FPSL Central Infrastructure Procurement
|
|
- Ann Underwood
- 5 years ago
- Views:
Transcription
1 FPSL Central Infrastructure Procurement Information Pack for Interested Parties v /10/2017 Restricted Circulation
2 Background This document is an introduction for parties interested in bidding for the real-time, 24*7 clearing infrastructure as articulated in the NPA The procurement is for infrastructure renewal (not a direct replacement) and associated full management of the Faster Payments service The process is being run as a competitive tender with the same criteria and rigour applied to all bidders, including the incumbent supplier(s) A competitive procurement is expected to be repeated approximately every 10 years 2
3 Items covered Key Project Drivers: Internal Key Project Drivers: Regulatory Project Objective Fundamental Service Principles Framing the Requirements Transition Approach Procurement Phasing Procurement Status Activities in next Quarter Questions 3
4 Key Project Drivers: Internal The current contract expires 30/06/2020, by which time the service architecture will be over 10 years old The need to provide a platform that caters for current and future needs of UK Plc and meets the strategic direction of the Company, and removes any unnecessary user barriers to safe and open access New Payments Architecture with a 24/7 real-time clearing and settlement capability at its heart PSF and PSR market review drive to ISO messaging and competitive tender: a level playing field for vendor selection via EOI/RFI/RFP 4
5 Key Project Drivers: Regulatory [ ] to promote effective competition and innovation in payment systems, in the interests of service-users [ ] we have decided to implement two remedies: mandating competitive procurement exercises for Bacs, FPS and LINK when they purchase central infrastructure services introducing ISO messaging standards in future procurement exercises for Bacs and FPS We consider that our remedies, taken together with the sale of Vocalink, will remove barriers to entry and create a competitive procurement process, opening up the provision of central infrastructure to competition. Specifically, these measures remedy the following competition issues that we identified in our final report: Operators and direct payment service providers (PSPs) do not have a strong incentive to run competitive procurements, which has resulted in limited competitive pressure on Vocalink. The use of bespoke messaging standards by Bacs and FPS represents a barrier to entry for alternative providers of central infrastructure services. The current ownership and governance arrangements at Vocalink are likely to reduce the level of competition in the provision of central infrastructure services. PSR: Market review into the ownership and competitiveness of infrastructure provision; Remedies Decision publ. ref. MR15/2.5, June
6 Project Objective To manage the gathering of service user requirements and deliver the service definition, competitive procurement, implementation of and transition to the next NPA-compliant, 24/7, safe and secure, real-time service by current contract end, including the managed migration of Participants to the next infrastructure and the delivery of revised or new legal, contractual, operational and support frameworks across stakeholders. 6
7 Fundamental Service Principles Assumed requirements for successor to the Faster Payments service:- 24/7 real-time Synchronous Immediate payment Irrevocable Immutable Very high availability Dynamic scalability Guaranteed settlement (Separate discussion on asynchronous payments delivery mechanism ongoing) 7
8 Framing the Requirements Availability Security and resilience Outsourced model Central architecture Payment types and payment volumes Settlement Risk Management Vendor(s) Currency(ies) Data and data analytics capability 8
9 Transition Approach X months X months X months SET UP TO RECEIVE Testing and Live Proving Interested parties will be invited to comment on transition and migration strategies and timescales at RFI and RFP stages SEND TRANSITION Migration EXISTING CI Parallel Running EXISTING CI Dormant but retained as fall-back 9
10 Procurement Phasing Oct 2017 Nov 2017 Apr 2018 Jun 2018 Sep 2018 EOI RFI RFP 1 RFP 2 Appointment The purpose of this phase will be to ensure that the net is cast as widely as possible in attracting potential talent to the bidding process and that the process is fair, transparent and nondiscriminatory. All bidders will be evaluated and scored with the same criteria. The aim at this stage is to ensure that only legitimate vendors receive copies of the RFI and that documentation is not distributed to other parties who are merely phishing for information. The aim is to act as market research, to elicit current thinking, planned future direction and trends/innovation within the industry. All bidders will have the opportunity to ask for clarification on any questions in dedicated Q&A sessions. Any new questions and related FPSL responses arising will be noted, and after completion of all the Q&A sessions, will be consolidated and distributed to all bidders to ensure a level playing field and that all bidders have the same level of knowledge and insight via equality of disclosure. Bidders will receive an RFP questionnaire and a copy of the contract and will be asked to provide realistic timelines, resource requirements to support the timelines and costs. Equality of disclosure will apply on any questions asked as per previous stage RFP responses will be reviewed and scored by a FPSL panel applying the same rigour and criteria to all bidders, and the scoring will determine which bidder(s) is/are shortlisted for the final RFP selection phase. Shortlisted bidders will be invited to present to an FPSL panel and a Best and Final Offer may be requested. Depending on whether reference customers are provided, additional visits to reference sites by the FPSL panel may be carried out. Bidders not shortlisted will have the opportunity to have a follow-up session with feedback on the rationale for nonselection. 10 The Preferred Bidder and Preferred Reserve will be notified and letters of intent will be sent for signature.
11 Procurement Status Procurement process formally kicked off on 06/10/2017, with publication for Expressions of Interest (Eligibility requirements and process can be found at: Requirements hierarchy developed: High Level Requirements will be made available at EOI, detailed at RFP stage Engagement with existing Participants ongoing to elicit new requirements (to feed into RFP) Additional engagement underway via workshops to feed into RFI & RFP phases (security, testing, settlement and clearing, standards etc.) 11
12 Activities in Next Quarter Workshops to cover areas in the Requirements Hierarchy Workshops to cover architectural requirements RFI distribution, Q&A and review Continued refinement of existing requirements into Requirements Catalogue Collation of new requirements into Requirements Catalogue 12
13 Questions All further procurement-related questions should be routed via: Any communications regarding procurement directly addressed to individuals within FPSL will be deleted and will not receive a response Restricted Circulation 13
NPSO Limited. New Payment System Operator 2 Thomas More Square London E1W 1YN. 28 th March 2018.
New Payment System Operator 2 Thomas More Square London E1W 1YN www.newpso.uk enquiries@newpso.uk 28 th March 2018 Dear Hannah Thank you for your letter dated 18 January 2018. As you point out the creation
More informationPayments Strategy Forum Forum Update: Programme Plan 29 th September 2017
Payments Strategy Forum Forum Update: Programme Plan 29 th September 2017 Agenda Slide number Introduction 3 Financial Crime 6 EUN Solutions 9 Confirmation of Payee 11 Request to Pay 17 New Payments Architecture
More informationNPSO Ltd. Participant Community Event 17 th January Aldersgate, London. For internal use only
Participant Community Event 17 th January 2018 200 Aldersgate, London Agenda 1. NPSO Purpose and Approach 2. NPSO Transition - Programme Status 3. Stakeholder Opportunities & Communications 4. Independent
More informationMARKET REVIEW INTO THE OWNERSHIP AND COMPETITIVENESS OF INFRASTRUCTURE PROVISION PSR MR15/2.1
8 September 2015 infrastructurereview@psr.org.uk Direct Line 020 3217 8276 Stuart.Cole@chequeandcredit.co.uk Infrastructure Review Team Payment Systems Regulator (15th floor) 25 The North Colonnade Canary
More informationDS3 System Services Project Plan Detailed Design and Implementation Phase
DS3 System Services Project Plan Detailed Design and Implementation Phase Dated: 20/5/2015 Executive Summary The System Services work stream within the DS3 Programme relates to the procurement of services
More informationData, Dialogue, Decisions! Lisa Hulet: SIRVA Worldwide Linda Ward O Farrell: Ward O Farrell Consultants
Data, Dialogue, Decisions! Lisa Hulet: SIRVA Worldwide Linda Ward O Farrell: Ward O Farrell Consultants Data, Dialogue, Decisions! Successful Partnership Walking you through... Survey results Corporate
More informationHR Outsourcing Making the Decision and Making it Work
HR Outsourcing Making the Decision and Making it Work Thought Leadership Council for Better Practices 1 HR Outsourcing I. Making the Decision Evaluating HR outsourcing II. Making the Selection Request
More informationRevised SMIS+ implementation plan. 4 th August 2015 SMIS+ Team
Revised SMIS+ implementation plan 4 th August 2015 SMIS+ Team Content Purpose and rationale Revised implementation plan Design & Build Plan (including workstreams) Design & Build Phases Deployment Phase
More informationMR15/2.3 Final report
Market review into the ownership and competitiveness of infrastructure provision Final report July 2016 In this final report we set out our view on the ownership and competitiveness of infrastructure provision
More informationBusiness Case Guidelines for Investment in Information Technology
Business Case Guidelines for Investment in Information Technology Citation: Ministry of Health. 2004. Business Case Guidelines for Investment in Information Technology. Wellington: Ministry of Health.
More informationAdvanced Tendering Procedures & Bid Evaluation
An Intensive 5 Day Training Course Advanced Tendering Procedures & Bid Evaluation Effective Tendering, Bidding Strategies & Evaluation 10-14 Sep 2017, Dubai 21-MAY-17 This course is Designed, Developed,
More informationRequirements Analysis and Design Definition. Chapter Study Group Learning Materials
Requirements Analysis and Design Definition Chapter Study Group Learning Materials 2015, International Institute of Business Analysis (IIBA ). Permission is granted to IIBA Chapters to use and modify this
More informationSUPPLIERS AND SUBCONTRACTORS
Page: 1 of 8 SUPPLIERS AND ISSUE STATUS Issue Date: 11-04-2016 Issued for Use Revision Date: 30-01-2017 Revision No.: 1 Action Position Issued By: Reviewed By: Reviewed By: Approved By: QESH Document Controller
More informationM i n i s t e r i a l R e v i e w T r a c k e r P a g e 1
M i n i s t e r i a l R e v i e w T r a c k e r P a g e 1 WG/SW Unique Review Recommendation Commentary Timescale ID Ref WG 1 3(i) Welsh Government should produce a long-term policy Policy statement delivered
More informationWork stream 3 Implementation Plan Industry Landscape
DRAFT Work stream 3 Implementation Plan Industry Landscape Payments Strategy Forum April 2017 Payments Industry Landscape NPA Implementation The purpose of this document is to provide a view of the change
More informationThe Devil is in the Details!
The Devil is in the Details! Presentation to: Sherwood Park & District Chamber of Commerce June 5, 2018 Agenda Welcome Types of RFx documents Mandatory requirements What not to do Preparing your best RFx
More informationPreventing and responding to authorised push payment scams: The role of payment system operators. Call for input from payment service providers
Preventing and responding to authorised push payment scams: Call for input from payment service providers May 2017 Contents 1. Introduction 3 2. Questions 6 3. Next steps 7 Payment Systems Regulator May
More informationOur Mission Statement: dedicated to the success of our people and places.
Procurement Information Sheet Welcome to our procurement information sheet also referred to as the Buyer Profile. This document offers organisations and individuals who are interested in working with whg
More informationGovernment Services Division. eservices High Level Implementation Plan
Government Services Division eservices High Level Implementation Plan The Secretary Department of Treasury and Finance 1 Treasury Place Melbourne Victoria 3002 Australia Telephone: +61 3 9651 5111 Facsimile:
More informationThe Devil is in the Details!
The Devil is in the Details! Presentation to: Sherwood Park & District Chamber of Commerce April 20, 2017 Agenda Welcome Types of RFx documents Mandatory requirements What not to do Preparing your best
More informationSHOP IT RFP Update & Review. November 5, 2014
SHOP IT RFP Update & Review November 5, 2014 Agenda How did we get here? Process Review Current Status Next Steps/Timeline Review RFP Evaluation Methodology Summary of RFP Sections SHOP RFP - How Did We
More informationTARGET Services: advanced market infrastructure for Europe
Marc Bayle de Jessé Director General Market Infrastructure and Payments Mehdi Manaa Head of Market Infrastructure Development Sylvain Debeaumont Head of Market Infrastructure Management TARGET Services:
More informationPPP procurement processes in New Zealand A review for the New Zealand Treasury
PPP procurement processes in New Zealand A review for the New Zealand Treasury Consultation questions for PPP market participants 24 March 2017 kpmg.com/nz Purpose of this consultation Purpose KPMG has
More informationRequest for Proposal # Global Family Planning VAN
11/22/2017 Request for Proposal # 2017-045 Global Family Planning VAN REQUEST FOR PROPOSAL # 2017-045: GLOBAL FAMILY PLANNING VAN 1 I. Summary and Outline of Deadlines A. Summary The Reproductive Health
More informationCompetitive Tendering Policy
Competitive Tendering Policy Policy reviewed by Academy Transformation Trust on June2016 This policy links to: REVIEW DATE: June 2019 Our Mission To provide the very best education for all pupils and the
More informationGENERAL REQUIREMENTS. S - Standard C2 - Small Customization C1 - Large Customization U - Unavailable
1 2 3 4 Functional Requirements Answer Comment Supplier Description Supplier Registration Supplier can register through the portal with the company profile and setup user name and password, fill in the
More informationAdvanced Tendering Procedures & Bid Evaluation. Effective Tendering, Bidding Strategies & Evaluation September 2016 Qatar
Advanced Tendering Procedures & Bid Evaluation 18-22 September 2016 Qatar This course is Designed, Developed, and will be Delivered under ISO 29990:2010 Standards & ISO 9001:2015 24-MAY-16 Advanced Tendering
More information2017 Contact Center Overflow Vendor Request for Proposals Responses to RFP Questions
2017 Contact Center Overflow Vendor Request for Proposals Responses to RFP Questions May 5, 2017 All questions are addressed below: Q1: Will the vendor s geographic location(s) or potential location(s)
More informationREQUEST FOR PROPOSAL ( RFP )
REQUEST FOR PROPOSAL ( RFP ) RFP Title: Association Management System online integrated website and membership management system Issue Date: Contracting Authority: Name: JF Champagne Title: President December
More informationInternal Audit. Audit of Procurement and Contracting
Internal Audit Audit of Procurement and Contracting June 2011 Table of Contents EXECUTIVE SUMMARY...5 1. INTRODUCTION...8 1.1 BACKGROUND...8 1.2 OBJECTIVES...9 1.3 SCOPE...9 1.4 METHODOLOGY AND APPROACH...9
More informationSupport for Competitive Procurement of Renewables in Mongolia
TERMS OF REFERENCE Support for Competitive Procurement of Renewables in Mongolia 1. Background The European Bank for Reconstruction and Development ( EBRD or the Bank ) and the Mongolian Ministry of Energy
More informationWorkshop Access to UK Payment Systems
Workshop Access to UK Payment Systems 1 Welcome Mary Starks Interim Managing Director of Payment System Regulator 2 Agenda Time 9am Item Registration and tea / coffee 9.30am Welcome Mary Starks 9.45am
More informationAt Procurement Australia, We get it.
WE GET IT At Procurement Australia, We get it. We re always doing the leg work for better results. Welcome to our world. The following pages share our unique approach to helping businesses like yours get
More informationAFRICAN DEVELOPMENT BANK SELECTION OF AN EVENT MANAGEMENT COMPANY (EMC) TO ORGANIZE THE AFRICAN INVESTMENT FORUM REF: ADB/RFP/CHGS/2017/0126
AFRICAN DEVELOPMENT BANK SELECTION OF AN EVENT MANAGEMENT COMPANY (EMC) TO ORGANIZE THE AFRICAN INVESTMENT FORUM REF: ADB/RFP/CHGS/2017/0126 PRE BID VIDEO CONFERENCE HQ 17S3 17 th FLOOR SOUTH TOWER Questions
More informationBREEAM Communities 2012 Bespoke International Process Guidance Note GN07 December 2013
Introduction This document contains information and guidance for BREEAM Communities Assessors who are seeking to assess a project outside of the UK. The guidance provides an outline of the bespoke criteria
More informationACCOUNT SWITCHING SERVICE ON-BOARDING PROCESS
THE LITTLE BACS GUIDE TO THE ACCOUNT SWITCHING SERVICE ON-BOARDING PROCESS The essential guide to the on-boarding process and the approach taken to support participants joining the Account Switching Service
More informationREQUEST FOR PROPOSAL
REQUEST FOR PROPOSAL Implementation of an Electronic Integrated Human Resources Information System Table of Contents 1.0 introduction... 1 2.0 ELIGIBILITY TO TENDER... 1 3.0 TIME SCALE... 2 4.0 OBJECTIVES
More informationSimplifying Supplier Selection. Sue Hurrell, Value Wales
Simplifying Supplier Selection Sue Hurrell, Value Wales What am I covering? Background Supplier Selection what we set out to achieve SQuID what is it? The risk-based approach Summary of content The project
More informationADR International ADR s Online Supply Chain Academy (OSCA) elearning Courses
Learning ADR International ADR s Online Supply Chain Academy (OSCA) elearning Courses 2016 ADR International Contents About ADR s Online Supply Chain Academy (OSCA) 3 The Strategic Sourcing Process 4 ADR
More informationStrategy for Future Wheel-Trans Taxi Service Contracts
For Action Strategy for Future Wheel-Trans Taxi Service Contracts Date: January 24, 2019 To: TTC Board From: Chief Service Officer Summary With over 44,000 active customers, Wheel-Trans is the third largest
More informationScotland Excel. Report by Director Scotland Excel
Scotland Excel To: Executive Sub Committee On: 10 February 2017 Report by Director Scotland Excel Tender: Engineering & Technical Consultancy Schedule: 06/16 Period: 18 March 2017 until 17 March 2021 1.
More informationStrategic Sourcing Guidelines on Requests for Proposals and Invitations for Bid
Strategic Sourcing Guidelines on Requests for Proposals and Invitations for Bid Table of Contents Request for Proposal Overview Slide 3 RFP Timeline estimates Slide 4 Business Owner tasks (RFP) Slide 5
More informationREPORT 2016/050 INTERNAL AUDIT DIVISION
INTERNAL AUDIT DIVISION REPORT 2016/050 Audit of local procurement in the United Nations Multidimensional Stabilization Mission in the Central African Republic Overall results relating to the effective
More informationPharmaceutical Development (Drug Substance & Drug Product) for Visceral Leishmaniasis candidate DNDI-6148
Request for Proposal Pharmaceutical Development (Drug Substance & Drug Product) for Visceral Leishmaniasis candidate DNDI-6148 Dated: October 12 th 2015 Page 1 Table of Contents 1. PURPOSE... 3 2. RFP
More informationICAP plc ( ICAP ) TERMS OF REFERENCE OF THE REMUNERATION COMMITTEE. (Approved on 22 February 2013)
ICAP plc ( ICAP ) TERMS OF REFERENCE OF THE REMUNERATION COMMITTEE (Approved on 22 February 2013) Introduction The purpose of the Remuneration Committee is to ensure that ICAP s global salary, discretionary
More informationProcurement Evaluation Report. For The Provision of CCTV Services
Procurement Evaluation Report For The Provision of CCTV Services Ref: 5000004944 Document Status: FINAL Date: 29/11/13 Author: Vanessa Amissah Owner: Kevin Bates Document Location Version Control Description/Reason
More informationLM032: Advanced Tendering Procedures & Bid Evaluation
LM032: Advanced Tendering Procedures & Bid Evaluation LM032 Rev.001 CMCT COURSE OUTLINE Page 1 of 6 Training Description: The engagement and management of contractors and suppliers is a vital part of the
More informationPlymouth Hospitals NHS Trust Business Case for replacement Managed Equipment Service
Plymouth Hospitals NHS Trust Business Case for replacement Managed Equipment Service Purpose The Business Case describes and seeks approval to award the contract for the replacement of the existing Pathology
More informationwww.adaptaconsulting.co.uk Adapta Consulting is a CFG Corporate Subscriber Published by Adapta Consulting First published 2013 Copyright Adapta Consulting All rights reserved No part of this book may be
More informationThe Provision of North West Non-Emergency Patient Transport Services
The Provision of North West Non-Emergency Patient Transport Services NHS Blackpool Clinical Commissioning Group on behalf of the 33 North West Clinical Commissioning Groups Final Evaluation Report for
More informationConnoisseur Solutions Project Procurement Management
Project Procurement Management Project Procurement Management Processes necessary to purchase or acquire products, services or results needed from outside the project team. Procurement Management Processes
More informationProcurement of Material for Biometric Voter Registration. Case studies: DR Congo and Conakry
Procurement of Material for Biometric Voter Registration Case studies: DR Congo and Conakry 1 1 Case: DR Congo Scope of the Assignment 10,000 voter registration kits Training of operators On-Site Technical
More informationNHS ROTHERHAM PROCUREMENT SCHEME
NHS ROTHERHAM PROCUREMENT SCHEME Pre-Qualification Questionnaire (PQQ) Volume 1 Instructions and guidance for completion Version 2 March 2010 1 Table of Contents 1 PURPOSE AND ORGANISATION OF THIS DOCUMENT...
More informationThe journey to best in class payments
1 The journey to best in class payments Speech given by David Bailey, Executive Director for Financial Market Infrastructure, Bank of England At the Westminster Business Forum Keynote Seminar: The future
More informationMILA SULLIVAN PROCUREMENT CONSULTANT
PRELIMINARY MARKET CONSULTATIONS IN PRACTICE IRISH EXPERIENCE MILA SULLIVAN PROCUREMENT CONSULTANT MILA@DAXPARTNERSHIP.COM EU PROCUREMENT COMPLIANT COMMUNICATION Treat all suppliers equally Be transparent,
More informationÔãîÞã ãã ¹ãÆãõ²ããñãäØã ãšãè ãäìã¼ããøã DEPARTMENT OF INFORMATION TECHNOLOGY
ÔãîÞã ãã ¹ãÆãõ²ããñãäØã ãšãè ãäìã¼ããøã DEPARTMENT OF INFORMATION TECHNOLOGY REVERSE AUCTION POLICY 2013-14 1. PREAMBLE 1.1. E-procurement has emerged as a near perfect solution to the need of maintaining
More informationYORK REGION DISTRICT SCHOOL BOARD Policy and Procedure #465.0, Tendering Capital Construction and Maintenance Projects
WORKING DOCUMENT YORK REGION DISTRICT SCHOOL BOARD Policy and Procedure #465.0, Tendering Capital Construction and Maintenance Projects The Tendering Capital Construction and Maintenance Projects policy
More informationAdvanced Tendering Procedures & Bid Evaluation Effective Tendering, Bidding Strategies & Evaluation
ISO 9001:2008 Certified ISO 29990:2010 Certified (Certificate No:1007049195) ISO 29990 (Certificate No: 1078694951) Advanced Tendering Procedures & Bid Evaluation 10-14 September 2017 Dubai, United Arab
More informationNAMPA PUBLIC LIBRARY REQUEST FOR PROPOSAL FOR SELF CHECKOUTS. May 21,
NAMPA PUBLIC LIBRARY REQUEST FOR PROPOSAL FOR SELF CHECKOUTS May 21, 2014 062114 Self Check Out Bid Specifications Table of Contents Section Page 1 STATEMENT OF PURPOSE 2 2 CRITICAL REQUIREMENTS 2 3 BACKGROUND
More informationRequest For Information (RFI) For a. Spectrum Management & Monitoring System (SMMS)
Request For Information (RFI) For a Spectrum Management & Monitoring System (SMMS) Table of Contents 1 Introduction... 3 1.1 About Iraq CMC... 3 1.2 The Iraq CMC Objectives... 3 1.3 RFI Process... 4 2
More informationGo Mobile to Ramp Up Service Efficiency
Go Mobile to Ramp Up Service Efficiency John Tiglias Sr. Vice President, Information Technology Transfield Services Americas William Ponseti Global Head, EC&O Industry Business Unit SAP AG Leading construction
More informationJustice Sub-Committee on Policing. Police Scotland s digital, data and ICT strategy
Justice Sub-Committee on Policing Police Scotland s digital, data and ICT strategy Contact, Command and Control Technology Roadmap HMICS published their Independent Assurance Review, Police Scotland Call
More informationAuditing Timeline. Top-Line Version
Auditing Timeline Top-Line Version As a complement to their book Agency Audits: How to Achieve Success, Joanne Davis and Jane Twyon have created a timeline that takes marketers through the auditing journey.
More informationInformation Session Strategic Heritage Plan. Madrid 30 November 2016
Information Session Strategic Heritage Plan Madrid 30 November 2016 Agenda Introduction Palais des Nations Strategic Heritage Plan SHP New Office Building Building H Renovation of the Palais de Nations
More informationInvitation to Tender for the Provision of
Invitation to Tender Invitation to Tender for the Provision of Catering Services To be supplied to the Bala Cranberry Festival 1 Invitation To Tender for Bus Services By participating in this tender you
More informationMaking Access Possible (MAP) Nepal. Pre-bid briefing 21 May 2015
Making Access Possible (MAP) Nepal Pre-bid briefing 21 May 2015 Agenda 1. MAP Objectives 2. MAP Process 3. The MAP Nepal project management landscape 4. The MAP Research process 5. MAP Quality Control
More informationFREQUENTLY ASKED QUESTIONS EMIS Practices GMS Systems & Services Procurement
FREQUENTLY ASKED QUESTIONS EMIS Practices GMS Systems & Services Procurement Version No. 1.0 Status: Final Author: Project Management Team Approver: Executive Committee Date: 08/02/2018 Next Review Date:
More informationRequest for Information: Online Survey for Self-Assessment Tool
Request for Information: Online Survey for Self-Assessment Tool Background The International Society for Biological and Environmental Repositories (ISBER) provides a Self- Assessment Tool (SAT) to assist
More informationTENDER, BID & PROPOSAL SERVICES
Julian Midwinter & Associates tender, bid, and proposal services are tailored to suit each client s budget and inhouse capacity. Be it hand holding for a first time tenderer, boosting an experienced team
More informationTransformation Programme. Sourcing Workstream PROCUREMENT PLAN. Inland Revenue. 28/06/2013 v1.0 FINAL Reference:
Inland Revenue Transformation Programme Sourcing Workstream PROCUREMENT PLAN Project Sponsor: Greg James Prepared by: Sourcing Team Date: 28/06/2013 v1.0 FINAL Reference: 2013050 Document Control File
More informationRequest For Quotation (RFQ) for the Procurement of an Independent External Evaluation Firm
Request For Quotation (RFQ) for the Procurement of an Independent External Evaluation Firm RFQ NO. GCF/RFQ/2015/013 Date: 16 November, 2015 GCF is accepting quotations from firms for the procurement of
More information(Online Procurement Initiative)
Internet Negotiations (Online Procurement Initiative) Objective Share Intel s present findings in the application of Internet negotiations (I-NEG) for construction services and facilities equipment. Specifically,
More informationNuclear Build Prospects
Nuclear Build Prospects March 2017 David Nicholls Chief Nuclear Officer Topics Background Approach to Nuclear Procurement Possible Location of Nuclear Plants Procurement Process 2 3 Eskom Nuclear Programme
More informationEffective Date: January, 2007 Last Reviewed Date: September, 2016 Last Revised Date: October, 2016 Next Review Date: April 2018
Section: Finance and Administration Number: 12.20.PP.v7 Subject: Goods and Services Procurement (including consulting services) Policy and Procedure Associated Document Form Number: 12.20.F Effective Date:
More informationEstates, Facilities & Professional Services. Transactional Finance, Accountancy & Transactional Procurement Services Framework User Guide
. Estates, Facilities & Professional Services Transactional Finance, Accountancy & Transactional Procurement Services Framework Framework Reference Number: LPP/2013/00002 April 2015 2 Version Control Contributor(s)
More informationContracting & Procurement Policy
Contracting & Procurement Policy 1. OBJECTIVE AND PRINCIPLES The objective of this policy is to provide a framework and direction for the acquisition of goods and services required for Grand Challenges
More informationTownship of Severn REQUEST FOR PROPOSAL. Architectural & Professional Services Fire Station Replacement
Township of Severn REQUEST FOR PROPOSAL Architectural & Professional Services Fire Station Replacement Deadline for proposal submission is June 15, 2017 at 2:00 p.m. Contact Person: Tim Cranney Director
More informationContract Management arrangements - Procurement Policy update
Agenda item: 13 Report title: Report by: Action: Contract Management arrangements - Procurement Policy update Gordon Duffus, Head of Procurement, Resources and Quality Assurance, gordon.duffus@gmc-uk.org,
More informationPUBLIC SERVICES AND PROCUREMENT CANADA
PUBLIC SERVICES AND PROCUREMENT CANADA DEPARTMENTAL OVERSIGHT BRANCH CANADIAN ARMED FORCES RELOCATION SUPPORT SERVICES FAIRNESS MONITORING FINAL REPORT July 27, 2016 Submitted to: Director Fairness Monitoring
More informationURFinancials Project Project Kick-Off
URFinancials Project Project Kick-Off The Seminar Room in the Alumni and Advancement Center from 9:00-10:30am Topics Session Objectives Scope and Timeline Project Methodology Project Structure Technical
More informationSupply Chain Operations: Principles for Continuity and Sustainability
Supply Chain Operations: Principles for Continuity and Sustainability Page 1 of 8 Why Attend When supply chains are weak, the flow of goods and services is interrupted, costs go up and customer satisfaction
More informationContract notice utilities
Business Opportunity Title: United Kingdom-Warrington: CHP Schemes servicing and repair and maintenance and provision of spares and consumables Document Type: Contract Notice Published By: United Utilities
More informationExternal Announcement
Invitation for Expression of Interest 83308725 Consultant for the Task of Development of Standard Templates of Power Purchase Agreement for Photovoltaic System External Announcement 21 November 2018 The
More informationUNITED NATIONS GLOBAL SERVICE CENTER United Nations Logistics Base, Brindisi, Italy UNLB United Nations Support Base, Valencia, Spain - UNSB
UNITED NATIONS GLOBAL SERVICE CENTER United Nations Logistics Base, Brindisi, Italy UNLB United Nations Support Base, Valencia, Spain - UNSB UN TENDER PROCESS 02 October 2012 Sasa Murganic 1. Framework
More informationWelcome. STAKEHOLDER ENGAGEMENT WORKSHOP. New Thinking New Beginning
Welcome. STAKEHOLDER ENGAGEMENT WORKSHOP New Thinking New Beginning SPPRA CIRCULARS SPPRA Circular No.1 of 2015 :CONTROL OF PRICES PAID BY PROCURING ENTITIES TO PREVENT AWARDING OF CONTRACTS TO TENDERERS
More informationGovernment Procurement: challenges and need for new approach Sheffield Hallam FM Conference
Government Procurement: challenges and need for new approach Sheffield Hallam FM Conference Deborah Rowland, Government Property Unit Paddy Howlin, Government Procurement Service 12 th September 2012 UNCLASSIFIED
More informationTrusted KYC Data Sharing Framework Implementation
July 2017 Trusted KYC Data Sharing Framework Implementation Supporting Document Contents Preface... 3 1 Objective of this Document... 4 2 Evolving Benefits Provided by the Data Sharing Environment... 5
More informationBrief Guide to Public Sector EU Procurement Legislation. Despatch PIN not a call for competition (optional) allowing shortened timescale
A summary of the Open Procedure: Brief Guide to Public Sector EU Procurement Legislation Despatch PIN not a call for competition (optional) allowing shortened timescale before the contract notice was dispatched,
More informationOrganisational Change
Organisational Change Contents Policy Statement... 2 Principles... 2 Organisational Change Process... 3 Phase 1: Engagement Period... 3 Phase 2: Formal Consultation Period... 5 Phase 3: Implementation...
More informationACTION TAKEN UNDER DELEGATED POWERS BY OFFICER 16 th October 2017
ACTION TAKEN UNDER DELEGATED POWERS BY OFFICER 16 th October 2017 Title Leisure Management Contract Award Report of Wards Status Strategic Director (Adults, Communities and Health) All Public (with separate
More information- Details of the item to be procured and whether it is for works, services or goods;
Procurement Policy 1. INTRODUCTION The policy is designed to ensure we comply with the relevant legislation, regulations and guidance which regulate our procurement activities. We will ensure our procurement
More informationBusiness Opportunities. and Insurance Board. with the Workplace Safety. Becoming a WSIB Supplier
Business Opportunities with the Workplace Safety and Insurance Board Becoming a WSIB Supplier Business Opportunities with the Workplace Safety and Insurance Board If you are interested in becoming a WSIB
More informationContractor Performance Evaluation Procedure
STAFF REPORT ACTION REQUIRED Contractor Performance Evaluation Procedure Date: October 3, 2013 To: From: Wards: Reference Number: Public Works and Infrastructure Committee Director, Purchasing and Materials
More informationBIS Research & Evaluation Framework. Guide for Buyers
BIS Research & Evaluation Framework Guide for Buyers Framework reference: CR150025BIS BIS Research & Evaluation Framework: Guide for Buyers Update 22 June 2016 1 P age Research & Evaluation Framework Contract
More informationParliamentary Procurement Rules
Parliamentary Procurement Rules Document Revision History and Key Facts Version Issue date Policy owner Date of next review Comments/ brief description of main changes in this revision 001 01/01/15 PPCS
More information2019 Project Prioritization and Budgeting Process
2019 Project Prioritization and Budgeting Process Brian Hurysz Manager, Market Products Budget and Priorities Working Group May 10, 2018, Krey Corporate Center Agenda Project Prioritization Process Project
More information1.3 If further guidance is required staff should contact the Head of Strategic Procurement.
Procurement Policy 1. Introduction 1.1 The University has a devolved procurement structure and this document is intended to give clear guidance to staff in teaching and central service departments who
More informationRequest for Expression of Interest (EOI)
Request for Expression of Interest (EOI) Title Procure and deploy a Learning Management System (LMS) for WHO EOI Ref. No. Published Date 31/03/2017 Closing Date & Time 10/04/201717:00 (UTC +1) Contact
More informationJob Title. Mandela Bay Development Agency. Reference number: Date: December 2017 Name
Reference number: Date: December 2017 Name Job Title SCM Practitioner Purpose: Coordinate Supply Chain Management (SCM) function for the stadium to be in line with policy and legislation. Required Minimum
More information