Project Goals and Scoping

Similar documents
South St. Vrain / Hall Meadows Restoration Planning August 20, 2015

Colorado Water Conservation Board Flood Recovery Update

Request for Proposal Scope Development Guide. Asotin County Geomorphic Assessment. and. Conceptual Restoration Plan

Beaver Creek Hydrology, LLC. Franklin, Tennessee

IMPROVING OUTCOMES FOR STREAM ALTERATION PROJECTS

Environment and Natural Resources Trust Fund 2015 Request for Proposals (RFP)

2.4 Floodplain Restoration Principles

Mountain States Chapter International Erosion Control Association Conference

Fires and Flash Flooding Federal Lands/Local Impact Waldo Canyon Fire Recovery Update: September Fall 2013

Parks and Open Space 5201 St. Vrain Road Longmont, Colorado Fax:

Meacham Creek Restoration Project

4. Present Activities and Roles

May 15, Lower Squaw Creek Restoration Public Workshop. for The Friends of Squaw Creek Truckee River Watershed Council Sierra Nevada Conservancy

Bylaw , being "Official Community Plan Bylaw, 2016" Schedule "A" 5Improve. Natural + Built Systems

REPLACING CULVERTS FOR FLOOD RESILIENCY AND AQUATIC CONNECTIVITY. Cheryl Bondi and Lori Sommer NHDES Aquatic Resource Mitigation Program

BASIC PRINCIPLES AND MANAGEMENT GUIDELINES

Bridging the Gap to Resilience Western Bridge Preservation Partnership Denver, CO May 23, 2017

A collaborative strategy for optimizing management of the river corridor. Wednesday, June 2, 2010

Drainage Criteria Manual Review

Municipal Class Environmental Assessment for Pottersburg Creek Slope Stability Study South of Hamilton Road, Schedule B

Prioritizing Local Action. Strengthening the Resilience of the Taunton River Watershed

STREAM RESTORATION PURPOSE, PRACTICE, AND METHODS. By Marcus Rubenstein, CPESC

IAFSM 2010 Annual Conference. City of Rockford Keith Creek Greenway Flood Mitigation Project

APPENDIX H JOINT PUBLIC NOTICE

How Much Habitat Is Enough? How Much Disturbance is Too Much?

Funding Guidelines State Fiscal Year 2016

Support legislation that will protect the quantity of water in Lake Erie

Scoping Study for Upper Petaluma River Watershed Flood Control Project. Frequently Asked Questions

Local Flood Hazard Mitigation Program. A framework for hazard mitigation in the NYC West of Hudson Water Supply Watersheds

RIPARIAN CORRIDOR STUDY FINAL PARLEYS CREEK MANAGEMENT PLAN TABLE OF CONTENTS

Background. AEM Tier 2 Worksheet Stream & Floodplain Management. Glossary

Sustainable Post Disaster Recovery

Post-Fire BAER Assessment Burned Area Emergency Response (BAER)

Watershed Hydrology: Go with the flow. Greg Jennings, PhD, PE

Restoration of Riparian Forests and Riparian Ecosystem Processes and Implications for Salmon Restoration. Katie Ross-Smith Jennifer Hammond

DEVELOPING A WATERSHED IMPROVEMENT PLAN TO MEET MULTIPLE COMMUNITY OBJECTIVES IN GAINESVILLE AND HALL COUNTY, GEORGIA

Don t Mow. Let it Grow!

The F.O.R.C.E. The Future Of Redwood Creek Environment

No Adverse Impact Floodplain Management

RIPARIAN CORRIDOR STUDY FINAL CITY CREEK MANAGEMENT PLAN TABLE OF CONTENTS

7.0 WATER-BASED CONTROL MEASURES

Primer introduction to watershed management Plan Process highlight the major steps of plan development Project types look at some examples of common

Section 6: Stormwater Improvements

COASTAL CONSERVANCY. Staff Recommendation March 25, 2004 NCCP PROGRAM IMPLEMENTATION: SAN DIEGO RIVER CALMAT PROPERTY PHASE 2

Climate Smart Resiliency Plans, Policies, and Projects Improvement Plan for: The Town of Caroline

Chapter 4 Watershed Goals and Objectives

Stinson Beach Watershed Program

Waldo Canyon Fire Post-Fire Flash Flood Recovery. Fall Sallie Clark Former County Commissioner El Paso County, CO

Chehalis Basin Strategy Programmatic SEPA Draft EIS

Toronto and Region Conservation 2017 Progress & 2018 Budget Peel Council

HYDROLOGY, WATER USE, AND INFRASTRUCTURE

Chapter 5: Water Quality Buffer Requirements

Narragansett Bay and Watershed Restoration Bond Fund

CATEGORY a protection of the natural environment, its ecosystems and biodiversity.

ANCR INDIVIDUAL RESPONSES SUMMARY: 2/11/04 WATER RESOURCES GOALS AND OBJECTIVES

MONTEREY PENINSULA WATER MANAGEMENT DISTRICT PROJECT DESCRIPTION FOR SELECTIVE VEGETATION MANAGEMENT AND BANK RESTORATION (RANCHO SAN CARLOS AREA)

RE: Recommendations for Staged Implementation of Alternative 3a

The Beckett s Run Experience. Fort Wayne, Indiana

Thief River One Watershed One Plan Prioritization Matrix Prioritization of Issues

Chapter 5. Natural Features. Environmental Management Mode Land Resources Water Resources Air Quality Preparing for Climate Change

BMP 5.4.2: Protect /Conserve/Enhance Riparian Areas

Bluff Creek One Water

COON CREEK WATERSHED DISTRICT PERMIT REVIEW

Wood-Pawcatuck Watershed Flood Resiliency Management Plan

US ARMY CORPS OF ENGINEERS ACTIONS DURING 2016 TEXAS SPRING FLOOD

GETTING STARTED: LEVERAGING FUNDING SOURCES TO CREATE OPPORTUNITIES KAMM CONFERENCE August 24, 2016 Presented By: Sarah Taylor

A Freshwater Blueprint for Maritime Canada

Management Objectives and Targets

DECISION MEMO. West Fork Blacktail Deer Creek Hardened Crossing

Public Notice ISSUED: 5/6/2014 EXPIRES: 6/5/2014

City of Fairmont Storm Water Pollution Prevention Plan Annual Public Meeting. June 11, 2018

CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND RESTORATION PLAN - UPDATE. Update to Chesapeake Bay Program STAR January 25, 2018

STAFF REPORT FOR POLICY PLAN AMENDMENT S10-CW-1CP

Riparian Buffer Restoration Fund. Gregg J. Cassidy RI DEM, Sustainable Watersheds Office

Reclaiming Seiad Creek Part 1

C. Staffing Needs Approximately 150 staff days TSA #3 staff time will also be utilized.

Juncrock Timber Sale Draft Environmental Impact Statement. Appendix G Soils

NRCS Programs and Practices for Riparian Areas in Hawaii

Small Project Proposal

DECISION MEMO FOR CATEGORICAL EXCLUSION HOLY JIM CREEK CROSSING REPLACEMENT

Restoring Ecological & Geomorphic Function on the Heartrock Ranch

Warren Wagon Road Improvement Project McCall Ranger District, Payette National Forest Project Description

Environmental Assessment

Spatially prioritizing fuel treatments to manage wildfire risks to municipal watersheds

Technical, Political, and Environmental Requirements of Transbasin Diversions

Downtown Estes Loop Project Frequently Asked Questions

Meacham Creek Fish Habitat Enhancement: Application of the CTUIR River Vision

Town of Aurora Stream Management Master Plan PUBLIC INFORMATION CENTRE May 1 st, 2018

Public Information Centre September 19 th, 2017

Chapter 10 Natural Environment

Small Project Proposal

INDIAN CREEK WATERSHED PLAN EXECUTIVE SUMMARY

PROJECT SCREENING MATRIX: A User s Guide

Stream Corridor Stewardship & Management Planning

Ingram Gulch Drainage 30% Design Report

Appendix B Stormwater Site Plan Submittal Requirements Checklist

Get the Rock Out: Engineered wood structures for stream restoration. Joe Berg, Doug Streaker, Matt Koozer and Kevin Nunnery Biohabitats, Inc.

Water Quality Stewardship Plan (WaQSP)

Flood Mitigation Plan

Transcription:

Prepared for: Boulder County, Colorado Flood Planning & Preliminary Design Services for South St. Vrain Creek Restoration at Hall Ranch and Scoping May 24, 2016 Meeting with General Public In association with: Otak, THK, ERO, and Blue Mountain

Introduction Purpose of meeting History of project Planning area Project sponsors and funding 30% design and construction Project website Information and comment www.bouldercountyopenspace.org/ssv

St. Vrain Creek Watershed Tier 1 - Projects reducing flood risk due to postflood conditions The purpose of this alternative is to implement a channel alignment that will optimize the interaction with completed, ongoing, and funded projects while being sensitive to the constraints presented by the presence of numerous private residences throughout this river corridor. The implementation of this alternative will expedite the maturation of this reach by re-establishing a natural channel, repairing erosion scars, reestablishing floodplain benches, building pointbars and excavating pools, re-vegetating denuded areas, and stabilizing channel banks. (p. 7-18)

St. Vrain Creek Watershed The also calls out the following restoration strategies for this reach (p. 7-23 to 7-25): Incorporate/stabilize a low flow channel section with lower width-to-depth ratio Increase in-stream habitat complexity by incorporating pools, boulders, rock clusters, and LWD (large woody debris) Revegetate riparian corridor with native species where needed However, the also states more detailed technical analysis and site specific survey and topographic information will further refine/revise the conceptual improvements reflected (in the ) (p. 7-23 to 7-25).

Funding Community Development Block Grant Disaster Recovery Planning Grant Grant = $295,000 Planning, surveys, engineering, public engagement, and up to 30% design for creek restoration Emergency Watershed Protection Program Eligible Projects 30% design complete by September 1, 2016 Construction ready by January 1, 2017 SSV 1 & SSV 2 = $1.6 million

Funding Spring 2016 Summer 2016 Planning and 30% Design* (CDBG-DR) Permitting & Environmental Clearance 100% Stream Design, as necessary Bidding & Contracting Implementation (EWP) - 220 days * Including Coalition and public engagement Fall 2016 Winter 2016 Spring 2017 Summer 2017 Fall 2017 Winter 2017

Matrix Fully integrated consulting firm Leaders in H&H analysis along with flood recovery Otak History of work in South St. Vrain Creek Watershed Leaders in resilient flood recovery solutions THK Native revegetation and riparian corridor restoration Leaders in public engagement and consensusbuilding

Design schedule Notice to proceed: May 2016 Alternative analysis: June 2016 Preferred alternative: July 2016 30% design: August 2016 Final deliverable: September 2016 Public engagement meetings General public and St. Vrain coalition: Meetings in late May, June, and August

Pre Flood Aerial: 2012

Post Flood Aerial: 2013

Post Flood Aerial: 2014

Post Flood Aerial: 2015

Pre Flood Aerial: 2012

Post Flood Aerial: 2013

Post Flood Aerial: 2014

Post Flood Aerial: 2015

Pre Flood Aerial: 2012

Post Flood Aerial: 2013

Post Flood Aerial: 2014

Post Flood Aerial: 2015

General Reduce impact of future flooding Provide public safety Protect private and public infrastructure Re-establish floodplain connectivity Restore creek and surrounding areas

Execution Strategies Jumpstart return to healthy corridor: Reconnect floodplains Expedite maturation of native plant associations Restore aquatic and riparian health Risk reduction: Reduce impact of future flooding Protect private and public infrastructure Improve public safety : Neighbors and other stakeholders Boulder County

Execution Strategies - Jumpstart return to healthy corridor / Risk reduction: Review of Background/Existing Information Channel Forming Hydrology Channel Hydraulics Geomorphology Sediment Transport Aquatic and Terrestrial Habitat Permitting Process

Execution Strategies - Decision process: Review established project goals Community input to I.D. project issues Develop evaluation criteria Develop alternatives Community input on alternatives Alternatives analysis with evaluation criteria I.D. preferred alternative Community input on preferred alternative Refine preferred alternative with additional technical analysis 30% design Public presentation

General Reduce impact of future flooding Provide public safety Protect private and public infrastructure Re-establish floodplain connectivity Restore creek and surrounding areas

Figure A Monument Creek Watershed Restoration Decision Making Process Context Statement Core Values Critical Issues from Stakeholders Evaluation Criteria The Monument Creek Watershed includes 236.8 square miles of forest and upland grass lands. The mountains meet the plans within the watershed which is why the United States Air Force Academy is located at the center of the watershed. The watershed is predominantly north of Colorado Springs and includes the communities of Monument and Palmer Lake. With a diversity of public and private ownerships, the watershed is a major regional tourist and recreation destination as well as home for a large percentage of El Paso County and Colorado Springs residents. The watershed is characterized by extremes in temperature and precipitation, large elevation changes, steep gradients and diverse ecosystems rich with plant life and wildlife. The recent summer of 2013 floods, coupled with the 2012 Waldo Canyon fire and the 2013 Black Forest fire, have resulted in considerable transport of sediment and debris. The floods altered the creek bed, banks, floodplains and structures and have led to extensive flood damage including property and infrastructure damage, erosion and sedimentation that resulted in a net loss of flood capacity. To identify strategies that will mitigate the effects of fire damage and flood damage in the watershed, a holistic restoration planning effort will provide effective and lasting protection of at risk assets, as well as the health, safety and welfare of the public. Safety Resiliency Constructability/Costs Environment Community Concern About Potential Forest Fires Concern About Potential Flooding 1. Reduces flood risk to the public and residents by providing long term solutions Public Health that increase resiliency? Actions in the Upper Watershed Effecting the Lower 2. Transfers risks or creates impacts downstream to infrastructure, channel and Watershed storm water system? Emergency Access 3. Number of people protected? Reduce Future Flood Damage Risk Provide Smarter Infrastructure Solutions Improve Creek Stability Risk to Critical Infrastructure 4. Physical area of watershed mitigated? 5. Critical Infrastructure at risk? Find Funding for Future Implementation 6. Creates infrastructure investments that are reasonable to construct and provides Fiscally Responsible Costs the best value for their lifecycle, function and purpose? Regional criteria, implementation and enforcement 7. Meets industry and local design standards? Long-term maintenance funding needed 8. Minimizes the effort required to maintain and repair the options? Minimize Maintenance Requirements and Costs 9. Compatible with forest fire mitigation? The impact of T&E species on constructability Reduce Future Sediment Loading and Hydrological Impacts to the Creek Due to 2012 and 2013 forest fires Reduce Sedimentation in General Improve Water Quality Including Turbidity, E. Coli and Debris Improve Wildlife Habitat (banking opportunities) Increase Channel Capacity to Accommodate future flooding Increase Storm Water Discharge Due to Development Work With Natural Systems Consistency with MS-4 requirements Presence of Endangered Species Introduction of new flow to the creek/volume change Detention ponds built to out dated design criteria Protect Infrastructure, Tourism and the Economy 10. Protects the habitat, water quality and geomorphology of Monument Creek? 11 Incorporates locally available materials and environmentally friendly processes? 12. Quantity of sediment reduced? 13. Consistent with MS-4 requirements? Concern About Increased Flood Insurance Costs Consider Greenway and Open Space Opportunities Communication with the Residents 14. Provides access and protects opportunities for enhancements to tourist destinations, Are the Historic CCC Structures of Value or a Risk to community facilities, features and neighborhoods? Future Flooding 15. Provides funding, partnering and collaboration opportunities by meeting multiple Need for better Flood Monitoring objectives? Collaboration Between Agencies and Communities 16. Can be supported by current land use regulations or revised land use regulations? Land Use Regulations and Management 17. Impacts to water rights? Impact on aesthetics (historical element of USAFA) Development Impact Economic injustice Impact to historic features Schedule Prioritize Strategies as Critical, Necessary or Desired

Decision Matrix Monument Creek Watershed Restoration Decision Matrix Draft 04/20/16 ID Criteria Evaluation Criteria Reduces flood risk to the public and residents by 1 providing long term solutions that increase resiliency? Avoids transfer of risks that create impacts 2 downstream to infrastructure, channel and storm water systems? 3 Number of people protected? 4 Physical area of watershed mitigated? 5 Critical Infrastructure at risk? 6 7 8 Creates infrastructure investments that are reasonable to construct and provides the best value for their lifecycle, function and purpose? Meets or exceeds industry and local design standards? Minimizes the effort required to maintain and repair the options? Figure B Created utilizing the criteria identified in the Decision Making Flow Chat and a Fair/Better/Best ranking system Options Ranking Project A Project B Project C Fair Better Best 9 Compatible with forest fire mitigation? 10 11 Protects or improves the habitat, water quality and geomorphology of Monument Creek? Incorporates locally available materials and environmentally friendly processes? 12 Quantity of sediment reduced? 13 Consistent with MS-4 requirements? 14 15 16 17 Does it meet CWCB criteria for multi-objectives program elements? Provides access, connectivity and protects opportunities for enhancements to tourist destinations, community facilities, features and neighborhoods? Provides funding, partnering and collaboration opportunities by meeting multiple stakeholder objectives? Can be supported by current land use regulations or revised land use regulations?

Overall creek design Debris Andesite quarry Private residences along corridor Hall meadows / Split flow Longmont diversion Old South St Vrain Road bridge Ditches Additional Issues??

What s Next? Compilation of issue comments Develop evaluation criteria Develop alternatives Schedule next public meeting Post project up-dates to website