Subcontractor Pre-qualification Statement

Similar documents
Document A305. The Undersigned certifies under oath that the information provided herein is true and sufficiently complete so as not to be misleading.

Document A305 TM. Contractor's Qualification Statement

Subcontractor Pre-Qualification Statement Hunt / Moss, A Joint Venture

SUBCONTRACTOR S QUALIFICATION STATEMENT

AIA Document A305 - Electronic Format CONTRACTOR S QUALIFICATION STATEMENT

Prequalification Form

Subcontractor Qualification Form

SUBCONTRACTOR/SUPPLIER PRE-QUALIFICATION QUESTIONNAIRE

1.5 Other than persons listed above, number of full-time office employees: 1.6 Number of full-time, permanent field employees:

Work Performed Please see the attached list of Construction Codes and mark all that your company typically performs

Sub-Contractor/Supplier Pre-Qualification Questionnaire

Builder Qualification Application Montserrat

DOCUMENT BID DOCUMENT

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER AT RISK FOR THE NEW

Pennsylvania Turnpike Commission Harrisburg, Pennsylvania

DAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower

Subcontractor Prequalification Form

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS

LEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies

TABLE OF CONTENTS Updated 1/2014 SECTION TITLE DATE

PREQUALIFICATION AND ADVERTISEMENT FOR BIDS

4.1.3 Project Manual

TABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS

Name of company: Mailing Address: City: State: Zip: - Street Address: City: State: Zip: -

GENERAL INFORMATION. Yrs. Yrs. Yrs. How many years has your organization been in business under your present firm name:

SUB PREQUAL FORM. prequalificatiom form information WE USE TEXTURA! Who requested prequal from R. C. Stevens? Check it out at

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

ADDENDUM NO Refer to Specifications Section Alternates. Clarifications to alternate descriptions are as follows:

McPherson Contractors, Inc.

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

LEED TM POINT DOCUMENTATION

CREC ACADEMY OF AEROSPACE AND ENGINEERING PHASE 2 GENERAL CONSTRUCTION STATE PROJECT # EA WINDSOR, CT. INVITATION TO BID

ADDENDUM 2 - JULY 14, 2015

PREQUALIFICATION APPLICATION

TABLE OF CONTENTS Public Safety Building

SECTION PAYMENT PROCEDURES

APPLICATION AND CERTIFICATE FOR PAYMENT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

Invitation to Bid. RLS Construction Group requests your firm to submit a quotation on the following project:

G703 Continuation Sheet Minimum Schedule of Values Please use the breakdown listed below when submitting your billing for the project

RIVERSIDE CHURCH OF CHRIST. Lafayette, LA

DOCUMENT B. 2. The low bidder shall submit this Expanded Subcontractors Listing to the Owner within 24 hours after the bid opening.

JMU Capital Projects SWaM Outreach Event Presentations

Johns Hopkins University APL Building 201 December 5, Rob Dahms,

SUBCONTRACTOR / SUPPLIER (Circle one) PRE-QUALIFICATION FORM

ADDENDUM NO. 2 Consisting of 3 pages and Attachments

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

PREQUALIFICATION DOCUMENTS FOR SUBCONTRACTORS FOR

Prequalification Statement 11.16

REQUEST FOR SUB/VENDOR BIDS

SECTION 2 DIVISION 01C DESIGN SERVICES PROJECT GUIDELINES (INFORMAL)

Division 00 Procurement and Contracting Requirements

PROJECT MANUAL FOR: CP AGRICULTURAL ENGINEERING RAIN TOWER REPAIRS CP HULSTON HALL STAIR TOWER REPAIRS

REQUEST FOR PROPOSAL (RFP) for the Construction of Base Building Requirements for the new Alaska Gallery exhibit.

Tulare-Kings Counties Builders Exchange, Inc.

A. Remove Table of Contents and insert new attached Table of Contents.

CONTRACTOR LICENSE APPLICATION Please complete each field; insert N/A if not applicable. Incomplete applications will not be processed.

ABC Membership Application (2018)

BERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 PIEDMONT RD SAN JOSE, CA OFC FAX

Houston Dynamo Stadium

Job Cost Summary 11/27/08

Minneapolis Community and Technical College T-Building Floor 2 Student Affairs Cost Estimating Form Templates - Exhibit C

CONTRACTOR S PREQUALIFICATION FORM

Contractor Pre-qualification profile and Questionnaire

ibidpro Trade Code List

Alameda County Waste Management Authority Model Specification Update March 2004 SECTION CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

J~e~~r Senior Director of Construction Services Facilities Design and Construction UNIVERSITY OF CALIFORNIA, SAN DIEGO.

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington

MAPLES COMMUNITY CENTRE EXPANSION WINNIPEG, MANITOBA CLASS 'C' ESTIMATE

Contractors wishing to submit bids for this contract must be prequalified by the Pennsylvania Turnpike Commission.

REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES. For the renovation of existing apartment buildings. August 15, 2016

This presentation was prepared by TeHota Construction Management, LLC. on behalf of Hunt Construction Group for the AT&T Center Renovation Project.

Maintenance and Operations 1302 Service Road Tustin, California (714) CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20

Doing Business with the Metropolitan Washington Airports Authority

APPLICATION FOR CONTRACTOR REGISTRATION AND RENEWAL OF REGISTRATION INSTRUCTIONS AND CHECKLIST

Emergency Department Addition Bid Tabulation Summary 5/18/2016

Ottawa Elementary. Buchanan Middle Schools Additions and Remodels. Pre-Bid Meeting February 13, and

PORTLAND COMMUNITY COLLEGE SW 49 th Avenue Portland, Oregon ADDENDUM NO. 4

New Hall High School Project Summary Report to the Board of Education June 3, 2015

THE BID DUE DATE FOR ALL BID PACKAGES HAS BEEN EXTENDED TO THURSDAY, APRIL 12, 2:00 P.M.

Request for Proposals

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

PAULDING COLLEGE & CAREER ACADEMY

DESIGN & CONSTRUCTION GUIDELINES

APPLICATION FOR BUILDERS REGISTRATION FORM 1

This Addendum is directed to all prime Contract Bidders, and all others to whom Drawings and Specifications have been issued by the Architect.

Schedule T5. Tender Documents. This tender is for: Tender Documents: The documents issued for this tender include the following: Tender Schedules

Project Manual Index of Specifications Shenandoah Schools Concession Building

Outreach Meeting September 29, 2016

Concrete. Conveying Systems. Doors, Windows & Interiors

University of Central Florida Downtown Campus / Dr. Phillips Academic Commons Pre-Bid Phase II Package Structural, Architectural and MEP

KU West Campus LEEP II High Bay Facility Project # , A (c)

Spring Lake Public Schools. Spring Lake, MI. March RE: High School Storage Buildings

PREQUALIFICATION QUESTIONNAIRE

INVITATION TO TENDER ITT No. PS RODDAN LODGE CONSTRUCTION ADDENDUM NO. 16

Scope of Work Bid Package C-4 - West Polished Concrete

NOTICE TO BIDDERS / ADVERTISEMENT FOR BIDS GEORGE C. SIMKINS JR. ELEMENTARY SCHOOL

CM ASSIGNMENT OF TEMPORARY FACILITIES see included IU Project Site Requirements

SPECIFICATION REVISION LOG

CM AT RISK RFQ INTEREST FORM (For Submission to Cambridge Housing Authority Immediately) Revitalization of Frank J. Manning Apartments

Transcription:

Subcontractor Pre-qualification Statement By submitting this Statement, Subcontractor affirms that the information provided herein is true and sufficiently complete so as not to be misleading. All fields must be completed in order to be processed by CK Construction Corp. Failure to complete all fields may result in a nonprequalification of your firm. PROJECT NAME: SUBMITTED TO: ADDRESS: CK Construction Corp. 1981 S. Painter Lane West Haven, Utah 84401 SUBMITTED BY: SUBCONTRACTOR NAME: PHYSICAL ADDRESS: PHONE/ CELL FAX NUMBERS: EMAIL ADDRESS: SECONDARY CONTACT INFORMATION FOR E-BUILDER COORESPONDENCE: NAME: E-MAIL: PHONE/ CELL (Will be used for sending information, bid documents, addenda, bid forms, clarifications, etc.) Minority Business Enterprise Status. MBE WBE DBE (Please attach certificate & check all that apply) Plans Digital or Printed, please check one.

CHECK THE BOXES NEXT TO THE BID PACKAGES FOR WHICH SUBMITTING FIRM WISHES TO PRE-QUALIFY: 2A Earthwork 2B Site Utilities 2C Drilled Piers 3A Foundations 3C Reinforcing Material 3E Slabs, Steps, and Misc 4 Masonry 5 Steel Material 6 Steel Erection 7A Gypsum Board Assemblies 7B EFIS 7C Acoustical Ceilings 8A Roof Insulation 8B Architectural Metal 8C Shingled Roofing 8D Membrane Roofing 9 Doors & Hardware 10 Aluminum Doors, Windows 11A Overhead Doors & Grilles 11B Wood Windows material 11C Unit Skylights 11D Translucent Panels 11E Folding Doors 12 Painting 13A Ceramic Tile Flooring 13B Wood Flooring 13C Resilient Flooring & Carpet 13D Composition Flooring 13E Epoxy Flooring 13F Concrete Stain and Sealant 14A Architectural Casework 14B Laboratory Casework 15 Specialties 16A Prefabricated Partitions 16B Stage Curtain & Rigging 16C Stage Lighting & Sound 16D Laundry Equipment 16E Food Service Equipment 16F Gymnasium Equipment 17A Elevators 17B Lifts 17C Hoists & Cranes 18 Mechanical 19A Electrical 19B Technology 20A Fencing 20B Irrigation Systems 20C Landscaping 21A Asphalt Pavement 21B Site Concrete 22A Pre Fabricated Detention Cells 22B Security Metal & Hardware 22C Security Fencing 22D Security Electronics 23A Asbestos Abatement 23B Building Demolition 23C Precast Concrete 23D Driven Piles 23E Drilled Piers 23F Sprayed Fire Resistive Materials 23G Pre Engineered Buildings 23H Metal Lockers 23J Wood Framing Labor 23K Exterior Bleachers 23L Synthetic Surfaces 24A Playground Surfaces 24B Playground Equipment 24A Playground Surfaces 24B Playground Equipment 24C Pedestrian Bridge 25 Ice Rink Cooling System 26 Crane Equipment 27A Foamed in Place Insulation 27B Cellulose Sprayed Insulation CK Construction Corp.-Subcontractor Pre-qualification Statement Page 2 of 6

1. ORGANIZATION 1.1 How many years has your organization been in business as a Subcontractor? 1.2 How many years has your organization been in business under its present business name? 1.2.1 Under what other or former names has your organization operated? 1.3 If your organization is a corporation, answer the following: 1.3.1 Date of incorporation: 1.3.2 State of incorporation: 1.3.3 President s name: 1.3.4 Vice-president s name(s): 1.3.5 Secretary s name: 1.3.6 Treasurer s name: 1.4 If your organization is a partnership, answer the following: 1.4.1 Date of organization: 1.4.2 Type of partnership (if applicable): 1.4.3 Name(s) of general partner(s): 1.5 If your organization is individually owned, answer the following: 1.5.1 Date of organization: 1.5.2 Name of owner: 1.6 If the form of your organization is other than those listed above, describe it and name the principals: 2. LICENSING 2.1 List jurisdictions and trade categories in which your organization is legally qualified to do business, and indicate registration or license numbers, if applicable. 2.2 List jurisdictions in which your organization s partnership or trade name is filed. Page 3 of 6

3. EXPERIENCE 3.1 List the categories of work that your organization normally performs with its own forces. 3.1.1 What are your Firm s Manpower Capabilities (crews and sizes)? 3.1.2 Please write in which States your company is willing to work. 3.2 Claims and Suits. (If the answer to any of the questions below is yes, please attach details.) 3.2.1 Has your organization ever failed to complete any work awarded to it? 3.2.2 Are there any judgments, claims, arbitration proceedings or suits pending or outstanding against your organization or its officers? 3.2.3 Has your organization filed any law suits or requested arbitration with regard to construction contracts within the last five years? 3.2.4 Has your organization failed to complete its portion of work by the contract completion date within the past five years? 3.2.5 Are there now pending and/or have there ever been Liquidated Damages assessed against your organization? 3.3 Within the last five years, has any officer or principal of your organization ever been an officer or principal of another organization when it failed to complete a construction contract? (If the answer is yes, please attach details.) 3.4 On a separate sheet, list major construction projects your organization has in progress, giving the name of project, phone & fax number for the general contractor and architect, contract amount, percent complete and scheduled completion date. 3.4.1 State total worth of work in progress and under contract: Page 4 of 6

3.5 On a separate sheet, list the major projects your organization has completed in the past five years, giving the name of project, contact information for the general cont ractor and architect, contract amount, date of completion and percentage of the cost of the work performed with your own forces. 3.5.1 State average annual amount of construction work performed during the past five years: 3.6 On a separate sheet, list the construction experience and present commitments of the key individuals of your organization. 3.7 On a separate sheet, list past work history with CK Construction Corp. 4. REFERENCES 4.1 Supplier References (Include contact name, phone & fax number). (minimum of three): General Contractor References (Include contact name and phone number). (minimum of three): 4.2 Banking Reference (Include Contact Name and Phone): 4.3 Surety: 4.3.1 Bonding Company and Information: 4.3.2 Please answer the following questions: Are you able to provide a 100% performance/payment bond? YES NO Are you able to provide a bid bond? YES NO Please provide a letter from your surety company. 4.3.3 Current bond Single and Aggregate limits and Bond Rate(as a percentage): 4.4 Insurance: 4.4.1 Name of insurance company: 4.4.2 Name, address, & phone # of agent: Page 5 of 6

5.SAFETY 5.1 OSHA Reported Accident/Incident History. 5.1.1 Provide OSHA 300 Summary Log for the last 3 full years, or the last full years your company has been in business. 5.2 Experience Modification Rate. 5.2.1 EMRs are obtained from your worker's compensation insurance carrier. Present year Last Year Two Years Ago EMR Effective Date(MM DD YYYY) 6.FINANCING 6.1 Financial Statement. 6.1.1 The following information is taken from Subcontractor s latest audited financial statement: (If an audited financial statement is not provided a bond may be required. Please complete Section 4.3 fully.) Current Assets (e.g., cash, joint venture accounts, accounts receivable, notes receivable, accrued income, deposits, materials inventory and prepaid expenses); Net Fixed Assets; Other Assets; Current Liabilities (e.g., accounts payable, notes payable, accrued expenses, provision for income taxes, advances, accrued salaries and accrued payroll taxes); Other Liabilities (e.g., capital, capital stock, authorized and outstanding shares par values, earned surplus and retained earnings). 6.1.2 Name, address, and phone number of firm preparing financial statement, and date thereof: 6.1.3 Is the referenced financial statement for the identical organization named on page one? 6.1.4 If not, explain the relationship and financial responsibility of the organization whose financial statement is provided (e.g., parent-subsidiary). 6.2 Will the organization whose financial information is provided act as guarantor of the contract for construction? Page 6 of 6