ENVIRONMENTAL AUDIT REPORT [STATEMENT] CONSTRUCTION WORK [ HALF YEARLY ] PERIOD OCTOBER 2012 TO MARCH 2013 FOUNDRY PARK

Similar documents
MECON LIMITED RANCHI , INDIA

MECON LIMITED RANCHI , INDIA

Mahabal Enviro Engineers Pvt. Ltd. Pollution monitoring, Engineers & Contractors in Environmental Management

KKB Micro Testing Labs Pvt. Ltd., , 2 nd Floor, Tarun Plaza, NFC Main Road, Krishna Nagar Colony, Moula Ali, Hyderabad, Telangana

Annex 7.1 National Ambient Air Quality Standards for Nepal, 2003

Point wise compliance for the conditions stipulated in Environmental Clearance of (Phase- I & II)

GLOBAL TECH. ENVIRO EXPERTS PVT. LTD. (FORMERLY GLOBAL EXPERTS) An ISO-9001:2008 Certified Company

RECOMMENDED SCOPE OF ACCREDITATION (For Testing Laboratories) * Test Method / Standard against which tests are performed

Indian Standard DRINKING WATER SPECIFICATION (Second Revision)

Nexus Test Labs Pvt. Ltd., No. 29, 2 nd Floor, 3 rd Cross, Singaiahnapalya, Mahadevapura, Bangalore, Karnataka

EPA Primary. (mg/l as CaCO3) (mg/l as CaCO3)

Prakruti Environmental Engineers (Environmental Laboratory), 1, Utkanth Society, B/H Alkapuri Club, Alkapuri, Vadodara, Gujarat

ANNEXURE- II Proposed TOR

Tolerance and Classification

Discipline Chemical Testing Issue Date Certificate Number T-3790 Valid Until Last Amended on - Page 1 of 5

Superintendence Company of India Private Limited, Plot Y-23, Block-EP, Sector-V, Salt Lake City, Kolkata, West Bengal

Mahabal Enviro Engineers Pvt. Ltd. At Booty, Near PHED Colony, Behind Pump House, PO - RMCC, District - Ranchi

SCHEDULE I LIST I GENERAL STANDARDS AND CRITERIA FOR THE DISCHARGE OF INDUSTRIAL EFFLUENTS INTO INLAND SURFACE WATERS

SIX MONTHLY REPORT OF EMP CLEARANCE J11015/536/2008- IA-II(M) FOR THE PERIOD OCTOBER-2014 TO MARCH-2015 (1 ST June 2015)

ENVIPRO Laboratories, 2nd Floor, Sy. No. 63/4, Site No. 5, P&T Layout Road, Ashwath Nagar, Srigandhada Kaval, Sunkadakatte, Bangalore, Karnataka

Discipline Chemical Testing Issue Date Certificate Number T-3617 Valid Until Last Amended on

Discipline Chemical Testing Issue Date Certificate Number T-3553 Valid Until Last Amended on - Page 1 of 9

APPENDIX I. LAMPIRAN I - RKL DAN RPL KEGIATAN TERPADU PROYEK PENGEMBANGAN TANGGUH LNG i

Appendix I. Agreement on National Environmental Standards of Lao PDR, 2009

Winmet Technologies Private Limited, Plot No. E-65, Site-IV, UPSIDC, Greater Noida, Uttar Pradesh. Discipline Chemical Testing Issue Date

having examined Legislative Decree No.21 of 1996 with respect to the and Ministerial Order No.10 of 1999 with respect to the Environmental

CERTIFICATE OF ANALYSIS

Chapter 1 (BFC32403) and Standards

State Expert Appraisal Committee, Punjab Ministry of Environment and Forests, Government of India

ENVIRONMENTAL LEGISLATION AND REGULATION IN MALAYSIA

Water Quality Concerns at Mines for Environmental Impact Assessment

Environmental Clearance Maliparbat Bauxite Mines-Compliance Report Page 2

Nichrome Testing Laboratory and Research Private Limited, No nd Main, German Hospital Road, Narayanpur, Dharwad, Karnataka

QUESTIONNAIRE FOR GENERAL WTP REQUESTED DATA FOR THE WATER TREATMENT PLANT (WTP) - Application : groundwater (well pit); urban wastewater;


Durban Height Waterworks, Design capacity: 615 ML/d, Period: 01 July June 2014

Lake Huron Water Treatment Plant Mineral Report

Detroit Water and Sewerage Department Water Quality Division Laboratory Analysis of Water Samples Collected at Lake Huron Plant 6/9/2015

Lake Huron Water Treatment Plant Mineral Report

ENVIRONMENT MANAGEMENT PLAN

Detroit Water and Sewerage Department Water Quality Division Laboratory Analysis of Water Samples Collected at Lake Huron Plant 10/14/2014

ENVIRONMENTAL GUIDANCE NOTES: ENVIRONMENTAL STANDARDS AND LIMITS

Haryana Test House & Consultancy Services, 50-C, Sector-25, Part-II, HUDA, Panipat, Haryana. Discipline Chemical Testing Issue Date

Environment Laboratory, Central Mine Planning & Design Institute Limited, Regional Institute-IV, Kasturba Nagar, Jaripatka, Nagpur, Maharashtra

Panasonic India Pvt. Ltd.

Submitted by: M/s Panasonic India Ltd

Madhya Pradesh Waste Management Project Laboratory, Plot No. 104, Industrial Area No. II, Pithampur, Dhar, Madhya Pradesh

Environment Laboratory, Central Mine Planning and Design Institute Limited, Gondwana Place, Kanke Road, Ranchi, Jharkhand

Appendix F Project Environmental Standards

IMPACT OF CEMENT INDUSTRY ON THE GROUND WATER QUALITY A CASE STUDY

SWANA 2017 Leachate Basics and Quality Changes with Organics Removal. Steve Johnson M.Eng., P.Eng.

Concentration of Metals (Cd, Hg, Ag; mean +SD) in sediment samples collected from Pit Specific Sediment Chemistry Monitoring for CMP 1 in May 2014.

Deep Testing Laboratories, Plot No.- 338, Sector-58, Ballabhgarh, Faridabad, Haryana. Discipline Chemical Testing Issue Date

Hagler Bailly Pakistan Associated with PA Consulting Group

CERTIFICATE OF ANALYSIS

Village of McBride Annual Water System Report

2. GUIDELINES FOR THE EVALUATION OF DRINKING-WATER QUALITY FOR HUMAN CONSUMPTION WITH REGARD TO CHEMICAL, PHYSICAL AND BACTERIOLOGICAL QUALITY

Schedule. Type of Test/ Properties Measured/ Range of Measurement. Biochemical Oxygen Demand (BOD) Calcium as Ca. Chromium, Hexavalent

Subject: Half Yearly Report for the period of 1 st October, 2013 to 31 st March 2014 for Refinery Expansion Project

Schedule of Accreditation

Abu Dhabi Trade Effluent Standards & Regulations Summary

REVISED NATIONAL ENVIRONMENTAL QUALITY STANDARDS (NEQS)

The proposed Baddegedara reservoir project could be justified due to following reasons

KASIA IRON AND DOLOMITE MINE SIX MONTHS REPORT (OCTOBER, 2011 MARCH, 2012)

Warm Mineral Springs Sampling by Sarasota County

TITLE: SABS PROFICIENCY TESTING SCHEME, RSA

DRAFT TERMS OF REFERENCE FOR EIA STUDY

Drinking Water Supply and

M/s. NILAWAR LABORATORIES, NAGPUR

Appendix B: Proposed trigger levels for groundwater quality and Response to Breach of Trigger Levels

Appendix C: Water Quality Data

Activities of Water Environment Management by Yangon Regional ECD. Daw Khin Thida Tin Director Environmental Conservation Department Yangon Region

Annex 2: National Environmental Quality Standards (Extract from the Gazette of Pakistan applicable to STZ CETP)

Essar Oil and Gas Exploration and Production Limited

CE 370. Wastewater Characteristics. Quality. Wastewater Quality. The degree of treatment depends on: Impurities come from:

Gomardih Dolomite Quarry TATA STEEL LIMITED

Schedule of Accreditation

SPECIFICATION NO.1197S Addendum No.4 Attachment D. Appendix L- Ground Water Quality Data and Revised Construction Groundwater Discharge Plan

ENVIRONMENTAL CLEARANCE (J-11015/121/ IA.II(M) ) October 14 to March 15. INTEGRATED ASHOK WASHERY cum FBC

Period: to

Investigation on Physico-Chemical Analysis of Ground Water around Polyfibre Industry Harihara, India

Accreditation No: LAB 067. SGS Chemical, Environmental & Microbiological Lab Lahore, Pakistan

Atmy Analytical Labs Pvt. Ltd., I-38, DLF Industrial Area, Phase-1, Faridabad, Haryana. Discipline Chemical Testing Issue Date

BMM Ispat Ltd., Danapura Village, Hospet Taluk, Bellary District, PIN , Karnataka. ENVIRONMENT MONITORING REPORT. Stage I units. For.

French Creek Well # 2 Water Analysis Behind 1221 Ormonde Road

Table B1: Analytical Results for Nutrients in Surface Water

Date Application Signed: Principal Executive Officer / Owner Signature FOR OFFICIAL USE ONLY

CERTIFICATE OF ANALYSIS REVISED REPORT

Appendix U. Mapping of Water Quality Concentration Contours across the Province

Rajasthan State Pollution Control Board

Raw Potable Well Water Analysis: Grid Water Analysis: 2009 & 2016

THE WATER POLLUTION CONTROL REGULATIONS, 1999

CANADA BRITISH COLUMBIA WATER QUALITY MONITORING AGREEMENT

Water and Waste Water Management in Yangon, Myanmar

RG (East)-CBM-2001/1 (Phase-III) Half Yearly Environment Clearance Compliance Report - October 17- March 18

(Pollution Control Consultant & Engineers)

ENVIRONMENT MANAGEMENT PLAN

Water Quality Report for ALDERNEY NORTH Monitoring Water Quality. Water Quality Parameters and their Standards

Compliance of The Additional Information sought By EAC Committee for North Urimari OCP (3 MTPA in Project Area of Ha)

DETERMINING APPROPRIATE DRINKING WATER CHEMICAL AND PHYSICAL MONITORING GUIDELINES

Transcription:

ENVIRONMENTAL AUDIT REPORT [STATEMENT] ON CONSTRUCTION WORK [ HALF YEARLY ] PERIOD OCTOBER 2012 TO MARCH 2013 FOUNDRY PARK HOULI BAGAN, RANIHATI AMTA ROAD, HOWRAH Prepared by: FOUNDRY CLUSTER DEVELOPMENT ASSOCIATION, 4, INDIA EXCHANGE PLACE (7 TH FLOOR), KOLKATA 700 001

JUNE 2013 CONTENTS 1.0 INTRODUCTION 1.1 FOUNDRY CLUSTER DEVELOPMENT ASSOCIATION (FCDA) A PROFILE 1.2 OVERVIEW OF PROJECT 1.3 PRESENT STATUS OF THE PROJECT 1.4 PRODUCTION CAPACITY 1.5 ENVIRONMENT MANAGEMENT STRATEGY 1.6 STATUTORY LEGISLATION 2.0 ENVIRONMENTAL MONITORING 2.0.1 RESULT OF AIR QUALITY MONITORING 2.0.2 RESULT OF DRINKING WATER QUALITY MONITORING 2.0.3 RESULT OF SURFACE WATER QUALITY MONITORING 2.0.4 RESULT OF NOISE QUALITY MONITORING STATEMENTS STATEMENT 1: REPORT OF AMBIENT AIR QUALITY STATEMENT 2: REPORT OF DRINKING WATER QUALITY STATEMENT 3: REPORT OF SURFACE WATER QUALITY STATEMENT 4: REPORT OF NOISE LEVEL MONITORING Filled-Up Form V FOUNDRY CLUSTER DEVELOPMENT ASSOCIATION Page i of i

1.0 INTRODUCTION The Environmental Statement (comprising Form V) has been prepared by M/s. FOUNDRY CLUSTER DEVELOPMENT ASSOCIATION (FCDA), 4, India Exchange Place, 7 th Floor, Kolkata 700001 in association with M/s. Scientific Research Laboratory, an Environmental Analytical Laboratory, Recognised by the Ministry of Environment & Forest (MoEF), Govt. of India. The environmental impact data on the basis of the observed-data generated and checking at the site by the competent staff of Scientific Research Laboratory. 1.1 FOUNDRY CLUSTER DEVELOPMENT ASSOCIATION (FCDA) A PROFILE Foundry industry in India, started around 1940 in Howrah and then later on spread to other states such as, Punjab, Gujarat, Maharashtra and Tamilnadu. At present around 500 units exist in West Bengal with an installed capacity of 1 Million tonnes. 95% of these units are concentrated in the district of Howrah forming an informal cluster. Realizing the need for modernization, expansion and relocation of foundries at Howrah, the Government of West Bengal had suggested West Bengal Industrial Development Corporation (WBIDC) and Indian Foundry Association to set up a Foundry Park near the vicinity of the existing Howrah foundry cluster. Once it was principally accepted by all concerned, Govt. of West Bengal formulated and forwarded the Project under Industrial Infrastructure Upgradation Scheme (IIUS), to the Department of Industrial Policy and Promotion (DIPP), Ministry of Commerce & Industry, GOI. Foundry Cluster Development Association (FCDA) is formed by the industry stakeholders, as required under the IIUS scheme of Government of India, to implement the Foundry Park Project. The Company was incorporated on 29.04.2005, having its registered office at Kolkata, India. The Executive Council currently consists of Chairman-WBIDC and industry stakeholders as Senior Vice Chairman, Vice Chairmen & members. The Executive Council also includes two nominees of Government of India. Page 1 of 9

1.2 OVERVIEW OF PROJECT In view of reduction of environmental pollution a modern foundry park with a common effluent management system is being developed by the FCDA, where some foundries will be relocated from their existing location. The Foundry Park will be developed on 924 acres of land on Ranihati-Amta Road, 5 kms off the National Highway 6, in Howrah (West Bengal). It is well connected also with NH-2, South-Eastern Railway and Kolkata & Haldia dock system. Connectivity with Kolkata is also easy and smooth through Kona Express way and Vidyasagar Setu (2 nd Howrah Bridge). The park will have all the essential infrastructure and modern facilities including: Adequate road network, Power and water distribution systems and drainage system. Modern Information, marketing and management upgradation center Common facilities including Tool room, testing laboratory and material handling equipment. Industrial Training Institute, Guesthouse, canteen and allied facilities. Utilities including Fire Station, bank counters, Post office etc. Landscaping, buffer zone of dense vegetation and water bodies. Within the park, one of its phases is also being planned as a Special Economic Zone. It is expected that the Foundry park will house around 150 units with an expected annual output of 1/2 million tonnes in its first year of operation, which is expected to reach 1 million tonnes in the next five years. The new park will accommodate the modernization, expansion and relocation program of foundries of Howrah in West Bengal and even from other parts of India through cluster approach, enabling them to capitalize on the increased demand in both the domestic and international market. The annual growth rate of foundry industry after relocation to the park is expected to be much higher than that it would realize in the existing set-up. Infrastructure and common facilities of international standards will enhance quality and productivity with reduced production costs and would thus enhance the competitiveness of the industry. The park will have provision and infrastructure for technology transfer, Research & Development and marketing set-up. Page 2 of 9

1.3 PRESENT STATUS OF THE PROJECT According to the availability of Land construction work of a part of The Foundry Park project has been initiated in February 2009. After the acquisition of 328.66 acres land, presently the FCDA started the construction to accommodate 65 numbers of foundry units with the permission of West Bengal Pollution Control Board. The FCDA aimed to complete the construction work within March 2013 to handover the individual units. FCDA already developed a greenbelt in the project area by plantation of over 20,000 nos. of various plants for environmental measures. 1.4 PRODUCTION CAPACITY As per Consent to Establish by West Bengal Pollution Control Board (Memo No.: 602 2N 162/2006 (E), Dated: 22.12.2008 total production capacity are 1313 ton/day by installing 65 nos. of foundry units (32 nos. of Induction furnace and 33 nos. of cupola furnace). Whereas, the total production capacity of the project will be 5 lakh ton to 10 lakh ton per year by installing 150 nos. of foundry units and 40 nos. of allied units (core making, pattern making, fettling, painting, fabrication and machining shops, raw material banks weigh bridge, petrol pump etc.) Environmental Impact Assessment clearances from Ministry of Environment & Forest, New Delhi, vide File No.: 102 170/07/EPE, Dt.-14.11.2008. 1.5 ENVIRONMENT MANAGEMENT STRATEGY To mitigate the impact of Industrial operations on the surrounding environment and to comply with the existing statutory legislation, the followings recommendations are put forward by FCDA: All The applicable environmental laws and regulations and to follow the relevant environmental guidelines and code of practices laid down by the concerned statutory services will be complied with. The necessary power to suitable members of staff will be delegated to oversee the environmental matters of the Company. Page 3 of 9

The staff members assigned for environmental matters will be trained to such an extent that they could perform their environmental duties in a useful manner. To be keep abreast with the new laws and regulations as well as latest technologies on pollution prevention and control relevant to the industry as are being developed in the country and abroad. Research and Development to modify the existing processing technique and pollution control facilities to accommodate the special features of the latest technologies in the respective field with an aim to reduce / control environmental pollution. The manufacturing to be undertaken in such manner that it can reveal clearly the nature and extent of environmental impact caused by it to the environment. The effective procedures compatible to the available technology to prevent environmental degradation will be observed. Appropriate procedures to be observed for immediate actions in case of such incident, this, may lead to environmental pollution, thereby minimizing the environmental degradation. Store and handle hazardous chemicals / substances will be done in such manner that in event of any spillage or leakage the environmental impact will be minimal. Consumption of energy to be optimized. Natural resources will be conserved. Maximum utilization / recycling of wastewater and to recover useable materials from the wastes in techno-economic manner. Up-to-date all the relevant information relating to environment will be generated. Maintenance of ready record of all the data so that retrieval of all the relevant data will be possible at any point of time for necessary action. Housekeeping to be maintained as best possible in the industry. Internal audits to be conducted to demonstrate compliance with policy and with statutory regulations. Adequate arrangements are required for suppressing the noise generated from the Compressor unit Page 4 of 9

1.6 STATUTORY LEGISLATION Submission of Environmental Audit Report Every person carrying on an industry, operation or process requiring consent under Section 25 of the Water (Prevention and Control of Pollution) Act, 1974 (6 of 1974) or under section 21 of the Air (Prevention and Control of Pollution) Act, 1981 (14 of 1981) or both or authorization under the Hazardous Wastes (Management and Handling) Rules, 1989 issued under the Environment (Protection) Act, 1986 (29 of 1986) shall submit an environmental audit report for the financial year ending the 31 st March in Form V to the concerned State Pollution Control Board on or before the 15th day of May every year, beginning 1993.] Inserted by Rule 2 of the Environment (Protection) Second Amendment & Rules, 1992 wide G.S.R. 329(E), dated 12.03.1992. 2.0 RESULT OF ENVIRONMENTAL MONITORING M/s FCDA entrusted the job of monitoring work all the environmental impacts i.e. Ambient Air Quality, Water Quality (Drinking & Surface) & Noise Level Monitoring etc. (Half yearly basis) as per statutory norms to M/s Scientific Research Laboratory, 90 Lake East 4 th Road, Santoshpur, Jadavpur, Kolkata 700 075, Recognised by the Ministry of Environment & Forest (MoEF), Govt. of India. 2.0.1 RESULT OF AIR QUALITY MONITORING Monitoring of air emissions required as per the consent to operate directed by the West Bengal Pollution Control Board. But production is not yet started; so only Ambient Air Quality monitoring was done and the report is given in statement No. 1, which was found that the results of all the parameters were within the permissible limit. Compilation copies of Ambient Air Quality report are presented in Annexure: I 1/3, Annexure: I 2/3 & Annexure: I 3/3. Page 5 of 9

2.0.2 RESULT OF DRINKING WATER QUALITY MONITORING The source of Drinking water is deep bore well and supplied through the Aquaguard. Drinking water analysis report is given statement no. 2. Drinking water analysis results are confirming the norms of IS 10500 (1991). Compilation copies of drinking water report are presented in Annexure: II 1/3, Annexure: II 2/3 & Annexure: II 3/3. 2.0.3 RESULT OF SURFACE WATER QUALITY MONITORING Surface water Quality monitoring report is given statement No. 3, which reveals that the results of all the parameters were within the permissible limit. Compilation copies of Surface water report are presented in Annexure: III 1/3, Annexure: III 2/3 & Annexure: III 3/3. 2.0.4 RESULT OF NOISE QUALITY MONITORING The chance of Noise Pollution will be started in foundry units during the production work, but presently production has not yet started; only the construction work is in progress. The construction does not require deep-foundation for multistoried building, so no scope of creating any loud hammering-noise. The ambient noise level monitoring report is given statement no. 4, which reveals that the results were within the permissible limit. Compilation copies of noise level monitoring report are presented in Annexure: IV 1/1. Page 6 of 9

STATEMENT 1 REPORT OF AMBIENT AIR QUALITY SL.NO PARAMETERS UNIT RESULTS Sampling Location -- Open Space Near Projects Site Office. Open Space Near WW-I Open Space Near WW - II Date of Monitoring -- 21-22/12/2012 21-22/12/2012 22-23/12/2012 01. PM 10 µg/m 3 91.4 88.4 84.6 02. PM 2.5 µg/m 3 53.5 47.5 50.4 03. Sulphur dioxide ( SO 2 ) µg/m 3 15.5 14.7 15.1 04. Nitrogen Oxides ( NO 2 ) µg/m 3 39.0 37.7 39.6 05. Ozone ( O 3 ) µg/m 3 48.4 50.2 46.8 06. Ammonia ( NH 3 ) µg/m 3 24.6 26.8 26.4 07. Lead ( Pb) µg/m 3 0.25 0.14 0.16 08. Benzene ( C 6 H 6 ) µg/m 3 0.24 0.26 0.25 09. Arsenic ( As) ng/m 3 1.84 1.78 1.94 10. Benzo(a)Pyrene (BaP) ng/m 3 0.02 0.02 0.02 11. Nickel ( Ni ) ng/m 3 7.32 4.98 5.82 12. Carbon monoxide (CO) mg/m 3 0.584 0.542 0.594 NOTE: PM 10, PM 2.5 & Carbon monoxide (CO) sampling was carried out for 8hours. Page 7 of 9

Date of Sampling: 22.12.2012 Characteristics Sl. No. Location STATEMENT 2 REPORT OF DRINKING WATER QUALITY CMAT Office Pantry Room Results NACTTI Pantry Room Tubewell Water Near Adm. Building 1. Colour, Hazen Units, Max <5 <5 <5 2. Odour Unobjectionable Unobjectionable Unobjectionable 3. Taste Agreeable Agreeable Agreeable 4. Turbidity, NTU, Max <1.00 <1.00 <1.00 5. ph Value 7.49 7.45 7.34 6. Total Hardness (as CaCO3), mg/l, Max 200.00 261.40 247.50 7. Iron (as Fe), mg/l, Max <0.10 0.56 2.62 8. Chloride (as Cl), mg/l, Max 46.60 243.20 159.60 9. Fluoride (as F), mg/l, Max 0.37 0.68 0.62 10. Dissolved Solids mg/l, Max 308.00 602.00 644.00 11. Calcium (as Ca), mg/l, Max 57.10 65.10 58.70 12. Magnesium (as Mg), mg/l, Max 14.00 20.20 24.50 13. Copper (as Cu), mg/l, Max <0.025 <0.025 <0.025 14. Manganese (as Mn), mg/l, Max <0.05 <0.05 <0.09 15. Sulphate (as SO4), mg/l, Max <5.00 21.30 7.80 16. Nitrate (NO3), mg/l, Max <0.50 <0.50 <0.50 17. Mercury (as Hg), mg/l, Max <0.001 <0.001 <0.001 18. Cadmium (as Cd), mg/l, Max <0.01 <0.01 <0.01 19. Arsenic (as As), mg/l, Max <0.01 <0.01 <0.01 20. Lead (as Pb), mg/l, Max <0.05 <0.05 <0.05 21. Zinc (as Zn), mg/l, Max 0.067 0.081 0.136 22. Chromium (as Cr 6+ ), mg/l, Max <0.01 <0.01 <0.01 23. Mineral Oil, mg/l, Max <1.00 <1.00 <1.00 24. Total Alkalinity (CaC03), mg/l, Max 388.00 450.10 422.90 25. Total Coliform Count, MPN/100 ml <1.1 1.1 <1.1 26. Fecal Coliform, MPN/100 ml Absent <1.1 2.2 Page 8 of 9

Date of Sampling: 22.12.2012 Sl. No. STATEMENT 3 REPORT OF SURFACE WATER QUALITY Parameter Unit Results Location -- Calvert No-1 (Cannel Water), Main Nalah Near Calvert (Cannel Water), Small Nalah Water Body Pond Water 1. ph -- 7.42 7.31 7.23 2. Total Suspended Solids mg/l 15.10 103.40 17.20 3. Dissolved Oxygen (as O2) mg/l 8.50 8.60 8.80 4. Biochemical Oxygen Demand, 3 Days at 27ºC mg/l 5.10 12.00 3.00 5. Chemical Oxygen Demand mg/l 17.00 37.00 23.00 6. Oil & Grease(Hexane Extract) mg/l <5.00 <5.00 <5.00 7. Iron (as Fe) mg/l 1.13 6.18 1.10 8. Ammonia- Nitrogen (as NH3N) mg/l 0.08 0.25 0.18 9. Phenolic Compounds (as C6 H5 OH) mg/l <0.002 <0.002 <0.002 STATEMENT 4 REPORT OF NOISE LEVEL MONITORING PARAMETERS UNIT RESULTS Location -- Near Main Gate CETP- R-O-3 WW - II Project Site Office Road Junction of R-01 & R-17 Road Junction of R-01 & R-03 Date of -- 21.12.2012 21.12.2012 22.12.2012 22.12.2012 22.12.2012 22.12.2012 Monitoring L max. db(a) 47.2 42.3 43.2 44.4 41.5 42.0 L min. db(a) 440.4 38.0 38.4 39.3 37.2 36.2 Equivalent Noise Intensity Level (Leq) db(a) 44.26 40.62 41.21 41.98 39.56 40.0 Page 9 of 9