standard tariffs 2012 Valid from 1 January 2012

Similar documents
BASE FACILITIES RATES

POINT LISAS INDUSTRIAL PORT DEVELOPMENT CORPORATION LIMITED

POINT LISAS INDUSTRIAL PORT DEVELOPMENT CORPORATION LIMITED

BOARD OF TRUSTEES OF THE GALVESTON WHARVES Tariff Circular No. 6

BOARD OF TRUSTEES OF THE GALVESTON WHARVES Tariff Circular No. 6

Point Lisas Industrial Port Development Corporation Limited

Point Lisas Industrial Port Development Corporation Limited

BOARD OF TRUSTEES OF THE GALVESTON WHARVES Tariff Circular No. 6

PRICE LIST by SAARTE LIINID Ltd for 2018 (Prices are exclusive of VAT 20%, if not pointed out differently)

Changes Effective 9/1/17

ADDENDUM No. 1B TO TERMS AND TARIFFS OF BMF PORT BURGAS EAD. ACT Burgas Tariff

PRICE LIST by SAARTE LIINID Ltd for 2016 (Prices are exclusive of VAT 20%, if not pointed out differently)

MUNDRA INTERNATIONAL CONTAINER TERMINAL PVT. LTD. TARIFF BOOKLET

ADDENDUM No. 1B TO TERMS AND TARIFFS OF BMF PORT BURGAS EAD. ACT Burgas Tariff. In force from

TARIFFS PRINCIPAL TARIFF: EFFECTIVE 1 JULY JUNE 2019 TERMS. Marine. Unless otherwise stated

OFFICIAL TARIFF. 10 th 12 th September 2018, Riyadh, KSA. Presented by

Abu Dhabi Ports Operating Company Abu Dhabi Terminals PJSC

Abu Dhabi Ports Operating Company Abu Dhabi Terminals PJSC

OFFICIAL TARIFF. 20 th and 21 st November 2017, Dubai, UAE. Presented by

Tariffs (rates, charges, fees) for works and services executed in JSC Sea port of Aktau

Logistics & Warehousing

OFFICIAL TARIFF. 10 th 12 th October 2018, Lagos. Presented by

USD per cubic meter (CBM) USD per consignment, per waybill

Section 4 Vessel Charges/Cargo Charges

Key To Abbreviations

Gdański Terminal Kontenerowy SA

CONSIGNEE TARIFF ICT/IPT, IRAQ (WEF

OFFICIAL TARIFF. 2 nd to 4 th October 2018, Barcelona, Spain. Presented by

Gulftainer Group CONSIGNEE TARIFF ICT/IPT/IST, IRAQ. (WEF 1 st November 2018)

SCALES OF AGENCY FEES

NAMPORT (NAMIBIAN PORTS AUTHORITY) N th ROAD PO Box 361 WALVIS BAY NAMIBIA

CentrePort Limited General Tariff Effective 1 July 2008

SOUTH PACIFIC INTERNATIONAL CONTAINER TERMINAL LIMITED (SPICTL)

PART 2: DOMESTIC TARIFF - CONTAINER YARD (For Account SHIPPER/CONSIGNEE)

Mundra International Container Terminal Private Limited. Tariff Amended on and valid from 01 August 2018 TARIFF BOOKLET- CFS. Key Contact Details:

Ashutosh Container Services Pvt.ltd. TARIFF BOOKLET

SECTION I CHARGES FOR MARINE SERVICES AND SHIP DUES

IMPORTING YOUR GOODS USING SEA FREIGHT. 1 Magellan Logistics

CONTAINER FREIGHT STATION KOLKATA TARRIF

STEVEDORING TARIFF. The Port of Helsingborg

TARIFF.

TARIFF FOR PORT SERVICES

MELBOURNE INTERNATIONAL RORO & AUTO TERMINAL PTY LTD TARIFF SCHEDULE FOR MELBOURNE January 2018

Gulftainer Group CONSIGNEE TARIFF ICT/IPT, IRAQ. (WEF 1 st January 2014)

Port of Djibouti Tariff Book

PORT ALMA SHIPPING TERMINAL

TARIFF. Applicable for internationally and coastally sailing vessels, and all the additional services, provided by Port Fleet Bourgas Ltd.

SERVICE CHARGES AT TAN CANG - CAT LAI TERMINAL

In this tariff, the following words and phrases have the meanings hereby assigned to them, unless the context requires another meaning.

Standard Oil Accounting Procedures Accounting for Logistics

INFORMATION HANDBOOK BRISBANE AUTOSTRAD TERMINAL BERTHS 8-10 FISHERMAN ISLANDS

Slade Shipping Pipe Management Services. Amsterdam Storage Facility

General Terms and Conditions for Sikuki Nuuk Harbour A/S 1 July 2016

HALIFAX PORT AUTHORITY TARIFF RATE SCHEDULES TABLE OF CONTENTS

MAXIMUM TARIFFS PUBLIC TERMINAL CONTAINERS

MELBOURNE INTERNATIONAL RORO & AUTO TERMINAL PTY LTD TARIFF SCHEDULE FOR MELBOURNE August 2018

ANNEX XII REFERRED TO IN ARTICLE 5.21 MARITIME TRANSPORT AND RELATED SERVICES

SHIPPING INSTRUCTIONS ISPOR 2013 The Convention Centre Dublin 2 nd 6 th November 2013

SCHEDULE 1. PART I PORT AND CARGO DUES No. Item Description of Vessel Dues 1. Port Dues (a) Overseas ship entering a port:

SCHEDULE OF CHARGES FOR USE OF ROLL-ON/ROLL-OFF BERTHS PURSUANT TO SECTIONS 26 AND 27 OF THE HARBOURS ACT 1964

PORT TARIFF 2017 / 2018

Notice of Tariff Change Effective January 1, 2014

MELBOURNE INTERNATIONAL RORO & AUTO TERMINAL PTY LTD TARIFF SCHEDULE FOR MELBOURNE July 2018

OFFICIAL TARIFF. Presented by

Angola. Ports description

Containerized Cargo Consignee Standard Tariff

Gdański Terminal Kontenerowy SA

Penang Port Sdn. Bhd. ( D) Headquarters : No.1. Pesara King Edward, Georgetown, Penang, Malaysia Postal : P.O. Box 1204, Penang,

Gulftainer Group GULFTAINER SCHEDULE OF CHARGES SHARJAH CONTAINER TERMINALS. (WEF 1 st December 2013)

MELBOURNE INTERNATIONAL RORO & AUTO TERMINAL PTY LTD TARIFF SCHEDULE FOR MELBOURNE September 2016

BAHRAIN PORTS TARIFF 2016 (MILITARY)

MATERIAL HANDLING AUTHORIZATION

Cargo Service Charges

Terminal Information Handbook

The Trade Fair Forwarding Agent Tariffs

POINT LISAS INDUSTRIAL PORT DEVELOPMENT CORPORATION LIMITED PORT POINT LISAS TARIFF GLOSSARY & NOTICES

TARIFF FOR SERVICES. BCT - Bałtycki Terminal Kontenerowy Sp. z o.o. The Tariff is valid from 1st January 2018

STEVEDORING TARIFF. The Port of Helsingborg

The Trade Fair Forwarding Agent Tariffs valid from 2018

Commercial Terms and Conditions. for use of infrastructure and services provided by the Port of Tromsø

SHIPPING TARIFF. API EXHIBITION ON INTERNATIONAL STANDARDS (AXIS) January 2016 Kuala Lumpur Convention Centre Kuala Lumpur Malaysia

SHIPPING TARIFF. Kuala Lumpur Convention Centre Kuala Lumpur Malaysia. Presented by

14. LOGISTICS SUPPORT GUIDELINES

STEVEDORING TARIFF. The Port of Helsingborg

ANNEX XVI REFERRED TO IN ARTICLE 6.19 MARITIME TRANSPORT AND RELATED SERVICES

Glossary of Charges. 17 Business Park Drive Ravenhall, VIC 3023 Tel: (03)

SEABIRD MARINE SERVICES PRIVATE LIMITED : DRONAGIRI

Distribution Capabilities

STEVEDORING BREAK BULK LOADING.


All transactions are handled in accordance with Standard Trading Conditions of the Co.

DUES AND CHARGES 2018 COMMERCIAL

Djibouti Ports Tariff Book

SEMICON China 2014 Section 4 Freight Handling

OFFICIAL TARIFF. Presented by

Berth 20. Stevedoring and Terminal Standard Tariff

HALIFAX PORT AUTHORITY BERTHAGE AND ANCHORAGE NOTICE SCHEDULE OF RATES. Item Description Rate

A. EXPORTS. Composite Charges for Stuffing 20' 40'

Gulftainer Group GULFTAINER SCHEDULE OF CHARGES SHARJAH CONTAINER TERMINALS. (WEF 1 st February 2018)

PORT OF THURSDAY ISLAND PORT RULES

Transcription:

SONANGOL INTEGRATED LOGISTIC SERVICES LDA standard tariffs 2012 Valid from 1 January 2012 SONILS LDA - YOUR OIL AND GAS LOGISTICS PARTNER IN ANGOLA SONILS LDA RUA 6 I.L. BOAVISTA LUANDA ANGOLA TEL +244 222 670400 FAX +244 222 310910 www.sonils.co.ao

CONTENTS Contents Page Base facilities rates... 2 Material handling services rates... 6 Vessels services rates... 9 Agency for vessels services rates... 11 Hire of lifting equipment... 13 Hire of dedicated personnel and equipment... 15 Base secondary services rates... 17 Rates for stevedoring for ocean going vessels... 20 Heavy lift dock services rates... 22 HQSE services rates... 25 IT services rates... 28 Weights and measurements conversion table... 30 Glossary of some of the terms used in this document OSC SONILS Oil Service Center BOL Bay of Luanda USD United States Dollars PPE Personal Protective Equipment Operator The Base Operator: SONILS Client A person or company or oganisation not connected with SONILS who wishes to use its facilities, equipment and/or services Base SONILS OSC IT Information Technology FT Freight Ton - means Weight or Measurement, whichever is higher W/M Means Weight or Measurement, whichever is higher Disclaimer: The tariffs shown in this document may vary from time to time and SONILS accepts no responsibility for typing errors or unforseen factors causing increases/decreases in tariffs. Please contact your SONILS representative to confirm tariffs before purchasing a product or service. SONILS LDA - YOUR OIL AND GAS LOGISTICS PARTNER IN ANGOLA Page 1

BASE FACILITIES RATES SONILS LDA - YOUR OIL AND GAS LOGISTICS PARTNER IN ANGOLA Page 2

BASE FACILITIES RATES S/N DESCRIPTION OF SERVICES UNIT COEFFI- CIENT RATE IF PAID 1 YEAR IN ADVANCE RATE IF PAID 3 YEARS IN ADVANCE RATE IF PAID 5 YEARS IN ADVANCE DAILY/ MONTHLY RATE PERIOD A) EXISTING BASE FACILITIES 1 Undeveloped industrial area (sand only) From 0 to 500 m 2 1.50 $94 $75 $60 N/A Year From 501 to 1000 m 2 1.30 $81 $65 $52 N/A Year From 1001 to 2000 m 2 1.25 $78 $63 $50 N/A Year From 2001 to 5000 m 2 1.20 $75 $60 $48 N/A Year From 5001 to 10000 m 2 1.10 $69 $55 $44 N/A Year From 10001 to 20000 m 2 1.05 $66 $53 $42 N/A Year Above 20000 m 2 $63 $50 $40 N/A Year 2 Semi-developed area (compacted with red soil or any other material) From 0 to 500 m 2 1.50 $188 $150 $120 N/A Year From 501 to 1000 m 2 1.30 $163 $130 $104 N/A Year From 1001 to 2000 m 2 1.25 $156 $125 $100 N/A Year From 2001 to 5000 m 2 1.20 $150 $120 $96 N/A Year From 5001 to 10000 m 2 1.10 $138 $110 $88 N/A Year From 10001 to 20000 m 2 1.05 $131 $105 $84 N/A Year Above 20000 m 2 $125 $100 $80 N/A Year 3 Concrete paved area From 0 to 500 m 2 1.50 $240 $210 $180 N/A Year From 501 to 1000 m 2 1.30 $208 $182 $156 N/A Year From 1001 to 2000 m 2 1.25 $200 $175 $150 N/A Year From 2001 to 5000 m 2 1.20 $192 $168 $144 N/A Year From 5001 to 10000 m 2 1.10 $176 $154 $132 N/A Year From 10001 to 20000 m 2 1.05 $168 $147 $126 N/A Year Above 20000 m 2 $160 $140 $120 N/A Year 4 Warehouse area (for existing facilities such as Dinama, Cometa and Container warehouse) From 0 to 500 m 2 1.50 $390 $345 $300 N/A Year From 501 to 1000 m 2 1.30 $338 $299 $260 N/A Year From 1001 to 2000 m 2 1.25 $325 $288 $250 N/A Year From 2001 to 5000 m 2 1.20 $312 $276 $240 N/A Year From 5001 to 10000 m 2 1.10 $286 $253 $220 N/A Year From 10001 to 20000 m 2 1.05 $273 $242 $210 N/A Year Above 20000 m 2 $260 $230 $200 N/A Year 5 Open shed area (for existing facilities only) From 0 to 500 m 2 1.50 $300 $263 $225 N/A Year From 501 to 1000 m 2 1.30 $260 $228 $195 N/A Year From 1001 to 2000 m 2 1.25 $250 $219 $188 N/A Year From 2001 to 5000 m 2 1.20 $240 $210 $180 N/A Year From 5001 to 10000 m 2 1.10 $220 $193 $165 N/A Year From 10001 to 20000 m 2 1.05 $210 $184 $158 N/A Year Above 20000 m 2 $200 $175 $150 N/A Year Continued on next page SONILS LDA - YOUR OIL AND GAS LOGISTICS PARTNER IN ANGOLA Page 3

BASE FACILITIES RATES S/N DESCRIPTION OF SERVICES UNIT COEFFI- CIENT RATE IF PAID 1 YEAR IN ADVANCE RATE IF PAID 3 YEARS IN ADVANCE RATE IF PAID 5 YEARS IN ADVANCE DAILY/ MONTHLY RATE PERIOD A) EXISTING BASE FACILITIES (continued) 6 Maintenance of the semi-developed area in case client request received (prices per one maintenance) From 0 to 500 m 2 1.50 $30 From 501 to 1000 m 2 1.30 $26 From 1001 to 2000 m 2 1.25 $25 From 2001 to 5000 m 2 1.20 $24 From 5001 to 10000 m 2 1.10 $22 From 10001 to 20000 m 2 1.05 $21 Above 20000 m 2 $20 7 Offices (for existing facilities only) Offices provided are inclusive off basic furniture, air-conditioner, telephone and internet connections, security, maintenance and parking area for one car. Unit $6,500 $6,000 $5,500 Month 8 Port cabin office 20 - provided by base operator Port cabin offices are provided by base operator unfurnished, with air-conditioner, while electricity for domestic use is provided where electricity is readily available and the consumption is not included in the above rates. Unit $1,100 Month 9 Port cabin office 40 - provided by base operator Port cabin offices are provided by base operator unfurnished, with air-conditioner, while electricity for domestic use is provided where electricity is readily available and the consumption is included not in the above rates. Unit $2,200 Month 11 Port cabin office 20 - provided by client outside dedicated facility Port cabin offices provided by clients will be provided with electricity for domestic use where electricity is readily available and the consumption is not included in the above rates. Unit $900 Month 12 Port cabin office 40 - provided by client outside dedicated facility Port cabin offices provided by clients will be provided with electricity for domestic use where electricity is readily available and the consumption is not included in the above rates. Unit $1,800 Month 1 B) NEW DEVELOPMENT BASE AND OFFICES FACILITIES Subject to negotiations: based on client s requirements and civil work engineering AND EXCLUDING THE RATES FOR THE LAND. Continued on next page SONILS LDA - YOUR OIL AND GAS LOGISTICS PARTNER IN ANGOLA Page 4

BASE FACILITIES RATES S/N DESCRIPTION OF SERVICES UNIT COEFFI- CIENT RATE IF PAID 1 Year IN ADVANCE RATE IF PAID 3 YEARS IN ADVANCE RATE IF PAID 5 YEARS IN ADVANCE DAILY/ MONTHLY RATE PERIOD C) TEMPORARY STORAGE IN THE BASE 1 Any type of area: to be decided by the base operator and availability a. General cargo W/M $4 Day b. General cargo W/M $110 Month c. Heavy lift W/M $6 Day d. Heavy lift W/M $160 Month e. 10 feet container f. 10 feet container g. 20 feet container h. 20 feet container i. 40 feet container j. 40 feet container Full or empty Full or empty Full or empty Full or empty Full or empty Full or empty $100 Day $2,800 Month $200 Day $5,600 Month $300 Day $8,500 Month Please note: 1) All the rates are in USD. 2) Coefficient for areas is applied to above rates, based upon road access being required to the areas leased. 3) The W/M means Weight or Measurement whichever is higher. 4) General cargo is all material up to 15 W/M. 5) Heavy lift is all material above 15 W/M. 6) Minimum charge is 1 W/M. 7) Rates for containers are for full or empty. 8) Zero (0) days storage is free of charge for the rates under point C. SONILS LDA - YOUR OIL AND GAS LOGISTICS PARTNER IN ANGOLA Page 5

MATERIAL HANDLING SERVICES RATES SONILS LDA - YOUR OIL AND GAS LOGISTICS PARTNER IN ANGOLA Page 6

MATERIAL HANDLING SERVICES RATES S/N DESCRIPTION OF SERVICES UNIT RATE (USD) 1 Discharging and/or loading rates for materials from/to vessel a General cargo FT $24 b Heavy lift FT $32 c 10 feet container Full or Empty $207 d 20 feet container Full or Empty $300 e 40 feet container Full or Empty $450 2 Discharging and/or loading rates for materials to/from vessel including transport to/from quayside from/to storage area a General cargo FT $68 b Heavy lift FT $90 c 10 feet container Full or empty $615 d 20 feet container Full or empty $900 e 40 feet container Full or empty $1,260 3 Transport charges rates (from/to quayside to/from storage area) a General cargo FT $48 b Heavy lift FT $64 c 10 feet container Full or Empty $450 d 20 feet container Full or Empty $660 e 40 feet container Full or Empty $900 4 Transport charges rates (from/to outside base to/from outside base) a General cargo FT $60 b Heavy lift FT $75 c 10 feet container Full or Empty $800 d 20 feet container Full or Empty $1,200 e 40 feet container Full or Empty $1,500 5 Transport charges rates (within the base) a General cargo FT $42 b Heavy lift FT $56 c 10 feet container Full or Empty $460 d 20 feet container Full or Empty $670 e 40 feet container Full or Empty $900 6 Direct delivery rates - from ocean going vessels to supply vessels/barges/trucks and/or vice-versa a General cargo FT $10 b Heavy lift FT $15 c 10 feet container Full or Empty $130 d 20 feet container Full or Empty $170 e 40 feet container Full or Empty $240 7 Truck load/offload rates (non-base operators trucks) a General cargo FT $15 b Heavy lift FT $23 c 10 feet container Full or Empty $170 d 20 feet container Full or Empty $240 e 40 feet container Full or Empty $350 Continued on next page SONILS LDA - YOUR OIL AND GAS LOGISTICS PARTNER IN ANGOLA Page 7

MATERIAL HANDLING SERVICES RATES S/N DESCRIPTION OF SERVICES UNIT RATE (USD) 8 Un-stuffing / stuffing rates for containers a 10 feet container Unit $200 b 20 feet container Unit $400 c 40 feet container Unit $800 9 Bulk materials transferring rates (pumping, cutting) a From vessel or tanker to plant FT $7 b Cutting into plant FT $10 c From truck to plant FT $15 d From plant to S/V FT $7 e From truck to vessel FT $30 10 Racking and/or re-racking rate for casings and tubulars a Casings and tubulars FT $12 Please note: 1) All rates are in USD. 2) The FT means Weight or Measurement whichever is higher. 3) General cargo is all material up to 15FT. 4) Heavy lift is all material above 15 FT. 5) Minimum charge is 1 FT. 6) Rates for containers are for full or empty. 7) The above rates excludes any lifting equipment but includes trucks, trailers, supervision and labours. SONILS LDA - YOUR OIL AND GAS LOGISTICS PARTNER IN ANGOLA Page 8

VESSELS SERVICES RATES SONILS LDA - YOUR OIL AND GAS LOGISTICS PARTNER IN ANGOLA Page 9

VESSELS SERVICES RATES S/N DESCRIPTION OF SERVICES UNIT RATE (USD) 1 Berthing fee for vessels a Ocean going vessels Day (24hrs) $600 b Support vessels, barges and others floating structures Day (24hrs) $300 c Crew vessels Day (24hrs) $200 2 Mooring and unmooring rates for all type of vessels a Mooring Vessel $250 b Unmooring Vessel $250 3 Access and maintenance rates (for vessels under point 1a and 1b only) a Access/maintenance in (crew vessels excluded) Vessel $1,200 b Access/maintenance out (crew vessels excluded) Vessel $1,200 4 Fuel supply rates (bunkering of diesel) a Product (diesel) rate (bunkering) At cost (in USD) + 20% b Pumping to vessels CBM $10 c Positioning of oil spill protection around the vessels during supply Operation $4,000 5 Water supply rate to vessels a Industrial water CBM $12 6 Rental of waste skips for removal of vessel garbage and arriving from offshore a Transportation of waste skip to/from quayside/disposal area including loading/discharging onto/from vessel per operation (empty or full) Unit / Operation $400 b Rental of certified waste skip from base-authorised waste management company At cost (in USD) + 20% c Disposal by base-authorised waste management company At cost (in USD) + 20% 7 Crew terminal rate for embarkation and disembarkation of crew and passengers a Crew terminal rate including the use of waiting room, immigration services, and transport from/to entrance of the base Person $10 Please note: 1) All rates are in USD. 2) Rental of waste skips and disposal of the waste can be agreed between the client and waste management company directly, taking into consideration that the transportation is paid to the base operator by one of them. SONILS LDA - YOUR OIL AND GAS LOGISTICS PARTNER IN ANGOLA Page 10

AGENCY FOR VESSELS SERVICES RATES SONILS LDA - YOUR OIL AND GAS LOGISTICS PARTNER IN ANGOLA Page 11

AGENCY FOR VESSELS SERVICES RATES S/N DESCRIPTION OF SERVICES UNIT RATE (USD) 1 Retainer/agency fee for vessel (agency availability fee) a Ocean going vessels Call $4,000 b Support vessels, barges and others floating structures Month $750 c Crew vessels Month $750 2 Clearance for vessels inward or outward movements a Inward call Call $370 b Outward call Call $370 3 Authority / port bills: a As per outlay At cost (in USD) + 20% Please note: 1) All rates are in USD. 2) Agency includes the services of the agent to the company, which is acting as charterer of the supply vessel and is providing all compulsory declarations, clearances in and out, fees provision with local authorities of Port of Luanda (port captain, customs, immigration, health services, navy, pilotage, launch, usage of the bay, etc.). 3) Client and or his clearing agent are responsible for the custom documentation, which should be given to the agent to prepare the manifest accordingly before vessel sailing. SONILS LDA - YOUR OIL AND GAS LOGISTICS PARTNER IN ANGOLA Page 12

HIRE OF LIFTING EQUIPMENT SONILS LDA - YOUR OIL AND GAS LOGISTICS PARTNER IN ANGOLA Page 13

HIRE OF LIFTING EQUIPMENT S/N DESCRIPTION OF SERVICES rate PER 1 hour rate PER 8 COntinuous hours rate PER 12 COntinuous hours rate PER 24 COntinuous hours 1 Berthing fee for vessels - all as per manufacturer s specifications a Crane up to 30 tons $300 $1,800 $2,400 $3,900 b Crane above 30 tons to 60 tons $600 $3,800 $4,800 $7,700 c Crane above 60 tons to 90 tons $850 $5,300 $7,000 $11,000 d Crane above 90 tons to 450 tons $2,000 $13,000 $17,000 $27,000 e Crane above 450 tons $5,000 - - - f Container handler $300 $1,400 $1,900 $3,100 g Forfklift up to 3 tons $75 $500 $700 $1,200 h Forklift above 3 tons to 6 tons $100 $600 $1,000 $1,600 i Forklift above 6 tons to 10 tons $135 $950 $1,300 $2,100 j Forklift above 10 tons to 15 tons $175 $1,300 $1,700 $2,700 k Forklift above 15 tons to 30 tons $300 $1,400 $1,900 $3,100 l Man lift $200 $1,500 $1,900 $3,100 2 Equipment hire (outside base: subject to availability and location) - all as per manufacturer s specifications a Crane up to 30 tons $400 n/a n/a n/a b Crane above 30 tons to 60 tons $800 n/a n/a n/a c Crane above 60 tons to 90 tons $1,200 n/a n/a n/a d Forfklift up to 3 tons $100 n/a n/a n/a e Forklift above 3 tons to 6 tons $150 n/a n/a n/a f Forklift above 6 tons to 10 tons $200 n/a n/a n/a g Forklift above 10 tons to 15 tons $250 n/a n/a n/a 3 Hire of trucks and trailers (only for outside base: subject to availability and location) a Mack truck / trailer 28T $250 n/a n/a n/a Please note: 1) All rates are in USD. 2) Hire of lifting equipment is calculated based on minimum 1 hour. 3) Equipment rates are inclusive of operator, maintenance, consumables, overtime, and 24 hours availability. 4) Equipment only to be used in client dedicated area(s) and for client operations. 5) All equipment is subject to availability at the time of request and dedicated trucks are not available due to their utilisation being included in the transfer rates. SONILS LDA - YOUR OIL AND GAS LOGISTICS PartnER IN ANGOLA Page 14

HIRE OF DEDICATED PERSONNEL AND EQUIPMENT SONILS LDA - YOUR OIL AND GAS LOGISTICS PARTNER IN ANGOLA Page 15

HIRE OF DEDICATED PERSONNEL AND EQUIPMENT S/N DESCRIPTION OF SERVICES UNIT RATE (USD) PERIOD 1 Dedicated personnel hire a Material/logistic coordinator Person To be discussed and agreed b Base foreman/supervisor Person $7,500 Month c Material/warehouse clerk Person $4,500 Month d Administrative support Person $4,000 Month e Rigger/labourer Person $2,000 Month f Security guard Person $3,000 Month g Any other position requested by the client Person To be discussed and agreed 2 Dedicated equipment hire - all as per manufacturer s specifications except where indicated in italics a Crane up to 30 tons Crane $40,000 Month b Crane above 30 tons to 60 tons Crane $60,000 Month c Crane above 60 tons to 90 tons Crane $90,000 Month d Crane above 90 tons Crane To be discussed and agreed e Forfklift up to 3 tons Forklift $10,000 Month f Forklift above 3 tons to 6 tons Forklift $13,000 Month g Forklift above 6 tons to 10 tons Forklift $17,500 Month h Forklift above 10 tons to 15 tons Forklift $20,000 Month i Forklift above 10 tons to 15 tons (rotative forks) Forklift $28,000 Month j Forklift above 15 tons Forklift To be discussed and agreed k Any other equipment requested by the client Unit To be discussed and agreed Please note: 1) All rates are in USD. 2) Dedicated personnel are charged at the above monthly rates and include all costs associated with the administration of the position. This includes, but is not limited to, travel to and from work, salaries and overtime, insurances, medical benefits, PPE, leave replacement and personnel replacement when if person is sick during duty period. However, rates only reflect normal working hours with acceptable overtime, but do not represent 24hr operations. 3) Personnel assigned as dedicated personnel will have the necessary experience and qualifications to fill the requirements of the dedicated designated position. 4) Equipment rates are inclusive of operator, maintenance, consumables, overtime, and 24 hours availability. 5) Equipment only to be used in client dedicated area(s) and for client operations. 6) All equipment is subject to availability at the time of request and dedicated trucks are not available due to their utilisation being included in the transfer rates. SONILS LDA - YOUR OIL AND GAS LOGISTICS PARTNER IN ANGOLA Page 16

BASE SECONDARY SERVICES RATES SONILS LDA - YOUR OIL AND GAS LOGISTICS PARTNER IN ANGOLA Page 17

BASE SECONDARY SERVICES RATES S/N DESCRIPTION OF SERVICES UNIT RATE (USD) PERIOD 1 Diesel supply rate (for domestic use, equipment and generators) in case service provided by operator a Supply within base Litre $1.32 2 Petrol supply rate (for domestic use, equipment and generators) in case service provided by operator a Supply within base Litre $2 3 Lubricant supply rate (for domestic use, equipment and generators) in case service provided by operator a Supply within base At cost (in USD) + 20% 4 Water (industrial) supply rate a Industrial water within base and dedicated facilities based on water meters CBM $12 5 Rental of waste skips within the base facilities for domestic waste only a Transportation of waste skip to/from client facility/disposal area including positioning per operation as well disposal of the waste 6 Electricity supply rate supplied by and through base operator facility Unit / Operation $300 a Supply of electricity within the base up to 10000 kwh KWH $1.00 b Supply of electricity within the base from 10001 up to 40000 kwh KWH $0.80 c Supply of electricity within the base from 40001 up to 50000 kwh KWH $0.70 d Supply of electricity within the base from 50001 up to 100000 kwh KWH $0.60 e Supply of electricity within the base from 100001 kwh upwards KWH $0.50 7 Rental of power generators and light pools within base (diesel & maintenance included) 1 Hr 12 Hr 24 Hr a Generator 220/380V up to 75 KVA $100 $900 $1,800 b Generator 220/380V above 75 up to 100 KVA $150 $1,000 $2,000 c Diesel light pools - $900-8 Maintenance supply rate supplied for any services a Maintenance of the existing rented facilities At cost (in USD) + 20% b Maintenance of the existing non-operator equipment At cost (in USD) + 20% 9 Access rates for the base a Individual access pass for resident company Person $50 Year b Temporary individual access pass for resident company (up till maximum 30 days validity) Person $50 Month c Individual access pass for non-resident company Person $300 Year d Temporary individual access pass for non-resident company (from 2 to maximum 30 days validity) e Penalty for non-returning temporary passes after expiration date within 48 hours Person $100 Month Pass $250 f Vehicle access pass for resident company Vehicle $300 Year g Vehicle access pass for non-resident company Vehicle $4,000 Year h Cargo pass/gate fee (for cargo arriving in and out of the base on non-base vehicles) Vehicle $400 10 Meal tickets a Purchase of meal tickets to be used within the base canteen. Ticket $20 Continued on next page SONILS LDA - YOUR OIL AND GAS LOGISTICS PARTNER IN ANGOLA Page 18

BASE SECONDARY SERVICES RATES S/N DESCRIPTION OF SERVICES UNIT RATE (USD) PERIOD 11 Diesel supply rate (for domestic use, equipment and generators) in case service provided by operator a Catering services by OSC-authorised company for various events upon request from the Client. At cost (in USD) + 20% 12 Supply of wooden dunnage and concrete blocks for pipes racking a Wooden dunnage (4.00 m x 0.30 m x 0.30 m) Pieces $370 b Wooden dunnage (4.00 m x 0.10 m x 0.10 m) Pieces $42 c Wooden wedges Pieces $4 d Concrete blocks for pipes racking Pieces $1,000 Please note: 1) All rates are in USD. 2) Rental of waste skips and disposal of the waste can be agreed between the client and waste management company directly taking into consideration that the transportation is paid to the base operator by one of them. 3) Rates under point 1, 2 and 3 may change without prior notice in accordance with official rates prescribed by the Angolan authorities or market price. SONILS LDA - YOUR OIL AND GAS LOGISTICS PARTNER IN ANGOLA Page 19

RATES FOR STEVEDORING FOR OCEAN GOING VESSELS SONILS LDA - YOUR OIL AND GAS LOGISTICS PARTNER IN ANGOLA Page 20

RATES FOR STEVEDORING FOR OCEAN GOING VESSELS S/N DESCRIPTION OF SERVICES UNIT RATE (USD) 1 Stevedoring fee at quayside a General cargo W/M $15 b 10 feet container Full or empty $80 c 20 feet container Full or empty $100 d 40 feet container Full or empty $120 2 Shifting of cargo fee - within same hatches a General cargo W/M $3 b 10 feet container Full or empty $20 c 20 feet container Full or empty $35 d 40 feet container Full or empty $55 3 Shifting of cargo fee - hatch to hatch onboard ocean going vessel a General cargo W/M $5 b 10 feet container Full or empty $30 c 20 feet container Full or empty $50 d 40 feet container Full or empty $70 4 Shifting of cargo fee - hatch to hatch through quayside and/or barge-support vessel a General cargo W/M $10 b 10 feet container Full or empty $85 c 20 feet container Full or empty $100 d 40 feet container Full or empty $170 5 Stuffing/un-stuffing fee of shipping line convenience containers a 10 feet container Full or empty $250 b 20 feet container Full or empty $450 c 40 feet container Full or empty $700 6 Terminal charges fee for empty containers (shipping line containers only) a 10 feet container Unit $350 b 20 feet container Unit $500 c 40 feet container Unit $700 7 Lifting equipment fee in case used during discharging/loading of the ocean going vessel a Shore crane Hour $1,500 b Forklift up-to 6 tons Hour $100 c Forklift above 6 tons Hour $200 d Container Handler Hour $400 8 Fee for cargo in transit through the base (shipping line only) a General cargo W/M $20 b 10 feet container Full or empty $400 c 20 feet container Full or empty $800 d 40 feet container Full or empty $1,200 9 Heavy lifts above 50 metric tons on spot request a Fee to be agreed case by case on shipping line request - shipping line to provide all details (weight, dimensions, etc.,) Please note: 1) All rates are in USD. 2) The W/M means Weight or Measurement whichever is higher. 3) Stuffing and un-stuffing of containers fee includes forklift in case necessary. 4) Cargo in transit fee includes transport from quayside to stacking area, storage for 15 days, loading and transport back to quay and lifting equipment utilisation. 5) Terminal charges fee for empty containers rates for containers includes receiving of empty containers from receivers, storage for 30 days only, loading and transport of the empty containers to quayside for export as well equipment utilisation. 6) If allowed time on points 4 & 5 is exceeded then a temporary storage fee will be considered. SONILS LDA - YOUR OIL AND GAS LOGISTICS PARTNER IN ANGOLA Page 21

HEAVY LIFT DOCK SERVICES RATES SONILS LDA - YOUR OIL AND GAS LOGISTICS PARTNER IN ANGOLA Page 22

HEAVY LIFT DOCK SERVICES RATES S/N DESCRIPTION OF SERVICES UNIT COEFFI- CIENT RATE IF PAID 1 Year IN ADVANCE RATE IF PAID 3 YEARS IN ADVANCE RATE IF PAID 5 YEARS IN ADVANCE PERIOD 1 Concrete paved area for projects (these rates apply unless otherwise agreed between the client and the base operator) From 0 to 500 m 2 1.50 $240 $210 $180 Year From 501 to 1000 m 2 1.30 $208 $182 $156 Year From 1001 to 2000 m 2 1.25 $200 $175 $150 Year From 2001 to 5000 m 2 1.20 $192 $168 $144 Year From 5001 to 10000 m 2 1.10 $176 $154 $132 Year From 10001 to 20000 m 2 1.05 $168 $147 $126 Year Above 20000 m 2 $160 $140 $120 Year 2 Warehouse area for project (for existing facilities only) - (these rates apply unless otherwise agreed between the client and the base operator) From 0 to 500 m 2 1.50 $390 $345 $300 Year From 501 to 1000 m 2 1.30 $338 $299 $260 Year From 1001 to 2000 m 2 1.25 $325 $288 $250 Year From 2001 to 5000 m 2 1.20 $312 $276 $240 Year From 5001 to 10000 m 2 1.10 $286 $253 $220 Year From 10001 to 20000 m 2 1.05 $273 $242 $210 Year Above 20000 m 2 $260 $230 $200 Year DESCRIPTION OF SERVICES UNIT RATE (USD) 3 Berthing fee for vessels at heavy lift dock a Ocean going vessels Day (24hrs) $600 b Support vessels, barges and others floating structures Day (24hrs) $300 c Crew vessels Day (24hrs) $200 4 Mooring and unmooring rates for all type of vessels at heavy lift dock a Mooring Vessel $250 b Unmooring Vessel $250 5 Access and maintenance rates (for vessels calling at the heavy lift dock) a Access/maintenance in (crew vessels excluded) Vessel $1,200 b Access/maintenance out (crew vessels excluded) Vessel $1,200 6 Discharging and/or loading rates for materials to/from vessel including transport to/from quayside from/to storage area a General cargo FT $68 b Heavy lift FT $90 c 10 feet container Full or empty $615 d 20 feet container Full or empty $900 e 40 feet container Full or empty $1,260 Continued on next page SONILS LDA - YOUR OIL AND GAS LOGISTICS PARTNER IN ANGOLA Page 23

HEAVY LIFT DOCK SERVICES RATES S/N DESCRIPTION OF SERVICES RATE PER 1 hour RATE PER 8 continuous hours RATE PER 12 continuous hours RATE PER 24 continuous hours 7 Equipment hire within the heavy lift dockyard - all as per manufacturer s specifications unless otherwise specified a Crane up to 30 tons $300 $1,800 $2,400 $3,900 b Crane above 30 tons to 60 tons $600 $3,800 $4,800 $7,700 c Crane above 60 tons to 90 tons $850 $5,300 $7,000 $11,000 d Crane above 90 tons to 450 tons $2,000 $13,000 $17,000 $27,000 e Crane above 450 tons $5,000 - - - f Heavy lift gantry crane at the heavy lift dock below <50 MT lifts $600 $3,800 $4,800 $7,700 g Heavy lift gantry crane at the heavy lift dock above >50 MT lifts $4,000 $28,000 $45,000 $90,000 h Container handler $300 $1,400 $1,900 $3,100 i Forfklift up to 3 tons $75 $500 $700 $1,200 j Forklift above 3 tons to 6 tons $100 $600 $1,000 $1,600 k Forklift above 6 tons to 10 tons $135 $950 $1,300 $2,100 l Forklift above 10 tons to 15 tons $175 $1,300 $1,700 $2,700 m Forklift above 15 tons to 30 tons $300 $1,400 $1,900 $3,100 n Man lift $200 $1,500 $1,900 $3,100 DESCRIPTION OF SERVICES UNIT RATE (USD) PERIOD 8 Dedicated equipment hire within the heavy lift dockyard - all as per manufacturer s specifications unless otherwise specified a Crane up to 30 tons Crane $40,000 Month b Crane above 30 tons to 60 tons Crane $60,000 Month c Crane above 60 tons to 90 tons Crane $90,000 Month d Crane above 90 tons Crane To be discussed and agreed e Forfklift up to 3 tons Forklift $10,000 Month f Forklift above 3 tons to 6 tons Forklift $13,000 Month g Forklift above 6 tons to 10 tons Forklift $17,500 Month h Forklift above 10 tons to 15 tons Forklift $20,000 Month i Forklift above 15 tons Forklift To be discussed and agreed j Any other equipment requested by the client Unit To be discussed and agreed Please note: 1) All the rates are in USD. 2) Coefficient for areas is applied to above rates, based upon road access being required to the areas leased. 3) The W/M means Weight or Measurement whichever is higher. 4) General cargo is all material up to 15 W/M. 5) Heavy lift is all material above 15 W/M. 6) Minimum charge is 1 W/M. 7) Rates for containers are for full or empty. 8) Hire of lifting equipment is calculated based on minumum 1 hour. 9) Equipment rates are inclusive of operator, maintenance, consumables, overtime, and 24 hours availability. 10) Equipment only to be used in client dedicated area(s) and for client operations. 11) All equipment is subject to availability at the time of request and dedicated trucks are not available due to their utilisation being included in the transfer rates. SONILS LDA - YOUR OIL AND GAS LOGISTICS PARTNER IN ANGOLA Page 24

HQSE SERVICES RATES SONILS LDA - YOUR OIL AND GAS LOGISTICS PARTNER IN ANGOLA Page 25

HQSE SERVICES RATES S/N DESCRIPTION OF SERVICES UNIT RATE (USD) 1 Fire fighting equipment with a dedicated fire fighting team 24 hours a day a Light fire fighting tender Attendance $2,000 b Fire truck tender Attendance $3,500 c Fire truck titan Attendance $5,000 d Any materials utilised to combat a fire will be back charged. At cost (in USD) + 20% NB The above service is available to all clients of the OSC. SONILS will not accept any liability resulting from the use of the service. 2 First Aid and ambulance 24 hours a day a Ambulance or boat call out (per trip into city closest clinic). Call $250 b All materials utilised during the evacuation of the person. At cost (in USD) + 20% c In the cases were persons are hospitalised in the clinic of operators choice due to client not having specific clinic/hospital and if the charges for this are invoiced directly to the operator At cost (in USD) + 20% by that clinic/hospital, then the operator will back charge client. 3 Spill response equipment and team 24 hours a day (Tier 1)* 3.1 Response team call out (excluding equipment) a Call out fee and utilisation of the response team to tackle spills both into the Bay of Luanda (BOL) and spills onshore. Hour $2,500 b Call out fee and utilisation of the response team to tackle spills both into the BOL and spills onshore. Shift of 8 hrs $15,000 c Monthly registration fee and unlimited utilisation of the response team to tackle spills both into the BOL and spills onshore. Month $2,500 d Yearly registration fee and unlimited utilisation of the response team to tackle spills both into the BOL and spills onshore. Year $17,500 3.2 Spill response equipment a Cranes Hour $1,500 b Forklifts Hour $500 c Portable lighting Hour $150 d Additional boom Hour $75 e Containment tank (4 m 3 ) Hour $275 f Water pressure pump Hour $75 3.3 Cleaning of the shore line and onshore spill locations a Excavator Hour $500 b Bobcat Hour $450 c Truck 12 m 3 Hour $650 d Tipper Hour $250 e Excavation Hour $100 f Clean up m 2 $50 g Overall (disposal off site) m 3 $45 h Shoreline back fill m 3 $100 i Onshore back fill m 3 $75 3.4 Decontamination of equipment a Equipment decontamination Pieces $450 3.5 Consumables a Consumable this includes but is not limited to chemicals, dispersants, mop-up pads, chemical suits, gloves etc. At cost (in USD) + 20% Continued on next page SONILS LDA - YOUR OIL AND GAS LOGISTICS PARTNER IN ANGOLA Page 26

HQSE SERVICES RATES S/N DESCRIPTION OF SERVICES UNIT RATE (USD) 4 Driving offences Speed limits for vehicles and equipment within the OSC 4.1 Speed limits for vehicles and equipment within the OSC as per Sonils Lda. General Rules and Regulations. Should any driver or operator be found in breach of these speed limits the following fees/fines shall apply: a First speeding offence Offence $50 b Second speeding offence Offence $100 c Third speeding offence Offence $200 NB After the third offence the driver or operator will be banned from driving within the OSC. Misuse of vehicle passes as set in the Sonils Lda. General Rules and Regulations 4.2 Should a vehicle be found with an incorrect, non-valid or a pass from a different vehicle the following fees/fines shall apply: If misuse is identified at the OSC main gate: a First misuse offence Offence $100 b Second misuse offence Offence $300 c Third misuse offence Offence $500 If misuse is identified during spot-checks within the OSC: a First misuse offence Offence $200 b Second misuse offence Offence $500 c Third misuse offence Offence $700 In all cases should misuse of the vehicle passes be found the pass will be confiscated. In case should vehicle be found misusing a vehicle pass three times then no further passes will be issued to that vehicle and the same will be denied to enter the OSC. 4.3 Driving on the wrong side of the road or driving without due care and attention Should a vehicle be found driving the wrong side of the road or driving without due care and attention the following fees/fines shall apply: a First offence Offence $130 b Second offence Offence $390 c Third offence Offence $500 Should a vehicle be found repeating the above offences more than three times then the vehicle and the driver shall be refused access into the OSC. Please note: 1) All rates are in USD. 2) An international standard spill response team and equipment are available within the OSC. This equipment and personnel are available 24 hrs a day 7 days a week and at this time are situated on the OSC quayside. * A Tier 1 spill is any spill up to a quantity of 250 barrels of oil. The response team is available to respond to Tier 1 water borne spills as well as shoreline and onshore spills. The response team can be made up of any of the following personnel and equipment depending on the response required: 3) Personnel available: Incident Commander Safety Officer Fire Fighting/Hazmat Supervisor Marine/Environ Supervisor Team Leader Operator Labour 4) Equipment available: Boom handling boat Boom support boat Brush skimmer system Portable temporary storage device Transfer pump Near shore containment boom (200FT) Communication system UHF/VHF/Phones. SONILS LDA - YOUR OIL AND GAS LOGISTICS PARTNER IN ANGOLA Page 27

IT SERVICES RATES SONILS LDA - YOUR OIL AND GAS LOGISTICS PARTNER IN ANGOLA Page 28

IT SERVICES RATES S/N DESCRIPTION OF SERVICES UNIT RATE (USD) 1 Configuration and maintenance of CISCO switches and routers a Configuration and maintenance of CISCO switches and routers Hour $120 b Support - professional technical support to the customer. To be discussed and agreed 2 Hardware / software a Hardware technical support - installation, configuration and repair of PC s. Hour $80 Monthly contracts from 01 to 20 PC s Month $2,000 Monthly contracts from 20 to 80 PC s Month $4,000 b Software technical support - installation and configuration of operating systems and applications. Hour $80 Monthly contracts from 01 to 20 PC s Month $2,000 Monthly contracts from 20 to 80 PC s Month $4,000 NB: The rates in (6) above do not include the supply of hardware or software. In addition, the SONILS IT department can provide a wide variety of services, including but not limited to: 3 Systems and IT consultants a IT strategy definition - presentation of an action plan that includes the customer s needs and that comes viable in terms of time, resources and budget. b Hardware and software recommendations - search, analyse, and evaluate, hardware and software acquisitions from different suppliers. c Documentation - design of manuals with text and graphs based on the system configurations, so that the user understands them. d Backup plans - design of database and systems backup. e Disaster recovery procedure - definition and explanation of procedures to be followed in case of disaster. The activities described in this strategy are related to applications, network systems and hardware. 4 Installation, configuration and maintenance of IT servers a Domain Controller the server responsible for the authentication of users in the domain. b Domain Name Server (DNS) the server responsible for the translation of alphabetical names in the domain into Internet Protocol (IP) addresses. c Dynamic Host Configuration Protocol (DHCP) the server responsible for the automatic distribution of IP addresses to all the machines connected to the domain, e.g. printers and PC s. d Exchange Server - the server responsible for sending, receiving and storage of e-mail. e Internet Security Acceleration Server (ISA) - the server responsible for sharing and managing internet use for all domain users; it has also a cache feature with the purpose of improving the downloading of web pages. f Structure Query Language Server (SQL) the database administration server. g System Management Server (SMS) - the server responsible for the administration and remote installation of software, updates, and design of inventories on the Microsoft platform. 5 Support to SAP system a Basis - installation and configuration of the SAP application and database. b Workflow - workflow configuration and support, configuration of SAP connectors to allow communication with the Microsoft Exchange Server. c ABAP customisation - customisation of SAP application according to the user s needs. 6 Other services a Web design - design of personalised web pages b E-mail services - mailbox hosting, spam and virus filtering c Photoshop d Corel Draw e Macromedia Flash For more information about the SONILS IT department e-mail sonils.helpdesk@sonils.co.ao or telephone +244 222 670 473. SONILS LDA - YOUR OIL AND GAS LOGISTICS PARTNER IN ANGOLA Page 29

WEIGHTS AND MEASUREMENTS CONVERSION TABLE Unit Multiply By To obtain Quantities to multiply Measurement to multiply Result after conversion obtained Measurement after conversion obtained 1 metre 3.28084 feet 1 metre 3.28084 feet 1 metre 39.3701 inches 1 metre 39.3701 inches 1 metre 1.09361 yards 1 metre 1.09361 yards 1 centimetre 0.032808 feet 1 centimetre 0.032808 feet 1 centimetre 0.393701 inches 1 centimetre 0.393701 inches 1 centimetre 0.010936 yards 1 centimetre 0.010936 yards 1 foot 0.3048 metres 1 foot 0.3048 metres 1 foot 30.48 centimetres 1 foot 30.48 centimetres 1 inch 0.0254 metres 1 inch 0.0254 metres 1 inch 2.54 centimetres 1 inch 2.54 centimetres 1 kg 2.20462 lbs 1 kg 2.20462 lbs 1 kg 0.001102 US tons 1 kg 0.001102 US tons 1 kg 0.000984 UK tons 1 kg 0.000984 UK tons 1 lb 0.453592 kgs 1 lb 0.453592 kgs 1 US ton 907.185 kgs 1 US ton 907.185 kgs 1 UK ton 1016.05 kgs 1 UK ton 1016.05 kgs 1 litre 0.2642 US gallons 1 litre 0.2642 US gallons 1 litre 0.22 UK gallons 1 litre 0.22 UK gallons 1 litre 0.001 m 3 /cbm 1 litre 0.001 m3/cbm 1 US gallon 3.785 litres 1 US gallon 3.785 litres 1 US gallon 0.8327 UK gallons 1 US gallon 0.8327 UK gallons 1 US gallon 0.003785 m 3 /cbm 1 US gallon 0.003785 m3/cbm 1 UK gallon 4.546 litres 1 UK gallon 4.546 litres 1 UK gallon 1.201 US gallons 1 UK gallon 1.201 US gallons 1 UK gallon 0.004546 m 3 /cbm 1 UK gallon 0.004546 m3/cbm 1 US barrel 42 US gallons 1 US barrel 42 US gallons 1 US barrel 158.97 litres 1 US barrel 158.97 litres 1 US barrel 0.15897 m 3 /cbm 1 US barrel 0.15897 m3/cbm 1000 litres 1 m 3 /cbm 1 litres 1 m3/cbm 1000 litres 264.2 US gallons 1 litres 264.2 US gallons 1000 litres 6.29 US barrels 1 litres 6.29 US barrels SONILS LDA - YOUR OIL AND GAS LOGISTICS PARTNER IN ANGOLA Page 30

SONANGOL INTEGRATED LOGISTIC SERVICES LDA SONILS LDA - YOUR OIL AND GAS LOGISTICS PARTNER IN ANGOLA SONILS LDA RUA 6 I.L. BOAVISTA LUANDA ANGOLA TEL +244 222 670400 FAX +244 222 310910 www.sonils.co.ao