Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

Similar documents
Cherokee Nation W.W. Keeler Second Story Addition and Remodel Tahlequah, Oklahoma WORK PACKAGE # 7B EIFS 3/25/15

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE # 5A Metal and Structural Steel 09/01/11

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE # 3A Cast-In-Place Concrete 08/29/11

Cherokee Nation W.W. Keeler Second Story Addition and Remodel Tahlequah, Oklahoma WORK PACKAGE # 4A Masonry 2/25/15

Cherokee Nation W.W. Keeler Second Story Addition and Remodel Tahlequah, Oklahoma. WORK PACKAGE # 23A Heating Ventilating and Air Conditioning 3/4/15

Cherokee Nation W.W. Keeler Second Story Addition and Remodel Tahlequah, Oklahoma. WORK PACKAGE # 8C Glass, Glazing, & Storefront

Cherokee Nation W.W. Keeler Second Story Addition and Remodel Tahlequah, Oklahoma. WORK PACKAGE # 26A Electrical 3/5/15

UNIVERSITY OF KENTUCKY Memorial Hall/College of Law Expansion and Renovation UK Project No

Scope of Work Bid Package C-4 - West Polished Concrete

Scope of Work Bid Package C-8 - West Overhead Doors

SECTION TEMPORARY FACILITIES AND CONTROLS

Cherokee Nation W.W. Keeler Second Story Addition and Remodel Tahlequah, Oklahoma. WORK PACKAGE # 9A Drywall and Ceilings 3/3/15

ADDENDUM NO Refer to Specifications Section Alternates. Clarifications to alternate descriptions are as follows:

MIRACOSTA COLLEGE. [X] MiraCosta College Bid Opportunities Website /FAX

Cherokee Casino - Catoosa IAQ Project

Texas Tech University Health Sciences Campus - MSBII Supplemental Bid Instructions March 3, 2017

C. Type of Selective Demolition Work: Demolition requires the selective removal and subsequent off-site disposal of:

REQUEST FOR TENDER - SERVICES RFT HOUSE DEMOLITION 7958 BEAVERDAMS RD., NIAGARA FALLS, ON.

Section Safety Section Cleanup. None Required

Scope of Work Bid Package C-1 West Site Utilities & Earthwork

Evanston Avidor Construction Site Management Plan AVIDOR EVANSTON APARTMENT BUILDING Oak Avenue. Evanston, IL 60201

The University of Alabama General Requirements for Purchase Orders Involving Public Works

SECTION GENERAL REQUIREMENTS

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Construction Guidelines

McPherson Contractors, Inc.

Project Manual Index of Specifications Shenandoah Schools Concession Building

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

STATE OF NEW JERSEY DEPARTMENT OF ENVIRONMENTAL PROTECTION DIVISION OF COASTAL ENGINEERING

2016 CDM Smith All Rights Reserved July 2016 SECTION MULTIPLE CONTRACT SUMMARY

Scope of Work Bid Package C-6 West Metal Panels

~lamance <tount!' 9'~UUJ ;i)epwdment 124 We6t ElmStltm (j,taluun,.ncjjdli &vwfina 27253!Jefepfwae(336) :Jax(336)

WORK AND PROJECT REQUIREMENTS

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

SECTION 2 DIVISION 01C DESIGN SERVICES PROJECT GUIDELINES (INFORMAL)

Dick s Sporting Goods Demolition Package

BIDDING SHEET CHECKLIST--SUBCONTRACTORS AND SUPPLIERS SUBCONTRACTOR/ PHONE DATES SUPPLIER NAME: CALLED BID. Sample

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

CITY OF TACOMA Department of Public Utilities Tacoma Power

University of Akron. Addendum No. 2. For. Zook Hall Renovation Phase 2A Abatement & Demolition Project #: UAK120015

EXHIBIT B TO AGREEMENT BETWEEN PENSACOLA HABITAT FOR HUMANITY AND SUBCONTRACTOR. Scope of Work. Plumbing. Division 055 Plumbing Rough

PRIVATE PLAN ROOM. Document Information Sheet

BABIES "R" US- TOYS R US

END OF SECTION SECTION FINAL CLEANING PART 1 - GENERAL 1.1 REQUIREMENTS INCLUDE

Scope of Work Bid Package C-3 - West Precast Concrete

EXHIBIT E GENERAL REQUIREMENTS Revised: 10/17/17

SECTION BID PROPOSAL FORM. Telephone NO: ( ) Facsimile NO: ( ) Oklahoma License NO:

DIVISION 02 SELECTIVE DEMOLITION

EXHIBIT II SCOPE OF CONTRACTOR'S SERVICES

TABLE OF CONTENTS VOLUME 1. DIVISION 00 - INTRODUCTORY INFORMATION, BIDDING REQUIREMENTS, CONTRACT FORMS & CONDITIONS OF THE CONTRACT Pages

Tracy Lo Terrell Place th Street NW Washington DC November 4, 2002 Construction Management

Construction Summary

1. Before selective demolition, Owner will remove the following items:

ENGINEERING DIVISION CONCURRENT PLAN CHECK PROGRAM

Water Pollution Control for Work in Sensitive Areas

ADDENDUM #1 TO THE SPECIFICATION FOR THE CONSTRUCTION OF THE 115KV STONEBREAK RD. TRANSITION STATION THE TOWN OF MALTA AND A PORTION OF THE 115KV

REQUEST FOR PROPOSALS Garfield Charter Township Hall Sidewalk Snowmelt Heating System Repairs Garfield Township, Grand Traverse County

June 12, 2017 Addendum #6 RFP # Modular Relocation & Site Development

DIVISION 1 - GENERAL REQUIREMENTS SECTION SUMMARY OF WORK

SECTION TRAFFIC REGULATIONS

DIVISION 2- EXISTING CONDITIONS

NEW CONSTRUCTION APPLICATION

STATE UNIVERSITY CONSTRUCTION FUND

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

Request for Proposal

RIVERSIDE CHURCH OF CHRIST. Lafayette, LA

PAULDING COLLEGE & CAREER ACADEMY

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS

TECHNICAL QUESTIONS FOR ITB-DOT-17/ LV DEMOLITION AND CONSTRUCTION OF DISTRICT SEVEN OFFICE SPACE

A. IEMA ten day notification for demolition provisions as necessary. C. IEPA Uncontaminated Soil Certification LPC 663

SECTION CONSTRUCTION OPERATIONS AND SITE UTILIZATION PLAN

DIVISION OF PLAN REVIEW & PERMITTING UTILITY PERMIT SPECIFICATIONS AND PERMIT APPLICATION

B ADDENDUM # 1

ASPHALT CONCRETE COLD PLANING THROUGH DECEMBER 2017

1. Complete Building Permit Application forms on page 2. Include septic system design approval from the Washington County Health Department.

Richmond Hill Primary Renovation SECTION SELECTIVE DEMOLITION

STATE UNIVERSITY CONSTRUCTION FUND

Tech Assignment 1 University Medical Center of Princeton. Plainsboro Road, Township of Plainsboro, New Jersey

Robinson Landing: Townhouse Pre-Construction Presentation January 9, 2018

SAMPLE WORK PLAN. 2. Execute subcontractor agreements and gather forms and documentation required from each sub

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

Minimum Standards for Construction of Aircraft Hangars MINIMUM STANDARDS FOR CONSTRUCTION OF AIRCRAFT HANGARS

Thomas Connors Executive Director, Construction Site Safety

SPECIAL SPECIFICATION 6666 Charter Communications System

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.

ADDENDUM NO. 2 Consisting of 3 pages and Attachments

Superintendent Job Description:

EXHIBIT A - INSTRUCTIONS TO BIDDERS

is to include all work necessary to complete the Bid Package Scope

ADDENDUM NO. 1. TO SCOPE OF WORK: Section 0220, Form 01004/5

T H E T O W N O F G U I L F O R D V E R M O N T

PUBLIC WORKS COMMISSION 2018 STREET EXCAVATION PERMIT PROCEDURE

ADDENDUM #1. February 2, 2018

SECTION PAYMENT PROCEDURES

SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL. A. This Section includes administrative and procedural requirements for the following:

APPENDIX 1 PROJECT REQUIREMENTS

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington

Job Order Sewer Repair Services

SECTION 23 DEMOLITION

Transcription:

SCOPE SUMMARY: DIVISION: 0 - LEGAL DOCUMENTS Complete; DIVISION: 1 - GENERAL REQUIREMENTS As Applicable; SECTION: - ATTACHED SKETCH Complete; Geotechnical Engineering Report as prepared by Building and Earth, dated May 25, 2011. In the event of a conflict or ambiguity between the following clarifications to the scope of Work and the contract documents, the contract documents shall control. The following Scope Clarifications are intended to emphasize, amplify, and clarify the work of this package, and do not supersede contract documents or in any way list every item of work required by contract documents for this work package. Terminology Contractor shall mean work package Bidder Construction Manager (CM) shall mean RM Builders GENERAL SCOPE OF WORK INCLUSIONS: Includes, but is not limited to, providing all the necessary labor, materials, tools, supplies, supervision, insurance, equipment, scaffolding, hoisting, fees, etc. necessary to provide Demolition and Dismantling for the Cherokee Nation located at Highway 75 and approximately ¼ mile south of E0310 Road, Ramona, OK in accordance with the Contract Documents. It is further understood and agreed that this Work Package also includes the furnishing and installation of the below listed items regardless of whether or not they are in the listed specification section(s) or any other specification section(s), or shown on drawings. Drawing and detail references are provided for reference only and are not to be considered as all inclusive of Contract Documents for particular items referenced. (Please note: The word provide when used herein shall mean furnish and install completely, including all costs for labor, materials, equipment, hoisting, layout, scaffolding, ladders, staging, tools, rigging and any other facilities necessary to complete the work.) BID PACKAGE SCOPE ITEMS: 1. One week notice will be given to the owner when the area is demolished and ready to move modular units. 2. Cut wood fencing into sections, and load onto trailer provided by others for removal. 3. Demolish vertical steel supports at wood fencing and load onto trailer provided by others. 4. Demolish and dispose of all curbs, sidewalks, and concrete inside the existing 5. Demolish and dispose of EFIS material on modular units. 6. Demolish and dispose of the entry stairs, entry ramps, and entry canopy structures. 7. Demolish and dispose of all interior partitions except for area stated in Scope of Work Exclusions, and as noted on attached sketch. 8. Demolish all interior and exterior canopy ceilings, all interior and exterior duct work (including duct work on ceiling). Existing HVAC units will be disconnected and removed by others. All openings caused by removal of any penetration in roof are to be patched and repaired by this subcontractor. 9. Units will have electrical service disconnected by others; this package will be responsible for all electrical demolition and removal. 10. Demolish and remove all under floor cable and electrical ducting and dispose of. 00450 - BID PACKAGE 1

11. Demolish and remove all existing plumbing and service lines. Water and plumbing service will be disconnected by others. 12. Remove and place on trailer provided by others all light fixtures, doors, and hardware. 13. Demolish and dispose of exterior walls at the (2) mods at far north end existing casino area. Reference attached sketch dated. 14. Demolish and dispose of restrooms and IDF closet in (2) mods on north end of the existing casino structure. Reference attached sketch. 15. Remove duct work at (2) mods on north end of the existing casino structure, and re install factory HVAC units to wall. Wall may require some additional patching. Reference attached sketch dated. 16. Once (2) modular trailers are removed on north end of existing casino structure, area will need to be backfilled to match surrounding sub grade. 17. This work package is to provide all required dumpsters for this scope of work. 18. Cleanup of any dirt or debris caused by this contractor from any paved surface or walk or building walls. Contractor to ensure that truck entering and leaving the jobsite do not soil any public roadways. 19. Provide all street/sidewalk/parking lane blocking and closures necessary including providing all safety requirements, traffic and pedestrian control, (i.e. signage, barricades, flashers, etc.), traffic covers, flagmen and flagging, etc. as required for prosecution and completion of Contractor s work. 20. Locate, mark, and protect all existing utilities indicated to remain. 21. Contractor shall be responsible for all required daily clean-up, protection and restoration of all public and private property during the performance of Contractor s work. Restore areas as indicated per documents and/or in accordance with jurisdictional requirements immediately following completion of the work. 22. In accordance with local jurisdictions and to the satisfaction of the CM, provide on a regular base all required street cleaning during the course of operation of this scope of work. Clean streets as required such that roadways remain clean at all times. Provide street sweeper as needed. 23. Open excavations shall be barricaded, protected, and provided approved railing at all times as required by CM. GENERAL SCOPE ITEMS: 24. Authorized Contractor supervision must be onsite while work is being performed. 25. Coordinate all work with the CM to avoid any delay or interference with other work. 26. Attend weekly on-site Foreman/Safety meetings conducted by the CM. 27. Comply with all CM Safety Policies and Insurance requirements. 28. Submit daily while on site, a Daily Project Report to the CM s on-site superintendent. 29. Contractor shall submit to the CM an emergency contact list. 30. Contractor shall include daily cleanup of construction debris created by work scope including depositing into trash dumpsters. Trash Dumpster(s), dump service, and cost thereof shall be provided by this subcontractor. Additionally, Contractor agrees that no hazardous substances will be discharged or deposited in any project dumpster, on the ground or other surface, or into any drainage system. All costs for lawful off-site disposal and any necessary reclamation resulting from this Contractor s operations are the responsibility of this Contractor. 31. Provide coordination, assistance, and necessary access for the Owner s furnished Testing Laboratory, including notification, obtaining samples and data gathering as required for scope of work. Costs for retesting due to failed tests and/or for Contractor s unpreparedness, will be paid by this Contractor. 32. Provide manpower and equipment mobilizations and remobilizations as required for the work of this agreement in accordance with project schedule including phasing and interim milestone dates. 33. Contractor agrees to expedite material deliveries and to supply adequate manpower and resources to complete work for all areas in accordance with CM s master schedule including all individual and/or phased area milestone completion dates, in order to meet the Owners completion and equipment installation dates. 00450 - BID PACKAGE 2

If inadequate progress by Contractor is evident, CM may direct Contractor to take immediate measures at no additional cost to CM or the Owner. Contractor further agrees to cooperate and work harmoniously with all trades to achieve required completion dates and to coordinate the work to avoid compression (to the extent possible) for the benefit of all trades. Provide to the CM each week, a two (2) week look-ahead schedule identifying anticipated work activities. 38. Provide all flagmen where required to position the truck for unloading and to control traffic during truck positioning. Provide barricades required for workers, pedestrians, and traffic control for material deliveries. All deliveries are to be coordinated through the CM may be restricted to nights or weekends to avoid traffic or schedule activity disruptions. All deliveries must be sized to fit within the designated construction entrances. 39. Furnish, install, and remove any temporary protection required to protect existing, all improvements, work of other trades and/or building finishes from damage from material deliveries or work activities of this Contractor. This also includes protection and proper storage of materials for this scope of work. 40. Contractor shall be responsible for all existing public and private property clean-up, protection and restoration if damaged from Contractor s work. Restore areas as indicated per documents and/or in accordance with jurisdictional requirements immediately following completion of the work. 41. Provide all hoisting, material transportation, dunnage, rigging, loading, unloading, protection thereof, etc. as required for the work of this contract. 42. In addition to other safety requirements required elsewhere in this work package, this Contractor shall replace or restore any removed safety rails, guards, fences, and protection temporarily removed or damaged by the work of this contract. 43. Contractor is responsible for all applicable sales and use taxes. 44. Provide in compliance with all rules and regulations, all coordination, obtaining, and payment for all permits, licenses, testing, inspections, approvals, certifications, etc. as may be required for work of this contract. Further, Contractor is responsible to provide all street/sidewalk/parking lane blocking and closures necessary for all applicable work including providing all safety requirements, traffic and pedestrian control, (i.e. signage, barricades, flashers, etc.), traffic covers, flagmen and flagging, etc. as required for prosecution and completion of Contractor s work. 45. Coordinate and conduct work to ensure minimum interference with vehicular or pedestrian traffic and to allow unencumbered access to site and adjacent properties. 46. All work adjacent or near existing buildings, drives, streets, sidewalks, etc. must be pre-scheduled in advance a minimum of 14 working days through CM (or longer if so specified or required by governing authorities). 47. Any shutdown of services to Cherokee Nation Entertainment requires a 30 day notice. 48. Provide as applicable to work scope, all factory or field testing of work and systems including test & startup, commissioning, Owner training, record drawings, O&M manuals, independent test & balance, etc., as specified. All close-out information is to be submitted as one package. 49. Schedule of Values and applications for payment shall be broken down as required by the Owner and/or the CM. 50. Contractor s, lower tier Subcontractor s and Supplier s lien releases must be received monthly prior to processing for the following month s application for payment. 51. Costs for bonds shall be provided (separately stated) with your proposal. Additionally, provide cost of bonds for any applicable alternates or unit prices. All bidders with contracts greater than $100,000 must be bondable. 52. The terms and conditions contained in the following documents, including General Provisions Article 2.5, Indemnification, are incorporated herein by reference as if fully written out (Copies are available from the CM upon request); CM General Provisions for Subcontracts Exhibit B Subcontract Performance and Payment bonds 00450 - BID PACKAGE 3

Exhibit C Contractors Minimum Insurance Requirements Exhibit D of Subcontract. Exhibit F Preliminary Schedule, SCOPE OF WORK EXCLUSIONS: 1. Any demolition outside of the footprint of the existing casino. 2. Demolition of fire riser room, women s restroom, men s restroom, janitor s closet, employee break room. 3. Removal of any carpet. 4. Disconnect and removal of HVAC units. 5. Disconnect the electrical service. 6. Disconnect the plumbing/sanitary service. 00450 - BID PACKAGE 4

ISSUED Demolish fence and vertical steel supports in sections at all areas and place on trailer provided by others. Provide separate cost for this area. Demo stairs and ramps only. All other demolition and removal will be provided by others. Demolish fence and vertical steel supports in sections at all areas and place on trailer provided by others. RED SHADED KITCHEN AREA EQUIPMENT TO BE REMOVED BY OWNER. ALL OTHER STRUCTURES, CURBS, FENCING TO BE DEMOLISHED AND REMOVED. HVAC Unit DEMOLISH DEMO SAVE. NO DEMOLITION THIS AREA. ALSO SAVE FIRE RISER ROOM IN THIS AREA. HVAC Unit DEMO DEMOLISH EXTERIOR WALLS AT THESE TWO MODULAR UNITS ONCE THESE TWO UNITS ARE REMOVED, AREA WILL NEED BACKFILLED TO MATCH SURROUNDING SUBGRADE. ***LEAVE CARPET EVERYWHERE ***DEMO ALL CEILINGS ***DEMO ALL DUCTWORK INTERIOR AND EXTERIOR ***ALL PENETRATIONS IN ROOF WILL NEED PATCHED AND REPAIRED.