SUMMARY SUPERINTENDENT OF PLANNING, HIGH VOLTAGE PROJECTS, ENGINEERING AND AUTOMATION DISTRIBUTION DISTRIBUTION ASSETS ENGINEERING MANAGEMENT

Size: px
Start display at page:

Download "SUMMARY SUPERINTENDENT OF PLANNING, HIGH VOLTAGE PROJECTS, ENGINEERING AND AUTOMATION DISTRIBUTION DISTRIBUTION ASSETS ENGINEERING MANAGEMENT"

Transcription

1 SUMMARY Pág. DISTRIBUCTION REF. CONEM 1. OBJECTIVE OF THE DOCUMENT GENERAL CONDITIONS MATERIAL INFORMATIONS DEFINITIONS Supplier with homologated Material Supplier with Pre-Homologated Material National or Nationalized Supplying Foreign Supplying GENERAL REQUIREMENTS Applicability of Homologated Products Technical Documentation of Homologated and Pre-Homologated Products TECHNICAL INDUSTRIAL QUALIFICATION BY CEMIG TECHNICAL DOCUMENTATION IN CASE OF CONTRACTING MAINTENANCE OF THE HOMOLOGATED STATUS DOCUMENTS TO BE SENT TO THE HOMOLOGATION REQUEST Tables with information about products and manufacturers Technical documentation (drawings, manuals, catalogs, and others) Special and Type Test Reports REFERENCE DOCUMENTATION Annex A - Questionnaire to Industrial Technical Qualification VIEW ATTENTION:. BEFORE USING THIS DOCUMENT, CHECK IF THIS IS THE CURENTE VERSION.. SUGGESTIONS TO THIS DOCUMENT, PLEASE CONTACT THE DISTRIBUTION OF ASSETS ENGINEERING MANAGEMENT (GERÊNCIA DE ENGENHARIA DE ATIVOS DA CEMIG DISTRIBUIÇÃO). DRAWN e COMPANHIA ENERGÉTICA DE MINAS GERAIS ELABOTARED d c b a MSN/PRFCC 27/06/16 SUPERINTENDENT OF PLANNING, HIGH VOLTAGE PROJECTS, ENGINEERING AND AUTOMATION DISTRIBUTION DISTRIBUTION ASSETS ENGINEERING MANAGEMENT Approval WAAV TECHNICAL REQUIREMENTS FOR HOMOLOGATION (TRHP) OF SF6 GAS INSULATED SWITCHGEAR (GIS) INFORMATION CLASSIFICATION PA/EA 38 a 14 pages REVISIONS 26/06/2016 ARQ.

2 2 CLASSIFICATION: TECHNICAL REQUIREMENTS FOR HOMOLOGATION (TRHP) OF SF6 GAS INSULATED SWITCHGEAR (GIS) 1. OBJECTIVE OF THE DOCUMENT 1.1. This document (TRHP) aims to complement the specification PA/EA-1 and establish specific requirements for homologation of SF6 Gas Insulated Switchgear by the suppliers, as defined in item 1.2 of specification PA/EA In case of divergence between the requirements of this document and the specification PA/EA-1, this document will prevail Due to the complexity and extension of the documentation of this equipment, the deadline for the analysis of all documentation, explanations, and technical qualification is ninety (90) days from the date of receipt of complete documentation, or as needed CEMIG. 2. GENERAL CONDITIONS 2.1. In addition to the requirements provide in this document the supplier must meet the foreseen conditions of PA/EA The premise is that homologation is required only for products already developed, with type and special tests performed in accordance with relevant standards The requirements are applicable to SF6 Gas Insulated Switchgear and its main equipment (Circuit Breaker, Current Transformer, Potential Transformer, Surge Arresters, Disconnector and Earthing Switch). The manufacturer of GIS is responsible to homologate all these components In order to start the homologation process, it should be presented the complete documentation specified in Item 9 - DOCUMENTS TO BE SENT TO THE HOMOLOGATION REQUEST After homologation, CEMIG may, at any time, check the continuity of customer requirements Alternatively, the carrying out of type and special tests is allowed for qualification and validation of type and / or special test reports, according to criteria defined in the document ED/AT-7, in order to be classified as pre-homologated or homologated By participating in the homologation process, the manufacturer agree that, after obtaining its homologation, the occurrence of any disqualification from the manufacturer, motivated and evidenced in events that led to the loss or suspension of the homologation status until being resolved nonconformities, he will abdicate to participate of corresponding Material Group (MG),

3 3 CLASSIFICATION: in tenders and product offerings when CEMIG is the final destination of the product, regardless of manufacturing origin. If it was done, inadvertently, it should withdraw its proposal in order to avoid disruption of the process. 3. MATERIAL INFORMATIONS Material/Equipment: Product Group: SF6 GAS INSULATED SWITCHGEAR (GIS) 5723 CEMIG Technical Specifications: CEMIG Standard drawing: ED/AT-19 SF6 Gas Insulated Switchgear and Do not exist. references in item Erro! Fonte de referência não encontrada. of this document Sampling required for homologation and pre-homologation tests: Preferably, the type tests should have already been conducted. If their reports were not validated, they shall be performed on a sample of each bay (functional unit) for each model. The sampling aims represent the complete project which is requested the homologation. Typical Bays assembled with all components for samples: transformers bay; overhead or underground transmission lines bay; buses interconnection bay. CODES: SF6 GAS INSULATED SWITCHGEAR, TYPE 1, 145kV, 2000A, 40kA, 275/650/- Kv, 200MVA, INTERNAL APPLICATION, DOUBLE ARRANGEMENT, 3 LINE BAY, 6 CT 1200/ A, 2 CIRCUIT-BREAKERS 1250A, 3 DISCONNECTORS 1250A MOTORIZED OF 3 POSITIONS, EARTHING SWITCHES, COMPLETED WITH ALL COMPONNENTS AND ACCESSORIES, INCLUDING FRAMES ACCESSORIES FOR FIXING THE FOUNDATIONS. SPECIFICATION ED/AT-19B SF6 GAS INSULATED SWITCHGEAR, TYPE 2, 145kV, 2000A, 40kA, 275/650/-kV, 200MVA, INTERNAL APPLICATION, DOUBLE ARRANGEMENT, 3 LINE BAY, 3 CT 1200/ A, 2 CIRCUIT-BREAKERS 1250A, 3 DISCONNECTORS 1250A MOTORIZED OF 3 POSITIONS, EARTHING SWITCHES, SURGE ARRESTERS, COMPLETED WITH ALL COMPONNENTS AND ACCESSORIES, INCLUDING FRAMES ACCESSORIES FOR FIXING THE FOUNDATIONS. SPECIFICATION ED/AT-19B SF6 GAS INSULATED SWITCHGEAR, TYPE 3, 145kV, 2000A, 40kA, 275/650/- kv, 200MVA, EXTERNAL APPLICATION, AERIAL CONNECTION FOR BUSHINGS, DOUBLE ARRANGEMENT, 2 LINE BAY, 3 CT 1200/ A, 1 CIRCUIT-BREAKER 1250A, 2 DISCONNECTORS 1250A MOTORIZED OF 3 POSITIONS, EARTHING SWITCHES, COMPLETED WITH ALL COMPONNENTS AND ACCESSORIES, INCLUDING FRAMES ACCESSORIES FOR FIXING THE FOUNDATIONS. SPECIFICATION ED/AT-19B 4. DEFINITIONS The definitions below are applicable to technical homologation of SF6 Gas Insulated Switchgear, and they prevail over the specification PA / EA Supplier with homologated Material

4 4 CLASSIFICATION: It refers to supplier: a) Registered at CEMIG; b) Approved in the technical qualification; c) With equipment in which type and special tests satisfactorily performed or have the test reports technically validated, according to item 4 of the technical specification No ED / AT-7. d) Meet the requirements of this document. 4.2 Supplier with Pre-Homologated Material It is the provider that partially meets the homologation requirements, once it does not meet the letter "c)" achievement or validation of all type tests, but have reports that meet the eligibility criteria of the type and special tests reports, according to item 3 of the technical specification No ED / AT-7. In other words, the supplier is under homologation. 4.3 National or Nationalized Supplying Manufacturer that has industrial installation in Brazil, own or formally constituted, for manufacturing or assembling, or customizing of its product, and which the accomplishment of routine and receiving tests, for final delivery of the its product, is expected to take place in Brazil. 4.4 Foreign Supplying Manufacturer that has its industrial installation outside from Brazil for manufacturing or assembling, and for performing routine and receiving tests in the final product. 5. GENERAL REQUIREMENTS 5.1 Applicability of Homologated Products Products can be applied in power electrical system expansion, maintenance and reform by CEMIG, and by consumers or generator when accessing on CEMIG s system (PART market). 5.2 Technical Documentation of Homologated and Pre-Homologated Products Once it was evaluated, design, key components, its subcontractors, and technical documentation verified in the process, these can t be changed without previous knowledge of CEMIG. 6. TECHNICAL INDUSTRIAL QUALIFICATION BY CEMIG 6.1. It shall be considered Technical Industrial Qualification for the factories of GIS and the main equipment that compose it, which according to the supplying history of the indicated plant may

5 5 CLASSIFICATION: be waived at the discretion of CEMIG. The performing period must be agreed between CEMIG and manufacturer Factories which are not qualified cannot supply to CEMIG Annex A of this document must be filled up during Technical Industrial Qualification It must be informed if there is some recommendation of any spare parts for the warranty period, for corrective and preventive maintenance failures. If there is something, the manufacturer must have these parts available during the warranty period The manufacturer, or formal subcontracted, must have availability for technical assistance related to the product. It shall be provided information regarding to the professionals and evidence training of these professionals, such as service reports and training certificates Technical assistance shall secure, during the delivery and warranty period, visiting the field at CEMIG and failure diagnosis in a maximum time of 15 consecutive days after the communication. The diagnosis must be formalized by Failure Diagnosis Report issued by the manufacturer For interruption failures, due to the complexity of the study and analysis, are accepted periods up to 30 days for the diagnosis after its formal activation. However, the place where the occurrence happened must be visited in a period equal or lower than 15 days In order to fulfill the diagnosis terms earlier mentioned is desirable that the manufacturer starts the investigation as soon as possible in order to not impact the total diagnosis period and issuance of Failure Report For diagnosed solutions the manufacturer must restore the operating conditions up to 60 days after diagnosis For interruption failures, if the failure diagnosis demonstrably indicates that they were due to equipment design, the manufacturer must restore the operating conditions within 120 days after diagnosis. For interruption failures which are not associated with the project, the period to restore the operating conditions is 60 days after diagnosis. 7. TECHNICAL DOCUMENTATION IN CASE OF CONTRACTING It will be not necessary sending all technical documentation required in the specifications to the homologated products. Only the technical documentation referent to the arrangement (electromechanic, civil, supporting structure, and identification nameplates) and electrical project of the set integration is planned to be supplied by manufacturer, and verified by CEMIG. 8. MAINTENANCE OF THE HOMOLOGATED STATUS

6 6 CLASSIFICATION: The homologation requirements must be supported by manufactures as a condition to keep their names in the list of homologated suppliers. Unsatisfactory supply quality, such as: the failure of the product or the lack of technical assistance, inadequate equipment delivery in relation to the homologated project, delay in delivery, no service warranty requirements, it will lead to loss or suspension of status. The loss or suspension of homologation and pre-homologation will also involve the loss or suspension of all items of the respective GIS Material Group (MG). 9. DOCUMENTS TO BE SENT TO THE HOMOLOGATION REQUEST Notes: 1. It shall be sent documentation related to GIS and the main equipment and materials that compose it. 2. In order to have a better understanding, CEMIG reserves the right to request additional information from the manufacturer, its subcontractors or customers indicated in providing history. 3. It shall be used the template "Table 8 Delivery Guide and Control Document Proceeding" for documents to be delivered in the homologation request Tables with information about products and manufacturers They have to be sent, filled out by the applicant, attached to the homologation request the following tables: a) Table 1 - Equipment and Factories proposed for homologation The table must be filled, by the manufacturer, with the product type, description, plants, and other fields. In the first column, it is necessary to indicate which CEMIG material code the project is associated with. The factory habilitation consists of quality analysis in the production chain, and the ability to perform routine tests and inspection, specifically for equipment in homologation, according to standards and specifications of CEMIG. b) Table 2 - Supplies History List c) Table 3 - Historical and List of Quality Control indexes, Customers Complaints Service, and Fault History It is required that the manufacturer send information of quality control on stage of fabrication, field assembling and operation (applicable to GIS and its components). Moreover, information about solutions of customers complaints and failure examples, corrective

7 7 CLASSIFICATION: maintenance reports, and solutions adopted to minimize the impact for customers are also required. d) Table 4 - List of Technical Assistance Contacts and Technical Training The manufacturer has to provide technical assistance in the supplying phases, installation, testing, and operation of the product. Moreover, it is also necessary the possibility to make personal contact within 48 hours after some failure, and it needs to be allowed notifying the failure event, at least by . The qualification of the technical support must be validated by training certificates and service reports. e) Table 5 Spare Parts Recommended for the Warranty Period The recommended spare parts are related to those ones which have more probability to be used during the warranty period, according to the quality control of the manufacturer. The manufacturing time for these parts must not interfere with the deadline set out in item 6. In other words, the manufacturer has to be prepared to provide support for its customer during the warranty period, in order to minimize the unavailability of the equipment. f) Table 6 Copies of Routine Testing Reports Related to the Proposal g) Table 7 Copies of Type and Special Testing Reports It must be sent copies of Type and special testing reports, performed on GIS and the main equipment which are part of it, according to item Type Tests reports. The list of reports must be filled through the Annex A of the Technical Specification ED / AT-7. h) Table 8 - Delivery Guide and Document Transit Control Fill in the list of the documents attached to the homologation request Technical documentation (drawings, manuals, catalogs, and others) In addition to the mentioned tables, it shall be also sent technical documentation containing details of the design about the proposed equipment, in order to allow checking the tested design. These documents have to be included in the list of delivery guide and control document proceeding Documents related to the GIS SF6 a) APPENDIX A - Table of Technical Data and Guaranteed Features from specification ED/AT-19;

8 8 CLASSIFICATION: b) Arrangement, outline drawings and dimensions of the typical bays and each component of GIS modules, including operating mechanisms; c) Arrangement, outline drawings and dimensions of cubicles for local control of the modules, indicating their components; d) Schematics diagrams related to the control of GIS modules for typical bays; e) Scheme of compressed air or hydraulic system, when applicable; f) Dimensional drawings of insulated cables transitions and bushings for GIS; g) Dimensional drawings of the bushings and output plugs of 138 KV, and terminals; h) Drawings of technical characteristic nameplate; i) Excitation curves of current transformers; j) Catalogs of components such as bus bars, compensated pressure monitor, flanges sealing rings, components and mechanisms for operating, and others; k) Brief description of the assembling process in field, testing, commissioning, and staff required for typical spans; l) GIS Instruction Manual; m) Technical deviations applicable to some eventual item in the specifications and standards. References must be given and referenced Circuit Breakers a. APPENDIX A - Technical Data and Guaranteed Features from specification CEMIG Disconnectors and Earthing Switches a. APPENDIX A - Technical Data and Guaranteed Features from specification CEMIG Current Transformers a. APPENDIX A - Technical Data and Guaranteed Features from specification CEMIG Voltage Transformers a. APPENDIX A - Technical Data and Guaranteed Features from specification CEMIG Surge Arresters a. APPENDIX A - Technical Data and Guaranteed Features from specification CEMIG Special and Type Test Reports Notes:

9 9 CLASSIFICATION: 1. In order to optimize the documentation and analysis, it is required sending only one report for each equipment and test. 2. In the reports shall be possible to detailed identify the tested equipment, through drawings, in order to allow a comparison with the project in homologation Test Reports related to GIS SF6 a. Dielectric tests (clause 6.2 of IEC /2003), including: Power-frequency voltage tests Lightning impulse voltage tests Partial discharge tests Dielectric tests on auxiliary and control circuits b. Radio interference voltage test (clause 6.3 of IEC /2003), if applicable; c. Resistance measurement of the main circuit (clause 6.4 of IEC /2003); d. Temperature rise test (clause 6.5 of IEC /2003); e. Short-time withstand current and peak withstand current tests, to main circuit and earthing device (clause 6.6 of IEC /2003); f. Basic short-circuit test-duties (6.106 clause of IEC /2012, and clause of IEC ): Basic short-circuit test-duties; Short-line fault tests; No-load line-charging breaking tests; No-load cable-charging breaking tests; Induced current switching by earthing switches (6.101 clause of IEC / 2003 and clause and Annex C of IEC / 2003). The applicability of the induced current switching requirement will be defined in the public notices of acquisition. g. Verification of the degrees of protection - testing of the degrees of protection of the control cabinets and operating mechanism (clause 6.7 of IEC / 2003); h. Mechanical operation test, 2000 cycles (closing-opening each) for circuit breakers, disconnectors and earthing switches (clause of IEC / 2012); i. Test to verify the proper functioning of the position and interlock indication device ( clause 6,102.1 of IEC / 2003); j. Proof tests for enclosures (6.103 clause of IEC / 2003); k. Gas tightness tests (clause 6.8 of IEC / 2003); l. Supportability test for the internal pressure of the enclosures due to an internal arc (clause of IEC / 2003);

10 10 CLASSIFICATION : m. Specific tests according to the applicable standards for components such as instrument transformers, surge arresters, disconnector, earthing switch, enclosure, and others Current Transformers (clause of NBR 6856/1992) a. Lightning impulse voltage tests, when they are not performed in conjunction with the GIS; b. Temperature-rise tests, when they are not performed in conjunction with the GIS; c. Short-time withstand current and peak withstand current tests, when they are not performed in conjunction with GIS; d. Open circuit voltage Voltage Transformers (6.1.2 clause NBR 6855/1992) a. Windings Resistance; b. Excitation current and no-load losses; c. Short-circuit impedance; d. Lightning impulse voltage tests, when they are not performed in conjunction with the GIS; e. Short circuit; f. Temperature-rise tests, when they are not performed in conjunction with the GIS Surge Arresters a. Insulation withstand tests, when they are not performed in conjunction with the GIS (clause 8.2 of IEC /2014); b. Residual voltage tests (clause 8.3 of IEC /2014); c. Long term stability in continuous operation voltage tests (clause 8.4 of IEC / 2014); d. Operating duty test (clause 8.7 of IEC /2014); e. Power-frequency voltage versus time test (clause 8.8 of IEC /2014); f. Short-circuit tests (clause 8.10 of IEC /2014).

11 11 CLASSIFICATION : 10. REFERENCE DOCUMENTATION a) ED/AT-19 - Subestação Blindada Isolada a Gás SF6; b) PE/LS Disjuntores e EPPT para Sistemas de Transmissão e Distribuição (Especificação Complementar); c) PE/LS Transformadores para Instrumentos de Alta Tensão 69 a 161kV - Especificação Técnica Complementar às especificações CEMIG-300 e CEMIG-301 (Especificação Complementar); d) ER/SE Secionadores para Sistemas de Transmissão e Subtransmissão (Especificação Complementar); e) CEMIG Disjuntores para Sistemas de Transmissão e Distribuição; f) CEMIG Circuit Breakers for Transmission and Distribution Systems; g) CEMIG Transformadores de Corrente para Sistemas de Transmissão; h) CEMIG Current Transformers for Transmission Systems; i) CEMIG Transformadores de Potencial Indutivos para Sistemas de Transmissão; j) CEMIG Inductive Potential Transformers for Transmission Systems; k) CEMIG Seccionadores para Sistemas de Transmissão; l) ED/AT-7 - Relatórios de Ensaios de Tipo - Qualificação Técnica d Validação em Processos de Homologação de Equipamentos para Subestações e Linhas. m) PA/EA-1 - Critérios para Homologação e Pré-Homologação de Material para a CEMIG

12 12 CLASSIFICATION : Annex A - Quiz for Industrial Qualification and Technical Assistance (Page 1/3) Equipment: SF6 Gas Insulated Switchgear (GIS SF6) Date: Manufacturer: Manufacturing unit: Equipment Model: Address: 1) Cemig codes required for homologation that are produced in industrial unit: ) Possible routine tests to be carried out in the Industrial Unit: 1 Visual and dimensional check 2 Power-frequency voltage tests on the main circuit 3 Partial discharge measurement 4 Tests on auxiliary and control circuits - Power-frequency voltage 5 Measurement of the resistance of the main circuit 6 Tightness test 7 Pressure tests of enclosures 8 Mechanical operation tests 9 Tests on auxiliary circuits, equipment and interlocks in the control mechanism 10 Pressure test on partitions Specific tests as applicable standards of components, such as circuit breaker, 11 instrument transformers, surge arrester, disconnector, earthing switch, etc. Verification tests of interchangeability of components of the same nominal 12 characteristics and construction Measurement tests resistance DC and AC insulation for buses and equipment 13 components of the sections to the land Availability and traceability of Routine Testing Reports acquis for the product 14 proposed for approval Note: If the GIS manufacturer has no ability to perform routine and receiving tests on the components of its manufacturing unit, it must be demonstrated the ability to perform these tests on its subcontractors. Comments:

13 13 CLASSIFICATION : Appendix A - Quiz for Industrial Qualification and Technical Assistance (Page 2/3) Equipment: SF6 Gas Insulated Switchgear (GIS SF6) 3) If recommended by the manufacturer for the warranty period, availability of spare parts (list): 4) Technical assistance Name of Responsible Address Contacts Telephone: 5) Services provided by the Technical Assistance (examples and references) Name of Responsible Client Client contacts Services provided / Reports

14 14 CLASSIFICATION : Appendix A - Quiz for Industrial Qualification and Technical Assistance (Page 3/3) Equipment: SF6 Gas Insulated Switchgear (GIS SF6) 6) Quality Control Requirements 1 - Are the test results available in traceable reports with the information required in technical standards and specifications? 2 Does the manufacturer uses indexes of customer complaints quality control and returns, registering, for example, failure percentage after delivery and identification of equipment and components that have failed? 3 - Are there records and control of materials and subcontractors? Y/N 4 - Is there traceability for raw materials used in the production of items proposed for approval? 5 Are Certificates / reports of tests carried out by sub-suppliers of components required and recorded (such as circuit breakers, measurement transformers, disconnectors, SF6, etc.), especially for cases that the GIS manufacturer does not perform at its factory routine tests? 6 Are the packaging and contents properly identified and meets customer specification requirements? CEMIG responsible CEMIG by enabling Name: Manufacturer responsible for the information Name: Signature: Signature: Elaborate Date Check Date MS/QL Quality Management of Material and Suppliers

Technical requirements to homologation and prehomologation PROTECTIVE RELAY

Technical requirements to homologation and prehomologation PROTECTIVE RELAY Classificação: Público 22.000-PE/LS-5690 Distribuição S.A. Superintendência de Engenharia da Distribuição - ED Superintendência de Planejamento, Estudos e Projetos de Expansão da Distribuição - PE Superintendência

More information

CONTENTS. 1.Scope 1. 2.General Conditions 1. 3.Material Information 1. Table 1 - TRHP Three-Phase Recloser 24.2 kv 1

CONTENTS. 1.Scope 1. 2.General Conditions 1. 3.Material Information 1. Table 1 - TRHP Three-Phase Recloser 24.2 kv 1 CONTENTS Page 1.Scope 1 2.General Conditions 1 3.Material Information 1 Table 1 - TRHP Three-Phase Recloser 24.2 kv 1 Table 2 - TRHP Single-Phase Recloser 15 kv 2 DISTRIBUTION ND 2.6 Table 3 - TRHP Three-Phase

More information

33-SDMS-02 SPECIFICATIONS FOR

33-SDMS-02 SPECIFICATIONS FOR SPECIFICATIONS FOR MV AUTOMATIC LINE SECTIONLIZER UP TO 36 KV This specification is property of SEC and subject to change or modification without any notice TABLE OF CONTENTS SECTION T I T L E PAGE NO.

More information

SPECIFICATIONS FOR Gas-to-Cable termination

SPECIFICATIONS FOR Gas-to-Cable termination Product GSM-145 1.0 APPLICATION: Gas-to-cable termination is a part of high voltage gas insulated indoor switchgear equipment. The component is intended for a high voltage system of 132 kv (AC), 50 Hz.

More information

30-SDMS-01 SPECIFICATIONS FOR LOAD BREAK SWITCH

30-SDMS-01 SPECIFICATIONS FOR LOAD BREAK SWITCH SPECIFICATIONS FOR LOAD BREAK SWITCH This specification is property of SEC and subject to change or modification without any notice TABLE OF CONTENTS 1.0 SCOPE 3 2.0 CROSS REFERENCES 3 3.0 APPLICABLE CODES

More information

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING NETWORK SYSTEMS SECTION

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING NETWORK SYSTEMS SECTION CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT NETWORK SYSTEMS SECTION SPECIFICATION EO-4133 REVISION 2 OCTOBER, 2006 GENERAL REQUIREMENTS

More information

TABLE OF CONTENTS. FOREWORD... Error! Bookmark not defined. INTRODUCTION SCOPE NORMATIVE REFERENCES DRAWING...4

TABLE OF CONTENTS. FOREWORD... Error! Bookmark not defined. INTRODUCTION SCOPE NORMATIVE REFERENCES DRAWING...4 TITLE SPECIFICATION FOR FREE- STANDING 11 DATE: AUGUST 2006 PAGE: 1 OF 15 TABLE OF CONTENTS Page FOREWORD... Error! Bookmark not defined. INTRODUCTION...3 1 SCOPE...3 2 NORMATIVE S...3 3 DRAWING...4 4

More information

B Improvements on High Voltage Electrical Substations to face the new Brazilian Legislation. G. M. Bastos (*) R. C. Valente E.

B Improvements on High Voltage Electrical Substations to face the new Brazilian Legislation. G. M. Bastos (*) R. C. Valente E. 21, rue d'artois, F-75008 Paris http://www.cigre.org B3-214 Session 2004 CIGRÉ Improvements on High Voltage Electrical Substations to face the new Brazilian Legislation G. M. Bastos (*) R. C. Valente E.

More information

SECTION SECONDARY UNIT SUBSTATIONS SECONDARY LESS THAN 1000 V

SECTION SECONDARY UNIT SUBSTATIONS SECONDARY LESS THAN 1000 V SECONDARY UNIT SUBSTATIONS SECONDARY LESS THAN 1000 V PART 1 GENERAL 1.01 1.02 SCOPE The Contractor shall furnish and install the secondary unit substation(s) complete from the incoming line terminals

More information

Market Survey. Qualification Questionnaire Supply of Cast-resin Dry-type Power Transformers 18/0.4 kv, 18/3.3 kv and 3.3/0.4 kv

Market Survey. Qualification Questionnaire Supply of Cast-resin Dry-type Power Transformers 18/0.4 kv, 18/3.3 kv and 3.3/0.4 kv EDMS No. 1853603 Document Ref. LHC-E-CS-0003 Group Code: EN-EL Market Survey Qualification Questionnaire Supply of Cast-resin Dry-type Power Transformers 18/0.4 kv, 18/3.3 kv and 3.3/0.4 kv Abstract In

More information

POLYMER HOUSED SURGE ARRESTORS

POLYMER HOUSED SURGE ARRESTORS POLYMER HOUSED SURGE ARRESTORS March 2015 Engineering Department WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED Regd. Office: VidyutBhawan, Block DJ, Sector-II, Bidhannagar, Kolkata 700091.

More information

PRIMARY UNIT SUBSTATIONS SECONDARY 1000 V AND ABOVE SECTION SECTION

PRIMARY UNIT SUBSTATIONS SECONDARY 1000 V AND ABOVE SECTION SECTION PRIMARY UNIT SUBSTATIONS SECONDARY 1000 V AND ABOVE PART 1 GENERAL 1.01 SCOPE A. The Contractor shall furnish and install the primary unit substation(s) complete from the incoming line terminals to the

More information

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING NETWORK SYSTEMS SECTION

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING NETWORK SYSTEMS SECTION CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING NETWORK SYSTEMS SECTION SPECIFICATION EO- 4035 REVISION 12 OCTOBER, 2006 OPERATION AND MAINTENANCE

More information

POWER TRANSFORMER INSTALLATION

POWER TRANSFORMER INSTALLATION Project Procedure POWER TRANSFORMER INSTALLATION No.: P-6.2-8-1 07/20/2011 PAGE 1 OF 6 1.0 PURPOSE The purpose of this procedure is to ensure that power transformer installations are accomplished in compliance

More information

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number PART 1 GENERAL 01 02 03 04 SCOPE Furnish and install Manual Transfer Switches (MTS) and

More information

A SUBSTATION CONCEPT FOR CHANGEABLE LOAD CONDITIONS

A SUBSTATION CONCEPT FOR CHANGEABLE LOAD CONDITIONS A SUBSTATION CONCEPT FOR CHANGEABLE LOAD CONDITIONS Willy LORD SwedPower AB Sweden willy.lord@swedpower.com Lennart AHNLUND Vattenfall Eldistribution AB Sweden B. WALLBING-LÖVGREN Vattenfall Eldistribution

More information

IMPLEMENTATION RULES FOR COMPULSORY CERTIFICATION OF ELECTRICAL AND ELECTRONIC PRODUCTS

IMPLEMENTATION RULES FOR COMPULSORY CERTIFICATION OF ELECTRICAL AND ELECTRONIC PRODUCTS Ref. No. CNCA-01C-011: 2007 IMPLEMENTATION RULES FOR COMPULSORY CERTIFICATION OF ELECTRICAL AND ELECTRONIC PRODUCTS Low-voltage Electrical Apparatus---switch and control Equipment Announced on Aug. 1,

More information

37-SDMS-01 REV. 03 SPECIFICATIONS FOR

37-SDMS-01 REV. 03 SPECIFICATIONS FOR 37-SDMS-01 REV. 03 SPECIFICATIONS FOR LOW VOLTAGE MOLDED CASE CIRCUIT BREAKERS FOR SERVICE CONNECTIONS This specification is property of SEC and subject to change or modification without any notice CLAUSE

More information

SERIES 800 / 810 SPECIFICATION 15KV & 25KV PADMOUNTED LIQUID-INSULATED VACUUM LOAD INTERRUPTER ASSEMBLIES

SERIES 800 / 810 SPECIFICATION 15KV & 25KV PADMOUNTED LIQUID-INSULATED VACUUM LOAD INTERRUPTER ASSEMBLIES SERIES 800 / 810 SPECIFICATION 15KV & 25KV PADMOUNTED LIQUID-INSULATED VACUUM LOAD INTERRUPTER ASSEMBLIES MANUALLY OPERATED / REMOTELY OPERATED DEAD FRONT PADMOUNTED SWITCHGEAR WITH VACUUM LOAD INTERRUPTING

More information

SECTION to 5000 AMPERE PLUG-IN AND FEEDER BUSWAYS - SPECTRA. A. Low-Voltage Plug-in Busway to 5000 ampere, 600 VAC

SECTION to 5000 AMPERE PLUG-IN AND FEEDER BUSWAYS - SPECTRA. A. Low-Voltage Plug-in Busway to 5000 ampere, 600 VAC PART 1 GENERAL A. The requirements of the Contract, Division 1, and Division 16 apply to work in this Section. 1.01 SECTION INCLUDES A. Low-Voltage Plug-in Busway - 225 to 5000 ampere, 600 VAC 1.02 RELATED

More information

SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard

SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard PART 1 GENERAL 1.1 Scope A. The intent of this specification is to provide power control for the parallel operation of generator

More information

ENGINEERING SPECIFICATION EE SPEC

ENGINEERING SPECIFICATION EE SPEC /. Company Directive ENGINEERING SPECIFICATION EE SPEC : 84/1 Relating to Surge Arresters EE SPEC : 84/1 20 December 2013-1 of 7 - IMPLEMENTATION PLAN Introduction This document defines the surge arresters

More information

PERMANENT DOCUMENT CIG 023. Factory Inspection Report

PERMANENT DOCUMENT CIG 023. Factory Inspection Report PERMANENT DOCUMENT CIG 023 Factory Inspection Report WARNING: THIS DOCUMENT IS ONLY VALID IF USED BY ECS MEMBERS AND THEIR AUTHORISED AGENTS Approved by: ECS General Meeting 8-9 April 2014 No. of pages:

More information

UHS 10kA Arrester. Certified Test Report IEC

UHS 10kA Arrester. Certified Test Report IEC CP No.: CP0606 Page 1 of 10 UHS 10kA Arrester Certified Test Report IEC 60099-4 2004 CERTIFICATION Statements made and data shown are, to the best of our knowledge and belief, correct and within the usual

More information

MANUFACTURER'S RESPONSIBILITIES AND REQUIREMENTS FOR FACTORY TESTS

MANUFACTURER'S RESPONSIBILITIES AND REQUIREMENTS FOR FACTORY TESTS MANUFACTURER'S RESPONSIBILITIES AND REQUIREMENTS FOR FACTORY TESTS 1.0 MANUFACTURER'S RESPONSIBILITIES: The manufacturer's responsibilities include, but are not limited to: 1.1 Control of UL Mark - Restrict

More information

Distribution Tradesperson (Jobsplus Permit No. 706/2017)

Distribution Tradesperson (Jobsplus Permit No. 706/2017) CAREER OPPORTUNITIES Enemalta plc is the leading energy service provider in the Maltese Islands, entrusted with the generation and distribution of electricity and the development of the national electricity

More information

NPS/002/017 Technical Specification for 66 kv and 132 kv Cable Accessories

NPS/002/017 Technical Specification for 66 kv and 132 kv Cable Accessories Version:- 4.0 Date of Issue:- October 2016 Page 1 of 21 NPS/002/017 Technical Specification for 66 kv and 132 kv Cable Accessories 1. Purpose The purpose of this document is to detail the technical requirements

More information

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION IEC/TS 62371 TECHNICAL SPECIFICATION Edition 1.0 2008-05 Characteristics of hollow pressurised and unpressurised ceramic and glass insulators for use in electrical equipment with rated voltages greater

More information

56-SDMS-01 REV. 01 SPECIFICATIONS FOR

56-SDMS-01 REV. 01 SPECIFICATIONS FOR 56-SDMS-01 REV. 01 SPECIFICATIONS FOR 13.8KV UNIT SUBSTATIONS This specification is property of SEC and subject to change or modification without any notice CONTENTS PAGE No. 1.0 SCOPE 3 2.0 CROSS REFERENCES

More information

Project Procedure 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES. No.: P /19/2011 PAGE 1 OF 4 FACILITY LIGHTING SYSTEMS INSTALLATION

Project Procedure 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES. No.: P /19/2011 PAGE 1 OF 4 FACILITY LIGHTING SYSTEMS INSTALLATION Project Procedure 07/19/2011 PAGE 1 OF 4 1.0 PURPOSE The purpose of this procedure is to ensure that facility lighting system installations are accomplished in compliance with Project specifications, applicable

More information

Type THP Serial No Rated voltage 145 kv Rated normal current 2500 A Rated short-circuit current 40 ka Rated frequency 50/60 Hz

Type THP Serial No Rated voltage 145 kv Rated normal current 2500 A Rated short-circuit current 40 ka Rated frequency 50/60 Hz Object One compact switchgear assembly comprising a three-pole SF 6 circuit-breaker and a three-position disconnector/earthing switch, the circuit-breaker incorporating one interrupter per pole in single-pole

More information

SECTION 07 TECHNICAL SPECIFICATIONS 11KV OUTDOOR TYPE SINGLE PHASE METAL OXIDE (ZNO) GAPLESS LIGHTNING ARRESTER (LA)

SECTION 07 TECHNICAL SPECIFICATIONS 11KV OUTDOOR TYPE SINGLE PHASE METAL OXIDE (ZNO) GAPLESS LIGHTNING ARRESTER (LA) SECTION 07 TECHNICAL SPECIFICATIONS OF 11KV OUTDOOR TYPE SINGLE PHASE METAL OXIDE (ZNO) GAPLESS LIGHTNING ARRESTER (LA) 7.0 TECHNICAL SPECIFICATIONS OF 11KV OUTDOOR TYPE SINGLE PHASE METAL OXIDE (ZNO)

More information

UNS 5kA Arrester. Certified Test Report IEC

UNS 5kA Arrester. Certified Test Report IEC CP No.: CP0504 Page 1 of 10 UNS 5kA Arrester Certified Test Report IEC 60099-4 2004 CERTIFICATION Statements made and data shown are, to the best of our knowledge and belief, correct and within the usual

More information

A. Section includes busway and fittings including plug-in units.

A. Section includes busway and fittings including plug-in units. SECTION 26 25 00 ENCLOSED BUS ASSEMBLIES PART 1 - GENERAL 1.1 SUMMARY A. Section includes busway and fittings including plug-in units. 1.2 REFERENCES A. Institute of Electrical and Electronics Engineers:

More information

TECHNICAL SPECIFICATION FOR SF6 GAS INSULATED METAL ENCLOSED SWITCHGEAR (GIS)

TECHNICAL SPECIFICATION FOR SF6 GAS INSULATED METAL ENCLOSED SWITCHGEAR (GIS) TECHNICAL SPECIFICATION FOR SF6 GAS INSULATED METAL ENCLOSED SWITCHGEAR (GIS) 1.1 Introduction This specification provides for the design, manufacture with approved QAP, factory acceptance testing, packing

More information

Connection Study Requirements

Connection Study Requirements Document Release Released: September 20, 2010 The Customer shall comply with all the applicable requirements in this document when performing connection studies to produce the engineering study report.

More information

IEC Oil Filled & SF 6 Gas Current Transformers

IEC Oil Filled & SF 6 Gas Current Transformers g IEC Oil Filled & SF 6 Gas Current Transformers 72.5kV - 550kV (325kV - 1550kV BIL) with Primary Plus TM Pre-engineered solution set that digitizes XD GE primary equipment and provides factory installed

More information

Facility Interconnection Requirements

Facility Interconnection Requirements Facility Interconnection Effective 1/1/2016 1. Purpose Facility Interconnection Facility Interconnection (FAC-001-2) To avoid adverse impacts on the reliability of the Bulk Electric System (BES), RPU documents

More information

ELECTRICAL INSPECTION BULLETIN (Effective )

ELECTRICAL INSPECTION BULLETIN (Effective ) ELECTRICAL INSPECTION BULLETIN (Effective 2009-02-01) Rule 36-000 Customer Owned High Voltage Installations With the increase in customer own high voltage equipment there appears to be confusion over which

More information

11-SDMS-01 REV. 03 ( )

11-SDMS-01 REV. 03 ( ) 11-SDMS-01 REV. 03 (19-07-2018) SPECIFICATION FOR LOW-VOLTAGE POWER AND CONTROL CABLES Saudi Electricity Company 1. SCOPE... 3 2. CROSS REFERENCES TO OTHER SEC STANDARDS... 3 3. APPLICABLE CODES AND STANDARDS...

More information

Certificate of Acceptance

Certificate of Acceptance Specific Conditions The following Conditions are specific to the approved product/s contained within this Certificate. These conditions must be adhered to in addition to the Network Rail General Conditions

More information

B. Provide liquid-filled secondary substation transformers as indicated on drawings.

B. Provide liquid-filled secondary substation transformers as indicated on drawings. SECTION 26 12 13 PART 1 - GENERAL 1.01 WORK INCLUDED A. Comply with the provisions of Sections 26 05 00. B. Provide liquid-filled secondary substation transformers as indicated on drawings. 1.02 RELATED

More information

TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT

TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT 1.1 General 1.1.1 These Special Conditions of Contract supplement the General Instructions.

More information

Pre-Qualification Certificate

Pre-Qualification Certificate Nordic Utility Pre-Qualification System Pre-Qualification Certificate Awarded to Registration number: 984 277 032 Sellihca Id: Sellihca Qualification hereby confirms that is now fully registered as a supplier

More information

Carry out routine inspection and service on high voltage indoor metal clad circuit breakers and bus

Carry out routine inspection and service on high voltage indoor metal clad circuit breakers and bus Page 1 of 7 Carry out routine inspection and service on high voltage indoor metal clad circuit breakers and bus Level 4 Credits 4 Purpose People credited with this unit standard are able to: prepare for

More information

TRANSMISSION PLANNING ASSESSMENT METHODOLOGY AND CRITERIA

TRANSMISSION PLANNING ASSESSMENT METHODOLOGY AND CRITERIA TRANSMISSION PLANNING ASSESSMENT METHODOLOGY AND CRITERIA For Compliance with NERC Reliability Standard: TPL-001-4 1/10/2017 Version: 4.2 Table of Contents 1 Revision and Approval History... 2 1.1 Revision

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS. Use for Southeast projects only **************************************************************************

UNIFIED FACILITIES GUIDE SPECIFICATIONS. Use for Southeast projects only ************************************************************************** USACE / NAVFAC / AFCESA / NASA UFGS-26 13 00.00 25 (July 2006) ------------------------------- Preparing Activity: NAVFAC Superseding Southeast UFGS-S-16345N (March 2001) Use in lieu of UFGS-26 13 00.00

More information

Standard. Extra High Voltage (EHV) Post Insulators Standard R Version 1.0, June Tasmanian Networks Pty Ltd (ABN )

Standard. Extra High Voltage (EHV) Post Insulators Standard R Version 1.0, June Tasmanian Networks Pty Ltd (ABN ) Standard Extra High Voltage (EHV) Post Insulators Standard R574184 Version 1.0, June 2018 Tasmanian Networks Pty Ltd (ABN 24 167 357 299) Authorisations Action Name and title Date Prepared by Michael Verrier,

More information

9KV/18KV METAL OXIDE LIGHTNING ARRESTORS WITHOUT GAPS WITH STANDARD NOMINAL DISCHARGE CURRENT 5KA

9KV/18KV METAL OXIDE LIGHTNING ARRESTORS WITHOUT GAPS WITH STANDARD NOMINAL DISCHARGE CURRENT 5KA 9KV/18KV METAL OXIDE LIGHTNING ARRESTORS WITHOUT GAPS WITH STANDARD NOMINAL DISCHARGE CURRENT 5KA Technical specification for 9KV/18KV 5KA Metal oxide Lightning Arrestors without Gap. ----------------------------------------------------------------------------------------------------------------

More information

AMERICAN RENEWABLES GAINESVILLE REGIONAL UTILITIES GAINESVILLE RENEWABLE ENERGY CENTER

AMERICAN RENEWABLES GAINESVILLE REGIONAL UTILITIES GAINESVILLE RENEWABLE ENERGY CENTER AMERICAN RENEWABLES GAINESVILLE REGIONAL UTILITIES --------------------------------------------- GAINESVILLE RENEWABLE ENERGY CENTER OPERATING PROCEDURES Revision 0; September 1, 2012 Revision 1; November

More information

Facilities Planning and Construction (FP&C)

Facilities Planning and Construction (FP&C) Appendix 8.4a Facilities Planning and Construction (FP&C) UAA FP&C Quality Assessment Checklist (A) Project: PM: Project ID: Updated:

More information

SUMMARY OF PRICES FOR 30MVA 161/24/36 kv MOBILE SUBSTATION ACCORDING to SR-152

SUMMARY OF PRICES FOR 30MVA 161/24/36 kv MOBILE SUBSTATION ACCORDING to SR-152 Israel Electric Corporation Ltd. Tender no. Name of Contractor: SUMMARY OF PRICES FOR 30MVA 161/24/36 kv MOBILE SUBSTATION ACCORDING to SR-152 1. GENERAL INSTRUCTIONS 2.1. Prices for the above captioned

More information

SECTION AUTOMATIC TRANSFER SWITCH

SECTION AUTOMATIC TRANSFER SWITCH SECTION 26 36 23 AUTOMATIC TRANSFER SWITCH PART 1: GENERAL 1.01 SCOPE A. Furnish all labor, materials, equipment and appurtenances, install and test electrically operated, automatic transfer switch (ATS)

More information

NPS/001/008 Technical Specification for Gapless Metal Oxide Surge Arresters

NPS/001/008 Technical Specification for Gapless Metal Oxide Surge Arresters Version:- 5.0 Date of Issue:- October 2017 Page 1 of 18 NPS/001/008 Technical Specification for Gapless Metal Oxide Surge Arresters 1. Purpose The purpose of this document is to detail the technical requirements

More information

CSA Group Products, Processes and Services Scheme

CSA Group Products, Processes and Services Scheme 1. CONTACT CSA CSA Group Products, Processes and Services Scheme 1.1 Getting started is easy. There are three ways to contact us: Call 866 797 4272 Email client.services@csagroup.org Complete a request

More information

CONSTRUCTION OF NEW 132/33 KV GIS SUBSTATION AT KULI, DISTRICT - MURSHIDABAD. (Package-12)

CONSTRUCTION OF NEW 132/33 KV GIS SUBSTATION AT KULI, DISTRICT - MURSHIDABAD. (Package-12) Section I - NOTICE INVITING TENDER ABRIDGED NOTICE INVITING TENDER WBSETCL (A Govt of West Bengal Enterprise) CHIEF ENGINEER (PROCUREMENT), VIDYUT BHAVAN NOTICE INVITING TENDERS For CONSTRUCTION OF NEW

More information

SECTION 1 SCOPE, SPECIFIC TECHNICAL REQUIREMENTS AND QUANTITIES

SECTION 1 SCOPE, SPECIFIC TECHNICAL REQUIREMENTS AND QUANTITIES Bihar State Electricity Board Bharat Heavy Electricals Ltd. 220 /132 kv Pusauli Substation & Dehri Extension Doc. No. TB-357-316-001, Rev 00 Technical Specification of 245kV & 145 kv Circuit Breaker SECTION

More information

PARTICULAR SPECIFICATION E11: GENERAL ELECTRICAL EARTHING AND LIGHTNING PROTECTION

PARTICULAR SPECIFICATION E11: GENERAL ELECTRICAL EARTHING AND LIGHTNING PROTECTION E11 : General Electrical Earthing and LIGHTNING Protection PARTICULAR SPECIFICATION E11: GENERAL ELECTRICAL EARTHING AND LIGHTNING PROTECTION 1 2009-05-12 Review of Mechanical / Electrical and Control

More information

NPS/001/003 Technical Specification for 11kV, 20kV and 33kV Overhead Line Air Break Switch-Disconnectors

NPS/001/003 Technical Specification for 11kV, 20kV and 33kV Overhead Line Air Break Switch-Disconnectors Document reference NPS/001/003 Document Type: Section Level Version:- 4.0 Date of Issue:- November 2015 Page 1 of 24 NPS/001/003 Technical Specification for 11kV, 20kV and 33kV Overhead Line Air Break

More information

NPS/003/001 Technical Specification for 33kV, 66kV and 132kV Voltage Transformers

NPS/003/001 Technical Specification for 33kV, 66kV and 132kV Voltage Transformers Version:- 5.0 Date of Issue:- February 2015 Page 1 of 25 NPS/003/001 Technical Specification for 33kV, 66kV and 132kV Voltage Transformers 1. Purpose This purpose of this document is to specify the technical

More information

What to Look for in a Good Quality Arrester

What to Look for in a Good Quality Arrester All good quality arresters have much in common. This first in a series of articles, sponsored by NEMA Surge Arrester Section members, covers what to look for in that quality arrester. Introduction We've

More information

COMPANY PROFILE INESING SPA

COMPANY PROFILE INESING SPA COMPANY PROFILE INESING SPA HISTORY The Company INESING has matured in the lasts 10 years the experience, knowledge and professionalism at the highest level, consolidating its presence in the market for

More information

SERVICE LEVEL PROCEDURE

SERVICE LEVEL PROCEDURE SERVICE LEVEL PROCEDURE METERING PROVIDER SERVICES PREPARED BY: AEMO MARKETS VERSION: 1.3 EFFECTIVE DATE: 01 DECEMBER 2017 STATUS: FINAL Approved for distribution and use by: APPROVED BY: PETER GEERS TITLE:

More information

SECTION MOTOR CONTROL CENTER

SECTION MOTOR CONTROL CENTER SECTION 16445 MOTOR CONTROL CENTER PART 1 GENERAL 1.01 DESCRIPTION A. This section covers the contract item Motor Control Center (MCC). The contract item includes demolition and removal of existing MCC;

More information

TURKISH ELECTRICITY DISTRIBUTION CO. TECHNICAL SPECIFICATION FOR POST (SUPPORT) INSULATORS FOR MEDIUM VOLTAGE SYSTEMS

TURKISH ELECTRICITY DISTRIBUTION CO. TECHNICAL SPECIFICATION FOR POST (SUPPORT) INSULATORS FOR MEDIUM VOLTAGE SYSTEMS TURKISH ELECTRICITY DISTRIBUTION CO. TECHNICAL SPECIFICATION FOR POST (SUPPORT) INSULATORS FOR MEDIUM VOLTAGE SYSTEMS CONSULTANT: ELTEM-TEK ELECTRICAL INSTALLATIONS ENGINEERING SERVICES AND TRADE CO. JUNE,

More information

Enhance Power Equipment Reliability with Predictive Maintenance Technologies

Enhance Power Equipment Reliability with Predictive Maintenance Technologies Enhance Power Equipment Reliability with Predictive Maintenance Technologies November 2012/1910DB1208 by S. Frank Waterer, Electrical Engineerinig, Fellow Schneider Electric USA, Inc. Make the most of

More information

Distribution Information Exchange Code

Distribution Information Exchange Code Distribution Information Exchange Code Version 5.1 Approved September 2007 Comments to this document can be forwarded to: The RSA Grid Code Secretariat Attention: Mr. Bernard Magoro Eskom, Transmission

More information

Document 2007 Rev 0 December 2005 Page 1 of 8

Document 2007 Rev 0 December 2005 Page 1 of 8 Document 2007 Rev 0 December 2005 Page 1 of 8 1. Scope... 2 2. Definitions... 2 a. LabTest...2 b. Factory Location/ Manufacturer's Premises...2 c. Manufacturer...2 d. Subcontractor...2 e. f. Out-Worker...2

More information

ECP SECONDARY SUBSTATION ENERGISATION PROCEDURE

ECP SECONDARY SUBSTATION ENERGISATION PROCEDURE Document Number: ECP 11-0504 Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE ECP 11-0504 SECONDARY SUBSTATION ENERGISATION PROCEDURE EPN, LPN, SPN This procedure details the energisation procedures

More information

Point Eight Power, Inc. Switchgear Specification Low Voltage UL 1558 Metal-Enclosed Switchgear

Point Eight Power, Inc. Switchgear Specification Low Voltage UL 1558 Metal-Enclosed Switchgear Table of Content 1.0 General... 2 2.0 Scope... 2 3.0 Applicable Codes, Standards and Qualifications... 2 4.0 Service and Environmental Conditions... 3 5.0 Construction... 3 6.0 Front Breaker Compartment

More information

INNOVATIVE LIFE-CYCLE CONCEPTS FOR MEDIUM-VOLTAGE SWITCHGEAR ON BROWN COAL SURFACE MINING DEVICES

INNOVATIVE LIFE-CYCLE CONCEPTS FOR MEDIUM-VOLTAGE SWITCHGEAR ON BROWN COAL SURFACE MINING DEVICES INNOVATIVE LIFE-CYCLE CONCEPTS FOR MEDIUM-VOLTAGE SWITCHGEAR ON BROWN COAL SURFACE MINING DEVICES Dr. S. Ruhland, Dr. U. Riedl ALSTOM Sachsenwerk GmbH, Germany The requirements for medium voltage switchgear

More information

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES Guidelines effective March 5, 2007 NES is committed to providing safe, reliable electric service at a reasonable price for all of our customers. These guidelines offer direction for activities relating

More information

4. GENERAL REQUIREMENTS

4. GENERAL REQUIREMENTS 4. GENERAL REQUIREMENTS 4.1 APPLICATION FOR SERVICE Application for service must be made to, and accepted by, the Company before service will be furnished. At the time of application, the Customer shall

More information

Houston First Corporation Package 1 SECTION MEDIUM VOLTAGE FUSED SWITCH INTERRUPTER

Houston First Corporation Package 1 SECTION MEDIUM VOLTAGE FUSED SWITCH INTERRUPTER PART 1 - GENERAL 1.1 SUMMARY SECTION 26 13 16 MEDIUM VOLTAGE FUSED SWITCH INTERRUPTER A. The scope of this section includes providing and assembling materials and equipment for the dead-front, medium voltage

More information

Deadline for documents submission June 11, 2009 before 12:00 hours (local time)

Deadline for documents submission June 11, 2009 before 12:00 hours (local time) United Nations Development Programme Date: 26 May 2009 Expression of Interest Pre-Qualification for Civil Works Ref: PRQ/KRT/09/001- R1 United Nations Development Programme (UNDP), Sudan office announces

More information

SECTION METAL-ENCLOSED BUS MEDIUM VOLTAGE

SECTION METAL-ENCLOSED BUS MEDIUM VOLTAGE METAL-ENCLOSED BUS MEDIUM VOLTAGE PART 1 GENERAL 1.01 1.02 1.03 1.04 1.05 SCOPE The Contractor shall furnish and install the equipment as specified herein and as shown on the contract drawings. The medium

More information

TABLE OF CONTENTS FOREWORD... 3 INTRODUCTION SCOPE NORMATIVE REFERENCES DRAWING... 5

TABLE OF CONTENTS FOREWORD... 3 INTRODUCTION SCOPE NORMATIVE REFERENCES DRAWING... 5 TITLE SPECIFICATION FOR FREE- STANDING 11 DATE: NOVEMBER 2016 PAGE: 1 OF 16 COMPILED BY FUNCTIONAL RESP APPROVED BY AUTHORIZED BY... Z NGQWALA TECHNICIAN: TECHNOLOGY SERVICES... V. RAMPERSAD SENIOR ENGINEER:

More information

TECHNICAL SPECIFICATIONS OF INSULATING OIL TESTING SET

TECHNICAL SPECIFICATIONS OF INSULATING OIL TESTING SET SECTION 07 TECHNICAL SPECIFICATIONS OF INSULATING OIL TESTING SET 7.0 TECHNICAL SPECIFICATIONS/ REQUIREMENTS OF INSULATING OIL TESTING SET 7.1 GENERAL This section of the document includes the design,

More information

Technical Guideline for. Section 8. Inspection and Approval of Construction

Technical Guideline for. Section 8. Inspection and Approval of Construction Technical Guideline for Section 8. Inspection and Approval of Construction Ontario Regulation 22/04 Electrical Distribution Safety January 12, 2005 Technical Guideline Section 8 General Legal Disclaimer

More information

DESIGN. DEVELOP. DELIVER. CAPABILITY STATEMENT

DESIGN. DEVELOP. DELIVER. CAPABILITY STATEMENT DESIGN. DEVELOP. DELIVER. CAPABILITY STATEMENT Mining & Industrial Switchgear Kiosk Substations Water Infrastructure Projects Project Management Slurry Management Systems Pumping Solutions Fire Protection

More information

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TECHNICAL SPECIFICATIONS

GUJARAT ENERGY TRANSMISSION CORPORATION LTD. TECHNICAL SPECIFICATIONS GUJARAT ENERGY TRANSMISSION CORPORATION LTD. SARADAR PATEL VIDYUT BHAVAN, RACE COURSE, BARODA 390 007. TECHNICAL SPECIFICATIONS FOR 220, 132 & 66 COMPOSITE SOLIDCORE STATION POST INSULATORS GETCO/E/2,1,6

More information

Important Considerations for Specifying MV Mining Switchgear Western Mining Electrical Association Edmonton, Canada June 13, 2008

Important Considerations for Specifying MV Mining Switchgear Western Mining Electrical Association Edmonton, Canada June 13, 2008 Important Considerations for Specifying MV Mining Switchgear Western Mining Electrical Association Edmonton, Canada June 13, 2008 (Above 1000V and up to 38kV for Surface Mining) Key Components of Specification:

More information

I. CLARIFICATIONS SOUGHT BY PROSPECTIVE BIDDERS

I. CLARIFICATIONS SOUGHT BY PROSPECTIVE BIDDERS This clarification forms part of the Request for Proposal and Contract documents, and modifies them as follows: I. CLARIFICATIONS SOUGHT BY PROSPECTIVE BIDDERS S. No. 1. Refer to section Bid Data Sheet

More information

SECTION SECONDARY UNIT SUBSTATIONS

SECTION SECONDARY UNIT SUBSTATIONS SECTION 26 12 16 SECONDARY UNIT SUBSTATIONS PART 1 GENERAL 1.1 SUMMARY This section describes metal-clad, indoor or outdoor, secondary unit substations with integral primary fused disconnect switches,

More information

SECTION BUSWAYS

SECTION BUSWAYS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 25 11 BUSWAYS SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable to the section and

More information

It is standard practice and all manufacturers to abide by this. It is standard practice and all manufacturers to abide by this.

It is standard practice and all manufacturers to abide by this. It is standard practice and all manufacturers to abide by this. 1 162 General 2 162 General We recommend to specify door handle to singe shot latch type, bolted construction of Door shall not be acceptable. Closing and Tripping Coils shall be rated for continuous supply,

More information

GST001 MV/LV TRANSFORMERS LOCAL SECTION CELG D

GST001 MV/LV TRANSFORMERS LOCAL SECTION CELG D GST001 MV/LV TRANSFORMERS LOCAL SECTION CELG D In addition on what specified in the common part, the following requirements are prescribed: 3.1 LAWS Portaria INMETRO 378/2010 Requisitos de Avaliação da

More information

NY State Unified Solar Permit

NY State Unified Solar Permit VILLAGE OF FARMINGDALE NY State Unified Solar Permit Unified solar permitting is available statewide for eligible solar photovoltaic (PV) installations. Municipal authorities that adopt the unified permit

More information

ARCHITECTURAL DESIGN ASSOCIATES, P.C O STREET, SUITE 105 LINCOLN, NE

ARCHITECTURAL DESIGN ASSOCIATES, P.C O STREET, SUITE 105 LINCOLN, NE ARCHITECTURAL DESIGN ASSOCIATES, P.C. 7501 O STREET, SUITE 105 LINCOLN, NE. 68510 February 15, 2019 YORK GENERAL HOSPITAL DIALYSIS BUILDING YORK, NEBRASKA ---------------------------------------------------------------------

More information

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICES

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICES INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICES EVALUATION CRITERIA FOR STRUCTURAL STEEL APPROVED FABRICATOR INSPECTION PROGRAMS 1.0 PURPOSE EC 020-2014 (Adopted

More information

Gas-insulated medium-voltage switchgear. for wind parks. Answers for energy.

Gas-insulated medium-voltage switchgear. for wind parks. Answers for energy. Gas-insulated medium-voltage switchgear for wind parks Answers for energy. Switchgear for wind turbines: 8DH10 up to 24 kv, up to 20 ka, up to 1,250 A up to 17.5 kv, up to 25 ka, up to 1,250 A Best performance

More information

A Study on Gas Insulated Substation with Reference to 220/33kV GIS, Khanapara

A Study on Gas Insulated Substation with Reference to 220/33kV GIS, Khanapara A Study on Gas Insulated Substation with Reference to 220/33kV GIS, Khanapara Bipul Kumar Talukdar *, Suranjana Bharadwaj Assistant Professor, Dept. of EE, Girijananda Chowdhury Institute of Management

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-26 36 23.00 20 (April 2006) -------------------------------- Preparing Activity: NAVFAC Replacing without change UFGS-16410N (February 2003) UNIFIED FACILITIES GUIDE

More information

IECEE OPERATIONAL DOCUMENT

IECEE OPERATIONAL DOCUMENT IECEE OD-4001 Edition 1.3 IECEE OPERATIONAL DOCUMENT IEC System of Conformity Assessment Schemes for Electrotechnical Equipment and Components (IECEE System) IECEE OD-4001:2013(E) Factory Surveillance

More information

IECEE OPERATIONAL DOCUMENT

IECEE OPERATIONAL DOCUMENT IECEE OD-4001 Edition 1.34 20138-06xx06-05 IECEE OPERATIONAL DOCUMENT IEC System of Conformity Assessment Schemes for Electrotechnical Equipment and Components (IECEE System) Factory Surveillance Report

More information

LEVEL 2 Application For Interconnection And Net Metering

LEVEL 2 Application For Interconnection And Net Metering LEVEL 2 Application For Interconnection And Net Metering Use this Application form when generating facility is not inverter-based or is not certified by a nationally recognized testing laboratory to meet

More information

úê üßµö ÖãÆü ü ¾Ö³ÖÖÖ - III

úê üßµö ÖãÆü ü ¾Ö³ÖÖÖ - III Subject: Implementation of IS/IEC 60947-2:2003 due to revision of IS 13947 series of specifications as IS/IEC 60947 series 1. ETD has informed regarding the publication of the series of specifications

More information

SMALL GENERATOR INTERCONNECTION REQUEST (Application Form)

SMALL GENERATOR INTERCONNECTION REQUEST (Application Form) SMALL GENERATOR INTERCONNECTION REQUEST (Application Form) Attachment 2 Transmission Provider: Bluestem Electric Cooperative, Inc. Designated Contact Person: Kevin Heptig Address: P.O. Box 5, Wamego, Kansas

More information

Candidate NICET ID No.: NICET ENGINEERING TECHNICIAN CERTIFICATION Experience Application, Part II: Verifier Data. (Please print legibly or type)

Candidate NICET ID No.: NICET ENGINEERING TECHNICIAN CERTIFICATION Experience Application, Part II: Verifier Data. (Please print legibly or type) Candidate: Experience Application, Part II: Verifier Data Candidate NICET ID No.: SM Standard Model (Please print legibly or type) To be completed by the Verifier only Name: Title: Current employer: Daytime

More information