DRAFTS IN WIDE CIRCULATION DOCUMENT DESPATCH ADVICE

Similar documents
BUREAU OF INDIAN STANDARDS

BUREAU OF INDIAN STANDARDS

BUREAU OF INDIAN STANDARDS

DOCUMENT DESPATCH ADVICE Ref: ME 28/T-72 Date: Mechanical Vibration and Shock Sectional Committee, MED 28

च क त स उप रण एव अस पत ल य जन ववभ ग डडकल डड इस स फ ट यर - स फ ट यर ज न चक कक य ए

DRAFT IN WIDE CIRCULATION

भ र य म नक ब य र. BUREAU OF INDIAN STANDARDS (Ministry of Consumer Affairs, Food & Public Distribution, Govt. of India) 3) All others Interested

BUREAU OF INDIAN STANDARDS PRODUCTION AND GENERAL ENGINEERING य पक पररच लन म मस द

(आई एस ओ : 2016 क अचधग रहण) (पह प न क षण )

DOCUMENT DESPATCH ADVICE

STEEL TUBES, PIPES AND FITTINGS SECTIONAL COMMITTEE, MTD 19 क) ध त क म इ ज तनयर ग ववभ ग पर षद (ए ट ड स ), क र चच खन व ल सदस य.

DOCUMENT DESPATCH ADVICE

(आई एस ओ : 2013 क अचधग रहण) (पह प न क षण)

व य पक पररचलन भ रत य म नक ब य र BUREAU OF INDIAN STANDARDS तकन क सम मत ए एच ड 06

ट ल फ क स : Please Contact at Telefax in; व य पक पर च लन म मस द DRAFT IN WIDE CIRCULATION

ट ल फ क स : Please Contact at Telefax in; व य पक पर च लन म मस द DRAFT IN WIDE CIRCULATION

एमट ड 4/ट -134 MTD 4/T-134 dated

IS : 2019 Doc No. TED 22 (13679) ISO : 2016

इल क ट र तनक एव इल क ट क ट रकल स घटक व उपस क क मलए

व य पक पररचलन भ रत य म नक ब य र BUREAU OF INDIAN STANDARDS तकन क सम मत ए एच ड 06

i) DOC : CHD 35 (10850)P IS 5182 (P art 5):... METHODS FOR MEASUREMENT OF AIR POLLUTION Part 5 Sampling of Gaseous Pollutants (First Revision)

Statistical Methods for Quality and Reliability Sectional Committee, MSD 3

क न द र य म ह व भ ग भ स द भ- स ए ड -III/16: IS

MANAK BHAVAN, 9 BAHADUR SHAH ZAFAR MARG, NEW DELHI

Document under wide circulation

य पक पर च लन म मस द. DRAFT IN WIDE CIRCULATION रल ख र षण स ञ पन/DOCUMENT DESPATCH ADVICE स दभभ /Ref. प ज ड 08/(1405, 1406)डब य. ददन क/Date

Doc: CHD 15 (11942)C

सम मततय भ जन क अ ततम ततथ

(प लयम, क यल एव स ब धत उ प द वभ ग)

DRAFT IN WIDE CIRCULATION

एम एच ड 12/ ट

द यब ष Website: Phones ट एक स ड 36 / ट

य प च ल म म द र ख रषण द ञ म ईट ड 28/ ट - 2, ट -3, ट -7, ट -17, ट -40, ट -41

DRAFT IN WIDE CIRCULATION CED 53/T January 2019

Technical Committee: LITD 02 LITD 02/T

MANAK BHAVAN, 9 BAHADUR SHAH ZAFAR MARG, NEW DELHI

FORMAT FOR SENDING COMMENTS ON BIS DOCUMENTS

क द य म हर व भ ग-2 CENTRAL MARKS DEPARTMENT -2

i) DOC : CHD 35 (10810)P IS 5182 (P art 7):... METHODS FOR MEASUREMENT OF AIR POLLUTION Part 7 Hydrogen Sulphide (First Revision)

भ रत य क त रम अ ग नम र ण नगम (ए ल क ) (भ रत सरक र क एक मन र न उपक रम) ज.ट. र ड, क नप र ISO 9001:2008

(ड चद र ) ञ न क ई (स ए ड -3)

(अन भ ग अध क र ) (स ए ड -3)

CENTRAL MARKS DEPARTMENT-2. Ref: CMD-2/16:

म नक भवन, 9 बह द रश ह फर म ग, नई दद ल ट ए स 23 / ट

क न र य व भ ग -2 हम र स दर भ: स एमड 2/16: व षय: आई एस 7903:2017 क प प एसट आई

भ रत य म नक ब य र (क द र य म हर व भ ग III) सभ श ख क य भलय स अन र ध ह क उपर क त ददश वनद श क अन प लन तत क ल प रभ स स वनव त कर

स ईड 54 (10574) WC र त य म नक IS 9417 क व व दत य प न क षण क मस द - प रबमलत क ट स चन क मलए उच च शव तत इस प त क सर य क मलए ल ड क न क मसफ र श

Head (CMD-2)(sd/-) Circulated to All ROs/BOs/FAD and MSD Copy to: ITS for hosting on intranet

CENTRAL MARKS DEPARTMENT-3. Our Ref: CMD-3/16: Subject: STI as per IS 13714: 1993 DUNNAGE PALLETS-WAREHOUSING

PUBLICATION AND GRAPHIC TECHNOLOGY SECTIONAL COMMITTEE, MSD 6

1. प स ड 21 क सम त सद य 2. प लयम, क यल एव स ब धत उ प द वभ ग प रषद (प स ड स ) क सद य 3. च रखन व ल सभ नक य

Doc: CED 54 (10573) WC

DOCUMENT DESPATCH ADVICE Ref: ME 28/T-17, 23, 39, 40, 3,7,16, 31 Date: DRAFTS IN WIDE CIRCULATION

सम म तय भ जन क अ तम त थ सम म तय य द क ई ह त क पय अध हस त र त क उपर ल खत फ क स न य ई म ल पर स लग न फ म ट म भ ज

CENTRAL MARKS DEPARTMENT-2

1. All Members of Sugar Industry Sectional Committee, FAD 2 2. Selected members of FADC 3. All interested

ईट ड 09/ ट

स ल न प ए, (द सर स श धन) (स श धन 1 स 6 श "मल)

न न ल खत क आप त और स थ पन क लए अ भ च क अ भ य त आम त क ज त ह क स म त क म ह ग और ईओआई क स ब ध म म ग सभ ल ख क त त क समय पर त त कय ज न च हए

भ रत य म नक मस द स लर क कर ब स ट इप व श भ ग 1 अप ए ( आइ एव भ ग 1 क दस ण व धय ( आइ एव भ ग 3 क दस

Date : Comments, if any, may please be made in the format as given overleaf and mailed to the undersigned at the above address.

Ministry of Science & Technology. 08-April, :56 IST

: प य वरण रब धन ववष सम तत स एचड 34

NRDC signs agreement for commercializing NEMHARI -A Plant based Formulation for Management of Mulberry Root Knot Disease

DRAFT IN WIDE CIRCULATION Document Despatch Advice

य प च ल लम म स. DRAFT IN WIDE CIRCULATION रल ख र षण स लम /DOCUMENT DESPATCH ADVICE एमट ड 13/ट -8, 22, 73 MTD13/T-8, 22, 73 dated

Demand No. 1. Department of Agriculture & Cooperation (म य श ष )

PROFORMA FOR SUPPLYING NIT INFORMATION. R&R of ground floor path and ceiling at SLDC complex BBMB, Chandigarh Rs.1000/- (Non-Refundable)

2. TEST RECORDS: All records of tests and analysis shall be kept in suitable forms approved by the Bureau.

MANAK BHAVAN, 9 BAHADUR SHAH ZAFAR MARG, NEW DELHI व य पक परर लन मस द

Solutions for Full Length Test - 1

(अAण प छक यल ) व D. ब (क.म.0व. 2) CENTRAL MARKS DEPARTMENT-2. Our Ref: CMD-2/16:

Disclosure to Promote the Right To Information

रभ ष क शल, अधर -क शल एव अक शल क नय क त

A sum of money becomes ` 2016 in 2 years and ` 2124 in 3 years, at simple interest. What is the sum of money? Q2_OA ` 1700

MANAK BHAVAN, 9 BAHADUR SHAH ZAFAR MARG, NEW DELHI

Proposed Terms of Reference for EIA studies of Jalkota -B, Mine, Area: ha. Madhya Pradesh Mining Corporation Bhopal To study the area surround

V.M. No. 670/XV-151/ April Tender Notice

क पय इस मस द क अव क कर और अप सम मनतय यह बत त ह ए भ ज कक यदद यह मस द प रक ल त ह त इस पर अम कर म आपक व यवस य अथव क र ब र म क य कद इय आ सकत ह

इ ड यन ऑयल क र पर प शन डलड ट (र इर ल इन प रभ ग) बर न क नर र र इर ल इन र स ट ऑड स- बर न ऑयल रर इनर ब ग सर य (डबह र)

इ ड यन ऑयल क र पर प शन डलड ट (र इर ल इन प रभ ग) बर न क नर र र इर ल इन र स ट ऑड स- बर न ऑयल रर इनर ब ग सर य (डबह र)

limbus technology pvt ltd.

Disclosure to Promote the Right To Information

प य वरण रब धन ववष सम तत स एचड 34

A sum of money becomes ` 2016 in 2 years and ` 2124 in 3 years, at simple interest. What is the sum of money? Q2_OA ` 1700

Disclosure to Promote the Right To Information

10 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II SEC. 3(i)] अ धस चन

Disclosure to Promote the Right To Information

श सदन (झ ल -घर) एव ड क यर स टर चल न ह त र चच क अश व यक तत

अख ल भ रत य व क श रवण स स थ न, म स र - 6

: ए ड 08/ट (12397) क : म म : व म क ए स मस थ म म म, ए ड 08 1 ए ड 08 ( ), 1 ए :... ए ड 08 (12397) (.. )

व य पक पर च लन मस द प स ड 13/ट ( 11590) स तकन क सम तत: प स ड 13

Disclosure to Promote the Right To Information

च ल म ज व द य त कम पन ल लमट ड

(To be published in the institute website ) Corrigendum to

त और नव न करण / Validation And Renewal

TENDER NOTICE Auction of Banks Vehicle

क न द र य म ह व भ ग. भ स द भ- स ए ड -III/16: IS 1489 (Part 2)

Disclosure to Promote the Right To Information

अ0पक ल1न &न2वद आम 4ण स चन

Transcription:

DRAFTS IN WIDE CIRCULATION DOCUMENT DESPATCH ADVICE Ref. Date MED 08 /T-18 24 01 2019 Mining Techniques and Equipment Sectional Committee, MED 08 i) All Members of Mechanical Engineering Division Council ii) All Members of Mining Techniques and Equipment Sectional Committee, ME 08 iii) Others interested Dear Sirs, Please find enclosed the following documents: 1) Doc: MED 08 (12504)W Draft Indian Standard on Cage Suspension Gear for Winding in Mines Part 1 General Requirements [Second Revision of IS 7587 (Part 1) : 2004] Kindly examine the draft standard and forward your views, stating any difficulties which you are likely to experience in your business or profession, if they are finally adopted as Indian Standards. Last date for comments: 25 March 2019 Comments, if any, may please be made in the format as given overleaf and mailed to the undersigned at the above address. In case no comments are received or comments received are of editorial nature, you will kindly permit us to presume your approval for the above document as finalized. However, in case of comments of technical in nature are received then it may be finalized either in consultation with the Chairman, Sectional Committee or referred to the Sectional committee for further necessary action if so desired by the Chairman, Sectional Committee. The document is also hosted on BIS website www@bis.org.in Thanking you, Yours faithfully Encl.: As above (Rajneesh Khosla). Scientist `E & Head (MED)

व य पक पर च लन म मस द प रल ख प र षण स ज ञ पन स दर च दद न क एम.ई.ड. 08 /ट 18 24 01 2019 खनन तकन क और उपकरण क व षय सम तत, ए.ई.ड. 08 प र वषतत: 1 य त र क इ ज तनयर व भ ग पररषद क सभ सदस य यय.व.प. 2 खनन तकन क और उपकरण क व षय सम तत, ए.ई.ड. 08 क सभ सदस य 3 अन य च रखन ह दय, तनम नम खत प र ख स ग न ह:: क र स ख य प र ख स ख य श षषक 1) प र ख ए.ई.ड.18 (12504) डबल य ख न क तन बन गयर ष टन भ ग 1 स न य अप य (आईएस 7587 (भ ग 1 क द सर प नर ण ) पर भ रत य नक स द क पय इन स द क अ कन कर और अपन सम ततय यह बत त ह ए भ क अ तत: यदद य नक र ष र य नक क चप प रक मशत ह ऍ त इन पर अ करन आपक व य स य अव क र ब र य कद न ईय आ सकत ह: सम ततय भ न क अजन त तत व 25 म चच 2019 यदद क ई सम तत ह त क पय अग प ष पर ददय प अ हस त र क उपरम खत पत पर भ द यदद क ई सम तत प र त नह ह त ह: अव सम तत क भ ष स ब दट ह ई त उपर त प र ख क यव त अ तत चप ददय य ग यदद क ई सम तत तकन क प रक तत क ह ई त व षय सम तत क अ य क पर शष स अव उनक इच छ पर आग क क यष ह क म ए व षय सम तत क भ न क ब द प र ख क अ तत चप द ददय एग यह प र ख ब.आई.एस क बस इट www@bis.org.in पर भ उप ब ह न य द, भ द य, प रतत: उपरम खत यर न श ख स ज ञ. `ई ए प र ख यए.ई.ड

भ रत य म नक ख न क ज ननल बन ग यर म व ष टन भ 1 स म न य प य (द सर नर ण ) Indian Standard CAGE SUSPENSION GEAR FOR WINDING IN MINES PART 1 GENERAL REQUIREMENTS (Second Revision) ICS 73.100.40 Not to be reproduced without the permission Last date for received Of BIS or to be used as a Standard Comments is 25 March 2019 FOREWORD (Adoption clauses to be added later on.) This standard deals with the suspension gear used for suspension of cages or skips for winding in mines. This Indian Standard is one in the series of standards on the cage suspension gear for winding in mines. The other parts of this standard are: Part 2 Part 3 Part 4 Part 5 Part 6 Part 7 Part 8 Cappels Shackles and pins Bridle chains Equalizing plates Safety detaching hooks (4 plates type) Safety detaching hooks (4 plates type) 120, 150 and 200 kn capacity Winding in mines - Suspension gear - Clivey hook suspension arrangements At the time of enquiry or order, the information specified in Annex A shall be given. The composition of the committee responsible for the formulation of this standard is given in Annex D. For the purpose of deciding whether a particular requirement of this standard is complied with, the final value, observed or calculated, expressing the result of a test or analysis, shall be rounded off in accordance with IS 2: 1960 Rules for rounding off numerical values (revised). The number of significant places retained in the rounded off value should be the same as that of the specified value in this standard. Mining Techniques and Equipment Sectional Committee, MED 08

Indian Standard CAGE SUSPENSION GEAR FOR WINDING IN MINES PART 1 GENERAL REQUIREMENTS 1 SCOPE (Second Revision) This standard (Part 1) prescribes the generalrequirements consistent with safety, regarding thematerial, design, manufacture, testing andexamination for various components of cage suspension gear used for suspension of cages for winding in mines. 2 REFERENCES The following standards contain provisions whichthrough reference in this text, constitute provision ofthis standard. At the time of publication, the editionsindicated were valid. All standards are subject torevision, and parties to agreements based on thisstandard are encouraged to investigate the possibilityof applying the most recent editions of the standardsindicated below: IS No.Title 1598:1977 Method for izod impact test for metals (first revision) 3073:1967 Assessment of surface roughness 3703:1980 Code of practice for magnetic particle flaw detection (first revision) 4163:1982 Method for determination of inclusioncontent in steel bymacroscopic method(first revision) 4432: 1988 Case hardening steels Specification (first revision) 5517: 1993 Steel for hardening and tempering Specification (second revision) 13805:1993 Guidelines for certification for personnelfor non-destructive testing 3 TERMINOLOGY 3.0 For the purpose of this standard, the nomenclatureas given in Fig. 1 to 3 and the following definitions shall apply. 3.1 Static Working Load (Safe Working Load) It consists of the aggregate load suspended onsuspension gear and shall include the weight ofsuspension gear (see also Annex B). 3.2 Proof Load The non-destructive tensile loadto which the components are subjected to in thefinished condition. 3.3 Breaking Load The destructive tensile load towhich the components are subjected to in the finishedcondition. 3.4 Factor of Safety The factor of safety is theratio between the breaking load and the static working load as defined in 3.3 and 3.1 respectively.

4 MATERIAL 4.1 Component of cage suspension gear shall be manufactured from any one of the following types of steels: a) Steel conforming to 20C15 of IS 5517, and b) Steel conforming to 20NiCr2Mo2 of IS 4432 c) Steel Conforming to MS to IS 2062: 2006 Grade E-250 in normalising condition for Detaching Plate/Catch Plate. 4.2 The inclusion rating for A, B, C and D type ofnon-metallic inclusion as given in IS 4163 shall notexceed 1.5. 5 HEAT TREATMENT 5.1 All components of cage suspension gear, after allforging and welding operations during manufacture and repair shall be heat-treated according to 5.2 to getoptimum mechanical properties. 5.2 The components of cage suspension gear shall beeither normalized or normalized and tempered, or hardened and tempered, or refined and hardened and tempered as indicated below: 5.3Aftet- heal treatment, hardness of various materials for various components shall be as given below: Material/Part Hardness HV 20C15 200 to 230 20 Ni2Cr2M02 250 to 280 Bridle chain 270 to 330 5.4Izod impact test values of the specimens of the above components when tested in accordance with IS 1598 after heat treatment shall not be less than 48 Joule. 6 DESIGN 6.1 The design of all components of cage suspension gear shall be such that the factor of safety shall not be less than 10 and shall eliminate accidental disconnections. Threaded joints shall be avoided as far as possible but if the same cannot be avoided, factor of safety of the threaded joints shall be at least 15.

6.2 Dimensions The form and dimensions of various components of suspension gear shall be as specified in relevant parts of this standard. 7 MANUFACTURE 7.1 All components of suspension gear shall be of sound construction, free from defects like cracks, roughness, deep tool marks, deep notches, etc, and shall be of good workmanship. There shall be no sharp reduction in cross section or sharp radius. 7.2 The recommended hot-working temperatures are Js follows: Designation of Steel Temperature o C 20C15 1200 to 850 20 Ni2Cr2M02 1150 to 900 7.3 Freedom from Defects 7.3.1 Each component shall be made by either forging or machining from slabs or bars. Billets, blooms, slabs and bars for the manufacture shall be free from cracks, surface flaws, laps and other surface defects which may resull in defects in forgings made therefrom. 7.3.1.1 Manufacture shall have adequate manufacturing and forging facilities. For forging the recommendation of hammer capacities as follows- Up to 10 tonne SWL minimum 250 Kg Hammer Up to 12 tonne SWL minimum 500 Kg Hammer Up to 20 tonne SWL minimum 1000 Kg Hammer 7.3.2 All plates, sections and bars shall be well and cleanly rolled to the dimensions specified, and shall be sound and free from flaws, laminations, cracks or other defects. 7.4 Flame Cutting and Machining Where flame cutting of steel plate is necessary suitablemargin shall be provided for removal by final machining to produce a finished surface free fromirregularities and decarburization zones. 7.4.1 Prior to final finish and subsequent to flamecutting, machining, forging and welding, allcomponents shall be hardened and tempered asrequired. The components shall be machined fromsolid as far as possible. 7.4.2 Surface finish (see IS 3073) of the various partsof the cage suspension gear shall be as given below: Part Sutface Finish microns Pins and holes 0.8 to 1.6

Mating surfaces 1.6t03.2 Outside surfaces 3.2 to 6.4 7.5 Bridle Chains The manufacture of bridle chains shall be carried out,as far as possible, by automatic chain bending machines. They shall be joined by either resistance orflash butt-welding process under carefully controlledconditions. 8 ARRANGEMENT OF SUSPENSION 8.1 Some typical arrangements of cage suspensionare shown in Fig. 1 to 3. 8.1.1 Adjusting links may also be used in place ofadjusting plates shown in Fig. 2 and 3. The purposeof these plates and links is to adjust the rope stretch.

8.1.1.1 Adjusting plates and adjusting links are optional and shall be designed to carry the static load suspended on them. 8.2 The inclination of bridle chains to the vertical plane shall not exceed 30, that is, the included angle between the two diagonal chains shall not exceed 60. 8.3 The inclination of cage hanger shall correspond to inclination of bridle chain. 9 TESTING AND EXAMINATION 9.1 Manufacturer shall have their own magnetic particle flaw detector and ultrasonic flaw detector along with testing personnel for carrying out these tests shall have requisite NDT level-ii (See IS 13805) competency certificate issued by ISNT/ASNT 9.2 Notwithstanding with any provision for statutory requirements, prototype of the component shall be tested to destruction to ensure the minimum factor of safety of 10 in the component. The above test shall be made in a test house approved by the appropriate authority permitting the use of suspension arrangement.prototype of CSG and its components shall be tested for its 1) Safe working load 2) Proof load 3) Breaking load 4) Non destructive test 5) Chemical analysis 6) Micro examination 7) Hardness 8) Izod - impact test 9) Inclusion rating The tests shall be at any Government approved laboratory or a Test house accredited by NABL/APLAC/ILAC, subject to confirmation to its ability to conduct such tests, along with testing personnel for carrying out NDT shall have requisite NDT level-iii (See IS 13805) competency certificate issued by ISNT/ASNT 9.3 Proof Load Test Each finished component of suspension gear separately or collectively, shall be subjected to tensileproof load as specified in relevant parts of this standardand shall satisfactorily withstand the test without anypermanent deformation or defect. Each componentshall be separately and thoroughly examined for cracks after proof load test, visually and by means of other suitable devices. Magnetic crack detection, gamma-ray, X-ray and ultrasonic tests shall be conducted as required. 9.4 Permissible imperfections for magnetic particle inspection of various cage suspension gear components are given in Annex C. 9.5 The statutory authority may inspect, check and examine the manufacturing facilities at any time and get samples tested during the course of inspection or send such samples for testing at any Govt. approved

laboratories or a Test house accredited by NABL/APLAC/ILAC, subject to confirmation to its ability to conduct such tests. 9.6 Certificate of Test Every component of suspension gear manufactured and tested as specified in this standard shall be certified by the testing authority in an appropriate proforma. If agreed to between the user and the manufacturer, the user or his representative shall be provided with the facilities for witnessing the tests as laid down in this standard. 10 PAINTING The components of suspension gear shall be supplied with a coat of anticorrosive dressing. 11 MARKING 11.1 Each component shall be permanently and legibly marked on a non-wearable portion of the part with the following information: a) Manufacturer s identification mark; b) Safe working load; c) Abbreviated name for material; and d) Inspection marking After testing, when the test results are in conformity with the specification, inspection mark shall be stamped on the components. NOTE Symbol C shall be employed for 20C 15 steel and symbol A shall be employed for 20 Ni2Cr2M02 steel. 11.2 The size of marking shall be as follows: Safe Working Load Size of mark kn mm Upto 30 3 Over 30 and up to 50 5 Over 50 6 11.3 BIS Certification Marking The components of the suspension gear may also be marked with Standard Mark. 11.3.1 The use of Standard Mark is governed by the provisions of the Bureau of Indian Standards Act, 1986 and the Rules and Regulations made thereunder. The details of conditions under which the license for the use of the Standard Mark may be granted to manufacturers or producers may be obtained from thebureau of Indian Standards. 12 PACKING All components of suspension gear shall be packedand suitably protected to avoid damage in transit. 13 CERTIFICATE OF TEST

The manufacturer shall provide a certificate with eachconsignment of different items of suspension gear orwith individual items if the purchaser so specifiesgiving the following information: a) Manufacturer s name, b) Material, c) Distinguishing mark (to enable the particular item to be identified), d) Proof load applied, e) Safe working load, f) Factor of safety (as determined by destruction test on prototype), g) Details of heat treatment adopted, h) Report of examination and status of examiners, j) Type of cappel, k) A declaration that the item supplied comply in all respects with the standard, and m) Details of packing before dispatch. ANNEX A (Foreword) INFORMATION TO BE GIVEN WITH ENQUIRY OR ORDER A-1 The enquiry or order shall state the following: a) Designation of the components of the suspension gear and number required, b) Safe working load, c) Specification of material, d) Heat treatment desired, e) Whether anti-corrosive dressing is required, f) Length of chain sling from end to end, g) Size of chain in short link h) Number of falls of chain slings, and j) Nominal diameter of rope and type of rope for cappel. B-1 Safe working load shall consist of: ANNEX B (Clause 3.1) STATIC OR SAFE WORKING LOAD a) Static load ( Winding material) 1) Weight of suspension gear 2) Weight of cage; 3) Weight of material and its container; and 4) Weight of balance rope, if used. b) Static load (Winding men) 1) Weight of suspension gear 2) Weight of cage;

3) Weight of men at 65 kg per head; and 4) Weight of balance rope, if used. ANNEX C (Clause 9.4) PERMISSIBLE IMPERFECTIONS FOR MAGNETIC PARTICLE INSPECTION C-1 Magnetic particle flaw detection shall be carried out as per IS 3703. The type of defects and their limits are given in C-2, C-3 and C-4. C-2 imperfections in components maybe in the form of a) non-metallic inclusions which are inherent in steels, and b) cracks. NOTE Magnetic particle inspection will reveal these imperfections when they are on or just below the surface. C-3LIMITS OF PERMISSIBLE IMPERFECTIONS The limits of permissible inclusions shall be as given in Fig. 4 to 13. Cracks shall not be permitted. C-4 A longitudinal imperfection is one which generally runs parallel to the major dimension of the component, a transverse imperfection is one which runs at right angles to the line defined for a longitudinal imperfection. C-5 RECORD Imperfections which, although within the permissible limits, are of a large number, unusual pattern or direction, should be recorded on the component certificate.

ANNEX- D (Committee Composition) SL. NO. ORGANISATION REPRESENTED PRINCIPAL MEMBER ALTERNATE MEMBER 1. DTE GENERAL OF MINES SAFETY, DHANBAD SH C RAMESH KUMAR (CHAIRMAN) SH VIJAYA KUMAR 2. ANDHRA PRADESH HEAVY MACHINERY & ENGG LTD., VIJAYWADA 3. BHARAT COKING COAL LTD, DHANBAD 4. BHARAT EARTH MOVERS LTD., BANGALORE SH T.V.RAMANA SH B.D. PAKRASHI SH V. R.S. PRASAD RAO SH B. MAHIDHAR SH C.P. GHOSH SH. H.S. SATISH HANDRA 5. CATERPILLAR LTD; BANGALURU SH K. RESI JOSE SH R. SRINIVASA RAO 6. CENTRAL MINE PLANNING & SH S.K. CHATERJI SH U. ROY DESIGN INSTITUTE LTD, RANCHI 7. CENTRAL INSTITUTE OF MINING SH M.K. SINGH SH SURAJIT DEY AND FUEL RESESARCH, DHANBAD 8. EASTERN COALFIELDS LIMITED, SH S. CHATTERJEE SH C.B. SAHAY SANCTORIA 9. EIMCO ELECON (INDIA) LTD, SH SHARAD CHAVDA SH RAVINDRA LUTHRA VALLABH VIDYANAGAR 10. HINDUSTAN COPPER LTD, SH R.C. SINGLA SH P.K. SHARMA KOLKATA 11. HINDUSTAN ZINC LIMITED, SH B.V. RAO -- UDAIPUR 12. INDIAN LINK CHAIN PVT LTD, SH PRADIP -- KOLKATA CHITLANGIA 13. JOHN DEERE LTD; PUNE SH KALIAPPAN SH VIVEK JOSHI KARTHIK 14. MANGANESE ORE (INDIA) LTD SH G.P. KUNDARGI SH G. WANGNEO,NAGPUR 15. NANDA MILLAR CO, KOLKATA SH J.P. GOENKA SH PANKAN GOENKA 16. NATIONAL MINERAL DEVLOPMENT CORPN, HYDERABAD 17. SIMPLEX ENGINEERING & FOUNDRY WORKS PVT LTD, BHILAI 18. SOUTH EASTERN COALFIELDS LTD, BILASPUR SH A. K. GUPTA SH MUKESH JAIN SH KAPIL K. RAI SH A.K. SHUKLA SH KETAN R SHAH SH D. BHATTACHARJEE 19. TATA STEEL LTD SH SOUMENDU SH ABINASH JHA KUMAR MANJHI 20. THE HUTTI GOLD MINES COMPANY LTD; DISTT RAICHUR DR M.L PATIL --

21. THE SINGARENI COLLIERIES CO. LTD, DISTT KHAMMAM SH P.VISWANADHA RAJU SH CH.V.JANARDHANA RAO

FORMAT FOR SENDING COMMENTS ON BIS DOCUMENTS (Please use A4 size sheet of paper only and type within fields indicated. Comments on each clauses/subclauses/table/fig. etc be started on a fresh box. Information in Column 4 should include reasons for the comments and suggestions for modified wording of the clauses when the existing text is found not acceptable. Adherence to this format facilitates Secretariat s work) It is desirable to send comments through email at : med@bis.org.in. IS. No./ Doc. No. TITLE : NAME OF THE COMMENTATOR /ORGN.: Sl. No. Clause/Subclause/ para/table/fig. No. commented Comments Justification Proposed change