Similar documents
Cantilever Loading Platform Erection Procedures and Guidance Notes

CONTRACTOR WHS HAZARD STANDARD FORMWORK & FALSEWORK EXTERNAL USE ONLY

CITP PROGRESS REPORT

OSHA 1994 AND FMA Chapter 4 (cont.)

Construction Safety Education Forum. 6 March Scaffolding. Dimitri Barlas, State Coordinator Construction Work Health and Safety Division DRAFT

Don t let them fall for it!

The Weaknesses of OSHA 1994 Implementation in Malaysian Construction Industry

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

The Construction (Design and Management) Regulations 2015 sets out the duties of Designers and Contractors.

OSH LEGISLATION LAW AND REGULATION TO CONSTRUCTION SAFETY LAW AND REGULATION TO CONSTRUCTION SAFETY 20/2/2013

Practice Notes For Construction Managers PNCM 7: Timber Formwork First Issue, January 2006

Presentation Outline Latest Requirements on Safe Lifting Operations. Presentation Outline

Annex C TIME-OUT CHECKLIST INTRODUCTION

Construction OS&H General duties

The safe management and control of Temporary Works

SAFETY, HEALTH & WELFARE AT WORK (CONSTRUCTION) REGULATIONS Briefing Note 1 for Clients, Designers and Project Supervisor Design Process

The following is Copyright 2009 The Queen s Printer, Saskatchewan

Scaffolds. OSHA Office of Training & Education 1

Formwork. Code of Practice

Scaffold Inspection Procedures for the Competent Person. Merle Errthum

Scaffolds. OSHA Office of Training & Education 1

1. Company Policies. 1.1 Project Control & Methodology Brief Methodology. Construction Program. Trade Budgets. Site Establishment Plan

OPTUS SUPPLIER WORK HEALTH & SAFETY POLICY

FRIDAY, NOVEMBER 21, WORKPLACE SAFETY AND HEALTH (APPROVED CODES OF PRACTICE) NOTIFICATION 2014

Plant, Construction & Business NVQs

WORKING AT HEIGHT. The company will comply with the Work at Height Regulations 2005, its schedules and Codes of Practice.

Government Gazette Staatskoerant

Health and and Safety Executive. Temporary Works. Phil Chester HM Inspector of Health and Safety

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

Management of Health and Safety Files

CONSTRUCTION SITES (SAFETY) (AMENDMENT) REGULATION 2003

CONSTRUCTION SPECIFICATION FOR TEMPORARY PROTECTION SYSTEMS

SCAFFOLDING PROCEDURE

Title: Scaffolding Safety Policy. University Division/Department: Environmental Health & Safety Effective Date: October 6, 2017 Page: 1 of 15

Guidelines for Multi-Point Suspended Scaffolds (MPSS)

Level 3 NVQ Diploma in Accessing Operations And Rigging (Construction) Qualification Specification

RMM 307 Scaffolds/Suspended Scaffolds and Powered Elevated Platforms Safety Program Page 2 November 2016

Safe Work Method Statement Perimeter and Balcony Fallguard (0003)

Construction Industry Council Seminar

REGISTERED INSPECTOR OF WORKS (IOW) PROFESSIONAL CERTIFICATE COURSES

Generic HEIGHT SAFETY IN FORMWORK 16/11/2012. Built from basic generic components like planks, beams, and posts of timber, steel etc.

Scaffolding. Safety Guide. STOP! Before you climb

Level 2 NVQ Diploma in Accessing Operations And Rigging (Construction) Qualification Specification

Chapter 2 Parties to the Contract

HEALTH AND SAFETY CONTRACT BETWEEN EMPLOYER AND MANDATORY (CONTRACTOR) SECTION 37(2) OF THE OHS ACT, ACT 85 OF 1993

Level 2 NVQ Diploma in Accessing Operations And Rigging (Construction) Qualification Specification

COMPENDIUM OF TYPICAL HAZARDS ASSOCIATED WITH CLADDING WORKS AND THEIR CONTROL MEASURES IN THE CONSTRUCTION INDUSTRY CLADDING WORKS

Annex I: Summary of duty holders

Corporate Policy and Procedure

REFURBISHMENT DEMOLITION

MSOSH OCCUPATIONAL SAFETY AND HEALTH AWARD 2017

HIGH RISK ACTIVITIES. GD02 Scaffold planning and work at height activities checklist. Design stage. Tender stage. Element Yes No N/A Comments

MALAYSIAN STANDARD. Licensed to UNIMAP LIBRARY / Downloaded on : 22-Dec :14:03 PM / Single user license only, copying and networking prohibited

OSH5063EP(PRS3607) Workplace and Work Equipment Hazard. Session 9. Working at Height

J&P OMAN COMPANY ORGANISATION P.110 PROCEDURE. Page: 1 of 16. Document Title: Issue Date: 13/04/2014. Revision Date: 06/06/2016 Revision No.

Occupational Qualification and Occupational Curriculum Project. Organising Framework of Occupations (OFO) Code:

SPECIFICATION OF JACKED ANCHOR FOR RETAINING STRUCTURES

Training Standard Draft Only

Apply for Working at Heights Permit

SOUTH AFRICAN NATIONAL STANDARD

In This Document. Scaffolds Lesson Plan. Overview

The Edge Protection Federation Containment Systems Product Specification, Test Methods

SCAFFOLDS Revision No: 3

People who are awarded this qualification have broad knowledge and skills in all aspects of concrete construction.

COMPENDIUM OF TYPICAL HAZARDS ASSOCIATED WITH USE OF SCAFFOLDS AND THEIR CONTROL MEASURES IN THE CONSTRUCTION INDUSTRY USE OF SCAFFOLDS

Supported Scaffold Inspections

Big Ox Energy Siouxland, LLC. Safety Management System. Authority: President

Scaffold Safety

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

THE REQUIREMENTS FOR SCAFFOLDING IN NSW POLICY STATEMENT 1. INTRODUCTION

WHS Change Management

Council Directive 89/391/EEC of 12 June 1989 on the introduction of measures to encourage improvements in the safety and health of workers at work

Licensed Science Officer Benchmark

MALAYSIAN STANDARD QUALITY MANAGEMENT SYSTEMS - REQUIREMENTS (FIRST REVISION) (ISO 9001:2008, IDT) (PUBLISHED BY STANDARDS MALAYSIA IN 2009)

MRICS, RPS(QS), MCIOB, MHKICM, MAIB, MHIREA

Reliant Holdings Ltd Safety Management System

STANDARD PRACTICE INSTRUCTION

Fall Protection Plan Developer (FPPD) Unit Standard (229994) Target audience and relevance. Course content. Course duration

Environmental Management System Manual (EM-01) Revision No. : 2 Date : 1/6/2017. Revision History Sections Affected

CONSTRUCTION HEALTH AND SAFETY, AND INJURY PREVENTION Prevent hazards when working with cranes, lifting appliances and rigging on construction sites

NOTICE INVITING TENDER (NIT)

LEGAL SUPPLEMENT 43. to the Government Gazette of Mauritius No. 13 of 8 February 2014

SAFETY MANAGEMENT: IMPLEMENTATION, REVIEW AND AUDIT SHASSIC ASSESSMENT TOOLS FOR SAFETY

Table of Contents. Project Agreement Schedule 14

Operations and Rigging (Construction)

IIRSM Qatar. 20 th March Presented by: Mark Stephens

Preventing Falls from Equipment and Bridges

(7 February 2014 to date) OCCUPATIONAL HEALTH AND SAFETY ACT 85 OF 1993

HEALTH AND SAFETY (MANAGEMENT IN CONSTRUCTION) (JERSEY) REGULATIONS 2016

Guideline for the erection of Supaloc Steel Trusses Pre- Delivery preparation by the supplier Installing Supaloc Steel roof trusses...

All rights reserved IJISE (I)

(Revised) Construction Industry Council 2 nd Progress Report of Committee on Construction Site Safety

Course in Owner Builder Compliance NTIS code: 91509NSW. Participants Guide

Scaffolding Procedures

NATIONAL DEPARTMENT OF LABOUR INSPECTION AND ENFORCEMENT SERVICES National Institute for Occupational Health. 23 rd MARCH /27/2017

HEALTH AND SAFETY (MANAGEMENT IN CONSTRUCTION) (JERSEY) REGULATIONS 2016

Occupational Health & Safety: Cranes and Construction

Water Industry Registration Scheme (WIRS) FAQs

RISK ASSESSMENT. HAZARD POTENTIAL 3 x MAJOR 2 SERIOUS 1 SLIGHT. RISK POTENTIAL 3 x HIGH 2 MEDIUM 1 LOW

Joint Structural Division. Standard for. Structural Engineering Services. 2nd Edition

Transcription:

1.0 INTRODUCTION There have been numerous reports in the media about failures of scaffolds and falseworks. The main reasons could be attributed to the lack of attention on the safety aspects in the installation, maintenance and dismantling of these scaffolds and falsework, especially during the boom period in the last decade. Prevention of failures or collapses is necessary because they normally resulted in human fatalities or bodily harm. Property damage, delays and loss of revenue for the companies involved are also normally unavoidable as a result of these failures. The Institution of Engineers, Malaysia in response to this concern and to address the problem, formed a special committee to study the causes of failures and to recommend suitable measures to mitigate these types of failures and to come out with a Policy Statement that could be forwarded to the relevant authorities and agencies to effect suitable actions. 1.1 The Issues The followings are the issues pertaining to the problems encountered in the industry, relating to scaffolds and falseworks, i. Scaffolds and falseworks safety must be seen as one of the major concerns in the local construction industry. In a study conducted in the United States, it was found that about 65% of construction workers will be working in one form of scaffolds or falseworks at one time or another. i iv. Existing legislations and guidelines have not been effective enough to produce satisfactory solution. Safety rules are frequently violated. Insufficient allocation of funds for construction safety in the construction budget seems to be the norm; Lack of competent personnel for erecting, maintaining, and dismantling scaffolds and false work is very apparent. 1.2 Objectives of the Position Paper Committee The main objective of the position paper committee is to formulate an s view in the prevention of collapse of scaffoldings and false works. This will be carried out through the following approaches, i. Obtaining views, inputs and feedbacks on the matter from a broad-based group of individuals and organisations, involved in the construction industry. i Reviewing relevant literatures. Conducting forums to discuss the issues.

1.3 Composition of the Members of Position Paper Committee The Civil and Structural Engineering Technical Division of the Institution of Engineers Malaysia (C&S) was requested to spearhead the relevant committee in studying this issue. In forming the Position Statement Committee, various individuals and agencies related to the construction industry were invited to join the committee. These include, i. The Department of Safety and Health(DOSH) The National Institute of Occupational Safety and Health(NIOSH) i The Construction Industry Development Board(CIDB) iv. The Association of Consulting Engineers, Malaysia(ACEM) v. The Master Builder Association of Malaysia(MBAM) vi. The Malaysian Institution of Steel Industries Federation(MISIF) v Practicing Engineers vi Manufacturers of Scaffolds and Falseworks. The list of the Position Statement Committee members is given in Appendix A. 2.0 BACKGROUND From the literature review carried out numerous examples of accidents related to scaffolds and falseworks can be cited. To highlight some examples, the followings were felt worth quoting, i. Collapse of falsework at a hotel development project at KL Sentral on the 13th. December 1999. Six people were injured. Cause of collapse was scaffolds were not constructed in accordance with the drawings prepared by the Professional Engineer. Fatal fall of a worker from a mobile scaffold at Dewan PUSPANITA, Lot JKR 5171, Jalan Hose on 15 March 1999. Cause of accident was that the scaffold was not constructed by competent personnels. i Falsework accident at Project Cadangaan Pembinaan 24 tingkat pejabat & 5 tingkat Wisma AIA, lot 250, Seksyen 49, Jalan Ampang on the 27th. February 1998. One worker working under a false work died as a result of being hit by a falling part from the falsework.

3.0 REVIEW OF AVAILABLE LITERATURES The following Malaysian Acts and Regulations and International Codes of Practice that are related to the issue were studied and discussed to establish the proposals for good practice. 3.1 Acts and Regulations Listed below are the Acts and Regulations related to scaffolds and falsework that were studied and reviewed by the Committee. i. Factories and Machinery Act 1967 - Part IV. Areas reviewed: Reporting of Accidents and dangerous occurrences; the power of conducting enquiry and investigation i Factories and Machineries (Building Operations and works of engineering Construction) (Safety) Regulations 1986. - Part III Areas reviewed: Construction of concrete works - Part X Areas reviewed: Construction of scaffolds Occupational Safety and health Act 1994 (Act 514) - Part IV Areas reviewed: General provisions on safety and health based o0n the concept of self-regulation. 3.2 Malaysian Standards MS 1462: 1999 Specification for Steel Frames tubes and fittings used in tubular scaffolding 3.3 Singaporean Standards i. SS 311: 1994 Specification for Steel Tubes and Fittings used in Tubular Scaffoldings i SS 280: 1984 Specification for Frame Scaffolding SS CP 14: 1996 Code of Practice for Scaffolds 3.4 Japanese Industrial Standards i. JIS A 8951:1985 Japanese Industrial Standard for Tubular Steel Scaffolds JIS G 3444:1999 Carbon Steel Tubes for General Structural Purposes

3.5 British Standards i. BS 1139:1990 Metal Scaffolding BS 2482: 1981 Specification for Timber Scaffold Boards i BS 5973: 1993 Code of Practice for Access and working scaffolds and special Scaffold Structures in Steel iv. BS 5974: 1990 Code of Practice for Temporarily Installed Suspended Scaffolds and access Equipment v. BS 5975: 1996 Code of Practice for Falsework vi. BS 4074: 1982 Specification for Metal Props and Struts 4.0 CAUSES OF COLLAPSE AND FAILURES OF SCAFFOLDS AND FALSEWORKS The followings are identified causes of collapse and failures of scaffolds and falseworks, i. Lack of considerations in the design and specifications. (Poor or insufficient design) Improper construction practice. (Non-provision of all necessary or recommended structural, construction and safety elements. Works carried out on ad-hoc basis. No planning or design) i Inadequate training for construction workers for erection,maintenance and dismantling of false works and scaffolds. (Lack of safety awareness among workers) iv. Inclusion of inferior material as scaffolds and falseworks. v. Lack of regular maintenance and inspection of these erected temporary structures vi. Accident s which occurred out of negligence of on-site personnels. 5.0 FACTORS CONTRIBUTING TO THE FAILURES The followings are contributing factors to failures of scaffolds and falseworks, i. Lack of enforcement by relevant authorities. Lack of concern for the safety of workers and the public by management and other relevant bodies. i Inadequate supervision and quality or safety checks not implemented during erection and use iv. Lack of erection drawings before erection v. Insufficient allocation of fund for safety and health training programmes for workers involved in constructions.

6.0 RECOMMENDATIONS PROCEDURES 6.1 Amendments to Relevant Local Acts and Regulations Local Acts and Regulations need to be amended to include sufficient provisions on safety requirement on scaffolds and falseworks. It is recommended that Acts and By-Laws be amended in the following matters, i. Submission for temporary works related to scaffolds and falsework is required where they are more than 6 m in height. The Responsibility of the submitting person on safety issues, need to be highlighted. i Requirement of regular inspection on temporary works is iv. necessary. Mandatory registration of the suppliers with DOSH is required. v. Mandatory registration of scaffolds and falseworks products is also needed. 6.2 More Stringent Enforcement Enforcement should not be restricted to accident or failure of the scaffolds and formworks. It is recommended that: i. Enforcement should be carried out on a regular basis to ensure that scaffolds and falseworks are constructed in accordance with sound engineering practice. ACTION Ministry of Housing and Local Governments. Other Agencies: Ministry of Human Resources DOSH Other Agencies: DOSH and Local Authorities The Project Manager of the respective project shouldverify records of all regular inspections by persons approved by DOSH. This should be included in the regular report to be submitted to the relevant authority. ACEM,, PAM, MBAM, REHDA 6.3 Mandatory Requirement for Sufficient Training for Supervisory Personnel and Erection Teams The required training on erection, alteration, maintenance and dismantling of scaffolds, falsework, ladders, etc. is necessary for construction workers and supervisory personnel. Such training could be provided by DOSH, NIOSH, CIDB, MBAM and even DOSH

other accredited organisations. Competency Certificate could be issued and this may be made as a requirement for erectors of scaffolds and falsework. Training is also required on the safety aspects of such structures and hazard preventive measures. This action is to ensure that sufficient trained personnel in these areas are available in the industry. Although there is a requirement that trained scaffolder should supervise the erection and dismantling, this requirement is yet to be fully enforced, because of lack of trained scaffolders. We recommend that Contractual Conditions of Contracts prepared by CIDB, PAM, etc. should include clauses on training the workers or supervisory personnel for the erection, dismantling and maintenance of scaffolds, falsework, ladders, hoists, trestles etc. 6.4 Inclusion of Item for Safety, Health and Environment Management Requirement in the Preliminaries of all Construction Contract Documentation Currently requirements for safety and health are not itemized as one item in every project. There are various items related to safety in the current lists of preliminaries in some projects. Furthermore, in some documents there is no inclusion at all for this item. It is recommended that one item be included in the Preliminaries of all construction projects for Safety, Health and Environment Management. 6.5 Updating Guidelines and Standard Code of Practices as Necessary Currently there is one Malaysian Standard which is productbased, viz. MS 1462:1999. Specification for Steel Frame Scaffoldings. All other design and construction of scaffolds and falseworks are designed to other Overseas Standards. It is recommended that a Code of Practice for Access Scaffolds, Working Scaffolds and Special Scaffolds Structures be drafted. This will include the Steel Tube Scaffolds, Timber Scaffolds and Scaffolds made from other materials.. Such Code of practice could also include details of loadings, construction methods, and quality checklists for erection, dismantling and maintenance. The guidelines on Occupational Safety in Construction Works, which is prepared by DOSH also need to be expanded. ISM Other Agecies: Regulatory agencies and consultants. SIRIM SIRIM DOSH

6.6 Provision of Sufficient Fund for Safety, Health and Environmental Programme for Each Construction Project Developers and contractors shall be required to provide sufficient fund for safety and health during construction stages. In order for this to be effective, it is recommended that the Bill of Quantities included in the tender documentation shall provide sufficient details on safety, health and environmental requirements. At present although some tender documents provide for quoting for items related to safety and health, many contractors do not quote sufficient sum for this requirement. Subsequently during the construction stage, they are unable to provide even basic protective equipment for workers safety. One of their excuses is that the tender quotations are very competitive. Organisations such as CIDB and DOSH could suggest a percentage allocation for safety and health matters for each category of construction projects, as per value of the project, based on their previous experience of well-managed projects. 6.7 Additional Guidelines Organizations such as, ACEM, CIDB, and MBAM together with DOSH could consider undertaking publications jointly or individually guidelines on safety and health, based on current priority. Some of the recommended titles are, i. Worked Examples on the Design of Scaffolds using MS 1462: Certified Scaffold Frames. Guidelines for Proprietary Metal Frame Scaffolds which at least include the following sub-topics, MBAM Other Agencies: MBAM, REHDA, ACEM and CIDB, DOSH, PAM, ACEM and Other Agencies: ACEM and CIDB SIRIM and CIDB a. Part 1 Initial Planning and Design b. Part 2 Erection and Quality Checks c. Part 3 Maintenance d. Part 4 Dismantling, Storage and Preservation e. Part 5 Training on Erection, Maintenance, Alteration and Dismantling i Safe Working Practices on scaffolds which at least should include the followings, DOSH and NIOSH a. Timber scaffolds construction, maintenance and dismantling guidelines. b. Safe use of scaffolds as working platforms

c. Access to higher working platforms d. Safety nets guidelines for fixing and maintenance e. Safety in falseworks for in-situ beams and slabs f. Safety in falseworks for overhead bridges and structures 6.8 More Commitment by Supervisory Staff The committee is of the view that if there is more commitment by Supervisory Staff such as engineers, designers, construction superintendents, builders, project managers, quantity surveyors, safety and health officers, many of the practical problems on construction sites could be arrested. This commitment to safety, health and environment will help to implement all the necessary requirements for safety and health at the planning, design, and tender stages where requirement for provision for funds could be envisaged. The same commitment should also be continued during the construction, monitoring, reporting and corrective action phases during the implementation and closing stages. NIOSH Other agencies:, ACEM, CIDB, DOSH, engineers, supervisory staffs, project managers, quantity surveyors and health officers

7.0 CONCLUSIONS The Institution of Engineers, Malaysia considers that safe practice in the construction environment is an absolute necessity. The recommendations given in this Position Paper are practical and could be achieved if due consideration and agreement can be obtained from professional organisations, local and government agencies. Concerted effort is necessary and the members of the Institution should be more than willing to implement such guidelines and regulations in the interest of good service to the society.

APPENDIX A LIST OF COMMITTEE MEMBERS Assoc. Prof. Ir. Dr. Mohd. Zamin Jumaat (Chairman) Ir. Tu Yong Eng (Secretary) Ir. CMM Aboobucker Ir. Hooi Wing Chuen Ir. Seth Lim Sow Wu Ir. Lee Kee Bau Mr. Ke Geok Chuan Mr. Azman Sah Sabali Mr. Raslim Salleh Ir. Dr. Abdul Majid Dato Abu Kassim Ir. Ho Hak Kiew Mr. Andrew Pak Soon Hock Mr. Ko Beng Hooi DOSH NIOSH CIDB ACEM MBAM MISIF MISIF

APPENDIX B DEFINITION OF TERMS Scaffold. Scaffold is defined as any temporary structure on or from which a person works in connection with an operation or work. It also includes any temporary structure which enables a person to obtain access to or which enable materials to be taken to any place at which such work is performed and include any working platform, gangway, skip, ladder or step ladder which does not form part of such structure together with any guard-rail, toe board or other safeguards and all fixings but does not include any lifting appliances or lifting machine. It is used merely to support such an appliance or such a machine as to support other plant or equipment. False work False work is a temporary structure, which enables the permanent structure to be constructed while it is not self-supporting.