Questionnaire in preparation for an audit according to IRIS (International Railway Industry Standard)

Similar documents
Questionnaire for preparation for an audit according to automotive standards

EXCELLENCE IN RAILWAY & MINING ENGINEERING

Annex. - new vehicles for which a joint uniform procedure has to be carried out in the countries mentioned above and

MTA Metro-North Railroad. Operations Division. Annual Report on Fleet Maintenance 2011

EXHIBITOR APPLICATION FORM

Guidelines. Approval of rolling stock

Supplier self-information

BHARAT HEAVY ELECTRICALS LIMITED, Jhansi

SWEDISH TRANSPORT AGENCY Railway Department. Approval TS JV 2009: Doc. No.: Version: Date: Approval Guidelines

Assurance provided by a second pair eyes (RASBO) of the correct Safe integration by the proposer of a new or modified Rolling Stock

Boise State University. Request for Quote RFQ CF passenger 4x4 Utility Vehicle with Snow/Debris Brush

Please complete the questionnaire and fax it to

SHIFT²RAIL Stakeholder meeting Innovations Programs - IP4 & IP5

Design Guidelines October 2016: Issue 3. Section 15 Lifts.

Data Recorders on Trains Design Requirements

Israel Railways Ltd. Procurement & Contracting Division

Keeping the World Flowing. Rail Industry Solutions

Permit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE

Catalogue of examples

Rolling Stock Interface Requirements with Other Systems. Presented by: Michael Weiss, P. Eng.

Permit Application Commercial / Industrial / Mutli-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE (Form #2)

MOBILE SUBSTATIONS TRAILER AND SKID. tgood.com. Energy, Fast!

MEASURING RAILWAY VEHICLES AND COMPONENTS

Product group classification InnoTrans 2018

TELESTE RAIL SMART, SAFE AND SMOOTH FUTURE

DESIGN DEVELOPMENT REVIEW PACKAGE CHECKLIST

EMIRATES AUTHORITY FOR STANDARDIZATION AND METROLOGY. UAE Scheme for Automotive spare parts

TABLE OF CONTENTS Public Safety Building

Permit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE

Ganz Mavag Prototype Refurbishment

TENDER No for the Supply and Maintenance of Electric Multiple Units. Volume B. Technical Specifications

Acoustics Management Predictions Measurements Analysis. Rail vehicle acoustics. Know-how and experience in vibro-acoustics.

Schedule of Accreditation issued by United Kingdom Accreditation Service 2 Pine Trees, Chertsey Lane, Staines-upon-Thames, TW18 3HR, UK

Tender No Attachments I1-I7 and I9 Technical Proposal

IFE Level 4 Certificate in Fire Science and Fire Safety (HL)

Supply and installation of nine elevators for Sharafat Social Housing Project in Beit Safafa - Jerusalem Bill of Quantities

REQUEST FOR QUOTATION (RFQ) (Goods)

Qualification Document. Name Phone Logo

The due date for submission of proposals has been rescheduled to Thursday, August 3, 2017 by the close of business (4:30 P.M.).

MODBRAKE FP6 Project: PLT EC Contract n : TST5-CT WP 1 - Management

RAIL SAFETY COMPLIANCE CODE. Data loggers

Rail Vehicle Maintenance

REQUEST FOR QUOTATION (RFQ) RFQ UKR/2018/23

Audit questions for DB Audit Tool Version 4.00

QUESTION / CLARIFICATION

Condition Monitoring Solutions

Supplier self-assessment

Towards an integrated European Railway Area

ENVIRONMENTAL PRODUCT DECLARATION. Prima II

1 Introduction. 2 Abbreviations and Definitions

Analysis of Reliability and Availability Indicators in Railway Vehicle Ordering Specifications of the Operating Agencies of Various Countries

ADDENDUM 2 - JULY 14, 2015

MTM REQUIREMENTS SPARES FOR NEW ASSETS

Background Information

ONE AND TWO FAMILY DWELLING PERMIT APPLICATION REQUIREMENTS

Defective On-Train Equipment. Defective On-Train Equipment. Railway Group Standard. GO/RT3437 Issue. Eight Date December 2015

ADDENDUM NO. 1 REQUEST FOR PROPOSAL REHABILITATION OF 1999 NEW FLYER BUS. September 5, 2018

Separate NS for the border crossing zone?

Technical Specification No. M for the supply and installation of. Rail Vehicle. Washing System

Infrastructure Based Train Detection Interface Requirements

Network Safeworking Rules and Procedures

PRELIMINARY QUOTATION No for the supply of. STACKER FOR SHEET max L3000 x W2100 mm

Missouri Army National Guard (RTI) MOARNG Project No. T Rev. 0 Ft. Leonard Wood, Missouri 15 April 2013 Bid Final Submittal

Supplier Self-Assessment

Latest Train Control and Management System Technologies for Improving Safety and Maintainability

Megatrends Demand Innovations Transportation and Energy Solutions for the Future. Engineering the Future since MAN SE

SHARE OUR PASSION FOR RAILWAY SOLUTIONS. «A passion for railway solutions»

A/E Design Deliverable Checklist

TECHNICAL SPECIFICATION

TECHNICAL SPECIFICATION

Contact Details: Phone Fax . Work Description: New Building Extensions Refurbishment Change of Use. Yes No Method:

Railway Industry Supplier Approval Scheme - BRIEFING NOTE

Committed to inspire your future

DIRECTIVES. (Text with EEA relevance)

UNITED REPUBLIC OF TANZANIA

Technical Specification No. M for the supply and installation of. Rail Vehicle. Washing System

Invitation to Bid. RLS Construction Group requests your firm to submit a quotation on the following project:

Benefits of harmonized regulations for placing in service of railway equipment - European experiences. Peter Mihm Head of Technical Cooperation

Stack Parking Surface Mounted Stackers

INTERNATIONAL BUSINESS CENTRE. General Specifications for Common and Private Offices areas

COMMERCIAL BUILDING PERMIT APPLICATION

Subcontractor Qualification Form

City of Lorena 107-A S. Frontage Road Lorena, Texas Phone: (254) Fax: (254)

Vehicle Registration, Marking and Numbering

Impact Assessment for Changes to Railway Group Standards

All-Weather Pneumatic Solutions for Rail

PE/PH. Product Data Parking Pallet. longitudinally shifting. Parking Pallet PE/PH

International BtoB Meetings for the Railway Industry April, Valenciennes Congress Center - France

FACILITY COMPONENTS - MIDDLE SCHOOL

The Applications and Reference Design of Railway Rolling Stock in Transportation Systems 1

Maintenance Plan Template Outsource

Automatic Equipment Identification (AEI) WOS 01.H

INTEROPERABILITY UNIT COMPLEMENTARY STUDY INTERCHANGEABLE SPARE PARTS

REPLACEMENT FLOATING BRIDGE Statement of Requirements Rev A BCP/J/10384/00

Rolling stock workshops Consulting and planning for new-build and renewal projects

FIRST CLASS ENGINEERING. Competence, dynamism and commitment to integrated engineering solutions

GM Remarks 3/27/2017

How Pneumatics Support Extreme Engineering. by Dave Walker

Values That Matter PLAN CERTIFICATION WORKSHEET

Transcription:

Page 1 of 9 Dear Customer, as a certification body for the certification of management systems we require some information about your company in order to provide you with an offer and to plan and prepare the certification and/or monitoring audits. Your support in ensuring a seamless certification procedure is highly appreciated. Please be kind to complete the questionnaire and include the required information / documents in the attachment. 1. General information (In case of groups / intended group certifications, please provide information for the complete group (registered office, total headcount, etc.).) Company: Address: Postcode, City: Land: Contact: Phone: Fax: Function: Mobile phone: Email: 2. Intended certification IRIS ISO 9001:2000 ISO/TS 16949:2002 VDA 6.1 VDA 6.2 VDA 6.4 RREG 70/156/EWG ISO 14001 OHSAS 18001 EN 9100 3. Eventual exclusions: Product development

Page 2 of 9 4. Do you strive for a collective certification (group scheme)? No Yes Please list the individual production/service sites below and complete the attachment 1 once per location. Subsequently, continue with page 2. 5. Do you operate remote support locations (Example: distribution and development offices, external shipping warehouses etc.)? Please enter all support areas at remote locations (incl. headcount and/or percental allocation to the sites) and continue with page 2. Name of the organisational entity No. of relevant employees Land Function (e.g. customer support, calibration, laboratory, contract review, development, storage/shipping)

Page 3 of 9 6. Site headcount information (and/or the total group headcount in case of group audits): Number of employees (incl. temporary workers) Thereof temporary workers: Number of employees in the rail vehicle area (incl. temporary workers) Thereof temporary workers: Research and development Production / services Certification scope: Please indicate the products and services in the languages desired for the certifications, but at least in English; e.g. Manufacturing of.

Page 4 of 9 7. Products/ product groups/ services (Please indicate the IRIS scope, see attachment 1.) 8. Management system certifications already received: Certificate No. Standard / regulation Certifying body Date of certification audit (dd.mm.yyyy) Valid until (dd.mm.yyyy) We hereby confirm the completeness and correctness of the information provided above and in any eventual attachments: Place/date Name, function Signature*) *) In case of a submission via email, the sender address is equally acceptable.

Page 5 of 9 List of individual locations (Note: Please reproduce this attachment as required.) Location No. / name 1. General information Location name: Address: Postcode / City: Land: Contact: Phone: Fax: Function: Mobile: Email: 2. Headcount information for the location Number of employees (incl. temporary workers) Thereof temporary workers: Number of employees in the rail vehicle area (incl. temporary workers) Thereof temporary workers: Research and development Production / services 3. Certification scope for the location: Please indicate the products and services in the languages desired for the certifications, but at least in English; e.g. Manufacturing of.

Page 6 of 9 4. Do you operate remote support locations (Example: distribution and development offices, external shipping warehouses etc.)? Please enter all support areas at remote locations (incl. headcount and/or percental allocation to the sites). Land Name of the organisational entity No. of relevant employees Function (e.g. customer support, calibration, laboratory, contract review, development, storage/shipping) 5. Products/ product groups/ services (Please indicate the IRIS scope, see attachment 1.) 6. Management system certifications already received: Certificate No. Standard / regulation Certifying body Date of certification audit (dd.mm.yyyy) Valid until (dd.mm.yyyy) Place/date Name, function Signature*) *) In case of a submission via email, the sender address is equally acceptable.

Attachment 1: Scope of Accreditation Key components of Rolling Stock Equipment: Page 7 of 9 The table contains level 1 and 2 of the rolling stock structure as specified in the current version (PBS MODTRAIN V4 [1].9-18MAY05) of the technical specifications for interoperability (TSI). The accreditation is based on the first level. No Description 1 st level No Description 2 nd level 1 Car body 1.1 Car body shell 1.2 Under frame 1.3 Floor 1.4 Crash structure 1.5 Windows 1.6 Insulation 1.7 Painting and Sound damping 1.8 Fixing / connecting elements 2 Car body fittings 2.1 Front/End car body fittings 2.2 Roof car body fittings 2.3 Under frame car body fittings 2.4 Lateral car body fittings 3 Guidance (Bogies and running gear) 3.1 Motor bogie 3.2 Trailer bogie 4 Power System 4.1 Power supply 4.2 Power generation 4.3 Power conversion 4.4 Power dissipation 4.5 Power storage 5 Propulsion 5.1 Traction Control Unit (TCU) 5.2 Gear box 5.3 Traction motor 5.4 Mechanical transmission 5.5 Power converter 6 Auxiliary systems 6.1 Air supply system 6.2 Hydraulic system 6.3 Auxiliary electric system 6.4 Main Auxiliary Converter equipment 6.5 Low Voltage Power Supply / Battery Charger equipment 6.6 Special Aux. converter equipment 6.7 Battery equipment 6.8 external supply system 6.9 Cooling unit for power and drive systems 6.10 Fire protection system 6.11 Sanding equipment 6.12 Horn 6.13 Flange lubrication device

Page 8 of 9 No Description 1st level No Description 2nd level 7 Braking System 7.1 brake control system 7.2 friction brake equipment 7.3 WSP equipment 7.4 magnetic track brake equipment 7.5 emergency brake equipment 7.6 eddy current brake equipment 8 Interiors 8.1 Interior architecture 8.2 Interior equipment 8.3 Toilet system 8.4 Engine room 8.5 Catering system 9 On board vehicle control 9.1 ETCS 9.2 TCMS 9.3 Heritage ATP unit 9.4 ATO unit 9.5 Fault data logger 9.6 Heritage juridical recorder unit 9.7 Voice recorder 9.8 System, capture unit 9.9 Video surveillance 9.10 Electronic rear mirror 10 Passenger Information System 10.1 Public Address System 10.2 Safety Alarm Systems 10.3 Central PIS unit 10.4 MMI for train/travel information 10.5 Seat reservation 10.6 Ticketing machine 10.7 Entertainment 11 Communication systems 11.1 Train to wayside communication system 11.2 Onboard communication system 12 Cabling and Cabinets 12.1 Cabling 12.2 Cabinets 13 Door System 13.1 External doors 13.2 Internal doors 14 HVAC 14.1 HVAC control unit 14.2 air conditioning system 14.3 heating system 14.4 air ventilation and distribution System 14.5 air intake 14.6 exhaust air unit 14.7 pressure protection system

Page 9 of 9 No Description 1st level No Description 2nd level 15 Tilt System 15.1 Tilt Control Unit 15.2 Actuating System 15.3 Pantograph tilt system 15.4 Tilt monitoring and detection 16 Lighting 16.1 Emergency lighting system 16.2 Exterior lighting system 16.3 Interior lighting system 17 Coupler 17.1 Front coupler 17.2 Intermediate coupler 17.1 Emergency coupler (Towing coupler) 18 Rolling Stock 318.1 Light Rail Vehicles 111 18.2 Regional and Commuter Trains 18.3 Metros 18.4 Coaches and Passenger Cars 18.5 High Speed Trains 18.6 Locomotives 18.7 Freight Wagons 19 Signalling 19.1 Other components for control command and signalling 20 Single Railway Components 20.1 e.g. bearing, sealing, etc.