadway Sections PC.A1.1 Arterial with Cement Concrete Traffic Curb and Gutter and Sidewalk, Closed Drainage 04/01/2019 PC.A1.2 Arterial with Cement
More informationUrban Arterial Roads Pavement Data Collection. October 23, 2012 Todd M. Halacy, P.E. VDOT Local Assistance Division
Urban Arterial Roads Pavement Data Collection October 23, 2012 Todd M. Halacy, P.E. VDOT Local Assistance Division Presentation Topics Background Information: CTB Subcommittee & Local Government Workgroup
More informationAN OVERVIEW OF ASSET FORT WORTH ELIZABETH YOUNG, GISP
AN OVERVIEW OF ASSET MANAGEMENT @ FORT WORTH ELIZABETH YOUNG, GISP AGENDA What is Asset Management Asset Management @ City of Fort Worth Streets & Traffic Management Initiative 2 WHAT IS ASSET MANAGEMENT
More informationLOCATED IN WASHINGTON COUNTY LAND AREA: 8.75 SQ. MI. POPULATION: 14, C/L MILES ODOT DISTRICT 10 CONTAINS 5 STATE ROUTES 1ST SETTLEMENT IN THE
LOCATED IN WASHINGTON COUNTY LAND AREA: 8.75 SQ. MI. POPULATION: 14,085 88 C/L MILES ODOT DISTRICT 10 CONTAINS 5 STATE ROUTES 1ST SETTLEMENT IN THE NORTHWEST TERRITORY WOOD-WIRT-WASHINGTON INTERSTATE PLANNING
More informationA Better Way to Manage Assets and Infrastructure. Mutasem Jokhdar InfoGraph
A Better Way to Manage Assets and Infrastructure Mutasem Jokhdar InfoGraph TITLE SLIDE InfoGraph (Founded in 1991) InfoGraph Specialty is Geographic Information Systems (GIS) & Remote Sensing software
More informationTacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington (253) Fax (253)
Tacoma Mall Office Building 4301 South Pine Street, Suite 446 Tacoma, Washington 98409-7207 (253) 798-7250 Fax (253) 798-4233 www.piercecountywa.org/roadstandards March 2012 Foreword This manual contains
More informationENGINEERING DEPARTMENT. Provide engineering and public improvements in the most economical manner.
ENGINEERING DEPARTMENT MISSION STATEMENT: Provide engineering and public improvements in the most economical manner. The Engineering Department performs the following services to maintain and improve the
More informationPavement Surface Evaluation and Rating Presentation. City of Oberlin Public Works Department July 5, 2011
Pavement Surface Evaluation and Rating Presentation City of Oberlin Public Works Department July 5, 2011 Causes of Pavement Deterioration Environmental : weathering and aging Structural: repeated traffic
More informationCity of Bremerton Public Works Department Notice to Consultants Pavement Management Program
City of Bremerton Public Works Department Notice to Consultants Pavement Management Program The City of Bremerton Department of Public Works & Utilities (City) is requesting Statements of Qualifications
More informationThe Role of PMS in the DOTD Decision Making Process
The Role of PMS in the DOTD Decision Making Process Christophe N. Fillastre, P.E. CE Louisiana Department of Transportation and Development Section 21, Management Systems and Data Collection Pavement Management
More informationSCDOT Needs, Funding Challenges, and Economic Development. Getting to Good (and Staying There ) Robert St. Onge, SCDOT January 2013
SCDOT Needs, Funding Challenges, and Economic Development or Getting to Good (and Staying There ) Robert St. Onge, SCDOT January 2013 SCDOT s Mission Mission (Section 57-1-30, SC Code of Laws) The department
More informationImprovement Plan Cost Estimate
Building and Engineering Division Development Services Department 214 S. C Street, Oxnard CA 93030 ph: 805.385.7925 fax 805.385.7854 Improvement Plan Cost Estimate Land Development Permit No. (Tract or
More informationFor Public Input Period
20142018 CAPITAL IMPROVEMENT PLAN ( Thousands) CITY OF HOUSTON STREET & TRAFFIC CONTROL Project: Kingwood Drive N100011 Loop 494 to Woodland Hills Project Description Project provides for the ROW acquisition,
More informationCITY OF GEORGETOWN, TEXAS
CITY OF GEORGETOWN, TEXAS STREET MAINTENANCE TREATMENTS SUMMARY REPORT Prepared By CITY OF GEORGETOWN & KPA ENGINEERS FEBRUARY 2016 1.0 Executive Summary In 2005, the City of Georgetown implemented the
More informationRIDOT S Statewide Roadway and Asset Data Collection Project
RIDOT S Statewide Roadway and Asset Data Collection Project GIS-T Conference 2017 Shane White Rhode Island DOT; Daniel Behnke DTS Accent image here Primary Image here RDIP Technical Assistance Started
More informationIntegrated Strategic Planning in Indonesia. James Robertson Business Development Director - EMEA AgileAssets, Inc. All Rights Reserved
Integrated Strategic Planning in Indonesia James Robertson Business Development Director - EMEA 2018 AgileAssets, Inc. All Rights Reserved Who is AgileAssets? Integrated Infrastructure Asset Management
More informationSECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS
SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page SECTION 14 RESTORATION OF SURFACES... 14.1 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01
More informationDepartment of Building and Zoning Approaches and Sidewalks for ONE AND TWO FAMILY CONSTRUCTION
Department of Building and Zoning Approaches and Sidewalks for ONE AND TWO FAMILY CONSTRUCTION GENERAL ITEMS SUBGRADE Prior to pouring concrete all subgrades must be wetted and compacted. All formwork
More informationManaging Paved Assets: YCDSB Pavement Management System for Parking Lots & Play Areas
Managing Paved Assets: YCDSB Pavement Management System for Parking Lots & Play Areas Wael Bekheet, Ph.D., P.Eng. wbekheet@gmail.com Faculty of Engineering, Alexandria University 1 El-Horreya Ave., El-
More informationAsset Management and Data Collection using Digital Video / GPS Data Extraction Techniques
Asset Management and Data Collection using Digital Video / GPS Data Extraction Techniques TRB 6 th National Conference on Transportation Asset Management Kansas City, Missouri November 2, 2005 Presentation
More informationLeading the Pack with Pavement Management
Leading the Pack with Pavement Management Pavement Analyst Implementation for Polk County, FL Katia M. Delgado, PE Polk County, FL Aaron D. Gerber, PE The Kercher Group, Inc. Florida s Crossroads of Opportunity
More informationSECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS
SECTION 26 - COLD PLANE ASPHALT CONCRETE PAVEMENT TABLE OF CONTENTS Section Page 26-1 GENERAL... 26.1 26-2 PAVEMENT KEYCUTTING... 26.1 26-3 PAVEMENT PLANING... 26.2 26-4 PLANED PAVEMENT CONFORMS... 26.3
More informationNJDOT: Asset Management Strategies and Tools
NEW JERSEY DEPARTMENT OF TRANSPORTATION NJDOT: Asset Management Strategies and Tools Wednesday, October 1, 2014 Afternoon Session (1:45pm 2:30pm) Presenters Michael Castaldo New Jersey Department Of Transportation
More informationPAVEMENT MANAGEMENT SIMPLIFIED
PAVEMENT MANAGEMENT SIMPLIFIED FINAL PROJECT REPORT PAVEMENT MANAGEMENT PROJECT City of Zanesville OH October 15, 2015 616 HEBRON ROAD, SUITE F HEATH, OH 43056 800.638.8040 SALES@JG3CONSULTING.COM EXECUTIVE
More informationCONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:
CONSTRUCTION SURVEY PART 1 - GENERAL 1.01 SECTION INCLUDES Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: A. Construction Survey: 1. Project
More informationPalm Beach County Engineering Overview & Implementation Plan for the One Penny Sales Surtax
Palm Beach County Engineering Overview & Implementation Plan for the One Penny Sales Surtax Engineering Sales Tax Projects Bridges $ 43.4 m (27) Roads (Resurfacing) $ 77.6 m (121) Roads (Restriping) $
More informationFROM: CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE: JULY 9, 2007 CMR:251 A:07
TO: HONORABLE CITY COUNCIL FROM: CITY MANAGER DEPARTMENT: PUBLIC WORKS DATE: JULY 9, 2007 CMR:251 A:07 SUBJECT: APPROVAL OF A CONTRACT WITH BOND BLACKTOP, INC., IN THE AMOUNT OF $556,812 FOR PHASE 1 AND
More informationSECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS
SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS Section Page 13-1 GENERAL... 13.1 13-1.01 Preservation of Property... 13.1 13-1.02 Overloading, Pavement Protection & Repair... 13.1 13-2 REMOVING EXISTING
More informationCHAPTER 12 INSTALLATION OF UTILITIES AND OTHER SYSTEMS TABLE OF CONTENTS
CHAPTER 12 INSTALLATION OF UTILITIES AND OTHER SYSTEMS TABLE OF CONTENTS Section Title Page 12.1 General... 12-1 12.2 Design Standards... 12-1 12.2.1 General Requirements...12-1 12.2.2 Minimum Depth...12-1
More informationBerkshire Region TIP Project Data Form
BASIC INFORMATION: 1. TIP ID #: 2. MUNICIPALITY: 3. ROUTE# AND/OR NAME: Berkshire Region TIP Project Data Form 4. PROJECT TYPE (CHECK BEST DEFINITION OF PROJECT): Intersection Improvement Road Resurfacing
More informationASSET MANAGEMENT GUIDE
ASSET MANAGEMENT GUIDE For Local Agencies in Indiana JUNE 2017 This Guide was developed for the Indiana LTAP by Applied Pavement Technology, Inc. 115 West Main Street Suite 400 Urbana, Illinois 61801 (217)
More informationAsset Management Fundamentals
Asset Management Fundamentals Work Management includes all of the scheduling and activities involved in maintaining assets at a predefined condition level, including: Work Orders Work Requests Maintenance
More informationstudy for 2018 include:
MEMORANDUM TO: Mayor and City Council gk FROM: Shawn Sanders irector of Public Works DATE: March 15, 2018 RE: Feasibility Study for the 2018 Street Improvement Project Project No. 2018-02 INTRODUCTION
More informationTools and Tactics for Roadway Pavement Preservation: An Implementation Guide to Preserving High-Traffic-Volume Roadways
Appendix C Pavement Condition and Distresses Tools and Tactics for Roadway Pavement Preservation: An Implementation Guide to Preserving High-Traffic-Volume Roadways Pavement Conditions and Distresses This
More informationROADWAY IMPROVEMENT PLAN for the GORHAM ROADWAYS located in GORHAM, NEW HAMPSHIRE
ROADWAY IMPROVEMENT PLAN for the GORHAM ROADWAYS located in GORHAM, NEW HAMPSHIRE Prepared for: Town of Gorham December 15, 2017 Prepared by: HEB Engineers, Inc. HEB Project #2016-091 HEB Engineers, Inc.
More informationRoadway Surfaces and Traffic Control Elements
Roadway Surfaces and Traffic Control Elements Lines of Business: General Liability, Public Officials Liability www.tridentinsurance.net Risk Control Strategy/Key Issues: To establish and document a program
More informationExisting Conditions Summary and Capital Improvement Plan
Town of Ledyard, CT Pavement Management Program Existing Conditions Summary and Capital Improvement Plan February 2011 Why Pavement Management? Maximize Available Funding Reduce long-term maintenance costs
More informationCapital District Transportation Committee November 6, Unit Costs for Non-State Highway Reconstructions with Federal Funds
Capital District Transportation Committee November 6, 2018 Unit Costs for Non-State Highway Reconstructions with Federal Funds CDTC s unit costs for non-state reconstruction projects were last updated
More informationGeneral Legend Details...100
SECTION 1 - ROADWAYS TABLE OF CONTENTS General Legend Details......100 Details Roadway Section......... 110 Residential Street Intersection.........115 Waterway and Waterway Transition Detail........116
More informationPavement Management Program for the Town of Cave Creek Final Report
Pavement Management Program for the Town of Cave Creek Final Report Prepared For: Town of Cave Creek 37622 N. Cave Creek Road Cave Creek, AZ 85331 480-488-1400 www.cavecreek.org Prepared By: Applied Pavement
More informationI. STREET CONSTRUCTION AND RECONSTRUCTION
CITY OF OSHKOSH POLICY FOR SPECIAL ASSESSMENTS A. GENERAL I. STREET CONSTRUCTION AND RECONSTRUCTION 1. Assessments shall be levied according to the front foot dimensions of the abutting property to the
More informationSustainable Pavement Practices Help Local Agencies in California Improve Their Road Infrastructure
Sustainable Pavement Practices Help Local Agencies in California Improve Their Road Infrastructure LA County s Path to Success Kevin Donnelly Western Emulsions Presentation Objectives What are applicable
More informationMaintenance, Construction & Secondary Roads. Terry Gibson, PE Chief Engineer February 20, 2013
Maintenance, Construction & Secondary Roads Terry Gibson, PE Chief Engineer February 20, 2013 State versus local responsibility Division structure Allocations Flexibility in funding Implications of not
More informationE R R A CITY OF LOS ANGELES / DEPARTMENT OF PUBLIC WORKS BUREAU OF STREET SERVICES
R ER YO IC A GAR TTI, M CE A BURE U ET E R T OF S S E C I V SER CTOR E R I DA, D E C U A RIO S A Z A N CITY OF LOS ANGELES / DEPARTMENT OF PUBLIC WORKS BUREAU OF STREET SERVICES explore the statistical
More informationJoint Legislative Transportation Oversight Committee January 6, 2016 Maintenance Operations Performance Analysis Report (MOPAR) Kristin Barnes
Joint Legislative Oversight Committee January 6, 2016 Maintenance Operations Performance Analysis Report (MOPAR) Kristin Barnes Division 4 Staff Maintenance Engineer 1 Legislative Requirements (NCGS 136-44.3)
More informationTransmap has gone Green. Please visit and click to find out more about Transmap s Green Initiatives.
Executive Summary MicroPAVER Experience Company Focus Transmap has been implementing pavement distress data into MicroPAVER for over 10 years on city and county roads ranging from 100 to over 3,000 centerline
More informationTRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM
VIRGINIA DEPARTMENT OF TRANSPORTATION TRAFFIC ENGINEERING DIVISION INSTRUCTIONAL & INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Americans with Disabilities Act Requirements of Maintenance and Operational
More informationIntegrated Strategic Planning in Indonesia
Integrated Strategic Planning in Indonesia October 2018 2018 AgileAssets, Inc. All Rights Reserved 2018 AgileAssets, Inc. All Rights Reserved Who is AgileAssets 26 State-Wide Systems w/ DOTs 20 15 20+
More informationIMPLEMENTATION OF COMPUTER AIDED SYSTEM FOR MANAGEMENT OF PAVEMENT MAINTENANCE DECISION
P a g e 118 Available online at http://arjournal.org APPLIED RESEARCH JOURNAL RESEARCH ARTICLE ISSN: 2423-4796 Applied Research Journal Vol.2, Issue, 3, pp.118-124, March, 2016 IMPLEMENTATION OF COMPUTER
More informationLAGRANGE TOWNSHIP 353 South center street p.o. box 565 lagrange ohio 44050
LAGRANGE TOWNSHIP 353 South center street p.o. box 565 lagrange ohio 44050 Resolution 2004-5 Resolution of the Board of Trustees of LaGrange Township, Lorain County, Ohio, adopting general rules and regulations
More informationFY 2019 TRANSPORTATION CAPITAL PROGRAM New Jersey Department of Transportation Projects
Baltic Avenue, Maine to Mississippi Avenues Project ID Numbers: S1702 / 173620 This project will mill and repave the roadway, upgrade ADA ramps, and improve drainage, thermoplastic stripping, manholes,
More informationTELLER COUNTY PUBLIC WORKS
TELLER COUNTY PUBLIC WORKS DEPARTMENT OF TRANSPORTATION ROAD MAINTENANCE & IMPROVEMENT PLAN TABLE OF CONTENTS SECTION PAGE (S) TRANSPORTATION OPERATIONS.............. 3 OUR MISSION.....................
More informationCity of Kettering. Bid Tabulations SWR PROJECT. Description: 2017 Sidewalk, Curb and Drive Approach Repair Account # PO#
City of Kettering Bid Tabulations 05-117 2017 SWR PROJECT Description: 2017 Sidewalk, Curb and Drive Approach Repair Account # 5212-77750 PO# Engineer's Estimate (1) America's Decorative Concrete (2) RA
More informationTRANSPORTATION HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA
HEAVY HIGHWAY ADOT I-10 WIDENING (PINAL AIR PARK TO PICACHO PEAK TRAFFIC INTERCHANGE) RED ROCK, ARIZONA 2008/09 $52.0 M 85% SELF-PERFORMED Widen 12 miles of Interstate 10 to six lanes including the reconstruction
More informationHB 2838/SB 1128 (2007) Report to the Governor, JLARC, and CTB. Virginia Department of Transportation 1401 East Broad Street Richmond, Virginia 23219
Biennial Report on the Condition of and Investment Needed to Maintain and Operate the Existing Surface Transportation Infrastructure for FY 2011 and FY 2012 HB 2838/SB 1128 (2007) Report to the Governor,
More information2017 Highway Safety Improvement Program Call
2017 Highway Safety Improvement Program Call The Highway Safety Improvement Program (HSIP) is for highway safety projects that eliminate or reduce the number of fatalities and serious injuries on all public
More informationAugust 5, Roy D. Rissky P.E.
August 5, 2014 Roy D. Rissky P.E. Pavement Maintenance: A systematic approach to keeping good pavements in good condition by applying the right treatment, to the right pavement, at the right time. Condition
More informationA Best Practice for the Implementation of a Pavement Management System For Small and Medium Airports
A Best Practice for the Implementation of a Pavement Management System For Small and Medium Airports Architectural & Engineering Services Civil Engineering Directorate Airport Engineering ATR-045 Real
More informationPerformance Audit: Pavement Condition Measures October 2008
Performance Audit: Pavement Condition Measures October 2008 City Auditor City of Lawrence, Kansas October 2, 2008 Members of the City Commission The city measures the condition of streets and uses the
More informationon the eastbound side of Route 29). identified in the table.
To: Jeannie Swim, Memo From: Ken Demmons, P.E. Project: Route 29 Bridge Replacement over Little Rocky Run Per plans received on January 23, 2012 CC: File Date: February 21, 2012 Job No: P2464 RE: Review
More informationCity of Berkley, Michigan Harvard Road Reconstruction & Water Main Replacement Project FREQUENTLY ASKED QUESTIONS (FAQ)
FREQUENTLY ASKED S (FAQ) The purpose of this document is to provide detailed information about the Harvard Road Reconstruction & Water Main Replacement Project. This project will directly affect residents
More informationLOU LAMBERT, DEPUTY DIRECTOR BUREAU OF TRANSPORTATION PLANNING
LOU LAMBERT, DEPUTY DIRECTOR BUREAU OF TRANSPORTATION PLANNING FIVE MAJOR AREAS Evolving Process of Strategic Analysis New Paradigm in Transportation Current Activities in Asset Management Michigan Business
More informationCity of DeBary, FL Sidewalk Data Collection Services
City of DeBary, FL Sidewalk Data Collection Services Prepared by: Data Transfer Solutions, LLC 2680 Avalon Park Blvd. East, Suite 200 Orlando, FL 32828 www.dtsgis.com 1 COVER LETTER May 30, 2017 Mr. Matt
More informationProject Need and Evaluation
City of Brooklyn Center 2011 Palmer Lake East Street and Utility Reconstruction Project Public Hearings February 14, 2011 Public Improvement Hearing: Special Assessments Local public improvements to the
More informationANNUAL REPORT. Pursuant to: Code of Virginia
ANNUAL REPORT 2015 Pursuant to: Code of Virginia 33.2-232 Virginia Department of Transportation 1401 East Broad Street Richmond, Virginia 23219 November 30, 2015 Table of Contents Executive Summary ii
More informationConstruction Cost Estimation Preparation Manual for Preliminary Design (English Units)
10/16/2014 Construction Cost Estimation Preparation Manual for Preliminary Design (English Units) July 2002 Prepared by Construction Cost Estimating Unit Program Support Services 10/16/2014 Table of Contents
More informationPre-Conference Workshop: Changing Methods in Pavement Data Collection
Pre-Conference Workshop: Changing Methods in Pavement Data Collection AUlloa@dynatest.com KKeifer@dynatest.com Alvaro Ulloa-Calderon, PhD Kurt Keifer, PhD, PE 2014 NWPMA Conference Seattle, WA October
More informationRUEKERT & MIELKE, INC. Serving Local People. Solving Local Problems.
RUEKERT & MIELKE, INC. Serving Local People. Solving Local Problems. March 15, 2017 Effective Road Ratings & Forecasting Agenda Introductions & Welcome 10:05-10:15 How to Rate Your Roads 10:15-10:50 What
More informationPAVEMENT CONDITION REPORT 2018 UPDATE. Pavement Condition Report. City of Delaware
2018 Pavement Condition Report City of Delaware Table of Contents Existing Conditions... 2 Pavement Ratings for Council Wards Pavement Ratings for Council Ward I... 3 Pavement Ratings for Council Ward
More informationRAIL-HWY PROJECT DEVELOPMENT GUIDE AND
RAIL-HWY PROJECT DEVELOPMENT GUIDE AND New procedures for Railroad Right-of-Entry Agreements & Bid Documents (SP Item 007) Bridge Division Webinar - July 18, 2013 GUIDE TO RAILROAD PROJECT DEVELOPMENT
More informationREQUEST FOR PROFESSIONAL SERVICES
REQUEST FOR PROFESSIONAL SERVICES The City of Lander is currently soliciting proposals from consultants who can offer a complete and accurate assessment of the condition of the City of Lander s street
More informationSTRUCTURAL EVALUATION & TREATMENT SELECTION FOR LOCAL ROADS. Nick Jones Local Technical Assistance Program Utah State University
STRUCTURAL EVALUATION & TREATMENT SELECTION FOR LOCAL ROADS Nick Jones Local Technical Assistance Program Utah State University SO YOU THINK YOU HAVE A DIFFICULT INTERSECTION? The condition of your
More informationCITY OF DES PLAINES-CONCRETE PROGRAM SIDEWALK, CURB AND DRIVEWAY GUIDELINES
CITY OF DES PLAINES-CONCRETE PROGRAM SIDEWALK, CURB AND DRIVEWAY GUIDELINES SUMMARY AND INTENT OF PROJECT The City of Des Plaines Curb and Sidewalk Program is intended to repair hazardous sidewalk and
More informationAsset Management For Indiana Counties
00% 90% 80% 70% 60% 50% 40% 30% 20% 0% 0% 272 250 83 220 273 25 88 28 304 338 375 375 44 406 44 42 428 433 430 275 232 98 97 69 74 56 8 74 72 68 67 74 68 8 3 996 997 998 999 2000 200 2002 2003 2004 2005
More informationMAKING THE PAVEMENT MANAGEMENT SYSTEM WORK TO SUPPORT ASSET MANAGEMENT
MAKING THE PAVEMENT MANAGEMENT SYSTEM WORK TO SUPPORT ASSET MANAGEMENT Andrew Williams Office of Technical Services Andrew.Williams@dot.ohio.gov 1 TODAY S TOPIC How ODOT uses the Pavement Management System
More informationToward Measuring Pavement Conditions to Optimize Roadway Treatments
Toward Measuring Pavement Conditions to Optimize Roadway Treatments Kevin Carstens, EIT Robert Bertini, Ph.D, PE Anurag Pande, Ph.D Department of Civil and Environmental Engineering, Cal Poly San Luis
More informationRoadway Intersection Inventory and Remote Sensing
Veneziano 1 Roadway Intersection Inventory and Remote Sensing David Veneziano Center for Transportation Research and Education Iowa State University ABSTRACT The application of remote sensing to the collection
More informationODOT Asset Management Plan 0
ODOT Asset Management Plan 0 Table of Contents Executive Summary... 1 ODOT s Experience with Asset Management... 1 A New Way of Doing Business... 2 ODOT s Investment Plans... 3 Moving Forward... 5 1.0
More informationPavement Management s Role in an Asset Management World
Pavement Management s Role in an Asset Management World Kathryn A. Zimmerman, P.E. (Corresponding Author) Prashant Ram, E.I.T. Applied Pavement Technology, Inc. W. Main Street, Suite 00 Urbana, IL 0 Paper
More informationAsset Management Implementations within the Ohio Department of Transportation
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director Asset Management Implementations within the Ohio Department of Transportation 2012-9th National Conference on Transportation
More informationCITY OF ENCINITAS CITY COUNCIL AGENDA REPORT Meeting Date: October 24, 2012
CITY OF ENCINITAS CITY COUNCIL AGENDA REPORT Meeting Date: October 24, 2012 TO: VIA: FROM: City Council Gus Vina, City Manager Greg Shields, Interim Director of Public Works Finance Department Kipp Hefner,
More informationB. All roadways per the American Association of State Highway and Transportation Officials, (AASHTO) Standards for local roads.
PART 1 - GENERAL 1.01. Summary: A. See UAF Master Landscape Plan. B. All roadways per the American Association of State Highway and Transportation Officials, (AASHTO) Standards for local roads. C. Roadway
More informationSafety Management System for Israel
Safety Management System for Israel Dr. Simon Lewis and Joe Garvey AgileAssets, Inc. Traffic Records Forum New Orleans July 27, 2010 A nation under pressure * Do things well /smart * Do things right first
More informationSidewalk Repair Program. Charter Township of Canton Engineering Services
Sidewalk Repair Program Charter Township of Canton Engineering Services Sidewalk Repair Program History Canton lost a landmark case at the Michigan Supreme Court level in 1997. The Supreme Court has determined
More information